REKAPITULASI BQ Program Pekerjaan Lokasi Tahun Anggaran

: Penataan kawasan pariwisata : Pembangunan Gedung TIC/ATM Centre, Area Kuliner, Wc & Musholla : Kecamatan Panimbang, Kabupaten Pandeglang : 2018

NO. A.

URAIAN PEKERJAAN

JUMLAH

PEKERJAAN PEMBANGUNAN TIC, & ATM CENTRE

I

PEKERJAAN PERSIAPAN

#N/A

II

PEKERJAAN FONDASI DAN BETON

#N/A

III

PEKERJAAN DINDING DAN PLESTERAN

#N/A

IV

PEKERJAAN PINTU DAN JENDELA

#NAME?

V

PEKERJAAN ATAP DAN PLAFOND

#N/A

VI

PEKERJAAN PELAPIS LANTAI DAN DINDING

#N/A

VII

PEKERJAAN SANITAIR

#N/A

VIII

PEKERJAAN LISTRIK

#N/A

IX

PEKERJAAN PENGECATAN

#N/A

X

PEKERJAAN LAIN-LAIN

#N/A SUB TOTAL A

B.

#N/A

PEKERJAAN PEMBANGUNAN KIOS DAN TEMPAT KULINER

I

PEKERJAAN FONDASI DAN BETON

#N/A

II

PEKERJAAN DINDING DAN PLESTERAN

#N/A

III

PEKERJAAN PINTU DAN JENDELA

IV

PEKERJAAN ATAP DAN PLAFOND

#N/A

V

PEKERJAAN PELAPIS LANTAI DAN DINDING

#N/A

VI

PEKERJAAN LISTRIK

#N/A

VII

PEKERJAAN PENGECATAN

#N/A

VIII

PEKERJAAN LAIN-LAIN

#N/A

40,950,000.00

SUB TOTAL B C

PEKERJAAN PEMBANGUNAN KIOS DAN TEMPAT KULINER

#N/A

I

PEKERJAAN FONDASI DAN BETON

#N/A

II

PEKERJAAN DINDING DAN PLESTERAN

#N/A

III

PEKERJAAN PINTU DAN JENDELA

#NAME?

IV

PEKERJAAN ATAP DAN PLAFOND

#N/A

V

PEKERJAAN PELAPIS LANTAI DAN DINDING

#N/A

VI

PEKERJAAN LISTRIK

#N/A

VII

PEKERJAAN PENGECATAN

#N/A

VIII

PEKERJAAN LAIN-LAIN

#N/A SUB TOTAL C

#N/A

D

PEKERJAAN PEMBANGUNAN KIOS DAN TEMPAT KULINER

I

PEKERJAAN FONDASI DAN BETON

#N/A

II

PEKERJAAN DINDING DAN PLESTERAN

#N/A

III

PEKERJAAN PINTU DAN JENDELA

#NAME?

IV

PEKERJAAN ATAP DAN PLAFOND

#N/A

V

PEKERJAAN PELAPIS LANTAI DAN DINDING

#N/A

VI

PEKERJAAN SANITAIR

#N/A

VII

PEKERJAAN LISTRIK

#N/A

VIII

PEKERJAAN PENGECATAN

#N/A

IX

PEKERJAAN LAIN-LAIN

#N/A SUB TOTAL D

Terbilang :

#N/A

TOTAL BIAYA FISIK (A+B+C+D)

#N/A

PPn 10%

#N/A

JUMLAH BIAYA

#N/A

DIBULATKAN

#N/A

#NAME?

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BILL OF QUANTITY (BOQ) Program Pekerjaan Lokasi Tahun Anggaran

No

: Penataan kawasan pariwisata : Pembangunan Gedung TIC/ATM Centre, Area Kuliner, Wc & Musholla : Kecamatan Panimbang, Kabupaten Pandeglang : 2018

Uraian Pekerjaan

Volume

Jumlah Harga (Rp) 5

1 A. I 1 2 3 4 5

2 PEKERJAAN PEMBANGUNAN TIC, & ATM CENTRE PEKERJAAN PERSIAPAN Pasang papan nama proyek Pengadaan air dan listrik kerja Set Out Dan Bowplang Pembuatan Direksi Keet 5X6 Biaya pelaporan dan dokumentasi

1.00 1.00 394.00 30.00 1.00

bh ls m' m2 ls

II 1 2 3 4 5 6 7 8 9 10 11 12

PEKERJAAN FONDASI DAN BETON Pek. Galian Tanah Fondasi Pek. Urugan Pasir Dibawah Fondasi Pek. Fondasi Batu Kali ad. 1.4 Pek. Urugan Tanah Fondasi Pek. Urugan Tanah Dari Luar Dipadatkan Pek. Sloof 20/20 Beton Bertulang K.175 Pas. Kolom 20/20 Beton Bertulang K.175 Pas. Kolom Praktis 15/15 Beton Bertulang K.175 Pas. Balok Lintel 10/12 Beton Bertulang K.175 Pas. Balok 15/30 Beton Bertulang K.175 Pas. Ring Balok 15/20 Beton Bertulang K.175 Pas. Dak Talang Beton t. 10 cm Beton Bertulang K.175

29.40 4.20 21.00 3.68 44.00 2.40 1.51 0.58 0.06 1.80 1.80 4.84

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A JUMLAH II

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

III 1 2 3 4

PEKERJAAN DINDING DAN PLESTERAN Pas. Bata Merah (1/2 bata), 1pc : 4 ps Pas. Plesteran + acian, 1 pc : 5 ps Pas. Acian Dak Beton Water Proofing Dak Beton

197.25 394.50 48.40 48.40

m2 m2 m2 m2

#N/A #N/A #N/A #N/A JUMLAH III

#N/A #N/A #N/A #N/A #N/A

IV 1 2 3 4

PEKERJAAN PINTU/JENDELA Pas. Kusen Pintu/Jendela + Daun Pintu Utama Allumunium Type P1 Pas. Kusen Pintu/Jendela + Daun Pintu ATM centre Allumunium Type P2 3 Pasang pintu alumunium type P.3 Pasang bouvenlight alumunium type B.1

1.00 1.00 3.00 2.00

bh bh bh bh

3,164,100.00 3,164,100.00 2,720,200.00 2,720,200.00 2,720,200.00 8,160,600.00 #NAME? #NAME? JUMLAH IV #NAME?

V 1 2 3 4 5

PEKERJAAN ATAP DAN PLAFOND Pas. Rangka Atap Baja Ringan C 75. 40. 0,75 Pas. Penutup Atap Metall Pasir Kwarsa Pas. Rangka plafond besi hollow galvanish Pas. Plafond gypsum t = 9 mm Pas. List profile plafond gypsum

88.00 88.00 85.00 85.00 80.00

m2 m2 m2 m2 m1

#N/A #N/A #N/A #N/A #N/A JUMLAH V

#N/A #N/A #N/A #N/A #N/A #N/A

VI 1 2 3

PEKERJAAN PELAPIS LANTAI DAN DINDING Pas. Granit lantai 60/60 corak/warna (polished) Pas. Keramik lantai KM/WC 20/20 anti selip Pas. Keramik dinding KM/WC 25/50 corak/warna

82.00 3.00 6.20

m2 m2 m2

#N/A #N/A #N/A JUMLAH VI

#N/A #N/A #N/A #N/A

VII 1 2 3 4 5 6

PEKERJAAN SANITAIR Pas. Kloset jongkok porselen sek. Toto Pas. Instalasi Pipa Air Bersih 1,5'' Pas. Instalasi Pipa Air Bersih 3 Pas. Instalasi Pipa Air Kotor 3'' Pasang Floor Drain Pas. Kran air stainless standar

1.00 3.00 10.00 5.00 1.00 1.00

bh m1 m1 m1 bh bh

#N/A #N/A #N/A #N/A #N/A #N/A JUMLAH VII

#N/A #N/A #N/A #N/A #N/A #N/A #N/A

11.00 11.00

ttk ttk

#N/A #N/A

#N/A #N/A

VIII PEKERJAAN LISTRIK 1 Pas. Instalasi titik lampu 2 Pas. Instalasi titik stop kontak

3

Harga Satuan (Rp) 4

750,000.00 1,000,000.00 #N/A #N/A

750,000.00 1,000,000.00 #N/A #N/A

750,000.00 JUMLAH I #N/A

750,000.00

3 4 5 6 7 8 9 10

Pas. Stop kontak AC as. Stop kontak Pas. Saklar seri Pas. Saklar tunggal Pas. Lampu Downlight 20 Watt Set. Phillips Pas. Lampu IRM 2X20 watt Set Phillips Exaust fan 40 cm Pas. Box panel + grounding

IX 1 2 3

PEKERJAAN PENGECATAN Pengecatan dinding Luar dalam sekualitas kemtone Pengecatan plafond sekualitas catylac Pengecatan Kayu

X 1 2 3 4 5

PEKERJAAN LAIN-LAIN Pek. Saluran air hujan dari buis beton U 20 cm Pek. Septicktank Pek. Rangka Torn Air Besi L+Torn kav. 1000 L Pembuatan Huruf Acrylic Pek. rabat Beton T. 8 cm

2.00 5.00 2.00 2.00 6.00 4.00 2.00 1.00

bh bh bh bh bh bh unit ls

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

394.50 85.00 5.04

m2 m2 m2

#N/A #N/A #N/A JUMLAH IX

40.00 1.00 1.00 1.00 2.75

m1 unit unit ls m3

250,000.00 1,500,000.00 JUMLAH VIII #N/A #N/A #N/A #N/A #N/A

151,700.00 #N/A

6,068,000.00 #N/A

2,500,000.00 950,000.00 #N/A JUMLAH X

2,500,000.00 950,000.00 #N/A #N/A

SUB TOTAL A B.

500,000.00 1,500,000.00

#N/A

PEKERJAAN PEMBANGUNAN KIOS DAN TEMPAT KULINER

I 1 2 3 4 5 6 7 8 9 10

PEKERJAAN FONDASI DAN BETON Pek. Galian Tanah Fondasi Pek. Urugan Pasir Dibawah Fondasi Pek. Fondasi Batu Kali ad. 1.4 Pek. Urugan Tanah Fondasi Pek. Urugan Tanah Dari Luar Dipadatkan Pek. Sloof 15/20 Beton Bertulang K.175 Pas. Kolom Utama+Teras 20/20 Beton Bertulang K.175 Pas. Kolom Praktis 15/15 Beton Bertulang K.175 Pas. Balok Lintel 10/12 Beton Bertulang K.175 Pas. Ring Balok+Balok Teras 15/20 Beton Bertulang K.175

II 1 2 3

PEKERJAAN DINDING DAN PLESTERAN Pas. Bata Merah (1/2 bata), 1pc : 4 ps Pas. Plesteran + acian, 1 pc : 5 ps Pas. Acian Beton

III 1

PEKERJAAN PINTU/JENDELA Pas. Rolling Door

IV 1 2 3 4 5 6 7

62.72 8.96 44.80 7.84 77.00 3.84 2.88 0.54 0.38 3.84

215.80 431.60 19.20

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

m2 m2 m2

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A JUMLAH I

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A JUMLAH II

#N/A #N/A #N/A

#N/A

#N/A

7.00

bh

PEKERJAAN ATAP DAN PLAFOND Pas. Rangka Atap Baja Ringan C 75. 40. 0,75 Pas. Penutup Atap Metall Pasir Kwarsa Pas. Bubungan Metall Roof Pas. Listplang Grc Pas. Rangka plafond besi hollow galvanish Pas. Plafond gypsum t = 9 mm Pas. List profile plafond gypsum

209.17 209.17 39.31 74.05 197.20 197.20 418.45

m2 m2 m' m' m2 m2 m1

#N/A #N/A #N/A #N/A #N/A #N/A #N/A JUMLAH IV

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

V 1

PEKERJAAN PELAPIS LANTAI DAN DINDING Pas. Keramik lantai 40/40 corak/warna (polished)

154.00

m2

#N/A JUMLAH V

#N/A #N/A

VI 1 2 3 4 5 6 7

PEKERJAAN LISTRIK Pas. Instalasi titik lampu Pas. Instalasi titik stop kontak as. Stop kontak Pas. Saklar seri Pas. Lampu Downlight 20 Watt Set. Phillips Pas. Lampu IRM 2X20 watt Set Phillips Pas. Box panel + grounding

14.00 14.00 7.00 7.00 7.00 7.00 1.00

ttk ttk bh bh bh bh ls

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

431.60

m2

#N/A

VII PEKERJAAN PENGECATAN 1 Pengecatan dinding Luar dalam sekualitas kemtone

5,850,000.00 JUMLAH III

40,950,000.00 40,950,000.00

1,500,000.00 JUMLAH VI #N/A #N/A

1,500,000.00

2

Pengecatan plafond sekualitas catylac

VIII PEKERJAAN LAIN-LAIN 1 Pek. Saluran air hujan dari buis beton U 20 cm 2 Pek. rabat Beton T. 8 cm

197.20

m2

#N/A JUMLAH VII

#N/A #N/A

74.05 4.74

m1 m3

151,700.00 #N/A #N/A JUMLAH VIII #N/A

SUB TOTAL B C.

11,233,385.00

#N/A

PEKERJAAN PEMBANGUNAN MUSHOLA

I 1 2 3 4 5 6 7 8 9 10 11 12 13

PEKERJAAN FONDASI DAN BETON Pek. Galian Tanah Fondasi Pek. Urugan Pasir Dibawah Fondasi Pek. Fondasi Batu Kali ad. 1.4 Pek. Urugan Tanah Fondasi Pek. Urugan Tanah Dari Luar Dipadatkan Pek. Sloof 15/20 Beton Bertulang K.175 Pas. Kolom Utama+Teras 20/20 Beton Bertulang K.175 Pas. Kolom Praktis 15/15 Beton Bertulang K.175 Pas. Balok Lintel 10/12 Beton Bertulang K.175 Pas. Balok 20/25 Beton Bertulang K.175 Pas. Dak Beton + Listplang t. 12 cm Beton Bertulang K.175 Pas. Kubah Beton Betulang t. 10 cm K.175 Pas. Ring Balok+Balok Teras 15/20 Beton Bertulang K.175

II 1 2 3 4

PEKERJAAN DINDING DAN PLESTERAN Pas. Bata Merah (1/2 bata), 1pc : 4 ps Pas. Plesteran + acian, 1 pc : 5 ps Water Proofing Dak Beton Pas. Acian Beton

III 1 2 3 4

38.22 5.46 27.30 4.78 77.00 2.34 4.24 0.68 0.10 1.35 8.16 1.50 2.34

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A JUMLAH I

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

161.70 323.40 68.00 68.00

m2 m2 m2 m2

#N/A #N/A #N/A #N/A JUMLAH II

#N/A #N/A #N/A #N/A #N/A

PEKERJAAN PINTU/JENDELA Pas. Pintu Allumunium Type P1 Pas. Pintu Allumunium Type P2 Pas. Bouvenlight Pas. Kusen Jendela

1.00 4.00 19.00 2.00

bh bh bh bh

3,164,100.00 3,164,100.00 2,720,200.00 10,880,800.00 #NAME? #NAME? #N/A #N/A JUMLAH III #NAME?

IV 1 2 3 4 5 6 7

PEKERJAAN ATAP DAN PLAFOND Pas. Rangka Atap Baja Ringan C 75. 40. 0,75 Pas. Penutup Atap Metall Pasir Kwarsa Pas. Bubungan Metall Roof Pas. Listplang Grc Pas. Rangka plafond besi hollow galvanish Pas. Plafond gypsum t = 9 mm Pas. List profile plafond gypsum

94.19 94.19 48.00 36.00 64.00 64.00 32.00

m2 m2 m' m' m2 m2 m1

#N/A #N/A #N/A #N/A #N/A #N/A #N/A JUMLAH IV

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

V 1

PEKERJAAN PELAPIS LANTAI DAN DINDING Pas. Keramik lantai 40/40 corak/warna (polished)

128.00

m2

#N/A JUMLAH V

#N/A #N/A

VI 1 2 3 4 5 6

PEKERJAAN LISTRIK Pas. Instalasi titik lampu Pas. Instalasi titik stop kontak as. Stop kontak Pas. Saklar seri Pas. Lampu Downlight 20 Watt Set. Phillips Pas. Box panel + grounding

8.00 8.00 4.00 4.00 7.00 1.00

ttk ttk bh bh bh ls

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

323.40 64.00

m2 m2

#N/A #N/A JUMLAH VII

46.00 2.94

m1 m3

151,700.00 #N/A #N/A JUMLAH VIII #N/A

VII PEKERJAAN PENGECATAN 1 Pengecatan dinding Luar dalam sekualitas kemtone 2 Pengecatan plafond sekualitas catylac VIII PEKERJAAN LAIN-LAIN 1 Pek. Saluran air hujan dari buis beton U 20 cm 2 Pek. rabat Beton T. 8 cm

SUB TOTAL C

1,500,000.00 JUMLAH VI #N/A

1,500,000.00

#N/A #N/A #N/A 6,978,200.00

#N/A

D.

PEKERJAAN PEMBANGUNAN WC/TOILET

I 1 2 3 4 5 6 7 8 9

PEKERJAAN FONDASI DAN BETON Pek. Galian Tanah Fondasi Pek. Urugan Pasir Dibawah Fondasi Pek. Fondasi Batu Kali ad. 1.4 Pek. Urugan Tanah Fondasi Pek. Urugan Tanah Dari Luar Dipadatkan Pek. Sloof 15/20 Beton Bertulang K.175 Pas. Kolom 20/20 Beton Bertulang K.175 Pas. Kolom Praktis 15/15 Beton Bertulang K.175 Pas. Ring Balok 15/20 Beton Bertulang K.1

II 1 2

PEKERJAAN DINDING DAN PLESTERAN Pas. Bata Merah (1/2 bata), 1pc : 4 ps Pas. Plesteran + acian, 1 pc : 5 ps

III 1 2 3

PEKERJAAN PINTU/JENDELA Pas. Pintu pvc Pasang bouvenlight alumunium type B.1 Pasang bouvenlight alumunium type B.2

IV 1 2 3 4 5 6 7

PEKERJAAN ATAP DAN PLAFOND Pas. Rangka Atap Baja Ringan C 75. 40. 0,75 Pas. Penutup Atap Metall Pasir Kwarsa Pas. Bubungan Metall Roof Pas. Listplang Grc Pas. Rangka plafond besi hollow galvanish Pas. Plafond gypsum t = 9 mm Pas. List profile plafond gypsum

V 1

PEKERJAAN PELAPIS LANTAI DAN DINDING Pas. Keramik 20/20 anti slip

VI 1 2 3 4 5 6

PEKERJAAN LISTRIK Pas. Instalasi titik lampu Pas. Instalasi titik stop kontak Pas. Stop kontak Pas. Saklar seri Pas. Lampu Downlight 20 Watt Set. Phillips Pas. Box panel + grounding

VII 1 2 3 4 5 6

PEKERJAAN SANITAIR Pas. Instalasi Pipa Air Bersih 1,5'' Pas. Instalasi Pipa Air Bersih 3 Pas. Kloset jongkok porselen sek. Toto Pas. Wasthafel Pas. Urinoir set. Toto Pas. Kran air stainless standar

VIII PEKERJAAN PENGECATAN 1 Pengecatan dinding Luar dalam sekualitas kemtone 2 Pengecatan plafond sekualitas catylac IX 1 2 3 4 5 6 7 8 9

PEKERJAAN LAIN-LAIN Pek. Saluran air hujan dari buis beton U 20 cm Pek. Septicktank + Rembesan Pek. Rangka Torn Air Besi L+Torn kav. 1000 L Pek. Grountank air bersih pas. Tangki air fiberglass kap. 2.000 ltr Pas. Pompa air pendorong otomatis (Hisap ≥ 5 m, Dorong ≥ 57 m) Pek. Rumah pompa air Pengeboran dengan mesin berikut material Pek. rabat Beton T. 8 cm Perapihan halam pekerjaan

SUB TOTAL D

26.46 3.78 18.90 3.31 27.00 1.62 0.96 1.01 1.62

m3 m3 m3 m3 m3 m3 m3 m3 m3

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A JUMLAH I

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

162.00 324.00

m2 m2

#N/A #N/A JUMLAH II

#N/A #N/A #N/A

9.00 1.00 6.00

bh bh bh

633,800.00 5,704,200.00 #NAME? #NAME? #NAME? #NAME? JUMLAH III #NAME?

93.67 93.67 22.40 36.40 77.25 77.25 105.25

m2 m2 m' m' m2 m2 m1

#N/A #N/A #N/A #N/A #N/A #N/A #N/A JUMLAH IV

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

77.25

m2

#N/A JUMLAH V

#N/A #N/A

8.00 8.00 4.00 4.00 8.00 1.00

ttk ttk bh bh bh ls

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

50.00 77.50 6.00 4.00 2.00 10.00

bh bh bh bh bh bh

#N/A #N/A #N/A #N/A #N/A #N/A JUMLAH VII

#N/A #N/A #N/A #N/A #N/A #N/A #N/A

324.00 77.25

m2 m2

#N/A #N/A JUMLAH VIII

#N/A #N/A #N/A

36.45 1.00 2.00 1.00 1.00 1.00 1.00 2.33 1.00

m1 unit unit unit bh bh titik m3 ls

1,500,000.00 JUMLAH VI #N/A

151,700.00 301,700.00 3,000,000.00 3,000,000.00 #N/A

1,500,000.00

5,529,465.00 301,700.00 6,000,000.00 3,000,000.00 #N/A

2,500,000.00 4,000,000.00 #N/A 1,155,065.50 JUMLAH IX #N/A

2,500,000.00 4,000,000.00

#N/A

1,155,065.50

#N/A

DAFTAR HARGA SATUAN DASAR TENAGA KERJA BAHAN DAN ALAT, DPU KOTA CILEGON

No

Uraian

Satuan

Kode

1

2

3

4

II

BAHAN / MATERIAL

A

BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA

SPESIFIKASI/ MERK

Agregat Kelas A

m3

Agregat Kelas B

m3

Batu Pecah Mesin

m3

Ukuran 15/20

Batu Pecah Mesin 1/2

m3

Ukuran 1/2

Batu Pecah Mesin 2/3

m3

Ukuran 2/3

Batu Pecah Mesin 3/5

m3

Ukuran 3/5

Batu Pecah Mesin 5/7

m3

1

Bata Merah Bakar

bh

M.02

2

Agregat Halus

m3

M.07.a

Harga Satuan Dasar ( Rp. ) 5

Ukuran 5/7 Kelas I

450.00 140,000.00

Ket. 6

3

Agregat Kasar

m3

M.07.b

150,000.00

4

Batu Koral Beton Kali

m3

M.10.a

220,000.00

5

Batu Belah Pondasi

m3

M.11.a

205,000.00

6

Kerikil

m3

M.11.b

205,000.00

7

Kerikil sungai tersaring

m3

M.11.d

190,000.00

8

Pasir Beton

m3

M.12.a

210,000.00

9

Pasir Pasang

m3

M.12.b

185,000.00

10 Pasir Urug

m3

M.12.c

160,000.00

11 Tanah Urug Pilihan

m3

M.13.a

90,000.00

12 Kapur pasang

m3

M.14.a

65,000.00

13 Semen PC

Kg

M.16.c

1,500.00

14 Semen Putih

kg

M.16.j

5,000.00

15 Semen Nut Bata ringan / Thin bed PM 110

zak

M.16.j

90,000.00

16 Bata Ringan / Hebel

m3

M.17.a

17 Kansteen beton K-300

bh

M.21.a

Uk. 10 x 20 x 40

Paving Block K.175

m2

M.22.f

Natural 6 cm

18 Paving Block K.175

m2

M.22.g

Natural 8 cm

750,000.00

Readymix Beton

m3

K 225

Readymix Beton

m3

K 250

Readymix Beton

m3

K 175

18 Floorhardener

kg

Pagar panel precast

m1

Tiang panel pagar precast

btg

Pagar precast

m1

Jendela Naco

bh

block hebel

m3

Perekat bata ringan

zak

Floor hardener

zak

Sirtu

m3

45,000.00 98,000.00

49,000.00

B

BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA

1

Amplas

lbr

M.28.a

5,000.00

2

Cat Dasar Tembok

kg

M.29.c

20,000.00

3

Cat Tembok

kg

M.29.d

setara kemtone

40,000.00

4

Cat Tembok

kg

M.29.e

setara dulux

80,000.00

5

Cat Tembok

kg

M.29.f

setara metrolite

24,000.00

7

Cat Dasar Besi

kg

M.29.h

Setara Jotun

45,000.00

8

Cat Tembok VINILEX (Sekualitas)

kg

M.29.i

22,000.00

9

Kuwas 3"

bh

M.31.a

10,000.00

10 Meni Kayu/Besi

kg

M.32.a

26,000.00

11 Plamir Tembok DECOFILL

kg

M.34.b

15,000.00

12 Thinner B

ltr

M.36.d

13 Water proofing

Kg

M.44.b

14 Lem Kayu

Kg

M.44.a

30,000.00 Aquaproof

40,000.00 25,000.00

Roll Cat Tembok Thinner Compound Sincromate Cat Kayu/Besi Cat Kayu Cat Besi

C

BAHAN KAYU BERIKUT BAHAN JADINYA

1

Dolken 7-10

btg

M.45.d

33,000.00

2

Kayu Balok BORNEO SUPER

m3

M.46.c

3,700,000.00

3

Kayu Papan KAMPER BANJAR

m3

M.46.f

4,600,000.00

4

Kayu Perancah / Bekisting

m3

M.46.p

1,600,000.00

5

Kayu papan kelas I / Bayur

m3

M.46.t

3,500,000.00

6

Kayu Kaso 5/7 kelas II

m3

M.46.v

2,500,000.00

7

Kayu Terentang

m3

D

BAHAN KAYU LAPIS

1

Multipleks 9 mm 120 x 240

lbr

M.54.a

140,000.00

4

Plywood 4 mm 120 x 240

lbr

M.54.c

68,000.00

1,900,000.00

2

Tripleks 4 mm 120 x 240

lbr

8

HPL

lbr

M.54.o

350,000.00

48,000.00

E

BAHAN LANTAI DAN PELAPIS DINDING

1

Keramik 25 x 25 Lt.KM DN KW I

bh

3,000.00

2

Keramik 25 x 25 Dinding KW I

bh

4,000.00

3

Keramik 40 x 40 DN Warna / Corak KW II

bh

6,000.00

4

Keramik 30 x 30 DN Warna / Corak KW I

bh

5,000.00

5

Granite Tile 60 x 60 DN Warna / Corak (polishe

bh

125,000.00

6

Step Nozing 10 x 40

bh

12,000.00

7

Keramik Border 8 x 20

bh

3,500.00

8

Granite Border 10 x 60

bh

5,500.00

9

Floor Hardener

kg

8,000.00

F

BAHAN RIOLING

2

Buis Beton Bertulang U dia. 30 cm

m'

120,000.00

G BAHAN LOGAM DAN BAHAN JADINYA 1

Besi Beton rata-rata U-24, U-32

kg

M.68.a

13,000.00

2

Besi Beton rata-rata U-39

kg

M.68.b

15,000.00

3

Besi Siku/Profil

kg

M.68.b

11,000.00

4

Besi WF ex. DN

kg

M.68.b

18,000.00

3

Kawat Beton

kg

M.71.a

17,000.00

6

Kawat Las Listrik

Kg

M.71.d

33,500.00

4

Pipa Galvanis dia.3" ( utk railing)

m'

M.74.c

4

Pipa GIP medium-B dia. 2"

btg

595,000.00

Pipa GIP medium-B dia. 4"

btg

660,000.00

38,000.00

H

BAHAN PENUTUP ATAP DAN PLAFOND

1

Gypsum 1.20 x 2.40 m tebal 9 mm ex DN

Lembar

75,000.00

2

List Plafond Gypsum

M'

9,000.00

3

List Profil Kayu 2x2 cm

M'

7,000.00

4

List kamper 2/10 cm / plin

M3

5,000.00

5

Coumpound/Cornice

Kg

15,000.00

6

Rangka Atap Baja Ringan (Metal Zingkalum) k

M2

190,000.00

7

Besi Hollow 40x40 Galvanize, Tebal 0.3 mm

M'

5,000.00

8

Besi Hollow 40x20 Galvanize, Tebal 0.3 mm

M'

6,000.00

9

Besi Hollow 50x50 Galvanize

M'

7,500.00

Lembar

22,000.00

11 Gennteng Metal Roof berpasir (uk 0,77 x 0,8 m) Lembar

30,000.00

12 Gennteng Bitumen

Lembar

45,000.00

13 GRC Board 1.20 x 2.40 m tebal 4 mm ex DN

Lembar

60,000.00

14 Nok Genteng Metal

m'

67,000.00

15 Atap Zincalum t=0,4 mm

m2

60,000.00

16 Thermal and Noise Insulation

m2

95,000.00

17 Aluminium Foil

m2

25,000.00

10 Listplank GRC 20 x 400 cm

I

KUSEN ALUMUNIUM DAN ALAT PENGGANTUNG

1

Jendela Nako

Buah

2

Jendela Nako

Buah

85,000.00

3

Kusen Alumunium Natural 4" 1.3 mm

m'

180,000.00

4

Kusen Alumunium Warna 3" 1.3 mm

m'

115,000.00

5

Kusen Alumunium Profil 1.3 mm

m'

245,000.00

6

Daun Pintu Aluminium Warna Ex Alexsindo

m'

45,000.00

7

Daun Jendela Aluminium Warna Ex Alexsindo

m'

15,000.00

8

Kisi-kisi Aluminium Warna 0,3mm

m'

7,500.00

9

Handle Alumunium

Buah

11,000.00

m1

35,000.00

10 Seng Plat BJLS lebar 90cm 11 Seng Gelombang BJLS

85,000.00

Lembar

54,000.00

12 Kaca Polos 5 mm

m2

135,000.00

13 Kaca Polos 6 mm Tempered

m2

143,000.00

14 Kaca Polos 12 mm Tempered

m2

168,000.00

15 Silent

Tube

M.86

16 Silent

kg

M.86

17 Engsel Pintu 4" Staenless

psg

18 Engsel Pintu 3" Staenless

15,000.00 9,000.00 25,000.00

psg

17,000.00

19 Kunci Tanam 2 Slaag Sekualitas Royal

Buah

157,000.00

20 Kunci Tanam 2 Slaag sekualitas SOLID

Buah

165,000.00

J

BAHAN PAKU DAN MUR BAUT

1

Paku 1 cm - 3 cm

kg

M.89.a

16,000.00

2

Paku 4 cm - 7 cm

kg

M.89.b

13,000.00

3

Paku 8 cm - 12 cm

kg

M.89.c

12,000.00

4

Paku Sekrup

kg

M.89.d

15,000.00

13 Mur Baut Biasa dia.19 - 16

bh

M.91.d

1,500.00

18 Skrup Piser dia. 4 - 8 mm

bh

300.00

19 Paku seng/Asbes uk.7 cm

kg

18,000.00

20 Plat Bondek

m2

210,000.00

21 Wiremesh M8

kg

55,000.00

22 Wiremesh M10

kg

80,000.00

K

BAHAN PERPIPAAN (AANSINERING)

1

Pipa PVC Abu-abu dia. 1/2" (AW)

btg

Pipa PVC Abu-abu dia. 3/4" (AW)

btg

2

Pipa PVC Abu-abu dia. 1" (AW)

btg

M.92.d

3

Pipa PVC Abu-abu dia. 1 1/2" (AW)

btg

M.92.f

65,000.00

3

Pipa PVC Abu-abu dia. 2" (AW)

btg

M.92.f

112,000.00

4

Pipa PVC Abu-abu dia. 3" (AW)

btg

M.92.i

125,000.00

5

Pipa PVC Abu-abu dia. 4" (AW)

btg

M.92.j

160,000.00

5

Pipa PVC Abu-abu dia. 6" (AW)

btg

400,000.00

Pipa PVC Abu-abu dia. 8" (AW)

btg

800,000.00

M.92.a

18,000.00 43,200.00 45,000.00

L

BAHAN SANITAIR

3

Wastafel Lengkap

bh

1,500,000.00

5

Floor Drain Stainles 2"

bh

49,000.00

6

Roof Drain 2"

bh

28,500.00

7

Kran Air ½"

bh

35,000.00

8

Gate Valve 1 1/2"

bh

95,000.00

9

Kitchen Zink

bh

580,000.00

10 Water Drain

bh

200,000.00

11 Urinoir Lengkap

unit

1,590,000.00

12 Pintu PVC berikut Pasang + Lengkap

bh

350,000.00

13 Package FRP Septictank 4m3 include pemasan

Unit

4,500,000.00

14 Water Level Control

set

74,000.00

15 Seal Tape

bh

6,000.00

M BAHAN ELEKTRIKAL 1

Pipa Listrik

Batang

6,500.00

3

Kabel NYM 3 x 1.5 mm2

m'

7,000.00

5

Kabel NYY 4Cx 35 Sqmm

m'

6,500.00

6

Terminal Kabel

bh

18,000.00

7

Saklar Seri

bh

18,500.00

8

Stop Kontak Sekualitas Broco

bh

28,000.00

9

Stop Kontak AC Sekualitas Broco

bh

65,000.00

10 Armature TLD 2 x 36 W ( RM 300 ALML M1 Typ

bh

180,000.00

11 Ceilling Mounted, V Shafe 1 x 36 W/840

bh

10 Armature TLD 2 x 18 W ( RM 300 ALML M1 Typ

bh

180,000.00

11 Ceilling Mounted, V Shafe 1 x 18 W/840

bh

310,000.00

15 Pasangan Lampu Downlight PLC 11 watt

bh

125,000.00

16 Pasangan Lampu Downlight PLC 14 watt

bh

155,000.00

18 Panel Induk Lengkap berikut pasang + Instalasi

unit

225,000.00

21 pasang Kepala Penangkal Petir

bh

95,000.00

22 Pasang Kabel BCC lengkap klem

m'

75,000.00

23 Inbow dos

bh

1,000.00

N

READY MIX

1

Adukan Ready Mix K-250

M3

M.154.c

1,250,000.00

2

Adukan Ready Mix K-300

M3

M.154.c

1,450,000.00

M.1001

O LAINNYA 1

Air

Liter

2

Solar Industri

Liter

200.00

3

Minyak Bekisting

Liter

4

Paving Block Natural t=8 cm

m2

90,000.00

5

Sirtu

m3

125,000.00

6

Tiner A

Liter

14,000.00

7

Tiner B

Liter

20,500.00

P

SEWA ALAT BERAT

1

Excavator

sewa-jam

350,000.00

2

Dump Truck

sewa-jam

250,000.00

3

Dozer

sewa-jam

375,000.00

4

Vibrator Roller

sewa-jam

350,000.00

5

Wheel Loader

sewa-jam

265,000.00

6

Motor Grader

sewa-jam

330,000.00

7

Water Tangker

sewa-jam

210,000.00

8

Tyre Roller

sewa-jam

305,000.00

9

Walles

sewa-jam

650,000.00

8,500.00 M.1002

12,000.00

REKAPITULASI RENCANA ANGGARAN BIAYA SATUAN KERJA

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN

KEGIATAN

: PENINGKTAN SARANA DAN PRASARANA SMA

PEKERJAAN

: PEMBANGUNAN RUANG KANTOR SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LEBAK)

LOKASI

: 1. KABUPATEN PANDEGLANG - SMAN 17 PANDEGLANG 2. KABUPATEN LEBAK - SMAN 2 BANJARSARI - SMAN 1 CIJAKU - SMAN 1 CIGEMBLONG

TAHUN ANGGARAN

- SMAN 1 SOBANG : TA . 2018

NO

URAIAN PEKERJAAN

I

JUMLAH HARGA (Rp)

KABUPATEN PANDEGLANG

I.1

SMAN 17 PANDEGLANG A PEKERJAAN PERSIAPAN

6,937,672.50

B PEKERJAAN TANAH

3,838,560.00 126,843,242.20 271,771,457.54 7,016,988.00

C PEKERJAAN PONDASI DAN BETON D PEKERJAAN PASANGAN E PEKERJAAN PLAFOND F PEKERJAAN ELEKTRIKAL

21,949,682.00 26,933,955.00 35,320,100.75

G PEKERJAAN MEKANIKAL DAN SANITARY H PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA I PEKERJAAN LANTAI

42,031,598.40 19,601,076.00 562,244,332.39

J PEKERJAAN PENGECATAN JUMLAH I.1 JUMLAH I

II

KABUPATEN LEBAK

II.1

SMAN 2 BANJARSARI A PEKERJAAN PERSIAPAN

6,937,672.50

B PEKERJAAN TANAH

3,838,560.00 126,843,242.20 271,771,457.54 7,016,988.00

C PEKERJAAN PONDASI DAN BETON D PEKERJAAN PASANGAN E PEKERJAAN PLAFOND F PEKERJAAN ELEKTRIKAL

21,949,682.00 26,933,955.00 35,320,100.75 42,031,598.40 19,601,076.00

G PEKERJAAN MEKANIKAL DAN SANITARY H PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA I PEKERJAAN LANTAI J PEKERJAAN PENGECATAN JUMLAH II.1

II.2

562,244,332.39

SMAN 1 CIJAKU A PEKERJAAN PERSIAPAN

6,937,672.50 3,838,560.00

B PEKERJAAN TANAH C PEKERJAAN PONDASI DAN BETON

126,843,242.20 271,771,457.54 7,016,988.00 21,949,682.00

D PEKERJAAN PASANGAN E PEKERJAAN PLAFOND F PEKERJAAN ELEKTRIKAL G PEKERJAAN MEKANIKAL DAN SANITARY

26,933,955.00 35,320,100.75 42,031,598.40

H PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA I PEKERJAAN LANTAI J PEKERJAAN PENGECATAN

19,601,076.00 562,244,332.39

JUMLAH II.2

II.3

SMAN 1 CIGEMBLONG A PEKERJAAN PERSIAPAN

6,937,672.50 3,838,560.00 126,843,242.20

B PEKERJAAN TANAH C PEKERJAAN PONDASI DAN BETON D PEKERJAAN PASANGAN

271,771,457.54 7,016,988.00 21,949,682.00 26,933,955.00

E PEKERJAAN PLAFOND F PEKERJAAN ELEKTRIKAL G PEKERJAAN MEKANIKAL DAN SANITARY H PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA

35,320,100.75 42,031,598.40 19,601,076.00

I PEKERJAAN LANTAI J PEKERJAAN PENGECATAN JUMLAH II.3

II.4

562,244,332.39

SMAN 1 SOBANG A PEKERJAAN PERSIAPAN

6,937,672.50 3,838,560.00 126,843,242.20 271,771,457.54 7,016,988.00 21,949,682.00 26,933,955.00 35,320,100.75

B PEKERJAAN TANAH C PEKERJAAN PONDASI DAN BETON D PEKERJAAN PASANGAN E PEKERJAAN PLAFOND F PEKERJAAN ELEKTRIKAL G PEKERJAAN MEKANIKAL DAN SANITARY H PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA I PEKERJAAN LANTAI

42,031,598.40 19,601,076.00 562,244,332.39

J PEKERJAAN PENGECATAN JUMLAH II.4 JUMLAH II

2,248,977,329.56 JUMLAH I + II (REAL COST) PPn 10 % JUMLAH TOTAL DIBULATKAN

TERBILANG : "

2,811,221,661.95 281,122,166.20 3,092,343,828.15

REKAPITULASI BQ SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN NO.

I

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMK : PEMBANGUNAN RUANG KELAS BARU SMK : 11 (SEBELAS) RUANG KELAS : KOTA CILEGON : TA.2018 URAIAN PEKERJAAN

SMKN 1 CILEGON - KOTA CILEGON

JUMLAH

2 (DUA) RUANG KELAS

581,395,860.00

1 (SATU) RUANG

315,575,990.00

II

SMKN 2 CILEGON - KOTA CILEGON

4 (EMPAT) RUANG KELAS

1,264,177,860.00

III

SMKN 3 CILEGON - KOTA CILEGON

4 (EMPAT) RUANG KELAS

1,268,082,220.00

TOTAL ANGGARAN

3,429,231,930.00

Terbilang :

#NAME?

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BILL of QUANTITY SATUAN KERJA

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN

KEGIATAN PEKERJAAN

: PENINGKTAN SARANA DAN PRASARANA SMA : PEMBANGUNAN RUANG KANTOR SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LEBAK)

LOKASI

: 1. KABUPATEN PANDEGLANG - SMAN 17 PANDEGLANG 2. KABUPATEN LEBAK - SMAN 2 BANJARSARI - SMAN 1 CIJAKU - SMAN 1 CIGEMBLONG

TAHUN ANGGARAN

- SMAN 1 SOBANG : TA . 2018

NO

I

URAIAN PEKERJAAN

VOLUME

SATUAN

KABUPATEN PANDEGLANG

I.1

SMAN 17 PANDEGLANG

A

PEKERJAAN PERSIAPAN 1 Pengukuran dan pemasangan bouplank 2 Pembersihan lokasi proyek

60.00 m1 216.00 m2

3 Papan nama proyek

1.00 bh

4 Listrik Kerja

1.00 ls

5 Biaya mobilisasi

1.00 ls

JUMLAH A B

PEKERJAAN TANAH 1 Galian tanah pondasi batu kali dan foot plate

48.00 m3

2 Urugan Tanah kembali

14.40 m3

JUMLAH B C

PEKERJAAN PONDASI DAN BETON 1 Urugan pasir dibawah pondasi

3.47 m3

2 Pasang batu kali kosong

13.52 m3

3 Pondasi batu kali

39.10 m3

4 Sloof beton 20x25

4.15 m3

5 Kolom beton 25x25

0.98 m3

6 Pasang Kolom beton 15x25

2.52 m3

7 Pasang Kolom beton 15x15

1.23 m3

8 Pasang Ring Balok 15x20

3.56 m3

JUMLAH C D

PEKERJAAN PASANGAN 1 Pasangan dinding batu bata 1:4

243.00 m2

2 Plesteran + acian 1:4 dinding batu bata

486.00 m2

3 Urugan tanah di padatkan dan peninggian elevasi + 20 dari muka jalan

30.60 m3

4 Pekerjaan Pasangan Saluran Keliling Bangunan : - Galian tanah

22.10 m3

- Urugan Pasir

19.21 m3

- Dinding batu bata

23.40 m2

- Plesteran dan acian

33.10 m2

- Buis beton 1/2 diameter 30 cm

90.00 m'

5 Pekerjaan Rangka Atap Baja Ringan C.075

326.00 m2

6 Pekerjaan Penutup Atap Metal roow

326.00 m2

7 Pekerjaan Nok Metal Roof

23.00 m'

8 Pekerjaan Lisplank GRC

66.00 m'

JUMLAH D E

PEKERJAAN PLAFOND 1 Pasang plafond Gypstyle

60.00 m2

2 Pasang plafond GRC selasar

96.00 m2

3 Pasang List Plafond Gypsum

102.00 m'

JUMLAH E F

PEKERJAAN ELEKTRIKAL 1 Pasang titik lampu penerangan

33.00 ttk

2 Pasang titik stop kontak

16.00 ttk

3 Pasang Stop kontak AC

4.00 ttk

4 Pasang lampu TL 2x18

28.00 bh

5 Pasang armature stop kontak

14.00 bh

6 Pasang armature saklar seri

16.00 bh

7 Pasang Panel MCB

1.00 unit

8 Lampu PL 8 w

5.00 bh

JUMLAH F G

PEKERJAAN MEKANIKAL DAN SANITARY 1 Pasang Pipa PVC AW 1/2"

12.00 m'

2 Pasang Pipa PVC AW 3/4"

18.00 m'

3 Pasang Pipa PVC AW 3"

18.00 m'

4 Pasang Pipa PVC AW 4"

18.00 m'

5 Pasang stop kran 3/4"

2.00 bh

6 Pasang Kran Air 1/2"

2.00 bh

7 Pasang Closet Duduk

2.00 set

8 Pasang Wastafel

2.00 set

9 Pasang Floor Drain

2.00 bh

10 Resevoar, Fibre Glass silinder kapasitas 2000 Lt + support

1.00 unit

11 Pompa air jet pump + Instalasi dan pengeboran

1.00 unit

JUMLAH G H

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA 1 Kusen Pintu dan Jendela ALLuminium 4" 2 Pintu utama rangka kayu lapis multiplek lapis HPL

167.20 m' 6.00 bh

3 Jendela Alluminium Casement 60 x 120

22.00 bh

4 Kaca polos 5 mm

17.50 m2

5 Pasang Engsel Pintu 4" ex Solid

18.00 bh

6 Pasang Engsel Jendela casement

24.00 pas

7 Pasang Grendel jendela

30.00 bh

8 Pasang Kunci pintu

6.00 bh

9 Pasang Pintu KM/WC PVC

2.00 set

JUMLAH H I

PEKERJAAN LANTAI 1 Urugan Pasir Bawah lantai tebal 5 cm 2 Kramik Lantai 40/40 3 Keramik Lantai KM 33.3x33.3

7.80 m3 161.00 m2 6.75 m2

4 Kramik Lantai 40x40

42.00 m2

5 Keramik Dinding 25 x 33.3

40.32 m2

6 Pekerjaan Rabat beton selasar

3.20 m3

JUMLAH I J

PEKERJAAN PENGECATAN 1 Pengecatan dinding ex Vinilex setara

486.00 m2

2 Pengecatan Plafond

166.00 m2

JUMLAH J

II

KABUPATEN LEBAK

II.1

SMAN 2 BANJARSARI

A

PEKERJAAN PERSIAPAN 1 Pengukuran dan pemasangan bouplank 2 Pembersihan lokasi proyek

60.00 m1 216.00 m2

3 Papan nama proyek

1.00 bh

4 Listrik Kerja

1.00 ls

5 Biaya mobilisasi

1.00 ls

JUMLAH A B

PEKERJAAN TANAH 1 Galian tanah pondasi batu kali dan foot plate

48.00 m3

2 Urugan Tanah kembali

14.40 m3

JUMLAH B C

PEKERJAAN PONDASI DAN BETON 1 Urugan pasir dibawah pondasi

3.47 m3

2 Pasang batu kali kosong

13.52 m3

3 Pondasi batu kali

39.10 m3

4 Sloof beton 20x25

4.15 m3

5 Kolom beton 25x25

0.98 m3

6 Pasang Kolom beton 15x25

2.52 m3

7 Pasang Kolom beton 15x15

1.23 m3

8 Pasang Ring Balok 15x20

3.56 m3

JUMLAH C D

PEKERJAAN PASANGAN 1 Pasangan dinding batu bata 1:4

243.00 m2

2 Plesteran + acian 1:4 dinding batu bata

486.00 m2

3 Urugan tanah di padatkan dan peninggian elevasi + 20 dari muka jalan

30.60 m3

4 Pekerjaan Pasangan Saluran Keliling Bangunan : - Galian tanah

22.10 m3

- Urugan Pasir

19.21 m3

- Dinding batu bata

23.40 m2

- Plesteran dan acian

33.10 m2

- Buis beton 1/2 diameter 30 cm

90.00 m'

5 Pekerjaan Rangka Atap Baja Ringan C.075

326.00 m2

6 Pekerjaan Penutup Atap Metal roow

326.00 m2

7 Pekerjaan Nok Metal Roof

23.00 m'

8 Pekerjaan Lisplank GRC

66.00 m'

JUMLAH D E

PEKERJAAN PLAFOND 1 Pasang plafond Gypstyle

60.00 m2

2 Pasang plafond GRC selasar

96.00 m2

3 Pasang List Plafond Gypsum

102.00 m'

JUMLAH E F

PEKERJAAN ELEKTRIKAL 1 Pasang titik lampu penerangan

33.00 ttk

2 Pasang titik stop kontak

16.00 ttk

3 Pasang Stop kontak AC

4.00 ttk

4 Pasang lampu TL 2x18

28.00 bh

5 Pasang armature stop kontak

14.00 bh

6 Pasang armature saklar seri

16.00 bh

7 Pasang Panel MCB

1.00 unit

8 Lampu PL 8 w

5.00 bh

JUMLAH F G

PEKERJAAN MEKANIKAL DAN SANITARY 1 Pasang Pipa PVC AW 1/2"

12.00 m'

2 Pasang Pipa PVC AW 3/4"

18.00 m'

3 Pasang Pipa PVC AW 3"

18.00 m'

4 Pasang Pipa PVC AW 4"

18.00 m'

5 Pasang stop kran 3/4"

2.00 bh

6 Pasang Kran Air 1/2"

2.00 bh

7 Pasang Closet Duduk

2.00 set

8 Pasang Wastafel

2.00 set

9 Pasang Floor Drain

2.00 bh

10 Resevoar, Fibre Glass silinder kapasitas 2000 Lt + support

1.00 unit

11 Pompa air jet pump + Instalasi dan pengeboran

1.00 unit

JUMLAH G H

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA 1 Kusen Pintu dan Jendela ALLuminium 4" 2 Pintu utama rangka kayu lapis multiplek lapis HPL

167.20 m' 6.00 bh

3 Jendela Alluminium Casement 60 x 120

22.00 bh

4 Kaca polos 5 mm

17.50 m2

5 Pasang Engsel Pintu 4" ex Solid

18.00 bh

6 Pasang Engsel Jendela casement

24.00 pas

7 Pasang Grendel jendela

30.00 bh

8 Pasang Kunci pintu

6.00 bh

9 Pasang Pintu KM/WC PVC

2.00 set

JUMLAH H I

PEKERJAAN LANTAI 1 Urugan Pasir Bawah lantai tebal 5 cm 2 Kramik Lantai 40/40 3 Keramik Lantai KM 33.3x33.3

7.80 m3 161.00 m2 6.75 m2

4 Kramik Lantai 40x40

42.00 m2

5 Keramik Dinding 25 x 33.3

40.32 m2

6 Pekerjaan Rabat beton selasar JUMLAH I

3.20 m3

J

PEKERJAAN PENGECATAN 1 Pengecatan dinding ex Vinilex setara

486.00 m2

2 Pengecatan Plafond

166.00 m2

JUMLAH J

II.2 A

SMAN 1 CIJAKU PEKERJAAN PERSIAPAN 1 Pengukuran dan pemasangan bouplank 2 Pembersihan lokasi proyek

60.00 m1 216.00 m2

3 Papan nama proyek

1.00 bh

4 Listrik Kerja

1.00 ls

5 Biaya mobilisasi

1.00 ls

JUMLAH A B

PEKERJAAN TANAH 1 Galian tanah pondasi batu kali dan foot plate

48.00 m3

2 Urugan Tanah kembali

14.40 m3

JUMLAH B C

PEKERJAAN PONDASI DAN BETON 1 Urugan pasir dibawah pondasi

3.47 m3

2 Pasang batu kali kosong

13.52 m3

3 Pondasi batu kali

39.10 m3

4 Sloof beton 20x25

4.15 m3

5 Kolom beton 25x25

0.98 m3

6 Pasang Kolom beton 15x25

2.52 m3

7 Pasang Kolom beton 15x15

1.23 m3

8 Pasang Ring Balok 15x20

3.56 m3

JUMLAH C D

PEKERJAAN PASANGAN 1 Pasangan dinding batu bata 1:4

243.00 m2

2 Plesteran + acian 1:4 dinding batu bata

486.00 m2

3 Urugan tanah di padatkan dan peninggian elevasi + 20 dari muka jalan

30.60 m3

4 Pekerjaan Pasangan Saluran Keliling Bangunan : - Galian tanah

22.10 m3

- Urugan Pasir

19.21 m3

- Dinding batu bata

23.40 m2

- Plesteran dan acian

33.10 m2

- Buis beton 1/2 diameter 30 cm

90.00 m'

5 Pekerjaan Rangka Atap Baja Ringan C.075

326.00 m2

6 Pekerjaan Penutup Atap Metal roow

326.00 m2

7 Pekerjaan Nok Metal Roof

23.00 m'

8 Pekerjaan Lisplank GRC

66.00 m'

JUMLAH D E

PEKERJAAN PLAFOND 1 Pasang plafond Gypstyle

60.00 m2

2 Pasang plafond GRC selasar

96.00 m2

3 Pasang List Plafond Gypsum

102.00 m'

JUMLAH E F

PEKERJAAN ELEKTRIKAL 1 Pasang titik lampu penerangan

33.00 ttk

2 Pasang titik stop kontak

16.00 ttk

3 Pasang Stop kontak AC

4.00 ttk

4 Pasang lampu TL 2x18

28.00 bh

5 Pasang armature stop kontak

14.00 bh

6 Pasang armature saklar seri

16.00 bh

7 Pasang Panel MCB

1.00 unit

8 Lampu PL 8 w

5.00 bh

JUMLAH F G

PEKERJAAN MEKANIKAL DAN SANITARY 1 Pasang Pipa PVC AW 1/2"

12.00 m'

2 Pasang Pipa PVC AW 3/4"

18.00 m'

3 Pasang Pipa PVC AW 3"

18.00 m'

4 Pasang Pipa PVC AW 4"

18.00 m'

5 Pasang stop kran 3/4"

2.00 bh

6 Pasang Kran Air 1/2"

2.00 bh

7 Pasang Closet Duduk

2.00 set

8 Pasang Wastafel

2.00 set

9 Pasang Floor Drain

2.00 bh

10 Resevoar, Fibre Glass silinder kapasitas 2000 Lt + support

1.00 unit

11 Pompa air jet pump + Instalasi dan pengeboran

1.00 unit

JUMLAH G H

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA 1 Kusen Pintu dan Jendela ALLuminium 4" 2 Pintu utama rangka kayu lapis multiplek lapis HPL

167.20 m' 6.00 bh

3 Jendela Alluminium Casement 60 x 120

22.00 bh

4 Kaca polos 5 mm

17.50 m2

5 Pasang Engsel Pintu 4" ex Solid

18.00 bh

6 Pasang Engsel Jendela casement

24.00 pas

7 Pasang Grendel jendela

30.00 bh

8 Pasang Kunci pintu

6.00 bh

9 Pasang Pintu KM/WC PVC

2.00 set

JUMLAH H I

PEKERJAAN LANTAI 1 Urugan Pasir Bawah lantai tebal 5 cm 2 Kramik Lantai 40/40 3 Keramik Lantai KM 33.3x33.3

7.80 m3 161.00 m2 6.75 m2

4 Kramik Lantai 40x40

42.00 m2

5 Keramik Dinding 25 x 33.3

40.32 m2

6 Pekerjaan Rabat beton selasar

3.20 m3

JUMLAH I J

PEKERJAAN PENGECATAN 1 Pengecatan dinding ex Vinilex setara

486.00 m2

2 Pengecatan Plafond

166.00 m2

JUMLAH J II.3

SMAN 1 CIGEMBLONG

A

PEKERJAAN PERSIAPAN 1 Pengukuran dan pemasangan bouplank 2 Pembersihan lokasi proyek

60.00 m1 216.00 m2

3 Papan nama proyek

1.00 bh

4 Listrik Kerja

1.00 ls

5 Biaya mobilisasi

1.00 ls

JUMLAH A B

PEKERJAAN TANAH 1 Galian tanah pondasi batu kali dan foot plate

48.00 m3

2 Urugan Tanah kembali

14.40 m3

JUMLAH B C

PEKERJAAN PONDASI DAN BETON 1 Urugan pasir dibawah pondasi

3.47 m3

2 Pasang batu kali kosong

13.52 m3

3 Pondasi batu kali

39.10 m3

4 Sloof beton 20x25

4.15 m3

5 Kolom beton 25x25

0.98 m3

6 Pasang Kolom beton 15x25

2.52 m3

7 Pasang Kolom beton 15x15

1.23 m3

8 Pasang Ring Balok 15x20

3.56 m3

JUMLAH C

D

PEKERJAAN PASANGAN 1 Pasangan dinding batu bata 1:4

243.00 m2

2 Plesteran + acian 1:4 dinding batu bata

486.00 m2

3 Urugan tanah di padatkan dan peninggian elevasi + 20 dari muka jalan

30.60 m3

4 Pekerjaan Pasangan Saluran Keliling Bangunan : - Galian tanah

22.10 m3

- Urugan Pasir

19.21 m3

- Dinding batu bata

23.40 m2

- Plesteran dan acian

33.10 m2

- Buis beton 1/2 diameter 30 cm

90.00 m'

5 Pekerjaan Rangka Atap Baja Ringan C.075

326.00 m2

6 Pekerjaan Penutup Atap Metal roow

326.00 m2

7 Pekerjaan Nok Metal Roof

23.00 m'

8 Pekerjaan Lisplank GRC

66.00 m'

JUMLAH D E

PEKERJAAN PLAFOND 1 Pasang plafond Gypstyle

60.00 m2

2 Pasang plafond GRC selasar

96.00 m2

3 Pasang List Plafond Gypsum

102.00 m'

JUMLAH E F

PEKERJAAN ELEKTRIKAL 1 Pasang titik lampu penerangan

33.00 ttk

2 Pasang titik stop kontak

16.00 ttk

3 Pasang Stop kontak AC

4.00 ttk

4 Pasang lampu TL 2x18

28.00 bh

5 Pasang armature stop kontak

14.00 bh

6 Pasang armature saklar seri

16.00 bh

7 Pasang Panel MCB

1.00 unit

8 Lampu PL 8 w

5.00 bh

JUMLAH F G

PEKERJAAN MEKANIKAL DAN SANITARY 1 Pasang Pipa PVC AW 1/2"

12.00 m'

2 Pasang Pipa PVC AW 3/4"

18.00 m'

3 Pasang Pipa PVC AW 3"

18.00 m'

4 Pasang Pipa PVC AW 4"

18.00 m'

5 Pasang stop kran 3/4"

2.00 bh

6 Pasang Kran Air 1/2"

2.00 bh

7 Pasang Closet Duduk

2.00 set

8 Pasang Wastafel

2.00 set

9 Pasang Floor Drain

2.00 bh

10 Resevoar, Fibre Glass silinder kapasitas 2000 Lt + support

1.00 unit

11 Pompa air jet pump + Instalasi dan pengeboran

1.00 unit

JUMLAH G H

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA 1 Kusen Pintu dan Jendela ALLuminium 4" 2 Pintu utama rangka kayu lapis multiplek lapis HPL

167.20 m' 6.00 bh

3 Jendela Alluminium Casement 60 x 120

22.00 bh

4 Kaca polos 5 mm

17.50 m2

5 Pasang Engsel Pintu 4" ex Solid

18.00 bh

6 Pasang Engsel Jendela casement

24.00 pas

7 Pasang Grendel jendela

30.00 bh

8 Pasang Kunci pintu

6.00 bh

9 Pasang Pintu KM/WC PVC

2.00 set

JUMLAH H I

PEKERJAAN LANTAI 1 Urugan Pasir Bawah lantai tebal 5 cm 2 Kramik Lantai 40/40 3 Keramik Lantai KM 33.3x33.3

7.80 m3 161.00 m2 6.75 m2

4 Kramik Lantai 40x40

42.00 m2

5 Keramik Dinding 25 x 33.3

40.32 m2

6 Pekerjaan Rabat beton selasar

3.20 m3

JUMLAH I J

PEKERJAAN PENGECATAN 1 Pengecatan dinding ex Vinilex setara

486.00 m2

2 Pengecatan Plafond

166.00 m2

JUMLAH J

II.4 A

SMAN 1 SOBANG PEKERJAAN PERSIAPAN 1 Pengukuran dan pemasangan bouplank 2 Pembersihan lokasi proyek

60.00 m1 216.00 m2

3 Papan nama proyek

1.00 bh

4 Listrik Kerja

1.00 ls

5 Biaya mobilisasi

1.00 ls

JUMLAH A B

PEKERJAAN TANAH 1 Galian tanah pondasi batu kali dan foot plate

48.00 m3

2 Urugan Tanah kembali

14.40 m3

JUMLAH B C

PEKERJAAN PONDASI DAN BETON 1 Urugan pasir dibawah pondasi

3.47 m3

2 Pasang batu kali kosong

13.52 m3

3 Pondasi batu kali

39.10 m3

4 Sloof beton 20x25

4.15 m3

5 Kolom beton 25x25

0.98 m3

6 Pasang Kolom beton 15x25

2.52 m3

7 Pasang Kolom beton 15x15

1.23 m3

8 Pasang Ring Balok 15x20

3.56 m3

JUMLAH C D

PEKERJAAN PASANGAN 1 Pasangan dinding batu bata 1:4

243.00 m2

2 Plesteran + acian 1:4 dinding batu bata

486.00 m2

3 Urugan tanah di padatkan dan peninggian elevasi + 20 dari muka jalan

30.60 m3

4 Pekerjaan Pasangan Saluran Keliling Bangunan : - Galian tanah

22.10 m3

- Urugan Pasir

19.21 m3

- Dinding batu bata

23.40 m2

- Plesteran dan acian

33.10 m2

- Buis beton 1/2 diameter 30 cm

90.00 m'

5 Pekerjaan Rangka Atap Baja Ringan C.075

326.00 m2

6 Pekerjaan Penutup Atap Metal roow

326.00 m2

7 Pekerjaan Nok Metal Roof

23.00 m'

8 Pekerjaan Lisplank GRC

66.00 m'

JUMLAH D E

PEKERJAAN PLAFOND 1 Pasang plafond Gypstyle

60.00 m2

2 Pasang plafond GRC selasar

96.00 m2

3 Pasang List Plafond Gypsum

102.00 m'

JUMLAH E F

PEKERJAAN ELEKTRIKAL 1 Pasang titik lampu penerangan

33.00 ttk

2 Pasang titik stop kontak

16.00 ttk

3 Pasang Stop kontak AC

4.00 ttk

4 Pasang lampu TL 2x18

28.00 bh

5 Pasang armature stop kontak

14.00 bh

6 Pasang armature saklar seri

16.00 bh

7 Pasang Panel MCB

1.00 unit

8 Lampu PL 8 w

5.00 bh

JUMLAH F G

PEKERJAAN MEKANIKAL DAN SANITARY 1 Pasang Pipa PVC AW 1/2"

12.00 m'

2 Pasang Pipa PVC AW 3/4"

18.00 m'

3 Pasang Pipa PVC AW 3"

18.00 m'

4 Pasang Pipa PVC AW 4"

18.00 m'

5 Pasang stop kran 3/4"

2.00 bh

6 Pasang Kran Air 1/2"

2.00 bh

7 Pasang Closet Duduk

2.00 set

8 Pasang Wastafel

2.00 set

9 Pasang Floor Drain

2.00 bh

10 Resevoar, Fibre Glass silinder kapasitas 2000 Lt + support

1.00 unit

11 Pompa air jet pump + Instalasi dan pengeboran

1.00 unit

JUMLAH G H

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA 1 Kusen Pintu dan Jendela ALLuminium 4" 2 Pintu utama rangka kayu lapis multiplek lapis HPL

167.20 m' 6.00 bh

3 Jendela Alluminium Casement 60 x 120

22.00 bh

4 Kaca polos 5 mm

17.50 m2

5 Pasang Engsel Pintu 4" ex Solid

18.00 bh

6 Pasang Engsel Jendela casement

24.00 pas

7 Pasang Grendel jendela

30.00 bh

8 Pasang Kunci pintu

6.00 bh

9 Pasang Pintu KM/WC PVC

2.00 set

JUMLAH H I

PEKERJAAN LANTAI 1 Urugan Pasir Bawah lantai tebal 5 cm 2 Kramik Lantai 40/40 3 Keramik Lantai KM 33.3x33.3

7.80 m3 161.00 m2 6.75 m2

4 Kramik Lantai 40x40

42.00 m2

5 Keramik Dinding 25 x 33.3

40.32 m2

6 Pekerjaan Rabat beton selasar

3.20 m3

JUMLAH I J

PEKERJAAN PENGECATAN 1 Pengecatan dinding ex Vinilex setara

486.00 m2

2 Pengecatan Plafond

166.00 m2

JUMLAH J

G DAN KABUPATEN LEBAK)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

64,141.00

3,848,460.00

10,835.00

2,340,360.00

748,852.50

748,852.50 6,937,672.50

65,450.00

3,141,600.00

48,400.00

696,960.00 3,838,560.00

220,660.00

765,690.20

353,265.00

4,776,142.80

682,627.00

26,690,715.70

5,138,120.00

21,323,198.00

7,228,650.00

7,084,077.00

8,398,160.00

21,163,363.20

11,381,670.00

13,999,454.10

8,719,270.00

31,040,601.20

126,843,242.20 91,152.60

22,150,081.80

99,100.00

48,162,600.00

167,860.00

5,136,516.00 -

65,450.00

1,446,445.00

220,660.00

4,238,878.60

91,152.60

2,132,970.84

99,100.00

3,280,210.00

75,850.00

6,826,500.00

287,421.75

93,699,490.50

231,448.80

75,452,308.80

104,632.00

2,406,536.00

103,620.00

6,838,920.00 271,771,457.54

46,002.00

2,760,120.00

23,001.00

2,208,096.00

20,086.00

2,048,772.00 7,016,988.00

224,818.00

7,418,994.00

224,818.00

3,597,088.00

65,670.00

262,680.00

72,105.00

2,018,940.00

32,835.00

459,690.00

54,835.00

877,360.00

7,000,000.00

7,000,000.00

62,986.00

314,930.00 21,949,682.00

35,866.60

430,399.20

72,909.10

1,312,363.80

265,974.50

4,787,541.00

257,691.50

4,638,447.00

85,200.00

170,400.00

85,200.00

170,400.00

1,038,340.00

2,076,680.00

526,680.00

1,053,360.00

65,340.00

130,680.00

4,419,200.00

4,419,200.00

7,744,484.00

7,744,484.00 26,933,955.00 -

3,663,660.00

21,981,960.00 -

185,876.90

3,252,845.75

176,033.00

3,168,594.00

124,921.50

2,998,116.00

49,021.50

1,470,645.00

232,540.00

1,395,240.00

526,350.00

1,052,700.00 35,320,100.75

220,660.00

1,721,148.00

156,948.00

25,268,628.00

179,520.00

1,211,760.00

156,948.00

6,591,816.00

179,520.00

7,238,246.40 42,031,598.40

30,063.00

14,610,618.00

30,063.00

4,990,458.00 19,601,076.00

64,141.00

3,848,460.00

10,835.00

2,340,360.00

748,852.50

748,852.50 -

6,937,672.50 65,450.00

3,141,600.00

48,400.00

696,960.00 3,838,560.00

220,660.00

765,690.20

353,265.00

4,776,142.80

682,627.00

26,690,715.70

5,138,120.00

21,323,198.00

7,228,650.00

7,084,077.00

8,398,160.00

21,163,363.20

11,381,670.00

13,999,454.10

8,719,270.00

31,040,601.20 126,843,242.20

91,152.60

22,150,081.80

99,100.00

48,162,600.00

167,860.00

5,136,516.00

-

-

65,450.00

1,446,445.00

220,660.00

4,238,878.60

91,152.60

2,132,970.84

99,100.00

3,280,210.00

75,850.00

6,826,500.00

287,421.75

93,699,490.50

231,448.80

75,452,308.80

104,632.00

2,406,536.00

103,620.00

6,838,920.00 271,771,457.54

46,002.00

2,760,120.00

23,001.00

2,208,096.00

20,086.00

2,048,772.00 7,016,988.00

224,818.00

7,418,994.00

224,818.00

3,597,088.00

65,670.00

262,680.00

72,105.00

2,018,940.00

32,835.00

459,690.00

54,835.00

877,360.00

7,000,000.00

7,000,000.00

62,986.00

314,930.00 21,949,682.00

35,866.60

430,399.20

72,909.10

1,312,363.80

265,974.50

4,787,541.00

257,691.50

4,638,447.00

85,200.00

170,400.00

85,200.00

170,400.00

1,038,340.00

2,076,680.00

526,680.00

1,053,360.00

65,340.00

130,680.00

4,419,200.00

4,419,200.00

7,744,484.00

7,744,484.00 26,933,955.00

3,663,660.00 -

21,981,960.00 -

185,876.90

3,252,845.75

176,033.00

3,168,594.00

124,921.50

2,998,116.00

49,021.50

1,470,645.00

232,540.00

1,395,240.00

526,350.00

1,052,700.00 35,320,100.75

220,660.00

1,721,148.00

156,948.00

25,268,628.00

179,520.00

1,211,760.00

156,948.00

6,591,816.00

179,520.00

7,238,246.40

-

42,031,598.40

30,063.00

14,610,618.00

30,063.00

4,990,458.00 19,601,076.00

64,141.00

3,848,460.00

10,835.00

2,340,360.00

748,852.50

748,852.50

-

-

-

6,937,672.50

65,450.00

3,141,600.00

48,400.00

696,960.00 3,838,560.00

220,660.00

765,690.20

353,265.00

4,776,142.80

682,627.00

26,690,715.70

5,138,120.00

21,323,198.00

7,228,650.00

7,084,077.00

8,398,160.00

21,163,363.20

11,381,670.00

13,999,454.10

8,719,270.00

31,040,601.20 126,843,242.20

91,152.60

22,150,081.80

99,100.00

48,162,600.00

167,860.00

5,136,516.00

-

-

65,450.00

1,446,445.00

220,660.00

4,238,878.60

91,152.60

2,132,970.84

99,100.00

3,280,210.00

75,850.00

6,826,500.00

287,421.75

93,699,490.50

231,448.80

75,452,308.80

104,632.00

2,406,536.00

103,620.00

6,838,920.00 271,771,457.54

46,002.00

2,760,120.00

23,001.00

2,208,096.00

20,086.00

2,048,772.00 7,016,988.00

224,818.00

7,418,994.00

224,818.00

3,597,088.00

65,670.00

262,680.00

72,105.00

2,018,940.00

32,835.00

459,690.00

54,835.00

877,360.00

7,000,000.00

7,000,000.00

62,986.00

314,930.00 21,949,682.00

35,866.60

430,399.20

72,909.10

1,312,363.80

265,974.50

4,787,541.00

257,691.50

4,638,447.00

85,200.00

170,400.00

85,200.00

170,400.00

1,038,340.00

2,076,680.00

526,680.00

1,053,360.00

65,340.00

130,680.00

4,419,200.00

4,419,200.00

7,744,484.00

7,744,484.00 26,933,955.00

3,663,660.00 -

21,981,960.00 -

185,876.90

3,252,845.75

176,033.00

3,168,594.00

124,921.50

2,998,116.00

49,021.50

1,470,645.00

232,540.00

1,395,240.00

526,350.00

1,052,700.00 35,320,100.75

220,660.00

1,721,148.00

156,948.00

25,268,628.00

179,520.00

1,211,760.00

156,948.00

6,591,816.00

179,520.00

7,238,246.40

-

42,031,598.40

30,063.00

14,610,618.00

30,063.00

4,990,458.00 19,601,076.00

64,141.00

3,848,460.00

10,835.00

2,340,360.00

748,852.50

748,852.50

-

-

-

6,937,672.50

65,450.00

3,141,600.00

48,400.00

696,960.00 3,838,560.00

220,660.00

765,690.20

353,265.00

4,776,142.80

682,627.00

26,690,715.70

5,138,120.00

21,323,198.00

7,228,650.00

7,084,077.00

8,398,160.00

21,163,363.20

11,381,670.00

13,999,454.10

8,719,270.00

31,040,601.20 126,843,242.20

91,152.60

22,150,081.80

99,100.00

48,162,600.00

167,860.00

5,136,516.00 -

65,450.00

1,446,445.00

220,660.00

4,238,878.60

91,152.60

2,132,970.84

99,100.00

3,280,210.00

75,850.00

6,826,500.00

287,421.75

93,699,490.50

231,448.80

75,452,308.80

104,632.00

2,406,536.00

103,620.00

6,838,920.00 271,771,457.54

46,002.00

2,760,120.00

23,001.00

2,208,096.00

20,086.00

2,048,772.00 7,016,988.00

224,818.00

7,418,994.00

224,818.00

3,597,088.00

65,670.00

262,680.00

72,105.00

2,018,940.00

32,835.00

459,690.00

54,835.00

877,360.00

7,000,000.00

7,000,000.00

62,986.00

314,930.00 21,949,682.00

35,866.60

430,399.20

72,909.10

1,312,363.80

265,974.50

4,787,541.00

257,691.50

4,638,447.00

85,200.00

170,400.00

85,200.00

170,400.00

1,038,340.00

2,076,680.00

526,680.00

1,053,360.00

65,340.00

130,680.00

4,419,200.00

4,419,200.00

7,744,484.00

7,744,484.00 26,933,955.00

3,663,660.00 -

21,981,960.00 -

185,876.90

3,252,845.75

176,033.00

3,168,594.00

124,921.50

2,998,116.00

49,021.50

1,470,645.00

232,540.00

1,395,240.00

526,350.00

1,052,700.00 35,320,100.75

220,660.00

1,721,148.00

156,948.00

25,268,628.00

179,520.00

1,211,760.00

156,948.00

6,591,816.00

179,520.00

7,238,246.40

-

42,031,598.40

30,063.00

14,610,618.00

30,063.00

4,990,458.00 19,601,076.00

64,141.00

3,848,460.00

10,835.00

2,340,360.00

748,852.50

748,852.50

-

-

-

6,937,672.50

65,450.00

3,141,600.00

48,400.00

696,960.00 3,838,560.00

220,660.00

765,690.20

353,265.00

4,776,142.80

682,627.00

26,690,715.70

5,138,120.00

21,323,198.00

7,228,650.00

7,084,077.00

8,398,160.00

21,163,363.20

11,381,670.00

13,999,454.10

8,719,270.00

31,040,601.20 126,843,242.20

91,152.60

22,150,081.80

99,100.00

48,162,600.00

167,860.00

5,136,516.00

65,450.00

1,446,445.00

220,660.00

4,238,878.60

91,152.60

2,132,970.84

99,100.00

3,280,210.00

75,850.00

6,826,500.00

287,421.75

93,699,490.50

231,448.80

75,452,308.80

104,632.00

2,406,536.00

103,620.00

6,838,920.00 271,771,457.54

46,002.00

2,760,120.00

23,001.00

2,208,096.00

20,086.00

2,048,772.00 7,016,988.00

224,818.00

7,418,994.00

224,818.00

3,597,088.00

65,670.00

262,680.00

72,105.00

2,018,940.00

32,835.00

459,690.00

54,835.00

877,360.00

7,000,000.00

7,000,000.00

62,986.00

314,930.00 21,949,682.00

35,866.60

430,399.20

72,909.10

1,312,363.80

265,974.50

4,787,541.00

257,691.50

4,638,447.00

85,200.00

170,400.00

85,200.00

170,400.00

1,038,340.00

2,076,680.00

526,680.00

1,053,360.00

65,340.00

130,680.00

4,419,200.00

4,419,200.00

7,744,484.00

7,744,484.00 26,933,955.00

3,663,660.00 -

21,981,960.00 -

185,876.90

3,252,845.75

176,033.00

3,168,594.00

124,921.50

2,998,116.00

49,021.50

1,470,645.00

232,540.00

1,395,240.00

526,350.00

1,052,700.00 35,320,100.75

220,660.00

1,721,148.00

156,948.00

25,268,628.00

179,520.00

1,211,760.00

156,948.00

6,591,816.00

179,520.00

7,238,246.40

-

42,031,598.40

30,063.00

14,610,618.00

30,063.00

4,990,458.00 19,601,076.00

REKAPITULASI BILL of QUANTITY SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 2 (DUA) RUANG KELAS SMKN 1 CILEGON - KOTA CILEGON TA.2018

NO

URAIAN PEKERJAAN

1

2

TOTAL HARGA 4

I

PEKERJAAN PERSIAPAN

JUMLAH I

9,134,219.99

II

PEKERJAAN LANTAI DASAR

JUMLAH II

247,525,407.78

A PEKERJAAN STRUKTUR A.1

PEKERJAAN TANAH & URUGAN

A.2

PEKERJAAN PONDASI

A.3

PEKERJAAN BETON STRUKTUR

5,598,523.70 32,268,804.56 114,016,737.87

B PEKERJAAN ARSITEKTUR

III

B.1

PEKERJAAN DINDING

16,176,394.72

B.2

PEKERJAAN KUSEN PINTU, JENDELA & KACA

26,495,000.00

B.3

PEKERJAAN PLAFOND

15,557,519.12

B.4

PEKERJAAN LANTAI

28,315,449.80

B.5

PEKERJAAN PENGECATAN

B.6

PEKERJAAN DRAINASE

6,217,178.00 2,879,800.00

PEKERJAAN LANTAI ATAS

JUMLAH III

266,283,279.04

A PEKERJAAN STRUKTUR A.1

PEKERJAAN BETON STRUKTUR

63,272,260.15

A.2

PEKERJAAN ATAP

76,222,898.40

B PEKERJAAN ARSITEKTUR

IV

B.1

PEKERJAAN DINDING

31,131,710.70

B.2

PEKERJAAN KUSEN PINTU, JENDELA & KACA

26,495,000.00

B.3

PEKERJAAN PLAFOND

45,080,902.79

B.4

PEKERJAAN LANTAI

14,889,179.80

B.5

PEKERJAAN PENGECATAN

9,191,327.20

PEKERJAAN ELEKTRIKAL

JUMLAH IV

5,598,786.00

REAL COS

Rp.

528,541,692.81

PPN 10%

Rp.

52,854,169.28

TOTAL

Rp.

581,395,862.09

JUMLAH TOTAL

Rp.

581,395,860.00

Terbilang :

#NAME?

REKAPITULASI BILL of QUANTITY SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 1 (SATU) RUANG SMKN 1 CILEGON - KOTA CILEGON TA.2018

NO

URAIAN PEKERJAAN

1

2

TOTAL HARGA 3

A PEKERJAAN PERSIAPAN

JUMLAH A

10,231,672.50

B PEKERJAAN STRUKTUR B.1

PEKERJAAN TANAH & URUGAN

B.2

PEKERJAAN PONDASI

10,787,282.55

6,766,262.80

B.3

PEKERJAAN BETON STRUKTUR

31,094,630.44

B.4

PEKERJAAN ATAP

91,967,598.49 JUMLAH B

140,615,774.28

C PEKERJAAN ARSITEKTUR C.1

PEKERJAAN DINDING

27,759,561.20

C.2

PEKERJAAN KUSEN PINTU, JENDELA & KACA

25,190,400.00

C.3

PEKERJAAN PLAFOND

47,939,793.19

C.4

PEKERJAAN LANTAI

18,878,026.29

C.5

PEKERJAAN PENGECATAN

8,896,168.16 JUMLAH C

128,663,948.84

D EKERJAAN DRAINASE

JUMLAH D

4,151,400.00

F PEKERJAAN ELEKTRIKAL

JUMLAH E

3,224,469.00

REAL COS

Rp.

286,887,264.62

PPN 10%

Rp.

28,688,726.46

TOTAL

Rp.

315,575,991.08

JUMLAH TOTAL

Rp.

315,575,990.00

Terbilang :

#NAME?

REKAPITULASI BILL of QUANTITY SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 4 (EMPAT) RUANG KELAS SMKN 2 CILEGON - KOTA CILEGON TA.2018

NO

URAIAN PEKERJAAN

1

2

TOTAL HARGA 4

I

PEKERJAAN PERSIAPAN

JUMLAH I

11,151,630.50

II

PEKERJAAN LANTAI DASAR

JUMLAH II

572,684,727.02

A PEKERJAAN STRUKTUR A.1

PEKERJAAN TANAH & URUGAN

A.2

PEKERJAAN PONDASI

A.3

PEKERJAAN BETON STRUKTUR

7,546,016.50 74,855,447.85 293,419,962.41

B PEKERJAAN ARSITEKTUR

III

B.1

PEKERJAAN DINDING

51,472,634.22

B.2

PEKERJAAN KUSEN PINTU, JENDELA & KACA

53,015,350.00

B.3

PEKERJAAN PLAFOND

33,742,399.68

B.4

PEKERJAAN LANTAI

37,484,767.82

B.5

PEKERJAAN PENGECATAN

17,108,948.56

B.6

PEKERJAAN DRAINASE

4,039,200.00

PEKERJAAN LANTAI ATAS

JUMLAH III

557,067,434.71

A PEKERJAAN STRUKTUR A.1

PEKERJAAN BETON STRUKTUR

113,669,443.61

A.2

PEKERJAAN ATAP

188,741,785.77

B PEKERJAAN ARSITEKTUR

IV

Terbilang :

B.1

PEKERJAAN DINDING

55,729,839.92

B.2

PEKERJAAN KUSEN PINTU, JENDELA & KACA

53,010,350.00

B.3

PEKERJAAN PLAFOND

94,308,077.05

B.4

PEKERJAAN LANTAI

34,577,870.58

B.5

PEKERJAAN PENGECATAN

17,030,067.78

PEKERJAAN ELEKTRIKAL

JUMLAH IV

8,348,808.00

REAL COS

Rp.

1,149,252,600.23

PPN 10%

Rp.

114,925,260.02

TOTAL

Rp.

1,264,177,860.26

JUMLAH TOTAL

Rp.

1,264,177,860.00

#NAME?

REKAPITULASI BILL of QUANTITY SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 4 (EMPAT) RUANG KELAS SMKN 3 CILEGON - KOTA CILEGON TA.2018

NO

URAIAN PEKERJAAN

1

2

TOTAL HARGA 4

I

PEKERJAAN PERSIAPAN

JUMLAH I

11,151,630.50

II

PEKERJAAN LANTAI DASAR

JUMLAH II

580,614,871.08

A PEKERJAAN STRUKTUR A.1

PEKERJAAN TANAH & URUGAN

A.2

PEKERJAAN PONDASI

A.3

PEKERJAAN BETON STRUKTUR

12,001,506.00 74,855,447.85 293,419,962.41

B PEKERJAAN ARSITEKTUR

III

B.1

PEKERJAAN DINDING

52,320,527.27

B.2

PEKERJAAN KUSEN PINTU, JENDELA & KACA

53,015,350.00

B.3

PEKERJAAN PLAFOND

33,742,399.68

B.4

PEKERJAAN LANTAI

37,942,329.32

B.5

PEKERJAAN PENGECATAN

17,108,948.56

B.6

PEKERJAAN DRAINASE

6,208,400.00

PEKERJAAN LANTAI ATAS

JUMLAH III

552,686,710.45

A PEKERJAAN STRUKTUR A.1

PEKERJAAN BETON STRUKTUR

106,707,936.45

A.2

PEKERJAAN ATAP

188,741,785.77

B PEKERJAAN ARSITEKTUR

IV

B.1

PEKERJAAN DINDING

56,577,732.98

B.2

PEKERJAAN KUSEN PINTU, JENDELA & KACA

53,010,350.00

B.3

PEKERJAAN PLAFOND

94,308,077.05

B.4

PEKERJAAN LANTAI

34,577,870.58

B.5

PEKERJAAN PENGECATAN

18,762,957.62

PEKERJAAN ELEKTRIKAL

JUMLAH IV

8,348,808.00

REAL COS

Rp.

1,152,802,020.03

PPN 10%

Rp.

115,280,202.00

TOTAL

Rp.

1,268,082,222.03

JUMLAH TOTAL

Rp.

1,268,082,220.00

Terbilang :

#NAME?

BILL of QUANTITY SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 2 (DUA) RUANG KELAS SMKN 1 CILEGON - KOTA CILEGON TA.2018

NO

URAIAN PEKERJAAN

SPESIFIKASI

1

2

3

I

KODE ANALISA

VOLUME

HARGA SATUAN

JUMLAH HARGA

4

5

6

PEKERJAAN PERSIAPAN 1 Papan Nama Proyek 1.5 x 0.8 m 2 Pengukuran dan Bowuplank

Kayu klas II

A. 2.2.1 .2

1.00

bh

748,852.50

A. 2.2.1 .1

2.89

m'

64,141.00

185,367.49

1.00

ls

5,000,000.00

5,000,000.00

1.00

m'

1,700,000.00

1,700,000.00

1.00

bh

1,500,000.00

3 Mobilisai dan demobilisasi 4 Gambar Kerja, Dokumentasi dan Pelaporan 5 Pas. Plakat/ Prasasti

Granit Hitam Uk.60x90

JUMLAH I II

748,852.50

1,500,000.00 9,134,219.99

PEKERJAAN LANTAI DASAR A PEKERJAAN STRUKTUR

A.1

PEKERJAAN TANAH & URUGAN 1 Pek. Galian Tanah Pondasi

kedalaman max. 1

A. 2.3.1 .1

8.11 m3

65,450.00

530,799.50

A. 2.3.1 .9

6.40

m2

48,400.00

309,760.00

Pasir urug

A. 2.3.1 .4

0.45

m3

220,660.00

99,297.00

4 Pek Tanah Peninggian Lantai

Tanah Merah

A. 2.3.1 .5

26.92

m3

167,860.00

4,518,791.20

5 Pek. Urugan Tanah Bekas galian

Tanah galian

A. 2.3.1 .3

2 Pek Perataan dan pemadataanTanah Sloof (S1) 3 Pek Pasir Urug Bawah Pondasi Pondasi t = 5 cm

2.89 m3

48,400.00 JUMLAH A.1

A.2

139,876.00 5,598,523.70

PEKERJAAN PONDASI 1 Pek Poot Plate 120x120x45 cm (P.1) Lantai Kerja beton di Bawah (lean Concrete) t = 5 cm Beton Besi beton (tulangan) Bekisting Pondasi 2 Pek Poot Plate 75x90x40 cm (P.2) Lantai Kerja beton di Bawah (lean Concrete) t = 5 cm Beton Besi beton (tulangan) Bekisting Pondasi 3 Pek Kolom Pedistal 40/40 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom 4 Pek Kolom Pedistal 25/30 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom

Site Mix K.100 Site Mix K. 225

A.4.1.1.1 A.4.1.1.7

U. 32

A.4.1.1.17.A A.4.1.1.20

Site Mix K.100

A.4.1.1.1

Site Mix K. 225 U. 32

A.4.1.1.7 A.4.1.1.17.A A.4.1.1.20

Site Mix K. 225

A.4.1.1.7

U. 32

A.4.1.1.17.A A.4.1.1.22

Site Mix K. 225

A.4.1.1.7

U. 32

A.4.1.1.17.A A.4.1.1.22

0.72 m3 6.48 m3

726,415.09 947,715.78

523,018.86 6,141,198.25

kg m2

11,854.70 177,958.00

5,994,566.15 3,843,892.80

0.14 m3

726,415.09

101,698.11

505.67 21.60

0.81 176.62

m3 kg

947,715.78 11,854.70

767,649.78 2,093,777.11

3.96

m2

177,958.00

1.09 m3

947,715.78

704,713.68 1,033,010.20

269.29 14.40

kg m2

11,854.70 353,336.50

3,192,352.16 5,088,045.60

0.30

m3

947,715.78

284,314.73

79.79 kg 4.40 m2

11,854.70 353,336.50

945,886.51 1,554,680.60

JUMLAH A.2 A.3

32,268,804.56

PEKERJAAN BETON STRUKTUR 1 Pek Sloof (S1) 20/30 Beton Bertulang Lantai Kerja beton di Bawah (lean Concrete) t = 5 cm Beton Besi beton (tulangan)

Site Mix K.100

A.4.1.1.1

0.32

m3

726,415.09

232,452.83

Site Mix K. 225 U. 32

A.4.1.1.7 A.4.1.1.17.A

1.92 554.98

m3 kg

947,715.78 11,854.70

1,819,614.30 6,579,121.41

A.4.1.1.21

19.20

m2

190,333.00

3,654,393.60 -

5.76 m3 729.07 kg 57.60 m2

947,715.78 11,854.70 353,336.50

5,458,842.89 8,642,906.13 20,352,182.40

Bekisting Sloof 2 Pek Kolom (K1) 40/40 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom 3 Pek Kolom (K2) 25/30 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom 4 Pek Balok B1 20/45 Beton Bertulang Beton Besi beton (tulangan) Bekisting balok 50% 5 Pek Balok (B2) 20/30 Beton Bertulang Beton

Ready Mix K. 225 U. 32

A.4.1.1.8 A.4.1.1.17.A A.4.1.1.22

Ready Mix K. 225

A.4.1.1.8

U. 32

A.4.1.1.17.A A.4.1.1.22

Ready Mix K. 225

A.4.1.1.8

U. 32

A.4.1.1.17.A A.4.1.1.23

Ready Mix K. 225

A.4.1.1.8

1.08

m3

947,715.78

1,023,533.04

218.05 15.84

kg m2

11,854.70 353,336.50

2,584,917.34 5,596,850.16

4.77 m3

947,715.78

4,520,604.27

1,063.15 49.06

kg m2

11,854.70 180,215.75

12,603,324.31 8,841,384.70

0.66

m3

947,715.78

625,492.41

Besi beton (tulangan) Bekisting balok 6 Pek Kanopi Beton Bertulang t.7 cm Beton Besi beton (tulangan) Perancah Bekisting Lantai 7 Pek Balok Lintel 10/12 Beton Besi beton (tulangan) Bekisting balok Non Struktur 8 Pek Plat Lantai Beton Bertulang t = 12 cm Beton Wiremesh M8 (2 lapis) Plat Bondek + Perancah Perancah Bekisting Lantai Sisi Plat

U. 32

A.4.1.1.17.A A.4.1.1.23

Site Mix K. 225

A.4.1.1.7

U. 24

A.4.1.1.17.A A.4.1.1.23A

Site Mix K.175

A.4.1.1.5

U. 24

A.4.1.1.17.A A.4.1.1.23A

Ready Mix K. 225

A.4.1.1.8

U. 24 T.0,75 mm

A.4.1.1.17.A A.4.1.1.24

183.57 kg 8.80 m2

11,854.70 360,431.50

2,176,167.28 3,171,797.20

0.46 m3

947,715.78

435,949.26

43.80 kg 7.62 m2

11,854.70 251,861.50

519,235.86 1,919,184.63

0.20 m3

893,214.41

178,642.88

53.77 3.89

kg m2

11,854.70 251,861.50

637,427.22 979,741.24

9.48

m3

947,715.78

8,984,345.59

95.01 m2 81.81 m2 5.86 m2

11,854.70 104,000.00 485,336.50

1,126,315.05 8,508,240.00 2,844,071.89

JUMLAH A.3

114,016,737.87

B PEKERJAAN ARSITEKTUR B.1

PEKERJAAN DINDING 1 Pek Pas Bata Ringan/Hebel (Celcon) ad. 1:4 2 Pek Plesteran Kolom & Dinding (mortar) - 301

10 x 20 x 60

A.4.4.2.26

60.28

m2

92,296.88

5,563,655.63

t=10mm

A.4.4.2.27

114.12

m2

62,902.81

7,178,468.96

A.4.4.2.28

142.28

m2

16,417.50

2,335,881.90

A.4.4.1.10

2.70 m2

91,152.60

246,112.02

4.4.2

5.40 m2

79,320.31

428,329.69

A.4.4.3.41b

8.87 m2

47,795.55

3 Pek Acian Kolm & Dinding (mortar) - 200 4 Pek Pas dinding bata merah Selasar ad. 1:4

1/2" bata

5 Pek Plesteran + Aci dinding selasar 6 Pek. Dinding Batu alam JUMLAH B.1 B.2

JUMLAH B.1

423,946.53 16,176,394.72

PEKERJAAN KUSEN PINTU, JENDELA & KACA 1 Pek. Pintu Alumunium+Assesoris (P1)

warna Hitam, 3", ykk

ALM 01

1.00 Unit

3,489,200.00

3,489,200.00

2 Pek Jendela Alumunium (J1)

warna Hitam, 3", ykk

ALM 03

4.00 Unit

3,164,100.00

12,656,400.00

3 Pek Jendela Alumunium (J2)

warna Hitam, 3", ykk

ALM 04

1.00 Unit

2,720,200.00

2,720,200.00

4 Pek Jendela Alumunium (BV1)

warna Hitam, 3", ykk

ALM 07

5.00 Unit

1,304,600.00

6,523,000.00

5 Pek Jendela Alumunium (BV2)

warna Hitam, 3", ykk

ALM 08

1.00 Unit

1,106,200.00 JUMLAH B.2

B.3

1,106,200.00 26,495,000.00

PEKERJAAN PLAFOND 1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 mm

hollow 4 x 4 dan 2 x 4 cm

A.4.2.1.25

84.96

m2

124,300.00

10,560,528.00

2 Pek Pas plafond gypsum board uk. (120x240x9) mm

, tebal 9 mm

A.4.5.1.7

84.96

m2

46,002.00

3,908,329.92

3 Pek List Plafond Gypsum

Uk.10 -15 cm

A.4.5.1.9a

54.20

m'

20,086.00 JUMLAH B.3

B.4

PEKERJAAN LANTAI 1 Pek Pas lantai granite 60x60 cm 2 Pas. Bata penguat rabat 3 Pek. Beton tumbuk

Warna/Corak Geranito/Indogress/Roma n 1/2 Bata

A.4.4.3.36c A.4.4.1.10

Camp. 1 : 3 : 5, T.7 cm

-

157.17

m2

169,774.00

26,683,379.58

8.20 m2

91,152.60

747,451.32

1.16 m2

762,602.50 JUMLAH B.4

B.5

1,088,661.20 15,557,519.12

884,618.90 28,315,449.80

PEKERJAAN PENGECATAN 1 Pek Pengecatan Tembok dan kolom

Catilac/Duluxe/Jotun

A.4.7.1.10

142.28

m2

24,376.00

2 Pek Pengecetan plafond dan kanopi dgn cat tembok

Catilac/Duluxe/Jotun

A.4.7.1.11

91.44

m2

30,063.00 JUMLAH B.5

B.6

3,468,217.28 2,748,960.72 6,217,178.00

PEKERJAAN DRAINASE 1 Pek. Grevel U Keliling Bangunan

1/2" buis uk.20x100 cm

7.1.1

30.80

m'

93,500.00 JUMLAH B.6

JUMLAH II III

2,879,800.00 2,879,800.00 247,525,407.78

PEKERJAAN LANTAI ATAS A PEKERJAAN STRUKTUR

A.1

PEKERJAAN BETON STRUKTUR 1 Pek Kolom (K3) 30/30 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

U. 32

A.4.1.1.17.A

694.35

kg

11,854.70

8,231,310.95

A.4.1.1.22

43.20

m2

353,336.50

15,264,136.80

0.54 m3

947,715.78

511,766.52

Bekisting Kolom

3.24 m3

947,715.78

2 Pek Kolom (K4) 20/25 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

U. 32

A.4.1.1.17.A

kg

11,854.70

1,747,145.69

A.4.1.1.22

9.72 m2

353,336.50

3,434,430.78

Site Mix K. 225

A.4.1.1.7

0.92 m3

947,715.78

871,898.52

U. 32

A.4.1.1.17.A

184.13

kg

11,854.70

2,182,805.91

A.4.1.1.23

15.20

m2

180,215.75

2,739,279.40

Bekisting Kolom

147.38

3 Pek Ringbalk (RB) 12/20 Beton Bertulang Beton Besi beton (tulangan) Bekisting balok 50% 4 Pek Balok Selasar (B3) 15/20 Beton Bertulang

3,070,599.13

-

-

Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

15.20

m3

947,715.78

14,405,279.86

U. 32

A.4.1.1.17.A

22.04

kg

11,854.70

261,277.59

A.4.1.1.23

0.12 m2

360,431.50

43,251.78

Site Mix K. 225

A.4.1.1.7

0.59 m3

947,715.78

559,152.31

U. 32

A.4.1.1.17.A

130.91

kg

11,854.70

1,551,898.78

A.4.1.1.23

11.70

m2

360,431.50

4,217,048.55

0.20 m3

893,214.41

178,642.88

Bekisting balok 5 Pek Balok Selasar (B4) 15/15 Beton Bertulang

-

Beton Besi beton (tulangan) Bekisting balok 6 Pek Balok Lintel 10/12

-

Beton Besi beton (tulangan)

Site Mix K.175

A.4.1.1.5

U. 24

A.4.1.1.17.A

kg

11,854.70

637,427.22

A.4.1.1.23A

3.89 m2

251,861.50

979,741.24

Site Mix K.175

A.4.1.1.5

0.30 m3

893,214.41

267,964.32

U. 32

A.4.1.1.17.A

Bekisting balok Non Struktur

53.77

7 Pek Balok Dinding Selasar (B4) 15/15 Beton Bertulang

-

Beton Besi beton (tulangan) Bekisting balok

A.4.1.1.23

60.02

kg

11,854.70

711,519.09

3.90

m2

360,431.50

1,405,682.85

JUMLAH A.1 A.2

PEKERJAAN ATAP

Bergaransi 10 Tahun Taso/Alfa/Haisteel C.07575 cm Pasir Kwarsa

A.4.2.1.26

136.00

m2

287,421.75

39,089,358.00

A.4.5.2.32

136.00

m2

231,448.80

31,477,036.80

Pasir Kwarsa

A.4.5.2.36

10.00

m'

153,450.00

1,534,500.00

Kalsi Board kalsiplank/SuperplankA.4.6.1.21a

39.78

m'

103,620.00

1 Pas. Rangka Atap Baja Ringan 2 Pas. Atap Genteng Metal berpasir 3 Pas. Nok Genteng metal 4 Pek. Lisplank GRC 2x20x2 lapis

63,272,260.15

JUMLAH A.2

4,122,003.60 76,222,898.40

B PEKERJAAN ARSITEKTUR B.1

PEKERJAAN DINDING 1 Pek Pas Bata Ringan/Hebel (Celcon) ad. 1:4 2 Pek Plesteran Kolom & Dinding (mortar) - 301

10 x 20 x 60

A.4.4.2.26

107.33

m2

92,296.88

9,906,223.59

t=10mm

A.4.4.2.27

208.22

m2

62,902.81

13,097,623.62

A.4.4.2.28

238.54

m2

16,417.50

3,916,230.45

1/2" bata

A.5.1.1.36/15

22.90

m2

91,152.60

2,087,394.54

4.4.2

22.90

m2

79,320.31

1,816,435.16

6.44 m2

47,795.55

3 Pek Acian Kolm & Dinding (mortar) - 200 4 Pek Pas dinding bata merah Selasar ad. 1:4 5 Pek Plesteran + Aci dinding selasar 6 Pek. Dinding Batu alam

A.4.4.3.41b

JUMLAH B.1 B.2

307,803.34 31,131,710.70

PEKERJAAN KUSEN PINTU, JENDELA & KACA 1 Pek. Pintu Alumunium+Assesoris (P1)

warna Hitam, 3", alexindo/Alco/ykkALM 01

1.00 Unit

3,489,200.00

3,489,200.00

2 Pek Jendela Alumunium (J1)

warna Hitam, 3", alexindo/Alco/ykkALM 03

4.00 Unit

3,164,100.00

12,656,400.00

3 Pek Jendela Alumunium (J2)

warna Hitam, 3", alexindo/Alco/ykkALM 04

1.00 Unit

2,720,200.00

2,720,200.00

4 Pek Jendela Alumunium (BV1)

warna Hitam, 3", alexindo/Alco/ykkALM 07

5.00 Unit

1,304,600.00

6,523,000.00

5 Pek Jendela Alumunium (BV2)

warna Hitam, 3", alexindo/Alco/ykkALM 08

1.00 Unit

1,106,200.00 JUMLAH B.2

B.3

1,106,200.00 26,495,000.00

PEKERJAAN PLAFOND 1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 mm

hollow 4 x 4 dan 2 x 4 cm

A.4.2.1.25

112.32

m2

331,829.08

37,271,042.27

2 Pek Pas plafond gypsum board uk. (120x240x9) mm

, tebal 9 mm

A.4.5.1.7

112.32

m2

46,002.00

5,166,944.64

3 Pek List Plafond Gypsum

Uk.10 -15 cm

A.4.5.1.9a

91.80

m'

20,086.00

1,843,894.80

Kayu Kls II dicat

A.4.5.1.9b

39.78

m'

20,086.00

4 Pek List Profil kayu (tepi listplang)

JUMLAH B.3 B.4

799,021.08 45,080,902.79

PEKERJAAN LANTAI 1 Pek Pas lantai granite 60x60 cm

Warna/Corak Geranito/Indogress/Roma n

A.4.4.3.36c

87.70

m2

169,774.00 JUMLAH B.4

B.5

14,889,179.80 14,889,179.80

PEKERJAAN PENGECATAN 1 Pek Pengecatan Tembok dan kolom

Catilac/Duluxe/Jotun

A.4.7.1.10

238.54

m2

24,376.00

2 Pek Pengecetan plafond dan kanopi dgn cat tembok

Catilac/Duluxe/Jotun

A.4.7.1.11

112.32

m2

30,063.00 JUMLAH B.5

JUMLAH III IV

5,814,651.04 3,376,676.16 9,191,327.20 266,283,279.04

PEKERJAAN ELEKTRIKAL 1 Pek Pas Instalasi titik Lampu Kabel NYM 3x2.5 mm

Eterna

EL.5.1.1.4

15.00

ttk

224,818.00

3,372,270.00

2 Pek Pas Instalasi stop kontak saklar Kabel NYM 3x2.5 mm

Eterna

EL.5.1.1.4

2.00

ttk

224,818.00

449,636.00

3 Pek Pas saklar Enkle

Broco

EL.5.1.1.5

-

bh

40,535.00

3 Pek Pas saklar Double

Broco

EL.5.1.1.6

2.00

bh

54,835.00

109,670.00

4 Pek Pas stop kontak

Broco

EL.5.1.1.8

2.00

bh

32,835.00

65,670.00

5 Pek Pas Lampu TL Reflektor 2x18 watt

Phillips

EL.5.1.1.10

12.00

bh

72,105.00

865,260.00

Phillips

EL.5.1.1.12

3.00

bh

78,760.00

236,280.00

Broco 900 A

EL.5.1.1.13

1.00

bh

500,000.00

6 Pek Pas Lampu Down Light SL 9 watt 7 Pek Pas MCB + Box

JUMLAH IV JUMLAH TOTAL (I+II+III+IV)

500,000.00 5,598,786.00 528,541,692.81

DAFTAR HARGA SATUAN PEKERJAAN (DHSP) SATUAN KERJA KEGIATAN PEKERJAAN KELOMPOK PEKERJAAN

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKATAN SARANA DAN PRASARANA SMK : PEMBANGUNAN RUANG KELAS BARU SMK KODE ANALISA A. 2.2.1 .2

Papan Nama Proyek

A. 2.2.1 .2

Pembuatan 1 m2 pagar sementara dari seng gelombang

A. 2.2.1 .1

Pengukuran dan pemasangan 1 m' Bouwplank

A. 2.2.1 .5

Pembuatan 1 m2 kantor sementara lantai plesteran

A. 2.3.1 .9

(K3) Pemadatan tanah 1 m3 tanah (per 20 cm)

A. 2.3.1 .1

Penggalian 1 m3 tanah biasa sedalam 1 m

A. 2.3.1 .3

Pengurugan kembali 1 m3 galian tanah

A. 2.3.1 .4

Pengurugan 1 m3 dengan pasir urug

A. 2.3.1 .5

Pengurugan 1 m3 dengan Tanah Urug Pilihan

A. 2.3.1 .9

(K3) Pemadatan tanah 1 m3 tanah (per 20 cm)

A. 2.2.1 .8

Pembersihan 1 m2 Semak Belukar

A. 3.2.1 .1

Pemasangan 1 m3 pondasi batu belah campuran 1PC : 4PP

A. 3.2.1 .9

Pemasangan 1 m3 batu kosong (anstamping)

A.4.1.1.1a

Pembuatan 1 m3 beton mutu fc 7,4 MPa (K100)

A.4.1.1.5

Pembuatan 1 m3 beton mutu fc 14,5 MPa (K175)

A.4.1.1.7

Pembuatan 1 m3 beton mutu fc 19,3 MPa (K225)

A.4.1.1.8

Pembuatan 1 m3 beton mutu fc 21,7 MPa (K250)

A.4.1.1.1

Pembuatan 1 m3 lantai kerja beton mutu fc 7,4 Mpa (K-100)

A.4.1.1.17

Pembesian 10 Kg dengan besi polos atau ulir

A.4.1.1.17.A

Pembesian 1 Kg dengan besi polos atau ulir

A.4.1.1.19

Pembesian 10 kg dengan besi Wire Mash

A.4.1.1.19a

Pembesian 1 kg dengan besi Wire Mash

A.4.1.1.20

Pemasangan 1 m2 bekisting untuk pondasi

A.4.1.1.21

Pemasangan 1 m2 bekisting untuk sloof

A.4.1.1.22

Pemasangan 1 m2 bekisting untuk kolom

A.4.1.1.22A A.4.1.1.23 A.4.1.1.23A

Pemasangan 1 m2 bekisting untuk kolom Non Struktur Pemasangan 1 m2 bekisting untuk balok Pemasangan 1 m2 bekisting untuk balok Non Struktur

A.4.1.1.24

Pemasangan 1 m2 bekisting untuk lantai

A.4.1.1.26

Pemasangan 1 m2 bekisting untuk tangga

A.4.1.1.35

Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm site mix

A.4.2.1.21a

Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm site mix

A.4.2.1

HARGA SATUAN

JENIS PEKERJAAN

Pemasangan 1 Bh Engsel Jendela Casment

A.4.2.1.1

Pemasangan 1 kg Besi Profil

A.4.2.1.23

Pemasangan 1 m2 rangka Teralis besi hollow 1x40.40.2mm

A.4.4.1.10

Pemasangan dinding bata merah 1/2 batu camp. 1PC:5PP

A.4.4.1.9

Pemasangan Plesteran + acian 1:4 dinding batu bata

A.4.4.2.26

Pemasangan dinding Hebel 100 x 200 x 600

A.4.4.2.27

Pemasangan plesteran Hebel dengan Mortar t = 10 mm Setara MU 301

A.4.4.2.28

Pemasangan acian Dengan Mortar Setara MU - 200

A.4.4.3.36

Pemasangan 1 m2 lantai keramik 25x25

A.4.4.3.36c

Pemasangan 1 m2 lantai granite 60 x 60 cm

A.4.4.3.36b

Pemasangan 1 m2 lantai keramik 40x40

A.4.4.3.36a

Pemasangan 1 m2 dinding keramik 25x40

A.4.4.3.41a

Pemasangan 1 m’ Step Nozing

A.4.2.1.25

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon

A.4.2.1.26

Pemasangan 1 m2 Konstruksi Kuda-Kuda Baja Ringan

A.4.5.2.43

Pemasangan 1 m2 Alumunium Foil

A.4.5.2.33

Pemasangan 1m2 Genteng Bitumen

A.4.5.2.37

Pemasangan 1 m1 nok Bitumen

A.4.5.1.7

Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

A.4.5.1.7

Pemasangan 1 m2 langit-langit GRC board ukuran (120x240x4) mm, tebal 4 mm

A.4.2.1.22

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding

A.4.5.1.9a

Pemasangan 1 m' List Langit-langit Gypsum profile

A.4.6.1.21a

Pemasangan listplank 3x30 GRC

A.4.6.1.20

Pemasangan Talang Miring Zingcalum

(Rp)

unit m2 m2 m2 m2 m3 m3 m3 m3 m3 m2 m3 m3 m3 m3 m3 m3 m3 Kg Kg Kg Kg m2 m2 m2 m2 m2 m2 m2 m2 m' cm cm kg m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m' m2 m2 m2 m2 m' m2 m2 m2 m' m' m'

748,852.50 41,100.00 64,141.00 1,159,650.64 48,400.00 65,450.00 48,400.00 220,660.00 167,860.00 48,400.00 10,835.00 682,627.00 353,265.00 743,214.41 893,214.41 947,715.78 1,495,274.00 726,415.09 118,547.00 11,854.70 583,418.00 212,946.80 177,958.00 190,333.00 353,336.50 251,861.50 360,431.50 251,861.50 485,336.50 327,926.50 81,052.95 810,529.50 124,921.50 23,419.00 331,829.08 91,152.60 99,100.00 92,296.88 62,902.81 16,417.50 153,450.00 169,774.00 156,948.00 179,520.00 47,795.55 124,300.00 287,421.75 28,800.00 231,448.80 104,632.00 46,002.00 23,001.00 198,195.25 20,086.00 103,620.00 76,785.50

A.4.7.1.10

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat

A.4.7.1.11

Pengecatan 1 m2 Plafon dengan cat tembok ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis

A.4.7.1.12

Pengecatan 1 m2 Pengecatan Permukaan Kayu, cat Politur/Melamin

A.4.7.1.13

Pengecatan 1 m2 Pengecatan Permukaan Baja Galvanis Secara Manual Sistem 1 Lapi

A.4.7.1.14

Waterprofing 1 m2

m2 m2 m2 m2 m2

24,376.00 30,063.00 48,230.60 26,559.50 26,111.25

A.5.1.1.35/18 A.5.1.1a.35/18a

Sumur Bor + Pompa + Suport kedalaman 60 m1 Water tower rangka besi siku + Tangki Air Kap.1000 liter

A.5.1.1.1

Pemasangan 1 buah closet duduk/monoblock Setara TOTO Cw 826J

A.5.1.1.2

Pemasangan 1 buah closet jongkok Setara TOTO Type CE9

A.5.1.1.25

Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”

A.5.1.1.28

Pemasangan 1 m’ pipa PVC tipe AW Ø 3/4”

A.5.1.1.29

Pemasangan 1 m’ pipa PVC tipe AW Ø 1”

A.5.1.1.30

Pemasangan 1 m’ pipa PVC tipe AW Ø 2”

A.5.1.1.31

Pemasangan 1 m’ pipa PVC tipe AW Ø 3”

A.5.1.1.32

Pemasangan 1 m’ pipa PVC tipe AW Ø 4”

A.5.1.1.35/19

Pemasangan 1 buah kran diameter ½” atau 3/4” Setara Onda

A.5.1.1.36/14

Pemasangan 1 buah floordrain

A.5.1.1.36/15

Pemasangan 1 buah Westafel

A.5.1.1.35/18

Sumur Bor + Pompa + Suport kedalaman 60 m1

EL.5.1.1.3

Pas. Kabel NYY 4 x 10 mm2 + BC 6 mm2 Dari P-SDp ke Panel P-Ds

EL.5.1.1.4

Instalasi Titik Listrik/Stop Kontak

EL.5.1.1.5

Pasangan 1 Bh Saklar Engkel

EL.5.1.1.6

Pasangan 1 Bh Saklar Seri

EL.5.1.1.7

Pasangan 1 Bh Saklar Hotel

EL.5.1.1.8

Pasangan 1 Bh Stop Kontak

EL.5.1.1.9

Pasangan 1 Bh Stop Kontak AC

EL.5.1.1.10

Pasangan 1 Bh Lampu TL 2 x 36 MR Setara Philips

EL.5.1.1.11

Pasangan 1 Bh Lampu Down Light SL 18 watt

EL.5.1.1.12

Pasangan 1 Bh Lampu Down Light SL 9 watt

EL.5.1.1.13

Pasangan 1 Bh Lampu Spot Light LED

EL.5.1.1.14

Pasangan 1 M' Lampu LED Strip Warna

ALM 09

Kusen Alumunium Type (P.Utama)

ALM 01

Kusen Alumunium Type (P1)

ALM 02

Kusen Alumunium Type (P2)

ALM 03

Kusen Alumunium Type (P3)

ALM 03

Kusen Jendela Alumunium (J1)

ALM 04

Kusen Jendela Alumunium (J2)

ALM 05

Kusen Jendela Alumunium (J3)

ALM 05

Kusen Jendela Alumunium (J.Kaca)

ALM 06

Pek Jendela Alumunium (BV1)

ALM 07

Pek Jendela Alumunium (BV2)

ALM 08

Pek Jendela Alumunium (BV3) Pasang Grendel jendela pek Fibre Glass silinder kapasitas 2000 Lt + support

A.4.2.1a.18

Pemasangan 1 M2 Kaca Polos 5 mm

A.4.2.1a.14

Pemasangan engsel pintu

A.4.2.1a.15

Pemasangan 1 buah kunci tanam 2 Slaag

A.4.2.1a.10

Pemasangan 1 Bh Door Closer

A.4.2.1a.20

Pemasangan 1 M2 Stiker Kaca Motip Sandblast

A.4.2.1a.21

Pemasangan 1 BH Pintu WPC

A.4.2.1a.22

Pemasangan 1 BH Pintu WPC Sleding

A.4.2.1a.16

Pemasangan 1 M' Architeave Kayu

A.4.2.1.24

Pemasangan 1 Unit Pintu rangka Besi Pelat + Expanded Metal

Unit Unit 1 bh 1 bh m1 m1 m1 m1 m1 m1 1 bh 1 bh Bh bh m' ttk bh bh bh bh bh bh bh bh bh M' Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit m2 bh bh bh m2 bh bh bh Unit

7,744,484.00 5,721,263.73 1,038,340.00 538,340.00 35,866.60 72,909.10 75,872.50 175,146.40 265,974.50 257,691.50 85,200.00 65,340.00 526,680.00 7,744,484.00 17,077.50 224,818.00 40,535.00 54,835.00 57,035.00 32,835.00 65,670.00 72,105.00 62,986.00 78,760.00 75,000.00 90,000.00 3,663,660.00 3,489,200.00 2,146,700.00 1,165,700.00 3,164,100.00 2,720,200.00 2,448,180.00 6,777,200.00 1,304,600.00 1,106,200.00 297,300.00 49,021.50 4,419,200.00 185,876.90 176,033.00 232,540.00 131,701.90 96,800.00 526,350.00 454,960.00 1,600,000.00 2,500,000.00

ANALISA HARGA SATUAN PEKERJAAN SATUAN KERJA KEGIATAN PEKERJAAN A

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKATAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 2.2.1

1

Pengukuran dan pemasangan 1 m' Bouwplank

No

A

B

C

A. 2.2.1 .1

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Kaso 5/7 kelas III Paku 1 cm - 3 cm Kayu papan 20/30

Koefisien

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

L.001 L.009 L.015 L.016

OH OH OH OH

0.1000 75,000.00 0.1000 80,000.00 0.0100 100,000.00 0.0050 130,000.00 JUMLAH TENAGA KERJA

7,500.00 8,000.00 1,000.00 650.00 17,150.00

M.03015 M.08002 M.03013

M3 KG M3

0.0120 0.0200 0.0070 JUMLAH BAHAN

24,000.00 360.00 16,800.00 41,160.00

2,000,000.00 18,000.00 2,400,000.00

PERALATAN JUMLAH PERALATAN

D E F A

2.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 2

B

C

10%

58,310.00 5,831.00 64,141.00

xD

Papan Nama Proyek

No

A

10%

A. 2.2.1 .2

Uraian

Kode

Satuan

Koefisien

ls

0.2500 JUMLAH TENAGA KERJA

m3 Kg m2

0.0700 1.0000 1.0000 JUMLAH BAHAN

TENAGA Ongkos Pasang BAHAN Kayu Kaso 5/7 kelas II Paku biasa Biner Cetak

M.03014 M.08004

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

219,100.00

54,775.00 54,775.00

2,300,000.00 15,000.00 450,000.00

161,000.00 15,000.00 450,000.00 626,000.00

PERALATAN JUMLAH PERALATAN

D E F A

2.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 5

B

C

10%

680,775.00 68,077.50 748,852.50

xD

Pembuatan 1 m2 kantor sementara lantai plesteran

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Kaso 5/7 kelas II Paku biasa Besi strip (SNI) 4x2.4 Semen Portland Pasir pasang Pasir beton Koral beton Bata merah Seng plat Jendela nako Kaca polos Kunci tanam Multipleks 6 mm 120 x 240

A. 2.2.1 .5 Kode

Satuan

Koefisien

L.001 L.003 L.009 L.015 L.016

OH OH OH OH OH

2.0000 1.0000 2.0000 0.3000 0.0500 JUMLAH TENAGA KERJA

M.03014 M.08004 M.06019 M.01042 M.01033 M.01032 M.01029 M.01004 M.11036 M.01063 M.07002 M.11044 M.04023

m3 Kg Kg Kg m3 m3 m3 Bh Lbr bh m2 Bh Lbr

0.1800 0.8000 1.1000 35.0000 0.1500 0.1000 0.1500 30.0000 0.2500 2.0000 0.0800 0.1500 0.0600 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 100,000.00 130,000.00

150,000.00 80,000.00 160,000.00 30,000.00 6,500.00 426,500.00

2,300,000.00 15,000.00 17,857.14 1,200.00 140,000.00 140,000.00 130,500.00 450.00 52,000.00 15,000.00 87,000.00 95,000.00 130,000.00

414,000.00 12,000.00 19,642.86 42,000.00 21,000.00 14,000.00 19,575.00 13,500.00 13,000.00 30,000.00 6,960.00 14,250.00 7,800.00 627,727.86

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

1,054,227.86 105,422.79 1,159,650.64

A

2.2.1

8

Pembersihan 1 m2 Semak Belukar

No

A

Uraian

TENAGA Pekerja Mandor

B

BAHAN

C

PERALATAN

A. 2.2.1 .8 Kode

Satuan

Koefisien

L.001 L.016

OH OH

0.0750 0.0325 JUMLAH TENAGA KERJA

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 130,000.00

5,625.00 4,225.00 9,850.00

JUMLAH BAHAN

-

JUMLAH PERALATAN D E F A

2.3.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 1

10%

9,850.00 985.00 10,835.00

xD

Penggalian 1 m3 tanah biasa sedalam 1 m

No

A

10%

Uraian

TENAGA Pekerja Mandor

B

BAHAN

C

PERALATAN

A. 2.3.1 .1 Kode

Satuan

Koefisien

L.001 L.016

OH OH

0.7500 0.0250 JUMLAH TENAGA KERJA

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 130,000.00

56,250.00 3,250.00 59,500.00

JUMLAH BAHAN

JUMLAH PERALATAN D E F A

2.3.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 3

10%

59,500.00 5,950.00 65,450.00

xD

Pengurugan kembali 1 m3 galian tanah

No

A

10%

Uraian

TENAGA Pekerja Mandor

B

BAHAN

C

PERALATAN

A. 2.3.1 .3 Kode

Satuan

Koefisien

L.001 L.016

OH OH

0.5000 0.0500 JUMLAH TENAGA KERJA

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 130,000.00

37,500.00 6,500.00 44,000.00

JUMLAH BAHAN

JUMLAH PERALATAN D E F A

2.3.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 4

B

C

10%

44,000.00 4,400.00 48,400.00

xD

Pengurugan 1 m3 dengan pasir urug

No

A

10%

Uraian

A. 2.3.1 .4 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

TENAGA Pekerja Mandor

L.001 L.016

OH OH

0.4000 0.0200 JUMLAH TENAGA KERJA

75,000.00 130,000.00

30,000.00 2,600.00 32,600.00

BAHAN Pasir Urug

M.01034

M3

1.2000 JUMLAH BAHAN

140,000.00

168,000.00 168,000.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

200,600.00 20,060.00 220,660.00

A

2.3.1

5

Pengurugan 1 m3 dengan Tanah Urug Pilihan

No

A

B

C

Uraian

TENAGA Pekerja Mandor BAHAN Tanah Urug Pilihan

A. 2.3.1 .5 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.016

OH OH

0.4000 0.0200 JUMLAH TENAGA KERJA

75,000.00 130,000.00

30,000.00 2,600.00 32,600.00

M.01036

M3

1.2000 JUMLAH BAHAN

100,000.00

120,000.00 120,000.00

PERALATAN JUMLAH PERALATAN

D E F A

3.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 1

B

10%

152,600.00 15,260.00 167,860.00

xD

Pemasangan 1 m3 pondasi batu belah campuran 1PC : 4PP

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Batu Belah Semen Portland (Tiga Roda/Holcim) Pasir Pasang

A. 3.2.1 .1

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.5000 0.7500 0.0750 0.0750 JUMLAH TENAGA KERJA

M.01028 M.01042 M.01033

M3 KG M3

1.2000 163.0000 0.5230

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

112,500.00 60,000.00 7,500.00 9,750.00 189,750.00

135,000.00 1,200.00 140,000.00

162,000.00 195,600.00 73,220.00

JUMLAH BAHAN C

430,820.00

PERALATAN JUMLAH PERALATAN

D E F A

3.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 9

B

10%

620,570.00 62,057.00 682,627.00

xD

Pemasangan 1 m3 batu kosong (anstamping)

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Batu Belah Pasir Urug

A. 3.2.1 .9 Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.7800 0.3900 0.0390 0.0390 JUMLAH TENAGA KERJA

M.01028 M.01034

M3 M3

1.2000 0.4320

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

58,500.00 31,200.00 3,900.00 5,070.00 98,670.00

135,000.00 140,000.00

162,000.00 60,480.00

JUMLAH BAHAN C

222,480.00

PERALATAN JUMLAH PERALATAN

D E F A

3.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 9

10%

321,150.00 32,115.00 353,265.00

xD

(K3) Pemadatan tanah 1 m3 tanah (per 20 cm)

No

A

10%

Uraian

TENAGA Pekerja Mandor

B

BAHAN

C

PERALATAN

A. 2.3.1 .9 Kode

Satuan

Koefisien

L.001 L.016

OH OH

0.5000 0.0500 JUMLAH TENAGA KERJA

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 130,000.00

37,500.00 6,500.00 44,000.00

JUMLAH BAHAN

JUMLAH PERALATAN D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

44,000.00 4,400.00 48,400.00

A

4.1.1

4

Pembuatan 1 m3 beton tumbuk 1 : 3 : 5, mutu fc 14,5 MPa

No

A

B

C

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Air

A.4.1.1.4 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.6500 0.2750 0.0280 0.0830 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

123,750.00 22,000.00 2,800.00 10,790.00 159,340.00

M.01042 M.01032 M.01029 M.17000

KG M3 M3 Liter

218.0000 0.5200 0.8700 215.0000 JUMLAH BAHAN

1,200.00 140,000.00 130,500.00 400.00

261,600.00 72,800.00 113,535.00 86,000.00 533,935.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 5

B

C

10%

693,275.00 69,327.50 762,602.50

xD

Pembuatan 1 m3 beton mutu fc 14,5 MPa (K175)

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Air

A.4.1.1.5 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.6500 0.2750 0.0280 0.0830 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

123,750.00 22,000.00 2,800.00 10,790.00 159,340.00

M.01042 M.01032 M.01029 M.17000

KG M3 M3 Liter

326.0000 0.5429 0.7622 215.0000 JUMLAH BAHAN

1,200.00 140,000.00 130,500.00 400.00

391,200.00 76,006.00 99,467.10 86,000.00 652,673.10

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 7

B

C

10%

812,013.10 81,201.31 893,214.41

xD

Pembuatan 1 m3 beton mutu fc 19,3 MPa (K225)

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Air

A.4.1.1.7 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.6500 0.2750 0.0280 0.0830 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

123,750.00 22,000.00 2,800.00 10,790.00 159,340.00

M.01042 M.01032 M.01029 M.17000

KG M3 M3 Liter

371.0000 0.4986 0.7756 215.0000 JUMLAH BAHAN

1,200.00 140,000.00 130,500.00 400.00

445,200.00 69,804.00 101,215.80 86,000.00 702,219.80

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

861,559.80 86,155.98 947,715.78

A

4.1.1

8

Pembuatan 1 m3 beton mutu fc 21,7 MPa (K250)

No

A

B

C

D E F A

4.1.1

B

C

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.6500 0.2750 0.0280 0.0830 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

123,750.00 22,000.00 2,800.00 10,790.00 159,340.00

BAHAN Beton K-250 Ready mix

M.01052

M3

1.0000 JUMLAH BAHAN

900,000.00

900,000.00 900,000.00

PERALATAN Concrete Vibrator Concrete Pump

M.16001 M.16002

hari hari

0.1000 0.1200 JUMLAH PERALATAN

600,000.00 2,000,000.00

60,000.00 240,000.00 300,000.00

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 1

10%

10%

1,359,340.00 135,934.00 1,495,274.00

xD

Pembuatan 1 m3 lantai kerja beton mutu fc 7,4 Mpa (K-100)

No

A

A.4.1.1.8

Uraian

Uraian

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.2000 0.2000 0.0200 0.0600 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

90,000.00 16,000.00 2,000.00 7,800.00 115,800.00

M.01042 M.01032 M.01029 M.17000

KG M3 M3 Liter

230.0000 0.6379 0.7607 200.0000 JUMLAH BAHAN

1,200.00 140,000.00 130,500.00 400.00

276,000.00 89,306.00 99,271.35 80,000.00 544,577.35

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Air

A.4.1.1.1 Harga Satuan

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 17

B

C

10%

660,377.35 66,037.74 726,415.09

xD

Pembesian 10 kg dengan besi polos atau besi ulir

No

A

10%

Uraian

TENAGA Pekerja Tukang Besi Beton Kepala Tukang Mandor BAHAN Besi Beton rata-rata U-24, U-32 Kawat Beton

A.4.1.1.17 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.004 L.015 L.016

OH OH OH OH

0.0700 0.0700 0.0070 0.0040 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

5,250.00 5,600.00 700.00 520.00 12,070.00

M.06003 M.06005

KG KG

10.5000 0.1500 JUMLAH BAHAN

10,000.00 15,000.00

105,000.00 2,250.00 107,250.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 18

B

C

10%

107,770.00 10,777.00 118,547.00

xD

Pembesian 100 kg dengan besi Wire Mash

No

A

10%

Uraian

TENAGA Pekerja Tukang Besi Beton Kepala Tukang Mandor BAHAN Besi Beton rata-rata U-24, U-32 Kawat Beton

A.4.1.1.18 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.004 L.015 L.016

OH OH OH OH

0.0700 0.0700 0.0070 0.0040 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

5,250.00 5,600.00 700.00 520.00 12,070.00

M.06003 M.06005

KG KG

10.5000 0.1500 JUMLAH BAHAN

10,000.00 15,000.00

105,000.00 2,250.00 107,250.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1 No

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 19

10%

10%

119,320.00 11,932.00 131,252.00

xD

Pembesian 10 kg dengan besi Wire Mash Uraian

A.4.1.1.19 Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

A

B

TENAGA Pekerja Tukang Besi Beton Kepala Tukang Mandor BAHAN Wire Mesh Kawat Beton

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

L.001 L.004 L.015 L.016

OH OH OH OH

0.2500 0.2500 0.2500 0.0010 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

18,750.00 20,000.00 25,000.00 130.00 63,880.00

M.06031 M.06005

KG KG

10.2000 0.5000 JUMLAH BAHAN

45,000.00 15,000.00

459,000.00 7,500.00 466,500.00

JUMLAH PERALATAN

A

4.1.1

19a

B

C

10%

530,380.00 53,038.00 583,418.00

xD

Pembesian 1 kg dengan besi Wire Mash

No

A

10%

Uraian

TENAGA Pekerja Tukang Besi Beton Kepala Tukang Mandor BAHAN Wire Mesh Kawat Beton

A.4.1.1.19a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.004 L.015 L.016

OH OH OH OH

0.0250 0.0250 0.0025 0.0001 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

1,875.00 2,000.00 250.00 13.00 4,138.00

M.07024 M.06005

KG KG

1.0200 0.0500 JUMLAH BAHAN

185,000.00 15,000.00

188,700.00 750.00 189,450.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 20

B

C

10%

193,588.00 19,358.80 212,946.80

xD

Pemasangan 1 m2 bekisting untuk pondasi

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 4 cm - 7 cm Minyak Bekisting

A.4.1.1.20 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.5200 0.2600 0.0260 0.0260 JUMLAH TENAGA KERJA

M.03009 M.08003 M.17002

M3 KG Liter

0.0400 0.3000 0.1000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

39,000.00 20,800.00 2,600.00 3,380.00 65,780.00

2,250,000.00 16,000.00 12,000.00

90,000.00 4,800.00 1,200.00 96,000.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 21

B

10%

161,780.00 16,178.00 177,958.00

xD

Pemasangan 1 m2 bekisting untuk sloof

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 4 cm - 7 cm Minyak Bekisting

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

A.4.1.1.21 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.5200 0.2600 0.0260 0.0260 JUMLAH TENAGA KERJA

M.03009 M.08003 M.17002

M3 KG Liter

0.0450 0.3000 0.1000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

39,000.00 20,800.00 2,600.00 3,380.00 65,780.00

2,250,000.00 16,000.00 12,000.00

101,250.00 4,800.00 1,200.00 107,250.00

JUMLAH PERALATAN

A

4.1.1

22

10%

173,030.00 17,303.00 190,333.00

xD

Pemasangan 1 m2 bekisting untuk kolom

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu

A.4.1.1.22 Kode

Satuan

L.001 L.009

OH OH

Koefisien

0.6600 0.3300

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00

49,500.00 26,400.00

Kepala Tukang Mandor B

C

BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

L.015 L.016

OH OH

0.0330 0.0330 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.03011 M.04030 M.03003

M3 KG Liter M3 LBR BATANG

0.0400 0.4000 0.2000 0.0150 0.3500 2.0000 JUMLAH BAHAN

100,000.00 130,000.00

3,300.00 4,290.00 83,490.00

2,250,000.00 15,000.00 12,000.00 2,150,000.00 134,500.00 30,000.00

90,000.00 6,000.00 2,400.00 32,250.00 47,075.00 60,000.00 237,725.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 22A

B

C

10%

321,215.00 32,121.50 353,336.50

xD

Pemasangan 1 m2 bekisting untuk kolom Non Struktur

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Plywood 4"x 8"x 9mm

A.4.1.1.22A

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.04030

M3 KG Liter LBR

0.0400 0.4000 0.2000 0.3500 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

49,500.00 26,400.00 3,300.00 4,290.00 83,490.00

2,250,000.00 15,000.00 12,000.00 134,500.00

90,000.00 6,000.00 2,400.00 47,075.00 145,475.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 23

B

C

10%

228,965.00 22,896.50 251,861.50

xD

Pemasangan 1 m2 bekisting untuk balok

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

A.4.1.1.23 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.03011 M.04030 M.03003

M3 KG Liter M3 LBR BATANG

0.0400 0.4000 0.2000 0.0180 0.3500 2.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

49,500.00 26,400.00 3,300.00 4,290.00 83,490.00

2,250,000.00 15,000.00 12,000.00 2,150,000.00 134,500.00 30,000.00

90,000.00 6,000.00 2,400.00 38,700.00 47,075.00 60,000.00 244,175.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

327,665.00 32,766.50 360,431.50

A

4.1.1

23A

Pemasangan 1 m2 bekisting untuk balok Non Struktur

No

A

B

C

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Plywood 4"x 8"x 9mm

A.4.1.1.23A

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.04030

M3 KG Liter LBR

0.0400 0.4000 0.2000 0.3500 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

49,500.00 26,400.00 3,300.00 4,290.00 83,490.00

2,250,000.00 15,000.00 12,000.00 134,500.00

90,000.00 6,000.00 2,400.00 47,075.00 145,475.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 24

B

C

10%

228,965.00 22,896.50 251,861.50

xD

Pemasangan 1 m2 bekisting untuk Lantai

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

A.4.1.1.24 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.03011 M.04030 M.03003

M3 KG Liter M3 LBR BATANG

0.0400 0.4000 0.2000 0.0150 0.3500 6.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

49,500.00 26,400.00 3,300.00 4,290.00 83,490.00

2,250,000.00 15,000.00 12,000.00 2,150,000.00 134,500.00 30,000.00

90,000.00 6,000.00 2,400.00 32,250.00 47,075.00 180,000.00 357,725.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 26

B

C

10%

441,215.00 44,121.50 485,336.50

xD

Pemasangan 1 m2 bekisting untuk Tangga

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

A.4.1.1.26 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.03011 M.04030 M.03003

M3 KG Liter M3 LBR BATANG

0.0300 0.4000 0.1500 0.0150 0.3500 2.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

49,500.00 26,400.00 3,300.00 4,290.00 83,490.00

2,250,000.00 15,000.00 12,000.00 2,150,000.00 134,500.00 30,000.00

67,500.00 6,000.00 1,800.00 32,250.00 47,075.00 60,000.00 214,625.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

298,115.00 29,811.50 327,926.50

A

4.1.1

28

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)

No

A

B

C

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3

A.4.1.1.28

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.3000 0.2750 1.3000 1.0500 0.2650 0.2560 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029

M3 KG Liter KG KG KG M3 M3

0.2000 1.5000 0.4000 157.5000 2.2500 326.0000 0.5400 0.8100 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

397,500.00 22,000.00 104,000.00 84,000.00 26,500.00 33,280.00 667,280.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00

450,000.00 22,500.00 4,800.00 1,575,000.00 33,750.00 391,200.00 75,600.00 105,705.00 2,658,555.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 28a

B

C

10%

3,325,835.00 332,583.50 3,658,418.50

xD

Membuat 1 m3 pondasi beton bertulang (132 kg besi + bekisting) K225 Ready mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Adukan Ready Mix K-225

A.4.1.1.28a

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.3000 0.2750 1.3000 1.0500 0.2650 0.2650 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01016

M3 KG Liter KG KG M3

0.2000 1.5000 0.4000 132.3636 2.2500 1.0500 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

397,500.00 22,000.00 104,000.00 84,000.00 26,500.00 34,450.00 668,450.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 850,000.00

450,000.00 22,500.00 4,800.00 1,323,636.00 33,750.00 892,500.00 2,727,186.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 29

B

C

10%

3,395,636.00 339,563.60 3,735,199.60

xD

Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3

A.4.1.1.29

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.6500 0.2750 1.5600 1.4000 0.3230 0.2830 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029

M3 KG Liter KG KG KG M3 M3

0.2700 2.0000 0.6000 210.0000 3.0000 336.0000 0.5400 0.8100 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

423,750.00 22,000.00 124,800.00 112,000.00 32,300.00 36,790.00 751,640.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00

607,500.00 30,000.00 7,200.00 2,100,000.00 45,000.00 403,200.00 75,600.00 105,705.00 3,374,205.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

4,125,845.00 412,584.50 4,538,429.50

A

4.1.1

29a

Membuat 1 m3 sloof beton bertulang (201 kg besi + bekisting) 15/20 K225 Ready mix

No

A

B

C

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Adukan Ready Mix K-225

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.6500 0.2750 1.5600 1.4000 0.3230 0.2830 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01016

M3 KG Liter KG KG M3

0.2700 2.0000 0.6000 200.5500 3.0000 1.0500 JUMLAH BAHAN

A.4.1.1.29a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

423,750.00 22,000.00 124,800.00 112,000.00 32,300.00 36,790.00 751,640.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 850,000.00

607,500.00 30,000.00 7,200.00 2,005,500.00 45,000.00 892,500.00 3,587,700.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 30

B

10%

4,339,340.00 433,934.00 4,773,274.00

xD

Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting)

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

A.4.1.1.30

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

7.0500 0.2750 1.6500 2.1000 0.4030 0.3530 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029 M.03011 M.04030 M.03003

M3 KG Liter KG KG KG M3 M3 M3 LBR BATANG

0.4000 4.0000 2.0000 210.0000 4.5000 336.0000 0.5400 0.8100 0.1500 3.5000 20.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

528,750.00 22,000.00 132,000.00 168,000.00 40,300.00 45,890.00 936,940.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00 2,150,000.00 134,500.00 30,000.00

900,000.00 60,000.00 24,000.00 2,100,000.00 67,500.00 403,200.00 75,600.00 105,705.00 322,500.00 470,750.00 600,000.00 5,129,255.00

JUMLAH PERALATAN

A

4.1.1

30a

B

C

10%

6,066,195.00 606,619.50 6,672,814.50

xD

Membuat 1 m3 kolom beton bertulang (196 kg besi + bekisting) 30/30 K225 Ready mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Adukan Ready Mix K-225 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

7.0750 0.2750 1.6500 2.1000 0.4030 0.3530 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01016 M.03011 M.04030 M.03003

M3 KG Liter KG KG M3 M3 LBR BATANG

0.4000 4.0000 2.0000 196.2333 4.5000 1.0500 0.1500 3.5000 20.0000 JUMLAH BAHAN

A.4.1.1.30a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

530,625.00 22,000.00 132,000.00 168,000.00 40,300.00 45,890.00 938,815.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 850,000.00 2,150,000.00 134,500.00 30,000.00

900,000.00 60,000.00 24,000.00 1,962,333.30 67,500.00 892,500.00 322,500.00 470,750.00 600,000.00 5,299,583.30

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1 No

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 30b

10%

10%

6,238,398.30 623,839.83 6,862,238.13

xD

Membuat 1 m3 kolom beton bertulang (198 kg besi + bekisting) 25/25 K225 Ready mix Uraian

Kode

Satuan

Koefisien

A.4.1.1.30b Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

A

B

C

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Adukan Ready Mix K-225 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

7.0500 0.2750 1.6500 2.1000 0.4030 0.3530 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01016 M.03011 M.04030 M.03003

M3 KG Liter KG KG M3 M3 LBR BATANG

0.4000 4.0000 2.0000 198.1056 4.5000 1.0500 0.1500 3.5000 20.0000 JUMLAH BAHAN

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

528,750.00 22,000.00 132,000.00 168,000.00 40,300.00 45,890.00 936,940.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 850,000.00 2,150,000.00 134,500.00 30,000.00

900,000.00 60,000.00 24,000.00 1,981,056.00 67,500.00 892,500.00 322,500.00 470,750.00 600,000.00 5,318,306.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 31

B

C

10%

6,255,246.00 625,524.60 6,880,770.60

xD

Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

A.4.1.1.31

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

6.3500 0.2750 1.6500 1.4000 0.3330 0.3180 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029 M.03011 M.04030 M.03003

M3 KG Liter KG KG KG M3 M3 M3 LBR BATANG

0.3200 3.2000 1.6000 210.0000 3.0000 336.0000 0.5400 0.8100 0.1400 2.8000 16.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

476,250.00 22,000.00 132,000.00 112,000.00 33,300.00 41,340.00 816,890.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00 2,150,000.00 134,500.00 30,000.00

720,000.00 48,000.00 19,200.00 2,100,000.00 45,000.00 403,200.00 75,600.00 105,705.00 301,000.00 376,600.00 480,000.00 4,674,305.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 31a

B

C

10%

5,491,195.00 549,119.50 6,040,314.50

xD

Membuat 1 m3 balok beton bertulang (205 kg besi + bekisting)) 20/40 K225 Ready mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Adukan Ready Mix K-225 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

A.4.1.1.31a

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

6.3500 0.2750 1.6500 1.4000 0.3330 0.3180 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01016 M.03011 M.04030 M.03003

M3 KG Liter KG KG M3 M3 LBR BATANG

0.3200 3.2000 1.6000 204.7500 3.0000 1.0500 0.1400 2.8000 16.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

476,250.00 22,000.00 132,000.00 112,000.00 33,300.00 41,340.00 816,890.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 850,000.00 2,150,000.00 134,500.00 30,000.00

720,000.00 48,000.00 19,200.00 2,047,500.00 45,000.00 892,500.00 301,000.00 376,600.00 480,000.00 4,929,800.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 31b

10%

5,746,690.00 574,669.00 6,321,359.00

xD

Membuat 1 m3 balok beton bertulang (255 kg besi + bekisting)) 10/20 Site mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton

Kode

Satuan

L.001 L.003 L.009 L.004

OH OH OH OH

A.4.1.1.31b Koefisien

6.3500 0.2750 1.6500 1.4000

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00

476,250.00 22,000.00 132,000.00 112,000.00

Kepala Tukang Mandor B

C

BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

L.015 L.016

OH OH

0.3330 0.3180 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029 M.03011 M.04030 M.03003

M3 KG Liter KG KG KG M3 M3 M3 LBR BATANG

0.3200 3.2000 1.6000 255.2550 3.0000 336.0000 0.5400 0.8100 0.1400 2.8000 16.0000 JUMLAH BAHAN

100,000.00 130,000.00

33,300.00 41,340.00 816,890.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00 2,150,000.00 134,500.00 30,000.00

720,000.00 48,000.00 19,200.00 2,552,550.00 45,000.00 403,200.00 75,600.00 105,705.00 301,000.00 376,600.00 480,000.00 5,126,855.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 31c

B

C

10%

5,943,745.00 594,374.50 6,538,119.50

xD

Membuat 1 m3 balok beton bertulang (218 kg besi + bekisting)) 12/20 luifel Site mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.6500 0.2750 1.5600 1.4000 0.3230 0.2830 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029

M3 KG Liter KG KG KG M3 M3

0.2700 2.0000 0.6000 218.4008 3.0000 336.0000 0.5400 0.8100 JUMLAH BAHAN

A.4.1.1.31c Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

423,750.00 22,000.00 124,800.00 112,000.00 32,300.00 36,790.00 751,640.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00

607,500.00 30,000.00 7,200.00 2,184,008.00 45,000.00 403,200.00 75,600.00 105,705.00 3,458,213.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 31d

B

C

10%

4,209,853.00 420,985.30 4,630,838.30

xD

Membuat 1 m3 balok beton bertulang (154 kg besi + bekisting)) 20/30 K225 Ready Mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Adukan Ready Mix K-225 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

6.3500 0.2750 1.6500 1.4000 0.3330 0.3180 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01053 M.03011 M.04030 M.03003

M3 KG Liter KG KG M3 M3 LBR BATANG

0.3200 3.2000 1.6000 154.2100 3.0000 1.0500 0.1400 2.8000 16.0000 JUMLAH BAHAN

A.4.1.1.31d Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

476,250.00 22,000.00 132,000.00 112,000.00 33,300.00 41,340.00 816,890.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 850,000.00 2,150,000.00 134,500.00 30,000.00

720,000.00 48,000.00 19,200.00 1,542,100.00 45,000.00 892,500.00 301,000.00 376,600.00 480,000.00 4,424,400.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 32

10%

5,241,290.00 524,129.00 5,765,419.00

xD

Membuat 1 m3 Plat beton bertulang (150 kg besi + bekisting)

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor

A.4.1.1.32

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.3000 0.2750 1.3000 1.0500 0.2650 0.2650 JUMLAH TENAGA KERJA

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

397,500.00 22,000.00 104,000.00 84,000.00 26,500.00 34,450.00 668,450.00

B

C

BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029 M.03011 M.04030 M.03003

M3 KG Liter KG KG KG M3 M3 M3 LBR BATANG

0.3200 3.2000 1.6000 157.5000 22.2500 336.0000 0.5400 0.8100 0.1200 2.8000 32.0000 JUMLAH BAHAN

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00 2,150,000.00 134,500.00 30,000.00

720,000.00 48,000.00 19,200.00 1,575,000.00 333,750.00 403,200.00 75,600.00 105,705.00 258,000.00 376,600.00 960,000.00 4,875,055.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

B

C

10%

5,543,505.00 554,350.50 6,097,855.50

xD

32a Membuat 1 m3 Plat beton bertulang (175 kg besi + bekisting) t=12 K225 Ready mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Adukan Ready Mix K-225 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10

A.4.1.1.32a

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.3000 0.2750 1.3000 1.0500 0.2650 0.2650 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01016 M.03011 M.04030 M.03003

M3 KG Liter KG KG M3 M3 LBR BATANG

0.3200 3.2000 1.6000 175.0000 22.2500 1.0500 0.1200 2.8000 32.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

397,500.00 22,000.00 104,000.00 84,000.00 26,500.00 34,450.00 668,450.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 850,000.00 2,150,000.00 134,500.00 30,000.00

720,000.00 48,000.00 19,200.00 1,750,000.00 333,750.00 892,500.00 258,000.00 376,600.00 960,000.00 5,358,050.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 1m2

B

10%

6,026,500.00 602,650.00 6,629,150.00

xD

Pasang Plat Bondek t = 1 mm

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Plat Bondek t = 1 mm

..1m2 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0800 0.3000 0.3000 0.0030 JUMLAH TENAGA KERJA

M.06008

M2

1.0000

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

6,000.00 24,000.00 30,000.00 390.00 60,390.00

104,000.00

104,000.00

JUMLAH BAHAN C

D E F A

4.1.1

PERALATAN alat bantu skafolding

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 32b

B

10%

ls

10%

0.1000 JUMLAH PERALATAN

55,000.00

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm

5,500.00 5,500.00 169,890.00 16,989.00 186,879.00

xD

Membuat 1 m3 Plat beton bertulang (120 kg besi + bekisting) t=7,5 Site mix

No

A

M.17032

104,000.00

A.4.1.1.32b

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

5.3000 0.2750 1.3000 1.0500 0.2650 0.2650 JUMLAH TENAGA KERJA

M.03009 M.08004

M3 KG

0.3200 3.2000

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

397,500.00 22,000.00 104,000.00 84,000.00 26,500.00 34,450.00 668,450.00

2,250,000.00 15,000.00

720,000.00 48,000.00

Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3 Kayu Balok kelas II kamper medan Plywood 4"x 8"x 9mm Dolken 7-10 C

M.17002 M.06003 M.06005 M.01042 M.01032 M.01029 M.03011 M.04030 M.03003

Liter KG KG KG M3 M3 M3 LBR BATANG

1.6000 120.0000 22.2500 336.0000 0.5400 0.8100 0.1200 2.8000 32.0000 JUMLAH BAHAN

12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00 2,150,000.00 134,500.00 30,000.00

19,200.00 1,200,000.00 333,750.00 403,200.00 75,600.00 105,705.00 258,000.00 376,600.00 960,000.00 4,500,055.00

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 35

B

C

10%

5,168,505.00 516,850.50 5,685,355.50

xD

Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm site mix

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Tukang Kayu Tukang Besi Beton Kepala Tukang Mandor BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Besi Beton rata-rata U-24, U-32 Kawat Beton Semen Portland (Tiga Roda/Holcim) Pasir Beton Batu pecah mesin 2/3

A.4.1.1.35

Kode

Satuan

Koefisien

L.001 L.003 L.009 L.004 L.015 L.016

OH OH OH OH OH OH

0.1800 0.0200 0.0200 0.0200 0.0600 0.0090 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.06003 M.06005 M.01042 M.01032 M.01029

M3 KG Liter KG KG KG M3 M3

0.0020 0.0100 3.0000 0.4500 4.0000 0.0060 0.0090 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

13,500.00 1,600.00 1,600.00 1,600.00 6,000.00 1,170.00 25,470.00

2,250,000.00 15,000.00 12,000.00 10,000.00 15,000.00 1,200.00 140,000.00 130,500.00

4,500.00 150.00 30,000.00 6,750.00 4,800.00 840.00 1,174.50 48,214.50

PERALATAN JUMLAH PERALATAN

D E F A

4.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 37

B

C

10%

73,684.50 7,368.45 81,052.95

xD

Pemasangan 1 m2 bekisting dengan papan

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor Pekerja (bongkar cetakan) BAHAN Kayu Perancah / Bekisting Paku 8 cm - 12 cm Minyak Bekisting Kayu Balok kelas II kamper medan

A.4.1.1.37 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016 L.001

OH OH OH OH OH

0.3000 0.1500 0.1500 0.0500 0.1500 JUMLAH TENAGA KERJA

M.03009 M.08004 M.17002 M.03011

M3 KG Liter M3

0.0240 0.3000 0.1000 0.0240 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00 75,000.00

22,500.00 12,000.00 15,000.00 6,500.00 11,250.00 67,250.00

2,250,000.00 15,000.00 12,000.00 2,150,000.00

54,000.00 4,500.00 1,200.00 51,600.00 111,300.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

178,550.00 17,855.00 196,405.00

A

4.1.1

38

Pemasangan 1 m2 bekisting dengan multiplek 9 mm

No

A

B

C

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor Pekerja (bongkar cetakan) BAHAN Plywood 4"x 8"x 9mm Paku 8 cm - 12 cm Minyak Bekisting Kayu Balok kelas II kamper medan

A.4.1.1.38

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016 L.001

OH OH OH OH OH

0.1200 0.1500 0.1500 0.0500 0.1200 JUMLAH TENAGA KERJA

M.04030 M.08004 M.17002 M.03011

LBR KG Liter M3

0.3470 0.4000 0.1000 0.0170 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00 75,000.00

9,000.00 12,000.00 15,000.00 6,500.00 9,000.00 51,500.00

134,500.00 15,000.00 12,000.00 2,150,000.00

46,671.50 6,000.00 1,200.00 36,550.00 90,421.50

PERALATAN JUMLAH PERALATAN

D E F A

4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 1

B

C

10%

141,921.50 14,192.15 156,113.65

xD

Pemasangan 1 kg Besi Profil

No

A

10%

Uraian

A.4.2.1.1 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

TENAGA Pekerja Tukang Konstruksi Kepala Tukang Mandor

L.001 L.013 L.015 L.016

OH OH OH OH

0.0600 0.0600 0.0060 0.0030 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

4,500.00 4,800.00 600.00 390.00 10,290.00

BAHAN Besi Siku L.50.50.5

M.06011

Kg

1.1000 JUMLAH BAHAN

10,000.00

11,000.00 11,000.00

PERALATAN JUMLAH PERALATAN

D E F A

4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 11

B

C

10%

21,290.00 2,129.00 23,419.00

xD

Pemasangan 1 m kusen alluminium

No

A

10%

Uraian

A.4.2.1.11 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

TENAGA Pekerja Tukang Konstruksi Kepala Tukang Mandor

L.001 L.013 L.015 L.016

OH OH OH OH

0.0430 0.0430 0.0043 0.0021 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

3,225.00 3,440.00 430.00 273.00 7,368.00

BAHAN Profil Alumunium Skrup Fixer Silent

M.07014 M.08017 M.10027

BTG BTG BTG

1.1000 2.0000 0.0600 JUMLAH BAHAN

155,000.00 35,000.00 75,000.00

170,500.00 70,000.00 4,500.00 245,000.00

PERALATAN JUMLAH PERALATAN

D E F A

4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 11a

B

C

10%

252,368.00 25,236.80 277,604.80

xD

Pemasangan 1 m2 Daun Pintu Rangka Alumunium

No

A

10%

Uraian

TENAGA Pekerja Tukang Konstruksi Kepala Tukang Mandor BAHAN Daun Pintu Rangka Alumunium Profil Kaca Silent

A.4.2.1.11a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.013 L.015 L.016

OH OH OH OH

0.4300 0.4300 0.0210 0.0210 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

32,250.00 34,400.00 2,100.00 2,730.00 71,480.00

M.07014 M.08017 M.10027

M' BTG BTG

1.1000 1.1000 0.0600 JUMLAH BAHAN

155,000.00 35,000.00 75,000.00

170,500.00 38,500.00 4,500.00 213,500.00

PERALATAN JUMLAH PERALATAN

D E F 4.2.1 No

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 11b

10%

10%

284,980.00 28,498.00 313,478.00

xD

Pemasangan 1 m2 Daun Jendela Rangka Alumunium Uraian

Kode

.4.2.1.11b Satuan

Koefisien

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

A

B

C

TENAGA Pekerja Tukang Konstruksi Kepala Tukang Mandor BAHAN Daun Jendela Profil Kaca Engsel Chasement Grendel Sekrup Fixer Silent

L.001 L.013 L.015 L.016

OH OH OH OH

0.4300 0.4300 0.0210 0.0210 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

32,250.00 34,400.00 2,100.00 2,730.00 71,480.00

M.07014 M.08017

M' BTG

M.10027

BTG

1.1000 1.1000 2.0000 2.0000 2.0000 0.0600 JUMLAH BAHAN

155,000.00 35,000.00 88,000.00 19,000.00 200.00 75,000.00

170,500.00 38,500.00 176,000.00 38,000.00 400.00 4,500.00 427,900.00

PERALATAN JUMLAH PERALATAN

D E F 4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 11c

B

C

10%

499,380.00 49,938.00 549,318.00

xD

Pemasangan 1 Bh Engsel Pintu

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

.4.2.1.11c Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0150 0.1500 0.0150 0.0008 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

1,125.00 12,000.00 1,500.00 104.00 14,729.00

Bh

1.0000 JUMLAH BAHAN

60,000.00

60,000.00 60,000.00

BAHAN Engsel Pintu PERALATAN

JUMLAH PERALATAN D E F 4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 11d

B

C

10%

74,729.00 7,472.90 82,201.90

xD

Pemasangan 1 Bh Engsel Jendela Casment

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.1000 0.2000 0.0200 0.0005 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

7,500.00 16,000.00 2,000.00 65.00 25,565.00

bh

1.0000 JUMLAH BAHAN

88,000.00

88,000.00 88,000.00

BAHAN Engsel Casment PERALATAN

JUMLAH PERALATAN D E F 4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 11d

B

C

10%

113,565.00 11,356.50 124,921.50

xD

Pasang Grendel jendela

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.1000 0.2000 0.0200 0.0005 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

7,500.00 16,000.00 2,000.00 65.00 25,565.00

bh

1.0000 JUMLAH BAHAN

19,000.00

19,000.00 19,000.00

BAHAN Grendel PERALATAN

JUMLAH PERALATAN D E F A

4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 10

10%

44,565.00 4,456.50 49,021.50

xD

Pemasangan 1 Bh Door Closer

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu

A.4.2.1a.10 Kode

Satuan

L.001 L.009

OH OH

Koefisien

0.0150 0.1500

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00

1,125.00 12,000.00

Kepala Tukang Mandor B

C

L.015 L.016

OH OH

0.0150 0.0008 JUMLAH TENAGA KERJA

100,000.00 130,000.00

1,500.00 104.00 14,729.00

bh

1.0000 JUMLAH BAHAN

105,000.00

105,000.00 105,000.00

BAHAN Door Closer kelas standar Dekson/Dorma PERALATAN

JUMLAH PERALATAN D E F 4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 17

B

C

10%

119,729.00 11,972.90 131,701.90

xD

Pemasangan 1 Bh Kait Angin

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0150 0.1500 0.0150 0.0008 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

1,125.00 12,000.00 1,500.00 104.00 14,729.00

bh

1.0000 JUMLAH BAHAN

23,000.00

23,000.00 23,000.00

BAHAN Kait Angin PERALATAN

JUMLAH PERALATAN D E F A

4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 18

B

C

10%

37,729.00 3,772.90 41,501.90

xD

Pemasangan 1 M2 Kaca Polos 5 mm

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

A.4.2.1a.18 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0150 0.1500 0.0150 0.0008 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

1,125.00 12,000.00 1,500.00 104.00 14,729.00

m2 m'

1.1000 0.0500 JUMLAH BAHAN

140,000.00 5,000.00

154,000.00 250.00 154,250.00

BAHAN Kaca Polos 8 mm ex. Asahimas Silent PERALATAN

JUMLAH PERALATAN D E F A

4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 20

10%

Uraian

A.4.2.1a.20 Kode

Satuan

Koefisien

ls

1.0000 JUMLAH TENAGA KERJA

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

TENAGA Ongkos Pasang 10 %

B

168,979.00 16,897.90 185,876.90

xD

Pemasangan 1 M2 Stiker Kaca Motip Sandblast

No

A

10%

BAHAN Stiker Sandblast Motip

M.04043

m2

1.0000

8,000.00

8,000.00 8,000.00

80,000.00

80,000.00

JUMLAH BAHAN C

80,000.00

PERALATAN JUMLAH PERALATAN

D E F A

4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 21

88,000.00 8,800.00 96,800.00

xD

Uraian

A.4.2.1a.21 Kode

Satuan

Koefisien

ls

1.0000 JUMLAH TENAGA KERJA

BAHAN Pintu WPC

M.10006

Bh

1.0000 JUMLAH BAHAN

C

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

TENAGA Ongkos Pasang 10 %

B

10%

Pemasangan 1 BH Pintu WPC

No

A

10%

PERALATAN

43,500.00

43,500.00 43,500.00

435,000.00

435,000.00 435,000.00

JUMLAH PERALATAN D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

478,500.00 47,850.00 526,350.00

A

4.2.1a

22

Pemasangan 1 BH Pintu WPC Sleding

No

A

Uraian

A.4.2.1a.22 Kode

Satuan

Koefisien

ls

1.0000 JUMLAH TENAGA KERJA

C

Jumlah Harga

(Rp.)

(Rp.)

TENAGA Ongkos Pasang 10 %

B

Harga Satuan

BAHAN Daun Pintu Rel Pintu Sleding + Aksesoris

M.07019 M.07021

m2 Bh

1.6800 1.0000 JUMLAH BAHAN

37,600.00

37,600.00 -

75,000.00 250,000.00

126,000.00 250,000.00 376,000.00

PERALATAN JUMLAH PERALATAN

D E F 4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

B

C

10%

413,600.00 41,360.00 454,960.00

xD

Pembuatan dan Pemasangan 1 M2 Daun Pintu Double Multiplek Rangka Kayu Kelas II

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Papan Kelas II Paku 5 - 16 cm Lem Kayu Multiplek 4 mm

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.7000 2.1000 0.2100 0.0350 JUMLAH TENAGA KERJA

M.03013 M.08004 M.09173 M.04022

m3 kg kg lembar

0.0250 0.0300 0.5000 1.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

52,500.00 168,000.00 21,000.00 4,550.00 246,050.00

2,400,000.00 15,000.00 25,000.00 120,000.00

60,000.00 450.00 12,500.00 120,000.00 192,950.00

PERALATAN JUMLAH PERALATAN

D E F A

4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

B

C

10%

192,950.00 19,295.00 212,245.00

xD

Pembuatan dan Pemasangan 1 M2 Daun Pintu Double Multiplek Lapis HPL Rangka Kayu Kelas II

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu Papan Kelas II Paku 5 - 16 cm Lem Kayu HPL Multiplek 4 mm

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.8500 2.5500 0.2550 0.0430 JUMLAH TENAGA KERJA

M.03013 M.08004 M.09173 M.04018 M.04022

m3 kg kg lembar lembar

0.0250 0.0300 0.8000 1.0000 1.0000 JUMLAH BAHAN

A.4.2.1a. Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

63,750.00 204,000.00 25,500.00 5,590.00 298,840.00

2,400,000.00 15,000.00 25,000.00 99,000.00 120,000.00

60,000.00 450.00 20,000.00 99,000.00 120,000.00 299,450.00

PERALATAN JUMLAH PERALATAN

D E F A

4.2.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 14

B

C

10%

598,290.00 59,829.00 658,119.00

xD

Pemasangan engsel pintu

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

A.4.2.1a.14 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0300 0.3000 0.0300 0.0060 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

2,250.00 24,000.00 3,000.00 780.00 30,030.00

set

1.0000 JUMLAH BAHAN

130,000.00

130,000.00 130,000.00

BAHAN Engsel Pintu Setara Dekson PERALATAN

JUMLAH PERALATAN D E F A

4.2.1a No

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 15

10%

10%

160,030.00 16,003.00 176,033.00

xD

Pemasangan 1 buah kunci tanam 2 Slaag Uraian

A.4.2.1a.15 Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

A

B

C

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kunci Pintu 2 Slaag Setara beluci

L.001 L.009 L.015 L.016

OH OH OH OH

0.0100 0.5000 0.0500 0.0050 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

750.00 40,000.00 5,000.00 650.00 46,400.00

M.11045

set

1.0000 JUMLAH BAHAN

165,000.00

165,000.00 165,000.00

PERALATAN JUMLAH PERALATAN

A

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

2

G.04

B

C

10%

211,400.00 21,140.00 232,540.00

xD

Memasang 1 kg rangka atap baja

No

A

10%

Uraian

TENAGA Pekerja Tukang Konstruksi Kepala Tukang Mandor BAHAN Besi profil Ex DN SII Meni besi

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.013 L.015 L.016

OH OH OH OH

0.0600 0.0600 0.0060 0.0300 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

4,500.00 4,800.00 600.00 3,900.00 13,800.00

M.06017 M.02046

KG KG

1.1000 0.0800 JUMLAH BAHAN

11,500.00 50,000.00

12,650.00 4,000.00 16,650.00

PERALATAN JUMLAH PERALATAN

A

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

2

G.05

B

10%

30,450.00 3,045.00 33,495.00

xD

Memasang 1 kg besi profil + Meni Besi

No

A

10%

-

Uraian

TENAGA Pekerja Tukang Konstruksi Kepala Tukang Mandor BAHAN Besi profil Ex DN SII Meni besi

Kode

Satuan

Koefisien

L.001 L.013 L.015 L.016

OH OH OH OH

0.0600 0.0600 0.0060 0.0030 JUMLAH TENAGA KERJA

M.06017 M.02024

KG KG

1.1500 0.0800

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

4,500.00 4,800.00 600.00 390.00 10,290.00

11,500.00 30,000.00

13,225.00 2,400.00

JUMLAH BAHAN C

15,625.00

PERALATAN Sewa Alat

-

JUMLAH PERALATAN

A

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

2

G.06

B

C

10%

10,290.00 1,029.00 11,319.00

xD

Mengerjakan 100 kg pekerjaan perakitan

No

A

10%

Uraian

TENAGA Pekerja Tukang Konstruksi Kepala Tukang Mandor BAHAN Solar Minyak pelumas

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.013 L.015 L.016

OH OH OH OH

0.0600 0.0600 0.0060 0.0030 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

4,500.00 4,800.00 600.00 390.00 10,290.00

M.02048 M.02047

LTR LTR

1.0000 0.1000 JUMLAH BAHAN

8,500.00 15,000.00

8,500.00 1,500.00 10,000.00

PERALATAN Sewa Alat

-

JUMLAH PERALATAN D E F A

4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 22

10%

20,290.00 2,029.00 22,319.00

xD

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding

No

A

10%

Uraian

TENAGA Pekerja Tukang Besi Beton Kepala Tukang

Kode

Satuan

L.001 L.004 L.015

OH OH OH

A.4.2.1.22 Koefisien

0.6600 0.3300 0.0330

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00

49,500.00 26,400.00 3,300.00

Mandor B

BAHAN Besi Hollow 40x40 Galvanize Assesoris(perkuatan, las dll)

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

L.016

OH

0.0330 JUMLAH TENAGA KERJA

130,000.00

4,290.00 83,490.00

M.17005 -

BTG Ls

0.8750 1.0000 JUMLAH BAHAN

85,000.00 22,312.50

74,375.00 22,312.50 96,687.50

JUMLAH PERALATAN

A

4.2.1

23

B

10%

180,177.50 18,017.75 198,195.25

xD

Pemasangan 1 m2 rangka Teralis besi hollow 1x40.40.2mm

No

A

10%

Uraian

TENAGA Pekerja Tukang Besi Beton Kepala Tukang Mandor BAHAN Besi Hollow 40x40 Galvanize Besi Hollow 40x20x2x6 m Pengelasan

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

A.4.2.1.23 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.004 L.015 L.016

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

49,500.00 26,400.00 3,300.00 4,290.00 83,490.00

M.06006 M.06007 A.4.2.1.21a

BTG BTG cm

0.7613 0.8733 26.4106 JUMLAH BAHAN

85,000.00 85,000.00 3,000.00

64,710.50 74,230.50 79,231.80 218,172.80

JUMLAH PERALATAN

A

4.2.1

25

B

C

10%

301,662.80 30,166.28 331,829.08

xD

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon

No

A

10%

Uraian

TENAGA Pekerja Tukang Besi Beton Kepala Tukang Mandor BAHAN Besi Hollow 40x40x2x6 m Besi Hollow 40x20x2x6 m Sekrup Fixer

A.4.2.1.25 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.004 L.015 L.016

OH OH OH OH

0.1500 0.1000 0.0250 0.0250 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

11,250.00 8,000.00 2,500.00 3,250.00 25,000.00

M.64.a M.64.b M.08019

BTG BTG BUAH

0.5000 0.5000 15.0000 JUMLAH BAHAN

85,000.00 85,000.00 200.00

42,500.00 42,500.00 3,000.00 88,000.00

PERALATAN JUMLAH PERALATAN

D E F A

4.2.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 26

B

C

D E F

10%

113,000.00 11,300.00 124,300.00

xD

Pemasangan 1 m2 Konstruksi Kuda-Kuda Baja Ringan

No

A

10%

Uraian

TENAGA Pekerja Tukang Besi Beton Kepala Tukang Mandor BAHAN Mobilisasi Main truss c-80 -75 Roof Bottom/Reng R 33-0.45 Self Drilling Screw dia-6 x 20 mm ( Truss Screw) Self Drilling Screw dia-4 x 16 mm ( Roof Batten Scre Dynabol dia- 12 x 120 mm

A.4.2.1.26 Jumlah Harga

(Rp.)

(Rp.)

Satuan

Koefisien

L.001 L.004 L.015 L.016

OH OH OH OH

0.2470 0.1760 0.1170 0.0100 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

18,525.00 14,080.00 11,700.00 1,300.00 45,605.00

M.06020 M.06021 M.08019 M.08020 M.08021

ls m' m' bh bh bh

1.0000 2.8000 5.1000 25.0000 35.0000 1.0000 JUMLAH BAHAN

50,000.00 15,000.00 8,750.00 200.00 200.00 2,000.00

50,000.00 42,000.00 44,625.00 5,000.00 7,000.00 2,000.00 150,625.00

ls ls

1.0000 1.0000 JUMLAH PERALATAN

50,000.00 15,062.50

50,000.00 15,062.50 65,062.50

PERALATAN Alat Bantu ( Mesin Bor Listril) /Genset Gambar Desain Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

Harga Satuan

Kode

10%

10%

xD

261,292.50 26,129.25 287,421.75

A

4.5.2

33

Pemasangan 1m2 Genteng Bitumen

No

A

B

C

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Atap Anduvilla (106x40x3) Paku genteng metal

A.4.5.2.33 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.2000 0.1000 0.0100 0.0010 JUMLAH TENAGA KERJA

M.11018 M.08022

LEMBAR BH

3.3280 16.1900 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

15,000.00 8,000.00 1,000.00 130.00 24,130.00

55,000.00 200.00

183,040.00 3,238.00 186,278.00

PERALATAN JUMLAH PERALATAN

D E F A

4.5.2

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 37

B

C

10%

210,408.00 21,040.80 231,448.80

xD

Pemasangan 1 m1 nok Bitumen

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Nok / Ridge Onduline Paku genteng metal

A.4.5.2.37 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0840 0.1250 0.0130 0.0040 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

6,300.00 10,000.00 1,300.00 520.00 18,120.00

M.11040 M.08022

Lembar Bh

1.2500 10.0000 JUMLAH BAHAN

60,000.00 200.00

75,000.00 2,000.00 77,000.00

PERALATAN JUMLAH PERALATAN

D E F A

4.4.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 10

B

10%

95,120.00 9,512.00 104,632.00

xD

Pemasangan dinding bata merah 1/2 batu camp. 1PC:5PP

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Bata Merah Semen Portland (Tiga Roda/Holcim) Pasir Pasang

A.4.4.1.10

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.3000 0.1000 0.0100 0.0150 JUMLAH TENAGA KERJA

M.01004 M.01042 M.01033

BUAH KG M3

70.0000 9.6800 0.0450

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

22,500.00 8,000.00 1,000.00 1,950.00 33,450.00

450.00 1,200.00 140,000.00

31,500.00 11,616.00 6,300.00

JUMLAH BAHAN C

49,416.00

PERALATAN JUMLAH PERALATAN

D E F A

4.4.2

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 5

B

10%

82,866.00 8,286.60 91,152.60

xD

Pemasangan plesteran 1PC:5PP tebal 15 mm

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Semen Portland (Tiga Roda/Holcim) Pasir Pasang

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.3000 0.1500 0.0150 0.0150 JUMLAH TENAGA KERJA

M.01042 M.01033

KG M3

5.1840 0.0260

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

22,500.00 12,000.00 1,500.00 1,950.00 37,950.00

1,200.00 140,000.00

6,220.80 3,640.00

JUMLAH BAHAN C

9,860.80

PERALATAN JUMLAH PERALATAN

D E F A

4.4.2 No

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 27

10%

10%

47,810.80 4,781.08 52,591.88

xD

Pemasangan acian Uraian

Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

A

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

B

C

BAHAN Semen Portland (Tiga Roda/Holcim)

L.001 L.003 L.015 L.016

OH OH OH OH

0.2000 0.1000 0.0100 0.0100 JUMLAH TENAGA KERJA

M.01042

KG

3.2500 JUMLAH BAHAN

75,000.00 80,000.00 100,000.00 130,000.00

15,000.00 8,000.00 1,000.00 1,300.00 25,300.00

1,200.00

3,900.00 3,900.00

PERALATAN JUMLAH PERALATAN

D E F A

4.4.2

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 26

B

C

10%

29,200.00 2,920.00 32,120.00

xD

Pemasangan dinding Hebel 100 x 200 x 600

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Bata Ringan 100 x 200 x 600 mm Semen Instan Mortar

A.4.4.2.26 Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.320 0.100 0.010 0.015 JUMLAH TENAGA KERJA

M.01055 M.01056

BUAH Kg

8.4000 0.0630 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

24,000.00 8,000.00 1,000.00 1,950.00 34,950.00

5,800.00 3,750.00

48,720.00 236.25 48,956.25

PERALATAN JUMLAH PERALATAN

D E F A

4.4.2

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 27

B

10%

83,906.25 8,390.63 92,296.88

xD

Pemasangan plesteran Hebel dengan Mortar t = 10 mm Setara MU 301

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Plesteran Mortar Setara MU 301

A.4.4.2.27

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.200 0.150 0.015 0.010 JUMLAH TENAGA KERJA

M.01057

KG

19.05

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

15,000.00 12,000.00 1,500.00 1,300.00 29,800.00

1,437.50

27,384.38

JUMLAH BAHAN C

27,384.38

PERALATAN JUMLAH PERALATAN

D E F A

4.4.2

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 28

B

C

10%

57,184.38 5,718.44 62,902.81

xD

Pemasangan acian Dengan Mortar Setara MU - 200

No

A

10%

Uraian

TENAGA Tukang Batu Kepala Tukang BAHAN Mortar Untuk Acian Setara MU - 200

A.4.4.2.28

Kode

Satuan

Koefisien

L.003 L.015

OH OH

0.075 0.010 JUMLAH TENAGA KERJA

M.01058

KG

2.0000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

80,000.00 100,000.00

6,000.00 1,000.00 7,000.00

3,962.50

7,925.00 7,925.00

PERALATAN JUMLAH PERALATAN

D E F A

4.4.3

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 36

10%

14,925.00 1,492.50 16,417.50

xD

Pemasangan 1 m2 lantai keramik 25x25

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

A.4.4.3.36 Kode

Satuan

L.001 L.003 L.015 L.016

OH OH OH OH

Koefisien

0.7000 0.3500 0.0350 0.0350

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

52,500.00 28,000.00 3,500.00 4,550.00

JUMLAH TENAGA KERJA B

C

BAHAN Keramik 25 x 25Km/Wc Anti Slip DN Warna/Corak K Semen Portland (Tiga Roda/Holcim) Pasir Pasang Semen Warna

M.05015 M.01042 M.01033 M.01051

M2 KG M3 KG

1.0600 10.4000 0.0450 1.6200 JUMLAH BAHAN

88,550.00 25,000.00 1,200.00 140,000.00 3,500.00

26,500.00 12,480.00 6,300.00 5,670.00 50,950.00

PERALATAN JUMLAH PERALATAN

D E F A

4.4.3

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 36a

B

C

10%

139,500.00 13,950.00 153,450.00

xD

Pemasangan 1 m2 dinding keramik 25x40

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Keramik 25 x 40 DN Warna / Corak KW 1, Setara KI Semen Portland (Tiga Roda/Holcim) Pasir Pasang Semen Warna

A.4.4.3.36a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.900 0.450 0.045 0.045 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

67,500.00 36,000.00 4,500.00 5,850.00 113,850.00

M.05016 M.01042 M.01033 M.01051

M2 KG M3 KG

1.0600 10.4000 0.0180 1.9400 JUMLAH BAHAN

26,000.00 1,200.00 140,000.00 3,500.00

27,560.00 12,480.00 2,520.00 6,790.00 49,350.00

PERALATAN JUMLAH PERALATAN

D E F A

4.4.3

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 36b

B

C

10%

163,200.00 16,320.00 179,520.00

xD

Pemasangan 1 m2 lantai keramik 40x40

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Keramik 40 x 40 DN Warna/Corak KW I, Setara Rom Semen Portland (Tiga Roda/Holcim) Pasir Pasang Semen Warna

A.4.4.3.36b Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.7000 0.3500 0.0350 0.0350 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

52,500.00 28,000.00 3,500.00 4,550.00 88,550.00

M.05020 M.01042 M.01033 M.01051

M2 KG M3 KG

1.0600 10.4000 0.0450 1.6200 JUMLAH BAHAN

28,000.00 1,200.00 140,000.00 3,500.00

29,680.00 12,480.00 6,300.00 5,670.00 54,130.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

142,680.00 14,268.00 156,948.00

A

4.4.3

36c

Pemasangan 1 m2 lantai granite 60 x 60 cm

No

A

B

C

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Granite Homogeneous Tile uk. 60 x 60 Setara Granito Semen Portland (Tiga Roda/Holcim) Pasir Pasang Semen Warna

A.4.4.3.36c Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.7000 0.3500 0.0350 0.0350 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

52,500.00 28,000.00 3,500.00 4,550.00 88,550.00

M.05006 M.01042 M.01033 M.01051

M2 KG M3 KG

1.0600 10.4000 0.0450 1.6200 JUMLAH BAHAN

39,000.00 1,200.00 140,000.00 3,500.00

41,340.00 12,480.00 6,300.00 5,670.00 65,790.00

PERALATAN JUMLAH PERALATAN

D E F A

4.4.3

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 41a

B

C

10%

154,340.00 15,434.00 169,774.00

xD

Pemasangan 1 m’ Step Nozing

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Keramik Step Nozing granito tile Semen Portland (Tiga Roda/Holcim) Pasir Pasang Semen Warna

A.4.4.3.41a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0900 0.0900 0.0350 0.0350 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

6,750.00 7,200.00 3,500.00 4,550.00 22,000.00

M.05021 M.01042 M.01033 M.01051

M1 KG M3 KG

1.0600 0.5700 0.0015 0.0130 JUMLAH BAHAN

19,350.00 1,200.00 140,000.00 3,500.00

20,511.00 684.00 210.00 45.50 21,450.50

PERALATAN JUMLAH PERALATAN

D E F A

4.4.3

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 41b

B

C

10%

43,450.50 4,345.05 47,795.55

xD

Pemasangan 1 m2 Batu Alam

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Batu Tempel Semen Portland (Tiga Roda/Holcim) Pasir Pasang

A.4.4.3.41b Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.3500 0.1750 0.0175 0.0088 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

26,250.00 14,000.00 1,750.00 1,144.00 43,144.00

M.01062 M.01042 M.01033

m2 KG M3

1.0600 0.5700 0.0015 JUMLAH BAHAN

45,000.00 1,200.00 140,000.00

47,700.00 684.00 210.00 48,594.00

PERALATAN JUMLAH PERALATAN

D E F A

4.5.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 7

B

C

10%

91,738.00 9,173.80 100,911.80

xD

Pemasangan 1 m2 langit-langit gypsum board ukuran(120x240x9) mm, tebal 9 mm

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Gypsum 9 mm 120 x 240 ex DN Paku Sekrup

A.4.5.1.7 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.1000 0.0500 0.0050 0.0050 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

7,500.00 4,000.00 500.00 650.00 12,650.00

M.04005 M.08005

LBR KG

0.3640 0.1100 JUMLAH BAHAN

75,000.00 17,000.00

27,300.00 1,870.00 29,170.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

41,820.00 4,182.00 46,002.00

A

4.5.1

9a

Pemasangan 1 m' List Langit-langit Gypsum profile

No

A

B

C

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN List Profil GYPSUM Paku Sekrup

A.4.5.1.9a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0500 0.0500 0.0050 0.0030 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

3,750.00 4,000.00 500.00 390.00 8,640.00

M.04007 M.08005

M1 KG

1.0500 0.0100 JUMLAH BAHAN

9,000.00 17,000.00

9,450.00 170.00 9,620.00

PERALATAN JUMLAH PERALATAN

D E F A

4.5.2

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 32

B

C

10%

18,260.00 1,826.00 20,086.00

xD

1 M2 PENUTUP ATAP METAL

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Genteng Metal roof (Pasir Kwarsa) Paku 1 cm - 3 cm

A.4.5.2.32 Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.2000 0.1000 0.0100 0.0010 JUMLAH TENAGA KERJA

M.11018 M.08002

LEMBAR KG

1.1000 0.2000 JUMLAH BAHAN

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

15,000.00 8,000.00 1,000.00 130.00 24,130.00

55,000.00 18,000.00

60,500.00 3,600.00 64,100.00

PERALATAN JUMLAH PERALATAN

D E F A

4.5.2

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 36

B

C

10%

88,230.00 8,823.00 97,053.00

xD

Pemasangan 1 m1 nok genteng metal

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Bubungan genteng metal berpasir Paku 1 cm - 3 cm

A.4.5.2.36 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.2500 0.1500 0.0150 0.0130 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

18,750.00 12,000.00 1,500.00 1,690.00 33,940.00

M.11024 M.08002

M' KG

1.1000 0.2000 JUMLAH BAHAN

35,500.00 18,000.00

39,050.00 3,600.00 42,650.00

PERALATAN JUMLAH PERALATAN

D E F A

4.7.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 10

B

C

10%

76,590.00 7,659.00 84,249.00

xD

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu/Cat Kepala Tukang Mandor BAHAN Plamir tembok Cat tembok dasar Cat tembok penutup

A.4.7.1.10 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0200 0.0630 0.0063 0.0030 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

1,500.00 5,040.00 630.00 390.00 7,560.00

M.02029 M.02011 M.02011

KG KG KG

0.1000 0.1000 0.2600 JUMLAH BAHAN

65,000.00 22,500.00 22,500.00

6,500.00 2,250.00 5,850.00 14,600.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

22,160.00 2,216.00 24,376.00

A

4.7.1

11

Pengecatan 1 m2 Plafon dengan cat tembok ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat)

No

A

B

C

Uraian

A.4.7.1.11 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

TENAGA Pekerja Tukang Kayu/Cat Kepala Tukang Mandor

L.001 L.009 L.015 L.016

OH OH OH OH

0.060 0.040 0.004 0.003 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

4,500.00 3,200.00 400.00 390.00 8,490.00

BAHAN Cat Tembok Plamir tembok Ampelas Roll

M.29.h M.34.b M.28.a M.31.e

KG KG LBR Bh

0.4700 0.1000 0.5000 0.0100 JUMLAH BAHAN

22,500.00 65,000.00 3,000.00 26,500.00

10,575.00 6,500.00 1,500.00 265.00 18,840.00

PERALATAN JUMLAH PERALATAN

D E F A

4.7.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 12

B

C

10%

27,330.00 2,733.00 30,063.00

xD

Pengecatan 1 m2 Pengecatan Permukaan Kayu, cat Politur/Melamin

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu/Cat Kepala Tukang Mandor BAHAN Pelitur Setara Impra Melamik Amplas

A.4.7.1.12 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.0400 0.0600 0.0160 0.0030 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

3,000.00 4,800.00 1,600.00 390.00 9,790.00

M.02013 M.02017 M.02001

KG KG KG

0.1500 0.3720 2.0000 JUMLAH BAHAN

37,000.00 60,500.00 3,000.00

5,550.00 22,506.00 6,000.00 34,056.00

PERALATAN JUMLAH PERALATAN

D E F A

4.7.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 13

B

C

10%

43,846.00 4,384.60 48,230.60

xD

Pengecatan 1 m2 Pengecatan Permukaan Baja Galvanis Secara Manual Sistem 1 Lapis

No

A

10%

Uraian

TENAGA Pekerja Tukang Cat Kepala Tukang Mandor BAHAN Cat Minyak Setara Duko Kuwas Thinner

A.4.7.1.13 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.008 L.015 L.016

OH OH OH OH

0.0600 0.0600 0.0120 0.0030 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

4,500.00 4,800.00 1,200.00 390.00 10,890.00

M.02004 M.02018 M.02043

KG BH L

0.3000 0.0100 0.0100 JUMLAH BAHAN

43,000.00 10,500.00 25,000.00

12,900.00 105.00 250.00 13,255.00

PERALATAN JUMLAH PERALATAN

D E F A

4.7.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 14

B

10%

24,145.00 2,414.50 26,559.50

xD

Waterprofing 1 m2

No

A

10%

Uraian

TENAGA Pekerja Kepala Tukang Mandor BAHAN Waterprofing

A.4.7.1.14 Kode

Satuan

Koefisien

L.001 L.015 L.016

OH OH OH

0.1600 0.0300 0.0100 JUMLAH TENAGA KERJA

M.02045

KG

0.1750 JUMLAH BAHAN

C

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 100,000.00 130,000.00

12,000.00 3,000.00 1,300.00 16,300.00

42,500.00

7,437.50 7,437.50

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

23,737.50 2,373.75 26,111.25

A

4.6.1

20

Pemasangan Talang Miring Zingcalum

No

A

B

C

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Seng Gel. BJLS 28 80 x 180 Paku genteng metal

A.4.6.1.20 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.2000 0.2000 0.0200 0.0010 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

15,000.00 16,000.00 2,000.00 130.00 33,130.00

M.11033 M.08022

M' Kg

1.0500 0.0150 JUMLAH BAHAN

34,500.00 30,000.00

36,225.00 450.00 36,675.00

PERALATAN JUMLAH PERALATAN

D E F A

4.6.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 21a

B

C

10%

69,805.00 6,980.50 76,785.50

xD

Pemasangan listplank 3x30 GRC

No

A

10%

Uraian

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Listplank GRC 3,66m Paku 8 cm - 12 cm

A.4.6.1.21a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.009 L.015 L.016

OH OH OH OH

0.1000 0.2000 0.0200 0.0050 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

7,500.00 16,000.00 2,000.00 650.00 26,150.00

M.11031 M.08004

M' KG

1.1000 0.1000 JUMLAH BAHAN

60,500.00 15,000.00

66,550.00 1,500.00 68,050.00

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 2

B

C

10%

94,200.00 9,420.00 103,620.00

xD

Pemasangan 1 buah closet jongkok Setara TOTO Type CE9

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Closet Jongkok Std. TOTO (setara) Type CE9 Semen Portland (Tiga Roda/Holcim) Pasir Pasang

A.5.1.1.2 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.0000 1.5000 0.1500 0.1600 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

75,000.00 120,000.00 15,000.00 20,800.00 230,800.00

M.10001 M.01042 M.01033

BUAH KG M3

1.0000 6.0000 0.0100 JUMLAH BAHAN

250,000.00 1,200.00 140,000.00

250,000.00 7,200.00 1,400.00 258,600.00

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 5

B

C

10%

489,400.00 48,940.00 538,340.00

xD

Pemasangan 1 buah wastafel

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Wastafel Lengkap TOTO (setara) Semen Portland (Tiga Roda/Holcim) Pasir Pasang Perlengkapan

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.2000 1.4500 0.1500 0.0600 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

90,000.00 116,000.00 15,000.00 7,800.00 228,800.00

M.10010 M.01042 M.01033

BUAH KG M3 %

1.0000 6.0000 0.0100 0.1200 JUMLAH BAHAN

250,000.00 1,200.00 140,000.00 90,510.00

250,000.00 7,200.00 1,400.00 10,861.20 269,461.20

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

498,261.20 49,826.12 548,087.32

A

5.1.1

25

Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”

No

A

B

C

Uraian

Jumlah Harga

(Rp.)

(Rp.)

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0360 0.0600 0.0060 0.0020 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

2,700.00 4,800.00 600.00 260.00 8,360.00

M.09092 -

M %

1.2000 0.3500 JUMLAH BAHAN

18,000.00 7,560.00

21,600.00 2,646.00 24,246.00

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Pipa PVC Abu-abu dia. 1/2" (AW) Perlengkapan

A.5.1.1.25 Harga Satuan

Kode

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 28

B

C

10%

32,606.00 3,260.60 35,866.60

xD

Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”

No

A

10%

Uraian

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0360 0.0600 0.0060 0.0020 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

2,700.00 4,800.00 600.00 260.00 8,360.00

M.09094 -

M %

1.2000 0.3500 JUMLAH BAHAN

43,000.00 18,060.00

51,600.00 6,321.00 57,921.00

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Pipa PVC Abu-abu dia. 3/4" (AW) Perlengkapan

A.5.1.1.28 Harga Satuan

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 29

B

C

10%

66,281.00 6,628.10 72,909.10

xD

Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

No

A

10%

Uraian

Jumlah Harga

(Rp.)

(Rp.)

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0360 0.0600 0.0060 0.0020 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

2,700.00 4,800.00 600.00 260.00 8,360.00

M.09095 -

M %

1.2000 0.3500 JUMLAH BAHAN

45,000.00 18,900.00

54,000.00 6,615.00 60,615.00

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Pipa PVC Abu-abu dia. 1" (AW) Perlengkapan

A.5.1.1.29 Harga Satuan

Kode

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 30

B

C

10%

68,975.00 6,897.50 75,872.50

xD

Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

No

A

10%

Uraian

Jumlah Harga

(Rp.)

(Rp.)

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0360 0.0600 0.0060 0.0020 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

2,700.00 4,800.00 600.00 260.00 8,360.00

M.09099 -

M %

1.2000 0.3500 JUMLAH BAHAN

112,000.00 47,040.00

134,400.00 16,464.00 150,864.00

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Pipa PVC Abu-abu dia. 2" (AW) Perlengkapan

A.5.1.1.30 Harga Satuan

Kode

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 31

10%

159,224.00 15,922.40 175,146.40

xD

Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

No

A

10%

Uraian

TENAGA

A.5.1.1.31 Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

L.001 L.003 L.015 L.016

OH OH OH OH

0.8100 0.1350 0.0135 0.0040 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

60,750.00 10,800.00 1,350.00 520.00 73,420.00

M.09100 -

M %

1.2000 0.3500 JUMLAH BAHAN

125,000.00 52,500.00

150,000.00 18,375.00 168,375.00

Pekerja Tukang Batu Kepala Tukang Mandor B

BAHAN Pipa PVC Abu-abu dia. 3" (AW) Perlengkapan

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

JUMLAH PERALATAN

A

5.1.1

32

B

C

10%

241,795.00 24,179.50 265,974.50

xD

Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Pipa PVC Abu-abu dia. 4" (AW) Perlengkapan

A.5.1.1.32 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0810 0.1350 0.0135 0.0040 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

6,075.00 10,800.00 1,350.00 520.00 18,745.00

M.09101 -

M %

1.2000 0.3500 JUMLAH BAHAN

160,000.00 67,200.00

192,000.00 23,520.00 215,520.00

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

B

10%

234,265.00 23,426.50 257,691.50

xD

35/18 Sumur Bor + Pompa + Suport kedalaman 60 m1

No

A

10%

Uraian

A.5.1.1.35/18

Kode

Satuan

Koefisien

LS

1.000 JUMLAH TENAGA KERJA

TENAGA Pengeboran BAHAN Mesin Pompa Air 150 w Pipa PVC 1 " Pipa PVC 4 " Bocht LL-D 1" (lokal) Water moer

M.10022 M.09095 M.09101

UNIT m' m' bh bh

1.0000 60.0000 16.0000 6.0000 2.0000

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

640,040.00

640,040.00 640,040.00

990,000.00 45,000.00 160,000.00 25,000.00 200.00

990,000.00 2,700,000.00 2,560,000.00 150,000.00 400.00

JUMLAH BAHAN C

6,400,400.00

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1a

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 35/18a

B

10%

7,040,440.00 704,044.00 7,744,484.00

xD

Water tower rangka besi siku + Tangki Air Kap.1000 liter

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Konstruksi besi siku Pondasi beton tapak K- 175 Tangki air kapasitas 1 m3

A.5.1.1a.35/18a

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

2.5000 3.0000 3.0000 0.3000 JUMLAH TENAGA KERJA

M.06011 A.4.1.1.5 M.10023

Kg m3 m'

175.0000 0.7665 1.0000 JUMLAH BAHAN

C

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

187,500.00 240,000.00 300,000.00 39,000.00 766,500.00

10,000.00 893,214.41 2,000,000.00

1,750,000.00 684,648.85 2,000,000.00 4,434,648.85

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

5,201,148.85 520,114.88 5,721,263.73

A

5.1.1

35/19

Pemasangan 1 buah kran diameter ½” atau 3/4” Setara Onda

No

A

B

C

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Kran Air Sealtape

A.5.1.1.35/19 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0100 0.4000 0.0400 0.0050 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

750.00 32,000.00 4,000.00 650.00 37,400.00

M.10023 M.10037

BUAH BUAH

1.0000 0.0250 JUMLAH BAHAN

30,000.00 5,500.00

30,000.00 137.50 30,137.50

PERALATAN JUMLAH PERALATAN

D E F 5.1.1b

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 35/19 a

B

C

10%

67,537.50 6,753.75 74,291.25

xD

Pemasangan 1 buah Urinoir

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Urinoir Perlengkapan PC Pasir Pasang

.5.1.1b.35/19 a Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.0000 1.0000 0.1000 0.1000 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

75,000.00 80,000.00 10,000.00 13,000.00 178,000.00

M.17003 M.01042 M.01033

BH BH kg m3

1.0000 0.3000 6.0000 0.0100 JUMLAH BAHAN

950,000.00 332,500.00 1,200.00 140,000.00

950,000.00 99,750.00 7,200.00 1,400.00 1,058,350.00

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 36/14

B

10%

1,236,350.00 123,635.00 1,359,985.00

xD

Pemasangan 1 buah floor drain

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Floor Drain Stainless Steel

A.5.1.1.36/14 Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

0.0100 0.1000 0.0100 0.0050 JUMLAH TENAGA KERJA

M.10016

BUAH

1.0000

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

750.00 8,000.00 1,000.00 650.00 10,400.00

49,000.00

49,000.00

JUMLAH BAHAN C

49,000.00

PERALATAN JUMLAH PERALATAN

D E F A

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 36/15

B

10%

59,400.00 5,940.00 65,340.00

xD

Pemasangan 1 buah Westafel

No

A

10%

Uraian

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Wastafel Lengkap TOTO (setara)

A.5.1.1.36/15 Kode

Satuan

Koefisien

L.001 L.003 L.015 L.016

OH OH OH OH

1.2000 1.4500 0.1500 0.0600 JUMLAH TENAGA KERJA

M.10010

BUAH

1.0000

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 80,000.00 100,000.00 130,000.00

90,000.00 116,000.00 15,000.00 7,800.00 228,800.00

250,000.00

250,000.00

JUMLAH BAHAN C

250,000.00

PERALATAN JUMLAH PERALATAN

EL

D E F 5.1.1 No

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) 10% 10% Harga Satuan Pekerjaan (D+E) 3 Pas. Kabel NYY 4 x 10 mm2 + BC 6 mm2 Dari P-SDp ke Panel P-Ds Uraian

Kode

478,800.00 47,880.00 526,680.00 EL.5.1.1.3

xD

Satuan

Koefisien

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

A

B

C

TENAGA Ongkos Pasang 15 % BAHAN Kabel NYY 4 x 10 mm2 + BC 6 mm2

M.14017

LS

1.0000 JUMLAH TENAGA KERJA

Unit

1.0000 JUMLAH BAHAN

2,025.00

2,025.00 2,025.00

13,500.00

13,500.00 13,500.00

PERALATAN JUMLAH PERALATAN

D E F EL

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

B

C

10%

15,525.00 1,552.50 17,077.50

xD

4 Instalasi Titik Listrik/Stop Konta

No

A

10%

Uraian

TENAGA Pekerja Tukang Listrik Kepala Tukang Mandor BAHAN Pipa Listrik PVC Kabel Nym 3 x 2.5 Terminal Kabel

EL.5.1.1.4 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.010 L.015 L.016

OH OH OH OH

0.1500 0.3000 0.0150 0.0010 JUMLAH TENAGA KERJA

75,000.00 90,000.00 100,000.00 130,000.00

11,250.00 27,000.00 1,500.00 130.00 39,880.00

M.14029 M.14015 M.14020

btg m' bh

1.0000 10.0000 1.0000 JUMLAH BAHAN

6,500.00 14,000.00 18,000.00

6,500.00 140,000.00 18,000.00 164,500.00

PERALATAN JUMLAH PERALATAN

D E F EL

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 5

B

C

10%

204,380.00 20,438.00 224,818.00

xD

Pasangan 1 Bh Saklar Engkel

No

A

10%

Uraian

EL.5.1.1.5 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

TENAGA Pekerja Tukang Listrik Kepala Tukang Mandor

L.001 L.010 L.015 L.016

OH OH OH OH

0.0100 0.0100 0.0020 JUMLAH TENAGA KERJA

75,000.00 90,000.00 100,000.00 130,000.00

750.00 900.00 200.00 1,850.00

BAHAN Saklar Tunggal

M.14031

bh

1.0000 JUMLAH BAHAN

35,000.00

35,000.00 35,000.00

PERALATAN JUMLAH PERALATAN

D E F EL

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 6

B

C

10%

36,850.00 3,685.00 40,535.00

xD

Pasangan 1 Bh Saklar Seri

No

A

10%

Uraian

TENAGA Pekerja Tukang Listrik Kepala Tukang Mandor BAHAN Saklar seri

EL.5.1.1.6 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.010 L.015 L.016

OH OH OH OH

0.0100 0.0100 0.0020 JUMLAH TENAGA KERJA

75,000.00 90,000.00 100,000.00 130,000.00

750.00 900.00 200.00 1,850.00

M.14030

bh

1.0000 JUMLAH BAHAN

48,000.00

48,000.00 48,000.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

49,850.00 4,985.00 54,835.00

EL

5.1.1

7

Pasangan 1 Bh Saklar Hotel

No

A

B

C

Uraian

TENAGA Pekerja Tukang Listrik Kepala Tukang Mandor BAHAN Saklar Hotel Setara

EL.5.1.1.7 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.010 L.015 L.016

OH OH OH OH

0.0100 0.0100 0.0020 JUMLAH TENAGA KERJA

75,000.00 90,000.00 100,000.00 130,000.00

750.00 900.00 200.00 1,850.00

M.14032

bh

1.0000 JUMLAH BAHAN

50,000.00

50,000.00 50,000.00

PERALATAN JUMLAH PERALATAN

D E F EL

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 8

B

C

10%

51,850.00 5,185.00 57,035.00

xD

Pasangan 1 Bh Stop Kontak

No

A

10%

Uraian

TENAGA Pekerja Tukang Listrik Kepala Tukang Mandor BAHAN Stop Kontak Standar

EL.5.1.1.8 Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.001 L.010 L.015 L.016

OH OH OH OH

0.0100 0.0100 0.0020 JUMLAH TENAGA KERJA

75,000.00 90,000.00 100,000.00 130,000.00

750.00 900.00 200.00 1,850.00

M.14034

bh

1.0000 JUMLAH BAHAN

28,000.00

28,000.00 28,000.00

PERALATAN JUMLAH PERALATAN

D E F EL

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 10

B

10%

29,850.00 2,985.00 32,835.00

xD

Pasangan 1 Bh Lampu TL 2 x 36 MR Setara Philips

No

A

10%

Uraian

Kode

EL.5.1.1.10 Satuan

Koefisien

Ls

1.0000 JUMLAH TENAGA KERJA

TENAGA Ongkos Pasang BAHAN Lampu TL 2 x 36 MR Setara Philips

M.14021

bh

1.0000

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

8,550.00

8,550.00 8,550.00

57,000.00

57,000.00

JUMLAH BAHAN C

57,000.00

PERALATAN JUMLAH PERALATAN

D E F EL

5.1.1

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E) 11

10%

65,550.00 6,555.00 72,105.00

xD

Pasangan 1 Bh Lampu Down Light SL 18 watt

No

A

10%

Uraian

TENAGA Pekerja Tukang Listrik Kepala Tukang Mandor

EL.5.1.1.11 Kode

Satuan

L.001 L.010 L.015 L.016

OH OH OH OH

Koefisien

0.1000 0.1000 0.0200 0.0020

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 90,000.00 100,000.00 130,000.00

JUMLAH TENAGA KERJA B

C

BAHAN Lampu SL 18 watt Setara Philips Fitting Down ligh

bh bh

1.0000 1.0000 JUMLAH BAHAN

7,500.00 9,000.00 2,000.00 260.00 18,760.00

38,000.00 500.00

38,000.00 500.00 38,500.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

xD

57,260.00 5,726.00 62,986.00

EL

5.1.1

12

Pasangan 1 Bh Lampu Down Light SL 9 watt

No

A

Uraian

TENAGA Pekerja Tukang Listrik Kepala Tukang Mandor

EL.5.1.1.12 Kode

Satuan

L.001 L.010 L.015 L.016

OH OH OH OH

Koefisien

0.1000 0.1000 0.0200 0.0200

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

75,000.00 90,000.00 100,000.00 130,000.00

JUMLAH TENAGA KERJA B

C

BAHAN Lampu 9 watt Setara Philips Fitting Down ligh

bh bh

1.0000 1.0000 JUMLAH BAHAN

7,500.00 9,000.00 2,000.00 2,600.00 21,100.00

50,000.00 500.00

50,000.00 500.00 50,500.00

PERALATAN JUMLAH PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

10%

10%

71,600.00 7,160.00 78,760.00

xD

A.5.1.1 26. Membuat 1 m1 saluran buis beton Ø 30 cm No

A

B

C

Uraian

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Buis Beton dia. 30 cm PC Pasir Pasang

Harga Satuan

Jumlah Harga

(Rp.)

(Rp.)

Kode

Satuan

Koefisien

L.01.01 L.02.03 L.03.01 L.04.01

OH OH OH OH

0.0800 0.0400 0.0040 0.0070 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

6,000.00 3,200.00 400.00 910.00 10,510.00

bh kg m3

1.0000 1.5000 0.1300 JUMLAH HARGA BAHAN

95,000.00 1,500.00 185,000.00

95,000.00 2,250.00 24,050.00 121,300.00 131,810.00 13,181.00 144,991.00 144,900.00

PERALATAN

JUMLAH HARGA ALAT

D E F G

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

0.1000 -

A.5.1.1 27. Membuat 1 m1 saluran buis beton U 30 cm No A

B

C

URAIAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

HARGA HARGA SATUAN (Rp.)

SAT.

KOEFISIEN

L.01.01 L.02.03 L.03.01 L.04.01

OH OH OH OH

0.0800 0.0400 0.0040 0.0070 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

6,000.00 3,200.00 400.00 910.00 10,510.00

bh bh kg m3

1.0000 35.0000 12.8680 0.0400 JUMLAH HARGA BAHAN

85,000.00 450.00 1,500.00 185,000.00

85,000.00 15,750.00 19,302.00 7,400.00 127,452.00 137,962.00 13,796.20 151,758.00 151,700.00

BAHAN Buis Beton U 30 cm Bata merah PC Pasir Pasang PERALATAN

JUMLAH HARGA ALAT

D E F G A.4.4.1.9

JUMLAH HARGA (Rp.)

KODE

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

0.1000 -

Pasangan Bata Merah 1/2 bata ad. 1 SP : 4 PP No A

B

C

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

HARGA HARGA SATUAN (Rp.)

SAT.

KOEFISIEN

L.01.01 L.02.03 L.03.01 L.04.01

OH OH OH OH

0.3000 0.1000 0.0100 0.0150 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

22,500.00 8,000.00 1,000.00 1,950.00 33,450.00

m3 Kg m3

70.0000 11.5000 0.0430 JUMLAH HARGA BAHAN

450.00 1,500.00 185,000.00

31,500.00 17,250.00 7,955.00 56,705.00 90,155.00 9,015.50 99,170.00 99,100.00

BAHAN Bata merah Semen portland Pasir Pasang PERALATAN

JUMLAH HARGA ALAT

D E F G

JUMLAH HARGA (Rp.)

KODE

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

0.1000 -

76 A.5.1.1 19. Pasang Kran Air 1/2" No A

B

C

URAIAN TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Kran Air Sealtape

HARGA HARGA SATUAN (Rp.)

SAT.

KOEFISIEN

L.01.01 L.02.03 L.03.01 L.04.01

OH OH OH OH

0.0100 0.1000 0.0100 0.0050 JUMLAH TENAGA KERJA

75,000.00 80,000.00 100,000.00 130,000.00

750.00 8,000.00 1,000.00 650.00 10,400.00

bh bh

1.0000 0.0250 JUMLAH HARGA BAHAN

67,000.00 5,500.00

67,000.00 137.50 67,137.50 77,537.50 7,753.75 85,291.00 85,200.00

PERALATAN

JUMLAH HARGA ALAT

D E F G

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

JUMLAH HARGA (Rp.)

KODE

0.1000 -

N PERSIAPAN A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter 4 No URAIAN KODE A

B

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

L.01.01 L.02.04 L.03.01 L.04.01

BAHAN Dolken kayu Ø 8-10/400 cm Seng gelombang Semen portland Pasir beton Koral beton Kayu 5/7 Paku biasa Residu

C

PERALATAN

D E F G

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

HARGA HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

SAT.

KOEFISIEN

OH OH OH OH

0.4000 0.2000 0.0200 0.0200 JUMLAH TENAGA KERJA

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Batang lbr Kg m3 m3 m3 Kg Liter

1.2500 1.2000 5.0000 0.0050 0.0090 0.0720 0.0600 0.4000 JUMLAH HARGA BAHAN

30,000.00 82,000.00 1,500.00 210,000.00 200,000.00 2,400,000.00 16,000.00 50,000.00

37,500.00 98,400.00 7,500.00 1,050.00 1,800.00 172,800.00 960.00 20,000.00 340,010.00

JUMLAH HARGA ALAT 0.1000 -

#N/A #N/A #N/A #N/A

A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter No A

B

C

URAIAN TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

KODE

SAT.

L.01.01 L.02.04 L.03.01 L.04.01

OH OH OH OH

BAHAN Dolken kayu Ø 8-10/400 cm Semen portland Seng gelombang Pasir beton Koral beton Kayu 5/7 Paku biasa Meni besi

Batang Kg Lbr m3 m3 m3 Kg Liter

HARGA HARGA JUMLAH HARGA SATUAN (Rp.) (Rp.) 0.2000 #N/A #N/A 0.4000 #N/A #N/A 0.0200 #N/A #N/A 0.0200 #N/A #N/A JUMLAH TENAGA KERJA #N/A KOEFISIEN

1.2500 2.5000 1.2000 0.0050 0.0090 0.0720 0.0600 0.4500 JUMLAH HARGA BAHAN

30,000.00 1,500.00 82,000.00 210,000.00 200,000.00 2,400,000.00 16,000.00 26,000.00

PERALATAN

JUMLAH HARGA ALAT

D E G

37,500.00 3,750.00 98,400.00 1,050.00 1,800.00 172,800.00 960.00 11,700.00 327,960.00

Jumlah (A+B+C) Overhead & Profit 10% Dibulatkan

#N/A #N/A #N/A

0.1000

A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter No A

B

C

URAIAN TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

HARGA HARGA SATUAN (Rp.)

SAT.

KOEFISIEN

L.01.01 L.02.04 L.03.01 L.04.01

OH OH OH OH

0.2000 0.3000 0.0200 0.0200 JUMLAH TENAGA KERJA

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Batang Kg M’ m3 m3 Kg

1.0000 2.0000 25.0000 0.0050 0.0090 0.0600 JUMLAH HARGA BAHAN

30,000.00 1,500.00 25,000.00 210,000.00 200,000.00 18,000.00

30,000.00 3,000.00 625,000.00 1,050.00 1,800.00 1,080.00 661,930.00 #N/A #N/A #N/A #N/A

BAHAN Dolken kayu Ø 8-10/400 cm Semen portland Kawat duri Pasir beton Koral beton Paku biasa 2” - 5” PERALATAN

JUMLAH HARGA ALAT

D E F G

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

A.2.2.1.4. S Pengukuran dan pemasangan 1 m’ Bouwplank 1 No URAIAN A

B

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Kayu balok 5/7 Paku 2”-3”

JUMLAH HARGA (Rp.)

KODE

0.1000 -

KODE

SAT.

L.01.01 L.02.04 L.03.01 L.04.01

OH OH OH OH

m3 Kg

HARGA HARGA JUMLAH HARGA SATUAN (Rp.) (Rp.) 0.1000 #N/A #N/A 0.1000 #N/A #N/A 0.0100 #N/A #N/A 0.0050 #N/A #N/A JUMLAH TENAGA KERJA #N/A KOEFISIEN

0.0120 0.0200

2,650,000.00 18,000.00

31,800.00 360.00

Kayu papan 2/20 C

m3

0.0070 JUMLAH HARGA BAHAN

PERALATAN

2,450,000.00 -

JUMLAH HARGA ALAT D E F G

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

0.1000 -

17,150.00 49,310.00 #N/A #N/A #N/A #N/A

A.2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran 2 No URAIAN A

B

C

TENAGA Pekerja Tukang Kayu Tukang batu Kepala Tukang Mandor

HARGA HARGA SATUAN (Rp.)

KODE

SAT.

KOEFISIEN

L.01.01 L.02.04 L.02.03 L.03.01 L.04.01

OH OH OH OH OH

2.0000 2.0000 1.0000 0.3000 0.0500 JUMLAH TENAGA KERJA

Batang m3 Kg Kg Kg m3 m3 m3 Bh Lbr Bh m2 Bh Lbr

1.2500 0.1800 0.0800 1.1000 35.0000 0.1500 0.1000 0.1500 30.0000 0.2500 0.2000 0.0800 0.1500 0.0600 JUMLAH HARGA BAHAN

BAHAN Dolken kayu Ø 8-10/400 cm Kayu balok 5/7 Paku biasa Besi strip Semen portland Pasir pasang Pasir beton Koral beton Bata merah Seng plat Jendela naco Kaca polos Kunci tanam Plywood 4 mm

#N/A #N/A #N/A #N/A #N/A 30,000.00 2,400,000.00 16,000.00 12,000.00 1,500.00 185,000.00 210,000.00 200,000.00 450.00 34,400.00 15,000.00 87,000.00 185,000.00 115,000.00

PERALATAN

JUMLAH HARGA ALAT

D E F G

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

0.1000 -

JUMLAH HARGA (Rp.) #N/A #N/A #N/A #N/A #N/A #N/A 37,500.00 432,000.00 1,280.00 13,200.00 52,500.00 27,750.00 21,000.00 30,000.00 13,500.00 8,600.00 3,000.00 6,960.00 27,750.00 6,900.00 681,940.00 #N/A #N/A #N/A #N/A

A.4.5.2.7. Resevoar, Fibre Glass silinder kapasitas 2000 Lt + support No A

B

URAIAN TENAGA Pekerja Tukang Kayu Kepala tukang Mandor BAHAN Fibre Glass

HARGA HARGA SATUAN (Rp.)

KODE

SAT.

KOEFISIEN

L.01.01 L.02.04 L.03.01 L.04.01

OH OH OH OH

0.1400 0.0670 0.0070 0.0070 JUMLAH TENAGA KERJA

unt

1.0000

75,000.00 80,000.00 100,000.00 130,000.00

10,500.00 5,360.00 700.00 910.00 17,470.00

4,000,000.00

4,000,000.00 4,000,000.00 4,017,470.00 401,747.00 4,419,217.00 4,419,200.00

JUMLAH HARGA BAHAN C

PERALATAN

JUMLAH HARGA ALAT

D E F G

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E) Dibulatkan

JUMLAH HARGA (Rp.)

0.1000 -

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN KURVA " S " SATUAN KERJA KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN NO.

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA : PEMBANGUNAN RUANG KANTOR SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LEBAK) : 1. KABUPATEN PANDEGLANG - SMAN 17 PANDEGLANG : TA.2018 URAIAN PEKERJAAN

BOBOT

% I

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL II PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

1.234 0.683 22.560 48.337 1.248 3.904 4.790 6.282 7.476 3.486

100

BULAN I MINGGU KE : 1 2 3 4 0.112 0.341

0.112 0.341 5.640

BULAN II MINGGU KE : 5 6 7 8

0.112

0.112

0.112

0.112

0.112

0.112

5.640

5.640 9.667

5.640 9.667

9.667

9.667

9.667

1.952 2.395 2.094

BULAN IV MINGGU KE : 10 11 12

9 0.112

0.112

0.624 -

0.624 1.952

2.492

2.492

KETERANGAN

-

0.112

50%

2.395 2.094

2.094 2.492

0%

3.486 0.45

6.09

###

###

###

0.45

6.55

###

###

###

9.78 ###

###

###

###

###

3.23 ###

5.18 ###

5.69

-

100

100

WAKTU PELAKSANAAN : 90 (SEMBILAN PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

100%

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BART CHART " DIAGRAM BATANG " SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN NO.

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 17 PANDEGLANG : TA.2018 URAIAN PEKERJAAN

BOBOT

% I

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL II PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

1.234 0.683 22.560 48.337 1.248 3.904 4.790 6.282 7.476 3.486

100

BULAN I MINGGU KE : 1 2 3 4 0.112 5.640 2.395 2.094 -

0.112 5.640 9.667 1.952 -

BULAN II MINGGU KE : 5 6 7 8

0.112 0.341 -

0.112 0.341 5.640 -

0.112 5.640 9.667 -

0.45

6.09 10.24 17.37 15.42

0.45

0.112 9.667 -

0.112 9.667 2.094 -

BULAN III MINGGU KE : 10 11 12

9

KETERANGAN

-

0.112 9.667 2.395 2.492 -

0.112 0.624 2.492 -

0.112 0.624 1.952 2.492 -

0.112 2.094 3.486

9.78 11.87 14.67

3.23

5.18

5.69

-

6.55 16.79 34.16 49.58 59.36 71.23 85.90 89.13 94.31

100

100

-

-

50%

-

WAKTU PELAKSANAAN : 90 (SEMBILAN PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

100%

0%

JADWAL MOBILISASI ( JAD - MOB ) PEKERJA - PERALATAN - BAHAN MATERIAL SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 17 PANDEGLANG : TA.2018

NO.

URAIAN PEKERJAAN

BOBOT

% I

PEKERJAAN PERSIAPAN

BULAN I MINGGU KE : 1 2 3 4

1.234

0.112

0.112

0.683

0.341

0.341

0.112

BULAN II MINGGU KE : 5 6 7 8

0.112

0.112

0.112

0.112

0.112

BULAN III MINGGU KE : 10 11 12

9 0.112

0.112

0.112

KETERANGAN

-

PERKERJA PERALATAN BAHAN MATERIAL

II

PEKERJAAN TANAH

-

-

-

-

-

-

-

-

100%

-

0%

-

PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN PONDASI DAN BETON

22.560

PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PASANGAN

48.337

PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PLAFOND

1.248

PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN ELEKTRIKAL

3.904

PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN MEKANIKAL DAN SANITARY

4.790

PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA

6.282

PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN LANTAI

7.476

PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PENGECATAN

3.486

PERKERJA PERALATAN BAHAN MATERIAL

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

100

0.45

6.09 10.24 17.37 15.42

5.18

5.69

0.00

0.45

6.55 16.79 34.16 49.58 59.36 71.23 85.90 89.13 94.31

9.78 11.87 14.67

3.23

100

100

WAKTU PELAKSANAAN : 90 (SEMBILAN PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BILL of QUANTITY SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

NO

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 1 (SATU) RUANG SMKN 1 CILEGON - KOTA CILEGON TA.2018

URAIAN PEKERJAAN

SPESIFIKASI

2

3

1 A

KODE ANALISA

VOLUME

HARGA SATUAN

JUMLAH HARGA

4

5

6

PEKERJAAN PERSIAPAN 1 Papan Nama Proyek 1.5 x 0.8 m 2 Pengukuran dan Bowuplank

Kayu klas II

A. 2.2.1 .2

1.00

bh

748,852.50

748,852.50

A. 2.2.1 .1

20.00

m'

64,141.00

1,282,820.00

3 Mobilisai dan demobilisasi

1.00

ls

5,000,000.00

5,000,000.00

4 Gambar Kerja, Dokumentasi dan Pelaporan

1.00

m'

1,700,000.00

1,700,000.00

1.00

bh JUMLAH A

1,500,000.00

5 Pas. Plakat/ Prasasti

Granit Hitam Uk.60x90

JUMLAH A B

1,500,000.00 10,231,672.50

PEKERJAAN STRUKTUR

B.1 PEKERJAAN TANAH & URUGAN 1 Pek. Galian Tanah Pondasi

kedalaman max. 1

A. 2.3.1 .1

33.84

m3

65,450.00

t = 5 cm

A. 2.3.1 .4

1.88

m3

220,660.00

414,840.80

3 Pek Tanah Peninggian Lantai

Tanah Merah

A. 2.3.1 .5

19.90

m3

167,860.00

3,340,414.00

4 Pek. Urugan Tanah Bekas galian

Tanah galian

A. 2.3.1 .3

16.45

m3

2 Pek Pasir Urug Bawah Pondasi Pondasi

48,400.00 JUMLAH B.1

2,214,828.00

796,180.00 6,766,262.80

B.2 PEKERJAAN PONDASI 1 Pek. Aanstamping batu Kosong

Batu Belah 15/20

A. 3.2.1 .9

3.29

m3

353,265.00

2 Pek Pas. pondasi batu belah camp 1PC : 4PP

Batu Belah 15/20

A. 3.2.1 .1

14.10

m3

682,627.00 JUMLAH B.2

1,162,241.85 9,625,040.70 10,787,282.55

B.3 PEKERJAAN BETON STRUKTUR 1 Pek Sloof (S1) 15/20 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 175

A.4.1.1.5

1.44

m3

893,214.41

1,286,228.75

U. 32

A.4.1.1.17.A

254.51

kg

11,854.70

3,017,139.70

A.4.1.1.21

23.04

m2

190,333.00

4,385,272.32

Site Mix K. 175

A.4.1.1.5

1.44

m3

893,214.41

1,286,228.75

U. 32

A.4.1.1.17.A

168.50

kg

11,854.70

1,997,516.95

A.4.1.1.22

23.04

m2

176,668.25

4,070,436.48

Site Mix K. 175

A.4.1.1.5

0.58

m3

893,214.41

518,064.36

U. 32

A.4.1.1.17.A

80.78

kg

11,854.70

957,622.67

A.4.1.1.22

11.52

m2

88,334.13

1,017,609.12

Site Mix K. 175

A.4.1.1.5

0.21

m3

893,214.41

187,575.03

U. 32

A.4.1.1.17.A

46.69

kg

11,854.70

553,495.94

A.4.1.1.22

6.92

m2

88,334.13

611,272.15

Site Mix K. 175

A.4.1.1.5

1.13

m3

893,214.41

1,009,332.28

U. 32

A.4.1.1.17.A

234.81

kg

11,854.70

2,783,602.11

A.4.1.1.23

18.80

m2

90,107.88

1,694,028.05

Site Mix K. 175

A.4.1.1.5

0.12

m3

893,214.41

107,185.73

U. 32

A.4.1.1.17.A

21.09

kg

11,854.70

250,015.62

A.4.1.1.23

2.20

m2

180,215.75

396,474.65

Site Mix K. 175

A.4.1.1.5

0.59

m3

893,214.41

526,996.50

U. 32

A.4.1.1.17.A

129.85

kg

11,854.70

1,539,332.80

A.4.1.1.23

11.70

m2

90,107.88

1,054,262.14

Site Mix K. 175

A.4.1.1.5

0.21

m3

893,214.41

187,575.03

U. 24

A.4.1.1.17.A

54.08

kg

11,854.70

641,102.18

A.4.1.1.23A

8.07

m2

125,930.75

1,016,261.15

Bekisting Sloof 2 Pek Kolom (K1) 20/25 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting Kolom 50% 3 Pek Kolom (K2) Selasar 20/20 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting Kolom 25% 4 Pek Kolom (KP) 12/12 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting Kolom 25% 5 Pek Ringalk 12/20 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting balok 25% 6 Pek Balok Selasar 15/20 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting balok 50% 7 Pek Balok Selasar 15/15 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting balok 25% 8 Pek Balok Lintel 10/12 Beton Besi beton (tulangan)

-

Bekisting balok Non Struktur 50%

JUMLAH B.3

31,094,630.44

B.4 PEKERJAAN ATAP 1 Pas. Rangka Atap Baja Ringan

Bergaransi 10 Tahun Taso/Alfa/Haisteel

A.4.2.1.26

161.04

m2

287,421.75

46,286,398.62

2 Pas. Atap Selulosa Bitumen

Onduvilla

A.4.5.2.33

161.04

m2

231,448.80

37,272,514.75

3 Pas. Nok Selulosa Bitumen

Onduvilla

A.4.5.2.37

35.76

m'

104,632.00

3,741,640.32

Kalsi Board kalsiplank/Superplank

A.4.6.1.21a

45.04

m'

103,620.00

4 Pek. Lisplank GRC 2x20x2 lapis

JUMLAH B.4 JUMLAH B C

PEKERJAAN ARSITEKTUR C.1 PEKERJAAN DINDING

4,667,044.80 91,967,598.49 140,615,774.28

1 Pek Pas Bata Ringan/Hebel (Celcon) ad. 1:4 2 Pek Plesteran Kolom & Dinding (mortar) - 301

10 x 20 x 60

A.4.4.2.26

105.11

m2

92,296.88

9,701,324.53

t=10mm

A.4.4.2.27

210.22

m2

62,902.81

13,223,429.24

A.4.4.2.28

224.62

m2

16,417.50

3,687,698.85

A.4.4.1.10

3.36

m2

91,152.60

306,272.74

4.4.2

6.72

m2

79,320.31

533,032.50

A.4.4.3.41b

6.44

m2

47,795.55

3 Pek Acian Kolm & Dinding (mortar) - 200 4 Pek Pas dinding bata merah Selasar ad. 1:4

1/2" bata

5 Pek Plesteran + Aci dinding selasar 6 Pek. Dinding Batu alam

JUMLAH C.1

307,803.34 27,759,561.20

C.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA 1 Pek. Pintu Alumunium+Assesoris (P1)

warna Hitam, 3", ykk

ALM 01

1.00

Unit

3,489,200.00

3,489,200.00

2 Pek Jendela Alumunium (J1)

warna Hitam, 3", ykk

ALM 03

4.00

Unit

3,164,100.00

12,656,400.00

3 Pek Jendela Alumunium (J2)

warna Hitam, 3", ykk

ALM 04

1.00

Unit

2,720,200.00

2,720,200.00

4 Pek Jendela Alumunium (BV1)

warna Hitam, 3", ykk

ALM 06

4.00

Unit

1,304,600.00

5,218,400.00

5 Pek Jendela Alumunium (BV2)

warna Hitam, 3", ykk

ALM 07

1.00

Unit

1,106,200.00 JUMLAH C.2

1,106,200.00 25,190,400.00

C.3 PEKERJAAN ATAP DAN PLAFOND 1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 mm

hollow 4 x 4 dan 2 x 4 cm

A.4.2.1.25

119.49

m2

331,829.08

39,650,256.77

2 Pek Pas plafond gypsum board uk. (120x240x9) mm

tebal 9 mm

A.4.5.1.7

119.49

m2

46,002.00

5,496,778.98

10 -15 cm

A.4.5.1.9a

94.00

m'

20,086.00

1,888,084.00

Kayu Kls II dicat

A.4.5.1.9b

45.04

m'

20,086.00

3 Pek List Plafond Gypsum 4 Pek List Profil kayu (tepi listplang)

JUMLAH C.3

904,673.44 47,939,793.19

C.4 PEKERJAAN LANTAI 1 Pek Pas lantai granite 60x60 cm 2 Pas. Bata penguat rabat 3 Pek. Rabat Beton

Warna/Corak Geranito/Indogress/Roman 1/2 bata Camp. 1 : 3 : 5, T.7 cm

A.4.4.3.36c

95.62

m2

169,774.00

A.4.4.1.10

10.60

m2

91,152.60

966,217.56

4.1.1

2.31

m2

726,415.09

1,678,018.85

JUMLAH C.4

16,233,789.88

18,878,026.29

C.5 PEKERJAAN PENGECATAN 1 Pek Pengecatan Tembok

Catilac/Duluxe/Jotun

A.4.7.1.10

205.32

m2

24,376.00

5,004,880.32

2 Pek Pengecetan plafond dgn cat tembok

Catilac/Duluxe/Jotun

A.4.7.1.11

119.49

m2

30,063.00

3,592,227.87

Sek.Glotex

A.4.7.1.13

11.26

m2

26,559.50

3 Pek. Pengecatan List Plafond+listplank

JUMLAH C.5 JUMLAH C D

128,663,948.84

PEKERJAAN DRAINASE 1 Pek. Grevel U Keliling Bangunan

1/2" buis uk.20x100 cm

7.1.1

44.40

m'

93,500.00 JUMLAH D

E

299,059.97 8,896,168.16

4,151,400.00 4,151,400.00

PEKERJAAN ELEKTRIKAL 1 Pek Pas Instalasi titik Lampu Kabel NYM 3x2.5 mm

Eterna

EL.5.1.1.4

8.00

ttk

224,818.00

1,798,544.00

2 Pek Pas Instalasi stop kontak saklar Kabel NYM 3x2

Eterna

EL.5.1.1.4

1.00

ttk

224,818.00

224,818.00

3 Pek Pas saklar Double

Broco

EL.5.1.1.6

2.00

bh

54,835.00

109,670.00

4 Pek Pas stop kontak

Broco

EL.5.1.1.8

1.00

bh

32,835.00

32,835.00

5 Pek Pas Lampu TL Reflektor miror 2x18 watt

Phillips

EL.5.1.1.10

6.00

bh

72,105.00

432,630.00

Phillips

EL.5.1.1.11

2.00

bh

62,986.00

125,972.00

Broco 900 A

EL.5.1.1.13

1.00

bh

500,000.00

6 Pek Pas Lampu Down Light SL 18 watt 7 Pek Pas MCB + Box

JUMLAH E JUMLAH

500,000.00 3,224,469.00 286,887,264.62

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN KURVA " S " SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN NO.

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 1 (SATU) RUANG SMKN 1 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Pas. Plakat/ Prasasti B PEKERJAAN STRUKTUR B.1 PEKERJAAN TANAH & URUGAN B.2 PEKERJAAN PONDASI B.3 PEKERJAAN BETON STRUKTUR B.4 PEKERJAAN ATAP C PEKERJAAN ARSITEKTUR C.1 PEKERJAAN DINDING C.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA C.3 PEKERJAAN PLAFOND C.4 PEKERJAAN LANTAI C.5 PEKERJAAN PENGECATAN D EKERJAAN DRAINASE F PEKERJAAN ELEKTRIKAL SERAH TERIMA PHO

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 9 10 11 12

BULAN IV MINGGU KE : 13 14 15 16

A

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

0.261 0.447 1.743 0.593 0.523 2.359 3.760 10.839 32.057

0.261 0.447 0.116 0.119

0.116

2.359 1.880

0.116

0.116

0.116 0.119

1.880 3.613

3.613

3.613

9.676 8.781 16.710 6.580 3.101 1.447 1.124

100

2.419

2.419

0.116

2.419 2.195

0.116

0.116

0.116 0.119

0.116

8.014

8.014

8.014

8.014

2.419 2.195

2.195

0.116

2.195 5.570

0.116

5.570 2.193

0.116 0.119

5.570 2.193

0.116

KETERANGAN

-

100%

-

50%

0.116 0.119 0.523

2.193 3.101 1.447

0.375 0.94

4.35

0.94

5.30

5.61 ###

6.15 ###

6.27 ###

5.11 ###

0.375 ### ###

8.13 ###

8.25 ###

### ###

8.26 ###

-

0.375 7.88 ###

8.00 ###

3.76 ###

4.23

-

100

100

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

BART CHART " DIAGRAM BATANG " SATUAN KERJA KEGIATAN LOKASI TAHUN ANGGARAN NO.

: : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK SMKN 1 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% A

PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Pas. Plakat/ Prasasti B PEKERJAAN STRUKTUR B.1 PEKERJAAN TANAH & URUGAN B.2 PEKERJAAN PONDASI B.3 PEKERJAAN BETON STRUKTUR B.4 PEKERJAAN ATAP C PEKERJAAN ARSITEKTUR C.1 PEKERJAAN DINDING C.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA C.3 PEKERJAAN PLAFOND C.4 PEKERJAAN LANTAI C.5 PEKERJAAN PENGECATAN D EKERJAAN DRAINASE F PEKERJAAN ELEKTRIKAL SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

0.261 0.447 1.743 0.593 0.523 2.359 3.760 10.839 32.057 9.676 8.781 16.710 6.580 3.101 1.447 1.124

100

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 10 11 12

9

KETERANGAN

0.261 0.447 0.116 0.119 -

0.116 2.359 1.880 -

0.116 1.880 3.613 -

0.116 3.613 2.419 -

0.116 0.119 3.613 2.419 -

0.116 2.419 2.195 0.375

0.116 8.014 2.419 2.195 -

0.116 8.014 -

0.116 0.119 8.014 -

0.116 8.014 2.195 -

0.116 2.195 5.570 0.375

0.116 5.570 2.193 -

0.116 0.119 5.570 2.193 -

0.116 2.193 1.447 -

0.116 0.119 0.523 3.101 0.375

-

0.94

4.35

5.61

6.15

6.27

5.11 12.74

8.13

8.25 10.33

8.26

7.88

8.00

3.76

4.23

-

0.94

5.30 10.91 17.05 23.32 28.43 41.17 49.30 57.55 67.88 76.13 84.01 92.01 95.77

100

100

-

100%

-

50%

-

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

JADWAL MOBILISASI ( JAD - MOB ) PEKERJA - PERALATAN - BAHAN MATERIAL SATUAN KERJA KEGIATAN LOKASI TAHUN ANGGARAN NO.

: : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK SMKN 1 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% A

PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Pas. Plakat/ Prasasti

0.261 0.447 1.743 0.593 0.523

BULAN I MINGGU KE : 1 2 3 4 0.261 0.447 0.116 0.119 -

BULAN II MINGGU KE : 5 6 7 8

0.116 -

0.116 -

0.116 -

0.116 0.119 -

2.359 1.880 -

1.880 3.613 -

3.613 -

3.613 -

2.419 -

2.419 -

0.116 -

BULAN II MINGGU KE : 5 6 7 8

0.116 -

0.116 -

0.116 0.119 -

0.116 -

8.014

8.014

8.014

- ` 8.014

0.116 -

BULAN III MINGGU KE : 10 11 12

9

0.116 -

0.116 0.119 -

0.116 -

0.116 0.119 0.523

KETERANGAN

-

-

100%

-

50%

PERKERJA PERALATAN BAHAN MATERIAL

B

PEKERJAAN STRUKTUR B.1 PEKERJAAN TANAH & URUGAN B.2 PEKERJAAN PONDASI B.3 PEKERJAAN BETON STRUKTUR B.4 PEKERJAAN ATAP

2.359 3.760 10.839 32.057

-

9.676 8.781 16.710 6.580 3.101

-

-

-

1.447

-

-

-

-

-

1.124

-

-

-

-

-

0.94

4.35

5.61

6.15

6.27

0.94

-

-

-

-

-

-

-

PERKERJA PERALATAN BAHAN MATERIAL

C

PEKERJAAN ARSITEKTUR C.1 PEKERJAAN DINDING C.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA C.3 PEKERJAAN PLAFOND C.4 PEKERJAAN LANTAI C.5 PEKERJAAN PENGECATAN

2.419 2.195 -

2.419 2.195 -

-

-

2.195 -

-

-

-

-

-

-

-

-

2.195 5.570 -

5.570 2.193 -

5.570 2.193 -

2.193 -

3.101

-

PERKERJA PERALATAN BAHAN MATERIAL

D

EKERJAAN DRAINASE

-

-

-

-

1.447

-

-

0.375

-

-

-

0.375

8.26

7.88

8.00

3.76

4.23

-

5.30 10.91 17.05 23.32 28.43 41.17 49.30 57.55 67.88 76.13 84.01 92.01 95.77

100

100

PERKERJA PERALATAN BAHAN MATERIAL

F

PEKERJAAN ELEKTRIKAL

0.375

-

PERKERJA PERALATAN BAHAN MATERIAL

-

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

100

5.11 12.74

8.13

8.25 10.33

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

BILL of QUANTITY : : : : : :

SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

NO

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 4 (EMPAT) RUANG KELAS SMKN 2 CILEGON - KOTA CILEGON TA.2018

URAIAN PEKERJAAN

SPESIFIKASI

2

3

1 I

KODE ANALISA

VOLUME

HARGA SATUAN

JUMLAH HARGA

4

5

6

PEKERJAAN PERSIAPAN 1 Papan Nama Proyek 1.5 x 0.8 m 2 Pengukuran dan Bowuplank

Kayu klas II

A. 2.2.1 .2

1.00

bh

748,852.50

748,852.50

A. 2.2.1 .1

48.00

m'

64,141.00

3,078,768.00

3 Mobilisai dan demobilisasi

1.00

ls

3,000,000.00

3,000,000.00

4 Gambar Kerja, Dokumentasi dan Pelaporan

1.00

ls

1,700,000.00

1,700,000.00

5 Biaya Keselamatan Kerja (Obat P3K, dll)

1.00

ls

1,124,010.00

1,124,010.00

1.00

bh

1,500,000.00

5 Pas. Plakat/ Prasasti

Granit Hitam Uk.60x90

JUMLAH I II

1,500,000.00 11,151,630.50

PEKERJAAN LANTAI DASAR A PEKERJAAN STRUKTUR

A.1

PEKERJAAN TANAH & URUGAN 1 Pek. Galian Tanah Pondasi

A. 2.3.1 .1

10.97

m3

65,450.00

717,986.50

A. 2.3.1 .9

18.60

m2

48,400.00

900,240.00

Pasir urug

A. 2.3.1 .4

0.90

m3

220,660.00

198,594.00

4 Pek Tanah Peninggian Lantai

Tanah Merah

A. 2.3.1 .5

32.00

m3

167,860.00

5,371,520.00

5 Pek. Urugan Tanah Bekas galian

Tanah galian

A. 2.3.1 .3

7.39

m3

kedalaman max. 1

2 Pek Perataan dan pemadataanTanah Sloof (S1) 3 Pek Pasir Urug Bawah Pondasi Pondasi t = 5 cm

48,400.00 JUMLAH A.1

A.2

357,676.00 7,546,016.50

PEKERJAAN PONDASI 1 Pek Poot Plate 120x120x45 cm (P.1) Lantai Kerja beton di Bawah (lean Concrete) t = 5 cm

Site Mix K.100

A.4.1.1.1

1.44

m3

726,415.09

1,046,037.72

Beton

Site Mix K. 225

A.4.1.1.7

12.96

m3

947,715.78

12,282,396.51

U. 32

A.4.1.1.17.A

Besi beton (tulangan) Bekisting Pondasi

1,365.31

kg

11,854.70

16,185,340.46

A.4.1.1.20

43.20

m2

177,958.00

7,687,785.60

2 Pek Poot Plate 75x90x40 cm (P.2) Lantai Kerja beton di Bawah (lean Concrete) t = 5 cm

Site Mix K.100

A.4.1.1.1

0.27

m3

726,415.09

196,132.07

Beton

Site Mix K. 225

A.4.1.1.7

1.62

m3

947,715.78

1,535,299.56

U. 32

A.4.1.1.17.A

Besi beton (tulangan) Bekisting Pondasi

A.4.1.1.20

485.41

kg

11,854.70

5,754,389.93

7.92

m2

177,958.00

1,409,427.36

3 Pek Poot Plate Tangga Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

0.04

m3

947,715.78

37,908.63

U. 32

A.4.1.1.17.A

16.34

kg

11,854.70

193,705.80

A.4.1.1.20

0.48

m2

177,958.00

85,419.84 2,236,609.24

Bekisting Pondasi 4 Pek Kolom Pedistal 40/40 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

2.36

m3

947,715.78

U. 32

A.4.1.1.17.A

727.08

kg

11,854.70

8,619,315.28

A.4.1.1.22

32.00

m2

353,336.50

11,306,768.00

Bekisting Kolom 5 Pek Kolom Pedistal 25/30 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

U. 32

A.4.1.1.17.A

Bekisting Kolom

A.4.1.1.22

0.60

m3

947,715.78

568,629.47

219.40

kg

11,854.70

2,600,921.18

8.80

m2

353,336.50 JUMLAH A.2

A.3

3,109,361.20 74,855,447.85

PEKERJAAN BETON STRUKTUR 1 Pek Sloof (S1) 20/30 Beton Bertulang Lantai Kerja beton di Bawah (lean Concrete) t = 5 cm

Site Mix K.100

A.4.1.1.1

0.93

m3

726,415.09

675,566.03

Beton

Site Mix K. 225

A.4.1.1.7

5.58

m3

947,715.78

5,288,254.05

U. 32

A.4.1.1.17.A

Besi beton (tulangan) Bekisting Sloof

A.4.1.1.21

2,110.40

kg

11,854.70

25,018,158.88

55.80

m2

190,333.00

10,620,581.40

2 Pek Kolom (K1) 40/40 Beton Bertulang Beton Besi beton (tulangan)

Ready Mix K. 225

A.4.1.1.8

U. 32

A.4.1.1.17.A

Bekisting Kolom

A.4.1.1.22

11.52

m3

947,715.78

10,917,685.79

1,968.49

kg

11,854.70

23,335,858.40

115.20

m2

353,336.50

40,704,364.80

3 Pek Kolom (K2) 25/30 Beton Bertulang Beton Besi beton (tulangan)

Ready Mix K. 225

A.4.1.1.8

2.16

m3

947,715.78

U. 32

A.4.1.1.17.A

599.62

kg

11,854.70

7,108,315.21

A.4.1.1.22

31.68

m2

353,336.50

11,193,700.32

Ready Mix K. 225

A.4.1.1.8

12.15

m3

947,715.78

11,514,746.73

U. 32

A.4.1.1.17.A

3,197.35

kg

11,854.70

37,903,625.05

Bekisting Kolom 4 Pek Balok B1 20/45 Beton Bertulang Beton Besi beton (tulangan)

2,047,066.08

-

Bekisting balok 50%

A.4.1.1.23

139.26

m2

180,215.75

5 Pek Balok (B2) 20/30 Beton Bertulang Beton Besi beton (tulangan)

Ready Mix K. 225

A.4.1.1.8

1.62

m3

947,715.78

1,535,299.56

U. 32

A.4.1.1.17.A

473.26

kg

11,854.70

5,610,355.32

A.4.1.1.23

21.60

m2

360,431.50

7,785,320.40

Bekisting balok 6 Pek Kanopi Beton Bertulang t.7 cm Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

1.06

m3

947,715.78

U. 24

A.4.1.1.17.A

73.00

kg

11,854.70

865,393.10

A.4.1.1.23A

17.77

m2

251,861.50

4,475,578.86

Site Mix K.175

A.4.1.1.5

0.46

m3

893,214.41

410,878.63

U. 24

A.4.1.1.17.A

170.25

kg

11,854.70

2,018,262.68

A.4.1.1.23A

9.08

m2

251,861.50

2,286,902.42

Perancah Bekisting Lantai 7 Pek Balok Lintel 10/12 Beton Besi beton (tulangan) Bekisting balok Non Struktur

Wiremesh M8 (2 lapis) Plat Bondek + Perancah

Ready Mix K. 225

A.4.1.1.8

23.55

m3

947,715.78

U. 24

A.4.1.1.17.A

218.13

m2

11,854.70

2,585,865.71

T.0,75 mm

-

185.33

m2

104,000.00

19,274,320.00

9.46

m2

485,336.50

4,591,283.29

Perancah Bekisting Lantai Sisi Plat

A.4.1.1.24

9 Pek Plat Tangga dan Bordes Beton Besi beton (tulangan)

1,004,578.73

-

8 Pek Plat Lantai Beton Bertulang t = 12 cm Beton

25,096,845.35

-

22,318,706.62

Site Mix K. 225

A.4.1.1.8

1.28

m3

947,715.78

1,213,076.20

U. 32

A.4.1.1.17.A

155.90

kg

11,854.70

1,848,147.73

A.4.1.1.26

12.72

m2

327,926.50

Bekisting tangga

JUMLAH A.3

4,171,225.08 293,419,962.41

B PEKERJAAN ARSITEKTUR B.1

PEKERJAAN DINDING 1 Pek Pas Bata Ringan/Hebel (Celcon) ad. 1:4 2 Pek Plesteran Kolom & Dinding (mortar) - 301

10 x 20 x 60

A.4.4.2.26

186.06

m2

92,296.88

17,172,756.56

t=10mm

A.4.4.2.27

359.24

m2

62,902.81

22,597,206.36

A.4.4.2.28

460.84

m2

16,417.50

7,565,840.70

A.4.4.1.10

8.10

m2

91,152.60

738,336.06

4.4.2

8.10

m2

79,320.31

642,494.53

8.48

m'

325,000.00

2,756,000.00

3 Pek Acian Kolm & Dinding (mortar) - 200 4 Pek Pas dinding bata merah Selasar ad. 1:4

1/2" bata

5 Pek Plesteran + Aci dinding selasar 7 Pek. Railling Tangga Besi Stanless Stell

JUMLAH B.1 B.2

51,472,634.22

PEKERJAAN KUSEN PINTU, JENDELA & KACA 1 Pek. Pintu Alumunium+Assesoris (P1)

warna Hitam, 3", ykk

ALM 01

2.00

Unit

3,489,200.00

6,978,400.00

2 Pek Jendela Alumunium (J1)

warna Hitam, 3", ykk

ALM 03

8.00

Unit

3,164,100.00

25,312,800.00

3 Pek Jendela Alumunium (J2)

warna Hitam, 3", ykk

ALM 04

2.00

Unit

2,720,200.00

5,440,400.00

4 Pek Jendela Alumunium (BV1)

warna Hitam, 3", ykk

ALM 07

10.00

Unit

1,304,600.00

13,046,000.00

5 Pek Jendela Alumunium (BV2)

warna Hitam, 3", ykk

ALM 08

2.00

Unit

1,106,200.00

2,212,400.00

-

1.00

m2

25,350.00

6 Pek Rooster dinding

JUMLAH B.2 B.3

25,350.00 53,015,350.00

PEKERJAAN PLAFOND 1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 mm

hollow 4 x 4 dan 2 x 4 cm

A.4.2.1.25

184.64

m2

124,300.00

22,950,752.00

2 Pek Pas plafond gypsum board uk. (120x240x9) mm

, tebal 9 mm

A.4.5.1.7

184.64

m2

46,002.00

8,493,809.28

3 Pek List Plafond Gypsum

Uk.10 -15 cm

A.4.5.1.9a

114.40

m'

20,086.00 JUMLAH B.3

B.4

2,297,838.40 33,742,399.68

PEKERJAAN LANTAI 1 Pek Pas lantai granite 60x60 cm 2 Pas. Bata penguat rabat 3 Pek. Beton tumbuk

Warna/Corak A.4.4.3.36c Geranito/Indogress/Roman 1/2 Bata A.4.4.1.10 Camp. 1 : 3 : 5, T.7 cm

-

203.67

m2

169,774.00

34,577,870.58

21.60

m2

91,152.60

1,968,896.16

1.23

m2

762,602.50 JUMLAH B.4

B.5

938,001.08 37,484,767.82

PEKERJAAN PENGECATAN 1 Pek Pengecatan Tembok dan kolom

Catilac/Duluxe/Jotun

A.4.7.1.10

460.84

m2

24,376.00

2 Pek Pengecetan plafond dan kanopi dgn cat tembok

Catilac/Duluxe/Jotun

A.4.7.1.11

195.44

m2

30,063.00 JUMLAH B.5

B.6

11,233,435.84 5,875,512.72 17,108,948.56

PEKERJAAN DRAINASE 1 Pek. Grevel U Keliling Bangunan

1/2" buis uk.20x100 cm

7.1.1

43.20

93,500.00

m'

JUMLAH B.6 JUMLAH II III

4,039,200.00 4,039,200.00 572,684,727.02

PEKERJAAN LANTAI ATAS A PEKERJAAN STRUKTUR

A.1

PEKERJAAN BETON STRUKTUR 1 Pek Kolom (K3) 30/30 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

U. 32

A.4.1.1.17.A

Bekisting Kolom

A.4.1.1.22

6.48

m3

947,715.78

6,141,198.25

1,388.70

kg

11,854.70

16,462,621.89

84.40

m2

353,336.50

29,821,600.60

2 Pek Kolom (K4) 20/25 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom 3 Pek Ringbalk (RB) 12/20 Beton Bertulang

Site Mix K. 225

A.4.1.1.7

1.44

m3

947,715.78

1,364,710.72

U. 32

A.4.1.1.17.A

294.76

kg

11,854.70

3,494,291.37

A.4.1.1.22

25.92

m2

353,336.50

9,158,482.08

Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

3.15

m3

947,715.78

2,985,304.71

U. 32

A.4.1.1.17.A

651.48

kg

11,854.70

7,723,099.96

A.4.1.1.23

52.40

m2

180,215.75

9,443,305.30 341,177.68

Bekisting balok 50% 4 Pek Balok Selasar (B3) 15/20 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

0.36

m3

947,715.78

U. 32

A.4.1.1.17.A

66.88

kg

11,854.70

792,842.34

A.4.1.1.23

12.55

m2

360,431.50

4,523,415.33

Bekisting balok 5 Pek Balok Selasar (B4) 15/15 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K. 225

A.4.1.1.7

1.13

m3

947,715.78

1,070,918.83

U. 32

A.4.1.1.17.A

248.49

kg

11,854.70

2,945,774.40

A.4.1.1.23

22.50

m2

360,431.50

8,109,708.75

Bekisting balok 6 Pek Balok Lintel 10/12 Beton Besi beton (tulangan)

Site Mix K.175

A.4.1.1.5

0.46

m3

893,214.41

410,878.63

U. 24

A.4.1.1.17.A

170.25

kg

11,854.70

2,018,262.68

A.4.1.1.23A

9.08

m2

251,861.50

2,286,902.42

Bekisting balok Non Struktur 7 Pek Balok Dinding Selasar (B4) 15/15 Beton Bertulang Beton Besi beton (tulangan)

Site Mix K.175

A.4.1.1.5

U. 32

A.4.1.1.17.A

Bekisting balok

A.4.1.1.23

0.57

m3

893,214.41

509,132.21

114.94

kg

11,854.70

1,362,579.22

7.50

m2

360,431.50 JUMLAH A.1

A.2

2,703,236.25 113,669,443.61

PEKERJAAN ATAP 1 Pas. Rangka Atap Baja Ringan 2 Pas. Atap Selulosa Bitumen

Bergaransi 10 Tahun Taso/Alfa/Haisteel C.075-75 cm A.4.2.1.26 Onduvilla A.4.5.2.33

340.02

m2

287,421.75

97,729,143.44

340.02

m2

231,448.80

78,697,220.98

A.4.5.2.37

49.33

m'

104,632.00

5,161,496.56

Kalsi Board kalsiplank/SuperplankA.4.6.1.21a

69.04

m'

103,620.00

3 Pas. Nok Selulosa Bitumen 4 Pek. Lisplank GRC 2x20x2 lapis

Onduvilla

JUMLAH A.2

7,153,924.80 188,741,785.77

B PEKERJAAN ARSITEKTUR B.1

PEKERJAAN DINDING 1 Pek Pas Bata Ringan/Hebel (Celcon) ad. 1:4 2 Pek Plesteran Kolom & Dinding (mortar) - 301

10 x 20 x 60

A.4.4.2.26

205.66

m2

92,296.88

18,981,775.31

t=10mm

A.4.4.2.27

398.44

m2

62,902.81

25,062,996.61

A.4.4.2.28

473.96

m2

16,417.50

7,781,238.30

A.5.1.1.36/15

22.90

m2

91,152.60

2,087,394.54

4.4.2

22.90

m2

79,320.31

3 Pek Acian Kolm & Dinding (mortar) - 200 4 Pek Pas dinding bata merah Selasar ad. 1:4

1/2" bata

5 Pek Plesteran + Aci dinding selasar

JUMLAH B.1 B.2

1,816,435.16 55,729,839.92

PEKERJAAN KUSEN PINTU, JENDELA & KACA 1 Pek. Pintu Alumunium+Assesoris (P1)

warna Hitam, 3", alexindo/Alco/ykkALM 01

2.00

Unit

3,489,200.00

6,978,400.00

2 Pek Jendela Alumunium (J1)

warna Hitam, 3", alexindo/Alco/ykkALM 03

8.00

Unit

3,164,100.00

25,312,800.00

3 Pek Jendela Alumunium (J2)

warna Hitam, 3", alexindo/Alco/ykkALM 04

2.00

Unit

2,720,200.00

5,440,400.00

4 Pek Jendela Alumunium (BV1)

warna Hitam, 3", alexindo/Alco/ykkALM 07

10.00

Unit

1,304,600.00

13,046,000.00

5 Pek Jendela Alumunium (BV2)

warna Hitam, 3", alexindo/Alco/ykkALM 08

2.00

Unit

1,106,200.00

2,212,400.00

1.00

m2

6 Pek Rooster dinding

-

20,350.00 JUMLAH B.2

B.3

20,350.00 53,010,350.00

PEKERJAAN PLAFOND 1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 mm

hollow 4 x 4 dan 2 x 4 cm

A.4.2.1.25

239.82

m2

331,829.08

79,579,249.97

2 Pek Pas plafond gypsum board uk. (120x240x9) mm

, tebal 9 mm

A.4.5.1.7

239.82

m2

46,002.00

11,032,199.64

3 Pek List Plafond Gypsum

Uk.10 -15 cm

A.4.5.1.9a

115.00

m'

20,086.00

2,309,890.00

Kayu Kls II dicat

A.4.5.1.9b

69.04

m'

20,086.00

4 Pek List Profil kayu (tepi listplang)

JUMLAH B.3 B.4

1,386,737.44 94,308,077.05

PEKERJAAN LANTAI 1 Pek Pas lantai granite 60x60 cm

B.5

Warna/Corak Geranito/Indogress/Roman A.4.4.3.36c

203.67

m2

169,774.00 JUMLAH B.4

34,577,870.58 34,577,870.58

PEKERJAAN PENGECATAN 1 Pek Pengecatan Tembok dan kolom

Catilac/Duluxe/Jotun

A.4.7.1.10

402.87

m2

24,376.00

2 Pek Pengecetan plafond dan kanopi dgn cat tembok

Catilac/Duluxe/Jotun

A.4.7.1.11

239.82

m2

30,063.00 JUMLAH B.5 JUMLAH III

IV

9,820,359.12 7,209,708.66 17,030,067.78 557,067,434.71

PEKERJAAN ELEKTRIKAL 1 Pek Pas Instalasi titik Lampu Kabel NYM 3x2.5 mm

Eterna

EL.5.1.1.4

22.00

ttk

224,818.00

4,945,996.00

2 Pek Pas Instalasi stop kontak saklar Kabel NYM 3x2.5 mm

Eterna

EL.5.1.1.4

4.00

ttk

224,818.00

899,272.00

3 Pek Pas saklar Enkle

Broco

EL.5.1.1.5

-

bh

40,535.00

3 Pek Pas saklar Double

Broco

EL.5.1.1.6

4.00

bh

54,835.00

219,340.00

-

4 Pek Pas stop kontak

Broco

EL.5.1.1.8

4.00

bh

32,835.00

131,340.00

5 Pek Pas Lampu TL Reflektor 2x18 watt

Phillips

EL.5.1.1.10

12.00

bh

72,105.00

865,260.00

6 Pek Pas Lampu Down Light SL 9 watt

Phillips

EL.5.1.1.12

10.00

bh

78,760.00

787,600.00

Broco 900 A

EL.5.1.1.13

1.00

bh

500,000.00

7 Pek Pas MCB + Box

JUMLAH IV JUMLAH TOTAL (I+II+III+IV)

500,000.00 8,348,808.00 1,149,252,600.23

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN KURVA " S " SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN NO.

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 4 (EMPAT) RUANG KELAS SMKN 2 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Biaya Keselamatan Kerja (Obat P3K, dll) Pas. Plakat/ Prasasti II PEKERJAAN LANTAI DASAR A PEKERJAAN STRUKTUR A.1 PEKERJAAN TANAH & URUGAN A.2 PEKERJAAN PONDASI A.3 PEKERJAAN BETON STRUKTUR B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN B.6 PEKERJAAN DRAINASE III PEKERJAAN LANTAI ATAS A PEKERJAAN STRUKTUR A.1 PEKERJAAN BETON STRUKTUR A.2 PEKERJAAN ATAP B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN IV PEKERJAAN ELEKTRIKAL SERAH TERIMA PHO

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 9 10 11 12

BULAN IV MINGGU KE : 13 14 15 16

I

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

0.065 0.268 0.261 0.148 0.098 0.131 0.657 6.513 25.531 4.479 4.613 2.936 3.262 1.489 0.351 9.891 16.423 4.849 4.613 8.206 3.009 1.482 0.726

100

0.065 0.268 0.017 0.030 0.098

0.017

0.017

0.017

0.017 0.030

0.017

0.017

0.017

0.017 0.030

0.017

0.017

0.017

0.017 0.030

0.017

KETERANGAN

-

100%

-

50%

0.017 0.030 0.131

0.657 3.257

3.257 6.383

6.383

6.383

6.383

1.120

1.120

1.120 1.538

1.120 1.538

1.538 1.468

1.468 1.087

1.087

1.087 1.489 0.351

3.297

3.297

1.616

3.297 5.474

5.474

5.474

1.616 1.153

1.616 1.153

1.153

1.153 2.735

2.735

2.735 3.009 1.482

0.145 0.48

3.93

0.48

4.41

9.66 ###

7.52 ###

7.55 ###

9.20 ###

5.97 ###

7.94 ###

0.145

0.145

###

9.49

###

###

0.145 7.73 ###

5.14 ###

-

0.145 3.13 ###

5.91 ###

3.15

-

100

100

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

BART CHART " DIAGRAM BATANG " SATUAN KERJA KEGIATAN LOKASI TAHUN ANGGARAN NO.

: : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK SMKN 2 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% I

PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Biaya Keselamatan Kerja (Obat P3K, dll) Pas. Plakat/ Prasasti II PEKERJAAN LANTAI DASAR A PEKERJAAN STRUKTUR A.1 PEKERJAAN TANAH & URUGAN A.2 PEKERJAAN PONDASI A.3 PEKERJAAN BETON STRUKTUR B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN B.6 PEKERJAAN DRAINASE III PEKERJAAN LANTAI ATAS A PEKERJAAN STRUKTUR A.1 PEKERJAAN BETON STRUKTUR A.2 PEKERJAAN ATAP B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN IV PEKERJAAN ELEKTRIKAL SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

0.065 0.268 0.261 0.148 0.098 0.657 6.513 25.531 4.479 4.613 2.936 3.262 1.489 0.351 9.891 16.423 4.849 4.613 8.206 3.009 1.482 0.726

100

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 10 11 12

9

KETERANGAN

0.065 0.268 0.017 0.030 0.098 -

0.017 0.657 3.257 -

0.017 3.257 6.383 -

0.017 6.383 1.120 -

0.017 0.030 6.383 1.120 -

0.017 6.383 1.120 1.538 0.145

0.017 1.120 1.538 3.297 -

0.017 1.538 1.468 3.297 1.616 -

0.017 0.030 1.468 3.297 5.474 1.616 1.153 0.145

0.017 1.087 5.474 1.616 1.153 0.145

0.017 1.087 5.474 1.153 -

0.017 1.087 1.153 2.735 0.145

0.017 0.030 0.351 2.735 -

0.017 2.735 3.009 0.145

0.017 0.030 0.131 1.489 1.482 -

-

0.48

3.93

9.66

7.52

7.55

9.20

5.97

7.94 13.20

9.49

7.73

5.14

3.13

5.91

3.15

-

0.48

4.41 14.07 21.59 29.13 38.34 44.31 52.25 65.45 74.94 82.67 87.81 90.95 96.85

100

100

-

100%

-

50%

-

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

JADWAL MOBILISASI ( JAD - MOB ) PEKERJA - PERALATAN - BAHAN MATERIAL SATUAN KERJA KEGIATAN LOKASI TAHUN ANGGARAN NO.

: : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK SMKN 2 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% I

PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Biaya Keselamatan Kerja (Obat P3K, dll) Pas. Plakat/ Prasasti

0.065 0.268 0.261 0.148 0.098

BULAN I MINGGU KE : 1 2 3 4 0.065 0.268 0.017 0.030 0.098

BULAN II MINGGU KE : 5 6 7 8

0.017 -

0.017 -

0.017 -

0.017 0.030 -

0.017 -

0.657 3.257 -

3.257 6.383

6.383

6.383

6.383

1.120 -

1.120 -

1.120 1.538 -

0.017 -

BULAN II MINGGU KE : 5 6 7 8

0.017 -

0.017 0.030 -

0.017 -

0.017 -

BULAN III MINGGU KE : 10 11 12

9

0.017 -

0.017 0.030 -

0.017 -

0.017 0.030 0.131

KETERANGAN

-

-

100%

-

50%

PERKERJA PERALATAN BAHAN MATERIAL

II A

PEKERJAAN LANTAI DASAR PEKERJAAN STRUKTUR A.1 PEKERJAAN TANAH & URUGAN A.2 PEKERJAAN PONDASI A.3 PEKERJAAN BETON STRUKTUR

0.657 6.513 25.531

-

4.479 4.613 2.936 3.262 1.489 0.351

-

-

-

9.891 16.423

-

-

-

-

-

-

4.849 4.613 8.206 3.009 1.482

-

-

-

-

-

-

0.726

-

-

-

-

-

0.145

-

0.48

3.93

9.66

7.52

7.55

9.20

5.97

0.48

-

-

-

-

` -

-

-

-

-

-

PERKERJA PERALATAN BAHAN MATERIAL

B

PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN B.6 PEKERJAAN DRAINASE

1.120 1.538 -

1.538 1.468 -

1.468 -

1.087 -

1.087 -

1.087 -

0.351

-

1.489 -

-

3.297 -

3.297 -

3.297 5.474

5.474

5.474

1.616 -

1.616 1.153 -

1.616 1.153 -

1.153 -

0.145

0.145

-

0.145

-

0.145

-

7.94 13.20

9.49

7.73

5.14

3.13

5.91

3.15

-

4.41 14.07 21.59 29.13 38.34 44.31 52.25 65.45 74.94 82.67 87.81 90.95 96.85

100

100

PERKERJA PERALATAN BAHAN MATERIAL

III A

PEKERJAAN LANTAI ATAS PEKERJAAN STRUKTUR A.1 PEKERJAAN BETON STRUKTUR A.2 PEKERJAAN ATAP

-

-

-

-

-

PERKERJA PERALATAN BAHAN MATERIAL

B

PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN

-

1.153 2.735 -

2.735 -

2.735 3.009 -

1.482

-

PERKERJA PERALATAN BAHAN MATERIAL

IV

PEKERJAAN ELEKTRIKAL

-

-

PERKERJA PERALATAN BAHAN MATERIAL

-

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

100

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI

0%

Direktur Cabang

BILL of QUANTITY SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN

NO

: : : : : :

URAIAN PEKERJAAN

SPESIFIKASI

2

3

1 I

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 4 (EMPAT) RUANG KELAS SMKN 3 CILEGON - KOTA CILEGON TA.2018

KODE ANALISA

VOLUME

HARGA SATUAN

JUMLAH HARGA

4

5

6

PEKERJAAN PERSIAPAN 1 Papan Nama Proyek 1.5 x 0.8 m 2 Pengukuran dan Bowuplank

Kayu klas II

A. 2.2.1 .2

1.00

bh

748,852.50

748,852.50

A. 2.2.1 .1

48.00

m'

64,141.00

3,078,768.00

3 Mobilisai dan demobilisasi

1.00

ls

3,000,000.00

3,000,000.00

4 Gambar Kerja, Dokumentasi dan Pelaporan

1.00

ls

1,700,000.00

1,700,000.00

5 Biaya Keselamatan Kerja (Obat P3K, dll)

1.00

ls

1,124,010.00

1,124,010.00

1.00

bh

1,500,000.00

5 Pas. Plakat/ Prasasti

Granit Hitam Uk.60x90

JUMLAH I II

1,500,000.00 11,151,630.50

PEKERJAAN LANTAI DASAR A PEKERJAAN STRUKTUR

A.1

PEKERJAAN TANAH & URUGAN 1 Pek. Galian Tanah Pondasi

A. 2.3.1 .1

21.98

m3

65,450.00

1,438,591.00

A. 2.3.1 .9

18.60

m2

48,400.00

900,240.00

Pasir urug

A. 2.3.1 .4

0.90

m3

220,660.00

198,594.00

4 Pek Tanah Peninggian Lantai

Tanah Merah

A. 2.3.1 .5

54.25

m3

167,860.00

9,106,405.00

5 Pek. Urugan Tanah Bekas galian

Tanah galian

A. 2.3.1 .3

7.39

m3

kedalaman max. 1

2 Pek Perataan dan pemadataanTanah Sloof (S1) 3 Pek Pasir Urug Bawah Pondasi Pondasi t = 5 cm

48,400.00 JUMLAH A.1

A.2

PEKERJAAN PONDASI 1 Pek Poot Plate 120x120x45 cm (P.1) Lantai Kerja beton di Bawah (lean Concrete) t = 5 Beton Besi beton (tulangan) Bekisting Pondasi 2 Pek Poot Plate 75x90x40 cm (P.2) Lantai Kerja beton di Bawah (lean Concrete) t = 5 Beton Besi beton (tulangan) Bekisting Pondasi 3 Pek Poot Plate Tangga Beton Besi beton (tulangan) Bekisting Pondasi 4 Pek Kolom Pedistal 40/40 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom 5 Pek Kolom Pedistal 25/30 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom

A.3

357,676.00 12,001,506.00

Site Mix K.100 Site Mix K. 225 U. 32

A.4.1.1.1 A.4.1.1.7 A.4.1.1.17.A A.4.1.1.20

1.44 12.96 1,365.31 43.20

m3 m3 kg m2

726,415.09 947,715.78 11,854.70 177,958.00

1,046,037.72 12,282,396.51 16,185,340.46 7,687,785.60 196,132.07 1,535,299.56 5,754,389.93 1,409,427.36 37,908.63 193,705.80 85,419.84 2,236,609.24 8,619,315.28 11,306,768.00 568,629.47 2,600,921.18 3,109,361.20 74,855,447.85

Site Mix K.100 Site Mix K. 225 U. 32

A.4.1.1.1 A.4.1.1.7 A.4.1.1.17.A A.4.1.1.20

0.27 1.62 485.41 7.92

m3 m3 kg m2

726,415.09 947,715.78 11,854.70 177,958.00

Site Mix K. 225 U. 32

A.4.1.1.7 A.4.1.1.17.A A.4.1.1.20

0.04 16.34 0.48

m3 kg m2

947,715.78 11,854.70 177,958.00

Site Mix K. 225 U. 32

A.4.1.1.7 A.4.1.1.17.A A.4.1.1.22

2.36 727.08 32.00

m3 kg m2

947,715.78 11,854.70 353,336.50

Site Mix K. 225 U. 32

A.4.1.1.7 A.4.1.1.17.A A.4.1.1.22

0.60 219.40 8.80

m3 kg m2

947,715.78 11,854.70 353,336.50 JUMLAH A.2

Lantai Kerja beton di Bawah (lean Concrete) t = 5

Site Mix K.100

A.4.1.1.1

0.93

m3

726,415.09

675,566.03

Beton

Site Mix K. 225

A.4.1.1.7

5.58

m3

947,715.78

5,288,254.05

U. 32

A.4.1.1.17.A

PEKERJAAN BETON STRUKTUR 1 Pek Sloof (S1) 20/30 Beton Bertulang

Besi beton (tulangan)

2,110.40

kg

11,854.70

25,018,158.88

A.4.1.1.21

55.80

m2

190,333.00

10,620,581.40

Ready Mix K. 225

A.4.1.1.8

11.52

m3

947,715.78

10,917,685.79

U. 32

A.4.1.1.17.A

Bekisting Sloof 2 Pek Kolom (K1) 40/40 Beton Bertulang Beton Besi beton (tulangan)

1,968.49

kg

11,854.70

23,335,858.40

A.4.1.1.22

115.20

m2

353,336.50

40,704,364.80

Ready Mix K. 225

A.4.1.1.8

2.16

m3

947,715.78

2,047,066.08

U. 32

A.4.1.1.17.A

599.62

kg

11,854.70

7,108,315.21 11,193,700.32

Bekisting Kolom 3 Pek Kolom (K2) 25/30 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting Kolom

A.4.1.1.22

31.68

m2

353,336.50

Ready Mix K. 225

A.4.1.1.8

12.15

m3

947,715.78

11,514,746.73

U. 32

A.4.1.1.17.A

3,197.35

kg

11,854.70

37,903,625.05

4 Pek Balok B1 20/45 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting balok 50%

A.4.1.1.23

139.26

m2

180,215.75

25,096,845.35

Ready Mix K. 225

A.4.1.1.8

1.62

m3

947,715.78

1,535,299.56

U. 32

A.4.1.1.17.A

473.26

kg

11,854.70

5,610,355.32

A.4.1.1.23

21.60

m2

360,431.50

7,785,320.40

Site Mix K. 225

A.4.1.1.7

1.06

m3

947,715.78

1,004,578.73

U. 24

A.4.1.1.17.A

73.00

kg

11,854.70

865,393.10

A.4.1.1.23A

17.77

m2

251,861.50

4,475,578.86

Site Mix K.175

A.4.1.1.5

0.46

m3

893,214.41

410,878.63

U. 24

A.4.1.1.17.A

170.25

kg

11,854.70

2,018,262.68

A.4.1.1.23A

9.08

m2

251,861.50

2,286,902.42

Ready Mix K. 225

A.4.1.1.8

23.55

m3

947,715.78

22,318,706.62

U. 24

A.4.1.1.17.A

218.13

m2

11,854.70

2,585,865.71

T.0,75 mm

-

185.33

m2

104,000.00

19,274,320.00

A.4.1.1.24

9.46

m2

485,336.50

4,591,283.29

Site Mix K. 225

A.4.1.1.8

1.28

m3

947,715.78

1,213,076.20

U. 32

A.4.1.1.17.A

155.90

kg

11,854.70

1,848,147.73

A.4.1.1.26

12.72

m2

327,926.50

5 Pek Balok (B2) 20/30 Beton Bertulang Beton Besi beton (tulangan)

-

Bekisting balok 6 Pek Kanopi Beton Bertulang t.7 cm Beton Besi beton (tulangan)

-

Perancah Bekisting Lantai 7 Pek Balok Lintel 10/12 Beton Besi beton (tulangan)

-

Bekisting balok Non Struktur 8 Pek Plat Lantai Beton Bertulang t = 12 cm Beton Wiremesh M8 (2 lapis) Plat Bondek + Perancah

-

Perancah Bekisting Lantai Sisi Plat 9 Pek Plat Tangga dan Bordes Beton Besi beton (tulangan)

-

Bekisting tangga

JUMLAH A.3

4,171,225.08 293,419,962.41

B PEKERJAAN ARSITEKTUR B.1

PEKERJAAN DINDING 1 Pek Pas Bata Ringan/Hebel (Celcon) ad. 1:4 2 Pek Plesteran Kolom & Dinding (mortar) - 301

10 x 20 x 60

A.4.4.2.26

186.06

m2

92,296.88

17,172,756.56

t=10mm

A.4.4.2.27

359.24

m2

62,902.81

22,597,206.36

A.4.4.2.28

460.84

m2

16,417.50

7,565,840.70

A.4.4.1.10

8.10

m2

91,152.60

738,336.06

4.4.2

8.10

m2

79,320.31

642,494.53

A.4.4.3.41b

17.74

m2

47,795.55

847,893.06

8.48

m'

325,000.00

2,756,000.00

3 Pek Acian Kolm & Dinding (mortar) - 200 4 Pek Pas dinding bata merah Selasar ad. 1:4

1/2" bata

5 Pek Plesteran + Aci dinding selasar 6 Pek. Dinding Batu alam 7 Pek. Railling Tangga Besi Stanless Stell

JUMLAH B.1 B.2

52,320,527.27

PEKERJAAN KUSEN PINTU, JENDELA & KACA 1 Pek. Pintu Alumunium+Assesoris (P1)

warna Hitam, 3", ykk

ALM 01

2.00

Unit

3,489,200.00

6,978,400.00

2 Pek Jendela Alumunium (J1)

warna Hitam, 3", ykk

ALM 03

8.00

Unit

3,164,100.00

25,312,800.00

3 Pek Jendela Alumunium (J2)

warna Hitam, 3", ykk

ALM 04

2.00

Unit

2,720,200.00

5,440,400.00

4 Pek Jendela Alumunium (BV1)

warna Hitam, 3", ykk

ALM 07

10.00

Unit

1,304,600.00

13,046,000.00

5 Pek Jendela Alumunium (BV2)

warna Hitam, 3", ykk

ALM 08

2.00

Unit

1,106,200.00

2,212,400.00

-

1.00

m2

25,350.00

6 Pek Rooster dinding

JUMLAH B.2 B.3

25,350.00 53,015,350.00

PEKERJAAN PLAFOND 1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 m hollow 4 x 4 dan 2 x 4 cm 2 Pek Pas plafond gypsum board uk. (120x240x9) , tebal 9 mm

A.4.2.1.25

184.64

m2

124,300.00

22,950,752.00

A.4.5.1.7

184.64

m2

46,002.00

8,493,809.28

3 Pek List Plafond Gypsum

A.4.5.1.9a

114.40

m'

20,086.00

Uk.10 -15 cm

JUMLAH B.3 B.4

2,297,838.40 33,742,399.68

PEKERJAAN LANTAI 1 Pek Pas lantai granite 60x60 cm 2 Pas. Bata penguat rabat 3 Pek. Beton tumbuk

Warna/Corak A.4.4.3.36c Geranito/Indogress/Roman 1/2 Bata A.4.4.1.10 Camp. 1 : 3 : 5, T.7 cm

-

203.67

m2

169,774.00

34,577,870.58

21.60

m2

91,152.60

1,968,896.16

1.83

m2

762,602.50 JUMLAH B.4

B.5

1,395,562.58 37,942,329.32

PEKERJAAN PENGECATAN 1 Pek Pengecatan Tembok dan kolom

Catilac/Duluxe/Jotun 2 Pek Pengecetan plafond dan kanopi dgn cat temb Catilac/Duluxe/Jotun

A.4.7.1.10

460.84

m2

24,376.00

A.4.7.1.11

195.44

m2

30,063.00 JUMLAH B.5

B.6

11,233,435.84 5,875,512.72 17,108,948.56

PEKERJAAN DRAINASE 1 Pek. Grevel U Keliling Bangunan

1/2" buis uk.20x100 cm

7.1.1

66.40

m'

93,500.00 JUMLAH B.6 JUMLAH II

III

6,208,400.00 6,208,400.00 580,614,871.08

PEKERJAAN LANTAI ATAS A PEKERJAAN STRUKTUR

A.1

PEKERJAAN BETON STRUKTUR 1 Pek Kolom (K3) 30/30 Beton Bertulang Beton Besi beton (tulangan) Bekisting Kolom 2 Pek Kolom (K4) 20/25 Beton Bertulang

Site Mix K. 225

A.4.1.1.7

U. 32

A.4.1.1.17.A A.4.1.1.22

6.48

m3

947,715.78

6,141,198.25

1,388.70

kg

11,854.70

16,462,621.89

86.40

m2

353,336.50

30,528,273.60 -

Beton

Site Mix K. 225

Besi beton (tulangan)

A.4.1.1.7

1.44

m3

947,715.78

1,364,710.72 3,494,291.37

A.4.1.1.17.A

294.76

kg

11,854.70

A.4.1.1.22

25.92

m2

353,336.50

9,158,482.08

Site Mix K. 225

A.4.1.1.7

3.15

m3

947,715.78

2,985,304.71

U. 32

A.4.1.1.17.A

651.48

kg

11,854.70

7,723,099.96

A.4.1.1.23

52.40

m2

180,215.75

9,443,305.30

Site Mix K. 225

A.4.1.1.7

0.36

m3

947,715.78

341,177.68

U. 32

A.4.1.1.17.A

66.88

kg

11,854.70

792,842.34

A.4.1.1.23

12.55

m2

180,215.75

2,261,707.66

Site Mix K. 225

A.4.1.1.7

1.13

m3

947,715.78

1,070,918.83

U. 32

A.4.1.1.17.A

248.49

kg

11,854.70

2,945,774.40

A.4.1.1.23

22.50

m2

180,215.75

4,054,854.38

Site Mix K.175

A.4.1.1.5

0.46

m3

893,214.41

410,878.63

U. 24

A.4.1.1.17.A

170.25

kg

11,854.70

2,018,262.68

A.4.1.1.23A

9.08

m2

251,861.50

2,286,902.42

Site Mix K.175

A.4.1.1.5

0.57

m3

893,214.41

509,132.21

U. 32

A.4.1.1.17.A

1,362,579.22

U. 32

Bekisting Kolom 3 Pek Ringbalk (RB) 12/20 Beton Bertulang

-

Beton Besi beton (tulangan) Bekisting balok 50% 4 Pek Balok Selasar (B3) 15/20 Beton Bertulang

-

Beton Besi beton (tulangan) Bekisting balok 5 Pek Balok Selasar (B4) 15/15 Beton Bertulang

-

Beton Besi beton (tulangan) Bekisting balok 6 Pek Balok Lintel 10/12

-

Beton Besi beton (tulangan) Bekisting balok Non Struktur 7 Pek Balok Dinding Selasar (B4) 15/15 Beton Bertu Beton Besi beton (tulangan)

-

Bekisting balok

A.4.1.1.23

114.94

kg

11,854.70

7.50

m2

180,215.75 JUMLAH A.1

A.2

1,351,618.13 106,707,936.45

PEKERJAAN ATAP Bergaransi 10 Tahun A.4.2.1.26 Taso/Alfa/Haisteel C.075-75 cm Onduvilla A.4.5.2.33

1 Pas. Rangka Atap Baja Ringan

340.02

m2

287,421.75

97,729,143.44

340.02

m2

231,448.80

78,697,220.98

A.4.5.2.37

49.33

m'

104,632.00

5,161,496.56

Kalsi Board kalsiplank/SuperplankA.4.6.1.21a

69.04

m'

103,620.00

2 Pas. Atap Selulosa Bitumen 3 Pas. Nok Selulosa Bitumen

Onduvilla

4 Pek. Lisplank GRC 2x20x2 lapis

JUMLAH A.2

7,153,924.80 188,741,785.77

B PEKERJAAN ARSITEKTUR B.1

PEKERJAAN DINDING 1 Pek Pas Bata Ringan/Hebel (Celcon) ad. 1:4 2 Pek Plesteran Kolom & Dinding (mortar) - 301

10 x 20 x 60

A.4.4.2.26

205.66

m2

92,296.88

18,981,775.31

t=10mm

A.4.4.2.27

398.44

m2

62,902.81

25,062,996.61

A.4.4.2.28

473.96

m2

16,417.50

7,781,238.30

A.5.1.1.36/15

22.90

m2

91,152.60

2,087,394.54

4.4.2

22.90

m2

79,320.31

1,816,435.16

A.4.4.3.41b

17.74

m2

47,795.55

3 Pek Acian Kolm & Dinding (mortar) - 200 4 Pek Pas dinding bata merah Selasar ad. 1:4

1/2" bata

5 Pek Plesteran + Aci dinding selasar Pek. Dinding Batu alam

JUMLAH B.1 B.2

847,893.06 56,577,732.98

PEKERJAAN KUSEN PINTU, JENDELA & KACA 1 Pek. Pintu Alumunium+Assesoris (P1)

warna Hitam, 3", alexindo/Alco/ykkALM 01

2.00

Unit

3,489,200.00

6,978,400.00

2 Pek Jendela Alumunium (J1)

warna Hitam, 3", alexindo/Alco/ykkALM 03

8.00

Unit

3,164,100.00

25,312,800.00

3 Pek Jendela Alumunium (J2)

warna Hitam, 3", alexindo/Alco/ykkALM 04

2.00

Unit

2,720,200.00

5,440,400.00

4 Pek Jendela Alumunium (BV1)

warna Hitam, 3", alexindo/Alco/ykkALM 07

10.00

Unit

1,304,600.00

13,046,000.00

5 Pek Jendela Alumunium (BV2)

warna Hitam, 3", alexindo/Alco/ykkALM 08

2.00

Unit

1,106,200.00

2,212,400.00

1.00

m2

6 Pek Rooster dinding

-

20,350.00 JUMLAH B.2

B.3

20,350.00 53,010,350.00

PEKERJAAN PLAFOND 1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 m hollow 4 x 4 dan 2 x 4 cm 2 Pek Pas plafond gypsum board uk. (120x240x9) , tebal 9 mm

A.4.2.1.25

239.82

m2

331,829.08

79,579,249.97

A.4.5.1.7

239.82

m2

46,002.00

11,032,199.64

3 Pek List Plafond Gypsum

Uk.10 -15 cm

A.4.5.1.9a

115.00

m'

20,086.00

2,309,890.00

Kayu Kls II dicat

A.4.5.1.9b

69.04

m'

20,086.00

4 Pek List Profil kayu (tepi listplang)

JUMLAH B.3 B.4

1,386,737.44 94,308,077.05

PEKERJAAN LANTAI 1 Pek Pas lantai granite 60x60 cm

B.5

Warna/Corak A.4.4.3.36c Geranito/Indogress/Roman

203.67

m2

169,774.00 JUMLAH B.4

34,577,870.58 34,577,870.58

PEKERJAAN PENGECATAN 1 Pek Pengecatan Tembok dan kolom

Catilac/Duluxe/Jotun 2 Pek Pengecetan plafond dan kanopi dgn cat temb Catilac/Duluxe/Jotun

A.4.7.1.10

473.96

m2

24,376.00

A.4.7.1.11

239.82

m2

30,063.00 JUMLAH B.5 JUMLAH III

IV

11,553,248.96 7,209,708.66 18,762,957.62 552,686,710.45

PEKERJAAN ELEKTRIKAL 1 Pek Pas Instalasi titik Lampu Kabel NYM 3x2.5 mm

Eterna

EL.5.1.1.4

22.00

ttk

224,818.00

4,945,996.00

2 Pek Pas Instalasi stop kontak saklar Kabel NYM 3

Eterna

EL.5.1.1.4

4.00

ttk

224,818.00

899,272.00

3 Pek Pas saklar Double

Broco

EL.5.1.1.6

4.00

bh

54,835.00

219,340.00

4 Pek Pas stop kontak

Broco

EL.5.1.1.8

4.00

bh

32,835.00

131,340.00

5 Pek Pas Lampu TL Reflektor 2x18 watt

Phillips

EL.5.1.1.10

12.00

bh

72,105.00

865,260.00

6 Pek Pas Lampu Down Light SL 9 watt 7 Pek Pas MCB + Box

Phillips Broco 900 A

EL.5.1.1.12 EL.5.1.1.13

10.00 1.00

bh

78,760.00

bh

500,000.00 JUMLAH IV

JUMLAH TOTAL (I+II+III+IV)

787,600.00 500,000.00 8,348,808.00 1,152,802,020.03

DAFTAR HARGA DASAR SATUAN BAHAN, PERALATAN DAN UPAH Program Pekerjaan Lokasi Tahun Anggaran

: Penataan kawasan pariwisata : Pembangunan Gedung TIC/ATM Centre, Area Kuliner, Wc & Musholla : Kecamatan Panimbang, Kabupaten Pandeglang : 2018

NO

URAIAN

SPESIFIKASI/ MERK

SATUAN

HARGA SATUAN (Rp.)

(1)

(2)

(3)

(4)

(5)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Bahan Agregat Kasar, Perekat dan Bahan Jadinya Tanah Urug Pasir Urug Pasir Pasang Pasir Beton Pasir Silika/Screening Agregat Kelas A Agregat Kelas B Batu Pecah Mesin Ukuran 15/20 Batu Pecah Mesin 1/2 Ukuran 1/2 Batu Pecah Mesin 2/3 Ukuran 2/3 Batu Pecah Mesin 3/5 Ukuran 3/5 Batu Pecah Mesin 5/7 Ukuran 5/7 Batu Belah Pondasi Batu kapur / Limestone Tanah Liat Kanstin beton K-300 Uk. 10 x 20 x 40 Bata Merah Bakar Kelas I Bata Ringan / hebel Paving Block K.175 Natural 6 cm Paving Block K.175 Natural 8 cm Semen PC Semen Putih Semen Warna Semen grout Readymix Beton K 225 Readymix Beton K 250 Readymix Beton K 175 Pagar panel precast Tiang panel pagar precast Pagar precast Jendela Naco Bata rooster/ Kerawangan/ Batu angin/ Angin-ang block hebel Dinding Conblock Mortar/Perekat bata ringan thin bed PM 110 40 kg Floor hardener MU-200 40 kg Sirtu

m3 m3 m3 m3 Kg m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 bh bh m3 m2 m2 kg kg kg kg kg m3 m3 lbr btg m1 bh bh m3 pcs sak sak m3

150,000.00 160,000.00 185,000.00 210,000.00 1,000.00 185,000.00 195,000.00 200,000.00 205,000.00 180,000.00 200,000.00 230,000.00 185,000.00 65,000.00 155,000.00 45,000.00 450.00 750,000.00 90,000.00 98,000.00 1,500.00 5,000.00 5,000.00 3,200.00 989,000.00 1,230,000.00 823,500.00 161,700.00 369,500.00 523,600.00 15,000.00 18,500.00 780,000.00 4,000.00 90,000.00 150,500.00 135,000.00

1 2 3 4 5 6 7 8 9

Bahan Finishing : Laburan, Pengisi dan Alatnya Cat Dasar Tembok Cat Tembok Cat Tembok Cat Tembok Cat Epoxy anti bakteri Water Profing Waterstop lebar 150 mm Waterstop lebar 200 mm Waterstop lebar 230 mm - 320 mm

kg kg kg kg kg kg m' m' m'

22,500.00 27,500.00 32,500.00 25,000.00 40,000.00 42,500.00 2,800.00 3,200.00 6,000.00

setara kemtone setara dulux setara metrolite Setara Jotun Aquaproof

10 11 12 13 14 15 16 17 18 19 20 21 21 22 23 24 25 26 27 28 29 30 31 32 33 33 34 34 35 34 35 35 36 37 38 39 40 41

Roll Cat Tembok Kuas 3" Thinner Soda Api Sabun Compound Amplas Meni Kayu/Besi Sincromate Cat Kayu/Besi Cat Kayu Cat Besi Cat dasar Besi Plamir Tembok Lem Putih Minyak Bekisting Solar Minyak Pelumas / Oil Cat Dasar Plafon Cat Plafon Plamir Cat Dasar kayu Cat genteng Kape Plastic aerator Plitur/politur Plitur/politur Plitur/politur Plitur/politur Dempul Plitur Vernis/pernis Filler ultran Sending sealer ultran Cat warna melamic Melamic ultran Residu Strorox - 100 Wall paper

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Bahan Kayu Berikut Bahan Jadinya Dolken Kayu Balok Terentang basah Balok Terentang basah List Kayu profil Kayu Kaso 5/7 Kayu Papan 2/20 Kayu reng 2/3 Kayu Albasia - Papan Kayu Albasia - Balok Kayu Albasia - Kaso Kayu Kls III - Papan Kayu Kls III - Balok Kayu Kls II - Papan Kayu Kls II - Balok Kayu Kls I - Papan Kayu Kls I - Balok spacer Bambu Ijuk Tali ijuk

setara Nippon paint, Imphala

setara Nippon sekelas 'Avian Sekelas Glotex Sekelas Seive zincronate ICI - Catylac Fox

catylac catylac Bee Brand Glotex setara Neptune

Impra Wood Stain Dulux V-Gloss warna standar Dulux V-Gloss warna khusus setara impra setara impra setara impra setara impra setara impra

panjang 10 m lebar 53 cm

Ø 8-10/400 cm Balok Kaso Uk. 4 x 400 cm Kelas II Kelas II Kelas II Papan Balok Kaso Kelas III Kelas III Mahoni Mahoni Jati Jati dia. 5 s.d 7

bh bh ltr kg kg kg lbr kg kg kg kg kg kg kg kg ltr ltr ltr kg kg kg kg kg bh bh ltr ltr ltr ltr kg ltr kg kg kg kg ltr kg roll

26,500.00 10,000.00 25,000.00 27,000.00 1,500.00 47,000.00 5,000.00 26,000.00 50,000.00 43,000.00 48,000.00 50,000.00 50,000.00 65,000.00 25,000.00 12,000.00 8,500.00 15,000.00 60,000.00 25,000.00 50,000.00 45,000.00 67,000.00 15,000.00 1,500.00 45,000.00 67,000.00 42,000.00 39,500.00 36,000.00 55,000.00 32,500.00 52,500.00 61,000.00 60,500.00 50,000.00 48,000.00 72,500.00

btg m3 m3 m1 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 Bh btg m3 kg

30,000.00 3,000,000.00 2,750,000.00 5,000.00 2,400,000.00 2,450,000.00 2,100,000.00 2,900,000.00 2,800,000.00 2,500,000.00 2,500,000.00 2,650,000.00 2,970,000.00 2,850,000.00 3,600,000.00 3,800,000.00 3,000.00 8,000.00 300,000.00 20,000.00

1 2 3 4

Bahan Penutup Rangka Plafon Gypsum GRC List Profil Gypsum Plafond PVC

1 2 3 4 5 6 7 8 9

Bahan Kayu Lapis Tripleks Tripleks Multipleks Multipleks Plywood Plywood Phenol film 12mm Formika HPL/Formica

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Bahan Lantai dan Pelapis Dinding Keramik 20x20 KM/WC Keramik 20x25 Keramik 30x30 cm Keramik 40x40 cm Keramik 25x50 cm Granit Tile Granit Tile Granit Tile Batu Granite Keramik Marmer 40x40 Keramik Marmer 30x60 Keramik Marmer 60x60 Stair nosing Floor Hardener Vinyl Parquet Batu paras/muka Batu tempel hitam Plin Triplek terpasang

1 2 3 4 5

Bahan Saluran Air Kotor Gorong-gorong 60 cm x 60 cm Gorong-gorong 100 cm x 100 cm Buis Beton dia. 30CM Buis Beton dia. 20CM Buis Beton dia. 20CM

1 2 3 4 5 6 7 8 9 10 11 12 13

Bahan Logam dan Bahan Jadinya Besi Beton Polos U24 Besi Beton Ulir U39 Besi scuare tube Wiremesh Besi profil Besi lis kaca Baja Siku Baja Strip / Besi Strip Plat baja Kawat Beton Kawat Baja Kawat las Kawat Nyamuk

120x240 cm 120x240 cm 10-15 cm

lbr lbr m1 m2

75,000.00 60,000.00 9,000.00 300,000.00

t=4mm Uk. 120x240 t=6mm Uk. 120x240 t=9mm Uk. 120x240 t=12mm Uk. 120x240 t=4mm Uk. 120x240 t=9mm Uk. 120x240 1220 x 2240 mm Grade 6 t=3mm Uk. 120x240

lbr lbr lbr lbr lbr lbr lbr lbr m2

66,500.00 94,200.00 237,000.00 162,500.00 115,000.00 145,000.00 285,000.00 72,000.00 115,500.00

anti slip KW I DN Corak KW I 30 x 30 cm putih 40 x 40 cm KW I 25 x 50 cm KW I Ukuran 40x40 cm ukuran 60x60 cm ukuran 60x60 cm unpolished

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 kg m2 m2 m2 m2 m1

40,000.00 45,000.00 48,000.00 52,000.00 56,000.00 277,400.00 312,000.00 340,000.00 7,000.00 155,500.00 175,500.00 185,500.00 38,700.00 27,500.00 39,900.00 264,750.00 130,000.00 150,000.00 195,800.00

Type Standard Type Standard Ø 30 cm panjang 1 m Ø 20 cm panjang 1 m U 20 cm panjang 1 m

m1 m1 bh bh bh

31,396.67 39,883.00 110,000.00 95,000.00 85,000.00

rata-rata rata-rata rata-rata M8 SNI/KS rata-rata SNI/KS SNI/KS SNI/KS

kg kg m1 m2 kg m1 kg kg kg kg kg kg m2

12,000.00 13,000.00 10,500.00 45,000.00 15,000.00 3,000.00 16,000.00 12,500.00 15,000.00 25,000.00 35,000.00 35,000.00 15,000.00

Ukuran 40x40 cm Ukuran 30x60 cm Ukuran 60x60 cm Granito Tile

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 32 33 33 34 34 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

Rolling Door Door closer Rel pintu sorong Pintu gulung besi Pintu Lipat Bondek Kusen Alumunium Warna 1,3 mm, 3" Kusen Alumunium Natural 1,3 mm, 3" Kusen Alumunium Warna 1,3 mm, 4" Kusen Alumunium Natural 1,3 mm, 4" Jendela Alumunium Warna Casement 1,3 mm Jendela Alumunium Natural Casement 1,3 mm Frame daun pintu/jendela alumunium Natural 1,3 mm Frame daun pintu/jendela alumunium Warna 1,3 mm Karet Aksesoris Alumunium Besi Hollow Galvaniz Uk. 40x40 Besi Hollow Galvaniz Uk. 40x20 Besi Hollow Uk. 40x60x1.5 mm Besi Hollow Uk. 100x100x2,1 mm Pipa Besi galvaniz dia. 1" dia. 1" Pipa galvanis 11/2” dia. 11/2" Pipa Besi galvaniz dia. 2" dia. 2" Pipa Besi galvaniz dia. 3" dia. 3" Pipa Besi galvaniz dia. 4" dia. 4" Pipa Besi galvaniz dia. 3/4" dia. 1/2" Plat Besi hitam t = 1 mm Seng plat zingcalum seng BJLS 28 seng gelombang Baja ringan canai dingin C75 Reng canai Kape Talang / Jurai Main truss c-80 -75 Roof Bottom/Reng R 33-0.45 Rooflight 90x180 Self Drilling Screw dia-6 x 20 mm ( Truss Screw) Self Drilling Screw dia-4 x 16 mm ( Roof Batten Screw) Dynabol dia- 12 x 120 mm Alumunium Composit Panel terpasang termasuk rangka Sincromate Baja Profil

bh bh set m2 m2 m2 m1 m1 m1 m1 bh bh m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m2 m' lbr kg m1 bh m1 m' m' lbr bh bh bh m2 m bh

5,850,000.00 175,000.00 210,000.00 85,000.00 155,000.00 210,000.00 155,000.00 180,000.00 165,000.00 190,000.00 475,000.00 425,000.00 150,000.00 185,000.00 40,000.00 6,000.00 5,000.00 28,000.00 45,000.00 45,000.00 55,500.00 75,000.00 85,500.00 95,000.00 89,500.00 180,000.00 34,400.00 82,000.00 190,000.00 35,000.00 6,000.00 70,000.00 15,000.00 17,000.00 75,000.00 475.00 450.00 2,000.00 260,000.00 63,300.00 435,000.00

t=5mm t=8mm t=10mm t=12mm t=5mm Darkgrey t=5 mm Darkgrey t=8 mm

m2 m2 m2 m2 m2 m2 m2 bh tube

87,000.00 140,000.00 185,000.00 360,000.00 135,000.00 72,000.00 150,000.00 19,000.00 29,900.00

Uk. 1-3 cm Uk.4-7 cm Uk. 8-12 cm Uk. 7 cm dia.19 / panjang 35 cm dia. 19 s/d 16 (5 cm)

kg kg kg kg bh bh

18,000.00 16,000.00 15,000.00 19,000.00 35,000.00 1,500.00

Pintu PVC

1 2 3 4 5 6 7 8 9

Bahan Kaca Kaca Polos Kaca Polos Kaca Polos Kaca Tempered Kaca Cermin 5 mm Kaca Rayband Kaca Rayband Glass box Sealent Kaca

1 2 3 4 5 6

Bahan Paku dan Mur Baut Paku biasa Paku biasa Paku biasa Paku seng/Asbes Angkur Mur Baut Mur Baut ATB

7 8 9 10

Sekrup fhiser Sekrup Gypsum/Calsiboard Paku Beton Paku genteng metal

1 2 3 4 5 6 6 7 8 9 10 11 12 13

Bahan Perpipaan Pipa Listrik PVC Pipa PVC type AW 1/2" Pipa PVC type AW 3/4" Pipa PVC type AW 1" Pipa PVC type AW 1 1/2" Pipa PVC type AW 2" Pipa PVC 21/2” Pipa PVC type AW 3" Pipa PVC type AW 4" Pipa PVC type AW 6" Pipa PVC type D 8" Pipa PVC type D 12" Lem paralon Lamella, pvc

1 2 3 4 5 6 7 8 9 9 10 11 12 13 14 15 15 15 15 15 15 15

Bahan Sanitair Stop kran Stop kran Stop kran Stop kran Kran leher angsa floor drain stainless (Standar) Kran tembok Kran zinc Kitchenzink + accesoriess (bak cuci stainlees) Waterdrain Jet washer Kran air stainless (Standar) Kran air stainless panas dingin Tempat sabun Wastafel + asessories Closet jongkok Closet duduk + asessories Urinoir sealtip Bathcuip Bak fibreglass Bak fibreglass

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Bahan Penutup Atap Alumunium Foil Genteng metal Nok atas metal Atap Spandek Nok Spandek Genteng Metal Pasir Genteng palentong ex. Jatiwangi Genteng bubung palentong ex. Jatiwangi Genteng Keramik Genteng bubung keramik Genteng Beton Genteng Kaca Gelombang Genteng Kaca Flat Genteng aspal

bh kg bh kg

300.00 15,000.00 800.00 30,000.00

dia 5/4" dia.1/2" dia.3/4" dia.1" dia.1 1/2" dia.2" 21/2” dia. 3" dia.4" dia.6" dia.8" dia.12"

btg btg btg btg btg btg btg btg btg btg btg btg tube lot

6,500.00 18,000.00 43,000.00 45,000.00 65,000.00 112,000.00 122,000.00 125,000.00 160,000.00 400,000.00 104,000.00 240,000.00 38,000.00 5,000.00

3/4" KIT 1 1/4" KIT 1 1/2" KIT 2" KIT stainless steel 1/2" stainless steel San-ei 1/2" leher angsa stainlees steel

bh bh bh bh bh bh bh bh bh bh bh bh set bh unit unit unit unit bh unit unit unit

17,500.00 25,000.00 30,000.00 40,000.00 105,000.00 49,000.00 188,000.00 32,000.00 287,000.00 75,000.00 170,000.00 35,000.00 675,500.00 27,700.00 1,200,000.00 250,000.00 589,900.00 1,655,000.00 5,500.00 257,000.00 800,000.00 3,000,000.00

m2 m2 m' m2 m1 bh bh bh bh bh bh bh bh lbr

8,300.00 35,000.00 32,000.00 60,000.00 50,000.00 40,000.00 5,000.00 6,600.00 9,000.00 9,000.00 6,500.00 35,000.00 50,000.00 145,000.00

stainless steel 1/2" stainlees steel stainlees steel standar putih TOTO Sekualitas TOTO Sekualitas TOTO Sekualitas TOTO Sekualitas TOTO 300 L 2000 L

double side Sekualitas Global Sekualitas Global t = 0.4 mm

sekualitas kanwuri sekualitas kanwuri sekualitas kanwuri sekualitas kanwuri sekualitas kanwuri

15 16 17 18 19

Listplank GRC Listplank GRC Listplank GRC genteng kodok Bubung stel gel.

1 2 3 4 5 6

Bahan Tata udara AC split Panasonic AC split Panasonic AC split Panasonic Pemindahan AC Exaust fan 40 cm Exaust fan 25 cm

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

Bahan Elektrikal Kabel NYM Kabel NYM Kabel NYY Kabel NYY Saklar Tunggal Saklar Seri Stop kontak Stop kontak Mesin Stop kontak AC Stop kontak Lantai Lampu neon TL philip Lampu TL panjang Rumah lampu sorot Armateur Lampu Downlight Lampu PL philip Lampu Sirkel TLE Lampu sorot Lampu SL philip Lampu SL philip Lampu RM Lampu RM Lampu LED philips Lampu LED philips Lampu Baret Armateur Lampu GMS Armatur TL Inbouw Armatur TL Outbouw Terminal Kabel Tiang Lampu PJU Armateur Lampu PJU Lampu Sodium Balast Lampu Sodium Kaki lampu TL Stater lampu 40 watt Pengadaan Lokal Panel + Kabel power

1 2 3 4 5 6 7 8

Bahan Alat Penggantung dan Kunci Kunci 2 slaag Kunci pintu tanam biasa Kunci pintu tanam antik Kunci silinder Kunci slot Frameless pintu kaca Kait angin jendela Sloot jendela tunggal

2400x300x1 mm 2400x200x1 mm 2400x100x1 mm

m' m' m' bh lbr

54,500.00 52,500.00 50,000.00 6,000.00 39,000.00

2 pk 1 1/2 pk 3/4 pk

unit unit unit unit unit unit

7,950,000.00 5,850,000.00 3,350,000.00 250,000.00 550,000.00 350,000.00

m' m' m' m' bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh unit

14,000.00 10,000.00 7,000.00 9,000.00 35,000.00 48,000.00 28,000.00 47,500.00 65,000.00 55,000.00 37,000.00 57,000.00 195,000.00 94,500.00 57,000.00 47,000.00 225,000.00 28,000.00 38,000.00 180,000.00 220,000.00 130,000.00 170,000.00 175,000.00 300,000.00 600,000.00 145,000.00 18,000.00 3,150,000.00 1,945,500.00 95,700.00 325,000.00 10,000.00 15,000.00 7,000,000.00

bh bh bh bh bh bh bh bh

165,000.00 95,000.00 185,000.00 35,000.00 18,000.00 900,000.00 27,000.00 32,500.00

Dinding (panasonic) Flapond (panasonic)

3x2,5 setara prima 2x1,5 setara prima 2x1,5 setara eterna 2x2,5 setara eterna setara Broco standar setara Broco standar setara Broco standar setara Broco standar setara Broco standar setara Broco Acrylic TLD 1x18 watt Phillip 36 watt (cool daylight) phillips 14 W 22 W lengkap Phllips 400 Watt 11-13 W 18-20 W 2 x 18 W 2 x 36 W 11-13 W 18-20 W 20 W Acrylic Mirror louvre 4x V-Shape Single 9 m Phillips, CVR SRC 250 Watt, Phillips

Handle Alumunium

antik antik

9 10 11 12 13 14 15 16 17 18

Door holder (handle) Door stop Grendel pintu tanam Engsel pintu Engsel pintu Engsel jendela Patch fitting Floor hinge Handle stainlees besar Handle stainlees kecil

bh bh set ps unit ps bh set set set

105,000.00 35,000.00 75,200.00 60,000.00 250,000.00 40,000.00 745,000.00 1,300,000.00 356,000.00 296,000.00

1 2 3

Bahan Penutup Konstruksi Jalan Aspal Emulsi Kerosene Laston ( AC - WC )

kg Liter Ton

10,500.00 15,500.00 1,225,500.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Bahan Penampung Air Tangki air fiber glass Tangki air fiber glass Tangki air fiber glass Air Mesin Pompa Air Mesin Jet pump Mesin Pompa Air (pendorong) Mesin Pompa Air celup (pendorong) Penutup sumur Asbes semen Akustik ukuran 30 x 30 cm Akustik ukuran 30 x 60 cm Akustik 60 x 120 Asbes gelombang 92x250

bh bh bh liter unit unit unit unit ls m2 lbr lbr lbr lbr

2,110,000.00 2,500,000.00 1,250,000.00 400.00 990,000.00 4,400,000.00 6,000,000.00 1,780,000.00 100,000.00 36,000.00 29,000.00 33,500.00 37,700.00 115,000.00

1 2 3 4 5 6

Bahan Landscape dan Penghijauan Rumput gajah mini Pohon Filicium Pohon pucuk merah Pohon Airis kuning Pohon lily putih Tanah subur

m2 btg btg btg btg m3

25,000.00 120,000.00 55,000.00 16,000.00 26,000.00 900,000.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Standar Rata-Rata Sewa Alat Besar, Kendaraan,Truk, Kendaraan Roda, dll Stamper Pneumatic Tyre Roller Crane on Truck Tandem roller 6-10 ton 5 jam/hr Sewa crane 30 ton pipe support M-90 Vibro roller Aspalt Finisher Aspalt Mixing Plant Sewa concreate Mixer Sewa Mesin Potong Tulangan Sewa Pompa Ready Mix Sewa Dump Truck Water Tanker Mesin Las Listrik Sewa Trowel Aspal Distributor Air Compresor Sewa Alat Bantu

Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam hari hari Jam Jam ls

19,211.00 135,167.00 765,406.00 442,310.00 150,000.00 30,000.00 150,500.00 146,707.00 1,217,551.00 327,850.00 55,200.00 812,500.00 250,700.00 184,900.00 40,975.00 55,000.00 574,264.00 500,000.00 55,000.00

stainless 4" Frameless stainless 3"

1.000 ltr 2.000 ltr 600 ltr 150 W-Ex.Sanyo Hisap ≥ 50 m, Dorong ≥ 50 m Hisap ≥ 5 m, Dorong ≥ 57 m Pancar > 5 m kap. 13 m3/jam

20 peralatan

1m2

100,000.00

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN KURVA " S " SATUAN KERJA KEGIATAN PEKERJAAN VOLUME LOKASI TAHUN ANGGARAN NO.

: : : : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK PEMBANGUNAN RUANG KELAS BARU SMK 4 (EMPAT) RUANG KELAS SMKN 3 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% PEKERJAAN PERSIAPAN 1 Papan Nama Proyek 1.5 x 0.8 m 2 Pengukuran dan Bowuplank 3 Mobilisai dan demobilisasi 4 Gambar Kerja, Dokumentasi dan Pelaporan 5 Biaya Keselamatan Kerja (Obat P3K, dll) 5 Pas. Plakat/ Prasasti II PEKERJAAN LANTAI DASAR A PEKERJAAN STRUKTUR A.1 PEKERJAAN TANAH & URUGAN A.2 PEKERJAAN PONDASI A.3 PEKERJAAN BETON STRUKTUR B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN B.6 PEKERJAAN DRAINASE III PEKERJAAN LANTAI ATAS A PEKERJAAN STRUKTUR A.1 PEKERJAAN BETON STRUKTUR A.2 PEKERJAAN ATAP B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN IV PEKERJAAN ELEKTRIKAL SERAH TERIMA PHO

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 9 10 11 12

BULAN IV MINGGU KE : 13 14 15 16

I

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

0.065 0.267 0.260 0.147 0.098 0.130 1.041 6.493 25.453 4.539 4.599 2.927 3.291 1.484 0.539 9.256 16.372 4.908 4.598 8.181 2.999 1.628 0.724

100

0.065 0.267 0.017 0.029 0.098

0.017

0.017

0.017

0.017 0.029

0.017

0.017

0.017

0.017 0.029

0.017

0.017

0.017

0.017 0.029

0.017

KETERANGAN

-

100%

-

50%

0.017 0.029 0.130

1.041 3.247

3.247 6.363

6.363

6.363

6.363

1.135

1.135

1.135 1.533

1.135 1.533

1.533 1.463

1.463 1.097

1.097

1.097 1.484 0.539

3.085

3.085

1.636

3.085 5.457

5.457

5.457

1.636 1.150

1.636 1.150

1.150

1.150 2.727

2.727 1.500

2.727 1.500 1.628

0.145 0.48

4.31

0.48

4.78

9.63 ###

7.52 ###

7.54 ###

9.19 ###

5.77 ###

7.74 ###

0.145

0.145

###

9.50

###

###

0.145 7.72 ###

5.14 ###

-

0.145 4.81 ###

4.39 ###

3.29

-

100

100

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

BART CHART " DIAGRAM BATANG " SATUAN KERJA KEGIATAN LOKASI TAHUN ANGGARAN NO.

: : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK SMKN 3 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% I

PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Biaya Keselamatan Kerja (Obat P3K, dll) Pas. Plakat/ Prasasti II PEKERJAAN LANTAI DASAR A PEKERJAAN STRUKTUR A.1 PEKERJAAN TANAH & URUGAN A.2 PEKERJAAN PONDASI A.3 PEKERJAAN BETON STRUKTUR B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN B.6 PEKERJAAN DRAINASE III PEKERJAAN LANTAI ATAS A PEKERJAAN STRUKTUR A.1 PEKERJAAN BETON STRUKTUR A.2 PEKERJAAN ATAP B PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN IV PEKERJAAN ELEKTRIKAL SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

0.065 0.267 0.260 0.147 0.098 0.130 1.041 6.493 25.453 4.539 4.599 2.927 3.291 1.484 0.539 9.256 16.372 4.908 4.598 8.181 2.999 1.628 0.724

100

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 10 11 12

9

KETERANGAN

0.065 0.267 0.017 0.029 0.098 -

0.017 1.041 3.247 -

0.017 3.247 6.363 -

0.017 6.363 1.135 -

0.017 0.029 6.363 1.135 -

0.017 6.363 1.135 1.533 0.145

0.017 1.135 1.533 3.085 -

0.017 1.533 1.463 3.085 1.636 -

0.017 0.029 1.463 3.085 5.457 1.636 1.150 0.145

0.017 1.097 5.457 1.636 1.150 0.145

0.017 1.097 5.457 1.150 -

0.017 1.097 1.150 2.727 0.145

0.017 0.029 0.539 2.727 1.500 -

0.017 2.727 1.500 0.145

0.017 0.029 0.130 1.484 1.628 -

-

0.48

4.31

9.63

7.52

7.54

9.19

5.77

7.74 12.98

9.50

7.72

5.14

4.81

4.39

3.29

-

0.48

4.78 14.41 21.92 29.47 38.66 44.43 52.17 65.15 74.65 82.37 87.51 92.32 96.71

100

100

-

100%

-

50%

-

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

JADWAL MOBILISASI ( JAD - MOB ) PEKERJA - PERALATAN - BAHAN MATERIAL SATUAN KERJA KEGIATAN LOKASI TAHUN ANGGARAN NO.

: : : :

DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN PENINGKTAN SARANA DAN PRASARANA SMK SMKN 3 CILEGON - KOTA CILEGON TA.2018 URAIAN PEKERJAAN

BOBOT

% I

PEKERJAAN PERSIAPAN Papan Nama Proyek 1.5 x 0.8 m Pengukuran dan Bowuplank Mobilisai dan demobilisasi Gambar Kerja, Dokumentasi dan Pelaporan Biaya Keselamatan Kerja (Obat P3K, dll) Pas. Plakat/ Prasasti

0.065 0.267 0.260 0.147 0.098

BULAN I MINGGU KE : 1 2 3 4 0.065 0.267 0.017 0.029 0.098

BULAN II MINGGU KE : 5 6 7 8

0.017 -

0.017 -

0.017 -

0.017 0.029 -

0.017 -

1.041 3.247 -

3.247 6.363

6.363

6.363

6.363

1.135 -

1.135 -

1.135 1.533 -

0.017 -

BULAN II MINGGU KE : 5 6 7 8

0.017 -

0.017 0.029 -

0.017 -

0.017 -

BULAN III MINGGU KE : 10 11 12

9

0.017 -

0.017 0.029 -

0.017 -

0.017 0.029 0.130

KETERANGAN

-

-

100%

-

50%

PERKERJA PERALATAN BAHAN MATERIAL

II A

PEKERJAAN LANTAI DASAR PEKERJAAN STRUKTUR A.1 PEKERJAAN TANAH & URUGAN A.2 PEKERJAAN PONDASI A.3 PEKERJAAN BETON STRUKTUR

1.041 6.493 25.453

-

4.539 4.599 2.927 3.291 1.484 0.539

-

-

-

9.256 16.372

-

-

-

-

-

-

4.908 4.598 8.181 2.999 1.628

-

-

-

-

-

-

0.724

-

-

-

-

-

0.145

-

0.48

4.31

9.63

7.52

7.54

9.19

5.77

0.48

-

-

-

-

` -

-

-

-

-

-

PERKERJA PERALATAN BAHAN MATERIAL

B

PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN B.6 PEKERJAAN DRAINASE

1.135 1.533 -

1.533 1.463 -

1.463 -

1.097 -

1.097 -

1.097 -

0.539

-

1.484 -

-

3.085 -

3.085 -

3.085 5.457

5.457

5.457

1.636 -

1.636 1.150 -

1.636 1.150 -

1.150 -

0.145

0.145

-

0.145

-

0.145

-

7.74 12.98

9.50

7.72

5.14

4.81

4.39

3.29

-

4.78 14.41 21.92 29.47 38.66 44.43 52.17 65.15 74.65 82.37 87.51 92.32 96.71

100

100

PERKERJA PERALATAN BAHAN MATERIAL

III A

PEKERJAAN LANTAI ATAS PEKERJAAN STRUKTUR A.1 PEKERJAAN BETON STRUKTUR A.2 PEKERJAAN ATAP

-

-

-

-

-

PERKERJA PERALATAN BAHAN MATERIAL

B

PEKERJAAN ARSITEKTUR B.1 PEKERJAAN DINDING B.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA B.3 PEKERJAAN PLAFOND B.4 PEKERJAAN LANTAI B.5 PEKERJAAN PENGECATAN

-

1.150 2.727 -

2.727 1.500 -

2.727 1.500 -

1.628

-

PERKERJA PERALATAN BAHAN MATERIAL

IV

PEKERJAAN ELEKTRIKAL

-

-

PERKERJA PERALATAN BAHAN MATERIAL

-

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN

100

WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI

0%

Direktur Cabang

JADW SATUAN KERJA KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN NO.

I

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA : PEMBANGUNAN RUANG KANTOR SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LE 2. KABUPATEN LEBAK - SMAN 2 BANJARSARI : TA.2018 URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL

II

PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN NO.

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 2 BANJARSARI : TA.2018 URAIAN PEKERJAAN

I

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL II PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 2 BANJARSARI : TA.2018

NO.

I

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PERKERJA PERALATAN BAHAN MATERIAL

II

PEKERJAAN TANAH PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN PONDASI DAN BETON PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PASANGAN PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PLAFOND PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN ELEKTRIKAL PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN MEKANIKAL DAN SANITARY PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN LANTAI PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PENGECATAN PERKERJA PERALATAN BAHAN MATERIAL

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN K

AAN PROVINSI BANTEN RANA SMA SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LEBAK)

U JENDELA DAN KACA

A PULUH) HARI KALENDER

BOBOT

%

0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

BART CHART " DIAGRAM BATANG "

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% 0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

A PULUH) HARI KALENDER

JADWAL MOBILISASI ( JAD - MOB

PEKERJA - PERALATAN - BAHAN MATE

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% -

-

#REF!

#REF!

#REF!

A PULUH) HARI KALENDER

#REF!

#REF!

DULE ) N DENGAN KURVA " S "

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 9 10 11 12

BULAN IV MINGGU KE : 13 14

0.142 0.035 0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.064

1.059 3.053

3.053

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

RT TANG "

BULAN I MINGGU KE : 1 2 3 4 0.142 0.035 0.063 0.064 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 1.059

0.063 -

-

3.053

3.053

-

-

-

-

-

-

-

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

( JAD - MOB )

BAHAN MATERIAL

0.063 0.064 -

0.063 -

0.063 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 0.064 -

0.063 -

0.063 -

BULAN III MINGGU KE : 10

9

0.063 -

0.063 0.064 -

0.063 -

-

-

-

0.06

0.06

0.13

0.06

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 10

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN IV MINGGU KE : 15 16

KETERANGAN

-

100%

-

50%

0.063 0.064 0.284

0.41

-

9

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

0.063 0.064 0.284 -

-

-

-

0.41

-

9

-

100%

-

50%

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

-

100%

#REF!

#REF!

-

#REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

JADW SATUAN KERJA KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN NO.

I

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA : PEMBANGUNAN RUANG KANTOR SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LE 2. KABUPATEN LEBAK - SMAN 1 CIJAKU : TA.2018 URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL

II

PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN NO.

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 1 CIJAKU : TA.2018 URAIAN PEKERJAAN

I

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL II PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 1 CIJAKU : TA.2018

NO.

I

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PERKERJA PERALATAN BAHAN MATERIAL

II

PEKERJAAN TANAH PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN PONDASI DAN BETON PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PASANGAN PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PLAFOND PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN ELEKTRIKAL PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN MEKANIKAL DAN SANITARY PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN LANTAI PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PENGECATAN PERKERJA PERALATAN BAHAN MATERIAL

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN K

AAN PROVINSI BANTEN RANA SMA SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LEBAK)

U JENDELA DAN KACA

A PULUH) HARI KALENDER

BOBOT

%

0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

BART CHART " DIAGRAM BATANG "

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% 0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

A PULUH) HARI KALENDER

JADWAL MOBILISASI ( JAD - MOB

PEKERJA - PERALATAN - BAHAN MATE

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% -

-

#REF!

#REF!

#REF!

A PULUH) HARI KALENDER

#REF!

#REF!

DULE ) N DENGAN KURVA " S "

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 9 10 11 12

BULAN IV MINGGU KE : 13 14

0.142 0.035 0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.064

1.059 3.053

3.053

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

RT TANG "

BULAN I MINGGU KE : 1 2 3 4 0.142 0.035 0.063 0.064 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 1.059

0.063 -

-

3.053

3.053

-

-

-

-

-

-

-

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

( JAD - MOB )

BAHAN MATERIAL

0.063 0.064 -

0.063 -

0.063 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 0.064 -

0.063 -

0.063 -

BULAN III MINGGU KE : 10

9

0.063 -

0.063 0.064 -

0.063 -

-

-

-

0.06

0.06

0.13

0.06

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 10

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN IV MINGGU KE : 15 16

KETERANGAN

-

100%

-

50%

0.063 0.064 0.284

0.41

-

9

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

0.063 0.064 0.284 -

-

-

-

0.41

-

9

-

100%

-

50%

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

-

100%

#REF!

#REF!

-

#REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

JADW SATUAN KERJA KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN NO.

I

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA : PEMBANGUNAN RUANG KANTOR SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LE 2. KABUPATEN LEBAK - SMAN 1 CIGEMBLONG : TA.2018 URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL

II

PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN NO.

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 1 CIGEMBLONG : TA.2018 URAIAN PEKERJAAN

I

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL II PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 1 CIGEMBLONG : TA.2018

NO.

I

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PERKERJA PERALATAN BAHAN MATERIAL

II

PEKERJAAN TANAH PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN PONDASI DAN BETON PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PASANGAN PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PLAFOND PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN ELEKTRIKAL PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN MEKANIKAL DAN SANITARY PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN LANTAI PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PENGECATAN PERKERJA PERALATAN BAHAN MATERIAL

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN K

AAN PROVINSI BANTEN RANA SMA SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LEBAK)

U JENDELA DAN KACA

A PULUH) HARI KALENDER

BOBOT

%

0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

BART CHART " DIAGRAM BATANG "

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% 0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

A PULUH) HARI KALENDER

JADWAL MOBILISASI ( JAD - MOB

PEKERJA - PERALATAN - BAHAN MATE

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% -

-

#REF!

#REF!

#REF!

A PULUH) HARI KALENDER

#REF!

#REF!

DULE ) N DENGAN KURVA " S "

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 9 10 11 12

BULAN IV MINGGU KE : 13 14

0.142 0.035 0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.064

1.059 3.053

3.053

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

RT TANG "

BULAN I MINGGU KE : 1 2 3 4 0.142 0.035 0.063 0.064 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 1.059

0.063 -

-

3.053

3.053

-

-

-

-

-

-

-

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

( JAD - MOB )

BAHAN MATERIAL

0.063 0.064 -

0.063 -

0.063 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 0.064 -

0.063 -

0.063 -

BULAN III MINGGU KE : 10

9

0.063 -

0.063 0.064 -

0.063 -

-

-

-

0.06

0.06

0.13

0.06

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 10

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN IV MINGGU KE : 15 16

KETERANGAN

-

100%

-

50%

0.063 0.064 0.284

0.41

-

9

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

0.063 0.064 0.284 -

-

-

-

0.41

-

9

-

100%

-

50%

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

-

100%

#REF!

#REF!

-

#REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

JADW SATUAN KERJA KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN NO.

I

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA : PEMBANGUNAN RUANG KANTOR SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LE 2. KABUPATEN LEBAK - SMAN 1 SOBANG : TA.2018 URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL

II

PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN NO.

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 1 SOBANG : TA.2018 URAIAN PEKERJAAN

I

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN PEKERJAAN PLAFOND PEKERJAAN ELEKTRIKAL II PEKERJAAN MEKANIKAL DAN SANITARY A PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PEKERJAAN LANTAI PEKERJAAN PENGECATAN SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

SATUAN KERJA KEGIATAN 0 TAHUN ANGGARAN

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PENINGKTAN SARANA DAN PRASARANA SMA - SMAN 1 SOBANG : TA.2018

NO.

I

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN PERKERJA PERALATAN BAHAN MATERIAL

II

PEKERJAAN TANAH PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN PONDASI DAN BETON PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PASANGAN PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PLAFOND PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN ELEKTRIKAL PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN MEKANIKAL DAN SANITARY PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN KUSEN PINTU JENDELA , DAUN PINTU JENDELA DAN KACA PERKERJA PERALATAN BAHAN MATERIAL

PEKERJAAN LANTAI PERKERJA PERALATAN BAHAN MATERIAL

#REF!

PEKERJAAN PENGECATAN PERKERJA PERALATAN BAHAN MATERIAL

SERAH TERIMA PHO

JUMLAH BOBOT JUMLAH BOBOT KEMAJUAN WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER : SERAH TERIMA PERTAMA ( PHO )

( TIME SCHEDULE ) JADWAL WAKTU PELAKSANAAN DENGAN K

AAN PROVINSI BANTEN RANA SMA SMA (KABUPATEN PANDEGLANG DAN KABUPATEN LEBAK)

U JENDELA DAN KACA

A PULUH) HARI KALENDER

BOBOT

%

0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

BART CHART " DIAGRAM BATANG "

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% 0.142 0.035 0.946 0.322 0.284 1.059 6.105

9

A PULUH) HARI KALENDER

JADWAL MOBILISASI ( JAD - MOB

PEKERJA - PERALATAN - BAHAN MATE

AAN PROVINSI BANTEN RANA SMA

U JENDELA DAN KACA

BOBOT

% -

-

#REF!

#REF!

#REF!

A PULUH) HARI KALENDER

#REF!

#REF!

DULE ) N DENGAN KURVA " S "

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 9 10 11 12

BULAN IV MINGGU KE : 13 14

0.142 0.035 0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.063

0.063

0.064

0.063

0.063

0.064

1.059 3.053

3.053

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

RT TANG "

BULAN I MINGGU KE : 1 2 3 4 0.142 0.035 0.063 0.064 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 1.059

0.063 -

-

3.053

3.053

-

-

-

-

-

-

-

0.30

4.17

3.12

0.06

0.13

0.06

0.06

0.06

0.13

0.06

0.30

4.48

7.59

7.66

7.79

7.85

7.91

7.97

8.10

8.16

( JAD - MOB )

BAHAN MATERIAL

0.063 0.064 -

0.063 -

0.063 -

BULAN II MINGGU KE : 5 6 7 8

0.063 -

0.063 0.064 -

0.063 -

0.063 -

BULAN III MINGGU KE : 10

9

0.063 -

0.063 0.064 -

0.063 -

-

-

-

0.06

0.06

0.13

0.06

8.23

8.29

8.42

8.48

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN I MINGGU KE : 1 2 3 4

BULAN II MINGGU KE : 5 6 7 8

BULAN II MINGGU KE : 5 6 7 8

BULAN III MINGGU KE : 10

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 20 Penawar, PT. SARJIS AGUNG INDRA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN IV MINGGU KE : 15 16

KETERANGAN

-

100%

-

50%

0.063 0.064 0.284

0.41

-

9

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI

Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

0.063 0.064 0.284 -

-

-

-

0.41

-

9

-

100%

-

50%

9

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

BULAN III MINGGU KE : 11 12

KETERANGAN

-

-

-

-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

-

100%

#REF!

#REF!

-

#REF! #REF! #REF! #REF!

Pandeglang , 04 Juli 2018 Penawar, PT. SARJIS AGUNG INDRAJAYA

Ttd & stempel

WAHYU SETIA BUDI Direktur Cabang

0%

PERHITUNGAN HARGA SATUAN PEKERJAAN KONTRUKSI BETON BERTULANG Analisa 1 m3 beton mutu K. 175 Analisa 1 m3 beton mutu K. 225 Analisa 1 kg pembesian dengan besi polos/ulir Analisa 1 m2 pemasangan bekisting untuk pondasi Analisa 1 m2 pemasangan bekisting untuk sloof Analisa 1 m2 pemasangan bekisting untuk kolom Analisa 1 m2 pemasangan bekisting untuk balok Analisa 1 m2 pemasangan bekisting untuk lantai KODE BTN 1

URAIAN PEKERJAAN 1 m3 Pondasi Telapak 90/90 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk pondasi Total harga Dibulatkan BTN 2 1 m3 Pondasi Telapak 60/120 Adukan Beton mutu K.125 Besi beton terpasang Bekisting untuk pondasi Total harga Dibulatkan BTN 3 1 m3 Pondasi Telapak 40/40 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk pondasi Total harga Dibulatkan BTN 4 1 m3 Sloof beton 20/30 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk sloof Total harga Dibulatkan 1 m3 Sloof beton 15/30 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk sloof Total harga Dibulatkan BTN 5 1 m3 Sloof beton 15/20 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk sloof Total harga Dibulatkan 1 m3 Pondasi tiang pancang Ø 25 beton mutu K-225 Adukan Beton mutu K.225 Besi beton terpasang Total harga Dibulatkan BTN 6 1 m3 Kolom beton 30/30 K.1 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan BTN 7 1 m3 Kolom beton 30/30 K.5 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan BTN 8 1 m3 Kolom beton 25/25 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan BTN 9 1 m3 Kolom beton 20/20 K.2 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan BTN 10 1 m3 Kolom beton 15/20 K.3 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk kolom

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. VOL

SAT

HARGA SATUAN

943,900.00 1,000,800.00 14,000.00 136,300.00 143,300.00 311,200.00 315,400.00 540,000.00 JUMLAH

M3 Kg M2

1.000 99.680 3.600

1,000,800.00 14,000.00 136,300.00

1,000,800.00 1,395,520.00 490,680.00 2,887,000.00 2,887,000.00

M3 Kg M2

1.000 81.806 6.250

943,900.00 14,000.00 136,300.00

943,900.00 1,145,277.78 851,875.00 2,941,052.78 2,941,050.00

M3 Kg M2

1.000 97.822 6.667

943,900.00 14,000.00 136,300.00

943,900.00 1,369,511.11 2,313,411.11 4,626,822.22 4,626,820.00

M3 Kg M2

1.000 126.778 10.000

1,000,800.00 14,000.00 143,300.00

1,000,800.00 1,774,888.89 1,433,000.00 4,208,688.89 4,208,680.00

M3 Kg M2

1.000 163.111 13.333

943,900.00 14,000.00 143,300.00

943,900.00 2,283,555.56 1,910,666.67 5,138,122.22 5,138,120.00

M3 Kg M2

1.000 167.556 13.333

943,900.00 14,000.00 143,300.00

943,900.00 2,345,777.78 1,910,666.67 5,200,344.44 5,200,340.00

M3 Kg

1.000 187.788

943,900.00 14,000.00

943,900.00 2,629,027.60 3,572,927.60 3,572,920.00

M3 Kg M2

1.000 169.778 13.333

1,000,800.00 14,000.00 311,200.00

1,000,800.00 2,376,888.89 4,149,333.33 7,527,022.22 7,527,020.00

M3 Kg M2

1.000 102.857 9.796

1,000,800.00 14,000.00 311,200.00

1,000,800.00 1,440,000.00 3,048,489.80 5,489,289.80 5,489,280.00

M3 Kg M2

1.000 121.707 14.720

943,900.00 14,000.00 311,200.00

943,900.00 1,703,893.33 4,580,864.00 7,228,657.33 7,228,650.00

M3 Kg M2

1.000 132.333 18.000

943,900.00 14,000.00 311,200.00

943,900.00 1,852,666.67 5,601,600.00 8,398,166.67 8,398,160.00

M3 Kg M2

1.000 226.889 23.333

943,900.00 14,000.00 311,200.00

943,900.00 3,176,444.44 7,261,333.33

Total harga Dibulatkan

11,381,677.78 11,381,670.00

KODE BTN 11

BTN 12

BTN 13

BTN 14

BTN 15

BTN 16

BTN 17

BTN 18

URAIAN PEKERJAAN 1 m3 Kolom beton 10/60 K.4 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan 1 m3 Kolom beton 15/15 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan 1 m3 Kolom beton 10/10 KP Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan 1 m3 Kolom beton 40/20 - 20/20 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk kolom Total harga Dibulatkan 1 m3 Balok beton 25/50 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 Balok beton 25/40 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 Balok beton 20/30 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 Balok beton 30/20 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 Balok beton 20/25 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan

VOL

SAT

HARGA SATUAN

JUMLAH

M3 Kg M2

1.000 159.778 23.333

943,900.00 14,000.00 311,200.00

943,900.00 2,236,888.89 7,261,333.33 10,442,122.22 10,442,120.00

M3 Kg M2

1.000 211.556 13.333

943,900.00 14,000.00 311,200.00

943,900.00 2,961,777.78 4,149,333.33 8,055,011.11 8,055,010.00

M3 Kg M2

1.000 336.000 20.000

943,900.00 14,000.00 311,200.00

943,900.00 4,704,000.00 6,224,000.00 11,871,900.00 11,871,900.00

M3 Kg M2

1.000 23.051 3.030

1,000,800.00 14,000.00 311,200.00

1,000,800.00 322,707.07 943,030.30 2,266,537.37 2,266,530.00

M3 Kg M2

1.000 109.600 8.080

943,900.00 14,000.00 315,400.00

943,900.00 1,534,400.00 2,548,432.00 5,026,732.00 5,026,730.00

M3 Kg M2

1.000 103.467 8.100

943,900.00 14,000.00 315,400.00

943,900.00 1,448,533.33 2,554,740.00 4,947,173.33 4,947,170.00

M3 Kg M2

1.000 120.000 9.333

943,900.00 14,000.00 315,400.00

943,900.00 1,680,000.00 2,943,733.33 5,567,633.33 5,567,630.00

M3 Kg M2

1.000 122.333 11.667

943,900.00 14,000.00 315,400.00

943,900.00 1,712,666.67 3,679,666.67 6,336,233.33 6,336,230.00

M3 Kg M2

1.000 152.133 14.000

943,900.00 14,000.00 315,400.00

943,900.00 2,129,866.67 4,415,600.00 7,489,366.67 7,489,360.00

BTN 7

BTN 16

BTN 19

BTN 20

BTN 21

BTN 22

KODE BTN 23

BTN 24

BTN 25

BTN 26

BTN 27

1 m3 Balok beton 15/25 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 Balok beton 15/20 beton mutu K-175 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 Balok beton 10/12 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 LIsplank beton 8/65 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 LIsplank beton 8/40 Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan 1 m3 Ringbalk beton 15/50 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk balok Total harga Dibulatkan

URAIAN PEKERJAAN 1 m3 Ringbalk beton 15/25 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk sloof Total harga Dibulatkan 1 m3 Ringbalk beton 15/20 Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk sloof Total harga Dibulatkan 1 m3 Plat beton t = 12 cm Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk lantai/plat Total harga Dibulatkan 1 m3 Plat beton t = 10 cm Adukan Beton mutu K.225 Besi beton terpasang Bekisting untuk lantai/plat Total harga Dibulatkan 1 m3 Plat beton t = 7 cm Adukan Beton mutu K.175 Besi beton terpasang Bekisting untuk lantai/plat Total harga Dibulatkan

M3 Kg M2

1.000 164.889 17.333

943,900.00 14,000.00 315,400.00

943,900.00 2,308,444.44 5,466,933.33 8,719,277.78 8,719,270.00

M3 Kg M2

1.000 131.556 18.333

943,900.00 14,000.00 315,400.00

943,900.00 1,841,777.78 5,782,333.33 8,568,011.11 8,568,010.00

M3 Kg M2

1.000 271.111 16.667

943,900.00 14,000.00 315,400.00

943,900.00 3,795,555.56 5,256,666.67 9,996,122.22 9,996,120.00

M3 Kg M2

1.000 103.333 25.000

943,900.00 14,000.00 315,400.00

943,900.00 1,446,666.67 7,885,000.00 10,275,566.67 10,275,560.00

M3 Kg M2

1.000 103.333 25.000

943,900.00 14,000.00 315,400.00

943,900.00 1,446,666.67 7,885,000.00 10,275,566.67 10,275,560.00

M3 Kg M2

1.000 175.556 15.333

943,900.00 14,000.00 315,400.00

943,900.00 2,457,777.78 4,836,133.33 8,237,811.11 8,237,810.00

VOL

SAT

M3 Kg M2

1.000 164.889 13.333

943,900.00 14,000.00 143,300.00

943,900.00 2,308,444.44 1,910,666.67 5,163,011.11 5,163,010.00

M3 Kg M2

1.000 167.556 13.333

943,900.00 14,000.00 143,300.00

943,900.00 2,345,777.78 1,910,666.67 5,200,344.44 5,200,340.00

M3 Kg M2

1.000 137.778 8.333

943,900.00 14,000.00 540,000.00

943,900.00 1,928,888.89 4,500,000.00 7,372,788.89 7,372,780.00

M3 Kg M2

1.000 165.333 10.000

943,900.00 14,000.00 540,000.00

943,900.00 2,314,666.67 5,400,000.00 8,658,566.67 8,658,560.00

M3 Kg M2

1.000 118.095 14.286

943,900.00 14,000.00 540,000.00

943,900.00 1,653,333.33 7,714,285.71 10,311,519.05 10,311,510.00

HARGA SATUAN

JUMLAH

DAFTAR HARGA SATUAN UPAH DAN BAHAN SATUAN KERJA PEKERJAAN

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN : PEMBANGUNAN RUANG KELAS BARU SMK

Kode

Uraian

Satuan

Harga Satuan Dasar ( Rp. )

KET.

1

2

3

4

5

UPAH TENAGA KERJA L.001 L.002 L.003 L.004 L.008 L.009 L.010 L.011 L.012 L.013 L.015 L.016

Pekerja Tukang Tukang Batu Tukang Besi Beton Tukang Cat Tukang Kayu Tukang listrik Tukang aluminium/kaca Tukang Pipa Tukang Konstruksi Kepala Tukang Mandor

OH OH OH OH OH OH OH OH OH OH OH OH

75,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 90,000.00 80,000.00 80,000.00 80,000.00 100,000.00 130,000.00

BAHAN / MATERIAL BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA M.01004

Bata Merah

M.01005

Batu Belah Pondasi

BUAH M3

M.01025

Batu Pecah Mesin 1/2

M3

M.01028

Batu Belah

M3

M.01029

Batu pecah mesin 2/3

M3

M.01032

Pasir Beton

M3

M.01033

Pasir Pasang

M3

M.01034

Pasir Urug

M3

M.01035

Sirtu

M3

M.01036

Tanah Urug Pilihan

M3

M.01040

Rooster Beton (20x20) keramik

bh

M.01042

Semen Portland (Tiga Roda/Holcim)

KG

M.01044

Semen Portland (50kg/zak) (Tiga Roda/Holcim)

M.01051

Semen Warna

KG

M.01052

Readymix Beton K250

m3

M.01053

Readymix Beton K225

m3

M.01054

Readymix Beton K175

M.01055

Bata Ringan 100 x 200 x 600 mm

M.01056

Mortar , Setara MU - 380 (untuk pasangan Mortar)

KG

M.01057

Mortar Untuk Plesteran Setara MU - 301

KG

M.01058

Mortar Untuk Acian Setara MU - 200

KG

M.01062

Batu Tempel Hitam

m2

M.01063

Jendela nako

m2

ZAK

m3 BUAH

450.00 155,000.00 145,500.00 135,000.00 130,500.00 140,000.00 140,000.00 140,000.00 115,000.00 100,000.00 40,000.00 1,200.00 60,000.00 3,500.00 900,000.00 850,000.00 800,000.00 5,800.00 3,750.00 1,437.50 3,962.50 45,000.00 15,000.00

BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA M.02001

Amplas

LBR

M.02004

Cat Besi Setara Avian

KG

M.02005

Cat Kayu SIEVE (Sekualitas)

KG

M.02011

Cat tembok dasar

kg

M.02012

Cat tembok penutup

kg

M.02013

Pelitur Setara Impra

kg

M.02017

Melamik

KG

M.02018

Kuwas

BUAH

M.02022

Rol Cat Tembok uk. Besar

BUAH

M.02024

Meni Besi

KG

M.02026

Meni Kayu

KG

M.02028

Plamir Kayu

KG

3,000.00 43,000.00 47,000.00 22,500.00 27,000.00 37,000.00 60,500.00 10,500.00 26,500.00 30,000.00 30,000.00 36,000.00

1

2

3

M.02029

Plamir Tembok /Sealer Tembok

KG

M.02031

Residu

LTR

M.02034

Thinner B

GLN

M.02034

Thinner B

ltr

M.02036

Cat minyak

KG

M.02043

Thinner

M.02045

Water proofing coating

M.02046

Cat Zinchromate

KG

M.02047

Minyak pelumas

LTR

M.02048

Solar

LTR

KLG KG

4

5 65,000.00 45,000.00 85,000.00 20,000.00 22,000.00 25,000.00 42,500.00 50,000.00 15,000.00 8,500.00

BAHAN KAYU BERIKUT BAHAN JADINYA M.03003

Dolken 7-10

M.03006

Kayu 3/20 kelas III BORNEO

BATANG M3

M.03009

Kayu Perancah / Bekisting

M3

M.03011

Kayu Balok kelas II kamper medan

M3

M.03012

Kayu papan kelas I / Bayur

M3

M.03013

Kayu papan 20/30

M3

M.03013

Kayu papan albasia

M3

M.03014

Kayu Kaso 5/7 kelas II

M3

M.03015

Kayu Kaso 5/7 kelas III

M3

M.03017

List Architeave Kayu 5.5 cm Profil

M'

M.03017

List kamper 10 cm / plint Profil

btg

30,000.00 2,550,000.00 2,250,000.00 2,150,000.00 2,650,000.00 2,400,000.00 2,500,000.00 2,300,000.00 2,000,000.00 17,000.00 25,000.00

BAHAN PENUTUP RANGKA PLAFON M.04005

Gypsum 9 mm 120 x 240 ex DN

LBR

M.04007

List Profil GYPSUM

M1

M.04008

List Profil GRC

M1

M.04010

GRC Board 4 mm 120 x 240

LBR

75,000.00 9,000.00 16,000.00 75,000.00

BAHAN KAYU LAPIS M.04018

HPL 120 x 140

LBR

M.04022

Multipleks 4 mm 120 x 240

LBR

M.04023

Multipleks 6 mm 120 x 240

LBR

M.04030

Plywood 4"x 8"x 9mm

LBR

M.04043

Stiker Sandblast Motip

M2

99,000.00 120,000.00 130,000.00 134,500.00 80,000.00

BAHAN LANTAI DAN PELAPIS DINDING M.05006

Granite Homogeneous Tile uk. 60 x 60 Setara Granito

M2

M.05013

Keramik 20 x 20 Km/Wc Anti Slip DN Warna/Corak KW 1, Setara KIA

M2

M.05014

Keramik 25 x 25Km/Wc Anti Slip DN Warna/Corak KW 1, Setar KIA

M2

M.05015

Keramik 20 x 25 Dinding KW 1, Setara KIA

M2

M.05016

Keramik 25 x 40 DN Warna / Corak KW 1, Setara KIA

M2

M.05020

Keramik 40 x 40 DN Warna/Corak KW I, Setara Roman

M2

M.05021

Keramik Step Nozing granito tile

M1

M.05026

Floor Hardener

Kg

39,000.00 20,000.00 22,500.00 25,000.00 26,000.00 28,000.00 19,350.00 27,500.00

BAHAN LOGAM DAN BAHAN JADINYA M.06001

Besi Hollow 40 x 40 x 2mm x 6 m

BTG

M.06002

Besi Hollow 40 x 40 x 2mm x 6 m

BTG

Grafel 1/2 dia. 20 cm

M'

85,000.00 85,000.00 64,500.00

BAHAN LOGAM DAN BAHAN JADINYA M.06003

Besi Beton rata-rata U-24, U-32

KG

M.06004

Besi Beton rata-rata U-39

KG

M.06005

Kawat Beton

KG

M.06006

Besi Hollow 40x40x2x6 m

BTG

M.06007

Besi Hollow 40x20x2x6 m

BTG

M.06008

Plat Bondek t = 1 mm

M2

M.06011

Besi Siku L.50.50.5

KG

M.06017

Besi IWF ex. DN SII

KG

M.06019

Besi strip (SNI) 4x2.4

KG

M.06020

Main truss c-80 -75

M'

M.06021

Roof Bottom/Reng R 33-0.45

M'

M.06023

Kawat Duri

M'

M.06024

Kawat Las Listrik

KG

M.06031

Wiremesh M8

Kg

M.06032

Jarum Keras

BH

10,000.00 12,000.00 15,000.00 85,000.00 85,000.00 104,000.00 10,000.00 11,500.00 17,857.14 15,000.00 8,750.00 25,000.00 35,000.00 45,000.00 4,800.00

1

2

3

4

5

BAHAN KACA DAN ALUMUNIUM M.07002

Kaca Polos 5 mm ex. Asahi

M2

M.07003

Kaca Rayben 5 mm

M2

M.07004

Kaca Polos 8 mm ex. Asahimas

M2

M.07005

Kaca Rayben 8 mm

M2

M.07006

Kaca tempered 12 mm

M2

M.07007

Kaca Reflektip tempered 8 mm

M2

M.07008

Kaca Reflektip tempered 6 mm

M2

M.07010

Kaca Rayband/Warna 10 mm

M2

M.07013

Kusen Alumunium Natural 1,3 mm 3"

M'

M.07014

Kusen Alumunium Warna 1,3 mm 3 "

M'

M.07015

Kusen Alumunium Natural 1,3 mm 4"

M'

M.07016

Kusen Alumunium Warna 1,3 mm 4 "

M'

M.07017

Daun Jendela Alumunium Natural 1,3 mm

M'

M.07018

Daun Jendela Alumunium Warna 1,3 mm

M'

M.07019

Daun Pintu Alumunium Natural

M'

M.07020

Daun Pintu Alumunium Warna

M'

M.07021

Rel Pintu Sleding + Aksesoris

bh

M.07023

Handle Jendela Alumunium

bh

M.07024

Handle Stainless Steell

bh

M.07027

Kunci Pintu Bottom patch Loock + Colinder

bh

M.07029

Profil Kaca

M2

M.07030

Engsel Jendela tophung

bh

M.07031

Floor Hinges ex dorma/setara

bh

M.07032

Engsel Casment

bh

M.07033

Grendel

bh

M.07034

Top Patch / bottom patch fitting

bh

M.07035

Kait Angin Sendok Alumunium

PS

M.07038

List Alumunium U

m'

M.07043

Engsel Pintu Setara Dekson

bh

M.07044

Silent

m'

M.07045

Karet Acsesoris

m'

87,000.00 97,500.00 140,000.00 150,000.00 225,000.00 375,000.00 315,000.00 230,000.00 90,000.00 155,000.00 175,000.00 165,000.00 250,000.00 275,000.00 75,000.00 85,000.00 250,000.00 85,000.00 185,000.00 167,000.00 35,000.00 83,000.00 500,000.00 88,000.00 19,000.00 125,000.00 23,000.00 25,000.00 130,000.00 5,000.00 40,000.00

BAHAN PAKU DAN MUR BAUT M.08002

Paku 1 cm - 3 cm

KG

M.08003

Paku 4 cm - 7 cm

KG

M.08004

Paku 8 cm - 12 cm

KG

M.08005

Paku Sekrup

KG

M.08006

Paku Anti Karat

KG

M.08007

Paku Seng

M.08013

Angkur Φ 16 mm ; P = 40 cm

M.08017

Piser dia.12 - 20cm

M.08019

Self Drilling Screw dia-6 x 20 mm ( Truss Screw)

BH

M.08020

Self Drilling Screw dia-4 x 16 mm ( Roof Batten Screw)

BH

M.08021

Dynabol dia- 12 x 120 mm

BH

M.08022

Paku genteng metal

M.08019

Sekrup Fixer

KG BUAH DUS

Kg BUAH

18,000.00 16,000.00 15,000.00 17,000.00 87,344.00 19,000.00 475.00 35,000.00 200.00 200.00 2,000.00 30,000.00 200.00

BAHAN PERPIPAAN (AANSINERING) M.09092

Pipa PVC Abu-abu dia. 1/2" (AW)

BATANG

M.09094

Pipa PVC Abu-abu dia. 3/4" (AW)

BATANG

M.09095

Pipa PVC Abu-abu dia. 1" (AW)

BATANG

M.09099

Pipa PVC Abu-abu dia. 2" (AW)

BATANG

M.09100

Pipa PVC Abu-abu dia. 3" (AW)

BATANG

M.09101

Pipa PVC Abu-abu dia. 4" (AW)

BATANG

M.09107

Pipa GIP medium-B dia. 1 1/4"

BATANG

M.09169

Biotech Type BT-12

BUAH

M.09173

Lem Kayu Putih FOX

KG

18,000.00 43,000.00 45,000.00 112,000.00 125,000.00 160,000.00 405,000.00 4,000,000.00 25,000.00

BAHAN SANITAIR M.10001

Closet Jongkok Std. TOTO (setara) Type CE9

BUAH

M.10005

Closet Duduk warna standar

UNIT

M.10006

Pintu WPC KM Standar

BUAH

M.10010

Wastafel Lengkap TOTO (setara)

BUAH

M.10014

Jet Shower Setara Toto THX20NBN5

UNIT

M.10016

Floor Drain Stainless Steel

BUAH

250,000.00 489,900.00 435,000.00 250,000.00 283,000.00 49,000.00

1

2

3

M.10019

Kran tembok 1/2"

BUAH

M.10023

Kran Air

BUAH

M.10027

Stop Kran PVC 2"

UNIT

M.10037

Sael Tape

bh

M.11001

Alumunium Foile

M2

M.11018

Atap Anduvilla (106x40x3)

M.11019

Nok / Ridge Onduline

M.11024

Bubungan genteng metal berpasir

M'

M.11031

Listplank GRC 3,66m

M'

M.11033

Seng plat zingcalum bjls 28 l = 90 cm

M.11034

Seng Gel. BJLS 28 80 x 180

LBR

M.11036

Seng Plat BJLS 28

M2

LEMBAR Lembar

m'

4

5

67,000.00 30,000.00 75,000.00 5,500.00 8,500.00 55,000.00 102,500.00 35,500.00 60,500.00 34,500.00 125,000.00 52,000.00

BAHAN ALAT PENGGANTUNG DAN KUNCI M.11040

Engsel Pintu

PS

M.11044

Kunci Tanam

BUAH

M.11045

Kunci Tanam 2 Slaag

BUAH

M.11054

Kunci Panel

M.11056

Door Closer kelas standar Dekson/Dorma

M.10022

Mesin Pompa Air 150 w

Set bh UNIT

60,000.00 95,000.00 165,000.00 65,000.00 105,000.00 990,000.00

BAHAN PENAMPUNG AIR

bh

2,500,000.00 2,000,000.00 4,000,000.00 30,000.00

KG

20,000.00 3,500,000.00 4,000,000.00 38,000.00 70,000.00 300.00 17,000.00 14,000.00 13,500.00 500.00 18,000.00 57,000.00 38,000.00 50,000.00 175,000.00 90,000.00 38,000.00 248,000.00 6,500.00 48,000.00 35,000.00 50,000.00 67,430.00 28,000.00 65,000.00

M.10022

Tengki Air 0,5 m3 PENGUIN

UNIT

M.10023

Tengki Air 1 m3

UNIT

M.10023

Fibre Glass 2000 lt

UNIT

M.10027

Silent BAHAN JADI PENAMPUNG TINJA

M.10007

Tali Injuk BAHAN ELEKTRIKAL

M.14001

Panel SDP

Unit

M.14002

Panel P-Ds

Unit

M.14009

Trapo TL 36 watt (philip)

BH

M.14010

Rumah TK I 2x20 W kosongan

BH

M.14011

Fitting

BH

M.14012

Kabel NYY 1x70 mm

M1

M.14015

Kabel NYM 3x2.5

M1

M.14017

Kabel NYY 4 x 10 mm2 + BC 6 mm2

M'

M.14019

Fitting Down ligh

Bh

M.14020

Terminal Kabel

Bh

M.14021

Lampu TL 2 x 36 MR Setara Philips

Bh

M.14022

Lampu SL 18 watt Setara Philips

Bh

M.14023

Lampu 9 watt Setara Philips

Bh

M.14024

Lampu Spot Light LED Setara Philips

Bh

M.14025

Lampu LED Strip Warna

M'

M.14026

Lampu SL 18 watt

BH

M.14028

MCB 8 A

M.14029

Pipa Listrik

BH

M.14030

Saklar seri

BH

M.14031

Saklar Tunggal

BH

M.14032

Saklar Hotel Setara

BH

M.14033

Saklar 3 gang

BH

M.14034

Stop Kontak Standar

BH

M.14036

Stop Kontak AC 16

BH

M.14018

BTG

SEWA ALAT-ALAT BERAT M.16001

Concrete Vibrator

hari

M.16002

Concrete Pump

hari

600,000.00 2,000,000.00

LAINNYA M.17000

Air

Liter

M.17001

Alat Las

jam

M.17003

Urinoir

M.17002

Minyak Bekisting

Liter

M.17006

Instalasi Listrik

titik

M.17020

Membrane 850 GSM

M2

M.17027

SEWA ALAT BERAT

bh

400.00 61,875.00 950,000.00 12,000.00 80,000.00 300,000.00

1

2

3

M.17028

Excavator

jam

M.17031

Dump truck

jam

M.17032

skafolding

ls

4 255,000.00 150,000.00 55,000.00

5

DAFTAR HARGA SATUAN PEKERJAAN (DHSP) Program Pekerjaan Lokasi Tahun Anggaran NO

KODE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

A.2.2.1.4 A.2.2.1.5 A. 2.2.1.7 A. 2.2.1.1 A.2.2.1.9 A.2.2.1.10 A.2.2.1.14 A.2.3.1.1 A.2.3.1.2 A.2.3.1.3 A.2.3.1.4 A.2.3.1.8 A.2.3.1.10 A.2.3.1.9 A.2.3.1.11 A.2.3.1.11S A.3.2.1.3 A.3.2.1.9

: Penataan kawasan pariwisata : Pembangunan Gedung TIC/ATM Centre, Area Kuliner, Wc & Musholla : Kecamatan Panimbang, Kabupaten Pandeglang : 2018 URAIAN PEKERJAAN

Pengukuran dan Pemasangan Bouwplank 1 M' Pembuatan kantor sementara lantai plesteran Pembuatan gudang semen dan peralatan Pembuatan pagar sementara dari seng tiang kayu tinggi 2 meter Pembersihan Lahan Pembuatan 1 m² steger/Perancah dari bambu Membongkar 1 m3 dinding bata (jika bongkaran tidak dipakai kembali) Penggalian tanah biasa (untuk pondasi) Penggalian tanah biasa Kedalaman Hingga 2 m Penggalian tanah biasa Kedalaman Hingga 3 m Penggalian tanah keras Kedalaman Hingga 1 m Pembuangan 1 m3 tanah sejauh 30 meter Pemadatan tanah 1 m3 tanah ( per 20 cm) Pengurugan kembali galian tanah Pengurugan dengan pasir urug Pengurugan dengan tanah urug + dipadatkan Pemasangan pondasi batu belah ad. 1 SP : 4 PP Pemasangan 1 m3 batu kosong (anstamping) Pemasangan 1 m3 batu pecah 2/3 (kerikil) Membongkar 1 m2 palfond (jika bongkaran tidak dipakai kembali) Membongkar 1 m2 lantai keramik (jika bongkaran tidak dipakai kembali) Bongkar Bekisting A.4.1.1.5 1 m3 beton mutu, f'c= 14,5 Mpa (K 175), slump (12±2) cm, w/c=0,66 A.4.1.1.7 1 m3 beton mutu, f'c= 19.3,5 Mpa (K 225), slump (12±2) cm, w/c=0,58 A.4.1.1.1S Membuat beton tumbuk ad. 1 Pc : 3 Pb : 5 Kr A.4.1.1.4S Membuat beton tumbuk ad. 1 Pc : 2 Pb : 3 Kr A.4.1.1.17S Pembesian dgn besi polos/ulir (U24) KONSULTAN 1 m3 Pondasi Telapak 90/90 BTN 1 1 m3 Pondasi Telapak 60/110 1 m3 Sloof beton 20/20 BTN 2 1 m3 Sloof beton 15/20 1 m3 Kolom beton 40/40 LT.1 1 m3 Kolom beton 20/40 1 m3 Kolom beton 40/40 + 20/40 BTN 3 1 m3 Kolom beton 20/20 BTN 4 1 m3 Kolom beton 12/20 BTN 5 1 m3 Kolom beton 10/12 BTN 6 1 m3 Balok beton 25/50 1 m3 Balok beton 20/25 BTN 7 1 m3 Balok beton 15/25 BTN 8 1 m3 Balok beton 10/12 1 m3 Ringbalk beton 15/30 1 m3 Ringbalk beton 20/25 BTN 9 1 m3 Ringbalk beton 15/20 1 m3 Plat beton t = 12 cm 1 m3 Plat beton t = 10 cm BTN 10 1 m3 Plat beton t = 8 cm A.4.2.1.1 Pemasangan 1 kg besi profil A.4.2.1.2S Pemasangan 1 kg rangka kuda-kuda baja IWF/Canal A.4.2.1.4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

SATUAN 1m1 1 m2 1 m2 1 m1 1 m2 1 m2 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 m2 m2 1 m2 1 m3 1 m3 1 m3 1 m3 1 kg 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 m3 1 kg 1 kg 1 m2

HARGA SATUAN #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

### ###

51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109

A.4.2.1.11S A.4.2.1.13 A.4.2.1.20S A.4.2.1.21S A.4.4.1.7 A.4.4.1.8 A.4.4.1.9 A.4.4.1.15 A.4.4.1.15 A.4.4.2.4S A.4.4.2.27. A.4.4.3.13 A.4.4.3.13S A.4.4.3.14 A.4.4.3.28 A.4.4.3.55S A.4.4.3.4 A.4.4.3.5 A.4.4.3.6 A.4.4.3.54S A.4.4.3.55S A.4.4.3.54SS A.4.4.3.57 A.4.4.3.58 A.4.4.3.61 A.4.5.1.7 A.4.5.1.7S A.4.5.1.9S A.4.2.1.15 A.4.2.1.15S A.4.6.1.16 A.4.6.1.16 A.4.2.1.18 A.4.6.1.21 A.4.2.1.19 A.4.5.2.32 A.4.5.2.36S A.4.5.2.1 A.4.5.2.4 A.4.5.2.32 A.4.5.2.36 A.4.5.2.1S A.4.5.2.4S A.4.5.2.42 A.4.6.1.2 A.4.6.1.5 A.4.6.1.6 A.4.6.1.8 A.4.6.1.9 A.4.5.2.42 A.4.6.2.2 A.4.6.2.5 A.4.6.2.12 A.4.6.2.17 A.4.6.2.18 A.4.7.1.1 A.4.7.1.6S A.4.7.1.10S

Pasang Kusen Alumunium 3" Natural 1,3 mm Pemasangan 1 m daun pintu/jendela alluminium Pasang Rangka dinding partisi Besi Hollow Galvanise Pasang Rangka Plafon Besi Hollow Galvanise Pasangan Rollag Bata Merah ad. 1 SP : 3 PP Pasangan Bata Merah 1/2 bata ad. 1 SP : 3 PP Pasangan Bata Merah 1/2 bata ad. 1 SP : 4 PP Pasangan dinding bata ringan (hebel) 1 m2 pemasangan wallpaper lebar 50 cm Pasang Plesteran Bata/beton + acian ad. 1pc : 4ps Pasang Acian Dinding/beton Pasang Glass Box Pemasangan lantai granit uk. 60 x 60 polished Pemasangan lantai granit uk. 60 x 60 unpolished Pemasangan lantai granit uk. 40 x 40 Pemasangan plint/stair nosing granit uk. 10 x 60 cm Pemasangan Dinding granit uk. 60 x 60 Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm Pasang Keramik Dinding 20x25 cm KW I Pasang Keramik Dinding 25x50 cm KW I Pasang Granit Dinding 40x40 cm Pemasangan 1 m2 dinding batu paras Pemasangan 1 m2 dinding batu tempel Pemasangan 1 m2 floor hardener Pasang Plafond Gypsum Pasang Plafond GRC Pasang List Plafon Gypsum 10-15 cm Pasang Konstruksi Kuda-Kuda Baja Ringan Pasang Rangka Atap Baja Ringan Pasang kaso rangka atap genteng keramik, kayu kelas II Pasang reng rangka atap genteng keramik, kayu kelas II Pasang Talang miring seng zingcalum Pasang Listplank tumpang sari kayu kls II Pasang Listplank GRC tumpang sari (30+10 cm) t= 1 mm Pasang Atap Spandek Pasang Nok Atap Spandek Pasang Atap genteng palentong kecil Pasang bubung genteng palentong Pasang Genteng Metal Pasang nok genteng metal Pasang Genteng Keramik Pasang nok genteng keramik Pemasangan alumunium foil/sisalation Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I Pembuatan 1 m2 daun pintu triplek rangkap t = 6 mm, rangka kayu kelas II tert Pembuatan 1 m2 daun pintu triplek rangkap t = 6 mm, rangka expose kayu kelas Pemasangan alumunium foil/sisalation Pemasangan 1 buah kunci tanam antik Pemasangan 1 buah engsel pintu Pemasangan 1 buah Door holder Pemasangan 1 m2 kaca polos tebal 5 mm Pemasangan 1 m2 kaca polos tebal 8 mm 1 m2 Pengikisan / pengerokan permukaan cat lama Pengecatan epoxy (anti bakteri) Pengecatan dinding sekualitas kemtone

1 m1 1 m1 1 m2 1 m2 1 m1 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m1 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m2 1 m1 1 m2 1 m2 1 m2 1 m2 1 m1 1 m1 1 m1 1 m2 1 m1 1 m2 1 m1 1 m2 1 m1 1 m2 1 m1 1 m2 1 m3 1 m2 1 m2 1 m2 1 m2 1 m2 BH BH BH 1 m2 1 m2 m2 m2 m2

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163

A.4.7.1.10S A.4.7.1.11S A.4.7.1.4S A.4.7.1.20S A.4.7.1.22S A.5.1.1.1 A.5.1.1 2 A.5.1.1 4. A.5.1.1.5 A.5.1.1 12 A.5.1.1.18 A.5.1.1.25 A.5.1.1.29 A.5.1.1 31 A.5.1.1 26 A.5.1.1 29 A.5.1.1 31 A.5.1.1 32 A.5.1.1 32 A.5.1.1 32 A.5.1.1 14 A.5.1.1 19 A.5.1.1 25 B.02.b B.07 a A.5.1.1 26 A.5.1.1 27 BTN27 JLN06 JLN07 JLN08 JLN10 JLN13 JLN13A JLN14 ELK01 ELK02 ELK05 ELK06S ELK07S ELK13S ELK14S ELK23S SNT20 SNT23S

Pengecatan dinding sekualitas dulux Pengecatan Plafond sekualitas catylac Pengecatan bidang kayu baru sekualitas glotex Pengecatan 1 m2 permukaan baja sistem 3 lapis 1 m2 Water Proofing Pemasangan 1 buah closet duduk Pemasangan 1 buah closet jongkok porselen (K3) Pemasangan 1 buah urinoir Pasang Wastafel - Lengkap Pemasangan 1 buah bak cuci piring stainless steel Bak Kontrol ukuran 60X60X65 Pasang Pipa Air 1/2" (15 mm) Pasang Pipa Air 2" (50 mm) Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Pemasangan 1 m’ pipa PVC tipe AW diameter 3” Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Pasang Pipa Air 4" (100 mm) Wavin Pemasangan 1 m’ pipa PVC tipe AW diameter 6” Pasang Floor Drain Pemasangan 1 buah kran diameter ½” atau 3/4” Pemasangan 1 buah pintu PVC KM/WC Lantai Kerja (K.100) tebal 5 cm 1 m3 beton mutu, fc- 19,3 MPa (K225), slump (12± 2) cm w/c=0,58 (manual) Membuat 1 m1 saluran buis beton Ø 20 cm Membuat 1 m1 saluran buis beton U 20 cm Gorong-gorong pracetak 60x60 cm Lapis Pondasi Atas (LPA) Lapis Pondasi Bawah (Telford) Lapis Perekat (Aspal Emulsi) Laston Lapis Aus (AC - WC) Pasang paving block natural t = 6 cm Pasang paving block natural t = 8 cm Pasang kansten beton Instalasi Titik Listrik/Stop Kontak Pasang Lampu Downlight Phillips 20 Watt Pasang Saklar Seri Rating 10 A Pasang Saklar Tunggal Pasang Stop Kontak Pasang Stop Kontak Mesin Pasang Lampu TL outbow Pasang Lampu Baret Circle TLE 22 Watt Pasang Stop Kontak AC Pasang Pompa Dorong 150 watt Pengeboran dengan mesin berikut material Pasang pintu alumunium type P.1 Pasang pintu alumunium type P.2 Pasang pintu Kayu + Daun type P.3 Pasang jendela alumunium type J.1 Pasang jendela alumunium type J.2 Pasang jendela alumunium type J.3 Pasang jendela alumunium type J.4 Pasang bouvenlight alumunium type B.1

m2 1 m2 1 m2 1 m2 1 m2 1 unit 1 bh 1 bh 1 unit 1 unit BH m1 1 m1 m1 m1 m1 m1 m1 1 m1 1 m1 1 bh 1 bh 1 bh 1 m3 1 m3 m1 m1 m1 1 m3 m3 Liter 1 ton 1 m2 1 m2 1 m1 1 ttk 1 bh 1 bh 1 bh 1 bh 1 bh 1 bh 1 bh 1 bh 1 unit 1 ttk 1 set 1 set 1 set 1 set 1 set 1 set 1 set 1 set

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 15,100.00 #N/A #N/A 23,400.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 633,800.00 #N/A #N/A 144,900.00 151,700.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 3,164,100.00 2,720,200.00 #NAME? 1,304,682.50 1,106,242.50 297,357.50 #NAME? #NAME?

PEKERJAAN KUSEN NO

1 2 3 4 5 6

URAIAN

Pemasangan 1 m kusen alluminium Pemasangan 1 m2 Daun Pintu Rangka Alumunium Kunci Pintu Bottom patch Loock + Colinder

Top Patch / bottom patch fitting Handle Stainless Steell

KODE

4.2.1 4.2.1 M.07034 M.07024

Ongkos pasang (10% x bahan)

SAT

m' m2 bh bh bh ls

HARGA SATUAN 165,914.54 165,914.54 167,000.00 125,000.00 185,000.00

ALM 01

Tipe P1

ALM 02

Tipe P2

ALM 03

Tipe P3

VOL

BIAYA

VOL

BIAYA

VOL

BIAYA

5.900 3.00 1.00 4.00 4.00 1.00

Jumlah Harga Keuntungan 10% Jumlah Total Dibulatkan

NO

1 2 3 4 5 6 7 8

URAIAN

Kusen Alumunium Warna 1,3 mm 3 " Daun Jendela Alumunium Natural 1,3 mm Kaca Rayben 5 mm Handle Jendela Alumunium Engsel Jendela tophung

Karet accessories Silent

KODE

SAT

M.07014 M.07017

m' m'

M.07003 M.07023 M.07030 M.07045 M.07044

m2 bh bh m' m' ls

Ongkos pasang (10% x bahan)

HARGA SATUAN 155,000.00 250,000.00 97,500.00 85,000.00 83,000.00 40,000.00 5,000.00 -

1 2 3 4 5 6 7 8

URAIAN

Kusen Alumunium Warna 1,3 mm 3 " Daun Jendela Alumunium Natural 1,3 mm Kaca Rayben 5 mm Handle Jendela Alumunium Engsel Jendela tophung

Karet accessories Silent

Ongkos pasang (10% x bahan)

KODE

SAT

M.07014 M.07017

m' m'

M.07003 M.07023 M.07030 M.07045 M.07044

m2 bh bh m' m' ls

HARGA SATUAN 155,000.00 250,000.00 97,500.00 85,000.00 83,000.00 40,000.00 5,000.00 -

Jumlah Harga Keuntungan 10% Jumlah Total Dibulatkan

4.150 1.80 1.00 2.00 2.00 1.00

3,172,003.35 317,200.33 3,489,203.68 3,489,200.00

688,545.34 298,646.17 167,000.00 250,000.00 370,000.00 177,419.15

3.400 1.40 1.00 1.00

1,951,610.66 195,161.07 2,146,771.73 2,146,700.00

564,109.44 232,280.36 167,000.00 96,338.98 1,059,728.77 105,972.88 1,165,701.65 1,165,700.00

ALM 03

J1

ALM 04

J2

ALM 05

J.KACA

VOL

BIAYA

VOL

BIAYA

VOL

BIAYA

7.45 0.97 1.37 3.00 6.00 6.60 13.44 1.00

Jumlah Harga Keuntungan 10% Jumlah Total Dibulatkan

NO

978,895.79 497,743.62 167,000.00 500,000.00 740,000.00 288,363.94

1,154,750.00 242,500.00 133,575.00 255,000.00 498,000.00 264,000.00 67,200.00 261,502.50

5.80 0.97 0.47 3.00 6.00 6.84 6.84 1.00

2,876,527.50 287,652.75 3,164,180.25 3,164,100.00

899,000.00 242,500.00 45,825.00 255,000.00 498,000.00 273,600.00 34,200.00 224,812.50

19.20 9.20 38.40 38.40 1.00

2,472,937.50 247,293.75 2,720,231.25 2,720,200.00

2,976,000.00 897,000.00 1,536,000.00 192,000.00 560,100.00 6,161,100.00 616,110.00 6,777,210.00 6,777,200.00

ALM 06

BV1

ALM 07

BV2

ALM 08

BV3

VOL

BIAYA

VOL

BIAYA

VOL

BIAYA

5.65 0.81 1.00

875,750.00 202,500.00 107,825.00 1,186,075.00 118,607.50 1,304,682.50 1,304,600.00

4.85 0.65 1.00

751,750.00 162,500.00 91,425.00 1,005,675.00 100,567.50 1,106,242.50 1,106,200.00

1.15 0.27 1.00

178,250.00 67,500.00 24,575.00 270,325.00 27,032.50 297,357.50 297,300.00

ANALISA PEKERJAAN PINTU DAN JENDELA ALUMUNIUM NO

1 2 3 4 5 6 7 8 9 10 11

URAIAN

Kusen alumunium warna 4" Kusen alumunium natural 4" Kaca bening t = 10 cm Frame daun pintu alumunium Kunci pintu alumunium Handle stainlees kecil

Engsel pintu Karet accessories alumunium Sekrup fhiser Selant/Silikon

Ongkos pasang 0.3%

SAT

m1 m1 m2 m1 set set bh m1 bh tube hrg

HARGA SATUAN 155,000.00 250,000.00 185,000.00 85,000.00 #NAME? 83,000.00 #NAME? 40,000.00 #NAME? 5,000.00 -

Jumlah Harga Keuntungan 10% Jumlah Total Dibulatkan

Pasang pintu alumunium type P.1 VOL BIAYA 12.4000 5.7800 11.3600 1.0000 2.0000 6.0000 14.4000 12.0000 1.6800 0.3000

1,922,000.00 1,069,300.00 965,600.00 #NAME? 166,000.00 #NAME? 576,000.00 #NAME? 8,400.00 #NAME? #NAME? #NAME? #NAME? #NAME?

Pasang pintu alumunium type P.2 VOL BIAYA

17.2000 3.6800 5.0000 1.0000 2.0000 3.0000 7.7200 10.0000 0.4632 0.3000

4,300,000.00 680,800.00 425,000.00 #NAME? 166,000.00 #NAME? 308,800.00 #NAME? 2,316.00 #NAME? #NAME? #NAME? #NAME? #NAME?

Pasang jendela alumunium VOL

10.0000 4.0000 7.7200 6.0000 0.4632 0.3000

BIAYA 2,500,000.00 740,000.00 #NAME? #NAME? 308,800.00 #NAME? 2,316.00 #NAME? #NAME? #NAME? #NAME? #NAME?

ANALISA PEKERJAAN PINTU DAN JENDELA ALUMUNIUM NO

1 2 3 4 5

URAIAN

Kusen Kayu Daun pintu Panil Kunci pintu Engsel pintu

Ongkos pasang 0.3%

SAT

m3 m2 set bh hrg

HARGA SATUAN 620,000.00 170,000.00 185,000.00 #NAME? -

Jumlah Harga Keuntungan 10% Jumlah Total Dibulatkan

Pasang pintu Kayu + Daun type P.3 VOL BIAYA 0.0418 1.6800 1.0000 3.0000 0.3000

25,916.00 285,600.00 185,000.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

VOL

BIAYA -

VOL -

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

BIAYA -

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

ANALISA PEKERJAAN PINTU DAN JENDELA ALUMUNIUM NO

1 2 3 4 5 6 7

URAIAN

Kusen alumunium natural 4" Daun jendela alumunium (cesment) Kaca bening t = 5 cm

Karet accessories alumunium Sekrup fhiser Selant/Silikon

Ongkos pasang 0.3%

SAT

m1 m2 bh m1 bh tube hrg

HARGA SATUAN 250,000.00 250,000.00 97,500.00 40,000.00 #NAME? 5,000.00 -

Jumlah Harga Keuntungan 10% Jumlah Total Dibulatkan

Pasang jendela alumunium Pasang jendela alumunium Pasang jendela alumunium type J.1 type J.2 type J.3 VOL BIAYA VOL BIAYA VOL BIAYA 17.0000 1.0000 4.1400 24.6600 28.0000 1.4796 0.3000

4,250,000.00 250,000.00

7,398.00 1,352,219.40 5,859,617.40 585,961.74 6,445,579.14 6,445,500.00

15.2000 1.0000 3.5600 14.4700 20.0000 0.8682 0.3000

3,800,000.00 250,000.00 347,100.00

4,341.00 1,320,432.30 5,721,873.30 572,187.33 6,294,060.63 6,294,000.00

9.6000 1.0000 1.4300 7.7800 14.0000 0.4668 0.3000

2,400,000.00 250,000.00 139,425.00

2,334.00 837,527.70 3,629,286.70 362,928.67 3,992,215.37 3,992,200.00

ANALISA PEKERJAAN PINTU DAN JENDELA ALUMUNIUM NO

1 2 3 4 5 6 7

URAIAN

Kusen alumunium natural 4" Daun jendela alumunium (cesment) Kaca bening t = 5 cm

Karet accessories alumunium Sekrup fhiser Selant/Silikon

Ongkos pasang 0.3%

SAT

m1 m2 bh m1 bh tube hrg

HARGA SATUAN 250,000.00 250,000.00 97,500.00 40,000.00 #NAME? 5,000.00 -

Jumlah Harga Keuntungan 10% Jumlah Total Dibulatkan

Pasang jendela alumunium type J.4 VOL BIAYA 5.8000 1.0000 0.9136 4.7400 12.0000 0.2844 0.3000

1,450,000.00 250,000.00

1,422.00 510,426.60 2,211,848.60 221,184.86 2,433,033.46 2,433,000.00

Pasang bouvenlight alumunium type B.1 VOL BIAYA 2.2000 0.2450 1.4000 8.0000 0.0840 0.3000

550,000.00 23,887.50 420.00 172,292.25 746,599.75 74,659.98 821,259.73 821,200.00

VOL 4.4000 0.4900 2.8000 16.0000 0.1680 0.3000

BIAYA 1,100,000.00 47,775.00

840.00 344,584.50 1,493,199.50 149,319.95 1,642,519.45 1,642,500.00

FORMULIR REKAFITULASI PERHITUNGAN TKDN SATUAN KERJA

: DINAS PENDIDIKAN DAN KEBUDAYAAN PROVINSI BANTEN

KEGIATAN

: PENINGKTAN SARANA DAN PRASARANA SMK

PEKERJAAN VOLUME

: PEMBANGUNAN RUANG KELAS BARU SMK : 11 (SEBELAS) RUANG KELAS

LOKASI TAHUN ANGGARAN

: KOTA CILEGON : TA.2018 Nilai Gabungan Barang/Jasa ( Rp.)

URAIAN PEKERJAAN (1)

DN

LN

(2)

(3)

TKDN TOTAL

Barang/

Rp.

%KDN

Jasa

(4)

(5)

(6)

Rp.

Gabungan

(7)

(8)

### ### ###

Barang I Material Langsung ( Bahan Baku ) II Peralatan ( Barang Jadi )

1,091,119,252 779,370,894

-

1,091,119,252 779,370,894

35% 25%

35% 25%

1,091,119,252 779,370,894

1,870,490,147

-

1,870,490,147

60%

60%

1,870,490,147

62,349,672 62,349,672

-

62,349,672 62,349,672

2% 2%

2% 2%

62,349,672 62,349,672

### ###

V Kontruksi dan Pabrikasi

935,245,073

-

935,245,073

30%

30%

935,245,073

###

VI Jasa Umum

187,049,015

-

187,049,015

6%

6%

187,049,015

###

1,246,993,431

-

1,246,993,431

3,117,483,578

-

3,117,483,578

Sub Total Barang

### ### ### 60% ### ### ###

Jasa III Manajemen Proyek dan Perekayasaan IV Alat Kerja/Fasilitas Kerja

Sub Total Jasa TOTAL Biaya ( A + B )

40% 100%

40% 100%

1,246,993,431

40%

3,117,483,578

100%

Pandeglang , 04 Juli 2018

Formulasi Perhitungan :

Penawar,

% TKDN (Gabungan Barang/Jasa ) :

PT. SARJIS AGUNG INDRAJAYA Barang =

1,870,490,146.61

60 %

Jasa

1,246,993,431.07

40 %

3,117,483,577.68

100 %

Jumlah

=

Ttd & stempel

###

WAHYU SETIA BUDI Direktur Cabang

Related Documents

Ahsp 2020
March 2021 0
Surat Mgbk Banten
February 2021 0
Masroni Smk
February 2021 3
Kelas 12 Smk Restoran
January 2021 3

More Documents from "rahman30"