Fortes Indicative BMS Points Schedule
Fortes Indicative BMS Points Schedule
GENERAL NOTES 1. 2. 3. 4. 5. 6.
7.
This Drawing is not to be scaled. All dimensions shown are in millimeters and do not take into account applied finishes unless specifically indicated otherwise. Any omissions or discrepancies found shall be reported to the Architect / Engineer immediately. Levels are given in meters to three decimal places above survey datum. This drawing is to be read in conjunction with the relevant section of the specification and schedules. The contractor shall submit full shop / setting out drawing for approval (based on site dimensions) prior to commencement of any site works, placing of orders, manufacture of fittings, fixtures and components. For External Finishes refer to Landscape Drawings and Specifications.
KEY PLAN
ZONE-A
ZONE-B
FINISH FLOOR LEVEL +0.480 = F.F.L. +8.40 ON SITE REVISIONS No. DATE
DESCRIPTION
C0
CONSTRUCTION ISSUE
15-06-15
BY DA
DESIGN ARCHITECTS & MEP ENGINEERS
Godwin Austen Johnson Architects STRUCTURAL ENGINEERS
OWNER
FORTES HOLDING
ISSUED FOR
CONSTRUCTION PROJECT
JVT SCHOOL Plot No. JVT05SCP001 Jumeirah Village Triangle, Dubai, UAE DRAWING TITLE
MECHANICAL SERVICES BMS POINTS SCHEDULES
Drawn Date Project No.
FA Checked 15.06.2014 Scale Zone
3350 Authority Dwg. No.
EL Approved
OP
NONE @ A1
Drawing No.
L51-900
Rev.
C0 Consecutive No.
NOTE: The Contractor is to use this as a basis for the point list. This is to be develop and quantify by the Contractor.
This drawing, the designs and details shown are the copyright of GODWIN AUSTEN JOHNSON and shall not be copied or reproduced in any form without their written consent. T +971 4 3237555 E
[email protected] F +971 4 3237717 W www.gaj-uae.ae PO Box 7185 Dubai United Arab Emirates
A1
Original Sheet FILE PATH : F:\- PROJECTS CURRENT\3350 - Fortes School\LIVE\ACAD\MEP DEPT\Sheet Files\Mechanical\51-BMS\3350-L51-900.dwg Size