© ABB Group July 2009

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Huheho PS HPP (4 x 300 MW) Airole & Bevera HPPs (2 x 7 + 2 x 4 MW) Ämmäkoski (3 MW) Albano HPP (1 x 15 MW) Bocac HPP (2 x 50 MW) Dong Nai 4 HPP (2 x 170 MW) Eidsfoss kraftverk (3 x 2 MVA) Haapakoski (0,6 MVA) Koivukoski (4 MW) Pyhännänkoski ( 6 MW) Svartisen HPP (1x350 & 1x250 MW) Trångfors HPP (1 x 73 MW)

Recent Projects 2009.10.doc

Project Country / Location China

Employer

Scope of Works

Start-Up

Italy

Inner Mongolia Electricity Corp. TirrenoPower

Computer supervisory & control system

2011

Finland

KaVo

Italy

Edison

Complete refurbishment for Green Cetrificate. Nr. 2 Automation Control System. Entire Electrical Balance of Plant of the HPPs. Consortium Agreement with the Turbine's Manufacturer. MV, LV, DC systems, MicroSCADA, Remote control, Automation, Governors, Protection systems, Excitation, Installation Speed Governor System

2010

2010

Bosnia Erzegovina Vietnam

Elnos

Speed Governor System

2010

EVN

Computer supervisory & control system, Protection system*

2010

Norway

Vang Energiverk

2010

Finland

Koskienergia

Control and protection, remote control, switchgear, AC/DC-supply, erection and commissioning PMG

Finland

KaVo

2010

Finland

Kainuun Energia

Norway

Statkraft Energi AS

Sweden

E.ON Vattenkraft Sverige AB

MV, LV, DC systems, MicroSCADA, Remote control, Automation, Governors, Protection systems, Excitation, Installation MV, LV, DC systems, MicroSCADA, Remote control, Automation, Governors, Protection systems, Excitation, Installation Control and protection, remote control, AC/DC-supply, erection and commissioning for the new 250MW unit; new control system for the existing 350MW unit MV, DC systems, Remote control, Automation, Governors, Protection systems, Excitation systems, Installation, Commissioning

2010

2010

2010 2010

2010

Page 1 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity)

Project Country / Location

Employer

Adamselv HPP (2 x 27 MW)

Norway

Statkraft Energi AS

An Khe HPP (2 x 80 MW) Aschach HPP (4 x 71.8 MW) Bålforsen HPP (2 x 44 MW) Ban Ve HPP (2 x 16 MW) Binga (4 x 37 MVA) Bugoye HPP (2 x 6.5 MW) Buon Tua Srah HPP (2 x 43 MW) Canetra HPP (1 x 7 MW) Dong Nai 3 HPP (2 x 90 MW) Flåsjö HPP (1 x 20 MW) Gausbu kraftverk (7.2 MW) Grundfors HPP (2 x 45 MW)

Vietnam

Recent Projects 2009.10.doc

Scope of Works

Start-Up

EVN

Control and protection, remote control, switchgear, AC/DC-supply, erection and commissioning. Some mechanical work at generator and turbine Computer supervisory & control system, Protection system*

2009

Austria

Verbund AHP

Electrical system

2009

Sweden

E.ON Vattenkraft Sverige AB

Control, Governors, Remote Control, Installation, Commissioning

2009

Vietnam

EVN

Computer supervisory & control system, Protection system*

2009

Philippines

Complete Electrical Balance of Plant, automation and protection

2009

Uganda

SN Aboitiz Power-Venguet, Inc. Tronder Power Limited

Complete Electrical Balance of Plant, automation and protection

2009

Vietnam

EVN

Computer supervisory & control system, Protection system*

2009

Italy

Endesa

Control and protection System

2009

Vietnam

EVN

Computer supervisory & control system, Protection system*

2009

Sweden

E.ON Vattenkraft Sverige AB

MV, DC systems, Remote control, Automation, Governors, Protection systems, Excitation systems, Installation, Commissioning

2009

Norway

Skafså kraftverk

Control, remote control erection and commissioning

2009

Sweden

Vattenfall Vattenkraft AB

Operator Stations, Installation, Commissioning

2009

2009

Page 2 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Järkvissle HPP (2 x 40 MW) Kvarnfallet HPP (1 x 19 MW) Lakshola kraftverk (31MW) Mosbakka kraftverk (5 MW) Peschiera HPP (1 x 7 MW) Sallilankoski (2 MW) Srepok3 HPP (2 x 110 MW) Stifone HPP (1 x 7 MW) Svabo kraftverk (4MVA) Svartisen HPP (1 x 350 & 1 x 250 MW) Triponzo HPP (1 x 7 MW) Wallseee-Mitterk. HPP (6 x 35 MW) Ybbs-Persenbeug HPP (6 x 39.4 MW)

Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Sweden

Vattenfall Vattenkraft AB

Control, Governors, Remote Control, Installation, Commissioning

2009

Sweden

E.ON Vattenkraft Sverige AB

MV, DC systems, Remote control, Automation, Governors, Protection systems, Excitation systems, Installation, Commissioning

2009

Norway

Elkem Energy AS

Control

2009

Norway

Mosbakka Kraft AS

2009

Italy

Endesa

Control and protection, remote control, switchgear, AC/DC-supply, erection and commissioning Control and protection System

2009

Finland

Sallilan Energia

Control, Protection, Excitation

2009

Vietnam

EVN

Computer supervisory & control system, Protection system*

2009

Italy

Endesa

Control and protection System

2009

Norway

Mo Ind park

Control, remote control erection and commissioning

2009

Norway

Statkraft Energi AS

2009

Italy

Endesa

Control and protection, remote control, AC/DC-supply, erection and commissioning for the new 250MW Unit. New control system for the existing 350MW Unit Control and protection System

2009

Austria

Verbund AHP

Electrical System

2009

Austria

Verbund AHP

Electrical System

2009

Page 3 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Atatürk HPP (8 x 300 + 1 x 6 MW) Karakaya HPP (6 x 300 MW) Campellio HPP (3 x 2 MW) Crevola Toce HPP (1 x 32 MW) Cua Dat HPP (2 x 49.5 MW) Degnone HPP (1 x 2 MW) Fadalto HPP (1 x 210 MW) Feldsee HPP (1 x 70 MW) Granö HPP (2 x 5.4 MW) GuiGang HPP (4 x 30 MW Bulb) Hirvikoski HPP (1 x 9 MW) Jufudu HPP (3 x 90 MW) Kjosfoss HPP (2 x 2 MW)

Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Turkey

EÜAS

Control & Protection, turbine governors, electrical systems

2008/2009

Turkey

EÜAS

Control & Protection, turbine governors, electrical systems

2008/2009

Italy

Enel Frame Agreement

Control system

2008

Italy

Enel Frame Agreement

Control system

2008

Vietnam

Cua Dat Hydro Power, JSC

Computer supervisory & control system

2008

Italy

Enel Frame Agreement

Control system

2008

Italy

Enel Frame Agreement

Control system

2008

Austria

Kelag

SFC, Switchgear

2008

Sweden

E.ON Vattenkraft Sverige AB

2008

China

Guigang Navigation Project Branch Bureau Vattenfall Oy

MV, DC systems, Remote control, Automation, Governors, Protection systems, Excitation systems, Installation, Commissioning Computer supervisory & control system updating for Advant OCS

2008

Control

2008

Computer supervisory & control system

2008

Rehabilitation of two turbines, one new 1-phase 16 2/3 Hz generator, one new 3-phase 50 Hz generator, 1-phase and 3-phase switchgear, 1-phase and 3-phase transformers. Control and protection, AC- and DC-supply, erection and commissioning

2008

Finland China Norway

Yunnan Datang Lixianjian Hydro Development Corp. Jernbaneverket Bane Energi

Page 4 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity)

Project Country / Location

Employer

Scope of Works

Start-Up

Kops 2 HPP (3 x 150 MVA) La Penna HPP (1 x 25 MW) Leirfossene HPP (1 x 30 & 1 x 16.5 MW) Maalismaa HPP (2 x 22 MW) Pian della Rocca HPP (3 x 8 MW) Preci HPP (2 x 6 MW)

Austria

VIW

Control, HV Systems

2008

Italy

Enel Frame Agreement

Control system

2008

Norway

TEV Kraft AS

2008

Finland

PVO-Vesivoima Oy

Italy

Enel Frame Agreement

Control and protection, remote control, switchgear, AC- and DC-supply, erection and commissioning MV, LV, DC systems, MicroSCADA, Remote control, Automation, Governors, Protection systems, Excitation systems Unitrol , Installation Control system

Italy

Endesa

Presenzano HPP (1 x 250 MW) Rosone HPP (4 x 50 MW)

Italy

Enel Frame Agreement

Italy

Iride Energia

Salto de Aguacate HPP (2 x 29 MW)

Dominican Republic

Salto de Jiuguey HPP (2 x 55 MW)

Dominican Republic

San Fiorano HPP (4 x 150 MW)

Italy

Empresa de Generación Hidroeléctrica Dominicana, EGEHID Empresa de Generación Hidroeléctrica Dominicana, EGEHID Enel Frame Agreement

Recent Projects 2009.10.doc

Nr. 2 Speed Regulation Systems, Nr. 2 Protection and Synchronisation Systems, Nr. 2 Excitation Systems, Nr. 1 Automatic Common Control System and Auxiliary Devices, Scada, Complete Sub-Station 150KV. Entire Electrical Balance of Plant Control system

2008 2008 2008

2008

Nr. 4 Speed Regulation Systems, Nr. 4 Protection and Synchronisation Systems, Nr. 4 Excitation Systems, Nr. 1 Automatic Common Control System and Auxiliary Devices, Scada, Complete Sub-Station 220KV. Entire Electrical Balance of Plants Upgrade control system with new PLC, synchronization, installation and commissioning

2008

Upgrade control system with new PLC, synchronization, installation and commissioning

2008

Control system

2008

2008

Page 5 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity)

Project Country / Location

Employer

Scope of Works

Start-Up

Santu Miali HPP (1 x34 MW) Sigillo HPP (1 x 6 MW) Skree kraftverk (7.2 MW) Song Ba Ha HPP (2 x 110 MW) Taloro HPP (3 x 80 MW) Verampio HPP (2 x 25 MW) Vietas HPP (2 x 160 MW) Albi & Magisano HPP (2 x 40 MW)

Italy

Ente Flumendosa

Control system & Speed Governor

2008

Italy

Endesa

Control system

2008

Norway

Skafså kraftverk

Control, remote control erection and commissioning

2008

Vietnam

EVN

Computer supervisory & control system, Protection system*

2008

Italy

Enel Frame Agreement

Control system

2008

Italy

Enel Frame Agreement

Control system

2008

Sweden

Vattenfall Vattenkraft AB

Vattenfall Vattenkraft AB

2008

Italy

Endesa

2007

Arthurwerk HPP (1 x 6 MW) Avestaforsen HPP (1 x 24 MW) Bodum HPP ( 1 x 12 MW) Bumbuna Falls HPP (2 x 17 MW) Cotilia HPP (2 x 30 MW)

Austria

EAG

Nr. 1 Speed Regulation Systems, Nr. 1 Protection and Synchronisation Systems, Nr. 1 Excitation Systems, Nr. 1 Automatic Common Control System and Auxiliary Devices, Scada. Revamping of the ElectroHydraulic Devices. Line Protection for the Sub-Station 220KV. Consortium Agreement with the Turbine's Manufacturer. Control+Electrical System

Sweden

Fortum Generation AB

Sweden

E.ON Vattenkraft Sverige AB

Italy Italy

Recent Projects 2009.10.doc

2007

Salini Costruttori

MV, LV, DC systems, Remote control, Automation, Governors, Protection systems, Excitation systems, Installation, Commissioning MV, LV, DC systems, Remote control, PGIM, Automation, Governors, Protection systems, Excitation systems, Installation, Commissioning Control system

2007

2007

Alstom Power

Control system

2007

2007

Page 6 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity)

Project Country / Location

Employer

Scope of Works

Start-Up

Creva HPP (3 x 11 MW) Dale II HPP (1 x 30 MW) Dietro La Torre HPP (2 x 1 MW) Domnarvet HPP (2 x 11 MW) Dossi HPP (6 x 10 MW) Funna HPP (1 x 22 MW) Gerlos II HPP (1 x 125 MW) Inga 2.3 HPP (1 x 250 MW)

Italy

Enel Frame Agreement

Control System

2007

Norway

BKK

Generator, transformer, control, protection, electrical balance of plant

2007

Italy

Enel Frame Agreement

Control System

2007

Sweden

Fortum Generation AB

Operator Stations

2007

Italy

Enel Frame Agreement

Control system

2007

Norway

132 kV switchgear, control and protection, remote control communication, switchgear, AC- and DC-supply, erection and commissioning Electrical system

2007

Austria

Nord-Trøndelag Elektrisitetsverk FKF Verbund AHP

Italy

Franco Tosi Meccanica

Kaldåga HPP (1 x 17 MW) Klåsarö HPP (2 x 2.3 MW) La Remolina HPP (1 x 200 MW) Le Piane HPP (2 x 5 MW) Ludrigno HPP (5 x 10 MW)

Norway

Helgelandskraft AS

Finland

Helsingin Energia Oy

Spain

Enel Viesgo

Nr. 1 Speed Regulation Systems, Nr. 1 Protection and Synchronisation Systems, Nr. 1 Excitation Systems, Nr. 1 Automatic Common Control System and Auxiliary Devices, Scada. Control and protection, remote control communication, switchgear, ACand DC-supply, electrical and mechanical erection and commissioning Automation, Governors, Protection systems, Excitation systems Unitrol, Installation Control system

2007

Italy

Enel Frame Agreement

Control System

2007

Italy

Enel Frame Agreement

Control system

2007

Recent Projects 2009.10.doc

2007 2007

2007 2007

Page 7 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity)

Project Country / Location

Employer

Scope of Works

Start-Up

Magisano (1 x 40 MW) ManWan Extension HPP(1 x 300 MW) Matfors HPP (1 x 21MW) Movileni HPP (4 x 7 MW) Narni HPP (2 x 30 MW) Niardo HPP (2 x 1 MW) Omkareshwar HPP (8 x 65 MW) Orichella (2 x 80 MW) Pengfors HPP (3 x 19 MW) Pontey I&II HPP (4x0.5 MW) Savuto PS (3 x 2 MW)

Italy

Endesa

Control system and Speed Regulation

2007

China

Governor electrical system

2007

Sweden

Huaneng Lancangjiang Hydro Development Corp. E.ON Vattenkraft Sverige AB

2007

Romania

S.H. Bistrita

MV, LV, DC systems, Remote control, PGIM, Automation, Governors, Protection systems, Excitation systems, Installation, Commissioning Control, Electrical systems

Italy

Endesa

Italy

Enel Frame Agreement

India

Svelgen 2 HPP (2 x 13.5 MW) Thac Ba HPP (3 x 40 MW)

Recent Projects 2009.10.doc

2007

Nr. 2 Step-Up Transformers. Nr. 1 Automation Control System. E-Bop of the HPP. Consortium Agreement with the Turbine's Manufacturer. Control system

2007 2007

Protection, electrical balance of plant

2007

Italy

Narmada Hydro Development Corporation Ltd. Endesa

Upgrade of Control System and Speed Regulation

2007

Sweden

E.ON Vattenkraft Sverige AB

Control, Remote Control, Governors, Installation, Commissioning

2007

Italy

Energia Plassier

2007

Italy

Endesa

Norway

Statkraft Energi AS

Vietnam

EVN

Complete Turn-Key of Nr. 4 Groups Turbine-Generator. Nr. 2 Automatic Control Systems Nr. 3 Motor-Pump with Soft Starter (one of them with speed-regulation). Nr.1 Automatic Control System. Consortium Agreement with the Penstock Supplier. Control and protection, remote control, switchgear, AC- and DC-supply, electrical and mechanical erection and commissioning Control & protection & measurement for the 3 units, bay & BB control and protection, plant control, cables and networks

2007

2007 2007

Page 8 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity)

Project Country / Location

Employer

Timpagrande HPP (2 x 80 MW)

Italy

Endesa

Tryland HPP (1 x 5.8 MW) Various HPP (217 Units) Various HPP (13 Units) Various HPP (8 Units) Various HPP (27 Units) Villa di Chiavenna HPP (2 x 6 MW) Yixing PSP (4 x 250 MW) Blåfalli Vik HPP (1 x 230 MW) Cimena HPP (2 x 22 MW) Copel HPP ( x MW) Dale II HPP (1 x 31.5 MW) Ermenek HPP (2 x 160 MVA)

Norway

Agder Energi Produksjon AS

Spain

Recent Projects 2009.10.doc

Scope of Works

Start-Up

Various

Nr. 2 Speed Regulation Systems, Nr. 2 Protection and Synchronisation Systems, Nr. 2 Excitation Systems, Nr. 1 Automatic Common Control System and Auxiliary Devices, Scada. Revamping of the ElectroHydraulic Devices. Consortium Agreement with the Turbine's Manufacturer Turbine, generator, transformer, control and protection, remote control, switchgear, AC- and DC-supply, erection and commissioning Excitation systems

2003/2007

Spain

Unelco

Protection systems

2003/2007

Spain

Alstom

Protection systems

2003/2007

Spain

Endesa

Protection systems

2003/2007

Italy

Maira Energia

China

2007

Norway

Jiangsu Pumped Storage Power Co. Ltd. Sunnhordland Kraftlag AS

Nr. 2 Step-Up Transformers. Nr. 2 Generators. Nr. 1 Automation Control System. E-Bop of the HPP Control and protection, complete electrical balance of plant, SFC Control, protection, 66 & 300kV switchgear, electrical balance of plant

2006

Italy

Enel Frame Agreement

Control System

2006

Brazil

COPEL

DCS HMI for generation control center + communication links

2006

Norway

BKK Produksjon AS

2006

Turkey

Alstom Power

Generator, Transformer, Control, Protection, Electrical Balance of Plant, erection and commissioning HV Systems

2007

2007

2007

2006

Page 9 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Framruste HPP (1 x 85 MW) Gamp HPP (2 x 5 MW) Harrsele HPP (3 x 75 MW) Hirvikoski HPP (1 x 9 MW) Kaltimo HPP (2 x 18 MW) Katzling HPP (2 x 2.5 MW) Khan Khar HPP (2 x 34 & 1 x 4 MW) Kierikki HPP (2 x 22 MW) Kvinesdal HPP (1 x 1.3 MW) Nazzano HPP (3 x 6 MW) Osbu HPP (1 x 25 MW) Paisco HPP (1 x 10 MW) Pallanzeno HPP (3 x 10 MW) Plankenau HPP (2 x 3.85 MW) Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Norway

Opplandskraft

Control, protection, electrical balance of plant

2006

Austria

Salzburg AG

Control+Electrical System

2006

Sweden

Holmens Kraft AB

Operator Stations

2006

Finland

Vattenfall Oy

MV, DC Systems

2006

Finland

UPM-Kymmene Oyj

2006

Austria

Pöls AG

HV switchyard, Main transformer 40MVA, generators, MV, LV, DC systems, MicroSCADA, Remote control, Automation, Governors, Control System + Electrical System

Pakistan

WAPDA

Control

2006

Finland

PVO-Vesivoima Oy

2006

Norway

Agder Energi Produksjon AS

Italy

Enel Frame Agreement

MV, LV, DC systems, MicroSCADA, Remote control, Automation, Governors, Protection systems, Excitation systems Unitrol F, Installation Turbine, Generator, Transformer, Control, Protection, Electrical Balance of Plant, erection and commissioning Control System

2006

Norway

Statkraft

Control and protection, complete electrical balance of plan

2006

Italy

Enel Frame Agreement

Control System

2006

Italy

Enel Frame Agreement

Control system

2006

Austria

EAG

Control+Electrical System Turbinenregler

2006

(2005)/2006

2006

Page 10 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Ponte Felice HPP (3 x 5 MW) Ponte Sargano HPP (2 x 5 MW) Rio General HPP (2 x 23 MW) Rødne HPP (1 x 9 MW) Røyrvatn HPP (2 x 2.6 MW) Smokovo HPP (2 x 5 MW) Wiesthal HPP (2 x 5 MW) Acquoria HPP (1 x 15 MW) Baoshan Houqiao HPP (3 x 18 MW) Calicano HPP (2 x 306 MW) Calice HPP (2 x 11 MW) Chievo HPP (2 x 39 MW) Clyde and Roxburgh (12 x 53.3 MW) Conception HPP (2 x 5 MW) Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Italy

Enel Frame Agreement

Control System

2006

Italy

Endesa

2006

Costa Rica Norway

Hidroenergía del General/ SARET Haugaland Kraft AS

Control System, AVR, Protection, Speed Governor, Electrical Balance of Plant Control, protection, transformers, 220 kV switchgear,electrical balance of plant Generator, control, protection, electrical balance of plant

2006

Norway

Sørfold Kraftlag A/L

Control, Protection, 22 kV switchgear and commissioning

2006

Greece

PPC

Control System, Excitation

2006

Austria

Salzburg AG

Control

2006

Italy

Enel Frame Agreement

Control System

2005

China

Control

2005

Italy

Yunnan Baoshan Binglang RHDP Co., Ltd ENEL Produzione

Control, protection

2005

Italy

Enel Frame Agreement

Control System

2005

Italy

ENEL Produzione

Control, protection

2005

New Zealand

Contact Energy

Control and governor retrofit

2005

Panama

Istmus Hydro

Control, protection, electrical BoP, turbine governor

2005

2006

Page 11 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Davos HPP (2 * 0.7 MW) Edolo HPP (4 x 150 MW) El Bote (42 MW) Farfa I HPP (1 x 15 MW) Flums HPP (8 MW) Gallicano HPP (2 x 30 MW) Gordon HPP (2 x 160 MW) Grabs HPP (2 MW) Guri HPP (20 x 500 MW) Hongye HPP (3 x 30 MW) Houqiao HPP (3 x 16 MW) Langstrommen HPP (2 x 32 MW) Leoben HPP (2 x 5 MW) Malgomaj/Volgsjofors HPP (3 x 10 MW) Recent Projects 2009.10.doc

Project Country / Location Switzerland

Employer

Scope of Works

Start-Up

Italy

Elektrizitätswerk Davos AG (EWD) ENEL Produzione

Control, replacement of hydraulic system with servomotors and digital governor Nr. 4 Automatic Control Systems. Protection. Scada. Reversible Turbine

2005

Nicaragua

ATDER

Automation, LV

2005

Italy

Enel Frame Agreement

Control System

2005

Switzerland

Spoerry & Co. AG

Control (new HIS on existing process control), water management

2005

Italy

ENEL Power

Control

2005

Australia

Hydro Tasmania

Complete governor incl. electronic governor & hydraulic systems

2005

Switzerland

EW Grabs

Control, water management

2005

Venezuela

EDELCA

Control, Protection, Communication upgrade

2005

China

Control

2005

Control

2005

Sweden

Sichuan Zagunao Hydropower Development Co., Ltd Yunnan Baoshan Binlangjiang Hydro Developm. Corp. Fortum

Control, protection, electrical balance of plant

2005

Austria

Verbund AHP

Electrical system

2005

Sweden

Statkraft

Control & protection & measurement for the 3 units, plant control, cables and networks

2005

China

2005

Page 12 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Matese HPP (1 x 15 MW) Montelungo HPP (2 x 22 MW) Montemaggiore HPP (2 x 30 MW) Mühlbach HPP (1 x 2 MW) Nembia HPP (2 x 7 MW) Obermatt HPP (2 x 12, 2 x 4 MW) Øyberget HPP (1 x 10 / 29 / 69 MW) Pedesina HPP (1 x 15 MW) Pequenos Libombos HPP (1 x 2.1 MW) Permantokoski HPP (1 x 16 MW) Pescara HPP (2 x 13 MVA) Roseires HPP (6 x 35 MW) Rott HPP (2 x 2.5 MW) Rovesca HPP (1 x 40 MVA) Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Italy

Enel Frame Agreement

Control System

2005

Italy

ENEL Produzione

Control, protection

2005

Italy

Franco Tosi

Control, turbine governor

2005

Austria

EAG

Control+Electrical System Turbinenregler

2005

Italy

Enel Frame Agreement

Control System

2005

Switzerland

Control, water management system, load distribution, 1st step

2005

Norway

EW Obermatt ewl Kraftwerke AG Vannkraft Øst AS

2005

Italy

ENEL

Control, Protection, Electrical Balance of Plant, erection and commissioning Control system

Mozambique

ARA-Sul

Finland

2005 2005

Kemijoki Oy

Control, Protection, Electrical balance of Plant, Rehabilitation of Mechanical Balance of Plant. Excitation

Italy

ENEL Power

Control

2005

Sudan

NEC

2005

Austria

Salzburg AG

Electrical and mechanical components (e.g. excitation; additional order on previous contract) Control System

Italy

Franco Tosi

Control, turbine governor

2005

(2004)/2005 2005

Page 13 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) S. Cipriano HPP (2 x 8 MW) S. Pancrazio HPP (1 x 34 MW) Salarno HPP (3 x 3 MW) Sardegnana HPP (1 x 15 MW) Schächental HPP (1 x 3 MW) Schwarzach HPP (3 x 35 MVA) Spannberg 1 HPP (2 x 0.63 MW) Stalon HPP (1 x 132 MW) Suviana HPP (1 x 15 MW) Svartisen HPP (1 x 230 MW) Talamona HPP (1 x 15 MW) Tasmania HPP (2 x 160 MW) Trebinje HPP (3 x 66.7MW) Tussa HPP (2 x 30 MW) Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Italy

Enel Frame Agreement

Control System

2005

Italy

Enel Frame Agreement

Control System

2005

Italy

Enel Frame Agreement

Control System

2005

Italy

Enel Frame Agreement

Control System

2005

Switzerland

EW Altdorf

Control

2005

Austria

Verbund AHP

Transformers

2005

Austria

EAG

Control+Electrical System, Turbinenregler

2005

Sweden

Vattenfall

Control for the unit

2005

Italy

Enel Frame Agreement

Control System

2005

Norway

Statkraft Energi

Control

2005

Italy

Enel Frame Agreement

Control System & Speed Governor

2005

Australia

Hydro Tasmania

Complete governor retrofit, electronic governor & hydraulic systems

2005

Bosnia Herzegowina Norway

HET

Control, protection, electrical and mechanical BoP

2005

Tussa Energi

Control

2005

Page 14 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Utanen HPP (3 x 18 MW) Vaccarizzo HPP (1 x 7 MW) Val Giuf HPP (1.5 MW) Vena Martello HPP (2 x 10 MW) Volgsjöfors HPP (2 x 10 MW) Volturno HPP (4 x 6 MW) Wiestal HPP (2 x 14 MW) Yamula HPP (2 x 50 MW) Zogno HPP (4 x 1.25 MW) Ajutian HPP (3 x 35 MW) Birkapali HPP (1 x 66 MW) Campliccioli HPP (1 x 6.5 MW) Cheongsong PSP (2 x 306 MW) Dongxiguan HPP (4 x 45 MW) Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Finland

Fortum Power and Heat

Control and electrical balance of plant

2005

Italy

Enel Frame Agreement

Control System

2005

Switzerland

Energia Alpina

Control, plant and water catchment monitoring

2005

Italy

Enel Frame Agreement

Control System

2005

Sweden

Sydkraft Vattenkraft AB

2005

Italy

Enel Frame Agreement

Control, Remote control, Governors, Protection systems, Excitation systems, DC systems, Installation, Commissioning Control System

2005

Austria

Salzburg AG

Control System

2005

Turkey

Ayen Energy Turkey

Control and protection system, excitation & synchronization equipment

2005

Italy

ENEL

Control system

2005

China

Supahe Hydro Dev. Corp.

Control, protection

2004

Turkey

ERE Otoprodüktör A.S.

Control, protection, electrical BoP, substation

2004

Italy

Enel Frame Agreement

Speed Governor System

2004

South Korea

KOWEPCO

Plant automation, protection, excitation, SFC, switchgear

2004

China

Sichuan Huaneng Corp.

Cascade Control Center System

2004

Page 15 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) El Canada (2 x 26 MW) Guadalupe HPP (3 plants) Kaprun HPP (4 x 55 MW) Kolsi HPP (1 x 14.5 MW) Långströmmen HPP (2 x 20 MW) Malgomaj HPP (1 x 10 MW) Offensee I HPP (3 x 1.2 MW) Pescara HPP (2 x 7 MW) Qingju HPP (3 x 30 MW) Roseires HPP (6 x 35 MW) Siso HPP (1 x 94, 1 x 130 MW) Stalon HPP (1 x 120 MW) Traunfall (1 x 10 MVA) Wagrain HPP & Weir (2 x 11 MW) Recent Projects 2009.10.doc

Project Country / Location

Employer

Scope of Works

Start-Up

Guatemala

GE Hydro

Plant automation, protection, switchgear, substation, power line

2004

Colombia

EPM

2004

Austria

KW Kaprun

Control system retrofit, instrumentation upgrade, fieldbus, joint control, cascade control Control and protection

2004

Finland

Graninge Oy

Turbine Governors, Excitation system Unitrol F, Installation

2004

Sweden

Fortum Generation AB

Control, Governor, Installation, Commissioning

2004

Sweden

Sydkraft Vattenkraft AB

2004

Austria

EAG

Control, Remote control, Governors, Protection systems, Excitation systems, DC systems, Installation, Commissioning Control+Electrical System, Turbinenregler

Italy

Enel Frame Agreement

Speed Governor System

2004

China

Control, protection

2004

Sudan

Sichuan Huaneng Jialigliang Hydro Dev. Corp. NEC

Control, protection, electrical BoP, turbine governor, mech. parts

2004

Norway

Elkem Energi AS

Control, protection, remote control

2004

Sweden

Vattenfall Vattenkraft AB

Control, Remote Control, commissioning

2004

Austria

EAG

Electrical and control systems

2004

Austria

EAG

Control+Electrical System, Turbinenregler

2004

(2003/2004

Page 16 of 17

Customer : Project : Quotation-No. :

ABB in HYDROPOWER

Ref.: Hydro’09

Recent Project References (start-up => 2003; rev.: 10.2009)

Project Name (Capacity) Wallseee-Mitterk. HPP (6 x 35 MW) Ybbs-Persenbeug HPP (6 x 39.4 MW) Baso Chhu 2 HPP (2 x 7.5 MW) Chamera II (3 x 100 MW) Esti HPP (2 x 75 MW) Guadalupe HPP (11 x 48 MW, 3 plants) Hongjiang HPP (4 x 45 MW) Itabepi HPP (3 x 150 MW) Kvarnsveden HPP (1 x 28 & 1 x 30 MW) Orichella HPP (U1/2) (2 x 80 MW) Qing Ju HPP (4 x 44 MW) Tyrvää HPP (2 x 8 MW)

Project Country / Location

Employer

Scope of Works

Start-Up

Austria

Verbund AHP

DC Supply System 220V

2004

Austria

Verbund AHP

DC Supply System 220V

2004

Bhutan

Alstom Power

Control System

2003

India

NHPC/SNC Lavalin

Control, protection, communication (PLC)

2003

Panama

AES Panama

2003

Colombia

EPM

Unit control, remote control from central control room at La Estrella, joint control, AGC Control, protection, electrical BoP

2003

China

Wuling Electric Corp.

Control, protection

2003

Brazil

Iberdrola

Control system

2003

Sweden

Fortum Generation AB

Operator Stations

2003

Italy

ENDESA

Control system

2003

China

Huaneng Jialingjiang Hydro co.Ltd UPM Kymmene Oyj

Control system

2003

MV, LV, DC systems, MicroSCADA, Remote control, Automation, Governors, Protection systems, Excitation systems Unitrol F, Installation

2003

Finland

(Besides these projects ABB’s Power Systems division is active and has references in other renewables, such as solar, wind and WTE projects as well as in thermal PPs (coal, gas, CC, …) and in the field of water treatment and pumping stations. Please visit us on www.abb.com.)

Recent Projects 2009.10.doc

Page 17 of 17

Related Documents

Abb Antivirus
January 2021 0
Abb Transformers
March 2021 0
Abb Iec61850
January 2021 0
Abb Safelinkba2002pres.pdf
February 2021 0

More Documents from "Jeteendra Sharma"

Workbook #3
February 2021 0
February 2021 0
Leziunile Traumatice
February 2021 0
Fachadas Patologia
February 2021 1