ABU DHABI COMPANY FOR ONSHORE PETROLEUM OPERATIONS LTD. (ADCO)
ENGINEERING PROCEDURE DRAWING DESIGN AND NUMBERING SYSTEMS EP-30-99-90-0001
Approved: Khalid Abdul Haq Abdul Samad VPTC(E&P)
The original document has been approved by the Vice President Technical Centre (Engineering & Projects), ADCO and is held by Technical Centre (Engineering & Projects) Division. This electronic copy is a true representation of the original. The on-line version is definitive; prints are discouraged but may be taken for reference purposes. They shall not be retained in filing systems.
Document Identification Document Number
: Master-30-99-90-0001
Dated
: Jun 2014
File Location
: EDMS
Revision
: 9
Draft Location
: EDMS
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Revision History
Page: II
Authorized for Issue: June 2014
Revision History The table below is a brief summary of the most recent revisions to this document. Details of all revisions are held on file by the issuing department. Revision No
Date
Originator
Reviewed
Approved
0
Apr 91
NC
SI
AVG
First Issue
1
Nov 91
NC
SI
AVG
Section Key Plan deleted. Document codes revised, structure drawing revised
2
Jan 92
VDK
VDK
AVG
Overall revisions
3
Jan 94
VDK
VDK
AVG
Overall revisions
4
Aug 96
VDK
SI
AMK
Overall revisions
5
Sep 98
A. Muflahi
N. Aulaqi
A. Al Seri
Overall revisions
6
July 05
V. P. Idicula
S. Ibrahim
S. Cordz
Revised to incorporate end users feedback & lessons learnt..
7
Dec 06
Simplification Task Force
A. Hsino
S. Wahedi
Overall revisions. Simplified as per EP Task Force recommendation
8
June 07
V. P. Idicula
S. Ibrahim
S. Wahedi
General Revision
9
Jun 2014
D&A Task Force
Ameena Al Hosani A/D&AM
Khaled A. Samad VP (TC)
General Revision
Document No: Master-30-99-90-0001 Rev 9.
Description
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Table of Contents
Page: III
Table of Contents 1.
INTRODUCTION ____________________________________________________________________________ 1 1.1. 1.2. 1.3. 1.4.
2.
PRESENTATION __________________________________________________________________________ 7 DRAWING SHEET SIZES ____________________________________________________________________ 8 DIMENSIONS ___________________________________________________________________________ 8 SURVEY POINTS AND CO-ORDINATES ___________________________________________________________ 9 DRAWING SCALES ________________________________________________________________________ 9 DRAWING TITLE BLOCK ___________________________________________________________________ 10 GRAPHIC SYMBOLS ______________________________________________________________________ 11 DRAWING REVISION _____________________________________________________________________ 11
TAGGING AND NUMBERING SYSTEMS ________________________________________________________ 12 3.1. INTRODUCTION_________________________________________________________________________ 3.2. TAGGING/ NUMBERING SYSTEMS MATRIX ______________________________________________________ 3.3. DOCUMENT NUMBERING __________________________________________________________________ 3.4. MECHANICAL AND ELECTRICAL/ TELECOM EQUIPMENT TAGGING _______________________________________ 3.5. WELL EQUIPMENT TAGGING________________________________________________________________ 3.6. INSTRUMENT TAGGING ___________________________________________________________________ 3.7. WELL INSTRUMENT TAGGING _______________________________________________________________ 3.8. ADNOC TAGS (INSTRUMENT): ______________________________________________________________ 3.9. CABLE NUMBERING______________________________________________________________________ 3.10. WELL CABLE NUMBERING _________________________________________________________________ 3.11. JUNCTION BOX NUMBERING ________________________________________________________________ 3.12. WELL JUNCTION BOX NUMBERING ___________________________________________________________ 3.13. LINE NUMBERING _______________________________________________________________________ 3.14. OVERHEAD LINE POLE/TOWER NUMBERING _____________________________________________________ 3.15. TABLES OF CODES _______________________________________________________________________ TABLE I: List of Area Codes __________________________________________________________________ TABLE II: List of Plant Area Codes _____________________________________________________________ TABLE III: List of System Codes _______________________________________________________________ TABLE III-1: List of System Codes for Maintenance planning (operations): _____________________________ TABLE IV: List of Cable Service Codes __________________________________________________________ TABLE V: List of Line Service Codes ____________________________________________________________ TABLE VI: List of Mechanical Equipment Classification Codes _______________________________________ TABLE VII: List of Electrical Equipment Classification Codes ________________________________________ TABLE VIII: List of Telecommunication Equipment Classification Codes _______________________________ TABLE IX List of Instruments Classification Codes ________________________________________________ TABLE X: List of Junction Box Codes ___________________________________________________________ TABLE XI: List of Document Classification Codes _________________________________________________
4.
1 5 5 6
DRAWINGS GENERALITIES ___________________________________________________________________ 7 2.1. 2.2. 2.3. 2.4. 2.5. 2.6. 2.7. 2.8.
3.
GENERAL ______________________________________________________________________________ DEFINITION OF TERMS _____________________________________________________________________ TERMINOLOGY __________________________________________________________________________ REFERENCES____________________________________________________________________________
12 13 14 23 27 29 34 36 37 38 39 41 42 47 49 49 50 55 59 60 61 62 64 66 68 78 79
DRAWING STRUCTURE AND CONTENTS OF MASTER DRAWINGS ___________________________________ 84 4.1.
INTRODUCTION ______________________________________________________________________ 84
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Table of Contents
Page: IV
4.2. GENERAL DRAWINGS __________________________________________________________________ 88 4.2.1. ADCO Facilities - Master Plan _________________________________________________________ 88 4.2.2. Field/ Terminal Layout Drawing _______________________________________________________ 90 4.2.3. Line Routing Plan __________________________________________________________________ 92 4.2.4. Site Layout Drawing ________________________________________________________________ 94 4.2.5. Field Area Layout Drawing ___________________________________________________________ 96 4.2.6. Plot Plan _________________________________________________________________________ 97 4.2.7. Fields Sub-Area Plan _______________________________________________________________ 102 4.2.8. Process Flow Diagram (PFD) _________________________________________________________ 104 4.2.9. Piping and Instrument Diagram (P&ID) ________________________________________________ 107 4.2.10. Area Classification Drawing _______________________________________________________ 114 4.3. PIPING/ MECHANICAL DRAWINGS ______________________________________________________ 116 4.3.1. General _________________________________________________________________________ 116 4.3.2. General Arrangement Piping Drawing _________________________________________________ 117 4.3.3. Piping Layout Drawing _____________________________________________________________ 119 4.3.4. Pipe Supports Drawings ____________________________________________________________ 123 4.3.5. Pipeline / Flowline Drawings ________________________________________________________ 123 4.3.6. Piping Drawings for Building Services _________________________________________________ 124 4.3.7. Equipment / Skid Drawings _________________________________________________________ 124 4.3.8. Vessel / Storage Tank Drawings _____________________________________________________ 124 4.4. INSTRUMENTATION DRAWINGS ________________________________________________________ 126 4.4.1. General Requirements _____________________________________________________________ 126 4.4.2. Instrument Loop Diagram___________________________________________________________ 126 4.4.3. Cause and Effect Diagram/ Logic Diagram/ Ladder Diagram/ Relay Schematic ________________ 131 4.4.4. DCS Loop Configuration Diagram _____________________________________________________ 137 4.4.5. Control Room Layout/ Control Panel Layout ____________________________________________ 137 4.4.6. Interconnection Diagram ___________________________________________________________ 141 4.4.7. Instrumentation and Fire & Gas Cable Routing Layout ____________________________________ 143 4.5. ELECTRICAL DRAWINGS _______________________________________________________________ 145 4.5.1. Overall Single Line Diagram/Key Single Line Diagram ____________________________________ 145 4.5.2. Single Line Diagram (SLD)___________________________________________________________ 146 4.5.3. HV/LV Protection and Metering Diagram ______________________________________________ 151 4.5.4. Electrical Location and Cable Routing Layout Drawing____________________________________ 151 4.5.5. Overhead Transmission Line Drawing _________________________________________________ 153 4.5.6. Panel Arrangement/ Layout _________________________________________________________ 154 4.6. CIVIL DRAWINGS ____________________________________________________________________ 155 4.6.1. General Requirements _____________________________________________________________ 155 4.6.2. General Arrangement Civil Drawings __________________________________________________ 156 4.6.3. Building Drawings _________________________________________________________________ 157 4.6.4. Steel Structure Drawings ___________________________________________________________ 158 4.7. TELECOMMUNICATION DRAWINGS _____________________________________________________ 159 4.7.1. General Requirements _____________________________________________________________ 159 4.7.2. Overall Telecom Equipment and Cable Routing Layout Drawing ____________________________ 160 4.7.3. Key Telecommunication Distribution Network Line Diagram _______________________________ 161 4.7.4. Equipment and outlet layouts, Telephone, Data, PA, and TV Services ________________________ 161 4.7.5. Telecommunication MDF (Main Distribution Face) Layout _________________________________ 162 4.7.6. In-Plant Radio Communication Schematic ______________________________________________ 162 4.7.7. Emergency Response Centre Layout __________________________________________________ 162 4.7.8. Telecom Equipment and Cable Layout – Radio Room _____________________________________ 163 4.7.9. PABX (Private Automatic Branch Telephone Exchange) Room Layout ________________________ 163
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Table of Contents
Page: V
4.7.10. Radio Tower Plans and Elevations__________________________________________________ 163 4.7.11. Antenna Installation / Location Layout ______________________________________________ 164 4.7.12. Key MATV Distribution Network Line Diagram ________________________________________ 164 4.8. SAFETY INCLUDING FIRE FIGHTING DRAWINGS ____________________________________________ 176 4.8.1. Safety Equipment Drawings _________________________________________________________ 176 4.8.2. Fire Fighting / Fire Water System Layout / Schematic Drawings ____________________________ 176 4.9. SCHEDULES_________________________________________________________________________ 177 4.9.1. Process/Mechanical _______________________________________________________________ 177 4.9.2. Valve Schedule ___________________________________________________________________ 177 4.9.3. Instrument _______________________________________________________________________ 177 4.9.4. Electrical ________________________________________________________________________ 178 4.9.5. Telecommunication _______________________________________________________________ 178 4.9.6. Well Head _______________________________________________________________________ 178 4.9.7. General Requirements for Schedules __________________________________________________ 179 5.
PROJECT DRAWINGS ______________________________________________________________________ 180 5.1. 5.2. 5.3. 5.4. 5.5. 5.6. 5.7. 5.8. 5.9. 5.10. 5.11. 5.12.
6.
INTRODUCTION________________________________________________________________________ 180 TERMINOLOGY - ADCO MASTER DRAWING AND PROJECT DRAWING ___________________________________ 180 GENERAL ____________________________________________________________________________ 180 APPLICABLE PROJECT LAYOUT DRAWINGS ______________________________________________________ 180 LINE ROUTING PLAN ____________________________________________________________________ 181 SITE LAYOUT/ FIELD AREA LAYOUT DRAWING ___________________________________________________ 183 GENERAL ARRANGEMENT DRAWINGS / GENERAL ARRANGEMENT, PIPING ________________________________ 183 PIPING LAYOUT DRAWING ________________________________________________________________ 183 PIPING ISOMETRIC _____________________________________________________________________ 188 LIST OF PROJECT ENGINEERING AND AS BUILT DRAWINGS ___________________________________________ 190 PROJECT ENGINEERING DRAWINGS PREPARATION ________________________________________________ 197 AS BUILT MARK-UP PREPARATION __________________________________________________________ 199
APPENDICES LIST _________________________________________________________________________ 203 APPENDIX 01 REQUISITION FORMS ________________________________________________________________ 203 APPENDIX 02 TAG PLATE FORMS _________________________________________________________________ 203 APPENDIX 03 DRAUGHTING & TAGGING REQUIREMENTS FOR VARIOUS TYPE OF CONTRACTS _________________________ 203 APPENDIX 04 GUIDELINES FOR USING ADCO ENGINEERING SCHEDULES _______________________________________ 204 APPENDIX 05 PROJECT DRAWING & DOCUMENT SUBMISSION INDEX _________________________________________ 204 APPENDIX 06 AVAILABLE ONLY IN CD ______________________________________________________________ 204 Symbols and Identification Systems __________________________________________________________ 204 Title Block Format ________________________________________________________________________ 204 Multiple Sheet Drawing Format _____________________________________________________________ 205 Blank Schedule Format ____________________________________________________________________ 206 Filled Sample Engineering Schedules _________________________________________________________ 207 APPENDIX 07 GEOGRAPHIC INFORMATION SYSTEM (GIS) REQUIREMENTS FOR VARIOUS TYPE OF CONTRACTS______________ 209
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS
1.
1.1.
Volume : 1/1
Revision: 9
Part
: 1/1
Date: Jun 2014
Section : Introduction
Page: 1 of 209
INTRODUCTION
General
The procedure outlined in this document is intended for use by ADCO and its nominated consultants, contractors and manufacturers responsible for the design and engineering of plants, parts of plants or equipment packages.
This procedure is not applicable for conceptual engineering. This procedure specifies the requirements for the preparation, content, revision and updating of engineering drawings and documents for ADCO and the numbering systems to be used for allocating tags. The procedure is prepared:
To avoid repetition of design details
To ensure compatibility of numbering of drawings and equipment with ADCO's drawing record system
To maintain uniformity of drawing content and information detailed in the drawings
The revision-2 of this procedure was an overall revision, which included:
Recommendations by the Shareholders/ Specialist consultants review working group
Streamlining of the drawing structure and the symbols including addition of ADCO Facilities Master Plan and Line Routing Plan
Sample drawings and schedules are inserted in appropriate locations for easy reference.
The revision-3 of this procedure included:
Feedback consequent to applications of the procedure to ADCO Major Projects and to the ongoing Drawing Updating and Tagging Project
Description of the concepts of Field Areas, Field Sub-Areas and the related drawings.
Additional Schedule Formats and Standard Forms
Additional Symbols and Equipment Classification Codes. Explanations regarding specific use of some of the classification codes were also included
User feedback
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
: 1/1
Date: Jun 2014
Section : Introduction
Page: 2 of 209
The revision 4 of this procedure included:
Feedback from application of the procedure to two major fields: Asab and Bu Hasa
User feedbacks including comments discussed during in-house workshops on the procedure
Additional plant area codes, system codes, classification codes, symbols and standard forms
Additional flexibility in the Master drawing structure to facilitate engineering drawings of smaller plants and well installations
Clarifications on the use of ADCO Master drawings for new projects
The revision 5 of this procedure included:
Feedback from application of the procedure to Jebel Dhanna Terminal.
Modifications proposed by Corrective Action Teams, these include :
Use of typical drawings
Removal of instrument location layout and lighting layout
Combination of electrical equipment, cable routing and earthing layouts into one drawing
Combination of Instrumentation and Fire & Gas Cable Routing Layouts
Addition of a more descriptive telecommunication section
Removal of manual drawing requirements
Application of Excel spreadsheets for all schedules
Additional plant area codes, system codes, classification codes, symbols and standard forms
The revision 6 of this procedure included:
User feedbacks including comments discussed agreed and approved
Implementing of Lessons Learnt from Rev. 5, September 1998
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
: 1/1
Date: Jun 2014
Section : Introduction
Page: 3 of 209
The revision 7 of this procedure included: Overall revisions as per the EP review committee recommendations, user feedback from ADCO Engineers and major Consultants on all the aspects of drafting, tagging and CAD procedures. Below are the main
Permit preparation of specific project layout drawings from Master drawings combining different drgs of the effected project area to reduce project drawing deliverables and eliminate unnecessary additional cost to projects.
Added P&ID legend sheet for Bab Area ADCO/GASCO tag numbers.
Added section – 5 for the preparation of project drawings.
Added sample layout drawings in different scale for the project layout drawings in section-5.
Permit use of typical drawings for a group of similar drawings for project.
Simplified the project drawing requesting system and given free hand to the users in allocation of ADCO drawing number sequence
Combining piping plan and section/detail in the same drawing if space allows in project drawings.
Changing AutoCAD formats to excel format for cause & effect diagram and sample forms.
Combining revision sheet with cover sheet for A4 documents.
Deleting volume 2 and making additional appendices.
Allocating new document type under misc. codes.
Merging well instrument / electrical cable and JB numbers with well number.
Exempted the booking of tag nos. for well equipment instruments, cable & JBs.
Exempted the requirement of providing the tag numbers for earthling cable
Added the instrument identification letters in the P&ID legend drawing.
Exempted the requirement of tag numbers for light fixtures and looping cables.
Provided separate tag numbers for Double circuit O/H towers / poles.
CAD requirements and compatibility upgraded to 2005 version.
Deleted EP 30-99-90-0002 “Preparation of project drawings, As-Built mark-up and ADCO Master Drawings” and incorporated in this procedure at appropriate sections.
Added draughting & tagging requirements for different type of contract.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
: 1/1
Date: Jun 2014
Section : Introduction
Page: 4 of 209
The revision 8 of this procedure included:
Typing corrections
General Revision.
Vendor drawing electronic file submission changed GP4 format to include AutoCAD or PDF.
The revision 9 of this procedure included:
New Codes for Areas, Plant Area,
New Instruments, Electrical /Mechanical Equipment, classification Codes.
New CAD Requirements
Annexure 3: Draughting & Tagging Requirements for Projects.
Removing of item 4.9 (Master Drawing Preparation / Update) new Procedure developed for specific item.
Removing of section 6 (Application of CAD) since the same has been specified in the CAD Manual
Introduction of Critical Safety System (System Code 90) .The Consultants, Contractors or Manufacturers shall follow the information set forth in this procedure to achieve the same level of engineering integrity. However, Consultants, Contractors or Manufacturers shall be solely responsible for the quality of work. For those requirements not specifically covered in this procedure, ADCO will expect Consultants, Contractors or Manufacturers without detracting from their own responsibilities, to consult the appropriate ADCO service. The custodian for this procedure is the Draughting & Application Manager. All issues pertaining to this procedure (e.g. user feedback, suggestion for improvement etc.) will be addressed to him/her.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS
1.2.
Volume : 1/1
Revision: 9
Part
: 1/1
Date: Jun 2014
Section : Introduction
Page: 5 of 209
Definition of Terms
The following definitions shall be applicable for the purpose of this document: Term
Definition
Shall
The word "shall" indicates a mandatory requirement
Should
The word "should" indicates a preferred course of action
May
The word "may" indicates a possible course of action.
Company
Abu Dhabi Company for Onshore Oil Operations (ADCO): U.A.E.
Consultant/ Contractor
The party to the contract with the Company who is responsible for all or part of the design, engineering, procurement, construction and commissioning of the project
Manufacturer
The party responsible for the manufacture of equipment or material to perform the duties specified by the consultant or the company
Vendor/ Supplier
The party responsible for the supply of equipment, material or product-related services in accordance with the purchase order issued by/ for ADCO.
1.3.
Terminology
Term
Definition
Field
The word "Field" indicates a main area defined by geographical boundaries, which is operated by ADCO. e.g. Asab, Bu Hasa, Bab, etc.
Terminal
The oil storage / loading facility at Jebel Dhanna
Site
A part of a 'Field' covering major facilities like central degassing stations, remote degassing stations, gas injection plants, etc.. e.g. Asab-CDS, Bu Hasa RDS-1, etc.
Field Area
An area covering non-major facilities like artificial lift wells, water supply stations, rest houses, etc.
Plot / Plant /
A part of a 'Site' or a 'Field Area' containing a facility which is generally defined by the fence around its perimeter
Station
e.g. Asab-CDS, Bu Hasa - MOL station, Accommodation etc. Field Sub Area
A part equal to one grid element of a "Field Area" or "Site Layout" containing a facility. e.g. Artificial Lift Well Sb-008 Flares etc.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS
1.4.
Volume : 1/1
Revision: 9
Part
: 1/1
Date: Jun 2014
Section : Introduction
Page: 6 of 209
References
In this procedure reference is made to the following ADCO documents. The latest issue of each document shall be used. Document Number
Title
30-99-90-0001
Engineering Procedure on Drawing Design & Numbering Systems.
30-99-95-0004
ADCO CAD Manual for Consultants
30-99-90-0384
ADCO Autocad Title Blocks User Guide
30-99-00-0001
Engineering Specification – Tag Plates for Field and Indoor Equipment (For Physical Tagging)
30-99-95-0006
ADCO Guidelines for Submission of Electronic Documentation
30-99-90-0024
Preparation Documents
30-99-37-0013
Engineering Specification for Painting and Coating - (For Physical Tagging)
30.99.90.0039
ADCO Guideline for Installation of ADCO Utility package “AR-PIPE” & “ARPID”
30.99.11.0159
Intelligent Engineering Modelling Systems Requirements Typical for EPC
30-99-95-0007
Procedure for Preparation of Pipeline Profile Data Sheet
30-99-11-0145
2D Draughting & Tagging Requirements Typical for CONCEPTUAL DESIGN
30-99-11-0146 30-99-11-0147
2D Draughting & Tagging Requirements Typical for FEED 2D Draughting & Tagging Requirements Typical For DETAIL ENGINEERING
30-99-11-0148
2D Draughting & Tagging Requirements Typical For CONSTRUCTION
30-99-11-0149
2D Draughting & Tagging Requirements Typical For EPC
30-99-92-0001
ADCO Standards and General Instructions (2D Mastering)
30-99-90-0049
Guidelines for Using ADCO Engineering Schedules
30-99-11-0170
Geographical Information System Typical Requirements for EPC
30-99-11-2603
Geographical Information System Pipeline Construction Management System Typical Requirements For EPC
30-99-11-2602
Geographical Information System Typical Requirements for FEED
of
Supplier’s
Document No: Master-30-99-90-0001 Rev 9.
/
Vendor’s
Engineering
Drawings
and
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Drawings Generalities
2. 2.1.
Page: 7 of 209
DRAWINGS GENERALITIES Presentation
The preparation and presentation of engineering drawings shall be in compliance with the following: 2.1.1. All the new engineering drawing produced by the Consultant/ Contractor shall be in the prescribed CAD format. (Refer ADCO CAD Manual EM 30-99-95-004). Any exceptions to this shall be specifically approved by ADCO. For vendor drawings refer ADCO Procedure 30-99-90-0024. 2.1.2. Drawings and documents shall be in accordance with this Engineering Procedure. 2.1.3. Drawings and documents shall be easy to read and understand with legible printing and suitable text size, such that the drawings prepared on A0, A1 and A2 format shall be s uitable for reduction to A3 size. Drawings on A3 format shall be suitable for reduction to A4 format. 2.1.4. Separate drawings shall be prepared for the different disciplines, except where noted 2.1.5. The space above the title block shall be kept free to use for notes, references, legend, etc. 2.1.6. It is not acceptable to mix different types of information on the same drawing, e.g. a Piping Layout and Isometric or Elevation views shall not be shown on the same drawing. 2.1.7. The use of typical drawings is allowed however adequate tables shall be produced to explicitly depict differences between similar installations. Approval shall be taken from ADCO for any drawings which are qualified to consider as typical drawings.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Drawings Generalities 2.2.
Page: 8 of 209
Drawing Sheet Sizes 2.2.1.
Size of drafted originals shall be:
A1
841 mm x 594 mm (between trimming lines)
A2
594 mm x 420 mm (between trimming lines)
A3
420 mm x 297 mm (between trimming lines)
A4
297 mm x 210 mm (between trimming lines)
ADCO's preferred standard drawing size is A1. The A0 size (1189 mm x 841 mm) may only be used for drawings specified in Section 4.0 or with prior ADCO approval. Other nonstandard formats shall not be used. 2.2.2. For all sizes of drawings, with exception of A3 and A4, a clear space of 30 mm between the tri mming edge and the adjacent borderline shall be left on the shorter edge along the left hand side of drawing. Also, a space of 15 mm shall be left between the trimming edge and the adjacent borderline on all the other sides. For A3 and A4 sizes of drawings, the corresponding spaces shall be 20 mm for the binding side, and 10 mm on all other sides. Refer Appendix-06 for Title Block Formats. 2.3.
Dimensions 2.3.1.
Dimensions which are not to scale shall be noted thus : N.T.S
2.3.2.
Use of METRIC SYSTEM is MANDATORY.
Dimensions shall be indicated in millimeters (mm). Co-ordinates, levels and survey data shall be indicated in meters (m). Nominal pipe sizes and valve bores shall be indicated in inches (in. or ").
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Drawings Generalities 2.4.
Page: 9 of 209
Survey Points and Co-ordinates 2.4.1. Levels (elevations) and co-ordinates of plants shall be based on Nahrwan Datum, available at the nearest triangulation (Trig) point for that plant. The triangulation points, UTM coordinates and datum levels are indicated on the relevant ADCO Master drawings for various plants. Where the ADCO Master drawings are not developed, the Consultant/ Contractor shall obtain these values from ADCO. 2.4.2.
Levels shall be indicated in meters (m).
2.4.3. Survey reference points (datum level, UTM coordinates and plant coordinates) shall be established for each plant and clearly mentioned on relevant drawings. Other levels and coordinates shall be based on these points and shall be referenced. 2.4.4. The zero axes of the plant coordinate system should be chosen in such a way that negative coordinates are avoided. 2.4.5. All the drawings shall indicate true north and plant north as specified in Section 4.0 of this procedure. The arrows should be indicated at the top right hand corner of drawing space with plant north arrow pointing upwards. 2.4.6. The included angle between the true north and plant north shall not be greater than 45°. Exceptions to this shall be specifically approved by ADCO. 2.5.
Drawing Scales 2.5.1. The scale shall be indicated on the drawing in the appropriate box of the title block 2.5.2. Generally, only one scale shall be used for each type of drawing. However, where it is necessary for detailing and clarity purpose, using more than one scale on the same drawing will be allowed. In this case the scale shall be indicated next to the applicable view p l a n and the scale box on the title block shall be indicated 'as shown'. 2.5.3. When a drawing or a view/detail is not to scale then the abbreviation 'N.T.S.' shall be indicated in the title block or below the relevant details.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Drawings Generalities 2.5.4.
Page: 10 of 209
Only the following scales shall be used:
1:1, 1:2, 1:5, 1:10, 1:20, 1:25 for details
1:50, 1:100, 1:250, 1:500, 1:750, 1:1,000, 1:1,250, 1:1,500, 1:2,500, 1:5,000, 1:10,000, 1:25,000, 1:50,000, 1:100,000 and 1:500,000.
Refer Section 4.0 for use of specific scales. 2.5.5. In the event that a non-approved scale is deemed essential for a particular drawing, the consultant / contractor shall propose this giving reasons and samples for the deviation. On no account shall he proceed without the prior written consent of ADCO. 2.6.
Drawing Title Block 2.6.1. The drawing title blocks samples are included in Appendix-06 of this Engineering Procedure. A brief explanation of the title block is as follows: Revision block
This consists of revision code and date, 'drawn', 'checked' and 'approved' columns and the description of the revision. Refer section 2.8 for drawing revisions.
Scale block
To indicate drawing scale as per Section 2.5
Location block
This shall indicate area and plant area applicable to the drawing. (e.g. Field Layout for Asab will have the location indicated as 'Asab', while the Plot Plan for the CDS will have the location indicated as 'AsabCDS').
Project No.
To indicate project number as allotted by ADCO
ADCO's Logo Consultant's block
To indicate name, logo and Consultant's / Contractor's drawing/ document number.
Project Title
To indicate project title as allotted by ADCO
Drawing Block title
1st line shall indicate type of document. e.g. Plot Plan, Piping & Instrument Diagram etc. 2nd line shall indicate subject of the document where appropriate. e.g. inlet manifold, test separator etc. A 3rd line shall be indicated to elaborate the title. (e.g. – Plant name, field,
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Drawings Generalities
Page: 11 of 209
location etc.) ADCO Drawing No
This shall indicate ADCO drawing number.
File Name
File name shall be provided at the Right Bottom Corner and it shall be the ADCO document/drawing number
2.6.2. The title block shall be positioned as shown on the samples of each drawing size, in Appendix-06. 2.6.3. ADCO title block for vendor drawings are included in Appendix-06. All the vendor drawings shall bear standard ADCO title block in addition to the vendor's title block. 2.7.
Graphic Symbols
The ADCO symbols, included in Appendix-06, shall be used in all types of documents and drawings as applicable for each engineering discipline. 2.8.
Drawing Revision 2.8.1. All project drawings and documents shall be given Revision Code in alphabetical sequence starting with letter "A" up to the stage where drawing/ document achieves "Approved for construction" (AFC) / “Issued for Construction” (IFC) status or in case of purchase documents (e.g. specifications, data sheets),the document achieves" Issued for Purchase"(IFP) status. AFC/IFC/IFP stage and the subsequent revisions shall bear revision codes in numerical starting with number 1. The letter "I" and "O" shall not be used as a revision code. 2.8.2. ADCO "Master" and non-project drawings and documents will have numeric revision codes starting with number 1. ADCO drawing/document numbers shall be used for references. Use of Consultant/ Contractor/ Vendor document numbers for reference is not acceptable. 2.8.3. Design "holds" or the information to be indicated at a "later" stage shall be highlighted by clouding and shall be clearly explained with notes. 2.8.4. Where ADCO Master Drawings are used to develop project drawings, Consultant/ Contractor shall follow section 5-11 of this procedure.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3. 3.1.
Tagging and Numbering Systems
Page: 12 of 209
TAGGING AND NUMBERING SYSTEMS Introduction
The objective of the procedure in this section is to rationalize registration of Tagging and to ensure that common numbering systems, having a high degree of identification and expansion, are used in projects at all ADCO installations. The ADCO tagging and numbering systems are based on three parameters:
Geographical (Area and Plant Area)
Functional (Classification and System)
Numerical (Unit No. and Sequence No.)
The tagging and numbering systems are summarized in the matrix shown in 3.2 and the systems are detailed in sections 3.3 to 3.13. Explanations regarding specific use of some of the classification codes are included in appropriate tables at the end of this section; however, while requesting tags, a complete list of disciplines classification codes shall be requested from ADCO that will represent the latest codes from Maximo ETS. Users of the system should understand the design intent so they can fully appreciate their responsibility when allocating drawing numbers, equipment tag numbers and other identification numbers. The system has been designed to suit the specific requirements of ADCO. If the user find difficulties or is in doubt about correctness of codes to be selected while allocating tag or document numbers, they shall consult the appropriate Departments of ADCO. Any deviation from the procedure shall be dealt with prior written approval of ADCO. Contractors shall ensure that their sub-contractors/vendors also follow the procedure for tagging/ numbering. As part of implementation of ADNOC Code of Practice ADCO has introduced assigning component tags under Critical Safety System to facilitate operations, these component tags shall be assigned system code 90.
Document No: Master-30-99-90-0001 Rev 9.
Document No: Master-30-99-90-0001 Rev 9.
11
PIPE LINE
XX AREA (1)
AREA (1)
------
XX PLANT AREA (II)
9
XX
XX PLANT AREA (II)
WELL JUNCTION XX BOX AREA (1)
AA CABLE SERVICE (IV)
XX LINE SIZE
AAAA EQUIP. CODE
JB/MH FIXED CODE
JB/MH FIXED CODE
A SYS/COMP. CODE
A SYS/COMP. CODE
XX UNIT No.
XX UNIT No.
A SYS/COMP. CODE
A SYS/COMP. CODE
AA LINE SERVICE (V)
XX CIRCUIT NUMBER SINGLE/DOUBLE
WELL No.
XXX
AA CABLE SERVICE (IV)
XXX WELL No.
AA CABLE SERVICE (IV)
WELL No.
XXX
WELL No.
XXX
XX SYS. CODE (III)
XX SYS. CODE (III)
-------
XXXX
XXX
XX
XXX
XXX
XXXX
XX
XX
XX
XX
XXXX
SERIAL/ SEQ. NO.
XXXXXX A A SPEC. DEP. DEV, INS
------
------
------
------
------
SUFFIX
A
------
A SUFFIX
------
X/A XXX / XXX REV. SHT.
SPECIAL
Tagging and Numbering Systems
O/H LINE POLES/ TOWERS
XX PLANT AREA (II)
XX AREA (1)
JUNCTION BOX
8
AA CABLE SERVICE (IV)
-------
INST. CODE (VIII)
AAAA
AAAA MECH. CODE (VI) ELEC. CODE (VII)
AAAA INST. CODE (VIII)
AAAA MECH. CODE (VI) ELEC. CODE (VIII)
XX DOCUMENT CODE (IX)
SYSTEM/ SERVICE UNIT CODES
Volume : 1/1 Revision: 9
Part Date: Jun 2014
: 1/1
10
XX PLANT AREA (II)
XX AREA (1)
XX
WELL CABLE
6
XX
XX PLANT AREA (II)
7
WELL INSTRUMENT
5
AREA (1)
XX
XX PLANT AREA (II)
XX PLANT AREA (II)
WELL EQUIPMENT
4
AREA (1)
XX
XX AREA (1)
INSTRUMENT
3
XX PLANT AREA (II)
XX AREA (1)
CABLE
EQUIPMENT
2
XX PLANT AREA (II)
XX AREA (1)
CLASSIFICATION CODE
3.2.
PLANT AREA (II)
DOCUMENT
1
GEOGRAPHICAL LOCATION
Section :
AREA (1)
DESCRIPTION
ITEM
ADCO - EP
DRAWING DESIGN AND NUMBERING SYSTEMS
Page: 13 of 209
Tagging/ Numbering Systems Matrix
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 14 of 209
Note: The figures in brackets refer to the table numbers in Section 3.14 of the EP 3.3.
Document Numbering 3.3.1. All documents as classified in table IX in this section shall be given a drawing/ document number. These include: a. All the drawings/documents prepared during the Engineering / execution of a project including specifications, datasheets, bill of material, design calculations, project procedures etc. b. Manufacturer‟s drawings / sub-contractors drawings c. Vendor drawings & documentation, operating manuals, safety manuals, maintenance instructions etc d. Drawing/Document No. is incomplete without ADCO Project Number. The document numbering systems are detailed in the succeeding sections.
3.3.2.
XX
Identification String
-
XX
-
XX
- XXXX
-
X/A
- XXX/XXX 6. Sht. of Sht.
5. Revision Code 4. Serial No. 3. Document Code 2. Plant Area Code 1.Area Code
3.3.3.
Definitions
1.
Area Code
The Area Code consists of two (2) digits and forms the first two items in the full identification string above. It defines a main operating area of ADCO. The Area Codes are listed in Table I.
2.
Plant Area Code
The Plant Area Code consists of two (2) digits and forms the third and fourth items in the full identification string. It defines a smaller area or plant within the main area. It covers areas such as stations (Degassing Stations, Remote Degassing
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 15 of 209
Station, Bu Hasa Power Station etc.), plant or a facility geographically separated from the station (Asab Sewage Plant, Asab Flare Area, Asab Camp etc.). A plant within a station is not considered as a plant-area on its own (Meco Plant and Power Plant in Asab CDS). Plant Area Codes shall also be used to identify:
W. I. Clusters Wells (single or dual) Pipelines (includes flow lines, transfer lines, MOL's, gas lines / milepoint stations outside fenced plant areas) Non ADCO Facilities Codes as listed in Table II shall be used. 3.
Document Code
This is two (2) digits code classifies the document into a specific category and forms the fifth and sixth items of the identification string. Codes as listed in Table IX shall be used for classification of documents.
4.
Serial No.
The Serial Number consists of four (4) digits. Serial No. 0001 to 0599, 1001 to 1599, 2001 to 2599 etc. are used for ADCO Master Drawings (Project No. Master). Consultant shall use drawing/ document serial nos. from 0601 to 0999, 1601 to 1999, 2601 to 2999 etc for preparation of project drawings/ documents. Consultant shall make sure that project drawing no. is not duplicated within the combination of area, plant area and document code. Drawing numbers are incomplete without the project number.
5.
Revision Code
All 'projects' drawings and documents shall bear revision code as explained in section 2.8.
6.
Sheet No.
The Sheet No. shall be used for any document listed in Table IX which comprises of more than one sheet, for example, schedules, loop diagrams, isometrics, etc. Drawings interrelated by match lines e.g. piping layouts etc., shall also be allotted Sheet Nos. All the other single sheeted drawings shall bear sheet number of 1 of 1.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.3.4.
3.3.4.1.
3.3.4.2.
Tagging and Numbering Systems
Page: 16 of 209
Notes and Rules
Sheet numbers as mentioned above shall be indicated on a cover/ front sheet (Sheet 1) and revision record sheet that provides list of sheet numbers, their description and the revisions.
Originator's d r a w i n g / document number may be given in addition to ADCO document number. The originator's document number shall be indicated in the space provided on ADCO title block, job number and originator's logo shall also be indicated in the same block.
For documents which are not specific to one area or plant area, area code '30' and plant area code '99' shall be used.
A judicious use of document numbers is required in case of dossiers like Vendor Data Book, Manufacturing Record Book, Construction Record Book, etc. The dossiers as a whole shall be given a document number and the contents can be identified by section numbers/ page numbers, indices, etc. However, it is not necessary to additionally allot document number to documents like Vendor Catalogues, Inspection Reports, Construction Reports, etc. which form part of the dossier. But key documents in Vendor Data Book shall be numbered as per ADCO procedure. Field Layouts Area Code
As per table I
Plant Area Code
99
Document Code
02
Serial Number
From 0001 to 0599
Line Routing Plan Line Routing Plans Inside a Field
Line Routing Plans Outside Fields
Area Code
As per table I
30
Plant Area Code
99
99
Document Code
07
07
Serial Number
From 0001 to 0599
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.3.4.3.
3.3.4.4.
Tagging and Numbering Systems
Page: 17 of 209
In case a line routing plan covers parts of two Fields, then the area code shall be 30.
In case a line routing plan covers part of a Field and area outside the Field, then the area code for the drawing shall be Field Area Code.
Site Layouts Area Code
As per table I
Plant Area Code
As per table II
Document Code
03
Serial Number
From 0001 to 0100
Field Area Layouts Field Area Layout Inside a Field (Derived from Field Layout)
Field Area Layout Outside Fields (Derived from Line Routing Plans)
Area Code
As per table I
30
Plant Area Code
99
99
Document Code
03
03
Serial Number
From 0101 to 0599 corresponding to the grid element number of the Field Layout
From 0101 to 0599
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.3.4.5.
3.3.4.6.
Tagging and Numbering Systems
Page: 18 of 209
Plot Plans Area Code
As per table I
Plant Area Code
As per table II
Document Code
04
Serial Number
Starting with 0010 in multiples of 10 The intermediate serial nos. are used to denote the G.A. piping drawings originated from the plot plan.
Field Sub-Area Plans Field Area Plan Inside a Field Area Code
As per Table Section 3.11
Plant Area Code
99
99
Document Code
05
05
Serial Number
Corresponds with serial number of the Field Area Layout/ Site Layout
Sheet Number
From 001 to 100 corresponding with the grid element number of field sub area as indicated on the Field Area Layout/Site Layout
Total Sheet
100 since the Field Area is divided into 100 Field Number Sub Areas
Document No: Master-30-99-90-0001 Rev 9.
I
in
Field Area Plan Outside Fields 30
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.3.4.7.
Tagging and Numbering Systems
Page: 19 of 209
General Arrangement Piping Drawings (For unique plant areas) Area Code
As per Plot Plan
Plant Area Code
As per Plot Plan
Document Code
21
Serial Number
The serial number shall be divided from the plot plan serial number. viz if the plot plan serial number is 0010 then the 1st G.A. piping (AreaA)shall bear a serial number 0011, the second G.A. piping (Area-B) shall have serial number 0012,…etc. Add 1, 2, 3,..etc. with second digit of drawing serial numbers for 1st level for 2nd level, 3rd level piping GAs for multi-tier piping GAs. e.g. 1st level of 1st GA piping “0111” 2nd level of 1st GA piping “0211”, etc.
3.3.4.8.
Electrical Location, Cable Routing and Earthing Layout An Electrical Location and Cable Routing Layout is a general arrangement drawing based on a Section of the Plot Plan and has the document code „59‟. Its identification string shall be similar to the GA – Piping Drawing except for the document code.
3.3.4.9.
General Arrangement - Civil A General Arrangement - Civil drawing is also based on a Section of the plot plan and has the document Code „79‟. The other Codes in its identification string shall be the same as for the corresponding GA Piping Drawing. Note 1 For similar installations having the same plant area, code, e.g. Water Supply Wells. The drawing serial number shall be used to identify each well/installation i.e. 12-20-04-0001 will be plot plan W.I. Supply Wells in Bu
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 20 of 209
Hasa, cluster No. 1. Similarly 12-20-04-0002 for plot plan W.I. Supply Wells in Bu Hasa cluster No. 2. Same shall be applied for single completion and dual completion Gas Wells, Water Injection Wells, WAG Wells, Water Disposal Well, etc. 3.3.4.10.
Piping Layout and Elevations Area Code
Same as the GA Piping drawing
Plant Area Code
Same as the GA Piping drawing
Document Code
13
Serial Number
From 0001 to 0599
Sheet Number
Shall be same as section number of the piping layout on the corresponding piping GA drawing / field sub area plan
Total Sheet
Shall be equal to the total number of sections on the piping GA drawing
The Piping elevation drawing of a piping layout shall be numbered same as above except the document code will be 14.
3.3.4.11.
PFD and P&ID Process Flow Diagrams and Piping & Instrumentation Diagrams have the document code „08‟. PFDs shall have the serial number range 0001 to 0100. P&ID shall have the serial numbers 0101 & 1101 and above.
3.3.4.12.
Wherever the Master drawing serial numbers are to be allotted by ADCO, a drawings/ documents requisition shall be filled up and submitted to ADCO by Consultant. Completed sample requisition is enclosed on the following page. Blank sample form is included in Appendix-01.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 21 of 209
ADCO Project & Master Drawings Numbers No.
Master Drawings No.
Projects drawings Nos.
From
To
From
To
1
0001
0599
0601
0999
2
1001
1599
1601
1999
3
2001
2599
2601
2999
4
3001
3599
3601
3999
5
4001
4599
4601
4999
6
5001
5599
5601
5999
7
6001
6599
6601
6999
8
7001
7599
7601
7999
9
8001
8599
8601
8999
10
9001
9599
9601
9999
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 22 of 209
ORIGINATOR
:
TECHNICAL CENTER (E&P)
PROJECT
:
MASTER DRAWING UPDATE
PROJECT No.
AREA
:
ASAB
AREA CODE (*)
PLANT AREA
:
CENTRAL DEGASSING STATION-1
PLANT AREA CODE (*) : 01
DOCUMENT
:
P0 :
14
SERIAL Nos. (**)
No.
QUANTITY TYPE
CODE(*)
FROM
TO
1
PROCESS FLOW DIAGRAM
08
2
0001
0002
2
PIPING GA-CDS-ASAB SECTION A to C
21
3
0011
0013
* **
FOR CODES REFER ADCO ENGINEERING PROCEDURE 30-99-90-0001 SERIAL Nos. TO BE ALLOCATED BY ADCO SAMPLE FORM MASTER DRAWING/DOCUMENT NUMBERS REQUISITION FORM
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.4.
Tagging and Numbering Systems
Page: 23 of 209
Mechanical and Electrical/ Telecom Equipment Tagging 3.4.1.
XX
Identification String
-
XX
- AAAA
-
XX
-
XX
- XX 6. Sequence No.
5. Unit No. 4. System Code. 3. Equipment Code 2. Plant Area Code 1.Area Code
3.4.2.
Definitions
1.
Area Code
As per Document Numbering (Section 3.3.3.1)
2.
Plant Area Code
As per Document Numbering (Section 3.3.3.2)
3.
Equipment Code
This Code classifies the equipment into a specific category / type. For mechanical equipment the list of classifications is shown in Table VI.
For electrical/telecom equipment classification is shown in Table VII.
the
list
of
4.
System Code
The system code consists of two (2) digits. It defines a process or a service to which the equipment is functionally related. System codes are listed in Table III.
5.
Unit No.
The Unit No. consists of two (2) digits, starting with 01 (See „3.4.3‟ for the use of unit No. 00) is used to number identical equipment in the same location. It also includes: Cluster No. Train No.
Bank No.
Fire & Gas System Zone Nos.
The unit numbers shall be allocated by ADCO. (Refer 3.4.4)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
6.
Sequence No.
3.4.3. 1
Tagging and Numbering Systems
The Sequence No. of two (2) digits may be used optionally to identify
Auxiliary equipment attached to main equipment
Manifolds slots
Notes and Rules
Driver codes T, M, D, G and F (Ref. Table VI) shall be used in second (2nd), third (3rd) and fourth (4th) position of equipment code to indicate the supporting driving function of a main equipment. Example: P = Pump PM = Pump Motor
2
Page: 24 of 209
G = Generator GT = Turbo-generator
For equipment that cannot be associated to specific unit, or is common to more than one unit, the unit No. of the tag shall be 00. Example: MOVs on common suction and discharge headers of Booster Pumps P-0901, P-0902 & P-0903 shall be tagged as : MOV-0900-01 and MOV-0900-02.
3
The alphabet 'X' shall be used: As a suffix to indicate that the tagged equipment is auxiliary equipment, e.g. 'P' for Pump, 'PX' for Auxiliary Pump such as lube oil pump of a MOL pump. Description of the auxiliary system shall be specified in the equipment schedule.
4
Equipment of identical description and service in different locations shall be given the same Tag No. They shall be differentiated only by area and plant area codes, e.g. Booster Pump No. '1' in Bu Hasa 'CDS-1' or Asab shall have the same Tag No. (P-0901) but different area and plant area codes.
5
Area and Plant Area codes are generally not required to be indicated on individual equipment in a drawing or a schedule. A note indicating these codes for all the equipment should suffice. Area and Plant Area codes however shall be indicated on the title blocks of drawing and the schedules.
6
The equipment tagging system for water (injection) supply wells and their station equipment shall be as explained below : For equipment which are a necessary part of the water (injection) supply process, the system code shall be '21'. For example a surface pump in
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 25 of 209
water supply cluster No. 4 in Asab shall be tagged as : 14-20-P-2104-.01 Where
7
14
:
Asab
20
:
Clusters
P
:
Pump
21
:
Water Injection
04
:
Cluster No.
01
:
Sequence No. of the Pump
However for the major equipment in the cluster with the main function different than water injection, the system code shall reflect this main function. For example a chemical injection pump in the above cluster will be tagged as : 14-20-P-6204-01 Where 62 : Chemical Injection
8
Water Injection well equipment are not tagged according to this section. These shall be tagged as explained in Section 3.5.
3.4.4. Notes regarding specific uses of some of the system codes and plant area codes are included at the end of tables II and III respectively. 3.4.5. A sample filled equipment tag number requisition is enclosed on the following page. This shall be used to obtain the unit numbers and sequence numbers from ADCO. Blank sample form is included in Appendix 01. Where tagging of complicated interrelated equipment is involved (e.g. multistage gas compressor trains) the requisition shall be submitted along with a schematic or PFD to explain the equipment arrangement. 3.4.6.
Tagging for light fixtures is not required.
3.4.7.
External lighting pole are to be tagged.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 26 of 209
ORIGINATOR
:
TECHNICAL CENTER (E&P)
PROJECT
:
BU HASA GAS INJECTION
PROJECT No.
:
P0
AREA
:
BU HASA
AREA CODE (*)
:
12
PLANT AREA
:
GAS INJECTION
PLANT AREA CODE (*)
EQUIPMENT
SYSTEM
No. TYPE
CODE(*)
DESCRIPTION
CODE (*)
QUANTITY
: 30
Unit-Sequence Nos. (**) FROM
TO
1
COMPRESSOR
K
GAS INJECTION
31
4
03
06
2
PUMP
P
CONDENSATE
35
2
04
05
3
SLUG CATCHER
SC
GAS INJECTION
31
4
07
10
4
AUXILIARY PUMPS
PX
COMPRESSOR-1 LUBE OIL
31
2
03-01
03-02
* **
FOR CODES REFER ADCO ENGINEERING PROCEDURE 30-99-90-0001 UNIT Nos. / SEQUENCE Nos. TO BE ALLOCATED BY ADCO SAMPLE FORM MECHANICAL/ ELECTRICAL EQUIPMENT TAG NUMBERS REQUISITION FORM
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.5.
Tagging and Numbering Systems
Page: 27 of 209
Well Equipment Tagging
3.5.1.
XX
Identification String
-
XX
- AAAA
-
XXX
-
A
- XX 6. Sequence No.
5. System/ Completion code 4. Well no. 3. Equipment Code 2. Plant Area Code 1.Area Code
3.5.2.
Definitions
1. Area Code
As per Document Numbering (Section 3.3.3.1)
2. Plant Area Code
Plant Area code for wells shall be classified based on their completion string such as:
Code 70 for wells in general
Code 71 for single completion
Code 72 for dual completion
3. Equipment Code
Same as Equipment Tagging (Section 3.4.2.3)
4. Well No.
Actual Well No. shall be used
5. System/Completion Code
Existing completion codes (see 3.5.4) shall be used to indicate the system function. It will also be a complement to plant area code to type/ specify the well.
6. Sequence No.
The sequence No. of two (2) digits starting with 01, shall be used to number the equipment.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.5.3.
Tagging and Numbering Systems
Page: 28 of 209
Notes and Rules
1
Well plant-area codes 70, 71, 72 cover all equipment relating to X-mas trees and the flow lines. e.g. all the equipment in the vicinity of the wellheads will be tagged and identified using well numbers.
2
This tagging system is applicable to equipment of water injection wells. For equipment of water supply well station, the tagging system as per Section 3.4 shall be followed.
3.5.4. CODE
System/ Completion Codes DESCRIPTION
CODE
DESCRIPTION
P
Oil Producer incl. Gas Lift Wells/ESP
H
Water Injection /disposal* Wells (Aquifier Water or Produced Water Re-Injection)
G
Gas Producer
A
Appraisal
J
Gas Injection
V
Appraisal/ Development
O
Observer
E
Exploration
D
Dump Injection
W
Water Alternate Gas Injection (WAG)
3.5.5. Well equipment tag number booking & registration in ADCO system is required. Well equipment number is unique for a particular well. Example:
11-71-P-008P-01
Where 11 is Area Code, 71 is Plant Area Code, P - is Equipment Code for Pump, 008 is Well No., P- is Well Completion Code and 01 is the Serial No. for Pump No. 1. * Wells on production clusters.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.6.
Tagging and Numbering Systems
Page: 29 of 209
Instrument Tagging 3.6.1.
XX
Identification String
-
XX
- AAAA
-
XX
-
XX
- XX
-
A
7. Suffix 6. Sequence No. 5. Unit No 4. System Code 3. Instrument Code 2. Plant Area Code 1.Area Code 3.6.2.
Definitions
1.
Area Code
As per Document Numbering (Section 3.3.3.1)
2.
Plant Area Code
Same as per Document Numbering (Section 3.3.3.2)
3.
Instrument Code
This classification in the Tag No. is a code which classifies the instrument into a specific category/type Instrument codes are listed in Table VIII
4.
System Code
The system code consists of two (2) digits. It defines a process system or service to which the instrument is functionality related. System codes are listed in Table III.
5.
Unit No.
The Unit No. consists of two (2) digits, starting with 01 (See „3.6.3‟ to the use of unit No. 00) is used to number identical equipment / instruments in the same location. It also includes:
Cluster No.
Train No.
Bank No.
Fire and gas System Zone Nos.
Unit numbers shall be allocated by ADCO (Refer 3.6.5)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 30 of 209
6.
Sequence No.
The Sequence No. starts with „01‟ and runs in sequence up to ‟99‟ for each type of measured variable like flow, pressure, temperature level, analysis etc. (the type of measured variable is normally denoted by the first or the first two letters of the instrument code). Sequence numbers are also used to denote manifold slot number. Sequence numbers shall be allocated by ADCO (Refer 3.6.5).
7.
Suffix Letter
If there are more than one instrument of the same type (e.g. control valves, transmitter or I/P converter) in one instrument loop, then these instruments shall be identified additionally by a suffix A, B,..etc. Suffix Letters are also used to number instruments on a manifold slot
3.6.3. 1
Notes and Rules
For instruments that cannot be associated to a specific unit, or is common to more than one unit, the unit No. of the tag No. would be 00. e.g. PCVs of common suction and discharge header of Booster Pumps : Pump = P-0901, P-0902, P-0903 PCVs = PCV-0900-01, PCV-0900-02
2
PSVs, PVSVs, PRVs shall not be linked with other 'Pressure' instruments, and shall be numbered separately.
3
While forming a new tag No. the most important function of the main equipment associated with the instruments shall prevail. This shall be reflected in the tag Nos. wherever possible so that the instrument tag No. can be related to the mother equipment. Therefore all instruments, valves would carry a unique tag No., related to the main piece of equipment by a common string, e.g. if a 1st stage separator tag is V-0301, the LIC loops on the separator will be tagged as: LIC-0301-01 and LIC- 0301-02. The 0301 being the common string. For Loops where the control valve or any other loop component is physically located near another equipment than the one to which the measuring variable belongs, the control valve or the loop component shall bear the same tag number as the measuring variable of this loop. For example, LIC- 0301-02 of the 1st stage separator is controlling one LCV which is located at the booster pumps control skid. In this case, although the LCV is physically located in the booster pumps control skid, whose system code is '09', the LCV will be tagged
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 31 of 209
LCV- 0301-02. This is because the priority is that the control valve is part of a particular loop and its location on the control skid is only secondary. Therefore, it takes the tag No. of the main equipment to which the measured variable (Level) is associated. 4
Instruments of the same loop shall be given the same sequence No.
5
Instrument of manifolds shall be tagged in the same manner as for other main equipment except that the sequence number shall be used in this case to identify the slot number of the manifold. Hence the suffix letter shall be used to number the instruments per slot.
6
Area and Plant Area Codes are generally not required to be indicated on individual instruments in a drawing. A note indicating these codes for all the instruments in the drawing should suffice. They are required to be indicated in the schedule.
7
The instrument classification codes for auxiliaries of an instrument loop (e.g. valve position transmitters, solenoids, valve limit switches, Zener Barriers, push buttons..etc.), shall be prefixed by the loop measuring parameter. For example : Zener Barrier of transmitter PT-0301-01 shall be tagged as PZB-0301-01, and Zener Barrier of LT-0301-01 shall be tagged as LZB0301-01. However, for shutdown valves the prefix is not required.
8
The instrument tagging system is also applicable to water (injection) supply wells and the supply station instruments. For example: A turbine meter in a water supply cluster number 04 in Asab will be tagged as 14-20-FT-2104-01 where 14
: Asab
21
: Water Injection
20
: Clusters
04
: Cluster No. 04
FT
: Flow Transmitter
01
: Sequence No. of the turbine meter.
9
The instruments of the water injection wells are not tagged according to this section. These shall be tagged as explained in Section 3.7.
10
In exceptional cases the sequence number does not contribute to the identification of an instrument. e.g. a pressure indicator on a transfer line between two stations. In such cases the sequence number may be omitted. However these cases are subject to prior ADCO approval.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 32 of 209
3.6.4.
Tagging/ Numbering of Equipment and Instruments which are essentially part of complex packages (e.g. turbines, gas compressors), may be numbered as per the vendor's standard.
3.6.5.
However, the Tag numbers of the package instruments and equipment to be displayed in or interfaced with applicable control room(s) shall be as per ADCO's systems.
3.6.6.
A sample instrument tag number requisition is enclosed on the following page. The sample form is included in Appendix-01. This shall be used to obtain unit number/ sequence numbers from ADCO. Since instrument numbers are dependent on the equipment/ system numbers, the requisition shall be accompanied by P&ID/ plot plan to enable ADCO to allot correct instrument tag numbers.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 33 of 209
ORIGINATOR
:
TECHNICAL CENTER (E&P)
PROJECT
:
SHAH DEVELOPMENT
AREA
:
SHAH
AREA CODE (*) :29
PLANT AREA
:
SHAH-1
PLANT AREA CODE (*) : 01
No.
INSTRUMENT GROUPS/ PARAMETERS
SYSTEM QUANTITY DESCRIPTION
CODE (*)
Unit-Sequence Nos. (**) FROM
TO
1
PRESSURE
BOOSTER PUMP-1
09
20
01-01
01-20
2
FLOW
BOOSTER PUMP-1
09
4
01-01
01-04
3
DIFFERENTIAL PRESSURE
BOOSTER PUMP-1
09
4
01-01
01-04
4
PRESSURE
MOL PUMP-2
10
10
02-01
02-10
5
FLOW
MOL PUMP-2
10
8
02-01
02-08
6
GAS DETECTOR (XGD) (ZONE-1)
FIRE & GAS DETECTION
54
10
01-01
01-10
7
GAS DETECTOR (XGD) (GENERAL – NO ZONE)
FIRE & GAS DETECTION
54
10
01
10
* **
FOR CODES REFER ADCO ENGINEERING PROCEDURE 30-99-90-0001 VOLUME 1 UNIT Nos./ SEQUENCE Nos. TO BE ALLOCATED BY ADCO SAMPLE FORM INSTRUMENT TAG NUMBERS REQUISITION FORM
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.7.
Tagging and Numbering Systems
Page: 34 of 209
Well Instrument Tagging 3.7.1.
XX
Identification String
-
XX
- AAAA
-
XXX
-
A
- XX
-
A
7. Suffix 6. Sequence No. 5. System/ Completion code 4. Well No. 3. Instrument Code 2. Plant Area Code 1.Area Code
3.7.2.
Definitions
1. Area Code
As per Document Numbering (Section 3.3.3.1)
2. Plant Area Code
Plant Area code for wells shall be classified based on their completion string such as:
Code 70 for wells in general
Code 71 for single completion
Code 72 for dual completion
3. Instrument Code
Same as Equipment Tagging (Section 3.6.2.3)
4. Well No.
Actual well No. shall be used
5. System/Completion Existing completion codes (see 3.7.4) shall be used to Code indicate the system function. It will also be a complement to plant area code to type/ specify the well. 6. Sequence No.
The sequence No. of two (2) digits starting with 01, shall be used to number the instrument within the particular well head area.
7. Suffix Letter
If there are more than one instrument of the same type (e.g. control valves, transmitter or I/P converter) in one instrument loop, then these instruments shall be identified additionally by a suffix A, B, etc.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.7.3.
Tagging and Numbering Systems
Page: 35 of 209
Notes and Rules
1
Well plant-area codes 70, 71, 72 cover all equipment relating to X-mas trees and the flow lines. e.g. all the instruments in the vicinity of the wellheads will be tagged and identified using well numbers.
2
This tagging system is applicable to instruments of water injection wells. For instruments of water supply well station, the tagging system as per Section 3.6 shall be followed.
3
All ASR Projects shall follow ADCO tagging procedures except instrument tagging. Instrument tagging shall follow ADNOC/GASCO procedures.
3.7.4.
System/ Completion Codes
For system/completion codes see section 3.5.4.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.8.
Tagging and Numbering Systems
Page: 36 of 209
ADNOC Tags (instrument):
We introduce this type of tag is used in Gas fields where there is interface with GASCO control rooms in order to have good communication. Instrument tag number is based on ADCO EP.30.99.90.0001 for area, plant area and instrument classification codes, sequence are based on ADNOC procedure as followed: Measurement type
Sequence No
Flow (inc. Ro‟s)
1000
Level Remote and Local
2000
Pressure (Remote)
3000
Pressure (Local)
4000
Temperature (Remote)
5000
Temperature (Local)
6000
Misc (Gas Detectors, MOV‟s, HSs, …)
7000
Pressure Safety Valves
8000
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.9.
Tagging and Numbering Systems
Page: 37 of 209
Cable Numbering 3.9.1.
Identification String
XX
-
XX
-
AA
- XXXX 4. Sequence No.
3. Cable Service Code 2. Plant Area Code 1.Area Code
3.9.2.
Definitions
1.
Area Code
As shown on Tag Number shall be shown on Cable Schedule Sheets.
2.
Plant Area Code
This code consists of a two (2) digits indicating Plant Area as defined in Section 3.3.3.2.
3.
Cable Service Code
This code consists of a two letters defining the cable service. For codes list, refer to table „IV‟
4.
Sequence No.
Sequence Number consists of four digits from 0001 to 9999. The number is allocated to a cable service group within a plant-area, by ADCO as indicated on the example at the end of the Section 3.10.
3.9.3.
Notes and Rules
1
Each cable shall be tagged with the appropriate code at each termination.
2
Where cables run from one plant-area to another this shall be treated as a continuation of the cable and should be tagged with the same tag as at the power source (or telecom service source e.g. PABX).
3
For telecommunication cables, the Plant Area Code shall always be of the Plant Area Code where the PABX (Telephone Exchange) is situated. In cases where the PABX is located outside a defined Plant Area, the Plant Area Code for PABX shall be used (see table II).
4
Earthing cables shall not be tagged.
5
Looping cables shall not be tagged.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 38 of 209
3.10. Well Cable Numbering 3.10.1.
XX
Identification String
-
XX
-
AA
-
XXX
-
X
- XXX 6. Sequence No.
5. System/ Completion code 4. Well no. 3. Cable Service Code 2. Plant Area Code 1.Area Code
3.10.2.
Definitions
1. Area Code
As shown on Tag Number shall be shown on Cable Schedule Sheets
2. Plant Area Code
Plant Area Code for wells shall be classified based on their completion string such as:
Code 70 for wells in general
Code 71 for single completion
Code 72 for dual completion
3. Cable Service Code
This code consists of two letters defining the cable service. For codes list, refer to table „IV‟
4. Well No.
Actual well no. shall be used
5. System/Com pletion Code
Existing completion codes (see 3.7.4) shall be used to indicate the system function. It will also be a complement to plant area code to type/specify the well.
6. 6Sequence No. 6
Sequence Number consists of three digits from 001 to 999. The number is allocated to a cable service group within a well head area as indicated on the example at the end of the Section 3.10.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 39 of 209
3.11. Junction Box Numbering 3.11.1.
XX
Identification String
-
XX
-
JB
-
XX
- XXX 5. Sequence No.
4. Associated Cable Service Code 3. Fixed Code 2. Plant Area Code 1.Area Code 3.11.2.
Definitions
1. Area Code
Not shown on Tag Number shall be shown on Junction Box Schedule
2. Plant Area Code
This group consists of a two (2) digits code indicating the Plant Area as defined in Section 3.3.3.2.
3. JB
This is a fixed code for Junction Box. (see notes below for telecom manholes)
4. Associated Cable Service Code
This code consists of a two letters defining the Service of the cables terminated at the Junction Box. For codes list, refer to table „IV‟.
5. Sequence No.
The Sequence Numbers consists of three digits from 001 to 999. The number shall be allocated to a cable service group within a Plant Area by ADCO.
3.11.3.
Notes
1
For telecom manholes, the fixed codes MH shall be used.
2
Junction Box Schedule sample forms are enclosed in Appendix-06 of this procedure.
3
The use of multi service junction boxes is not preferred and shall be limited to exceptional cases only after approval from ADCO.
3.11.4. A sample cable No./ Junction Box numbers requisition is enclosed on the following page. The sample is also included in Volume II of this Procedure. This shall be used to obtain the Cable sequence numbers/ Junction Box sequence numbers from ADCO. Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 40 of 209
ORIGINATOR
:
TECHNICAL CENTER (E&P)
PROJECT
:
BU HASA NEW CONTROL SYSTEM
PROJECT No.
AREA
:
BU HASA
AREA CODE (*)
PLANT AREA
:
CENTRAL DEGASSING STATION NO. 1
PLANT AREA CODE (*) : 01
CABLE SERVICE No.
QUANTITY DESCRIPTION
CODE (*)
:
P0 :
12
Sequence Nos. (**) FROM
TO
1
INSTRUMENT – ANALOGUE
IA
200
0001
0200
2
SYSTEM CABLE
SC
10
0001
010
3
FIRE & GAS DETECTION
FG
50
0001
0050
4
LOW VOLTAGE (240V)
LV
20
0001
0020
5
JUNCTION BOX – INSTRUMENT ANALOGUE
JB-IA
10
001
010
* **
FOR CODES REFER ADCO ENGINEERING PROCEDURE 30-99-90-0001 VOLUME 1 SEQUENCE Nos. TO BE ALLOCATED BY ADCO SAMPLE FORM CABLE/JB NUMBER REQUISITION FORM
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 41 of 209
3.12. Well Junction Box Numbering 3.12.1.
XX
Identification String
-
XX
-
JB
-
XX
-
XXX
-
X
- XX
7. Sequence 6. Well Completion 5. Well No. 4. Associated Cable Service Code 3. Fixed Code 2. Plant Area Code 1.Area Code
3.12.2.
Definitions
1.
Area Code
Not shown on Tag Number shall be shown on Junction Box Schedule
2.
Plant Area Code
This group consists of a two (2) digits code indicating the Plant Area as defined in Section 3.3.3.2.
3.
Fixed Code
This is a fixed code for Junction Box. (see notes below for telecom manholes)
4.
Associated Cable Service Code
This code consists of a two letters defining the Service of the cables terminated at the Junction Box. For codes list, refer to table „IV‟.
5.
Well No.
Actual well no. shall be used.
6.
System/Completion Code
Existing completion codes (see 3.7.4) shall be used to indicate the system function. It will also be a complement to plant area code to type/specify the well.
7.
Sequence No.
The Sequence Numbers consists of two digits from 01 to 99 within a well head area.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 42 of 209
3.13. Line Numbering 3.13.1.
XX
Identification String
-
XX
-
AA
- XXXX
- XXXXXX
- A
-
A
7. Insulation 6. DEP. Deviation 5. Specification 4. Serial No. 3. Service Code 2. Line Size 1.Area Code
3.13.2. 1.
Definitions
Area Code
As per document numbering (sec. 3.3.3.1) For pipelines connecting ADCO Field areas, area code shall be the same as source code.
2.
Line Size
As per standard sizes from ¾” to 48”. Shall be indicated in inches
3.
Service Code
This code consists of two (2) letters to define the nature of the primary component of the flowing medium. For codes list, refer to Table V.
4.
Serial No.
The serial number consists of four (4) digits from 0001 to 9999 and shall be allocated by ADCO.
5.
Specification
Two systems of specification codes shall be used as described below: A
ANSI classes up to 2500# rating: The specification code shall consist of six digits. The first two digits shall indicate the flange class in accordance with the ANSI flange ratings, up to 2500 class, (Refer Shell DEP. 31.38.01.10-Gen). 01.
Document No: Master-30-99-90-0001 Rev 9.
For ANSI rating class 150
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
03.
For ANSI rating class 300
06.
For ANSI rating class 600
09.
For ANSI rating class 900
15.
For ANSI rating class 1500
25.
For ANSI rating class 2500
Page: 43 of 209
Although the SHELL DEP uses only one digit for 150#, 300#, 600# and 900# classes, two digits as above shall be used for uniformity. The third digit is derived from a series number that identifies the material. (Refer Shell DEP 31.38.01.10-Gen). 1000
series for carbon steels
2000
series for low and intermediate alloy steels
3000
series for stainless steels
4000
series for aluminum and aluminum alloys
5000
series for copper and copper alloys
6000
series for nickel, nickel base alloys
7000
series for non-metallic material
8000 series for carbon steel with lining and for galvanized carbon steel. The last three digits are randomly chosen by SHELL DEP and have no specific meaning. These digits should be selected from DEP. 31.38.01.12-GEN and DEP. 31.38.01.15-GEN as applicable. B API classes up to 20000# rating: The specification code shall consist of 4 alpha numerals. The first place shall indicate the letter to pressure rating as below: I - 2000 PSI H - 3000 PSI J - 5000 PSI K - 10000 PSI
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 44 of 209
L - 15000 PSI M - 20000 PSI The second place shall indicate corresponding to material as follows:
the
letter
A
:
Carbon steel (sour service)
B
:
Carbon steel (non our service)
C
:
Stainless steel (316L)
D
:
Carbon steel (galvanized)
E
:
R.T.R.P. (Reinforced Thermosetting Resin Pipe)
F
:
Cement lined carbon steel
The last two digits shall indicate the sequential number starting with 10. 6.
DEP Deviations
This code shall be used to denote a derived piping class (refer SHELL DEP. 31.38.01.21-GEN.). A derived piping class is identical with the piping class on which it is based except for some deviations. These deviations shall be understood as changes to a piping class, but shall not alter the piping material, the wall thickness or the flange class. Other piping components may be changed or special notes to be added. The derived piping classes retain the piping class number of the class on which they are based, but an 'X' shall be added to this class no. e.g. 011410 become 011410-X. If the same piping class has to be used with other deviations, within the scope of the same project, a 'Y' shall be added instead for the second duty. Similarly, a 'Z' shall be added for a third deviation.
7.
Insulation
Following codes shall be used:
Document No: Master-30-99-90-0001 Rev 9.
H
:
Thermal hot
C
:
Thermal cold
P
:
Personnel protection
A
:
Acoustic
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
3.13.3.
Tagging and Numbering Systems
Page: 45 of 209
Note and Rules
The general rules for assigning a line number are as follows: 1
Piping connections that are very short in length such as sample connections, vents and drains should be included with the same serial number as the line, with the appropriate service code.
2
Line to relief valve shall be given new serial number. Relief exhausts to atmosphere and relief exhausts connected to a collection header also be given new numbers
3
Use one serial number for a line running from one piece of equipment to another. Changes in size, class and material are not criteria for serial number changes.
4
The serial number does not identify a line by itself; however, the full identification and uniqueness of the line is defined by the complete string which includes in addition to the serial number, the size, class and material classification.
5
Assign numbers by starting with the main feed and following the major stream as closely as possible until the process is completed for each P&ID.
6
Miscellaneous "auxiliary" process lines and utility lines shall be numbered similarly.
7
Continue one serial number from one piece of equipment to another. One serial number may include one or more line sizes.
8
If the specification of a line changes downstream of a control valve to a lower specification, carry the higher specification and same serial number through to include the by-pass valve, control valve and downstream block valve. Assign a lower specification with the same serial number to the number to the downstream portion of the line.
9
Bypasses around vessels shall be given a new serial number.
10
Where lines of the same service, size and specification continue on another P&ID, use the same number.
3.13.4. A sample line number requisition is enclosed on the following page. Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 46 of 209
ORIGINATOR
:
TECHNICAL CENTER (E&P)
PROJECT
:
SHAH DEVELOPMENT
PROJECT No.
AREA
:
SHAH
AREA CODE (*) SERVICE
: :
P0 29
Serial Nos. (**)
No.
QUANTITY DESCRIPTION
CODE (*)
FROM
TO
1
CRUDE OIL
PO
100
1001
1100
2
INSTRUMENT AIR
IA
10
0101
0110
3
VENT GAS
VG
20
0001
0020
4
PRODUCED WATER
PW
10
0001
0010
* **
FOR CODES REFER ADCO ENGINEERING PROCEDURE 30-99-90-0001 VOLUME 1, SECTION 3.10 SERIAL Nos. TO BE ALLOCATED BY ADCO SAMPLE FORM LINE NUMBERS REQUISITION FORM
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 47 of 209
3.14. Overhead Line Pole/Tower Numbering 3.14.1.
XX
Identification String
-
XX
- AAAA
- XXXX
- XXX 5.
Serial No.
4. Circuit Nos. (Single/Double) 3. Equipment No. 2. Plant Area Code 1.Area Code
3.14.2.
Definitions
1. Area Code
As per Document Numbering (sec. 3.3.3.1)
2. Plant Area Code
Plant Area Codes listed in table II shall be used e.g. 44
:
132kV transmission
45
:
33kV overhead lines
46
:
11kV overhead lines
3. Equipment No.
OHLP – Overhead line pole
4. Circuit Nos.
Identifies circuit Nos. (e.g. 0103 means double circuit, first two digits 01 indicate circuit line No. of left side and other two digits 03 indicate circuit line No. of right side).
5. Serial No.
Pole or tower sequence number in each circuit, from 001 to 999
3.14.3.
OHLT – Overhead line tower
Notes
For overhead lines running from one plant area to another plant area or from one field to another field the poles/towers shall be tagged in continuous sequence Nos. beginning from the source. 3.14.4. A sample overhead line pole / tower requisition is enclosed on the following page.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
ORIGINATOR
:
Tagging and Numbering Systems
Page: 48 of 209
TECHNICAL CENTER (E&P)
PROJECT
:
OGD-II
PROJECT No.
:
P90028
AREA
:
BAB
AREA CODE (*)
:
11
PLANT AREA
:
OVERHEAD LINES 33KV
PLANT AREA CODE (*) :
45 Serial Nos. (**)
EQUIPMENT No. DESCRIPTION
CODE (***)
CIRCUIT
FROM XX
XX XX
1
OVERHEAD LINE 1
OHLT
2
OVERHEAD LINE
OHLP
*
FOR CODES REFER ADCO ENGINEERING PROCEDURE 30-99-90-0001
** ***
QUANTITY
01
10
01 05
20
SERIAL Nos. TO BE ALLOCATED BY ADCO OHLP (OVERHEAD LINE POLE) & OHLT (OVERHEAD LINE TOWER) SAMPLE FORM OVERHEAD LINE POLE / TOWER NUMBERS REQUISITION FORM
Document No: Master-30-99-90-0001 Rev 9.
TO
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 49 of 209
3.15. Tables of Codes TABLE I: List of Area Codes CODE
DESCRIPTION
CODE
DESCRIPTION
00
Abu Dhabi
48
Qarn Saba
02
Al Dabbiya
49
Qaroon Al Ghashah
03
Jebel Dhanna
51
Muhaiyimat
11
Bab/Habshan
52
Zerkouh
12
Bu Hasa
53
Jarn Yaphour
13
Huwaila
54
Beda El Qmzan
14
Asab
56
Dalma South
16
Sahil
57
Bu Tini
17
Zarrara
58
Qusahwira
18
Hudairat
59
Arjan
19
Sadiyat
63
Rabbad
20
Zibara
65
Shanayel
23
Mender
66
Shames
24
Fujairah
67
Bu Labyad
25
Sweihan
68
Ras Sadr
26
Mash Hur
69
Khusub
28
Agrab
70
Ruqaa
29
Shah
71
Silmiya
30
General for more than one area
72
Junana
31
Gezira
73
Jumayalah
32
Shuweihat
74
Mirfa
33
Ruwais
75
LIA
34
Umm Al Ishtan
76
LIIA
35
Qamra
78
Ramhan
36
Mushash
79
LIB
37
Salabikh
80
LIIB
38
Bida Hamama
81
WH-1
39
Faiha
82
SH-1
40
Al Bida
83
NH-1
41
Sila
85
LI-G
42
Faid
86
LI-H
43
Hail
87
UWais
44
Rumaitha
88
LI-1
46
Hawi
98
Bab 13 Main Store
47
Minedis
99
Mussafah
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
TABLE II: List of Plant Area Codes CODE
DESCRIPTION
00 01
Central Degassing Station „1‟
02
Central Degassing Station „2‟
03
Central Degassing Station „3‟
04
Central Degassing Station „4‟
05 06 07 08 09 10
Remote Gathering & Pumping Station
11
Remote Degassing Station / Gathering Station „1‟
12
Remote Degassing Station / Gathering Station „2‟
13
Remote Degassing Station / Gathering Station „3‟
14
Remote Degassing Station / Gathering Station „4‟
15
Remote Degassing Station / Gathering Station „5‟
16
Remote Degassing Station / Gathering Station „6‟
17
Remote Degassing Station / Gathering Station „7‟
18
Remote Degassing Station / Gathering Station „8‟
19
Remote Degassing Station / Gathering Station „9‟
20
Water Supply Stations
21
Production Clusters /well Pads
22
Effluent Water Plant
23
Raw Water Pumping Station/Wells
24
Potable/Sweet Water Plant
25
Utility Water Plant
26
Fire Water Station
(NOTE 1)
(NOTE 6)
(NOTE 6)
(NOTE 6)
Document No: Master-30-99-90-0001 Rev 9.
Page: 50 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
TABLE II: List of Plant Area Codes CODE 27
DESCRIPTION Water Storage Plant
(NOTE 6)
28 29
Pilot Gas Injection Plant
30
Gas Plant
31
1st Gas Compressor Station (All Areas)
32
2nd Gas Compressor Station (All Areas)
33
3rd Gas Compressor Station (All Areas)
34
4th Gas Compressor Station (All Areas)
(NOTE 7)
35 36 37
Non-ADCO Facility
(NOTE 2)
38 39
Flares, Burnpits and other pits
40
Power Station
(NOTE 3)
41 42
Substation/ Transformer Yard
43
Load Dispatch Center
44
132kV Transmission
45
Overhead Lines 33kV
46
Overhead Line 11kV
47 48 49 50
MOL Station
51
Remote Degassing Station „10‟
53 54
Document No: Master-30-99-90-0001 Rev 9.
(NOTE 10)
Page: 51 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 52 of 209
TABLE II: List of Plant Area Codes CODE 55
DESCRIPTION Dehydration and Desalting Plant
56 57 58 59 60 61
Remote Manifold Station No. „1‟/Gas Remote Station No. 1
62
Remote Manifold Station No. „2‟/Gas Remote Station No. 2
63
Remote Manifold Station No. „3‟/Gas Remote Station No. 3
64
Remote Manifold Station No. „4‟/Gas Remote Station No. 4
65
Remote Manifold Station No. „5‟
66
Remote Manifold Station No. „6‟
67
Remote Manifold Station No. „7‟
68 69 70
Well – General
71
Well – Single
72
Well – Dual
73 74 75 76
Gas Flow lines/Trunk Lines
(NOTE 9)
77 78
Pipelines – Oil & Water Lines includes Transfer Lines, Main Oil Lines (NOTE 1 & 4)
79 80
Tank Farm
81
Oil/Water Separation Plant
(NOTE 6)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 53 of 209
TABLE II: List of Plant Area Codes CODE
DESCRIPTION
82
Industrial Area
83
Tank Farm No. 2
84
Terminal Facilities
(Note 11)
85 86 87
Jetty/ Causeway/ Artificial Island/ Channels
88
Berth/ Mooring
89
Oil Spill Centre
90
Accommodation/ Residential Area/ Rest houses/ Mosque
91
Police Station
92
Telecom./ TV Station Tower or Mast/ Radio Room
93
Abu Dhabi – ADCO Compound
94
Public Automatic Branch Exchange (PABX) (NOTE 8)
95
Fire Station
96
Sewage Plant
97
General Buildings (Offices/ Lab/ Stores/ Workshop/ Warehouses/ Sheds)
98
Airstrips/ Helipad
99
General
(NOTE 5)
NOTES: 1.
Code „20‟ shall be used for water (injection) supply station equipment and distribution network up to the distribution header of injection wells. For individual injection wells plant area codes „70‟, „71‟ or „72‟ shall be used as applicable. Code „78‟ shall be used for water pipelines between water supply and water injection wells.
2.
Code ‟37‟ shall be used for ADCO equipment physically located at a nonADCO facility e.g. GASCO plant, ADNOC plant, etc.
3.
„Other pits‟ listed under code 39 are the pits located outside CDS area.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 54 of 209
4.
Code '78' includes all Oil & Water pipelines outside plant areas, e.g. oil flow lines from wellheads to manifolds, transfer lines from RDS's to CDS, Main Oil Lines from the field to another field or terminal, mile point stations, gravity lines etc.
5.
Code '99' shall be used for documents/ equipment for more than one plant area or where the other plant area codes cannot be effectively used.
6.
Examples of these codes are: Code 23
:
Raw Water Pumping Station near Sb-006 in Asab
Code 24
:
Bu Hasa Potable Water Plant
Code 26
:
Fire Water Station in Bu Hasa
Code 27
:
Water Tank Farm in Asab
Code 81
:
Oil/Water Separation Plant in Jebel Dhanna
7.
Code '30' includes Gas Compression / Injection Plant in Bu Hasa, ADCO gas inlet facilities in Asab, Bab Gas Inlet facilities in Bab (OGD „O‟, „I‟, „II‟ & „III‟ receiving stations in Bab).
8.
PABX Plant Area Codes is to be used only when another plant area cannot be effectively used.
9.
Code „76‟ includes all gas pipelines outside plant areas, e.g. flow lines trunk lines and gas injection lines.
10. Plant area code 11 to 19 is for RDS / GS 1 to 9. Since „20‟ is used for water supply station „51‟ is assigned for RDS-10. 11. Code „84‟ is for terminal facilities including tank farm and loading facilities (Used for Fujairah Pipeline).
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 55 of 209
TABLE III: List of System Codes CODE
DESCRIPTION OIL
00 01
Gathering Manifold System (Flowlines to Headers)
02
Inlet Manifold System (Flowlines or Headers to Separators)
03
1st Stage Separation
04
2nd Stage Separation
05
Back Pressure Control
06
Test Separation
07
Boot Separation
08
Flow Suction Tank
09
Booster Pumping
10
MOL Pumping/ Export
11
Surge And Sump System/Recovered Oil System/Flushing System
12
Dehydration and Desalting
13
Launcher/ Receiver System/Gravity Lines
14
Crude Stabilization
15
Oil Storage
16
Oil Metering
17
Meter Prover
18
Shore Lines / Sea Lines
19
Flare/ Burn Pit/ Other Pits WATER
20 21
Water (Injection) Supply
22
Raw / Fresh / Irrigation Water
23
Potable Water/Distilled Water
24
Produced Water/ Effluent Water System/ Disposal Water
25
Sewage GAS
26
Manifold
Document No: Master-30-99-90-0001 Rev 9.
(NOTE 1)
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 56 of 209
TABLE III: List of System Codes CODE
DESCRIPTION
27
Test Separation/ high Pressure Separation
28
LP/ MP Compression & Gas Dehydration
29 30 31
Gas Injection
32
Fuel gas
33
Blanket Gas/ Purge Gas
34
Gas Lean Recycle (Stripping)
35
Condensate
36
Gas Export/ Transfer
37
Gas gathering
38
Vapour Recovery
39
Launcher/ Receiver
(NOTE 2)
POWER/ LIGHTING/ EARTHING 40 41
Power Generation
42
Power Emergency Generation
43
Power Primary Distribution System (132kV, 33kV, 11kV, 3.3kV)
44
Power AC Distribution
45
Power DC Distribution
46 47
Lighting – Essential & Normal
48
Earthing
49
Electrical Control (Software System) FIRE & SAFETY
50 51
Fire Water
52
Foam
53
Halon
54
Fire & Gas Detection/ Protection (Plant Facilities)
Document No: Master-30-99-90-0001 Rev 9.
(Note -4)
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 57 of 209
TABLE III: List of System Codes CODE
DESCRIPTION
55
Emergency Shutdown
56
Miscellaneous
57
Deluge System
58
Fire & Gas Detection/ Protection (Buildings)
59
Access Control System
(Note -5)
UTILITIES (OTHERS) 60
Steam/ Hot Oil
61
Instrument Air/ Plant Air
62
Chemical Injection/ Dosing
63
Diesel Oil/ Jet Fuel
64
Sweet Gas
65 66
Drain Open
67
Drain Closed/ Oil Water Drain/ Fluid Boosters
68
HP/ LP Vent
69
Inert Gas (Nitrogen)/ Liquid Nitrogen
(NOTE 2)
70 71
ICS/ICSS - Integrated Control System (NOTE 4)
72
Computer Control Network
73
SCADA
74
Control – General
75
Building Management System (BMS)
/ Integrated Control & Safety System
76 77 78 79 TELECOMMUNICATIONS 80 81
Radio (UHF/VHF/TETRA)/ Telecom Tower (TWR)
Document No: Master-30-99-90-0001 Rev 9.
(NOTE 3)
(NOTE 3)
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 58 of 209
TABLE III: List of System Codes CODE
DESCRIPTION
82
Telephone/ Telecom Cabinet (TLC)
83
MATV/ CCTV
84
Beacon (Navaid)
85
Data/ Structured Cabling/ FO/ LAN/ Meteorological System/ SDH Sys./ Automatic Weather Station (AWS)/FCMS (Fibre optic cable monitoring system)
86
Satellite
87
GSM/ Mobile
88
Public Address/ Music System (PAS)/ Video Conference System (VCE)
89 MISCELLANEOUS 90
Critical Safety System (Components)
91
HVAC
92
Cathodic Protection
93
Material Handling
94
Control Rooms/ Substations/ HVSG & MVSG Rooms
95
Offices/ Workshop/ Lab/ Guard House
96
Accommodation/ Mosque
97
Warehouses/ Sheds
98
Testing Instruments
99
General
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 59 of 209
The below table codes will be used by Maintenance planning (operations): TABLE III-1: List of System Codes for Maintenance planning (operations): Product
System
OFS
Oil
WFS
Water
GFS
Gas
PFS
Power/Lighting/Earthing
FFS
Fire & Safety
UFS
Utilities (Others)
CFS
Control
TFS
Telecommunications
MFS
Miscellaneous
Product
System
OFS
Oil
NOTES: 1.
Code „16‟ includes major flow metering of fields e.g. Sahil and Shah flow metering in Asab-CDS.
2.
Code „33‟ shall be used for hydrocarbon gas blanketing. Code ‟69‟ shall be also used for inert gas blanketing.
3.
Code „72‟ shall be used for digital process control systems e.g. distributed control systems (DCS), programmable logic controllers (PLC)…etc. For discrete or analogue systems code „74‟ shall be used.
4.
Code „54‟ shall be used for F&G Detection / Protection of Plants. Code „71‟ shall be used for digital Basic Process Control System (BPCS) viz Integrated Control System (ICS) / Integrated Control & Safety System (ICSS)
5.
Code ‟58‟ shall be used for F&G Detection / Protection of all buildings.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 60 of 209
TABLE IV: List of Cable Service Codes CODE
DESCRIPTION
BM
BMS Cables
TX
Telecom - Multi Service
DA
DATA CABLE FOR ADCO INTRANET (TELECOM)
DC
Direct Current
DH
Data Highway/Data Bus/Field Bus
EC
Electrical Control
EE
Earthing Cable
EX
Electrical - Multi Service
FD
Arial Feeder Cable
FG
Fire & Gas Detection
FO
Fiber Optic Telecommunication Cable
FO**
Fiber Optic Telecommunication Cable/ Other applicable Cable Service Codes as in this Table – See example below
HV
High Voltage(132/33/11/3.3/2.82 KV)
IA
Instrument - Analogue
ID
Instrument - Digital
IX
Instrument - Multi service
LV
Low Voltage (240/125/110/48V)
MV
Medium Voltage (415V)
NN
Neutral Cable
OH
Overhead Lines
PA
PUBLIC ADDRESS
SC
System Cable
TE
Telecommunication
TV
TV CABLE - TV/ MATV/ CCTV
CP
Cathodic Protection
Example: ** If the FO cable is with grounding conductor, shall be FOEE. ..EE Earthing Cable ..LV Low Voltage (240/125/110/48V) ..FD Arial Feeder Cables
Document No: Master-30-99-90-0001 Rev 9.
then the combined cable service
..PA ..TV
-
Public Address TV Cables
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 61 of 209
TABLE V: List of Line Service Codes CODE
DESCRIPTION
AW
Aquifer Water
ZO
Sludge
BG
Blanket Gas
BZ
Bactericide
CG
CO2
CO
COOLING OIL
CW
Cooling Water
CZ
Flocculant/ Coagulant
D
Drains (General)
DF
Diesel Fuel
DW
Potable Water/ Distilled Water
DZ
Demulsifier
FG
Fuel Gas (includes purge, stripping)
FW
Fire Water
FZ
Foam Compound
GL
Glycol
H
Halon
HC
Hydrocarbon Condensate
HF
Helifuel
HM
Heating Medium
HO
Hydraulic Oil
IA
Instrument Air
IG
Injection Gas
IW
Injection Water(Surface pump discharge t
Document No: Master-30-99-90-0001 Rev 9.
CODE
DESCRIPTION
IX
Injection Water or Gas (Common Line)
IZ
Corrosion Inhibitor
LO
Lube Oil
MF
Motor Gasoline Fuel
NN
Nitrogen
OZ
Oxygen Scavenger
PA
Plant Air
PG
Process Gas
PO
Process Oil (all Crude streams)
PW
Produced Water (From Process sources)
PZ
PH Control Chemical
R
Relief (General)
RW
Raw Water
SD
Sewage Drain
SO
Seal Oil
SW
SCAD Water
SZ
Scale Preventative
V
Vent
VG
Vent Gas (Flare)
WW
Wash Water
XZ
Miscellaneous Chemicals
Z
Chemicals
BD
Blowdown Drain (Automatic Process Drain)
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 62 of 209
TABLE VI: List of Mechanical Equipment Classification Codes CODE
DESCRIPTION
CODE
DESCRIPTION
ACSU
AC Split Unit (Indoor & Outdoor)
GD
Diesel Generator
ACU
HVAC Unit
GT
Turbine Generator
AHU
Air Handling Unit
GTAU
Gas Turbine Alternator Unit
AVB
B annulus Valve
H
Heater
AVC
C annulus Valve
HAP
Hose Accessory POD
AVL
A annulus Valve Left
HGB
Horizontal Ground bed
AVR
A annulus Valve Right
HL
Hose Flaking/Laying POD
B
Burner
HLV
Hook Lift Vehicle
BDH
Blow Down Hatch
HOV
Hand Operated Valve
BGB
Bore Hole Ground bed
HRV
Heat Recovery Ventillation
BOH
BLOWOUT HATCH
IQ
Injection Quill
C
Column
IWV
Injection Wing Valve
CHLR
Chiller
J
Ejector
CNVR
Conveyor as per ISA 5.5.
K
Compressor
CR
Crane
KD
Compressor Diesel Engine
D
Drier
KG
Compressor Gear Box
E
Heat Transfer Equipment/Water Cooler
KT
Compressor Turbine (Driver)
KWV
Killing Wing Valve
EX
Auxiliary Cooler
L
Loading Device Equipment
F
Fan/ Blower
LIWV
FA
Flame Arrestor
Long String Injection Wing Valve
FCU
HVAC-Fan Coil Unit
LLMV
Long String Lower Master Valve
FL
Flare
LMV
Lower Master Valve
FLS
Flare Stack
LP
Pig Launcher
FP
Foam Pumper
LPWV
FPS
Foam Proportioning Skid POD
Long String Production Wing Valve
FPT
Foam Pump Trailer
LSV
Long String Swab Valve
FWP
Foam / Water Pumper
LUMV
Long String Upper Master Valve
FX
Auxilliary Fan
M
Manifold
G
Generator/ Alternator
MFM
Mobile Foam Monitor
MFT
Mobile Foam Trailer
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
Page: 63 of 209
CODE
DESCRIPTION
MIV
Manual Isolation Valve
V
Vessel (Pressure)
MS
Molecular Seal
VAV
Variable Air Volume Box
NRV
Non Return Valve
VX
Auxilliary Vessel
P
Pump
WH
Well Head
PD
Pump Diesel
X
Miscellaneous Equipment
PT
PUMP DRIVER
XA
Agitator
PWV
Production Wing Valve
XBXA
Breathing Apparatus
PX
Auxiliary Pump
XD
Dampener
RIV
Rapid Intervention Vehicle
XDM
Motorized Shut-Off Dampers
RP
Pig Receiver
XECG
Carbon Dioxide Extinguisher
S
Filter
XEDP
Dry Powder Fire Extinguisher
SC
Slug Catcher
XEWG
Wheeled Gas Fire Extinguisher
SF
Filter Separator
XEWP
SHSV
Short String Swab Valve
Wheeled Powder Fire Extinguisher
SIWV
Short String Injection Wing Valve
XFB
Fire Blanket
XFF
Foam Hose Reel
SK
Skimmer/ Flotation Unit
XFH
Fire Hydrant
SLMV
Short String Lower Master Valve
XFM
Fire Monitor
SP
Special Piping Spool
XFR
Fire Hose Reel
SPWV
Short String Production Wing Valve
XFXD
Fire Dampers
XJ
Insulating Joint
ST
Strainer
XM
Mixer
SUMV
Short String Upper Master Valve
XMM
Motor Mixer
SV
Swab Valve
Z
Building (General)
SX
Auxiliary Filter
T
Tank
TC
Tractor Cab
TX
Auxiliary Tank
U
Package/ Skid
UMV
Upper Master Valve
DRIVERS Codes *
nd
rd
th
T
Turbine (Gas/ Diesel)
M
Motors (Electrical)
G
Gearbox
D
Diesel Engine
F
Fuel Gas Engine
(*) Drivers codes shall be used as 2 , 3 or 4 optional position letters to specifically indicate the supporting driving function of the main equipment.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 64 of 209
TABLE VII: List of Electrical Equipment Classification Codes CODE
DESCRIPTION
CODE
DESCRIPTION
ACB
Air Circuit Breaker (415V)
FP
Feeder Pillar
AHUM
AHU Motor
FS
Fuse Switch Unit
AMSP
Auto Manual Synchronising Panel
FSU
SWITCH FUSE UNIT
FXM
Auxiliary Fan Motor
BAT
Battery
GCB
SF6 GAS CIRCUIT BREAKER
BC
Battery Charger
GCP
Generator Control Panel
BMP
Burner Management Panel
GICB
CAP
Capacitor
SF6 GAS INSULATED CIRCUIT BREAKER
CB
Circuit Breaker (33kV/ 11kV)
GRP
Generator Relay Panel
CCB
Current Control Box
GTCP
CL
Current Limitor (For IS Limitor)
Generator/Turbine Control Panel
CON
Contactor
HF
Harmonic Filter
CRM
CRANE MOTOR
HSWG
High Voltage Switchgear
CT
Current Transformer
HVLI
HV Line Isolator
CUB
Switchgear Cubical
HVPP
High Voltage Protection Panel
CVT
Capacitor Voltage Transformer
IRP
Interposing Relay / Interface Panel
DB
Distribution Board
ISL
Isolator
ECP
Electrical Control Panel (General)
KM
Compressor Motor
ELCB
Earth Leakage Circuit Breaker
LCP
Local Control Panel
EM
Cooler Motor
LF
Light Fitting
EP
Earth Pit
LVPP
Low Voltage Protection Panel
ESCP
Electrical System (Software) control Panel
LVPR
Low Voltage Protection Relay
MC
Electrical Submersible Pump Panel
Motor Control Station (Field) (Start/ Stop Push Button)
MCC
Motor Control Centre
ESWG
Essential Services Switchgear
MCCB
Moulded Case Circuit Breaker
ETMP
Electrical Tariff Metering Panel
MDB
Main Distribution Board
EXM
Auxillary Cooler Motor
MP
Mimic Panel
FLTR
Fault Recorder
MPR
Motor Protection Relay
FM
Fan Motor
MSP
Manual Synchronising Panel
ESP
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 65 of 209
DESCRIPTION Protection Relay
MSWG
Medium Voltage Switchgear
MX
Auxiliary Motor
TP
Power Transformer
MXB
Marshalling Box
TPCP
Tap Changer Control Panel
NER
Neutral Earthing Resister
TPR
Transformer Protection Relay
NESB
Neutral Earthing Switch Board
TPX
Power Transformer (Auxiliary)
OCB
OIL CIRCUIT BREAKER
TR
OCR
Over Current Relay
Transformer Rectifier (cathodic Protection)
OHLP
Overhead Line Pole
TRX
Transformer Rectifier (Cathodic Protection)
OHLT
Overhead Line Tower
UPS
Uninterrupted Power Supply
PM
Pump Motor
UVR
Under Voltage Protection Relay
PS
General Power Socket (220V)
VCB
VACUME CIRCUIT BREAKER
PSS
Power Sub-Station (WS Cluster)
VFD
Variable Frequency Drive
PXM
Auxillary Pump Motor
VSD
Variable Speed Drive
R
Reactor
VT
Voltage Transformer
RCP
Remote Control Panel (General)
WS
Welding Socket (415V)
WT
Wave Trap/ Line Trap
RMU
Ring Main Unit
XAM
Agitator Motor
RRP
Reactor Relay Panel
XB
RTCP
Remote Tap Changer Control Panel
Beacon Light (Navigational/ Fire Etc.)
XCP
Miscellaneous Panels
RX
Resistor General
XDM
Dampener Motor
SAR
Surge Arrester
XLF
SKT
Sockets
Lighting Pole (Floor, Projector ....external)
SLP
Solar Panel
XMM
Mixer Motor
SVC
Static VAr Compensation
XMR
ANALOG / Digital MARSHALLING CABINET
SXM
Air Filter Drive
XPC
Misc. Computer
TCP
Turbine Control Panel
XR
Fault Recorder
TCS
Trip Circuit Supervision
XVM
Vibration Monitoring Panel
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 66 of 209
TABLE VIII: List of Telecommunication Equipment Classification Codes CODE
DESCRIPTION
ACSS
Access Control System Equipment
AWS
Automatic Weather Station
BTX
Beacon Transmitter
BXT
Beacon- Telephone System.
CCTV
Closed Circuit Television
CMRA
CCTV Camera
DDF
Digital Distribution Frame
FCMS
Fiber optic Cable Monitoring System - cabinet
CODE
DESCRIPTION
PAG
Paging Transmitters
PAS
Public Address System
PDH
Plesiochronous Digital Hierarchy
PPNL
Patch Panel (for Fiber/Copper Data)
PRJ
Projector
RAAT
Radio Antenna
RSS
Rural Subscriber System
RXR
Radar Reflector
FDB
Fiber Distribution Box
SCDA
FOCC
FIBER OPTIC COPPER CONVERTER
SCADA MTU: Supervisor Control And Data Acquisition
SDH
Synchronic Digital Hierarchy Network Equipment/Panel
SPKR
Speaker
SPL
Splitter
SXT
Sounder/ Hooter – Telephone system
TCB
Telephone Connection Box
TDB
Telephone Distribution Box
GTA
Ground To Air
HFS
HF Base Station
IDF
Intermediate Distribution Frame
LAN
Local Area Network Equipment
MATV
Master Antena Television System
MDF
Main Distribution Frame
TETR
Tetra Radio System- Cabinet
METE
Meteorological System Equipment
TEAT
Telephone Antenna
TEL
Telephone
MOD
Modem
THOD
TELEPHONE/TELECOM
MRN
Marine Radio
THR
Tetra Hand Held Radio
MUX
Multiplexer
TLC
Telecom Cabinet
ODF
Optical Distribution Frame
TMR
OLTE
Optical Line Terminal Equipment
Tetra Mobile Radio (Desktop / Vehicle radio)
TWR
Telecom Tower
OTDR
Optical Time – Domain Reflectometer.
TXRM
WELL SITES
PABX
Telephone Exchange
UHFR
UHF Base Station Repeater Panel
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 67 of 209
DESCRIPTION
UHFS
UHF Base Station
XCSL
UFH RADIO
USCH
Single Channel Radio (UHF)
XCTR
MATV/CCTV
VAR
Voice Activated Recorder
XDVR
MATV/CCTV
VCE
Video Conference System
XIDU
SATELLITE
VHFS
VHF Base Station
XMON
MATV/CCTV
VSCH
Single Channel Radio (VHF)
XODU
SATELLITE
WBBR
Wireless Broadband Remote Unit
XPF
Miscellaneous Pole Fixture (CCTV, F&G detectors etc.)
WBBS
Wireless Broadband Base Station
AMP
Amplifier
* XXAT
Miscellaneous Antenna
WKT
Walkie Talkie
WWU
Wash Wiper Unit (For CCTV....)
(* ‘XX’ is variable and can be replaced with TV-for television antenna, RA-for Radio Antenna, TE-for Telecom Antenna, etc.)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 68 of 209
TABLE IX List of Instruments Classification Codes CODE AAH
DESCRIPTION
CODE
DESCRIPTION "Open"
Analyzer (Humidity/Moisture) Alarm High
BZSL
AAHH
Analyzer (Hum/Moist) Alarm High High
BDV Position Switch "Low" or "Closed"
CAH
conductivity Alarm High
AAL
Analyzer Alarm Low
CAL
conductivity Alarm Low
AC
Analyser Controller
CC
corrosion Coupon
ACP
Alarm Collection Point
CCP
Central Control Panel
ACV
ANALYZER CONTROL VALVE
CCR
Central Control Room
AE
Analyser Probe
CE
conductivity Element
AI
Analyser Indicator
CI
Conductivity Indicator
AIC
Analyser Indicator Controller
CM
Corrosion Monitor
AIT
Analyser Indicator Transmitter
CMA
Corrosion Monitor Alarm
ANN
Annunciator
CP
corrosion Probe
AP
Analyser Sampling Point
CPI
Corrosion Indicator
ASH
Analyzer (Humidity/Moisture) Switch High
CPT
Corrosion Probe Transmitter
ASHL
Analyser Switch High & Low
CSH
conductivity Switch High
ASL
Analyzer Switch Low
CSL
conductivity Switch Low
AT
analyser Transmitter
CVA
choke Valve
AXXX
Analyser General
DCC
DCS Cabinet
BA
Burner Flame or Flame-Out Alarm /Normal
DCS
distributed Control System
DDXA
Drier Alarm
BAH
Burner Flame Alarm High or "On"
DE
density Element
BAL
Burner Flame Alarm Low or "Off"
DI
density Indicator
BDV
BLOW DOWN VALVE
DPAH
Differential Pressure Alarm High
BE
Burner Flame Element
DPAL
Differential Pressure Alarm Low
BOH
Tank Blowout Hatch
DPC
differential Pressure Controller
BSDA
Burner Shut Down Alarm
DPCV
BSOV
BDV Solenoid valve
Differential Pressure Control valve
BV
Block Valve / Sectionalising Valve
DPI
differential Pressure Indicator
BZSH
BDV Position Switch "High" or
DPIC
differential Press. Indi. Controller
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
DPIT
Differential Pressure Indicator Transmitter
DPR
Differential Pressure Recorder
DPRV
Differential Pressure Regulating Valve
DPS
differential Pressure Switch
DPSA
Differential Pressure Switch Alarm
DPSH
differential Pressure Switch High
DPSL
differential Pressure Switch Low
DPT
differential Pressure Transmitter
DPXX
Differential Pressure (General)
DR
Density Recorder
DT
density Transmitter
DTAH
CODE
Page: 69 of 209
DESCRIPTION
FC
flow Controller - Blind
FCP
fire & Gas Control Panel
FCRP
Fire Control Repeater Panel
FCV
flow Control Valve
FE
flow Element
FFHC
Hand Switch to Close from Console for FAN
FFHO
Hand Switch to Open/Start from Console for FAN
FFHS
Hand Switch to Stop from Console for FAN
FFHX
Misc./Selector/Test Handswitch from Console
FFXA
Misc. Fault/Alarm in Software System for Fan
Differential Temperature Alarm High
FFXC
Signal To Close from DCS/PLC for FAN
DTAL
Differential Temperature Alarm Low
FFXI
Misc./Status Indication in Software System for Fan
DTI
differential Temperature Indicator
FFXO
Signal to Open/Start from DCS/PLC for FAN
DTIC
Differential Temperature Controler
FFXS
Signal to Stop from DCS/PLC for FAN
DTSL
Differential Temperature Switch Low
FG
flow Sight Glass
DTXX
DIFFERINTIAL TEMP. (GEN)
FHS
flow Hand Switch
DWS
DCS Workstation
FI
flow Indicator
DY
Density I/P Relay/ Converter
FIA
Flow Indicator Alarm
EI
Voltage Indicator
FIC
flow Indicator Controller
EIV
Emergency Manual Isol. Valve
FIS
flow Indicating Switch
ET
Voltage Transmitter
FIT
Flow Indicator Transmitter
FA
flow Alarm
FQ
flow Totaliser
FAH
flow Alarm High
FQI
flow Totaliser Indicator
FAL
flow Alarm Low
FR
flow Recorder
FALL
Flow Alarm Low Low
FRC
flow Recorder Controller
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 70 of 209
DESCRIPTION
FS
flow Switch
HIC
manual Loader
FSAH
flow Shutdown Alarm High
HM
Hour Meter
FSAL
flow Shutdown Alarm Low
HPPV
High Pressure Pilot Valve
FSDH
flow Shutdown High
HS
FSDL
flow Shutdown Low
hand Operated Switch (push Button)
FSDX
Flow Shutdown Override switch
HSC
Hand Switch Close
FSH
flow Switch High
HSD
Manual Shut Down Switch
FSHH
flow Switch High High
HSDA
Manual Shut Down Alarm
FSHL
Flow Switch High Low
HSDV
HAND SHUTDOWN VALVE
FSL
flow Switch Low
HSDX
Hand Shut Down Override Switch
FSLL
flow Switch Low Low
HSO
Hand Switch Open
FSOV
FCV Solenoid Valve
HSOV
HCV Solenoid Valve
FT
flow Transmitter
HSXA
Hand Oper. Switch - Operated Alarm
FV
flow On/ Off Control Valve
HV
hand On/off Control Valve
FX
flow Computer
HY
HCV I/P RELAY/CONVERTOR
FXXX
Flow Instrument (General)
HZIH
FY
flow I/p Relay/ Converter
HCV/HV Position Indicator "High" Or "Open"
FZB
flow Zener Barrier
HZIL
FZIH
FCV Position Indicator "High" Or "Open"
HCV/HV Position Indicator "Low" Or "Closed"
HZSH
FZIL
FCV Position Indicator "Low" Or "Closed"
HCV/HV Position Switch "High" Or "Open"
HZSL
FZSH
FCV Position Switch "High" Or "Open"
HCV/HV Position Switch "Low" Or "Closed"
ICC
ICS/ICSS-Control Cabinet
FZSL
FCV Position Switch "Low" Or "Closed"
ICP
intermediate Control Panel
ICS
Integrated Control System
FZT
FCV Position Transmitter
ICSS
GDXA
Misc. Fault/Alarm in Software System for Generator Diesel Engine
Integrated Control & Safety System
II
Current Indicator
IT
Current Transmitter
IWS
ICS/ICSS Work Station
JB
junct. Box (elec./telec./control)
GDXI
HCV
Misc./Status Indication in Software System for Generator Diesel Engine hand Control Valve
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 71 of 209
DESCRIPTION
JPB
junction Box (pneumatic)
LIL
Level Indicator Low
KKHC
Hand Switch to Close from Console for COMPRESSOR
LISH
Level Indicator Switch High
LISL
Level Indicator Switch Low
KKHO
Hand Switch to Open/Start from Console for COMPRESSOR
LIT
Level Indicator Transmitter
KKHS
Hand Switch to Stop from Console for Compressor
LPPV
Low Pressure Pilot Valve
LR
level Recorder
LRC
level Recorder Controller
LS
level Switch
LSAH
level Shutdown Alarm High
KKHX
Misc./Selector/Test Handswitch from Console
KKXA
Misc. Fault/Alarm in Software System for Compressor
KKXC
Signal To Close from DCS/PLC for COMPRESSOR
LSAL
level Shutdown Alarm Low
LSDH
level Shutdown High
KKXI
Misc./Status Indicator in Software System for Compressor
LSDL
level Shutdown Low
KKXO
Signal to Open/Start from DCS/PLC for Compressor
LSDX
Level Shut Down Override switch
LSH
Level Switch High
KKXS
Signal to Stop from DCS/PLC for Compressor
LSHH
level Switch High High
LSHL
level Switch High/ Low
LA
Level Alarm
LSL
level Switch Low
LAH
level Alarm High
LSLL
level Switch Low Low
LAHH
level Alarm High High
LSOV
LCV Solenoid Valve
LAHL
Level Alarm High & Low
LT
level Transmitter
LAL
level Alarm Low
LV
level On/ Off Control Valve
LALL
level Alarm Low Low
LXXX
Level Instrument (General)
LC
level Controller - Blind
LY
level I/p Relay/ Convertor
LCP
local Control Panel
LZB
level Zener Barrier
LCV
level Control Valve
LZIH
LG
level Gauge
LCV/LV Position Indicator "High" Or "Open"
LHS
level Hand Switch
LZIL
LI
level Indicator
LCV/LV Position Indicator "Low" Or "Closed"
LIA
Level Indicating Alarm
LZSH
LCV/LV Position Switch "High" Or "Open"
LIC
level Indicator Controller
LZSL
LIH
Level Indicator High
LCV/LV Position Switch "Low" Or "Closed"
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 72 of 209
DESCRIPTION
LZT
LCV Position Transmitter
PAH
pressure Alarm High
MAH
humidity Alarm High
PAHH
Pressure Alarm High High
MAL
humidity Alarm Low
PAHX
High Pressure Alarm Override
MCS
Master Control Station
PAL
pressure Alarm Low
MOS
maintenance Override Switch
PALL
Pressure Alarm Low Low
MOV
motor Operated Valve
PALX
Low Pressure Alarm Override
MP
mimic Panel
PC
pressure Controller-blind
MR
humidity Recorder
PCV
pressure Control Valve
MT
Humidity Transmitter
PDXA
MVHC
Hand Switch to Close from Console for MOV
Misc.Fault/Alarm in Software System for Diesel Engine Pump
PDXI
Misc./Status Indication in Software System for Diesel Engine Pump
PHS
pressure Hand Switch
PI
pressure Gauge Indicator
PIA
Pressure Indicating Alarm
PIC
pressure Indicator Controller
PISH
Pressure Indicator Switch High
PISL
Pressure Indicator Switch Low
PIT
Pressure Indicating Transmitter
PLC
programmable Logic Controller
PPHC
Hand Switch to Close from Console for Pump
PPHO
Hand Switch to Open/Start from Console for Pump
PPHS
Hand Switch to Stop from Console for Pump
PPHX
Misc./Selector/Test Handswitch from Console
PPXA
Misc. Fault/Alarm in Software System for Pump
PPXI
Misc./Status Indicator in Software System for Pump
PPXO
Signal to Open/Start from DCS/PLC for Pump
MVHO
Hand Switch to Open/Start from Console for MOV
MVHS
Hand Switch to Stop from Console for MOV
MVHX
Misc./Selector/Test Handswitch from Console
MVXA
Misc. Fault/Alarm in Software System for MOV
MVXC
Signal To Close from DCS/PLC for MOV
MVXI
Misc./Status Indication in Software System for MOV
MVXO
Signal to Open/Start from DCS/PLC for MOV
MVXS
Signal to Stop from DCS/PLC for MOV
MVZA
Miscrepancy Alarm in Software System for MOV
MVZI
MOV Position Indicator
MVZT
MOV Position Transmitter
MX
Moisture Analyser
MXB
MARSHALLING BOX
OOS
Operational Override Switch
PA
pressure Alarm
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 73 of 209
DESCRIPTION
PPXS
Signal to Stop from DCS/PLC for Pump
PZSH
PCV Position Switch "High" Or "Open"
PR
pressure Recorder
PZSL
PRC
pressure Recorder Controller
PCV Position Switch "Low" Or "Closed"
PRV
pressure Reducing/ Regul. Valve
PZT
PCV Position Transmitter
PS
pressure Switch
QC
Quality Controller
PSAH
pressure Shutdown Alarm High
QT
Totalizer Transmitter
PSAL
pressure Shutdown Alarm Low
QX
Quality Transmitter
PSDH
pressure Shutdown High
RHS
Remote Hand Oper. Switch (Push Button)
PSDL
pressure Shutdown Low
RO
Restriction Orifice
PSDX
Pressure Shut Down Override switch
ROV
remote Operated Valve
PSE
bursting Disc
RSOV
ROV Solenoid Valve
PSH
pressure Switch High
RZIH
ROV Position Indicator "High" Or "Open"
PSHH
pressure Switch High High
RZIL
PSHL
Pressure Switch High Low
ROV Position Indicator "Low" Or "Closed"
PSL
pressure Switch Low
RZSH
PSLL
pressure Switch Low Low
ROV Position Switch "High" Or "Open"
PSOV
PCV Solenoid Valve
RZSL
ROV Position Switch "Low" Or "Closed"
PSV
pressure Safety Valve
SA
Speed Alarm
PT
pressure Transmitter
SAH
Speed Alarm High
PV
pressure On/off Control Valve
SAL
Speed Alarm low
PVSV
pressure/ Vacuum Safety Valve
SC
scale Coupon
PXXX
Pressure Instrument (General)
SDP
shutdown Panel
PY
pressure I/p Relay/ Converter
SDV
shutdown Valve
PZB
pressure Zener Barrier
SE
Speed Element
PZI
PSV Position Indicator
SI
speed Indicator
PZIH
PCV Position Indicator "High" Or "Open"
SIH
Speed Indicator High
PZIL
PCV Position Indicator "Low" Or "Closed"
SIL
Speed Indicator Low
SOV
solenoid Valve
PZS
PSV Position Switch
SOVI
Solinoid Status Indication
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 74 of 209
DESCRIPTION
SOVX
Solenoid Status Override
TIC
temperature Ind. Controller
SS
Selector Switch
TISH
SSDH
speed Shutdown High
temperature Indicator Switch High
SSOV
SDV Solenoid Valve
TISL
temperature Indicator Switch Low
SSSV
sub-surface Safety Valve
TIT
SSV
surface Safety Valve
Temperature Indicating Transmitter
ST
Speed Transmitter
TJ
Temperature Scanner
SVHX
Misc./Selector/Test Handswitch from Console
TR
temperature Recorder
TRC
temperature Recorder Controller
TRV
Temperature Reduc./Regulating valve
SVZT
SDV Position Transmitter
SXS
Speed Switch
SY
Speed Indicator
TS
temperature Switch
SZAH
Speed High Alarm High
TSAH
SZIH
SDV Position Indicator "High" Or "Open"
temperature Shutdown Alarm High
TSAL
SZIL
SDV Position Indicator "Low" Or "Closed"
temperature Shutdown Alarm Low
TSDH
temperature Shutdown High
SZSH
SDV Position Switch "High" Or "Open"
TSDL
temperature Shutdown Low
TSDX
SZSL
SDV Position Switch "Low" Or "Closed"
Temperature Shut Down Override switch
TSH
temperature Switch High
TA
temperature Alarm
TSHH
temperature Switch High High
TAH
temperature Alarm High
TSHL
Temperature Switch High Low
TAHH
Temperature Alarm High High
TSL
temperature Switch Low
TAL
temperature Alarm Low
TSLL
temperature Switch Low Low
TALL
temperature Alarm Low Low
TSOV
TCV Solenoid Valve
TC
temperature Controller - Blind
TSV
Thermal Safety Relief Valve
TCB
telephone Connection Box
TT
temperature Transmitter
TCV
temperature Control Valve
TV
temp. On/off Control Valve
TE
temperature Element
TW
thermowell
THS
temperature Hand Switch
TXXX
TI
temperature Indicator
Temperature Instrument (General)
TIA
Temperature Indicator Alarm
TY
temp. I/p Relay/ Converter
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 75 of 209
DESCRIPTION
TZB
temperature Zener Barrier
XFAS
fire Alarm Sounder
TZIH
TCV Position Indicator "High" Or "Open"
XFD
fire Detector
XFGA
TZIL
TCV Position Indicator "Low" Or "Closed"
MISC. FIRE & GAS ALARM COMMON
XFM
fire Monitor
TZSH
TCV Position Switch "High" Or "Open"
XFP
CO2 Dry Powder
TZSL
TCV Position Switch "Low" Or "Closed"
XFSB
Combined Sounder Beacon-Fire Alarm in Container
TZT
TCV Position Transmitter
XFV
Pneumatic/Fire On-Off Cont. Valve
UA
Miscellaneous Alarm
XFXS
Fire Interface activation Signal
UCP
Unit Control Panel
XFZB
Fire Zener Barrier
UI
Tank side Indicator
XGA
flammable Gas Alarm
UIT
Tank Data Receiver
XGAB
gas Alarm Beacon
UL
lamp local panel
XGAS
gas Alarm Sounder
UX
Tank Scanning Unit
XGCA
VSD
Variable Speed Drive
Misc. Gas Chromatograph Analyser
VV
main Isolation Valve (hand Operatd)
XGD
flammable Gas Detector
XGDR
IR Beam Gas Det. (Receiver)
XA
Miscellaneous Alarams
XGDT
IR Beam Gas Det. (Transmitter)
XAH
Vibration Alarm High
XGM
flammable Gas Monitor
XAHH
Vibration Alarm High High
XGXS
Gas Interface activation Signal
XALL
Vibration Alarm Low Low
XHCP
XBLV
Hydraulically Actuated Ball Valve
HEAT DETECTOR CONTROL PANEL
XBS
Fog Horn
XHD
heat Detector
XCFD
CCTV Flame Detector
XHDI
XCP
SCADA RTU/Console/Misc. Panels
Heat Detector Response Indicator
XDM
Damper Motor
XHGD
Hydrogen Gas Detector
XE
Vibration Probe
XHS
Selector Switch / Misc.Hand Operated Switch
XFA
fire Alarm
XI
Miscellaneous/ Status Indication
XFAB
fire Alarm Beacon
XISD
Incipient Smoke Detector
XFAM
Individual Addressable Module/ Interface Module
XL
3 Lamp status Unit (AutoManual-Inhibit)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 76 of 209
DESCRIPTION
XLHD
Linear Heat Detector
XVAL
Vibration Alarm Low
XMCP
manual Call Point
XVCP
vibration Control Panel
XMR
marshalling Cabinet
XVE
vibration Probe
XO
Start Signal from DCS
XVM
vibration Monitor
XOV
Locally Operated Valve or Misc./Hydraulic Operated Valve
XVS
vibration Switch
XVSA
vibration Shutdown Alarm
XP
Bio Probe
XVSD
Video Smoke Detector
XPC
Misc. Computer
XVSH
Vibration Shutdown High
XPD
Pig Detector
XVSL
Vibration Shutdown Low
XPI
Bio Indicator
XVT
Vibration Transmitter
XPZI
Pig Position Indicator
XVXX
Vibration General
XR
Misc. Recorder/ Printer
XWDT
WIND DIRECTION TRANSMITTER
XRV
Air Release Valve
XWE
WIND SENSOR
XS
Misc. Switch
XWS
Misc. Workstation
XSD
smoke Detector
XWST
WIND SPEED TRANSMITTER
XSDI
Smoke Detector Response Indicator
XY
Pneumatic Pilot
XSDT
smoke Detector Transmitter
XZAH
Misc. Valve Position Alarm "High" Or "Open"
XSH
Vibration Switch High
XZAL
XSHH
Vibration Switch High High
Misc Valve Position Alarm "Low" Or "Closed"
XSL
Misc. Switch Low
XZIH
XSOV
Misc. Solenoid Valve
Misc. Valve Position Indicator "High" Or "Open"
XTGA
toxic Gas Alarm
XZIL
Misc. Valve Position Indicator Low Or "Closed"
XTGB
Toxic Gas Alarm Beacon
XZSH
XTGD
toxic Gas Detector
Misc. Valve Position Switch "High" Or "Open"
XTGI
Toxic Gas Detector Response Indicator
XZSL
Misc. Valve Position Switch "Low" Or "Closed"
XTGM
toxic Gas Monitor
YA
KEY PHASE ALARM
XTGT
toxic Gas Detector Transmitter
YE
KEY PHASOR PROBE
XV
Pneumatic Valve / Relay
YS
Key Phase Switch
XVA
vibration Alarm
YSM
Key Phase Monitor
XVAH
Vibration Alarm High
YT
KEY PHASOR TRANSMITTER
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
CODE
Tagging and Numbering Systems
DESCRIPTION
CODE
Page: 77 of 209
DESCRIPTION in "Between"
ZA
Position Alarm
ZAH
Valve Position Alarm "High" Or "Open"
ZSOV
Solenoid Valve
ZT
Position Transmitter
ZAL
Valve Position Alarm "Low" Or "Closed"
ZXA
Valve Discrepancy Alarm
ZAM
Valve Position Alarm "Middle" Or in "Between"
ZXAH
Axial displacement Alarm High
ZXXX
Position Indicator (General)
ZB
Zener Safety Barrier
ZC
Position Controller
ZE
*..HO
Hand Switch To Open/ Start From Console
Axial Position / Axial Displacement
*..HS
Hand Switch To Stop From Console
ZI
position Indicator
*..HC
Hand Switch To Close From Console
ZIC
Position Indicator "Closing"
ZIH
Position Indicator "High" Or "open"
*..XO
Signal To Open/Start From DCS/PLC
*..XS
Signal To Stop From DCS/PLC
**..XC
Signal to Close From DCS/PLC
ZIL
Position Indicator "Low" Or "closed"
ZIM
Valve Position Indicator "Middle" Or in "Between"
*..XA
Miscellaneous Alarms including Fault Alarm in Software System
ZIO
Positioned Indicator "Opening"
*..XI
Miscellaneous/ Status Indication in Software System
ZS
Position Limit Switch
ZSH
position Switch "high" Or "open"
*..ZA
Discrepancy Alarm in Software System
ZSL
position Switch "low" Or "closed"
**..ZI
Position Indicator
ZSM
Valve Position Switch "Middle" Or
*..ZT
Position Transmitter
*.. These 2 letter codes shall be preceded by PP for pumps, FF for fans, MV for MOVs, KK for compressor, SV for SDVs, AB for Air Circuit Breakers, GB for Gas Circuit Breakers, IL for Isolators, MB for Moulded Case Circuit Breakers, OB for Oil Circuit Breakers, VB for Vacuum Circuit Breakers or Vacuum Insulated Circuit Breakers, etc. Note: Additional instrument codes may be formatted using the instrument identification matrix in Appendix-06. However these shall be subject to ADCO Approval
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
TABLE X: List of Junction Box Codes CODE
DESCRIPTION
MH
Manhole
JB
Junction Box
Document No: Master-30-99-90-0001 Rev 9.
Page: 78 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
TABLE XI: List of Document Classification Codes CODE
DESCRIPTION GENERAL
00
General Specification
01
Hazardous Area Classification
02
Field Layouts & Terminal Layouts
03
Site Layouts & Field Area Layouts
04
Plot Plans
05
Field Sub-Area Plans
06 07
Line Routing Plans
08
PFD & P&ID
09
Asset Integrated Management System (AIMS)
10 11
Miscellaneous PIPING INCLUDING PIPELINES
12
Piping Specifications
13
Piping Layouts
14
Piping Layout “Elevations”
15
Isometrics
16
Pipe Supports
17
Line List/Schedules
18
Data Sheets
19
Bill Of Materials/ Tie-in Schedules
20
Piping For Building Services
21
General Arrangement – Piping
22
Pipeline Profiles & Details
23
Miscellaneous/Stress Analysis Reports MECHANICAL: EQUIPMENT
24
Equipment Specifications
25
Equipment Drawings
Document No: Master-30-99-90-0001 Rev 9.
Page: 79 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 80 of 209
TABLE XI: List of Document Classification Codes CODE
DESCRIPTION
26
Equipment Schedules
27
Equipment Data Sheets
28
HVAC Equipment Drawings
29 30 31
Miscellaneous MECHANICAL: VESSELS & STORAGE TANKS
32
Vessels & Tank‟s Specification
33
Vessels & Tank‟s Drawings
34
Vessels & Tank‟s Data Sheets
35 36
Miscellaneous MATERIALS/ CORROSION
37
Specifications/ Standards / Procedures
38
Miscellaneous INSTRUMENTATION INCLUDING FIRE & GAS
39
Instrument Specifications
40
Instrument Data Sheets
41
Instrument Loop/Segment diagrams
42
Cause & Effect/ Logic/ Ladder Diagrams/ Software Configuration Diagrams And relay Schematics
43
Control Room/ Control Panel/ Auxiliary Racks Layouts
44
Instrument Location Layouts
45
Fire & Gas Detectors Location Layouts (Including Building Services)/ F& G Block Diagram
46
Instrument Hook-Up Diagrams (Process & Pneumatic)/ Installations Drawings
47
Instrument Intercon./ Schematic/ Termination/ Wiring Diagrams
48
Lists/Schedules/Bill Of Materials (Safety/ Relief Valve Schedule, I/O Lists etc.)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 81 of 209
TABLE XI: List of Document Classification Codes CODE
DESCRIPTION
49
Instrument Location & Cable Routing Layouts / Fire & Gas Detector Location & Cable Routing Layouts / Cable Block Diagrams
50
Instrumentation Equipment Drawings
51
Instrument Engineering Sheets
52
Miscellaneous ELECTRICAL
53
Electrical Specifications
54
Electrical Data Sheets
55
Electrical Load Lists
56
Key Single Line Diagrams, SLDs & Protection & Metering Diagrams
57
Electrical Panel Layouts
58
Schematic Wiring/ Interconnection/ Circuit/ Termination/ Sequence Diagrams/ Elect. Logic Diagrams
59
Elect. Equip., Location & cable Routing Layouts, Substation/ Switchyard Layouts, Lighting/ Earthing Layouts & cable Block Diagram
60
Electrical Equipment Drawings
61
Overhead Transmission Lines Drawings
62
Cathodic Protection Drawings
63
Lists/ Schedules/ Bill Of Material
64
Electrical Drawings For Building Services
65
Building Management System Drawings
66 67
Protection Relay Co-ordination Settings (Calculations, Curves, Tables)/ Installation Standards/ Load Analysis/ Miscellaneous TELECOMMUNICATION
68
Telecommunication Specifications
69
Telecommunication Data Sheets
70
Telecom. Line Diagram, Telecom Block Diagram, Telecom Wiring/ Interconnection Diagram, Telecom Panels Layout
71
Overall Telecom. Equipment and Cable Routing Layout
72
Equipment & Outlet Layouts Telephone, Data, PA and MATV Services
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 82 of 209
TABLE XI: List of Document Classification Codes CODE
DESCRIPTION
73
List /Schedules Bill of Materials
74
Miscellaneous CIVIL
75
Civil Specifications
76
All Structural and Civil Drawings
77
Schedules & Bill Of Materials
78
Architectural Drawings
79
General Arrangement – Civil (Refer Sec. 4.6.2)
80 81 82
Maps, Topographic drawings, Grading Plan, Levelling & Surveys, Irrigation, Landscaping
83
Miscellaneous SAFETY INCLUDING FIRE FIGHTING
84
Specifications
85
Safety Equipment Data Sheets
86
Safety Equipment Drawings
87
Safety Equipment Layout
88
Fire Fighting Layout/ Fire Water System Layout/ Schematic
89
Miscellaneous MISCELLANEOUS DOCUMENTS
90
Engineering Procedures And Working Procedures
91
Philosophy & Project definition Reports & General Reports
92
Terms Of Reference/ Contract Documents/ Tender Documents/ Minor Work Order/ Task Order Justification
93
Scope Of Works/ Procurement Packages/ Manufacturing/ Construction Records Books
94
Engineering Dossiers/ Technical Proposal
95
Manuals (Engg., Operating Maintenance, Safety, Etc..)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :
Tagging and Numbering Systems
Page: 83 of 209
TABLE XI: List of Document Classification Codes CODE
DESCRIPTION
96
Vendor Data Books
97
Hazop/ Hazan Studies And Technical Audits/ Safety Audits & Quality Assurances/ Project Quality Plan/ Commissioning
98
Finance Documents
99
Catalogue
For Technical Studies, Calculations, Reports, etc. the relevant discipline miscellaneous code to be used. e.g. General Studies – Code 11, Stress Analysis Report – Code 23, Electrical Studies – Code 67, etc.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
4. 4.1.
Page: 84 of 209
DRAWING STRUCTURE AND CONTENTS OF MASTER DRAWINGS INTRODUCTION
This section details the MASTER engineering drawings structure and contents of each type of drawings. The drawings of the Engineering Division have been redefined and organized in a structure that maps all operating areas of ADCO with greater details at each layer downward and also utilizes full potential of the CAD system. The engineering drawings structure diagrams enclosed in this section depict the type of engineering drawings and the logical flow of information required to prepare the drawings. The succeeding chapters of this section describe the content requirements and the interrelationship between the drawings. 4.1.1.
General
The Consultant/Contractor of ADCO Projects shall use these ADCO drawings electronic files in AutoCAD to develop project engineering drawings as explained in Section 5.11 of this document, Procedure for Preparation of Project Drawings. Project deliverables shall be as defined in Section 5.10 of this document and the project specific deliverable schedule. For Project Drawings, Refer to Section 5.0 of this Document.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.
Page: 88 of 209
GENERAL DRAWINGS 4.2.1.
ADCO Facilities - Master Plan
This drawing indicates the Fields and Terminal operated by ADCO. The relative location of each area and its size are shown. grid used in ADCO engineering drawings.
It also indicates the master
The master grid is overlaid on the Abu Dhabi emirates map in UTM projection on a scale of 1:500,000. One grid element corresponds with the line routing plan drawing and the area covered under each field corresponds with the field Layout drawing(s). The following areas presently operated by ADCO are shown in the Master Plan:
Bab Field
Bu Hasa Field
Asab Field
Shah Field
Sahil Field
Jarn Yaphour Field
Jebel Dhanna Terminal
North East Bab (Al Dabbiya & Rumaitha)
Beda Al Qemzan
Quashwira
Mender
Each of these areas is shown in detail in the corresponding Field Layout / Terminal Layout drawings. A copy of the Master Plan is enclosed on the following page. All UTM co-ordinates shall be based on Nahrwan Datum.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.2.
Page: 90 of 209
Field/ Terminal Layout Drawing
4.2.2.1.
Size
:
A0
4.2.2.2.
Scale
:
1 : 50,000 *
4.2.2.3.
Content
:
The Field/ Terminal Layout drawing shall indicate all the facilities in outline in a overall field shown in the ADCO Facilities Master Plan. The facilities shall include:
Central facilities and accommodation area.
Remote stations and facilities.
All wells with well numbers.
Main pipelines (oil, gas, water).
Electrical power overhead lines.
Main roads and sand tracks.
Survey control points.
Field boundaries.
The drawings shall be prepared with appropriate grid system as shown on the sample drawings on the following page and shall be with both Northing and Easting coordinates. The main grid shown on the drawing is used for developing Master Site Layouts/ Field Area Layouts. The secondary and larger grid corresponds with applicable Line Routing Plans. One grid element of a Field Layout drawing (2km x 2km) corresponds with one Field Area Layout. Each Field Area shall be identified by a number beginning with 101 at the top left. * 1:66,000 scale is used for big areas to accommodate all Field to accommodate in 1 sheet e.g. – Bu Hasa & Bab.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.3.
Page: 92 of 209
Line Routing Plan
4.2.3.1.
Size
:
A0
4.2.3.2.
Scale
:
1 : 10,000
4.2.3.3.
Content
:
The Line Routing Plan shall correspond with one grid element of ADCO Facilities Master Plan and also the larger grid element (denoted by *) of the Field Layout drawing. The drawing shall indicate facilities such as:
Central and Remote Facilities
Overhead transmission lines.
Main Oil Lines Transfer pipeline and Flowlines
Well injection lines/ gas trunk lines and gathering/ injection lines
Main roads, sand tracks and landmarks
Survey control points
Underground cables/FO cables
The grid element with reference to the Master Plan shall be identified on the drawing and also on the title description. The drawing shall indicate both Northing and Easting coordinates and key to the Field Layout (line routing plan inside the Field) or ADCO Facilities Master Plan (line routing plan outside a Field). The line routing plans developed for an area outside a Field shall additionally contain an alphabetic grid as shown on the Master drawing structure on page 88 to enable development of downstream drawings. The drawing is enclosed on the following page. It covers an area of 8 km x 6 km. All major and non-major facilities both inside and outside the ADCO field limits shall be shown (e.g. overhead lines, main oil lines etc. for outside the field).
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.4.
Page: 94 of 209
Site Layout Drawing
4.2.4.1.
Size
:
A0
4.2.4.2.
Scale
:
1 : 2,500
4.2.4.3.
Content
:
A Site Layout Drawing shall be made for the Major Facilities like central degassing station, accommodation, remote stations, compressor stations, etc. A Site Layout Drawing shall include the following:
All plants
Buildings/ Structures
Roads and Main Tracks
Main Pipe runs
Overhead lines
Underground cable runs and trenches
Survey control points.
Wells
Flares
Prevailing wind direction
The Site Layout shall be drawn to 1:2500 scale. It shall be developed from field layout drawings with an appropriate grid system as shown on the sample drawing. The area covered by the drawing shall be 2km x 2km and shall either coincide with one full grid element of the Field/ Terminal Layout or shall cover several adjacent grid divisions as appropriate, to include full details of the plant facility. Key to the Field Layout shall also be indicated.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.5.
Page: 96 of 209
Field Area Layout Drawing
4.2.5.1.
Size
:
A0
4.2.5.2.
Scale
:
1 : 2,500
4.2.5.3.
Content
:
A Field Area Layout drawing is an equivalent of a Site Layout drawing. It covers an area of 2km x 2km and indicates non major facilities, like overhead transmission lines, transfer pipelines, artificial lift installations, water supply stations, rest houses and areas adjacent to the Site Layouts. The Field Area Layout drawing shall include the following:
Building/ Structures
Wellheads
Roads and main tracks
Main Pipe runs
Overhead lines
Underground cable runs and trenches.
Flares
The Field Area Layout shall be drawn to scale using the existing co-ordinates (Nahrwan Datum) with an appropriate grid system as shown on the sample drawing on the following page and with base co-ordinates for both UTM Northing and Easting. The area covered by the drawing should coincide with one grid element of the Field Layout/ Line Routing Plan.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.6.
Page: 97 of 209
Plot Plan
4.2.6.1.
Size
:
A0/A1
4.2.6.2.
Scale
:
1 : 500
4.2.6.3.
Content
:
A Plot Plan corresponds to a fenced plant of the Site Layout or a field Area Layout. A Plot Plan shall indicate:
Buildings/ Structures
Equipment/ skids
Roads/ Tracks
Fence Lines
Wells
Pits/ Concrete Trenches, Telecom Manholes
Prevailing wind direction
The drawing shall be prepared with appropriate grid system aligned with the plant North as shown on the sample drawings on the following pages. The included angle between the true north and plant north shall be indicated on the drawing. All equipment shall be identified with tag numbers. Plant North shall be selected along one side of the fence such that the included angle is less than 45°. Plant zero axes shall be positioned such that negative coordinates are avoided. Reference shall be made to the nearest available ADCO Survey Control points and the plant (inside) survey reference points and their coordinates shall be established and tabulated on the Plot Plan. In case a Plot Plan is required to be shown on more than one sheet because of its large size, then a "Plot Plan-Overall" drawing shall be developed at the nearest suitable scale to show the full extent of the plot on one sheet as indicated on the sample drawing enclosed. This is the case for Asab-CDS, Bab-CDS, Jebel Dhanna tank farm and Industrial Area, etc. The Plot Plan shall be provided with alphanumeric grid covering the full area of the Plot Plan. The main sections of the grid shall be identified with alphabetic code and subsections shall be numbered beginning with 01 at the top left of each main section. Each grid element shall be of 25m (H) x 30 m (W).
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 98 of 209
Each main sections of the Plot Plan shall be shown in greater detail in the corresponding General Arrangement drawing. Piping layouts shall be drawn for each subsection. All gas wells shall be considered as Plant and same description shall be followed.
Document No: Master-30-99-90-0001 Rev 9.
1
3
2
4
A1
A A20
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
4.2.7.
Page: 102 of 209
Fields Sub-Area Plan
4.2.7.1.
Size
:
A1
4.2.7.2.
Scale
:
1 : 500
4.2.7.3.
Content
:
A Field Sub-Area corresponds to one grid element (an area of 200m x 200m) of the Field Area Layout or Site Layout and is equivalent to the Plot Plan drawing. The Field Sub-Area drawing shall include the following:
Building/ Structures
Equipment/ Skids
Roads/ Tracks
Fence lines
Wells
Pits/ Concrete Trenches
The drawing shall be prepared according to the grid of the corresponding Field Area Layout i.e. aligned with the true North as shown on the sample drawing on the following page. All equipment shall be identified with tag numbers. Field Sub-Area Plan shall contain an alpha-numeric grid with each grid element of 25m x 25m as shown on the sample drawing. Key to the Field Area Layout (or Site Layout) shall be indicated. Reference drawings indicated on Field Sub Area Plan shall include the Field Area Layout and General Arrangement drawings.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.8.
Page: 104 of 209
Process Flow Diagram (PFD)
4.2.8.1.
Size
:
4.2.8.2.
Content
A0/A1 :
Process Flow Diagrams are the primary source of information about the process. It shall show the following:
Main process lines with flow direction.
All the plant equipment
Main line control valves and isolation valves.
Control loops relief valves and restriction orifices.
Equipment number and equipment data
Process data for each operating mode
PFD shall indicate full compositional data for all streams and equipment data. These data formats are as shown on the sample drawings on the following pages. If space permits stream data can be combined with PFD in the same drawing.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.9.
Page: 107 of 209
Piping and Instrument Diagram (P&ID)
4.2.9.1.
Size
:
4.2.9.2.
Content
:
A1
Piping and Instrument Diagram is the primary source of information for preparation of detailed drawings of piping, mechanical, instrument and electrical disciplines. P&ID shall be drawn such that flows are generally from left to right, the plant equipment shall be shown in correct spatial relationship and the process/ utility connections shall be shown in their true sequence. Equipment description, Tag. No. and design parameters shall appear either near the top or near the bottom of the sheet directly above or below the equipment symbol. All piping equipment and instruments and their interconnections shall be shown using the symbols as per Appendix-06. Abbreviations as applicable shall be as per tables in section-3 and Appendix-06. A legend sheet for P&ID's shall be prepared to include the symbols and abbreviations used. Each line shall be numbered as per procedure described in Section 3.0 of this Procedure. Line sizes, specifications, process fluids and direction of flow shall be shown. Piping specification changes shall be clearly shown. Route sources, destinations and cross-reference drawing numbers shall be shown. Process vents and drains shall be shown on the P&ID. Insulation on piping and equipment shall be shown. Tracing requirements shall also be indicated. Packaged equipment skid shall be shown clearly defining vendor supply limits. Regarding Vendor Equipment 'package' the following shall apply:
Consultant/ Contractors' preliminary P&ID may indicate the proposed equipment package as a box with all the tie-ins required.
Consultant/ Contractor shall ensure that the Vendor P&ID is prepared as per this engineering procedure (tag Nos., symbols, line Nos... etc.)
Consultant/ Contractor shall incorporate the finalized vendor P&ID into their main P&ID.
In case of complex packages (turbine, gas compressors etc.) the Vendor P&ID may be used as a standalone drawing and the main P&ID may show the Vendor
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings package as a box and include reference to the Vendor P&ID. cases shall be subject to prior ADCO approval.
Page: 108 of 209 However all these
Specific requirements of details of pipework, and mechanical equipment which shall be shown on P&IDs' are as listed below:
Pipework:
Underground piping noted with aboveground/ buried breaks.
Electrical insulation flanges for cathodic protection.
Sections of piping and joints which should not be pocketed or require a slope in a given direction.
Spectacle blinds in their normal operational position.
Air failure action of control valves/ locking requirements of valves
Air to open/ close action of Control Valves
Chemical injection points and sample connections.
Corrosion monitoring points/ chambers
Expansion joints, flexible couplings, bellows, etc.
Valve types/ types of end connections
Vessels and Columns:
Nozzles numbers and sizes
Manhole(s)
Internals (trays, vortex breakers, demister pads, stilling wells, weirs, distribution arrangements, column packing)
Numbered column trays
Tanks:
Type of Tank (Conical roof, floating roof, open top etc.)
Gas blanket/ purge
Tank heaters and mixers.
Swan-neck vents on atmospheric tanks
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Cathodic protection
Flame arresters
Anti-syphon hole (with diameter) on top filling lines with dip legs
Nozzle numbers and sizes
Manholes
Foam injection points
Page: 109 of 209
Compressors and Blowers
Suction strainer (temporary or permanent and type)
Anti-surge system
Seal system
Lubricating oil system
Unloading and loading system
Extent of piping to be pickled
Blowdown valves
Acoustic and personnel protection insulation
Heat Exchangers
Number of bays and passes (air-cooled type)
Number of bundles per bay (air cooled type)
Number of fans (air cooled type)
Type of fan, variable or fixed pitch/ single or double speed/ induced or forced draught
Number of shells
Number of tube-side and shell-side passes.
Any elevation requirements
Normal liquid level on reboilers
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 110 of 209
Pumps
Suction strainer and type.
Seal system.
Lubricating oil system
Drain/ vent valves
Type of drive
Nominal throughput
Differential head.
Type of pump
The Layout of P&IDs' shall allow future additions and shall avoid crossing of lines. Sample P&ID and legend sheets are enclosed on the following pages. A combination of ADCO/ADNOC tag numbering system is used for Bab Gas System tag numbering, except for Bab Thammama-B Gas Injection Facilities. Refer Attached P&ID legend sheet for Bab Gas System.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.2.10.
Page: 114 of 209
Area Classification Drawing
Area classification drawing shall be developed using the Plot Plan to indicate the limit of hazardous or nonhazardous area. The areas shall be classified as hazardous zones as per the latest IP code and shall be indicated as under:
ZONE-0
ZONE-2
ZONE-1
UNCLASSIFIED AREA
Specific information regarding areas around pumps, valve pits etc. may be indicated by notes and figures. Selection criterion and acceptable types of protection for electrical equipment located in various zones should be indicated. Applicable apparatus sub group and temperature class should also be indicated. Prevailing wind direction shall be shown on the drawing. Sample drawing is enclosed on the following page.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.3.
Page: 116 of 209
PIPING/ MECHANICAL DRAWINGS 4.3.1.
General
4.3.1.1.
Piping and Mechanical Drawings together with Bill of Materials, Piping specifications, Schedules and Scope of Work shall provide a clear and concise drawing arrangement for fabrication and installation.
4.3.1.2.
Piping Layout Drawings shall be associated with the Piping Elevations, Piping isometric and Bill of Materials.
4.3.1.3.
Complex parts of a piping system shall be clarified on the Piping Sections/ Elevations Drawings.
4.3.1.4.
Drawings providing fabrication details shall contain Bill of Materials.
4.3.1.5.
Symbols and abbreviations as per Appendix-06 shall be used. Numbering of equipment, instruments and pipelines shall be as per Section 3.0.
4.3.1.6.
All equipment, fittings and provisions required to complete the piping system shall be shown. This includes:
Vents, drains (process and testing)
Control valves, meters, orifice plates or carriers, instrument sensing points with root isolation valves
Valves with an indication of operating method, extended spindle, chain, motor piston etc. and showing the spindle orientation
Types of valves and types of end connections
Breakable joints if specifically required
Blind Flanges and plugs for connections which are not valved or piped
Expansion and/or settlement provision
Cooling/ lubricating oil harness at pumps, vents, drains from meters, pumps, bed plates etc.
Insulation, tracing.
4.3.1.7.
All control valves/MOVs, pipe runs and other equipment in the line shall be uniquely identified by a tag number.
4.3.1.8.
All other items, pipe fittings, joints, small bore valves etc. shall be identified.
4.3.1.9.
Sloped piping shall be indicated together with flow arrows and slopes where necessary.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.3.1.10.
The position of supports, anchors, guides, concrete foundations and expansion provisions shall be indicated.
4.3.2. 4.3.2.1.
Page: 117 of 209
General Arrangement Piping Drawing
Each GA Piping drawing covers a section of the Plot Plan, and shall show the sub-sections into which the section is divided. This shall include an alphanumeric grid as shown on the sample drawing on the following page. Sub section of a GA shall cover an area of 30 m x 25 m.
4.3.2.2.
GA Piping drawings shall be at a scale of 1:250 (see structure clarification drawing on page 88). Following drawings shall be based on the GA Piping drawing:
Electrical Equipment Location & Cable Routing, layout Lighting Layout and Earthing Layout
Instrument location & cable routing layout and Fire & Gas Cable Routing Layout
Telecom Cable Routing Layout
General Arrangement Civil Drawing
4.3.2.3.
The General Arrangement Piping drawings shall show all buildings, Structures, roads, equipment and piping pits within a section of the Plot Plan. Both underground and aboveground piping between plants/ equipment are identified and shown as single line piping; flow direction & line number to be written adjacent to the line.
4.3.2.4.
The numeric code on the grid of a piping GA shall corresponds with the sheet numbers of the piping Layout drawings.
4.3.2.5.
In case detailed Piping Layouts are not prepared for some subsections, the corresponding grid element shall be marked with an asterix mark and an explanatory note shall be added.
4.3.2.6.
In case of multi-tier structures (viz. Gas Compressor House) the GA piping drawing shall be produced for each tier. Consequently piping layout drawing shall be produced from each GA piping drawing for each tier.
4.3.2.7.
Key to the plot plan shall be shown on the GA piping drawing.
4.3.2.8.
A sample GA-Piping drawing is enclosed on the following page.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.3.3.
Page: 119 of 209
Piping Layout Drawing
4.3.3.1.
Piping Layout drawing shall be drawn on a scale 1:50 with the area covered in one sheet corresponding to a grid element of the GA piping drawing.
4.3.3.2.
This drawing shall contain all mechanical equipment, piping, components, instruments and their connections. It shows all items in their true relative position on site. The limits of the Layout shall be marked to indicate which subsections adjoin the present Layout. This can be achieved using both the adjoining sheet numbers and the drawing number of its GA Piping drawing. Key to the GA piping drawing shall also be indicated. The Layout will take the form of a plan view. Elevations and details shall be produced to clarify complex piping. If required separate drawings shall be prepared to give full details such as elevation, sections and details. These piping sections/elevations/details shall be prepared from the Piping Layout drawing and shall be properly referenced on the Piping Layout drawing. Skid mounted equipment are not detailed on the Piping Layout Drawings, but only the skid limits shall be indicated. For each equipment skid, a "Skid Detail Drawing" shall be produced, at an appropriate scale to show the equipment and piping in sufficient details. The skid detail drawing shall be referenced inside the skid box as well as under the reference drawings.
4.3.3.3.
Piping Layout Drawing shall include
All equipment with equipment number, location and nozzle positions. -
Location of equipment dimensions and elevations.
by
means
of
co-ordinates,
-
Nozzle positions by means of dimensions and orientation.
Equipment foundations outline, size and elevations. Equipment/ skid dimension and top of skid elevation.
All pipework. When pipes have a common bottom level (e.g. on a pipe rack) elevations shall be shown with respect to the bottom of the pipes (BOP). In other case these shall be to pipe centres.
Dimensions shall be to the centreline of pipe and face of flange unless noted otherwise.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 120 of 209
Lines 12 inch and smaller shall to be drawn as a single line, 14 inch and larger as double line. Full line number and direction of flow should be shown. If line number is not available, the size, medium and class shall be shown.
All on-Line instrumentation, gauges and valves with tag numbers.
Main steel and concrete structures with coordinates, dimensions and elevations.
Pipe sleepers with elevations, coordinates and dimensions to nearby structure.
Piperacks with elevations coordinates and dimensions.
Pipe supports by means of symbols in accordance Appendix-06. Pipe support drawings shall be referenced.
Building outlines.
Operating platforms with elevations.
with
4.3.3.4.
The reference drawings indicated on a piping Layout drawing shall include piping elevation drawings, skid detail drawings, nozzle orientation drawings, plot plan, GA piping drawings, etc.
4.3.3.5.
The piping Layout drawing samples are enclosed on the following pages.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.3.4.
Page: 123 of 209
Pipe Supports Drawings
Pipe supports shall be shown on piping Layouts. All types of pipe supports shall be detailed on dedicated drawings showing all necessary engineering details as well as the outline of their concrete foundation where necessary. Detailed fabrication drawings shall be issued by the fabricator. Pipe supports indicated on the GA Piping drawing, piping Layout drawing etc. shall be correlated to the pipe support drawing by means of pipe support code numbers. Consultant/ Contractor shall use their own pipe support code numbers. number registration/booking in ADCO system is not required.
4.3.5.
Pipe support
Pipeline / Flowline Drawings
4.3.5.1.
Pipeline / Flow line Drawings (Buried / Above-ground) together with Alignment sheets, Typical Crossing details, Line Routing Plans, Site Layouts, Field layouts with Corridors, Pipeline Specification, Design Calculations, Stress Analysis, Upheaval Buckling, Bill of Materials, Schedules, Scope of Work, etc. in accordance with the TABLE IX : List of Document Classification Codes thus shall provide a clear and concise set of drawings for Installation.
4.3.5.2.
Based on the Topographical Survey findings of the Approved Route, Pipeline / Flowline Alignment Sheet (Plan & Profile) Drawings shall be prepared for each Pipeline / Flowline independently in compliance to the Scale stated in the Alignment Sheet Drawing Template.
4.3.5.3.
Based on the Approved Design of Project Alignment Sheets i.e. “Approved For Construction”, EPC Contractor/Construction Contractor shall ensure during the Construction as a part of As-Builting” prior to back-filling to verify/re-confirm the accurate Pipeline parameters; as listed in the attached Sample of Pipeline Data, so as to facilitate the incorporation of attributes mandatory for the Corporate GIS Map indicating all Off-Plot Facilities.
4.3.5.4.
Pipeline / Flowline Typical Crossing Detail Drawings shall be prepared for each crossing; as applicable i.e. Crossing the following Existing facilities Pipeline / Flowline, Rig Access route/Road/Sand Track, Over-Head Lines, Buried Cable(s), Sabkha (Wet/Dry), etc.
4.3.5.5.
Line Routing Plan, Site Layout & Field Layout Drawing shall be prepared based on the latest MASTER / Project Drawing.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.3.6.
Page: 124 of 209
Piping Drawings for Building Services
4.3.6.1.
Piping Drawings for Building services together with Schematics, Building Layout Drawings, Pipe Specification, Design Calculations, Bill of Materials, Schedules, Scope of Work, Typical details, etc. in accordance with the TABLE IX : List of Document Classification Codes thus shall provide a clear and concise set of drawings for Installation.
4.3.6.2.
4Based on the Schematics; Piping Drawings for Building services i.e. Potable Water System, Fire Water Sprinkler System, Chiller System, Irrigation System, Drain / Sewage Services for Buried & Above-ground shall be independently prepared in compliance to the Drawing Template. 4.3.7.
Equipment / Skid Drawings
4.3.7.1.
Equipment / Skid Drawings together with PFDs, P&IDs, General Arrangements, Detailed Fabrication Drawings, Support Drawings, Nozzle Orientation / Tie-In envelopes, Nozzle Schedule, Data sheets, Specifications, Design Calculations, Bill of Materials, Schedules, Scope of Work, Plan / End View / Cross Section details, etc. in accordance with the TABLE IX : List of Document Classification Codes thus shall provide a clear and concise set of drawings for Installation.
4.3.7.2.
Based on the Equipment / Skid General Arrangement & Fabrication Drawings; Detailed Drawings i.e. trims, Internals, Weld joints, Alignment / Assembly / Fixing, Lifting / Loading Arrangement, Maintenance Access / Withdrawal Space, Name Plate, etc. shall be independently prepared in compliance to the Drawing Template.
4.3.7.3.
Appropriate Equipment / Skid Project Drawing Number & Document Number references shall be ensured to be reflected in the relevant sections of Operating & Maintenance Manual, Equipment Catalogues, etc. 4.3.8.
Vessel / Storage Tank Drawings
4.3.8.1.
Vessel / Storage Tank Drawings together with Data sheets,, General Arrangements, Detailed Fabrication Drawings, Support Drawings, Nozzle Orientation, Nozzle Schedule, Specifications, Design Calculations, Bill of Materials, Scope of Work, Plan / End View / Cross Section details, etc. in accordance with the TABLE IX : List of Document Classification Codes thus shall provide a clear and concise set of drawings for Installation.
4.3.8.2.
Based on the Vessel / Storage Tank General Arrangement & Fabrication Drawings; Detailed Drawings i.e. trims, Internals, Weld joints, Alignment / Assembly / Fixing, Lifting / Loading Arrangement, Maintenance Access /
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 125 of 209
Withdrawal Space, Name Plate, etc. shall be independently prepared in compliance to the Drawing Template. 4.3.8.3.
Appropriate Vessel / Storage Tank Project Drawing Number & Document Number references shall be ensured to be reflected in the relevant sections of Operating & Maintenance Manual, Equipment Catalogues, etc.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.4.
Page: 126 of 209
INSTRUMENTATION DRAWINGS 4.4.1.
General Requirements
A set of instrumentation documents and drawings shall be prepared for each project, which shall include, but not necessarily be limited to those specified in this Procedure. 4.4.1.1.
The extent of detailing of each document and drawing shall be such as to facilitate the installation and correct functioning of all instruments and serve as a reference for future maintenance, changes and extension to the instrumentation system.
4.4.1.2.
All parts and sections of any form, sheet or other document which requires 'filling in' shall be completed. Where a particular part of any document is not applicable it shall be so indicated.
4.4.1.3.
Certain 'documents' shall be made in the format of 'multi- drawing' consisting typically of:
A cover sheet with revision record giving the applicable revision indicator and the sheets contained in the set.
Listing of symbols and abbreviations used.
Listing of materials required (by item number)
Detail sheets (as indicated on the index sheet) giving the required information.
All sheets of a multi-sheet drawing shall have the same size (A3 or A4). 4.4.1.4.
Instrumentation symbols as indicated in Appendix-06 of this Procedure shall be used for all the drawings and documents.
4.4.1.5.
Key instrumentation drawings are enclosed in this section.
4.4.2.
Instrument Loop Diagram
4.4.2.1.
Instrument loop diagram shall show the location of each component of an instrument loop and the interconnection between them.
4.4.2.2.
Sufficient details of all instruments, junction boxes, cables, marshalling cabinets as shown on the enclosed loop diagram shall be indicated such that the diagram can be used for construction, loop checking, commissioning and maintenance activities.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 127 of 209
4.4.2.3.
For instrument loops involving specialized system like distributed control systems, main software functional blocks/ cards, etc. shall also be shown to enable full understanding of the loop function.
4.4.2.4.
Loop diagrams shall be prepared for closed loops, open loops, alarm loops and fire and gas loops. Only multipoint measurements may be combined on one sheet.
4.4.2.5.
Sample instrument loop diagram is enclosed on the following page.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 131 of 209
4.4.3. Cause and Effect Diagram/ Logic Diagram/ Ladder Diagram/ Relay Schematic 4.4.3.1.
The requirements of process interlocks, plant safety/ shutdown interlocks including fire and gas interlocks shall be detailed in matrix form in cause and effect diagram.
4.4.3.2.
Cause and effect diagram should be prepared preferably on A3 size i n Excel format. The format of the matrix is enclosed on the following page.
4.4.3.3.
Logic diagram shall be developed from the cause and effect diagram using symbols as per Appendix-06. Cross reference sheet indicators shall be provided. Sample logic diagrams enclosed on the following page.
4.4.3.4.
Where it has been decided by ADCO the logic functions will be realized by electro-mechanical relays, the logic diagrams shall be converted relay diagrams. These conversions shall take into account system engineering aspects such as:
fail-safe provision.
provision for override, start-up, testing under operating conditions etc.
identification of all components such as relays, circuit breakers, etc., terminals sockets and pins, especially for incoming and outgoing signals.
The resulting relay diagram or engineering logic diagrams shall be in such detail that proper hardware execution by the system supplier is ensured. 4.4.3.5.
Where it has been decided by ADCO that the logic functions will be executed by a programmable logic controller, ladder diagrams shall be prepared.
Document No: Master-30-99-90-0001 Rev 9.
ACTION
NOTES: 1. ALL THE EQUIPMENT AND INSTRUMENT TAG NUMBERS ON THIS DRAWING SHALL BE PREFIXED BY AREA CODE (XX) AND PLANT AREA CODE (XX) UNLESS SPECIFIED OTHERWISE. 2. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
DESCRIPTION
EFFECTS
EFFECTS
3. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TAG No.
CAUSE
CAUSE TITLE
TAG. No.
SL No
DESCRIPTION
REFERENCE DRAWINGS TITLE
REV
DATE BY
DRAWING NUMBER
CHD
APD
LOCATION:
DESCRIPTION PROJECT NO: PXXXXXX
CONSULTANT / CONTRACTOR / VENDOR
DRAWING No. PROJECT :
PROJECT TITLE -1 PROJECT TITLE -2 PROJECT TITLE -3
DRG. TITLE:
DRG. TITLE -1 DRG. TITLE -2 DRG. TITLE -3
ADCO DRG No:
XX
XX
XX
AREA
P/AREA
DOC. CODE
XXXX XX XX SLNO
REV
SH
/ /
XX TS
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Drawing – 14-01-42-0601-2
Document No: Master-30-99-90-0001 Rev 9.
Page: 133 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.4.4. 4.4.4.1.
Page: 137 of 209
DCS Loop Configuration Diagram
DCS and PLC loop configuration diagrams shall be prepared indicating the signal conditioning, control, computational and other software blocks, applied to a loop and/ the input/ output interface details. Sample drawings are enclosed on the following pages. 4.4.5.
Control Room Layout/ Control Panel Layout
4.4.5.1.
Control Room Layout shall indicate the arrangement of panels, operator consoles, racks auxiliary equipment and cable ways in control room. The drawing shall be drawn to scale and shall include identification of all the items. Sample control room Layout drawing is enclosed on the following pages.
4.4.5.2.
Control panel Layout drawing shall show the Layout (to scale) of all equipment installed on/ in the panel with cut out details and bezel dimensions. Front view and rear view of the panel shall be shown; side views if necessary shall be shown. An itemized instrument/ equipment list shall be provided in addition to the Layout. The main dimensions of the panel shall be given. The drawing shall also specify panel sheet thickness and color/ shade painted as per the applicable standards.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
4.4.6.
Page: 141 of 209
Interconnection Diagram
4.4.6.1.
Interconnection diagram as enclosed on the following page shall show the field instruments, junction boxes, auxiliary racks control panel and the interconnections between these, as applicable.
4.4.6.2.
Appendix-06 of this Procedure includes the sample format for interconnection diagrams.
4.4.6.3.
In case of intrinsic safe applications the earthing arrangement of equipment and cable screens shall be indicated on the drawing.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.4.7.
Page: 143 of 209
Instrumentation and Fire & Gas Cable Routing Layout
4.4.7.1.
The Drawing shall show the above-ground and underground routing of all instrumentation and Fire and Gas cables from their termination point in the plant to their termination points in the control room, complete with laying pattern for identification with the help of cross sections.
4.4.7.2.
Separate instrument location & cable routings layout drawings and fire & gas cable routing layout drawings shall be prepared for congested areas.
4.4.7.3.
Where it is permitted, electrical supply cables to run close to instrument signal cables; then the supply cables shall also be shown on this drawing. If not permitted, they shall be accommodated with other electrical cables for power and lighting on an electrical cables drawing with cross reference to the instrument cables drawing.
4.4.7.4.
A sample layout drawing is enclosed on the following page.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.5.
Page: 145 of 209
ELECTRICAL DRAWINGS 4.5.1.
Overall Single Line Diagram/Key Single Line Diagram
Overall single line diagram shall be prepared for main stations apart from key single diagram of each HV/MV switchgears. Key Single-Line Diagrams shall indicate the overall electrical distribution systems of all voltage levels prevailing in the plant commencing at the main supply point. On all Key Single-Line Diagrams the following details shall be shown:
Overhead line arrangement with ratings of all components.
Power transformers rating, voltage ratio, and vector group.
All HV/MV/LV Switchgear and Distribution boards
Circuit breaker, bus section and isolator types and ratings.
Busbar fault and thermal ratings.
Protection relays with the device function codes.
Cable numbers.
Cross reference of main drawings.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.5.2.
Page: 146 of 209
Single Line Diagram (SLD)
4.5.2.1.
This diagram shall indicate the individual systems by means of symbols as per Appendix-06. Its purpose is to illustrate the main parts of each system and to indicate the main connections with other systems as applicable.
4.5.2.2.
Each Single Line Diagram shall include HV/MV/LV Main components such as:
a. Switchgear / Distribution board details
Bus bar fault and thermal ratings.
Isolator/ Circuit breaker fault and thermal ratings and types.
Fuse base ratings and fuse ratings.
CT/VT ratio, class and burden.
Protection relay, function and type.
Measuring instruments with ranges.
Short-circuit ratings.
Board identification number, if any, marked at site.
Board location within the plant.
b. Power Transformers details such as:
Rating in kVA.
Voltage ratio.
Tap ranges
Percentage impedance
Vector group.
Protection components on transformer.
Transformer identification number as marked at site.
Location within the plant.
c. Generators
Rating
Voltage
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Connection
Percentage impedance
Tag number as marked up at site
Page: 147 of 209
d. DC Supply System (consisting of 125V DC/ 24V DC distribution board and associated standby power battery and rectifier set) details such as:
Main component ratings.
Location of each equipment in the plant.
Equipment identification number, as marked at site.
Battery rating and standby time.
e. Transformer/ Rectifier for Cathodic Protection:
Rated input in V AC and number of phases; output in volts and amps.
DC output control steps.
f. All interconnecting cable details such as:
Cable identification number as tagged at site
g. Feeder details such as:
Equipment tag no. and description.
Phase / voltage and connected load.
h. Reference drawings indicated on a SLD shall include key SLD, related panel layout drawings cable schedules, and diagrams etc.
schematic/
Sample single line diagram is enclosed on the following page.
Document No: Master-30-99-90-0001 Rev 9.
wiring
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.5.3.
HV/LV Protection and Metering Diagram
Schematic Diagrams shall contain:
Single-Line diagrams by system.
Current/ voltage transformer class, ratio and burdens.
Relay setting schedule.
Over-current grading curves.
Earth-fault grading curves.
Trip/Alarm from various relays connected to trip devices
Relay and Metering details 4.5.4.
Page: 151 of 209
Electrical Location and Cable Routing Layout Drawing
4.5.4.1.
This drawing shall be based on GA piping drawing and shall show all electrical equipment, their interconnection and cable routing in correct spatial relationship.
4.5.4.2.
All cables are to be identified and listed on a separate cable schedule, which will give the length, type, rating and section of the cable.
4.5.4.3.
Any necessary cable ducts, trays, junction boxes, marshalling boxes, motor control stations etc. shall be indicated on the drawing.
4.5.4.4.
When necessary, the position of lighting fittings, switches, sockets, heaters and equipment shall be dimensioned in relation to a floor/ grade level, or wall/ structure position.
4.5.4.5.
Electrical earthing layout and lighting layout drawings shall be prepared separately for congested areas.
4.5.4.6.
This drawing shall contain detailed information which can be cross referenced to the Electrical Cable Schedules and Power Cable Layout drawings in order to determine the precise laying pattern for both underground and above ground cables. The details shall include:
Cable trench dimensions.
Cable tray/ ladder dimensions.
Spacing ratios employed.
Cable Layout pattern of cable entries into building/ equipment.
Sample drawings are enclosed on the following pages. Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.5.5. 4.5.5.1.
Page: 153 of 209
Overhead Transmission Line Drawing
Overhead Transmission Line Route Drawing Overhead Transmission Line Route Diagrams shall indicate the major reticulation routes on Field layout/ line routing plan. And show clearly the landmarks, and point distances along the line, changes in route/direction, t racks/ roads compass points overhead with crossings and switchyard locations etc.
4.5.5.2.
Overhead Transmission Line Plan and Elevation Diagram Overhead Transmission Line Plan and Elevation Diagrams shall contain detailed dimensions of all major road crossings and areas where the transmission lines crossover structures, e.g. entry into switchyards.
4.5.5.3.
Overhead Transmission Line Connection Detail Diagram Overhead transmission Line connection Details Diagram shall contain details on the transmission line cable joints/ terminations at such locations as switchyard and road crossings. The details shall include:
4.5.5.4.
Type and manufacture of the termination equipment.
Cable support details.
Cable/ line identification number.
Position dimensions of overhead line structure.
the
joint/
termination
relative
to
Overhead Transmission Line Structural Drawings Overhead Transmission Line Structural Drawings shall contain dimensional details of the structures installed. The details shall include:
Type and manufacture of the overhead line structures.
Overhead Line Conductor size and type.
Insulator type and manufacturer.
Overhead line accessories and equipment.
Stay wire Layout and fixing details.
Structural foundation details.
Document No: Master-30-99-90-0001 Rev 9.
the
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.5.6. 4.5.6.1.
Page: 154 of 209
Panel Arrangement/ Layout
Panel Layout drawing shall show the Layout (to scale) of all equipment installed on/ in the panel with cut out details and bezel dimensions and also the semi-graphic. Front view and rear view of the panel shall be shown and side views if necessary. An itemized equipment list shall be provided in addition to Layout. The main dimensions of the panel shall be shown. The drawing shall also specify panel sheet thickness, color/ shade painted as per the applicable standards. For MCC and HV/MV/LV Switchgear layouts, cubicle/ compartment number and component list shall be indicated.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.6.
Page: 155 of 209
CIVIL DRAWINGS 4.6.1.
General Requirements
A set of civil/ structural drawings shall be prepared for each project which shall include but not necessarily limited to those specified in this Procedure. 4.6.1.1.
Detail drawings shall give all the necessary information viz. setting out point, dimensions, levels and material selection.
4.6.1.2.
Where necessary, different types of work should be dealt with on separate construction drawings, e.g. architectural, reinforced concrete, pipe support, pipe racks, drainage, water supply, sewerage and the various details
4.6.1.3.
Horizontal dimensions shall be given on the plan view. .
4.6.1.4.
Vertical dimensions shall be given on sections and elevations.
4.6.1.5.
Sections shall be taken through structural elements and the detail beyond the element shall be omitted unless it is necessary to clarify a detail.
4.6.1.6.
Where structures, foundations, slabs, and roads are not parallel to the existing grid, setting out shall be given by dimensions relating to the centre line of roads, major plant items or existing structures. Minimum of two setting out points shall be given. For smaller structures which serve mechanical plant, setting out should be from the plant item, either plant centreline or centreline of inlet or outlet nozzles if applicable.
4.6.1.7.
Levels shall be given relative to the site datum.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.6.2. 4.6.2.1.
Page: 156 of 209
General Arrangement Civil Drawings
The General Arrangement Civil Drawing is based on a section of the Master Plot Plan and is developed partially from the General Arrangement - Piping and the Electrical Location & Cable Route Layout. It is to a scale of 1:250 and shall be drawn on A1 size drawing.
4.6.2.2.
4.6.2.3.
In addition to the buildings, equipment and roads already shown on the Section Plot Plan, the GA-Civil will show all works that come under the scope of the civil discipline including but not limited to :
Buildings/ sheds including walkways / aprons.
Equipment foundations
Manholes, valve pits, cable boxes drain pits
Fences
Stairs (concrete or steel)
Platforms
Culverts
Crash barriers
Concrete trenches
Retaining walls / partition walls
Bunds
Extent of site paving and its types
Ditches, channels, dykes
Ramps
Lighting poles
Soakways pits and septic tank
Pipe supports and anchor blocks
Elevation on main roads and buildings
Landscape and plantation including flower beds
Bench marks locations and their elevations
The reference drawings indicated on a GA Civil drawing shall include related piping GA/ Piping Layout drawings and all construction detail necessary for fabrication and erection of civil works.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.6.3. 4.6.3.1.
4.6.3.2.
Page: 157 of 209
Building Drawings
The GA - Civil shall show all buildings. A Building structure can be:
An accommodation block
A control room
Office block
A laboratory or workshop
A warehouse or shed
Substation, transformer house (bldg), pump house, guard house, covered parking etc.
Each building will have a set of drawings that in detail treat the different aspects of the building structure.
a.
b.
Architectural Set:
Site Plans
Architectural Perspective Drawing (if needed)
Architectural Plans
Architectural Elevations (full or partial)
Architectural Construction Details (plan details)
Schedule Tables for Finishes
Schedule Tables for Doors/ Windows
Schedule Tables for Ironmongery
Reflected Ceiling Plans
Sections (Building)
Roof plans and details
Furniture details
Landscape plans & details
Section details
Furniture plan layout
Structural Set:
Structural Foundation Layout
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
c.
d.
4.6.4.
Page: 158 of 209
Structural Columns, Lintels, Beams and Parapet Details
Structural Floor Slab Details
Structural Roof Slab Details
Misc. Details (Sumps, Pits)
A/C Plinths Details
Reinforced Concrete Details
Structural Reinforcement Details
Bar Bending Schedule
Utilities Set:
Potable & Utility Water Supply Layout
Drainage System Layout
Lighting Layout
Electrical Power Layout
Load Distribution Diagram
Telephone Line Layout
Fire & Gas Detection Layout
HVAC System Layout
Bill of Materials
General Set of Drawings that covers
Water Proofing details
Septic Tank & Manhole details
Steel Structure Drawings
Each steel structure will have a full set of drawings that show the fabrication and erection details, of which:
Foundation Layout & Details
Steel Framing Plan & Sections
Steel Connection Details
Steel Roofing Details
Bill of Materials
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.7.
Page: 159 of 209
TELECOMMUNICATION DRAWINGS 4.7.1.
General Requirements
A set of telecommunication documents and drawings shall be prepared for each project, which shall include, but not necessarily be limited to those specified in this procedure. Sample drawings can be found at the end of this section. 4.7.1.1.
The extent of detailing of each document and drawing shall be such as to facilitate the installation and correct functioning of all telecommunication equipment and systems and serve as a reference for future maintenance, changes and extension to the telecommunication equipment.
4.7.1.2.
All parts and sections of any form, sheet or other document which requires 'filling in' shall be completed. Where a particular part of any document is not applicable it shall be so indicated.
4.7.1.3.
Certain 'documents' shall be made in the format of 'multi sheets drawing' consisting typically of:
A cover sheet
Revision sheet giving the applicable revision indicator and the sheets contained in the set.
Listing of symbols and abbreviations used.
Listing of material required (by item number)
Detail sheets (as indicated on the index sheet) giving the required information.
All sheets of a multi sheet drawing shall have the same size (A3 or A4). 4.7.1.4.
Telecommunication symbols as indicated in Appendix-06 of this Procedure shall be used for all the drawings and documents.
4.7.1.5.
Sample forms are enclosed in this Procedure.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 160 of 209
4.7.2. Overall Telecom Equipment and Cable Routing Layout Drawing 4.7.2.1.
This drawing shall cover the overall telecom distribution network for the field showing the interconnection between buildings and cable routing in correct spatial relationship. This may consist of several sheets of field layout, site layouts and Field area layouts in order to encompass all Telecom cable routing under one drawing. A suitable scale shall be selected from section 2.5 of this procedure with ADCO approval.
4.7.2.2.
All cables are to be identified and listed on a separate cable schedule, which will give the length, sizes, type, no. of pairs and starting and termination points.
4.7.2.3.
All necessary cables, cable ducts, trays, junction boxes, telecom manholes, MDF, IDFs and TDBs shall be indicated on the drawing.
4.7.2.4.
All cables and manholes shall be tagged.
4.7.2.5.
The number of ducts shall be shown for each duct banks.
4.7.2.6.
The following drawing shall be developed from the telecom location and cable routing drawing : 1. Layout drawing 2. Earthing layout drawing
Appropriate details of equipment location, cabling and earthing of MDF, IDF and PABX rooms etc. shall be prepared in addition to the layout drawings as subsequent sheets. 4.7.2.7.
This drawing shall contain detailed information which can be cross referenced to the telecom cable schedules, manhole schedule and telephone network line diagram in order to determine the precise laying pattern for both underground and above ground cables. The details shall include:
Cable trench dimensions
Cable tray/ladder dimensions
Spacing ratios employed
Cable layout pattern of cable entries into building/MDFs, IDFs and PABX rooms.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
Page: 161 of 209
4.7.3. Key Telecommunication Distribution Network Line Diagram 4.7.3.1.
Key line diagram shall indicate the overall telecommunication distribution system for the complete voice and data network.
4.7.3.2.
On all key line diagram the following details shall be shown :
Telecom cables, their pair capacity and tag number.
Main distribution frame, intermediate distribution frame and telephone distribution boxes indicating their physical location, number of pairs.
4.7.4. Equipment and outlet layouts, Telephone, Data, PA, and TV Services 4.7.4.1.
This shall be drawn on a 1:100 or 1:250 or 1:500scale and shall in effect be the plan drawing of the building.
4.7.4.2.
The following details shall be indicated on this drawing:
All MDFs, IDFs and TDBs
Telecom outlets (voice and data)
MATV system outlets
PA system outlets
MDF, IDF and TDB room
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.7.5.
Page: 162 of 209
Telecommunication MDF (Main Distribution Face) Layout
4.7.5.1.
This drawing shall indicate how the underground telecom cables are terminated on the MDF or IDF terminal blocks. Also it shall indicate how the internal distribution cables shall be terminated on the blocks for the case where the MDF or IDF is located in the same building.
4.7.5.2.
Generally, the MDF is located in the PABX room and an IDF is located in the main distribution mode (e.g. IDF room for accommodation block or main office block).
4.7.5.3.
The tag number of each cable shall be indicated on the terminal block where it terminates.
4.7.6.
In-Plant Radio Communication Schematic
4.7.6.1.
This drawing shall indicate the main components of the in-plant radio communication details.
4.7.6.2.
Details shown are: Operating frequencies, base station and controller‟s location
4.7.6.3.
The notes of this drawing shall outline the operating philosophy of the system.
4.7.7.
Emergency Response Centre Layout
4.7.7.1.
This drawing shall indicate the main components of the telephone and radio equipment details.
4.7.7.2.
Details shown are: Operating frequencies, base station and controllers location, telephone set numbers.
4.7.7.3.
The notes of this drawing shall outline the operating philosophy of the system.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.7.8.
Page: 163 of 209
Telecom Equipment and Cable Layout – Radio Room
4.7.8.1.
This drawing shall be drawn to scale (1:50, 1:100 or 1:250) to show the layout of the room and the function of each part.
4.7.8.2.
The location of all telecom equipment in the room shall be shown. These shall include: 19" RF equipment racks, power rectifiers, batteries, RF cable entries, UG telecom cable entries.
4.7.9. PABX (Private Automatic Branch Telephone Exchange) Room Layout 4.7.9.1.
This drawing shall be drawn to scale (1:50, 1:100 or 1:250) to show the layout of the room and the function of each part.
4.7.9.2.
The location of all telecom equipment in the room shall be shown. These shall include; Transmission equipment, racks, power rectifiers, batteries, PABX, MDF, UG telecom cable entries, cable trays under raised floor for main cables connections, MCCB
4.7.10.
Radio Tower Plans and Elevations
4.7.10.1.
This drawing shall be drawn to scale (1:50 or 1:100). It shall indicate all the antennas, tower lights and their height.
4.7.10.2.
This drawing shall indicate the overall height, height of walkways, location of climbing ladder.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.7.11.
Page: 164 of 209
Antenna Installation / Location Layout
4.7.11.1.
This drawing is not to scale. It shall indicate the installation arrangement of the antennas and tower lights.
4.7.11.2.
This drawing shall contain a second sheet for the antennas schedule indicating installation height, type of antenna, operating frequencies, type of cable it is connected to.
4.7.12.
Key MATV Distribution Network Line Diagram
4.7.12.1.
The key line diagram shall indicate the complete master antenna television (MATV) distribution system.
4.7.12.2.
All key line diagrams shall contain the following details:
A line diagram for the head end equipment indicating its various components (dish, down converter / LNB, channel amplifier, channel modulator, etc.)
The dB level at each stage of the network.
The lengths of the various cable segments.
All system components in the distribution network i.e. trunk amplifiers, splitters, tap points.
4.7.12.3.
A table shall be included to show the physical location of all system components.
4.7.12.4.
table shall be included to show the TV channels provided.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings
4.8.
Page: 176 of 209
SAFETY INCLUDING FIRE FIGHTING DRAWINGS
4.8.1.
Safety Equipment Drawings
4.8.1.1.
Safety Equipment Drawings together with Data sheets, Specification, Design Calculations, Bill of Materials, Schedules, Scope of Supply, Vendor Drawings, etc. shall provide a clear and concise set of drawings for Installation.
4.8.1.2.
Based on the Safety Equipment Vendor Drawings; Safety Equipment Layout, Detailed Connection Drawings, etc. shall be independently prepared in compliance to the Drawing Template.
4.8.2. Fire Fighting / Fire Water System Layout / Schematic Drawings 4.8.2.1.
Fire Fighting / Fire Water System Layout / Schematic Drawings together with Hazardous Area Layout Drawings, Data sheets, Specification, Design Calculations, Bill of Materials, Schedules, Scope of Work, Typical details, etc. shall provide a clear and concise set of drawings for Installation.
4.8.2.2.
Based on the Fire Fighting Schematics; Fire Fighting P&IDs, Fire Fighting Layout Drawings indicating Fire Water Network Layouts, Fire Fighting FoamSystem Layout, Fire Hydrant, Deluge Skids, etc. shall be independently prepared in compliance to the Drawing Template.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.9.
Page: 177 of 209
SCHEDULES
The following shall be prepared using Microsoft Excel Version 7.0 and on the electronic format, supplied by ADCO.
4.9.1.
Process/Mechanical
Mechanical Equipment Schedule
Line Schedule
Tie-in Schedule
4.9.2.
Valve Schedule
Valve Schedule
Safety Relief Valve Schedule
4.9.3.
Instrument
Instrument Engineering Sheets, Level Instruments
Instrument Engineering Sheets, Temperature Instruments
Instrument Engineering Sheets, Flow Instruments
Instrument Engineering Sheets, Pressure Instruments
Instrument Engineering Sheets, Fire & Gas Instruments
Instrument Engineering Sheets, Miscellaneous Instruments
Instrument Cable Schedule
Instrument Cable Schedule (Fire & Gas)
Instrument Cable Schedule (UVIR)
Instrument Junction Box Schedule
Instrument Junction Box Schedule (UVIR)
Instrument Junction Box Schedule (Fire & Gas)
Cause and Effect Diagram
List of Alarm & Trip Setting
DCS Input/Output List Analogue & Digital
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.9.4.
Electrical
Electrical Equipment Schedule
Electrical Cable Schedule
Electrical Junction Box Schedule
4.9.5.
Telecommunication
Telecom Equipment Schedule
Telecom Cable Schedule
Telecom Manhole Schedule
4.9.6.
Page: 178 of 209
Well Head
Well Mechanical Equipment Schedule
Well Electrical Equipment Schedule
Well Instrument Engineering Sheets, Level Instruments
Well Instrument Engineering Sheets, Temperature Instruments
Well Instrument Engineering Sheets, Flow Instruments
Well Instrument Engineering Sheets, Pressure Instruments
Well Instrument Engineering Sheets, Fire & Gas Instruments
Well Instrument Engineering Sheets, Miscellaneous Instruments
Well Safety Relief Valve Schedule
Well Electrical Cable Schedule
Well Electrical Junction Box Schedule
Well Instrument Cable Schedule
Well Instrument Junction Box Schedule
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section :Drawing Structure & contents of Master Drawings 4.9.7.
Page: 179 of 209
General Requirements for Schedules
a. Instrument engineering sheets shall be prepared at an early stage of the engineering phase and shall specify the components for each instrument loop, with all additional information available at that time. During the detailed engineering period, the instrument engineering sheets shall be further completed with engineering and purchasing data and referenced to related drawings.
a)b. The safety / relief valve schedule shall list all safety valves, relief valves, thermal safety valves, rupture devices etc. That shall be as per section 3.6 of this procedure. c. The list of alarm and trip settings shall be prepared to include all the alarms and alarm trip point settings. Details like originating instrument, instrument services, process settings and equivalent transmitter signal settings as applicable in the case of receiver switches, shall be included.
d. Telecommunication cables shall be cables for telephony, PA and MATV systems.
e. The following equipment shall be indicated on the Telecommunication Equipment Schedule: 1
All MDF's, IDF's and TDB's.
2
All MATV system components modulators and channel amplifiers)
3
All PA system components.
(amplifiers,
splitters,
channel
f. The telecommunication manhole schedule shall indicate the type of telecom service it is being used for (i.e. telephone, TV and PA), the cable layout drawing where it can be located and the coordinates.
g. All schedule formats are available in electronic format and samples are included in CD.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
5. 5.1.
Page: 180 of 209
PROJECT DRAWINGS Introduction
The procedure contained in this section is intended for use by ADCO and ADCO's Consultants/Contractors for: Preparation of:
New project engineering drawings / documents.
Mark-up the drawings to reflect the As-built status at construction stage.
The custodian of this Document is Team Leader ( Draughting). All issues pertaining to this procedure [e.g. user feedback, suggestion for improvement etc.] shall be addressed to him.
5.2.
Terminology - ADCO Master Drawing and Project Drawing
Project Drawing
A new engineering drawing project/Plant Modification
prepared
for
a
particular
ADCO Master Drawing An engineering drawing held with ADCO for its plants and facilities which contain up-to-date information. It is updated continuously to reflect changes due to projects & Plant modifications.
5.3.
General
This section explains the requirement and content of project related drawings. Project layout drawings can be prepared by combining information from one or more Master Drawing to prepare a layout specific to the new/modified development. But while preparing the project specific drawings, the appropriate ADCO Master drawing scale and grid pattern of the concerned type of drawings as per section 4 of this procedure shall be followed. The Consultant may follow existing ADCO EP Master Drawing structure by reusing ADCO Master Layout Drawings. All other type of project drawings not described in this section shall be prepared according to the reference in Section 4. 5.4.
Applicable Project Layout Drawings
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 181 of 209
Layout Drawings are General Arrangements in 1:250 Scale:
Piping
Electrical Equipment & Cable Routing Layout
Earthing Layouts
Lighting Layout
Instrument Location & Cable Routing Layout
F&G Location and Cable Routing
Telecommunication Cable Routing Layout
General Arrangement Civil etc.
Layout Drawings in 1:50 Scale:
Piping Layouts
Layout Drawings in 1:10,000 Scale:
Pipe Line Routing Plan
Layout Drawings in 1:2500 Scale: 5.5.
Site Layout/ Field Area Layout Drawing Line Routing Plan
Refer section 4.2.3 for the format, contents, details, grid details, co-ordinates, etc. Line routing Plans shall be prepared in 1:10,000 scale for the project affected areas from the applicable master drawings. Proper references shall be given to all Master Drawings used to develop the new project drawing. Match line with co-ordinates of each drawing shall be provided. When layout drawing is prepared by combining more than one area of the existing Master drawings, then the title of the new drawing shall be reflected to show the names of all the areas combined to prepare the new drawing. (For example P37, P38, Q37 & Q38) Sample layout drawing is enclosed in the following pages.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings 5.6.
Page: 183 of 209
Site Layout/ Field Area Layout Drawing
Refer sections 4.2.4 and 4.2.5 for the format details, contents, co-ordinates, reference drawings. Site Layout/ Field Area Layout drawing shall be prepared in 1:2,500 scale for the project affected area from the applicable master drawings. Proper references shall be given to all master drawings used to develop the new project drawing. Match line with co-ordinates of each drawing shall be provided. When layout drawing is prepared by combining more than one area of the existing Master drawings, then the title of the new drawing shall be reflected to show the names of all the areas combined to prepare the new drawing. (For example PART AREA-231, 246 & 247). Sample layout drawing is enclosed in the following page.
5.7.
General Arrangement Drawings / General Arrangement, Piping
Refer section 4.3.2 for the format details, contents, grid system, coordinate multiple layer piping, reference drawings. General Arrangement Piping drawing shall be prepared in 1:250 scale for the project affected area from the applicable master drawings. Proper references shall be given to all master drawings used to develop the new project drawing. Match line with co-ordinates of each drawing shall be provided. When layout drawing is prepared by combining more than one area of the existing Master drawings then the title of the new drawing shall be reflected to show the names of all the areas combined to prepare the new drawing. (For example PART SECTION-B, C, F & G). The same principle and drawing structure shall be used for preparing all other discipline drawings in 1:250 scale such as listed in Section 5.4. Refer Sections 4.4.7, 4.5.4, 4.6.2, 4.7.2 for contents, format grid system, co-ordinates reference drawings etc. Sample layout drawing is enclosed in the following page.
5.8.
Piping Layout Drawing
Refer section 4.3.3. for contents, Limits, skid in layout areas, requirement of developing elevation drawings, reference drawings etc. Piping Layout drawing shall be prepared in 1:50 scale for the project affected areas from the applicable master drawings. Proper references shall be given to all master drawings used to develop the new project drawing. Match line with co-ordinates of each drawing shall be provided. When layout drawing is prepared by combining more than one area of Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 184 of 209
the existing Master drawings then the title of the new drawing shall be reflected to show the names of all the areas combined to prepare the new drawing. (For example PART AREAS-F12, F13, F17 & F18). Sample layout drawing is enclosed in the following page.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings 5.9.
Page: 188 of 209
Piping Isometric 5.9.1. The isometric shall indicate pipework in three dimensions Length, width and height. Specific requirements for preparation of isometric are as follows:
Isometrics are drawn at a 30 deg. angle.
Piping on ISO's is not to scale.
Generally the North arrow shall point top left. may be placed at top right.
Indicate line number and flow arrow and slope on the line.
Show the orientation of valve handwheels.
Show outline of equipment chain dotted and equipment numbers.
Orifice flange fittings shall be detailed on the same isometric.
Give one set of co-ordinates north and east (put this on the vessel if possible) or a reference dimension to a center line of a column or reference point.
Position supports.
Show continuation drawings.
Complete the list of material and add material item numbers (MESC Nos.)
Indicate design parameters.
Piping elevation shall be shown on at least one part of each line.
Overall Bill of Material shall be prepared, as per project requirement.
Graphic symbols shall be as per Appendix-06.
Isometric drawings where prepared by fabricator, shall detail all field joints (welding and threading) and the different pipe spools shall be clearly identified with sequential spool numbers.
In exceptional cases it
5.9.2. Dimensional isometrics shall be made for all piping of nominal size 15 mm and larger or as agreed with ADCO. 5.9.3. A sample isometric drawing is enclosed on the following page. Blank format is included in CD.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 190 of 209
5.10. List of Project Engineering and As Built Drawings 5.10.1. This list of project drawings and documents with appropriate ADCO Document Codes is prepared from ADCO Engineering Procedure for Drawing Design & Numbering System (EP) 30 -99-900001. Consultant/Contractor in agreement with ADCO shall select applicable drawings and documents from the list below. Any deviation or addition to this list shall be discussed & agreed with ADCO. 5.10.2. List of Project Engineering Deliverables, As-Built Drawings and Documents
Code
Discipline*
Description
As-built Required
Note
GENERAL 00
General Specification
01
Hazardous Area Classification
02
Field Layouts & Terminal Layouts
03
Site Layouts & Field Area Layouts
04
Plot Plans
07
Line Routing Plans
11
Tag List & Painting Schedule(for Physical Tagging)
11
Miscellaneous
**
Key Vendor Drawings (all Disciplines)
08
Process Flow Diagrams
08
Piping & Instrument Diagrams
08
Utility Flow Diagram
38
Material Selection Diagram
PROCESS
PIPING 12
Piping Specifications (Material. Classes)
Document No: Master-30-99-90-0001 Rev 9.
Note-1
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 191 of 209
13
Piping Layouts / Skid Piping Layouts
14
Piping Layout "Elevations"
15
Piping Isometrics / Bill Of Materials
16
Pipe Supports/Guides, Anchors etc.
17
Line Schedules (Line List)
19
Tie-In Schedule / Project Bill of Materials
20
Piping For Building Services
21
General Arrangement -Piping
22
Pipeline Alignments/ Profiles & Details
23
Piping Miscellaneous / Stress Analysis Reports
Note-2
MECHANICAL 25
Mechanical Equipment Drawings
26
Mechanical Equipment Schedules (List)
27
Mechanical Equipment Data Sheets
28
HVAC Equipment Drawings
31
Equipment Miscellaneous
32
Vessels & Tank‟s Specifications
33
Vessels & Tank‟s Drawings
34
Vessels & Tanks Data Sheets
Note-5
36
Vessels & Tanks Miscellaneous
Note-5
Note-5
MATERIAL/CORROSION 37
Specifications/Standards/Procedures
38
Corrosion Miscellaneous INSTRUMENTATION INCLUDING FIRE & GAS
39
Instrument Specifications
40
Instrument Data Sheets
41
Loop Diagrams (Analog & Digital)
42
Cause & Effect Diagrams
42
Logic Diagrams
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 192 of 209
42
Ladder Diagrams
42
Software Configuration Diagrams
42
Relay Schematics
43
Control Room Layouts
43
Control Panel Layouts
43
Auxiliary Racks Layouts
44
Instrument Location Layouts
45
Fire & Gas Detectors Location/ Cable Routing Layouts (Including Building Services)
45
Fire & Gas Cable Block Diagrams
46
Instrument Hook–Up Diagrams Pneumatic) / Installation Drawings
47
Instrument Interconnection Diagram
47
Termination Diagram / Schematic Diagram
47
Instrument Wiring Diagrams
48
Instrument Cable Schedule
48
Instrument Junction Box Schedule
48
Fire & Gas Cable Schedule
48
Fire & Gas Junction Box Schedule
48
Safety/Relief Valve Schedule
48
I/O Lists
48
Instrument Bill Of Materials
49
Instrumentation Cable Routing Layouts
49
Instrumentation Cable Block Diagrams
49
Fire & Gas Cable Routing Layouts
50
Instrumentation Equipment Drawings
51
Instrument Engineering Sheets: Pressure
51
Instrument Engineering Sheets: Flow
51
Instrument Engineering Sheets: Temperature
51
Instrument Engineering Sheets: Level
Document No: Master-30-99-90-0001 Rev 9.
(Process
Note-3
&
Note-3
Note-1
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 193 of 209
51
Instrument Engineering Sheets: Miscellaneous including Equipment (e.g.:- All Panel, MOVs, etc.)
51
Instrument Engineering Sheets: Fire & Gas
52
Instrument Installation Standards : Cable Trench Sections/details
52
Instrumentation Miscellaneous ELECTRICAL
53
Electrical Specifications
54
Electrical Data Sheets
55
Load Lists
56
Key Single Line Diagram /Single Line Diagrams/ Protection & Metering Diagrams
57
Electrical Panel Layouts
58
Electrical Schematic Wiring Diagrams
58
Electrical Interconnection Diagrams
58
Electrical Termination Diagrams
58
Electrical Logic Diagrams
59
Electrical Equip. Location & Cable Routing Layouts
59
Electrical Cable Block Diagrams
59
Lighting Layouts
59
Earthing Layouts
59
Equipment Layout:-Substation / Switchyard
60
Electrical Equipment Drawings
61
Overhead Transmission Lines Drawings
62
Cathodic Protection Drawings
63
Electrical Equipment Schedule
63
Electrical Cable Schedule
63
Electrical Junction Box Schedule
63
Lists / Bill Of Materials
64
Electrical Drawings For Building Services
Document No: Master-30-99-90-0001 Rev 9.
Note-5
Note-1
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 194 of 209
65
Building Management System Drawings (BMS)
67
Protection Relay Coordination Settings (Calculations, Curves & Tables)
67
Electrical Installation Standards (Power, Lighting, Cable Trench Sections, Earthing etc…)
67
Electrical Load Analysis
67
Electrical Miscellaneous TELECOMMUNICATION
68
Telecom Specifications
69
Telecom Data Sheets
70
Telecom Line Diagram
70
Telecom Block Diagram
70
Telecom Wiring Diagram
70
Telecom Interconnection Diagram
70
Telecom Panels Layout / Face Layout
71
Overall Telecom. Equipment and Cable Routing Layout
72
Equipment and Outlet Layouts Telephone, Data, PA and MATV Services
73
Telecom Equipment Schedule
73
Telecom Cable Schedule
73
Telecom Manhole Schedule
73
Lists/Bill Of Materials
74
Telecom Miscellaneous CIVIL
75
Civil Specifications
76
All Structural & Civil Drawings
77
Schedules & Bill Of Materials
78
Architectural Drawings
79
General Arrangement – Civil
Document No: Master-30-99-90-0001 Rev 9.
Note-5
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 195 of 209
82
Maps / Topographic Drawings, Grading Plan Leveling & Surveys
82
Irrigation / Landscaping Drawings
83
Civil Miscellaneous
SAFETY / FIRE FIGHTING 84
Safety Specifications
85
Safety Equipment Data Sheets
86
Safety Equipment Drawings
87
Safety Equipment Layout
88
Fire Fighting Layout / Fire Water System Layout
89
Fire Water System Schematic
89
Safety / Fire Fighting Miscellaneous MISCELLANEOUS
90
Engineering Procedures and Working Procedure
91
Philosophy & Project Definition Reports & General Reports
92
Terms of Reference / Contracts Documents / Tender Documents / Minor Work Order / Task Order Justification
93
Scope of works / Procurement packages Manufacturing / Construction Record Books
94
Engineering Dossiers / Technical Proposal
95
Manuals etc…)
96
Vendor Data Books
97
Hazop/Hazan Studies / Technical Audits/Safety Audits & Quality Assurances / Project Quality Plan / Commissioning
98
Finance Documents
99
Catalogues
(Eng.,
Document No: Master-30-99-90-0001 Rev 9.
Operating
Maintenance,
/
Safety
Note-5
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings Notes:
Page: 196 of 209
1
ADCO vendor title block/drawing number is not required for vendor equipment drawings for manual valves, pumps, electric motor, cable gland, terminal boxes, transformers, instruments (e.g.:- pressure transmitter) etc.
2
As-built mark-ups of piping isometrics are required for QA/QC requirements. As built mark-ups of P & I Ds and piping layouts/ GAs shall be marked up/ verified with piping isometric mark ups.
3
Instrument location layouts & Instrument cable routing layouts may be combined for areas that are not congested. Document code '49' shall be used.
4
Consultant/Contractor in agreement with ADCO shall drawings.
5
Vendor shall submit As built Data Sheets with Vendor Data Book. Vendor has to stamp “As Built” on Engineering Data Sheet if same is used. * - As per this Procedure. ** - As per applicable discipline document code.
Document No: Master-30-99-90-0001 Rev 9.
select applicable
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 197 of 209
5.11. Project Engineering Drawings Preparation 5.11.1. Consultant/contractor shall be familiarized with ADCO Engineering Procedure for Drawing Design and Numbering System prior to the beginning of any project. DDR Representatives shall conduct separate presentation/ meetings with Consultant‟s/ Contractor‟s Engineers/ Designers for EP clarifications and DDR requirements. 5.11.2. In case there are more than one project completed/ong oing in the same area, the drawing numbers will be duplicated. However, their project numbers will differ. Hence for project drawings, the drawing numbers together with the project number provide a unique identification. The drawing document number in isolation is not sufficient to identify a particular drawing/ document. A project drawing number is incomplete without project number. 5.11.3. The following activities shall be carried out prior to the initiation of the design engineering work for a project, by:
The project Consultant / Contractor
The appropriate department of ADCO in case of in-house engineered project/PMRFs.
5.11.3.1.
Electronic files of existing ADCO master/project drawings shall be used to develop new project drawings. New drawings shall be prepared only in cases where the master/project drawings are not available/ not applicable.
5.11.3.2.
Analyze the existing ADCO drawings for the Area and view the required drawings through ADCO EDMS (Documentum) by using viewing station in ADCO Offices. Copy the required drawings using ADCO CD writer with viewing station or using USB Flash Card.
5.11.3.3.
In agreement with ADCO DDR Representatives, consultant/Contractor shall be given free hand to use ADCO Drawing/ Document serial nos. for a particular project. Consultant /Contractor shall submit the list of project drawings to D&A Representatives regularly to verify the Area, Plant Area & Document codes used are in line with ADCO EP. 30-9990-0001.
5.11.3.4.
Consultant shall update the drawings and docs. accordingly.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 198 of 209
5.11.3.5.
All project drawings / documents, engineering schedules and tag lists shall be prepared with drawing / document serial numbers within the range of 0601 – 0999, 1601 – 1999, 2601 – 2999 and so on. For major projects, it is advisable to use drawing serial no. 0601 to 0999 for FEED and 1601 onwards at EPC stage to differentiate both stages. ADCO Standard drawing / documents template shall be used.
5.11.3.6.
Consultant / Contractor shall assign ADCO drawing/ document nos. to his subcontractors and vendors. This drawing list shall also be submitted to DDR Representative‟s approval.
5.11.3.7.
When a project drawing is created from an existing ADCO drawing, the Consultant/ Contractor shall carry out the following actions. 5.11.3.7.1.
Delete project title and indicate actual project title.
5.11.3.7.2.
Delete project number and indicate actual project number as allotted by ADCO.
5.11.3.7.3.
Insert Consultant/ Contractor's logo, name and drawing number in the allocated ADCO title block space, with out exploding the drawing title block.
5.11.3.7.4.
Change drawing serial number.
5.11.3.7.5.
A note shall be added in a box above the revision block stating that ”This drawing is developed from ADCO master drawing no. ___ Rev. ________ “ or “ADCO project drawing number __________ Rev. _________ of project no. PXXXXX”.
5.11.3.7.6.
Project scope clouds shall be shown from the first issue onwards to highlight the project scope. Retain only project scope cloud at final stage. A note in a box shall be added above the revision block stating that “clouded portion denotes the project scope”.
5.11.3.8.
Revisions made on all prepared drawings to incorporate, design changes or modifications / additions to existing facilities shall be highlighted by clouding the affected area and by placing triangles with the revision code adjacent to the clouds.
5.11.3.9.
Revision cloud and triangle shall be placed in Auto CAD layer rev-n (Refer CAD manual 30-99-95-004).
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 199 of 209
5.11.3.10.
All project drawings and documents shall be given revision code as explained in section 2.8 of this Procedure.
5.11.3.11.
ADCO drawing numbers shall be used for references. Use of Consultant /Contractor/Vendor drawing numbers for references is not acceptable
5.11.3.12.
The use of TYPICAL DRAWING is allowed for a group of similar drawings. But all the deviations from typical shall be tabulated in the same drawing. Prior ADCO approval shall be taken.
5.11.3.13.
The tag nos. for equipment, instruments, cables, JBs and pipeline shall be requested from ADCO by filling the appropriate forms available in ADCO EP CD. Consultant/Contractor shall not use tag no/ line no with out booking in ADCO system to avoid duplicate tag no with in an ADCO Operating area. Consultant / Contractor is liable to update drawings/Engineering schedules/Documents and replace duplicate physical tags with in the warrantee period , if tag number is duplicated.
5.11.3.14.
As part of simplification, wellhead tag nos. are simplified. Except pipeline nos., equipment, instruments, cables & JB nos. are prefixed with well Nos. Thus booking / registration of these tag nos. in ADCO system is not required (for detail ref. section 3.5, 3.7, 3.9 & 3.11 of this Procedure).
5.11.3.15.
Design “Holds” or information to be indicated at a later stage shall be highlighted by clouding and shall be clearly clarified with notes.
5.11.3.16.
Tag lists and painting schedules for physical tagging shall be prepared using ADCO standard blank forms available in EP CD. Tag lists shall be as per “Engineering Specification for Outdoor and Indoor Tag Plates and painting of equipment & pipeline no” - ES 30-99-00-0001.
5.11.3.17.
Subcontractors and manufacturers shall also follow this procedure and ADCO CAD manual 30-99-95-004.
5.11.3.18.
DDR Representative shall provide the status of ADCO Maser Drawings to consultant/ Contractor to select the applicable Master / Project drawings for engineering work.
5.11.3.19.
Deliverables shall be as per project TOR.
5.12. As Built Mark-Up Preparation
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 200 of 209
5.12.1. Construction Contractor shall prepare and submit As -built red line mark-ups as construction progresses. As built mark up shall not be left to be completed at the end of the project. 5.12.2. Construction Contractor shall appoint a qualified Senior Designer (Engineer for major EPC projects) as focal point for As built red line mark-ups, project close-out /document submission and physical tagging. The C.V. of the focal point shall be submitted for ADCO DDR Representative‟s approval. 5.12.3. Construction Contractor shall prepare a Drawing Control Register (DCR) for As built drawings. ADCO standard AFC drawing list shall be used for this register. Drawings and Documents which are not to be made As-built shall be deleted from „AFC‟ list. Subcontractor‟s drawings, important shop drawings and key vendor drawings shall also be added in DCR. Status of As built submission & ADCO approval columns shall be added in the DCR. It shall be updated continuously until it reaches final stage. 5.12.4. Changes to IFC/ AFC drawings shall only be through Field Change Sheet (FS) / Site Change/Technical Query (TQ). These forms shall be filled with applicable list of drawings to be marked up for As-built. The forms no. shall also be written against mark up for ADCO Construction Engineer‟s verification / appr oval of As-built mark up. 5.12.5. As-built mark-ups shall be carried out on the latest issue of “Issued for Construction / Approved foro Construction” (IFC / AFC) drawings / documents. 5.12.6. Piping fabrication / construction changes shall be reflected on P&IDs and piping layouts As-built mark-ups. Hydro test vents and drains shall be shown and marked on piping layouts and P&IDs. Piping isometric drawings mark-up for QA/QC records shall be used for P&IDs and piping layout drawing mark-up. 5.12.7. Construction Contractor shall mark-up the project drawings, engineering schedules, tag lists, all key vendor drawings including ADCO free issue items, subcontractor‟s drawings and important shop drawings from the beginning of construction activities. All As built drawing/docs. shall be stamped „AS BUILT‟ with contractor‟s signature prior to ADCO submission. Drawings without changes shall also be stamped As built. These drawings shall be submitted
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 201 of 209
to ADCO batch by batch for comments/approval as construction progresses. 5.12.8. The mark-up drawings shall accurately reflect the status of the facilities constructed. It shall contain exact dimensions and information as to what has been actually constructed. This shall include the following: 5.12.8.1.
Notes related to construction phase shall be changed to reflect asbuilt information.
5.12.8.2.
True sequence of connections of process & utility lines and actual valve end connections (Flanged, Welded etc....) shall be indicated on mark-ups of P&IDs, piping layouts etc.
5.12.8.3.
Deviation in underground services shall be marked correctly before back filling. Existing underground services which are not shown on contract drawings, but are noticed while excavation (location, size etc.) shall also be marked. Operations team at site and DDR site representative shall be notified for identification.
5.12.9. Contractor shall prepare drawings / As-built red line markups for variation in scope of work. These drawings shall also be submitted for ADCO approval. 5.12.10. Submission of key Vendor drawing As-built mark-ups shall be the responsibility of the contractor. DDR site representative will help contractor to select key vendor drawing from vendor drawing list (Vendor Data Book). In place of submitting all key vendor drawings with As-built stamp, contractor may agree with ADCO the affected vendor items for which As-built markup shall be submitted. 5.12.11. ADCO Construction Engineer shall check the As -built status against mark-ups and sign on prints. For buried installations, the contractor shall submit the mark up for changes to ADCO Construction Engineer & DDR representative for signature prior to back filling. 5.12.12.
D&A Site Representative shall:-
a. Make sure that the Construction Contractor mark-up all discipline drawings for As-built status as construction progresses
b. Review Contractor‟s As-built Drawing Control Register continuously for As-
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Project Drawings
Page: 202 of 209
built status and submits weekly report on As-built status.
c. Review As-built submission against drawings list, (drawing title, drawing no., revision, no of drawing etc.) and pass to construction engineer for review / signature.
d. Review the As-built red line mark-up drawings for any mark-up anomalies, Mark up shall be clear to ADCO draughting consultant to update with necessary information, dimensions, tags etc. Make sure that marked-up addition/deletions/changes are marked –up on other discipline drawings. (e.g.:- valve pits, foundations added/ deleted shall be marked on piping, electrical and instrumentation layouts). If approved D&A Representative shall sign on As built drawing.
e. Verify at site if in doubt (e.g. P & ID is not matching with piping layout, deviation in underground services etc.)
f. Make sure that variations in scope of work are properly marked-up and change in original design is carried out by filling design Change Form (DCF) by marking up/preparing proper drawing.
g. Assign additional tag no if required at construction stage. Verify physical tags for completeness against tag lists and drawings. .Any mismatch /missing tags of vendor equipment/instruments shall be notified to HC/Contractor for corrective action .Paintings of tag no. on vessels, tanks, pipelines shall be in accordance with ES.30-99-00-0001.
h. Prepare plan for project close out drawings & documents submission as per contract & follow up with the contractor (No. of deliverables, time of delivery, hard copy/ electronic files etc)
i. Provide ADCO doc.no for project close-out documents/dossiers such as Engineering Dossiers, Vendor Data Books, MRBs, SPIRs, Operating manuals etc. Make sure that all key documents in dossiers carry ADCO doc no. Also make sure that electronic files are submitted as per guidelines for submission of electronic documentation 30-99-95-0006.
j. Shall be responsible for the completeness of project drawing As-built red line mark-ups and collection of approved project close-out documents as per contract.
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Appendices List
6.
Page: 203 of 209
APPENDICES LIST
APPENDIX 01 Requisition Forms Document Number
30-99-11-0004 30-99-11-0005 30-99-11-0006 30-99-11-0007 30-99-11-0009 30-99-11-0010 30-99-11-0011 30-99-11-0049
DESCRIPTION
USER FEEDBACK FORM DOCUMENT/DRAWING NUMBER REQUEST FORM EQUIPMENT TAG NUMBER REQUEST FORM INSTRUMENT TAG NUMBER REQUEST FORM LINE NUMBER REQUEST FORM CABLE & JB NUMBER REQUEST FORM OVERHEAD LINE NUMBER REQUEST FORM MASTER DRAWINGS ELECTRONIC FILES REQUISITION FORM
APPENDIX 02 Tag Plate Forms Document Number 30-99-11-0044
DESCRIPTION List of Tag plate Sample Format
APPENDIX 03 Draughting & Tagging Requirements for Various type of contracts Document Number
DESCRIPTION
30-99-11-0145
2D Draughting & Tagging Requirements Typical for CONCEPTUAL DESIGN
30-99-11-0146
2D Draughting & Tagging Requirements Typical for FEED
30-99-11-0147
2D Draughting & Tagging Requirements Typical For DETAIL ENGINEERING
30-99-11-0148
2D Draughting & Tagging Requirements Typical For CONSTRUCTION
30-99-11-0149
2D Draughting & Tagging Requirements Typical For EPC
30-99-92-0001
ADCO Standards and General Instructions (2D Mastering)
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Appendices List
Page: 204 of 209
APPENDIX 04 Guidelines for using ADCO Engineering Schedules Document Number 30-99-90-0049
DESCRIPTION Guidelines for Using ADCO Engineering Schedules
APPENDIX 05 Project Drawing & Document Submission Index Document Number
DESCRIPTION
30-99-11-0120
PROJECT DRAWING INDEX
30-99-11-0121
PROJECT TECHNICAL DOCUMENT INDEX
APPENDIX 06 Available only in CD Document Number 30-99-90-0016
DESCRIPTION
Symbols and Identification Systems Utility Pack AR-PID AR-Pipe Fonts Line Types Miscellaneous Patterns Symbols Templates
Title Block Format
ADCOVA0
ADCO Stamp for Vendor Drawings-A0
ADCOVA1
ADCO Stamp for Vendor Drawings-A1
ADCOVA2
ADCO Stamp for Vendor Drawings-A2
Document No: Master-30-99-90-0001 Rev 9.
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Appendices List
APPENDIX 06 Available only in CD Document Number
DESCRIPTION
ADCOVA3
ADCO Stamp for Vendor Drawings-A3
ADCOVA4
ADCO Stamp for Vendor Drawings-A4
ADCOA0
ADCO A0 Title Block
ADCOA0H
ADCO A0 Horizontal Title Block
ADCOA1
ADCO A1 Title Block
ADCOA1H
ADCO A1 Horizontal Title Block
ADCOA2
ADCO A2 Title Block
ADCOA2H
ADCO A2 Horizontal Title Block
ADCOA3
ADCO A3 Title Block
ADCOA3L
ADCO A3 Horizontal Title Block
ADCOA4
ADCO A4 Title Block
ADCODOCA4
ADCO A4 Document Template
ADCOEXCELA4
ADCO A4 Excel Template
ADCOLOGO
ADCO Logo with Company Name
ADCOLOGO1
ADCO Logo Only
ADCONAME
ADCO Company Name Only
Multiple Sheet Drawing Format 30-99-11-0068
Piping Isometric - Cover Sheet
30-99-11-0069
Piping Isometric - Revision Sheet
30-99-11-0070
Piping Isometric - Sample Format
30-99-11-0029
Instrument Loop Diagram - Cover sheet
30-99-11-0030
Instrument Loop Diagram - Revision Sheet
30-99-11-0031
Instrument Loop Diagram - Sample Format
30-99-11-0032
Instrument Interconnection Diagram - Cover Sheet
30-99-11-0033
Instrument Interconnection Diagram - Revision Sheet
30-99-11-0034
Instrument Interconnection Diagram - Sample Format
Document No: Master-30-99-90-0001 Rev 9.
Page: 205 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Appendices List
APPENDIX 06 Available only in CD Document Number
DESCRIPTION
30-99-11-0038
Logic Diagram - Cover Sheet
30-99-11-0039
Logic Diagram - Revision Sheet
30-99-11-0040
Logic Diagram - Sample Format
Blank Schedule Format 30-99-11-0013
MECHANICAL EQUIPMENT
30-99-11-0014
WELL MECHANICAL EQUIPMENT
30-99-11-0016
INSTRUMENT CABLE UVIR
30-99-11-0020
LINE
30-99-11-0022
FLOW INSTRUMENTS
30-99-11-0023
ELECTRICAL EQUIPMENT
30-99-11-0025
PRESSURE INSTRUMENTS
30-99-11-0045
MISCELLANEOUS INSTRUMENTS
30-99-11-0047
FIRE & GAS INSTRUMENTS
30-99-11-0053
WELL MISCELLANEOUS INSTRUMENTS
30-99-11-0055
WELL FIRE & GAS INSTRUMENT
30-99-11-0056
WELL ELECTRICAL EQUIPMENT
30-99-11-0058
TEMPERATURE INSTRUMENTS
30-99-11-0071
LEVEL INSTRUMENTS
30-99-11-0072
INSTRUMENT JUNCTION BOX FIRE & GAS
30-99-11-0073
INSTRUMENT JUNCTION BOX UVIR
30-99-11-0084
SAFETY RELIEF VALVE
30-99-11-0086
WELL SAFETY RELIEF VALVE
30-99-11-0087
VALVE
30-99-11-0089
WELL INSTRUMENT JUNCTION BOX
30-99-11-0127
ELECTRICAL CABLE
30-99-11-0129
INSTRUMENT CABLE
Document No: Master-30-99-90-0001 Rev 9.
Page: 206 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Appendices List
APPENDIX 06 Available only in CD Document Number
DESCRIPTION
30-99-11-0130
INSTRUMENT CABLE F&G
30-99-11-0131
TELECOM EQUIPMENT
30-99-11-0133
TELECOM CABLE
30-99-11-0134
TELECOM JUNCTION BOX
30-99-11-0135
TELECOM MAN HOLE
30-99-11-0137
INSTRUMENT JUNCTION BOX
30-99-11-0138
ELECTRICAL JUNCTION BOX
30-99-11-0140
WELL LEVEL INSTRUMENTS
30-99-11-0141
WELL TEMPERATURE INSTRUMENT
30-99-11-0142
WELL FLOW INSTRUMENT
30-99-11-0143
WELL PRESSURE INSTRUMENTS
30-99-11-0150
WELL ELECTRICAL CABLE
30-99-11-0151
WELL ELECTRICAL JUNCTION BOX
30-99-11-0152
WELL INSTRUMENT CABLE
30-99-11-0153
OVEAR HEAD LINE POLE TOWER
30-99-11-0154
ADNOC INSTRUMENT
30-99-11-0155
WELL TELECOM CABLE
30-99-11-0156
WELL TELECOM EQUIPMENT
30-99-11-0157
ADNOC WELL INSTRUMENT
30-99-11-0158
ADNOC SAFETY RELIEF VALVE
Filled Sample Engineering Schedules
SAMPLE OF: Cause and effect diagram SAMPLE OF: Alarm & Trip Settings SAMPLE OF: DCS input/output SAMPLE OF: Tie-in Schedule SAMPLE OF: Cable-Electrical Document No: Master-30-99-90-0001 Rev 9.
Page: 207 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Appendices List
APPENDIX 06 Available only in CD Document Number
DESCRIPTION
SAMPLE OF: Cable-F&G SAMPLE OF: Cable-UVIR SAMPLE OF: Cable-Instrument SAMPLE OF: Cable-Instrument-OLD SAMPLE OF: Cable-Telecom SAMPLE OF: Cable-Electrical-Well SAMPLE OF: Cable-Instrument-Well SAMPLE OF: Cable-Telecom-Well SAMPLE OF: Electrical Equipment SAMPLE OF: Electrical Equipment-Well SAMPLE OF: Instrument-ADNOC SAMPLE OF: Instrument-Safety Valve-ADNOC SAMPLE OF: Instrument-F&G SAMPLE OF: Instrument-Flow SAMPLE OF: Instrument-Level SAMPLE OF: Instrument-Miscellaneous SAMPLE OF: Instrument-Pressure SAMPLE OF: Instrument-Safety Valve SAMPLE OF: Instrument-Temperature SAMPLE OF: Instrument-Valve SAMPLE OF: Instrument-F&G-Well SAMPLE OF: Instrument-Flow-Well SAMPLE OF: Instrument-Level-Well SAMPLE OF: Instrument-Miscellaneous-Well SAMPLE OF: Instrument-Pressure-Well SAMPLE OF: Instrument-Safety Valve-Well
Document No: Master-30-99-90-0001 Rev 9.
Page: 208 of 209
ADCO - EP DRAWING DESIGN AND NUMBERING SYSTEMS Volume : 1/1
Revision: 9
Part
Date: Jun 2014
: 1/1
Section : Appendices List
Page: 209 of 209
APPENDIX 06 Available only in CD Document Number
DESCRIPTION
SAMPLE OF: Instrument-Safety Valve-Well SAMPLE OF: Instrument-Temperature-Well SAMPLE OF: JB-Instrument SAMPLE OF: JB-F&G SAMPLE OF: JB-UVIR SAMPLE OF: JB-Electrical SAMPLE OF: JB-Telecom SAMPLE OF: JB-Telecom-Manhole SAMPLE OF: JB-Electrical-Well SAMPLE OF: JB-Instrument-Well SAMPLE OF: Line SAMPLE OF: Mechanical Equipment SAMPLE OF: Mechanical Equipment-Well SAMPLE OF: Over Head Line SAMPLE OF: Telecom Equipment-Well SAMPLE OF: Telecom Equipment APPENDIX 07 Geographic Information System (GIS) Requirements for Various type of contracts Document Number
DESCRIPTION
30-99-11-0170
Geographical Information System Typical Requirements for EPC
30-99-11-2603
Geographical Information System Pipeline Construction Management System Typical Requirements For EPC
30-99-11-2602
Geographical Information System Typical Requirements for FEED
Document No: Master-30-99-90-0001 Rev 9.