Annexure VI Redundent
GPS Antenna
GPS Antenna
PTP Master Clock and allied equipment
PTP Master Clock and allied equipment
Network Printer 1
Large Screen Display
Network Printer 2
Printer Server
Controller Unit
Operator Workstation I
Operator Workstation II
IEC 61850 Ed. 2 & IEC 624393 PRP Station Bus
To Next Page
To Next Page
Ethernet Switches 500 kV System – PRP A
1 FO Cable per Ethernet Switch
Rx,Tx
IEEE 1588 v2 PTP Clock Synchronization Signal
IEEE 1588 v2 PTP Clock Synchronization Signal
Ethernet Switches 500 kV System – PRP B Rx,Tx
Rx,Tx Similar conn. from all 500 kV Dias
Similar conn. from all 500 kV Dias
Ethernet Switches 500 kV Bay 1 – PRP 1A Rx,Tx
Ethernet Switches 500 kV Bay 1 – PRP 1B
Similar for all 500 kV Dias
Rx,Tx
Rx,Tx
Rx,Tx
IEEE 1588 v2 PTP Clock Synchronization Signal Rx,Tx
Rx,Tx DTT/PUTT/POTT to Telecom Panel on DPLC or SDH
Multi Core Hardwire / Copper Cable
Rx,Tx
Rx,Tx
All Protection Panels for 500 kV Dia 1
Rx,Tx
BCU + Mimic Panel 500 kV Dia 1
DTT/PUTT/POTT from Telecom Panel
Rx,Tx
Rx,Tx
500 kV Common Sync. Panel
AC/DC Aux. Supply Panel for 500 kV System
500 kV Bus I & Bus II PTs
Rx,Tx
Rx,Tx
500 kV Energy Meters Panel
Rx,Tx
Rx,Tx
500 kV Common BCU Panel
Rx,Tx
500 kV Busbar I&II Prot. Panel
DTT to Telecom Panel
National Transmission & Despatch Company Limited 500/220/132 kV Lahore North Substation
Fiber Optic Cable
LCCs 500 kV Dia 1
Substation Automation System (SAS) Concept Diagram Dwg. # P&C/LN/01
Protection & Control, NTDC
April, 2018 Sht. 1/2
Annexure VI IEC 60870-5-101/104
Engineering Workstation I
Engineering Workstation II
Ethernet Switches 220 kV & 132 kV System – PRP A Rx,Tx
Similar conn. from all 220/ 132 kV Dias
Similar conn. from all 220/ 132 kV Dias
Similar for all 220 kV & 132 kV Dias
Ethernet Switches 220 kV /132 kV Bay 1 – PRP 1B
Rx,Tx
Rx,Tx
Rx,Tx
Rx,Tx
Rx,Tx
Rx,Tx
Rx,Tx
All Protection Panels for 220 kV / 132 kV Dia 1
Rx,Tx
132 kV Energy Meters Panel
Rx,Tx
Rx,Tx
132 kV Busbar I&II Prot. Panel
Rx,Tx
Rx,Tx
Rx,Tx
Rx,Tx
220 kV Energy Meters Panel
Rx,Tx
Rx,Tx
220 & 132 kV Common BCU Panel
Rx,Tx
220 kV Busbar I&II Prot. Panel
DTT to Telecom Panel
BCU + Mimic Panel 220 kV /132 kV Dia 1
DTT/PUTT/POTT from Telecom Panel Rx,Tx
Rx,Tx
220 kV Common Sync. Panel
Multi Core Hardwire / Copper Cable
Ethernet Switches 220 kV /132 kV Bay 1 – PRP 1A
IEEE 1588 v2 PTP Clock Synchronization Signal DTT/PUTT/POTT to Telecom Panel on DPLC or SDH
IEC 61850-2 Rx,Tx
Rx,Tx
Rx,Tx
Disturbance and Fault Recorder
IEC 61850-2
Ethernet Switches 220 kV & 132 kV System – PRP B
Fiber Optic Cable
IEEE 1588 v2 PTP Clock Synchronization Signal
IEEE 1588 v2 PTP Clock Synchronization Signal
IEC 61850 Ed. 2 & IEC 624393 PRP Station Bus
From Previous Page
IEEE 1588 v2 PTP Clock Synchronization Signal
From 500 kV Ethernet A
Clock Synchronization Signal from Previous Page
GATEWAY-II
From 500 kV Ethernet B
GATEWAY-I
DTT to Telecom Panel
LCCs 220 kV / 132 kV Dia 1
AC/DC Aux. Supply Panel for 220 kV & 132 kV Systems
220 kV & 132 kV Bus I & Bus II PTs
National Transmission & Despatch Company Limited 500/220/132 kV Lahore North Substation Substation Automation System (SAS) Concept Diagram Dwg. # P&C/LN/01
Protection & Control, NTDC
April, 2018 Sht. 2/2