471775984-wbs-of-wilmont-pharmacy-drone-case-pdf.pdf

  • Uploaded by: Leo Doe
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 471775984-wbs-of-wilmont-pharmacy-drone-case-pdf.pdf as PDF for free.

More details

  • Words: 610
  • Pages: 1
Loading documents preview...
Develop Project Work Breakdown Structure (WBS)

WBS Dictionary

WBS Activity 1 Develop the Prototype Drones

Overall Project

1.1 Initiating 1.1.1 Develop Project Scope and Plan

Define the scope of project. Plan the Purpose and goals of Project. Do an initial cost estimation.

1.1.2 Develop a project Charter

Develop a project charter and submit it to the stakeholders and get it approved.

1.1.3 Engage Stakeholder

Engage the stakeholders and get to know about the project deliverables. Do all the research about project and stakeholders requirement's

1.1.3.1 Signatures on project Contract

Project Manager(ME) and Stakeholders sign the official project charter as a contract to start the project legally

1.2 Planning 1.2.1 Drone Design

Dronetech will design 4 prototypes with Wilmont's logo on it for Delivering Process.

1.2.2 Project Scope Plan

A project Scope Management Plan will be produced by Project Manager listing the scopes, Deliverables and constraints of Project.

1.2.3 Risk Management Plan

A risk management plan will be made to encounter any possible risks during the project.

1.2.4 Cost estimates

A cost estimation of overall project will be given by Project Manager to Dronetech founder. This cost will include the cost for manufacturing and management process.

1.2.5 Create a Project Organization Chart

A project organizational Chart will be developed listing all the Levels of Authorities and Reporting structure Of Project.

1.2.6 Create a Work Breakdown Structure

A Work Breakdown Structure for Project will be created for better understanding of communication command And Deliverables of Project.

1.2.7 Project Kickoff Meeting

A project kickoff Meeting will be called which will include all the stakeholders of Project and a consensus will be Created among them regarding the project deliverables and they will be informed about project.

1.3 Execution 1.3.1 Drones Manufacturing

Dronetech will manufacture the Drones of approved design and specifications as mentioned in project Scope Plan.

1.3.2 Piloting and delivering 1.3.3 Development of Mobile Application

Dronetech will handle piloting the drones and delivery of the products. Dronetech will develop a mobile application as a booking system for Drugs Delivery process.

1.3.4 interface with Dronetech Flight operation

Organize the Wilmont’s resources in order to interface with Dronetech flight operations and other management systems that control and manage the drone delivery system.

1.3.5 Interface communications

Interface communications about deliveries for Wilmont’s customers electronically through email online, and through mobile alerts as the customer requests.

1.3.6 Information Security Management

Ensure the privacy and security of Wilmont pharmacy, Dronetech will collaborate with IT department of Wilmont

1.3.7 Drones Allocation

DroneTech will need to allocate a total of 4 new drones for this prototype project.

1.3.8 Drone Maintenance/Repair Parts

Budget will be allocated for maintained of Drones and construction of new parts

1.3.9 First Delivery through Drones

Delivery through drones will start from November 30

1.4 Management and Control 1.4.1 Regular meetings 1.4.2 Testing 1.4.3 Quality control and User Training 1.4.4 Monitoring the Changes

There will be regular meetings with the Team, Stakeholders, and Cross‐impacted areas of the company. Testing of Drone Delivery system will take place to check that drones are working satisfactory will all the required features Users will be trained to pilot the drone and quality assessment of Drones will take place. Changes in Drone Manufacturing and add on features of drones will be monitored to keep them within Project cost Plan

1.5 Closeout 1.5.1 Audit Performance 1.5.2 Close out report 1.5.3 Documenting the files

Performance of the project personals and delivery systems will be audited by external organizations or Stakeholders. A closeout report on project success and Phase will be made at the end of project All the files will be documented and archived into company storage for future reference.

Revision Date - 8/08/2020

More Documents from "Leo Doe"