PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 1 of 13 PROJECT, VISAKHAPATNAM
PROJECT PLANNING, SCHEDULING, MONITORING & CONTROL SYSTEM UNDERGROUND CIVIL WORKS
0
04.04.2007
ISSUED FOR BIDS
RDR
VKS
SKM
Rev. No
Date
Purpose
Prepared by
Checked by
Approved by
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 2 of 13 PROJECT, VISAKHAPATNAM
CONTENTS CLAUSE NO.
DESCRIPTION
SHEET NO.
1.0
INTRODUCTION
3
2.0
DEFINITIONS
3
3.0
ABBREVIATIONS
3
4.0
DOCUMENTS ALONG WITH BID
4
5.0
AFTER AWARD OF WORK
4
6.0
PROJECT SCHEDULES
5
7.0
UPDATION OF PROJECT SCHEDULES
8
8.0
REVIEW MEETINGS
9
9.0
PROGRESS REPORTING
10
10.0 BULK MATERIAL CONTROL
11
11.0 PLANNING PACKAGE
12
12.0 CONTROL ROOM DISPLAY
12
13.0 SOFTWARE PACKAGES
13
14.0 PROVISION OF COMPUTER FACILITIES
13
ATTACHMENTS I II III IV
PROJECT SCHEDULE HIERARCHY ( 1 Sheet) WORK BREAK DOWN STRUCTURE ( 1 Sheet) MONTHLY PROGRESS REPORT ( 32 sheets) FLOW OF DOCUMENTS (3 sheets)
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 3 of 13 PROJECT, VISAKHAPATNAM
1.0
INTRODUCTION To ensure timely completion, the Contractor shall establish and maintain an effective Planning, Scheduling, Monitoring and Control system, including mobilization of required number of professionally qualified and experienced Planning Engineers for design office and construction site. The system shall be capable of accurate and timely prediction of trend, evolution of adequate preventive actions for likely slippages, and formulation of suitable catch-up schedule for delays, if any, that have occurred. Planning, scheduling, progress reporting/monitoring and control system attached herewith is for a typical contract, comprising residual basic engineering, detail engineering, ordering, manufacturing/delivery, sub-contracting, construction, precommissioning & commissioning etc. as scope of work. Contractor based on the above procedure, is required to develop the planning, scheduling, reporting/ monitoring and control system which will cater to the specific scope of work defined in the ITB document for this contract. Schedules, reports and documents to be prepared and submitted by the Contractor for review of OWNER/ Project Management Consultant (PMC) at various stages and details of meetings to be held are described here.
2.0
DEFINITIONS Work Breakdown Structure (WBS) Work Breakdown Structure is a diagram that depicts various units in a project and each unit is detailed with work items/equipments and major workloads. Design Office Where Residual Basic Engineering, Detailed engineering, procurement activities for the contract are performed by Contractor. Functions Function means basic components of the projects e.g. engineering, ordering, manufacturing & delivery and construction. Each function is divided into various disciplines. In case of engineering, various disciplines are architecture, civil, structure, piping etc.
3.0
ABBREVIATIONS PMC MR AFC WBS UOM PR
-
Format No. EIL-1641-1924 Rev.1
Project Management Consultant Material Requisition Approved for Construction Work Breakdown Structure Unit of measurement Purchase Requisition
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 4 of 13 PROJECT, VISAKHAPATNAM
4.0
DOCUMENTS ALONG WITH BID The bidder shall submit following documents along with the bid: a) Proposed Overall Project Schedule in network form showing details of all units. b) Write up on Project Planning, Scheduling, Monitoring and Control system (proposed). c) Organizational set up for Planning, Scheduling, Monitoring & Control at Contractor’s Design Office and Site Office. d) Progress Measurement Methodology with details such as weightages, milestones, frequency etc. e) Project execution methodology. f) Function wise Resource Deployment Schedule (manpower & construction equipment). g) Softwares to be used for planning and material control. h) Statement confirming compliance to the “Planning, Scheduling, Monitoring and Control System” requirements regarding contents of the documents to be submitted to OWNER/PMC.
5.0
AFTER AWARD OF WORK
5.1
90 DAYS FRONT END SCHEDULE The Contractor shall prepare and submit a detailed 90 days front-end schedule within one week of award. Pending finalisation of functional schedules, this schedule shall be the basis of monitoring of front-end activities. The schedule shall cover all activities to be carried out during initial 90 days period of the contract. The schedule shall be reviewed in the kick-off meeting.
5.2
KICK OFF MEETING A Kick Off Meeting shall be organised within two weeks of award of contract. The meeting shall be attended by OWNER’s and PMC’s representatives. During the meeting the following with respect to Planning, Scheduling, Monitoring and Control system shall be discussed and finalized, 1. 2. 3. 4. 5. 6. 7. 8. 9.
Planning deliverables required for Project Monitoring and Control. Work Breakdown Structure for Project Schedules, organisation and level of detailing for Overall Project Schedule and Functional Schedules. Procedure for Project Planning, Scheduling, Monitoring & Control system including all reporting formats. Progress Measurement Methodology and Unit, Function, Discipline, and Deliverable wise weightage breakdown. List of engineering deliverables with indicative schedule for submission. List of unit wise milestones to be included in the network, in addition to milestones specified in the Contract, if any (the number of milestones shall be at least 2 to 3 per unit per month). List of critical equipment and materials for the fortnightly expediting report to be issued by the Contractor. Procedure for Bulk material control. Cut off dates, distribution list with number of copies and Project calendar indicating submission of various planning documents and revisions.
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 5 of 13 PROJECT, VISAKHAPATNAM
10. 5.3
Any other document as required. PROGRESS MEASUREMENT METHODOLOGY The Contractor shall submit during Kick-off Meeting, the detailed methodology of progress measurement of Residual Basic Engineering, Detailed Engineering, Ordering, Manufacturing & Delivery, Sub-contracting, Construction and Commissioning for review by OWNER/PMC. Contractor shall also furnish the methodology of progress measurement for sub-contracted packages such as DM plant, Cooling tower etc. and integration of the same with the overall progress. During the Kick Off meeting, OWNER/PMC shall specify weighted values to be used for the following:a) b) c)
Unit wise within the package, if applicable. Function wise within each unit. Milestone weightage within each deliverable.
Effort based weighted values for the following, along with the basis of their derivation, shall be submitted by Contractor for review by OWNER/PMC, and the comments if any shall be incorporated by Contractor before submission of functional schedules that use these weighted values as the basis: a) b)
Discipline wise within each function. Deliverable level weightage Percentage.
Progress figures at Unit / Function / Discipline level shall be summarized from deliverable level and indicated in the functional schedules. 6.0
PROJECT SCHEDULES Following schedules shall be prepared and submitted by Contractor to OWNER/PMC for approval. A hierarchy of all schedules to be generated by Contractor is shown in Attachment – I.
6.1
OVERALL PROJECT SCHEDULE Contractor shall submit within three weeks of award an network based overall project schedule (unit wise) on time scale in ‘AO’ size, for all units in the package and all functions of the work along with a Work Breakdown Structure indicating unit wise workload (sample format as Attachment - II). The schedule shall highlight interface activities in the scope of OWNER/PMC and clearly reflect strategies and philosophy of execution. Major milestones for each unit shall be depicted at the beginning of the network. The project schedule shall be developed for contractual duration. Grace period, if any as per contract shall not be considered for schedule. The schedule shall be reviewed by OWNER/PMC and the comments if any shall be incorporated and the schedule shall be issued for implementation within one week from the receipt of comments.
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 6 of 13 PROJECT, VISAKHAPATNAM
6.2
FUNCTIONAL SCHEDULES Contractor shall prepare resource based detailed Unit wise functional schedules for all functions in bar chart form in line with overall project schedule for monitoring and control. Contractor shall submit the same within six weeks of award for review. Unit wise “S” curves for schedule progress shall also be submitted along with the functional schedules. The schedule shall be reviewed by OWNER/PMC and comments, if any, shall be incorporated and issued for implementation within one week from receipt of comments. The Schedule “S” curves shall remain firm during the execution of the project. Contractor shall also ensure preparation, submission and updation of all functional schedules as described herein for all sub contracted packages like Heaters, DM Plant, WWTP, Cooling Tower, Nitrogen Plant etc.
6.2.1
Residual Basic Engineering Schedule Contractor shall submit a unit wise schedule for all Residual Basic Engineering Activities like finalisation including updation (incorporating vendor data) of P&IDs for process units and utilities & offsites, release of line schedules, finalisation of process data sheets for equipment etc. as per page 14 of Attachment - III.
6.2.2
Detailed Engineering Schedule The Contractor shall submit a Unit wise schedule of all engineering deliverable/documents such as AFC drawings, Isometrics, Specifications, Tender inputs/Tender drawings, Material Requisition, Purchase Requisition, Design calculations etc. as per page 14 of Attachment - III.
6.2.3
Ordering Schedule The Contractor shall submit a Unit wise schedule for all ordering activities as per page 17of Attachment - III. This shall include all MRs listed in Engineering Schedule.
6.2.4
Manufacturing & Delivery Schedule The Contractor shall submit a Unit wise schedule for all Manufacturing & Delivery activities as per page 21 of Attachment - III. These shall include all orders listed in the Ordering Schedule. The progress at Function/Unit level shall be summarized considering weighted values of tagged items and bulk material to report overall Manufacturing and Delivery progress. Contractor shall also submit along with Weekly Progress Report, status of drawings and documents for all vendors on whom orders have been placed, as per page 15 of Attachment - III. In addition to the above, for critical items as mutually agreed between Contractor and OWNER/PMC, Contractor shall ensure that vendor prepares and updates logical network for Manufacturing & Delivery and submit the same on weekly / monthly basis to OWNER/PMC if asked for.
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 7 of 13 PROJECT, VISAKHAPATNAM
6.2.5
Sub-contracting Schedule The Contractor shall submit a Unit wise schedule for all Sub-contracting activities as per page 22 of Attachment - III. This shall include all tenders envisaged for the Project.
6.2.6
CONSTRUCTION SCHEDULE The Contractor shall prepare and submit a Detailed Construction Schedule (Network) unit wise for OWNER/PMC review. The Contractor shall describe resources (manpower and machinery) required to be mobilised. The schedule shall have interface with Engineering, Ordering and Manufacturing & Delivery activities and also interface required from OWNER/PMC. The Contractor shall also define construction quantity for each activity. Contractor shall finalise discipline wise Construction ”S” Curves and quantum schedule.
6.3
OVERALL ‘S’ CURVES The Contractor shall prepare unit wise and Overall “S” curves showing cumulative schedule progress taking into consideration “S” curves for Residual Basic Engineering, Detailed Engineering, Ordering, Manufacturing & delivery, Sub-contracting and Construction “S” Curves. The overall “S” curves shall be updated immediately after finalisation of construction schedule. The overall “S” curves shall be submitted for OWNER/PMC review, with necessary back ups and shall form part of monthly progress report.
6.4
OTHER SCHEDULES The control philosophy for construction activities involves monitoring at the unit/discipline/subcontract/area level from the initial stages of construction and supplementing it with monitoring at the system/ loop level as construction advances towards mechanical completion/ pre-commissioning/ commissioning stages. To meet this objective, the following schedules/deliverables shall be prepared by Contractor.
6.4.1
SUB CONTRACTOR SCHEDULE Contractor shall ensure preparation of detailed schedules for all works in the scope of each subcontract awarded by him, for monitoring of construction progress. These schedules shall have quantity/work load details of all work items and “S” curve for each of the sub contracts. The Contractor shall ensure updation of the same on weekly basis. OWNER/ PMC reserve the right to check these schedules at any time.
6.4.2
MONTHLY PROGRAMME Contractor shall prepare monthly quantitative programme in line with functional schedules for all the functions. These programme shall be made keeping in view the cumulative targets as set in the schedules backlog and work front available in terms of vendor inputs, drawings, materials and access as applicable. The programme for construction shall be accompanied by list of resources (Manpower & machinery) planned to be deployed to achieve the programme. Current hold ups (Drawing, Materials, etc. if any) required to be resolved for the execution of the programme made, shall be indicated with proposed action plan for resolution.
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 8 of 13 PROJECT, VISAKHAPATNAM
Monthly programme other than Construction shall be submitted to OWNER/PMC Design Office within three calendar days of monthly progress report cut-off date. In case of Construction the monthly programme shall be finalised in consultation with OWNER/PMC’s site representative and submitted within two calendar days of monthly progress report cut-off date. In all matters concerning the extent of targets set out in monthly programme, the decision of OWNER/PMC shall be final and binding. The monthly programme shall be further broken down into weekly programme and indicated in weekly reports for closer monitoring of progress. 6.5
CATCH-UP SCHEDULE The Contractor shall generate and submit catch-up schedule for completion of all balance activities without change in contractual completion date with detailed resource reinforcement as and when asked by OWNER/PMC. The catch-up schedules shall be submitted to OWNER/PMC for review. Accordingly the “S” curves for catch-up schedules shall be made and shown along with the original schedules and actual “S” curves. During updation of overall project schedule and construction schedule, the catch-up schedules shall be shown in bar charts along with the original schedule.
7.0
UPDATION OF PROJECT SCHEDULES The various schedules as described herein shall be updated for submission to OWNER/PMC. Updation of the schedule is to determine the project trend, with the objective of taking preventive/ corrective action. The reflection of delayed anticipated completion by way of current trend does not in any manner absolve the Contractor of his contractual obligations as per the contract. This schedule once approved by OWNER/PMC shall not be revised without the prior written permission of OWNER/PMC.
7.1
OVERALL PROJECT SCHEDULE The schedule shall be updated on monthly basis and submitted in linked bar chart form in A4 size with monthly progress report. The updation shall be compared with the original schedule. -
While updating, the following shall be considered: Actual date of start and completion for the activities. Contractual completion dates for vendors and sub-Contractors/turnkey agencies, any change of duration due to offloading of vendors/sub-Contractors/turnkey agencies to be reflected. Duration of activities not yet started shall remain the same as per the original schedule. Anticipated dates of activities in progress. Addition/deletion of any activity if required or any change on job logic. Any change in drawing/material availability or change in activity duration. Any change in resource planning. Change in philosophy/strategy in execution of balance works, keeping in mind the actual status of the project.
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 9 of 13 PROJECT, VISAKHAPATNAM
7.2
FUNCTIONAL SCHEDULES The updated functional schedule trend and original schedule shall be shown together in bar chart format and submitted to OWNER / PMC on monthly basis. While updating, the following aspects shall be considered: Actual dates of start and completion for the activities. Actual work progress/balance work Contractual completion date for sub-Contractors and vendor delivery not reflected earlier. Any change in estimated activity durations Material and drawing availability Interfaces of one agency with other agencies Various statutory reviews/approval Interfaces between unit & offsite / utilities i.e. permanent power & water, waste disposal etc. Any change in execution logic/philosophy and engagement of number of agencies/ sub-Contractors and resource planning/ offloading if restored to.
7.3
OTHER SCHEDULES The following schedules shall be updated on a weekly basis and submitted to OWNER/PMC before the weekly review meeting at site in bar chart format. The updated schedule trend shall be compared with original schedule. -
8.0
Loopwise piping completion schedule Systemwise completion schedule Pre-commissioning/commissioning schedule
REVIEW MEETINGS The Contractor shall present project status, project highlights and action plan as applicable at various review meetings as described below. The presentation materials shall be submitted by Contractor to OWNER/PMC at least two days before the date of the meeting for management level review meetings and Monthly/ Fortnightly review meetings.
8.1
Management level Review Meeting Level of participation: senior management of OWNER, PMC and Contractor. Agenda frequency and venue : To be decided by OWNER/PMC.
8.2
Monthly/Fortnightly Review Meeting Level of participation: OWNER, PMC and Contractor Agenda:
Format No. EIL-1641-1924 Rev.1
1) Status against various commitments made during the previous review meetings 2)Monthly programme v/s Progress Status/ Statistics 3) Project Completion Outlook 4) Areas of concern with action plan Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 10 of 13 PROJECT, VISAKHAPATNAM
5) Catch-up schedule. Venue and timing of the meeting shall be decided by OWNER/PMC. Frequency of Meeting (Monthly or Fortnightly) shall also be decided by OWNER/PMC, based on criticality of the project status. 8.3
Weekly Review Meeting
8.3.1
For Design Office activities Level of participation:
OWNER, PMC & Contractor
Agenda: 1) Weekly programme v/s progress status/Statistics for Residual Basic, Engineering, Detailed Engineering, Ordering, Manufacturing & Delivery & Subcontracting. 2) Action taken for slippages. 3) Programme for next week 4) Status of various resources deployed Vs planned 8.3.2
For Site Activities Level of participation:
OWNER, PMC & Contractor
Agenda:1) Work front availability 2) Weekly programme v/s Achievement 3) Resource mobilization 4) Reasons for shortfall 5) Catch-up Schedule 6) Progress statistics 7) Programme for next week. 8) Status of resources deployed v/s planned. Venue and timing of Weekly Review Meetings for shall be decided by OWNER /PMC. 9.0
PROGRESS REPORTING The Contractor shall submit the following reports on regular basis for OWNER/PMC’s information/ review.
9.1
Monthly Progress Report The report shall be submitted on monthly basis within 5 calendar days from cut-off date covering overall scenario of the project. A copy of the specified formats for the report is enclosed as Attachment – III.
9.2
Weekly Progress Report (Overall) This report shall be prepared by Contractor and issued on weekly basis to OWNER/PMC. The report shall include the following: • Executive Summary • Project highlights with dates of achievements.
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 11 of 13 PROJECT, VISAKHAPATNAM
• Project exception (work programmed but not achieved with reasons for nonachievement) and work programmed for next week • Critical areas • Action taken / to be taken for slippages • Progress statistics This shall cover both for Contractor’s Design Office activities and construction activities at site. 9.3
Weekly Progress Report (Construction) This report shall be prepared by Contractor and submitted on weekly basis within 1 calendar day from cut off date. The report shall cover following items: • Progress statistics • Work item wise quantity completed against programme for the week including reasons for shortfall • Programme for next week • Front available • Constraints, if any. • Resources deployed against planned with reasons for shortfall in resource deployment • List of equipment/materials received at site during the week
9.4
Daily Progress Report (Construction) Contractor shall submit (daily before noon), for status of previous working day a daily report including the following • • • • •
9.5
Programme v/s Progress for the day Programme for next day Important achievements for the day Materials / Equipment receipt for the day. Man power / Machinery deployment report - Required v/s Deployed.
Expediting Report Contractor shall submit fortnightly expediting report based on his representative’s visit to vendor’s work for orders where delivery of materials is critical to project completion. A list of such critical items/vendors shall be specified by OWNER / PMC during the kick off meeting or at a later date. In addition to the above, OWNER / PMC may request expediting report based on visit of Contractor’s representatives in case of orders which though not critical at the time of order placement become subsequently critical during project execution due to any reason.
10.0
BULK MATERIAL CONTROL The Contractor shall follow an integral material control system for the project. The system shall be such that material identification in the design office, procurement and
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 12 of 13 PROJECT, VISAKHAPATNAM
allocation, are all channelised and controlled in an orderly manner. The Contractor shall follow material identification like unitwise/system wise/area wise/zone wise/Linewise, and shall give construction orientation to material control. The Contractor, right from the beginning, at the design office stage, shall start identifying materials system wise or area wise as indicated above. The system shall be based upon tracking of material requisitioning, placement of purchase order, manufacturing at vendor’s shop up to receipt at site for making the material available for performing planned and sequential construction work. Through periodic reviews, the Contractor shall have a system of generating Hold up reports well in advance to identify exception on material availability and to track such material by the expeditors through a systematic follow up procedure from the vendors. The Contractor shall make a presentation on the bulk material control system proposed to be implemented by them for the project during the kick-off meeting. Contractor shall submit the following reports on monthly basis for each unit as well as summary level. ▲ Bulk Material Status Report ▲ Material hold up/shortage report. 11.0
PLANNING PACKAGE Details of time of submission, frequency of submission and tentative number of copies required for all documents to be submitted by the Contractor are tabulated in attachment IV. Once the majority of the schedules are finalized, the Contractor shall compile the same and submit in the form of an Planning Package. (Not later than 12 weeks of award of the job). The Planning Package shall consist of the following : -
Introduction Overall schedule barchart (Summarised) 90 days front end schedule Project WBS Progress measurement methodology Overall Project schedule Functional schedules Sub-Contractor schedule Progress ‘S’ curves Sample reporting formats Manpower and Machinery deployment schedule
Contractor shall submit reports, updated schedules, programmes etc. as described herein till the completion of all work in the scope of the contract. No chapter/annexure of any report shall be deleted without prior written approval of OWNER/PMC. 12.0
CONTROL ROOM DISPLAY Contractor shall have conference room at site to display charts featuring salient static information of the project, schedules, status of progress, resource deployment, rainfall
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
PLANNING, SCHEDULING, SECTION: A-3.10 MONITORING & CONTROL SYSTEM 6838-8-2744-1003 Rev. 0 (PLNG & SCH) UNDERGROUND CIVIL WORKS STRATEGIC STORAGE OF CRUDE OIL Page 13 of 13 PROJECT, VISAKHAPATNAM
record, block flow diagram, plot plan, work break down structure etc. The status shall be updated at least on weekly basis. The objectives of the control room are to provide information at a glance to project personnel including the management of OWNERs and PMC. 13.0
SOFTWARE PACKAGES For schedule preparation and updation, The contract shall use Internationally acclaimed network analysis package such as Primavera Project Planner, Project Scheduler, Artemis etc. compatible with that being used by OWNER/PMC and submit the backup of the schedules on compact disks along with the hard copy whenever submission of the schedules are called for. The electronic files for all other deliverables shall be compatible with Microsoft Office.
14.0
PROVISION OF COMPUTER FACILITIES Contractor shall provide the following facilities for use by PMC at office:
Contractor’s design
A. PC with latest hardware, A3 size colour laser jet printer and Internet connection. B. Software: i) Network Analysis Package such as Primavera Project Planner, Project Scheduler, Artemis etc ii) MS Office iii) E-mail facilities iv) Internet explorer / Netscape
Format No. EIL-1641-1924 Rev.1
Copyright EIL – All rights reserved
ATTACHMENT - I
PROJECT SCHEDULE HIERARCHY (TO BE GENERATED BY CONTRACTOR)
LEVEL - I
LEVEL - II
90 DAYS FRONT END SCHEDULE (UNITWISE)
OVERALL PROJECT SCHEDULE (UNITWISE)
FUNCTIONAL * SCHEDULE FOR ENGINEERING
FUNCTIONAL * SCHEDULE FOR ORDERING
UNITWISE/DISCIPLINEWISE
UNITWISE/DISCIPLINEWISE
CATCH UP SCHEDULE (AS APPLICABLE)
FUNCTIONAL * SCHEDULE FOR MANUFACTURING & DELIVERY (UNITWISE)
CONSTRUCTION SCHEDULE (UNITWISE)
LEVEL - III
SUB-CONTRACTOR SCHEDULE SUB-CONTRACTOR A
SUB-CONTRACTOR SCHEDULE SUB-CONTRACTOR B
SUB-CONTRACTOR SCHEDULE SUB-CONTRACTOR C
FUNCTIONAL * SCHEDULE FOR SUB CONTRACTING (UNITWISE)
CATCH UP SCHEDULE (AS APPLICABLE)
SUB-CONTRACTOR SCHEDULE SUB-CONTRACTOR D
PACKAGE CONTRACTOR
ATTACHMENT- II
WORK BREAKDOWN STRUCTURE (TYPICAL) UNIT - 1 (CAPACITY, LICENSORS NAME)
REACTORS
COLUMNS
VESSELS/ DRUMS
HEAT EXCHANGER
HEATERS
COMPRESSORS
(HEAT DUTY) NOS. MATL SIZE & WT INDG/IMP
PUMPS NOS. KW RATING (RANGE) MOTOR/TURBINE DRIVEN INDG/IMP
NOS. MATL MAX. WT & HT INDG/IMP
PIPING A/G & U/G KM ----" DIA " MTR MATL INDG / IMP
NOS. MATL MAX. SIZE & WT INDG/IMP
NOS. MATL INDG/IMP
CIVIL/ STRUCTURAL
NOS. MATL STR STEEL REFRACTORY TUBES M/ IN DIA BURNER/SOOT BLOWERS
ELECTRICAL
RCC IN FDN RCC IN S/STR BRICK WORK STRL STEEL
NOS. OF PANELS TRANSFORMERS MCC/PCC CABLES HT < LIGHTING
NOS. KW RATING MOTOR/TURBINE DRIVEN INDG/IMP
INSTN. INSTRNS. IND/IMP CONTROL CABLE TUBES CONTROL PANELS
UNIT - 2 (CAPACITY, LICENSORS NAME)
SIMILAR TO UNIT - 1
PROJECT/PLANT (CAPACITY) UNIT - 3 (CAPACITY, LICENSORS NAME)
SIMILAR TO UNIT - 1
UTILITY / OFFSITES RAW WATER SYSTEM (CAPACITY) PUMPS PIPES
W.W.T.P.
COOLING WATER SYSTEM NO OF CELLS PUMPS PIPE COOLING TOWER CWTP
STORAGE YARD
TANKAGES SPHERES
NOTE :
ACTUAL QUANTUM / NOS. TO BE WRITTEN.
FIRE WATER SYSTEM
DM WATER SYSTEM
PUMPS PIPE
CIVIL/ STRUCTURAL
RCC STRL STEEL
CAPACITY
YARD PIPING
A/G MATERIAL KM/IM
STEAM SYSTEM
NON PLANT BUILDINMGS
BOILER CAPACITY
ELECTRICAL
SWITCH GEAR TRANSFORMERS CABLES NO. OF S/STN.
CONTROL ROOM (SIZE) CONTROL PANELS
NOS. QUANTUM OF WORK
OTHER UTILITY SYSTEMS INCLUDING C.P.D. (IF ANY)
ATTACHMENT - III INDIAN STRATEGIC PETROLEUM RESERVES LIMITED VISAKHAPATNAM
STRATEGIC STORAGE OF CRUDE OIL PROJECT UNDERGROUND CIVIL WORKS
PMC :- M/s. ENGINEERS INDIA LTD., NEW DELHI.
MONTHLY PROGRESS REPORT PROGRESS REPORT NO. XX UPTO____ (DAY) ______ (MONTH)_______ (YEAR) (REPORTING CUT-OFF DATE)
PREPARED BY :
U/G CIVIL CONTRACTOR
PAGE 1 OF 32
INFORMATION/ACTION DATE
ISSUED FOR
PREPD BY
DOCUMENT NO ___________
CHKD BY/ REVD BY
APPVD BY
UNDERGROUND CIVIL WORKS CONTRCTOR : STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 2 OF 32
TABLE OF CONTENTS SECTION DESCRIPTION I INTRODUCTION II EXECUTIVE SUMMARY III DETAILED STATUS IV AREAS OF CONCERN WITH ACTION PLAN V PROGRESS STATISTICS VI MILESTONE STATUS VII PROBLEMS / HOLD-UPS ANNEXURES I PROGRESS CURVES 11
PAGE NO. 3 4 5 6 7 9 10
II STATUS REPORTS A B.1 B.2 C D.1 D.2 E.1 E.2 E.3 E.4 F G1 G2 H I J K L.1 L.2 N O P
CHRONOLOGICAL ACHIEVEMENTS SUMMARY STATUS OF ENGINEERING DRAWINGS DRAWING / DOCUMENT RELEASE SCHEDULE VENDOR/PACKAGE CONTRACTOR DRAWINGS AND DOCUMENTS STATUS ORDERING STATUS (SUMMARY) ORDERING STATUS (DETAILED) EQUIPMENT DELIVERY STATUS (SUMMARY) EQUIPMENT RECEIPT AND ERECTION STATUS (DETAILED) BULK MATERIAL STATUS (SUMMARY) MANUFACTURING / DELIVERY STATUS SUB CONTRACTING STATUS UNITWISE STATUS OF CONSTRUCTION QUANTITIES RELEASED QUANTITATIVE MONTHLY CONSTRUCTION PROGRESS STATUS PROGRESS OF STRUCTURAL STEEL FABRICATION STATUS OF CONSTRUCTION LOOPWISE HYDROTESTING STATUS SYSTEM HANDING OVER STATUS UNITWISE DEPLOYMENT OF LSTK PERSONNEL AT CONSTRUCTION SITE UNITWISE RESOURCE DEPLOYMENT STATUS - EQUIPMENT AND MACHINERY UPDATED OVERALL PROJECT SCHEDULE STATUTORY APPROVAL STATUS PROJECT PHOTOGRAPHS
III OTHER REPORTS OTHER REPORTS SUCH AS - QUALITY REPORT - HEALTH, SAFETY AND ENVIRONMENT REPORT - COST REPORTS ETC. AS CALLED FOR IN THE OTHER SECTION OF THE BID PACKAGE.
DISTRIBUTION
AS PER DISTRIBUTION LIST IN CONTRACT.
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
UNDERGROUND CIVIL WORKS CONTRCTOR : STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 3 OF 32
I - INTRODUCTION CLIENT
:
PROJECT LOCATION
:
PMC
:
DESIGN CAPACITY
:
M/s. EIL, NEW DELHI
UNIT
CAPACITY
LICENSOR
CONTRACT VALUE
: _____Rs.(IN CRORES) (FE COMPONENTS_____)
SCOPE OF WORK
:
PROJECT TARGET DATES (UNIT WISE) EFFECTIVE START DATE
:
CONTRACTUAL COMPLN DATE
:
CONTRACTUAL COMMNG DATE (If Applicable)
:
ANT. MECH COMPLN DATE
:
ANT. COMMG DATE (If Applicable)
:
PROJECT DURATION
:_________ MONTHS
TIME ELAPSED
:__________MONTHS
UNDERGROUND CIVIL WORKS CONTRCTOR : STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 4 OF 32
II - EXECUTIVE SUMMARY EXECUTIVE SUMMARY SHALL SERVE AS SYNOPSIS OF THE PROJECT. IT NEEDS TO FOCUS ON THE FOLLOWING : -
OVERALL SCHEDULE AND ACTUAL PROGRESS TO BE SPECIFIED (CUMULATIVE AND DURING THE MONTH)
-
LIMIT IT TO ONE PAGE AS FAR AS POSSIBLE.
-
MAJOR MILESTONES ACHIEVED DURING THE MONTH.
-
CONTINGENCY/ CRASH ACTION PLAN FOR MOST CRITICAL AREAS, IF ANY, BEING FORMULATED / IMPLEMENTED.
-
SIGNAL FOR THE AREAS LIKELY TO BECOME CRITICAL.
-
ANY OTHER ISSUE NOT LISTED ABOVE.
UNDERGROUND CIVIL WORKS CONTRCTOR : STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 5 OF 32
III - DETAILED STATUS (UNITWISE / DISCIPLINEWISE)
A.
RESIDUAL BASIC ENGINEERING - ACTIVITIES COMPLETED DURING THE MONTH - ACTIVITIES PLANNED FOR THE NEXT MONTH
B.
DETAILED ENGINEERING - ACTIVITIES COMPLETED DURING THE MONTH - ACTIVITIES PLANNED FOR THE NEXT MONTH
C.
PROCUREMENT i) ORDERING - ACTIVITIES COMPLETED DURING THE MONTH - ACTIVITIES PLANNED FOR THE NEXT MONTH ii) MFG/DELIVERY - ACTIVITIES COMPLETED DURING THE MONTH - ACTIVITIES PLANNED FOR THE NEXT MONTH
D.
SUB-CONTRACTING - ACTIVITIES COMPLETED DURING THE MONTH - ACTIVITIES PLANNED FOR THE NEXT MONTH
E.
CONSTRUCTION - ACTIVITIES COMPLETED DURING THE MONTH - ACTIVITIES PLANNED FOR THE NEXT MONTH
F.
PACKAGE SUB-CONTRACTOR STATUS PACKAGE SUB-CONTRACTORWISE STATUS TO BE GIVEN FUNCTIONWISE AS APPLICABLE) i) ENGINEERING ii) ORDERING iii) MANUFACTURING & DELIVERY iv) CONSTRUCTION - ACTIVITIES COMPLETED DURING THE MONTH - ACTIVITIES PLANNED FOR THE NEXT MONTH
UNDERGROUND CIVIL WORKS CONTRACT CONTRACTOR
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 6 OF 32
STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
IV - AREAS OF CONCERN WITH ACTON PLAN (UNITWISE / DISCIPLINEWISE) SR.
IMPACT ON
AREAS OF CONCERN NO.
CONSTRAINTS SCHEDULE
ACTION TARGET ACT ION PLA N
(IN MONTHS)
NOTE 1. THIS SHALL CONTAIN ONLY CRITICAL ITEMS/ISSUES WHICH ARE DIRECTLY AFFECTING THE PROJECT SCHEDULE OTHER ITEMS CAN BE PLACED IN PROBLEMS & HOLD UPS CHAPTER. 2 TARGET DATES SHALL BE FURNISHED WITH ACTION PLAN.
BY
DATE
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 7 OF 32
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAP
V - PROGRESS STATISTICS A OVERALL PROJECT PROGRESS DESCRIPTION
WTD % AGE COMPLEX
DURING THE MONTH SCHEDULE
ACTUAL
CUMULATIVE SCHEDULE
ACTUAL
RESIDUAL BASIC ENGINEERING DETAILED ENGINEERING MANUFACTURING/DELIVERY SUB-CONTRACTING CONSTRUCTION COMMISSIONING
OVERALL PROGRESS - PHYSICAL B. PROCESS UNIT (UNITWISE)
Σ Α=100%
B.1 UNIT NAME DESCRIPTION
WTD % AGE COMPLEX
UNIT
A1 %
100
DURING THE MONTH SCHEDULE
ACTUAL
CUMULATIVE SCHEDULE
ACTUAL
RESIDUAL BASIC ENGINEERING DETAILED ENGINEERING ORDERING MANUFACTURING/DELIVERY SUB-CONTRACTING CONSTRUCTION COMMISSIONING
PHYSICAL PROGRESS UNIT- A1 B.2 UNIT NAME B.3 UNIT NAME B.4 UTILITIES /OFFSITES DESCRIPTION
WTD % AGE COMPLEX
UNIT
A4 %
100
DURING THE MONTH SCHEDULE
ACTUAL
CUMULATIVE SCHEDULE
ACTUAL
RESIDUAL BASIC ENGINEERING DETAILED ENGINEERING ORDERING MANUFACTURING/DELIVERY SUB-CONTRACTING CONSTRUCTION # COMMISSIONING
PHYSICAL PROGRESS /OFFSITES
UTILITIES
B.5 INFRASTRUCTURE/ENABLING FACILITIES DESCRIPTION
WTD % AGE COMPLEX
UNIT
A5 %
100
DETAILED ENGINEERING ORDERING MANUFACTURING/DELIVERY SUB-CONTRACTING CONSTRUCTION COMMISSIONING
PHYSICAL PROGRESS INFRASTRUCTURE
DURING THE MONTH SCHEDULE
ACTUAL
CUMULATIVE SCHEDULE
ACTUAL
UNDERGROUND CIVIL WORKS CONTRACTOR
MONTH & YEAR CLIENT PMC : EIL PAGE 8 OF 32
STRATEGIC STORAGE OF CRUDE OIL PROJCT AT VISAKHAPATNAM C. SUB CONTRACTED PACKAGES (PROCESS UNIT,UTILITIES & OFFSITES) C.1 RAW WATER TREATMENT PLANT WTD %AGE
DESCRIPTION
w.r.t U/OFF
UNIT
X1
100
DURING THE MONTH SCHEDULE
ACTUAL
CUMULATIVE SCHEDULE
ACTUAL
RESIDUAL BASIC ENGINEERING
DETAILED ENGINEERING ORDERING MANUFACTURING & DELIVERY CONSTRUCTION COMMISSIONING
PHYSICAL PROGRESS RWTP C.2 D.M. PLANT DESCRIPTION
WTD %AGE w.r.t U/OFF
UNIT
X2
100
DURING THE MONTH SCHEDULE
ACTUAL
CUMULATIVE SCHEDULE
ACTUAL
RESIDUAL BASIC ENGINEERING
DETAILED ENGINEERING ORDERING MANUFACTURING & DELIVERY CONSTRUCTION COMMISSIONING
PHYSICAL PROGRESS DM PLANT C.3 COOLING WATER TEATMENT PLANT C.4 COOLING WATER PLANT C.5 EFFLUENT TREATMENT PLANT etc. C.6 HEATERS
C.7 REFORMER WITH WH RECOVERY SYSTEM C.8 HT SYSTEM C.9 LT SYSTEM C.10 DCS C.11 NITROGEN
D. MAJOR REASONS FOR SHORTFALL NOTE: 1. WHEREIN THE GAP BETWEEN SCHEDULE & ACTUAL %AGE PROGRESS IS MORE THAN 5 % , EXPLANATION FOR THE BACK LOG/GAP REQUIRED TO BE FURNISHED IN THIS SHEET. 2. ALL COMPONENTS OF THE PROJECT IN LSTK CONTRACTOR'S SCOPE AS PER THE CONTRACT, SHOULD BE REPORTED IN IN THE PROGRESS STATISTICS. 3. UNIT WISE ALL SUBCONTRACTED PACKAGES TO BE REPORTED UNDER SUBHEADING "SUB CONTRACTED PACKAGE". 4. # CONSTRUCTION INCLUDES %AGE PROGRESS OF SUB-CONTRACTED PACKAGES IF ANY IN THE RESPECTIVE UNIT / OFFSITES & UTILITIES AS DETAILED IN THE ANNEXURE TO CONSTRUCTION PROGRESS.
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 9 OF 32
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
VI. MILESTONE STATUS (CURRENT + 2 MONTHS) STATUS AS ON : S.
MILESTONE DESCRIPTION
NO.
1
GENERAL
2
UNIT
2.1
RESIDUAL BASIC ENGINEERING
2.2
DETAILED ENGINEERING
2.3
PROCUREMENT
SCHEDULE
LATEST
ACTUAL
FORECAST
STATUS/
DATE
ALLOWABLE DATE
DATE
DATE
REMARKS
a) ORDERING b) MANUFACTURING & DELIVERY
2.4
SUB-CONTRACTING
2.5
CONSTRUCTION
2.6
PRECOMMISSIONING
2.7
COMMISSIONING
NOTE :
ALL MILESTONES (UNIT WISE AND FUNCTION WISE) AS AGREED DURING KICK OFF MEETING ARE TO BE LISTED.
UNDERGROUND CIVIL WORKS CONTRACT CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 10 OF 32
VII - PROBLEMS / HOLD-UPS (UNIT WISE / DISCIPLINE WISE)
SR. NO.
PROBLEM / HOLD-UPS
1
2
3
4
5
NOTE : ONLY POINTS WHICH AFFECT THE PROGRESS BUT MAY NOT HAVE THE IMPACT ON THE PROJECT SCHEDULE SHALL BE LISTED HERE.
ACTION PLAN
ACTION BY
TARGET DATE
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 11 OF 32 ANNEXURE - I (A)
STRATEGIC STORAGE OF CRUDE OIL PROJECT 100
45
90
40
80
35
70
30
60
25
50
20
40
15
30 20
10
10
5
0
D'00
J'01
F'01
M'01
SCH DURING THE MONTH
0
10
42.5
14.5
ACT. DURING THE MONTH
0
15
24
19
CUMM. SCH
5
15
57.5
72
CUMM. ACT
3
18
42
61
A'01
M'01
J'01
J'01
A'01
80
85
90
95
100
MONTHLY % PROGRESS
CUMULATIVE % PROGRESS
FUNCTION / PHYSICAL
0
NOTE : 1. UNIT WISE SEPARATE CURVE FOR EACH FUNCTION AND CURVE FOR PHYSICAL PROGRESS 2. OVERALL (AT CONTRACT LEVEL) SEPARATELY FOR EACH FUNCTION AND ONE CURVE FOR PHYSICAL PROGRESS
UNDERGROUND CIVIL WORKS CONTRACT CONTRACTOR
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 12 OF 32
STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
ANNEXURE - II (A)
CHRONOLOGICAL ACHIEVEMENTS S. NO.
DESCRIPTION OF KEY MILESTONES
SCH. DATE
ACTUAL DATE OF OCCURRENCE
1.
GENERAL
2.
UNITWISE (AS APPLICABLE)
2.1
RESIDUAL BASIC ENGINEERING
2.2
DETAILED ENGINEERING
2.3
ORDERING
2.4
MANUFACTURING & DELIVERY
2.5
SUB-CONTRACTING
2.6
CONSTRUCTION
2.7
SUB-CONTRACTED PACKAGES
2.8
PRECOMMISSIONING
2.9
COMMISSIONING
NOTE : MECHANICAL COMPLETION & COMMISSIONING DATES SHALL ALSO BE RECORDED.
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 13OF 32
SUMMARY STATUS OF ENGINEERING DRAWINGS (SUMMARY LEVEL & UNIT WISE SEPARATELY) TOTAL DRAWINGS
DISCIPLINE
NOS. ARCHITECTURAL
GENERAL CIVIL
STRUCTURAL
PIPING GAD's ISO's ELECTRICAL
INSTRUMENTATION
TOTAL
DRAWINGS RELEASED (NOS.) DURING THE MONTH SCH.
ACT.
REVIEW STATUS (NOS.)
CUMULATIVE SCH
ANNEXURE :II(B.1)
ACT
TOTAL DRGS. FOR REVIEW
CODE 1
CODE 2
SUBMISSION PROGM. CODE 3
FOR NEXT MONTH FRESH
CODE 3
REMARKS
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 14 OF 32
DRAWINGS / DOCUMENTS RELEASE SCHEDULE (UNITWISE / DISCIPLINEWISE) ANNEXURE - II(B.2)
PROJECT NAME
STATUS AS OF : DD/MM/YYYY MILESTONES DRAFT CHECK IST % WTD REV. REVIEW COMPL. COMPL. SUBM. CODE 2 CODE 1 PROG. PROG. CODE * * * * *
REV USE WTD. DRG. NO. . CAT. DRAWING / DOCUMENT TITLE CODE VALUE NO.
DISCIPLINE : PROCESS
SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F
LEGEND CATEGORY (CAT.): I: INFORMATION R: REVIEW A : APPROVAL S : STUDY A: STATUTORY / CLIENT REVIEW USE CODE :- P: PURCHASE C: CONSTRUCTION T: TENDERING L: CALCULATION NOTE : 1. INDICATE A/F (ACTUAL / FORECAST)AS APPLICABLE WITH THE DATES. 2. * DATES FOR AGREED MILESTONES AS PER PROGRESS MEASUREMENT METHODOLOGY. 3. THIS INCLUDES PROCESS / BASIC ENGG. DELIVERABLES.
REMARKS
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 15 OF 32
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
VENDOR/PACKAGE CONTRACTOR DRAWINGS & DOCUMENTS STATUS (UNITWISE / DISCIPLINEWISE) ANNEXURE - II(C) STATUS AS OF : DD/MM/YYYY
PROJECT NAME SL NO
DRG. NO.
DESCRIPTION
WTD. REV. NO. REVIEW DATE VALUE CODE Ist SUBM. REV. CODE-2 * *
VENDOR / PACKAGE CONTRACTOR NAME : ……………………….
NOTE : 1. * - AGREED MILESTONE PERCENTAGE 2. ALL VENDOR / PACKAGE CONTRACTOR DRAWINGS DOCUMENTS TO BE LISTED.
CODE-1 *
PROG (%)
REMARKS & STATUS
UNDERGROUND CIVIL WORKS
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 16 OF 32
CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT A
UNIT NAME / SUMMARY LEVEL ANNEXURE : II (D.1)
ORDERING STATUS (SUMMARY) (LOCAL(INDIAN) & FOREIGN PROCUREMENT SEPARATELY) CATEGORY
TOTAL
MR
MRs
ISSUED SCH
ISSUE
BIDS
ENQUIRY ACT
SCH
ACT
FOI/TOI
DUE SCH
PO
ISSUED ACT
SCH
ISSUED ACT
SCH
EQUIPMENT COLUMNS EXCHANGERS
TOTAL BULK
TOTAL NOTE :
NE AGAINST EACH EQUIPMENT CATEGORY AS COLUMN, EXCHANGERS, PUMPS ETC. AND BULK MATERIAL. 2. SEPERATE STATUS FOR EACH UNIT AND AT PROJECT SUMMARY LEVEL.
ACT
UNDERGROUND CIVIL WORKS CONTRACTOR
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 17 OF 32
STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
ORDERING STATUS (DETAILED) (DISCIPLINEWISE FOR EACH UNIT) UNIT_______________ MR NO.
ANNEXURE - II(D.2)
DESCRIPTION
WTD.
ITEM NO.
VAL.
CAT
MR
ISSUE
RECV
TBA
FOI/TOI
PO
L/C
%
VENDOR/
PO NO.
PR
REV.
REV.
RELS
ENQ.
BIDS
ISSUED
ISSUE
ISSUE
OPEN
PROG
LOCATION
/DATE
REVIEW
CODE 2
CODE
DATE
MECHANICAL SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F
NOTE :
1. INDICATE A/F (ACTUAL/FORECAST) AS APPLICABLE WITH THE DATES 2. CONTRACTUAL DELIVERY DATE (CDD) IS TO BE QUALIFIED IN REMARKS COLUMN (I.E EX WORKS, FOT, FOB, AT SITE ETC.)
CDD REMARKS
UNDERGROUND CIVIL WORKS
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 18 OF 32
CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT / SUMMARY *
ANNEXURE: II(E.1)
EQUIPMENT DELIVERY STATUS (SUMMARY) EQUIPMENT DESCRIPTION
TOTAL
QTY
NOS
ORDERED (NOS.)
RECEIVED
QTY IN
DESPATCHED
AT SITE
TRANSIT
(NOS.)
(NOS.)
(NOS.)
COLUMNS VESSELS REACTORS EXCHANGERS AIR COOLERS PUMPS COMPRESSORS FANS MISC. (MAJOR CRITICAL ITEMS)
TOTAL NOTE 2. * SEPARATE STATUS FOR EACH UNIT AND AT SUMMARY LEVEL.
DELIVERY FORECAST AT SITE FOR BAL. EQPT. CALENDAR MONTHS ---------> 1
2
3
4
5
6
UNDERGROUND CIVIL WORKS
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 19 OF 32
CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT / SUMMARY * EQUIPMENT RECEIPT AND ERECTION STATUS (DETAILED)
ANNEXURE: II(E.2)
(UNITWISE/DISCIPLINEWISE)) PO NO.
EQPT
EQUIPMENT
TAG NO.
DESCRIPTION
ERECTION VENDOR NAME, WT.
LOCATION,
(MT)
COUNTRY
REQD. AT SITE
C.D.D
DESPATCHED
RECEIVED
SITE
FDN
STRL.
ERECTION
HYDROTESTING
ON
AT SITE
ASSEMBLY
READY
READY
DATE
DATE
(IF ANY)
DATE
DATE
COLUMNS a) b) VESSELS
REACTORS
EXCHANGERS
AIR COOLERS
PUMPS
COMPRESSORS FANS/BLOWERS OTHER ITEMS ELECTRICAL EQUIPMENTS
NOTE
: 1. ALL EQUIPMENT TO BE COVERED. TAGGED ITEMS WITH MULTIPLE SUFFIXES TO BE MENTIONED SEPARATELY. e.g 2. * SEPARATE STATUS FOR UNIT AND AT SUMMARY LEVEL.
701-E-03A,
701-E-03B
701-E-03C
PAINTING
INSULATION
FIRE PROOFING
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 20 OF 32
UNDERGROUND CIVIL WORKS CONTRACT CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
ANNEXURE - II (E.3)
UNIT NAME / SUMMARY LEVEL *
BULK MATERIAL STATUS (SUMMARY) STATUS AS OF : _______
S.NO.
ITEMWISE DESCRIPTION
UOM
1
PIPES
2
FITTINGS
No.
3
FLANGES
No.
4
VALVES
No.
5
ELECTRICAL ITEMS (ALL)
TOTAL REQUIREMENT
ORDERED
QUANTITY RELEASED
RECEIVED AT SITE
FORECAST FOR BALANCE DELIVERY 1 2 3 4 5
M
ALL ITEMS
6
INSTRUMENTATION ITEMS ALL ITEMS
NOTE :
1. SEPARATE STATUS FOR EACH UNIT AND AT SUMMARY LEVEL. 2. STATUS TO BE GIVEN SEPARATELY FOR LOCAL (INDIAN) AND IMPORTED PURCHASE.
STATUS/PROBLEMS
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 21 OF 32
MANUFACTURING / DELIVERY STATUS (UNITWISE / DISCIPLINEWISE/ ORDERWISE) (LOCAL (INDIAN) AND FOREIGN PROCUREMENT SEPARATELY)
ANNEXURE - II(E.4) STATUS AS OF : DD/MM/YYYY
PROJECT NAME TAG NO./
DESCRIPTION
WTD
PO
VENDOR/
ITEM
OF ITEM
VAL
NO.
LOCATION/
&
COUNTRY
INSPN ORDER RELSD CAT
QTY
QTY
RECD
VENDOR
RAW
RAW
MFG
MFG
FINAL
QTY
DRG
MATL.
MATL
START
FINISH
INSPN
REV.
S/O
RECPT
*
*
*
*
*
*
DATE
CDD
FOB/EX
ARRIVAL
ARRIVAL
SITE
%
WORKS
INDIAN
AT
REQD
PROG
DELY
PORT
SITE
DATE
*
*
*
SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F
LEGEND INSPN. CAT.- INSPECTION CATEGORY ;- AS DESCRIBED IN INSPECTION METHODOLOGY. NOTE : 1 INDICATE A/F AS APPLICABLE WITH THE DATES (A/F :- ACTUAL / FORECAST) 2 3 4
BULK ITEMS LIST SHOULD INCLUDE PIPING, ELECTRICAL AND INSTRUMENTATION ITEMS. CONTRACTUAL DELIVERY DATE (CDD) IS TO BE QUALIFIED IN REMARKS COLUMN (I.E. EX WORKS, FOT, FOB, AT SITE (AS APPLICABLE) ETC.)
* - AGREED MILESTONE PERCENTAGE A/F :- ACTUAL / FORECAST
REMARKS
UNDERGROUND CIVIL WORKS CONTRACTOR
MONTH & YEAR CLIENT : ISPRL PMC : EIL
STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
PAGE 22 OF 32
SUB-CONTRACTING STATUS ANNEXURE - II(F) STATUS AS OF : DD/MM/YYYY
UNIT : DESCRIPTION
WTD
ISSUE OF
PREPARATION
TENDER
RECEIPT
AWARD
NAME
DURATION
CONTRACTUAL
INTERMEDIATE
OF WORK
VALUE
TENDER
OF TENDER
ON
OF BIDS
OF
%AGE
OF
OF
COMPLETION
CONTRACTUAL
SPECS
DOCUMENT
SALE
WORK
PROGRESS
AGENCY
CONTRACT
DATE
MILESTONES
*
*
*
SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F SCH. A/F
* - AGREED MILESTONE PERCENTAGE A/F :- ACTUAL/FORECAST NOTE : 1. INDICATE A/F AS APPLICABLE WITH THE DATES.
*
*
(IF ANY)
REMARKS
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 23 OF 32
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT ______________
ANNEXURE : II(G.1)
UNITWISE STATUS OF CONSTRUCTION QUANTITIES RELEASED ( DISCIPLINEWISE FOR EACH UNIT) S.
DISCIPLINE &
NO.
MAJOR WORK ITEM
UOM : UNIT OF MEASUREMENT.
UOM
LIKELY
CUM
BALANCE
PROGRAMME FOR BALANCE
QTY UNDER HOLD
QTY
RELEASED
QTY TO BE
MONTHS
AND REASON FOR THE SAME
QTY
RELEASED
1 ST
2ND
3RD
4TH
5TH
6TH
UNDERGROUND CIVIL WORKS
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 24 OF 32
CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT : ____________
QUANTITATIVE MONTHLY CONSTRUCTION PROGRESS STATUS ( UNITWISE/DISCIPLINEWISE) ANNEXURE :II(G.2)
WORK ITEM DESCRIPTION
UNIT OF MEASU-
EXCAVATION
REMENT CM
BACK FILLING
CM
RCC WORKS
CM
BRICK WORK
CM
A/G PPG - FAB
ID
A/G PPG - ERN
IM
U/G PPG - FAB
ID
U/G PPG - ERN
IM
CUMMULATIVE WORKLOAD
FRONT
TOTAL QUANTITY DURING THE MONTH
COMPLETED
PROGRAMME
COMPLETED
BACKLOG
INSTRUMENTATION - LOOPCHECKING
NOS
PERCENTAGE PROGRAMMED DURING THE MONTH PERCENTAGE ACHIEVED DURING THE MONTH PERCENTAGE PROGRAMMED FOR NEXT MONTH
: : :
CUM. PERCENTAGE PROGRESS SCHEDULE : FRONT: ACTUAL:
PROGRAM FOR NEXT MONTH
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 25 OF 32
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT ______________
ANNEXURE - II (H)
PROGRESS OF STRUCTURAL STEEL FABRICATION STATUS AS ON : SL.
WORK ORDER
NO. UNIT DESCRIPTION
STATUS CUMUL.
LOAD
TO DATE
CONTRACTOR AGENCY 1
1
UOM WORK
MT
YEAR
YEAR
MONTHS
MONTHS
SCH. PROG. ACT
AGENCY 2
2
MT
SCH. PROG. ACT.
AGENCY 3
3
MT
SCH. PROG. ACT.
GRAND
MT
TOTAL
PROG. ACT
LEGENDS: UOM : UNIT OF MEASUREMENT
SCH. : SCHEDULE
PROG. : PROGRAM
ACT. : ACTUAL
NOTE : SIMILAR DATA SHALL BE PROVIDED FOR OTHER KEY CONSTRUCTION ITEMS SUCH AS RCC, TANKAGE, CABLE LAYING, PIPING FABRICATION, ERECTION, HYDROTESTING , STRUCTURAL EREECTION ETC.
REMARKS
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 26OF 32
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT :_______________
ANNEXURE : II (I)
STATUS OF CONSTRUCTION SR. NO.
AGENCY SCOPE OF WORK
DURATION (MONTHS)
CONTRACTUAL START COMPLN DATE
DATE
ACTUAL START
ACT/ANT COMPLN DATE
CUM. % ACHIEVED MONTHLY PROGRESS SCH.
PROGM
CONTRACTUAL
FRONT*
SCH
AVAILABLE
ACT.
SUMMARY NOTE : 1. * FRONT INDICATES WORK THAT CAN BE TAKEN UP CONSIDERING AVAILABILITY OF DRAWINGS, MATERIALS AND ACCESS.
ACTUAL
UNDERGROUND CIVIL WORKS CONTRACTOR
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 27 OF 32
STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT :__________________
LOOPWISE HYDROTESTING STATUS ANNEXURE : II (J)
SR. NO.
DESCRIPTION
1.0 UNIT I
TOTAL 100
FRONT AVAILABLE 50
CHECK LISTED 30
MECH. CLEARED 20
RADIOGRAPHY CLEARED 20
NO. OF LOOPS HYDROTESTED SR THIS MONTH CUMULATIVE CLEARED SCH. ACT. SCH. ACT. 20
15
5
20
SERVICEWISE / SYSTEMWISE
2.0 UNIT II SERVICEWISE / SYSTEMWISE
3.0 OFFSITES PART A SERVICEWISE
4.0 OFFSITES PART B SERVICEWISE
5.0 PACKAGES SERVICEWISE
TOTAL NOTE : REPORTING SHALL START AFTER PREPARATION OF LOOPWISE PIPING COMPLETION SCHEDULE
10
REMARKS
LOOPS UNDER HOLD MATERIAL ERECTION TOTAL
35
15
50
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 28 OF 32
UNDERGROUND CIVIL WORKS CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
UNIT : ______________
ANNEXURE : II (K)
SYSTEM HANDING OVER STATUS (UNITWISE) S.NO. A.
SYSTEM DESCRIPTION
SYSTEM I
FORMAT I ISSUE DATE
FORMAT II ISSUE DATE
FORMAT III ISSUE DATE
TARGET DATE ACTUAL DATE
B.
SYSTEM II
TARGET DATE ACTUAL DATE
C.
SYSTEM III
TARGET DATE ACTUAL DATE TARGET DATE ACTUAL DATE TARGET DATE ACTUAL DATE
GRAND TOTAL
TARGET (NOS.) ACTUAL (NOS.)
LEGEND : FORMAT I
: INFORMATION REGARDING SYSTEM COMPLETION
FORMAT II : CHECKLIST FORMAT III : READY FOR PRE-COMMISSIONING \ MECH COMPLENTION CERTIFICATE FORMAT IV : READY FOR COMMISSIONING CERTIFICATE FORMAT V : COMPLETION OF COMMISSIONING CERTIFICATE NOTE :
1. TO BE FURNISHED SEPARATELY FOR EACH UNIT 2. REPORTING SHALL START AFTER PREPARARTION OF SYSTEMWISE COMPLETION SCHEDULE
FORMAT IV ISSUE DATE
FORMAT V ISSUE DATE
NAME OF UNIT
GRAND PLAN
TOTAL ACT
ENG. DEPT.
PLAN
ACT
PLAN
ACT
PLAN
ACT
PLAN
ACT
NOTE : REASON FOR DEVIATION BETWEEN MONTHLY CONSTRUCTION PROGRAMME AND ACTUAL TO BE MENTIONED. (USE SEPARATE SHEET IF NECESSARY) GRAND TOTAL : (1) + (2)
SUB TOTAL : (2)
OTHERS
SURVEYORS
SAFETY DEPT.
SITE SUPERVISORS
SITE ENG.
QA / QC DEPT.
STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
PROJECT CONTROL
ADMN. DEPT.
(1) LABOUR
MANAGERS
SUB TOTAL : (1)
OTHERS
UNSKILLED LABOUR
LAGGERS
GUNITOR
DRILLERS
FABRICATORS
TACK WELDERS
CRANE OPERATORS
SAND BLASTERS
MECHANICS
MILL WRIGHT FITTERS
INSTR. TECHNICIANS
STRL. FITTERS
PAINTERS
STRL. ERECTORS
SCAFFOLDERS
OPERATOR / DRIVER
INSULATORS
INST. FITTERS
ELECTRICIAN
GRINDERS
GAS CUTTER
PIPE/FABN. FITTERS
RIGGERS
WELDERS - PIPE
WELDERS - STRL.
BATCH PLANT LAB.
MASONS
BAR BENDER
CARPENTERS
FOREMAN
PLAN / ACT
UNDERGROUND CIVIL WORKS CONTRACTOR
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 29 OF 32
ANNEXURE - II(L.1)
UNITWISE DEPLOYMENT OF LSTK PERSONNEL AT CONSTRUCTION SITE MONTHLY CONSTN. PROGRAMME(%):
MONTHLY CONSTRN. ACTUAL (%) :
(2) MANAGEMENT & SUPERVISION
SL NO NAME OF UNIT
TOTAL DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED REQUIRED
DEPLOYED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
DEPLOYED REQUIRED
REQUIRED
DEPLOYED
PROGRAMME %AGE :-
%AGE PROGRESS ACHIEVED :BAR CUTTING M/C
250 MT CRANES
HYDRA (8T)
MOBILE DG SETS
HOT MIX PLANT
SAND BLASTING HOPER
CUBE TESTING M/C
EQUIPMENT & MACHINERY
PAV. BREAKERS
STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
HAND CUTTING SETS
CONTRACTOR
MAGNETIC DRILL M/C
SCREW JACK
PUG CUTTING M/C
OVENS MOTHER/PORTABLE
GRINDING M/C(AG)
BAR BENDING M/C
TRANSIT MIXERS
WINCH/HOIST
TRACTORS/TRAILORS
WAGON DRILLERS
CRANES/HYD. CRANES
LORRY/CARS/JEEPS
MOTOR GRADERS
BATCHING PLANT
SHEARING/GROOVING M/C
WATER PUMPS
ROCK BREAKERS
DRILLING M/C RIGS
PIPE BENDING M/C
PAY LOADERS
VIBRO ROLLERS
ROAD ROLLERS
COATING/WRAPPING M/C
WELDING MACHINE
VIBRATORS
COMPACTORS
COMPRESSORS
JACK HAMMERS
ROLLING MACHINES
DW PUMPS
DG SETS 125/82.5 KW
WATER TANKS
DOZERS
CONC MIXERS
DUMP LOADERS
EXCAVATORS
EQUIPMENT/MACHINERY
UNDERGROUND CIVIL WORKS
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 30 OF 32
UNITWISE RESOURCE DEPLOYMENT STATUS ( FOR THE MONTH OF : ___________)
ANNEXURE : II (L.2)
UNDERGROUND CIVIL WORKS
MONTH & YEAR CLIENT: ISPRL PMC : EIL PAGE 31 OF 32
CONTRACTOR STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
ANNEXURE : II (O) .
STATUTORY APPROVAL STATUS (APPROVALS TO BE LISTED UNDER THE HEADS OF (A) FOR DESIGN / DRAWINGS AND (B) FOR INSTALLATION) SL. NO.
APPROVALS
@@ STATUS
APPROVAL DATE REQUIRED BY
1
CHIEF INSPECTOR OF FACTORIES FOR PLANT LAYOUT a) CONSTRUCTION b) AS BUILT
2
MUNICIPAL CORPORATION FOR VARIOUS BUILDINGS
3
CIVIL AVIATION FOR FLARE STACK OF CHARGE HEATER
4
FIRE & NUISANCE DEPARTMENT FOR FURNACE STACK ( CHARGE STACK)
5
NOC FROM MUNICIPAL CORP. FOR ALL FACILITIES
6
IBR FOR STEAM PIPING & EQUIPMENTS
7
IBR FOR CHARGE HEATER
8
TAC FOR FIRE WATER & FIRE FIGHTING SYSTEM
9
CCE FOR PLANT LAYOUT, FIRE FIGHTING SYSTEM & TANK
10
CEI APPROVAL FOR H.V ELECTRICAL DISTRIBUTION SYSTEM
11
ANY OTHER STATUTORY & GOVT. APPROVALS (LIST THE SAME)
@@ NOTE : PROBLEMS IF ANY HOLDING APPROVAL SHALL BE HIGHLIGHTED IN THE STATUS COLUMN.
RECEIVED ON
REMARKS
UNDERGROUND CIVIL WORKS CONTRCTOR : STRATEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM
MONTH & YEAR CLIENT : ISPRL PMC : EIL PAGE 32 OF 32
ANNEXURE : II (P) PROJECT PHOTOGRAPHS NOTE : COLOUR PHOTOGRAPHS SHOWING KEY PROJECT ACTIVITIES e.g MANUFACTURING OF CRITICAL EQUIPMENT, TRANSPORTATION OF ODC ITEMS, CONSTRUCTION/ERECTION OF MAIN AREAS / EQUIPMENT SHALL BE INCLUDED EVERY MONTH.
Attachment -IV
FLOW OF DOCUMENTS FROM CONTRACTOR Note :
1. Documents to be submitted by the bidder along with Bid are listed in clause 4.0 2. Contractor shall submit electronic file along with hard copy wherever “*” is marked below 3. Number of copies to be submitted by Contractor for each document indicated below are indicative and shall be modified as per project requirement by Project Manager before including in the bid document.
S.NO . 1.
NO. OF COPIES DESCRIPTION OF DOCUMENT 90 Days Front End schedule
2a. Procedure for Planning Scheduling and Monitoring along with sample formats. 2b. Progress Measurement Methodology 3a. Overall Project Schedule ( Unit wise )
3b. Updation of overall Project schedule ( Unit wise )
FREQUENCY / TIME OF RECEIPT With in one week of award
CLIENT
PMC (HO)
PMC (SITE)
PMC (DESIGN OFFICE)
4
4*
2*
2*
DOCUMENT CATEGORY Review Approval
During kick off Meeting ( To be held within two weeks of award )
2
With in three weeks of award
4
4*
2*
2*
Approval
Monthly / to be submitted with monthly progress report
3
3*
2*
2*
Information
-
4*
-
1
Review
Within 6 weeks of award 4a. Unit wise Functional Schedules in resource based bar chart with “s” curves - Residual Basic Engineering Schedules Schedules of different disciplines to be submitted as separate documents - Detailed Engineering Schedules - Ordering Schedules - Manufacturing & Delivery Schedule Sub-contracting Schedule Updation of Functional Schedule and “S”
2
2
2 Approval
Page 1 of 3
Attachment -IV
FLOW OF DOCUMENTS FROM CONTRACTOR 4b. Curve
Monthly
3
2*
2*
2*
Information
5a. Construction Network ( Unit wise ) with contract level, unit level and discipline “S” curves. 5b. Updation of Construction Network and “S” curves ( Unit wise )
Within eight weeks of award or one month before start of construction activities, which ever is earlier. Monthly
2
3*
2*
2*
Review
1
1
2*
1
Information
6a. Loop wise piping completion schedule
Two months before start of hydro -testing as scheduled in unit wise construction network
2
3*
2*
2*
Review
1
1
2*
1
Information
6b. Updation of loop wise piping completion schedule
Weekly, to be submitted before review meeting
7a. System wise completion schedule
One month before scheduled completion as per unit wise construction network
2
3*
2*
2*
Review
7b. Updation of system wise completion schedule
Weekly, to be submitted before review meeting
1
1
2*
1
Information
8a. Pre-commissioning / commissioning schedule
Two months before scheduled system completion or one month before starting. Pre-commissioning activities as per unit wise construction
2
3*
2*
2*
Review
8b. Updation of Pre-commissioning / commissioning schedule
Weekly, to be submitted before review meeting
1
1
2*
1
Information
9.
As desired by Client/PMC
Catch up Schedules
Page 2 of 3
Attachment -IV
FLOW OF DOCUMENTS FROM CONTRACTOR a. For Overall Project Schedule b. For Construction Networks c. Updation
4 3
4* 3*
2* 2*
2* 2*
Review
As per 4b & 7b.
Review As called for
10a. Sub-contractor schedules with “S” curves To be made within two weeks of award of Sub-Contract including all Sub-Contractor Packages To be submitted when called for by the like Heater, DM Plant etc, owner / PMC. Fortnightly 10b. Updation of Sub-contractor schedules with “S” curves
Information
Information
11. Monthly Programme a. Design Office Activities b. Construction Activities
Within three calendar days of monthly progress report cut off date Within two calendar days of monthly progress report cut off date
12. Monthly Progress Report
Monthly, within 5 calendar days from cut off date
3
13. Weekly Progress Report ( Over all )
Weekly / within 2 calendar days of cut off date.
3
2
2
2
Information
( 2H )
2
2
2
Information
1
2
2
1
Information
( 2H )
( 2H )
( 2H )
( 2H )
Information
14. Weekly Progress Report ( Construction ) Weekly / within 2 calendar days of cut off date. 15. Daily Progress Report ( Site )
Daily / before noon of next day
16. Expediting Report
Fortnightly
As desired
2
2
2
Review
2
2
2
Review
2* Files as 2* Files as 2* Files as Information mentioned mentioned mentioned above above above
Page 3 of 3