PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
Mekanik
2
2
Mekanik
Mekanik
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Keterangan
Pekerjaan Yang Akan Dilaksanakan (Work To Do)
Target (%)
Keterangan
Rencana (%)
Realisasi (%)
Disassembly Cross Over Pipe
20%
20%
Disassembly Cross Over Pipe
100%
Rio
Disassembly Outer Casing LP Turbine
10%
10%
Disassembly Outer Casing LP Turbine
100%
Rio
Melepas Manhole Outer Casing LP
100%
100%
Disassembly Lever CV 1-4
50%
50%
Disassembly Lever CV 1-4
100%
Januar
Disassembly Coupling MSV 1-2
50%
50%
Disassembly Coupling MSV 1-2
100%
Januar
Turbin Utama
Koor. Pekerjaan
Turbin Utama
Valve Turbin
Valve Turbin
BFPT
BFPT
Lepas Hydraulic LCV #20 A-B
100%
100%
Bongkar Isolasi #20B
100%
Venda
Lepas Motor Turning #20 A-B
100%
100%
Lepas Baut Casing BFPT #20 A
100%
Venda
Bongkar Isolasi #20 A
100%
100%
Lepas Baut Casing BFPT #20 B
50%
Venda
Lepas Baut Cover Labyrinth #20 A-B
100%
100%
Lepas Thrust Bearing & Disc #20 B
100%
100%
Rendal
I Gede Tias Eka B
Koordinator
Djupri Isnandar
PT PJB SERVICES
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
Mekanik
2
Mekanik
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Realisasi (%)
Buka Manhole
100%
100%
Pemeriksaan Baut Manhole
100%
100%
50%
50%
Steam Drum
Mekanik
4
Mekanik
Target (%)
Keterangan Koor. Pekerjaan
Pemeriksaan Groove
50%
Nasir
10%
Fikri
10%
Fikri
Super Heater
Aux. Steam Piping Pemeriksaan/Pembersihan Valve
Pekerjaan Yang Akan Dilaksanakan (Work To Do) Steam Drum
Super Heater Pemeriksaan/Pembersihan Valve
3
Keterangan Rencana (%)
Penggantian Gland Packing Valve Aux. Steam Piping
50%
50%
Main Burner
Penggantian Gland Packing Valve Main Burner
Pengecekan Tiny Oil Gun
100%
100%
Penggantian Gland Packing Valve Oil Gun
50%
Yusuf
Pengecekan & Pembersihan Filter
100%
100%
Penggantian Flexible Hose Oil Gun
50%
Yusuf
Penggantian Gland Packing Valve Oil Gun
50%
50%
Pembersihan/Pemeriksaan Valve Sistem
60%
Yusuf
Pembersihan/Grease Valve Oil Gun
100%
100%
Penggantian Flexible Hose Oil Gun
40%
40%
Pemeriksaan & Cleaning Fan
70%
70%
Rendal
I Gede Tias Eka B
Koordinator
Bambang Soetrisno
PT PJB SERVICES
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
Mekanik
2
Mekanik
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Mekanik
Pekerjaan Yang Akan Dilaksanakan (Work To Do)
Target (%)
Keterangan
Realisasi (%)
Lepas Lock Blade/Impeller
100%
100%
Cleaning Casing, Cover Coupling
100%
Bambang
Cleaning Casing, Cover Coupling
50%
50%
Melepas Blade/Impeller
100%
Bambang
Melepas Blade/Impeller
50%
50%
100%
100%
100%
Irwandi
Drain & Pembersihan Filter Lube Oil A
40%
40%
Pemeriksaan & Perbaikan Seal Plate
50%
Danan
Pemeriksaan & Perbaikan Seal Plate A-B
30%
30%
Drain & Pembersihan Filter Lube Oil
60%
Danan
ID Fan #20 A
Koor. Pekerjaan
ID Fan #20 A
Coal Feeder Drain Oil Coal Feeder A-E
3
Keterangan Rencana (%)
Coal Feeder
APH
Couple Motor Valve Coal Feeder APH
Rendal
I Gede Tias Eka B
Koordinator
Prasetyo Anandito
PT PJB SERVICES
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
Pihak 3
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
3
4
Pihak 3
Pihak 3
Pihak 3
Realisasi (%)
50%
50%
Cleaning All Sump Pit Pit Condensor
2
Keterangan Rencana (%)
Pekerjaan Yang Akan Dilaksanakan (Work To Do)
Target (%)
Keterangan Koor. Pekerjaan
Cleaning All Sump Pit
Cleaning Area Coal System
Pit Condensor
75%
CV Alfa Rizky
100%
CV Alfa Rizky
Cleaning Area Coal System
Drain Coal Bunker #20 B
50%
50%
Cleaning Coal Feeder #20 C
100%
100%
Scaffolding
Drain Coal Bunker #20 B Scaffolding
Pemasangan di Furnace
50%
50%
Pemasangan di Furnace
50%
PT SDM (MKP)
Pemasangan di Economizer
5%
5%
Pemasangan di Turbin-Generator
50%
PT SDM (MKP)
Pemasangan di Burner
25%
25%
Pemasangan di Turbin-Generator
50%
50% 100%
PT Roda Emas Jaya
Heat Insulation Bongkar Isolasi Turbin
Heat Insulation 50%
50%
Bongkar Isolasi Turbin
Rendal PT PJB SERVICES Koordinator
I Gede Tias Eka B
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
Pihak 3
2
Pihak 3
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Pihak 3
4
Pihak 3
Pihak 3
Target (%)
Keterangan
Membuka Cover no 3
35%
35%
Membuka Cover no 3
37%
PT SBC
Tail Out Grinding 3
35%
35%
Tail Out Grinding 3
37%
PT SBC
35%
35%
37%
PT SBC
37%
PT SBC
Mill #20 A
Koor. Pekerjaan
Mill #20 A
Mill #20 B
Mill #20 B
Mill #20 C Cleaning dalam Mill
5
Pekerjaan Yang Akan Dilaksanakan (Work To Do)
Realisasi (%)
Cleaning dalam Mill 3
Keterangan Rencana (%)
Cleaning dalam Mill Mill #20 C
35%
35%
Mill #20 D
Cleaning dalam Mill Mill #20 D
Cleaning dalam Mill
35%
35%
Cleaning dalam Mill
37%
PT SBC
Membuka Ring Grinding
35%
35%
Membuka Ring Grinding
37%
PT SBC
Mill #20 E
Mill #20 E
Cleaning dalam Mill
35%
35%
Cleaning dalam Mill
37%
PT SBC
Membuka Ring Grinding
35%
35%
Membuka Ring Grinding
37%
PT SBC
Melepas Grinding dari Jurnal Shaft
35%
35%
Melepas Grinding dari Jurnal Shaft
37%
PT SBC
Rendal PT PJB SERVICES Koordinator
I Gede Tias Eka B
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
Generator
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done) melepas shaft grounding
Keterangan Rencana (%)
Realisasi (%) 100%
Pekerjaan Yang Akan Dilaksanakan (Work To Do) pengukuran clearance oil deflector
Keterangan Target (%) 100%
Rendal
I Gede Tias Eka B
Koordinator
Sutrisno Subandi
PT PJB SERVICES
Koor. Pekerjaan Imam G
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Keterangan Realisasi (%)
Cleaning bracket bearing mill A
50%
50%
Cleaning bracket bearing mill A
100%
Cleaning bracket bearing mill C
50%
50%
Cleaning bracket bearing mill C
100%
MOTOR 6 KV
MOTOR 380 V
MOTOR 380 V
MOTOR LUBE OIL BFPT A
MOTOR LUBE OIL BFPT B
penggantian bearing motor
100%
pemasangan motor
3
penggantian bearing motor MOTOR FAN COOLING ID FAN 20 B melepas motor dan bearing MOV MOV inlet coal feeder A- E function test cleaning
Mansur
pemasangan motor
100%
MOTOR FAN COOLING ID FAN 20 B
100%
penggantian bearing motor 100%
Koor. Pekerjaan Arie
100%
MOTOR LUBE OIL BFPT B
MOTOR
Keterangan Target (%)
Rencana (%)
MOTOR 6 KV
2
Pekerjaan Yang Akan Dilaksanakan (Work To Do)
100%
100% 100% MOV MOV inlet coal feeder A- E function test cleaning
Riza
20% 20%
20% 20%
function test
20%
20%
function test
40%
cleaning
20%
20%
cleaning
40%
MOV outlet coal feeder A- E
40% 40%
MOV outlet coal feeder A- E
Rendal
I Gede Tias Eka B
Koordinator
Sutrisno Subandi
PT PJB SERVICES
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal
22-Sep-17 Keterangan
No
Bidang
1
ESP
Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Keterangan
Rencana (%)
Realisasi (%)
pemeriksan penghantar tegangan tinggi
50%
50%
pemeriksaan tegangan tembus minyak trafo chamber A & B
100%
100%
Pekerjaan Yang Akan Dilaksanakan (Work To Do) pemeriksan penghantar tegangan tinggi pemeriksaan DS, isolator & tubing+cleaning
Target (%) 100% 10%
Rendal
I Gede Tias Eka B
Koordinator
Imam Ghozali
PT PJB SERVICES
Koor. Pekerjaan Syahru
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal
22-Sep-17 Keterangan
No
Bidang
1
LISTRIK KONTROL
Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Keterangan Pekerjaan Yang Akan Dilaksanakan (Work To Do)
Target (%)
Rencana (%)
Realisasi (%)
Pembersihan breaker +cubicle
75%
75%
Pembersihan breaker +cubicle
75%
Suryo
pemeriksaan finger
75%
75%
pemeriksaan terminasi
75%
Suryo
pemeriksaan fuse
75%
75%
BREAKER 6KV BUS BBB
Koor. Pekerjaan
BREAKER UNIT PCC 2 A 1
Rendal
I Gede Tias Eka B
Koordinator
Imam Ghozali
PT PJB SERVICES
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal No
Bidang
1
I&C TURBINE
22-Sep-17 Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Keterangan Rencana (%)
Realisasi (%)
Turbin melepas sensor vibrasi turbin bea 1,2,3,4,5,6 & 7
Pekerjaan Yang Akan Dilaksanakan (Work To Do)
Keterangan Target (%)
Turbin 100%
100%
BFPT
Melepas TI & TC LP Turbin
100%
BFPT
kalibrasi PS MBFP lube oil 20 A
100%
100%
kalibrasi PI BFPT 20 A
100%
kalibrasi PS MBFP lube oil 20 B
100%
100%
kalibrasi PI BFPT 20 b
100%
Rendal
I Gede Tias Eka B
Koordinator
Sufyan Shalehuddin
PT PJB SERVICES
Koor. Pekerjaan
PT PEMBANGKITAN JAWA BALI SERVICES SIAP INTEGRATED MANAGEMENT SYSTEM SERIOUS INSPECTION UNIT #20 PLTU REMBANG 2017 DAILY REPORT Tanggal
22-Sep-17 Keterangan
No
Bidang
1
I&C BOILER
Pekerjaan Yang Telah Dilaksanakan (Work To be Done)
Rencana (%)
Keterangan
Realisasi (%)
Main burner peanggantian seal pneumatic oil gun burner (22 ea)
Pekerjaan Yang Akan Dilaksanakan (Work To Do)
Target (%)
Main burner 10%
10%
penggantian seal piston pyrite inlet & outlet
100%
100%
kalibrasi pressure switch
30%
30%
Mill A - E
Koor. Pekerjaan Nyoman
peanggantian seal pneumatic oil gun burner (22 ea)
30%
Mill A - E
Nyoman
kalibrasi pressure switch
40%
penggantian seal piston lock -unlock hot air gate
20%
Rendal
I Gede Tias Eka B
Koordinator
I Nyoman Kurnia
PT PJB SERVICES