Biaya Standar ( Standard Cost ) Dalam menentukan biaya yang dipersiapkan dengan cermat biasanya single unit. Demikian pula Biaya Produksi

yang

direncanakan

(Product’s

Planned Cost) dan pada umumnya selalu dibuat dengan baik sekali sebelum produksi mulai dan berfungsi sebagai Budget, tetapi dalam sekala lebih kecil dimana budget berhubungan dengan jumlah dan bukan dalam Biaya per unit.

Cost Accounting

Macam-macam Standar ( Types of Standard ) 1. Basic Standard : Standar baik estimate maupun actual cost dibandingkan satu sama lain, biasanya hal itu konstan dari tahun ke tahun dan digunakan dengan cara yang sama seperti INDEK. 2. Current Standard, mempunyai tiga kemungkinan ; a. Ecpected Actul Standard, sebagai akibat yang diharapkan akan terjadi dalam satu tahun atas dasar syarat-syarat operasi dan biaya yang dapat ditentukan lebih dahulu. b. Normal Standard, suatu angka rata-rata atas operasi normal untuk menentukan FOH yang dapat ditentukan secara baik. c. Theoritical Standard, jumlah menunjukan suatu tingkat produksi (output) maksimum yang merupakan keadaan ideal dan tujuan. Cost Accounting

PENYIMPANGAN BAHAN BAKU (Material Variance) 1.

Price Variance (PV) ; adalah perbedaan antara biaya standar dengan biaya aktual, perbedaan ini dipengaruhi oleh kekuatan luar. Manajemen mempunyai control yang sedikit atas penyimpangan tersebut, karena adanya perubahan dalam harga dari barang yang dibeli. PV = ( Standard unit Cost – Actual unit Cost ) x Actual Quantity.

Cost Accounting

2. Quantity Variance (QV) ; Perbedaan antara faktor produksi (Output) standar dengan yang sebenarnya dan biasanya hal ini dapat dikuasai oleh manajemen. Quantity Variance ; (Standard Quantity Used – Actual Quantity Allowed) X Standard Unit Price.

Cost Accounting

Contoh 1. Biaya standar per unit Bahan Baku $800,- di beli 6.000 unit dengan harga $830 per unit; dipakai dalam proses 4.000 unit, menurut standar 4.100 unit, maka : Price Variance = ($800 – $830)4.000 unit

: ($ 120.000,-) (Un Favorable)

Quantity Variance = (4.100 unit – 4.000 unit )$800

: $ 80.000,-

Materials Variance

: ($ 40.000,- ) (Un Favorable)

(Favorable)

Cost Accounting

LABOR VARIANCE

1.

Rate Variance ( Standard Rate – Actual Rate) Actual Hours Works (Std R – Act R)X Act HW

2.

Efficiency Variance (Standard Hours – Actual Hours) Standard Rate (Std HW – Act HW) Std R Cost Accounting

Contoh Jam Riil (actual hours) 5000 jam, tarif riil (actual rate) $4.100,-. Tarif standar (standard rate) $4.200,- jam standar (standard hours) 5200 jam.

1. Rate Variance (Std Rate - Act Rate ) Act Hourwork ( $ 4,200 - $ 4,100 ) 5000 hours

= $ 500,000

2. Efficience Variance (Std hourwork - Act hourwork) Std rate ( 5200 5000 ) $ 4,200

= $ 840,000

Labor Variance = $ 1,340,000

Cost Accounting

3. FACTORY OVERHEAD VARIANCE Adanya penyimpangan dalam FOH dapat disebabkan oleh adanya 3 kemungkinan : 1. Output lebih besar atau kurang dari kapasitas normal yang diperkirakan. 2. Biaya FOH yang riil lebih besar atau kurang dari FOH yang ditentukan menurut anggaran (budget FOH) 3. Jam riil (actual hours worked) yang ada berbeda dengan jumlah jam standard yang diperkenankan menurut tingkat tercapainya produksi.

Cost Accounting

Overall FOH Variance Suatu perbedaan FOH bersih (Net FOH Variance) dapat dihitung dengan formula sbb :

Actual FOH Less : FOH Applied to Production at standard hours and rate

Cost Accounting

TWO – VARIANCE METHOD 1. CONTROLLABLE VARIANCE Actual FOH Less : Budget Allowance at standard hours ( fixed + variable cost )

2. VOLUME VARIANCE Budget Allowance at standard hours Less : Standard hours X standard FOH Rate

Cost Accounting

CONTOH Diketahui data sebagai berikut : Actual direct labor hours : 5000 hours Standard allowance : 5200 hours Normal Capacity : 6000 hours Actual FOH : $ 29,500

Budget FOH (Normal Capacity)

Variable FOH Fixed FOH

TOTAL Rate $ 12,000 $ 2 $ 18,000 $ 3 $ 30,000 $ 5

Cost Accounting

FOH Variance 1. Controllable Variance Actual FOH Budget at Standard : Fixed FOH Variable FOH 5200 $ 2 =

$

18,000

$

10,400

Un Faforable Controllable Variance :

$

29,500

$

28,400

$

(1,100)

2. Volume Variance Budget at Standard :

$

28,400

$

26,000

Un Faforable Volume Variance :

$

(2,400)

FOH Variance =

$

(3,500)

Standard X Standard 5200 X $

5 =

THREE – VARIANCE METHOD 1.

Spending Variance Actual FOH Less : Budget allowance at actual hours (Fixed + Variabel Cost)

2.

Idle Capacity Variance Budget alllwance at actual hours Less : Actual hours x standard FOH Rate

3.

Efficiency Variance Actual hours x standard FOH Rate Less : Standard hours x standard rate

Cost Accounting

FOH Variance 1. Spending Variance Actual FOH Budget at Actual : Fixed FOH Variable FOH 5000 $

$ 29,500 $ 18,000 2 =

$ 10,000 $ 28,000

Un Faforable Spending Variance :

$ (1,500) UF

2. Idle Capacity Variance Budget at Actual

$ 28,000

Actual hours at standard rate act hour 5000 rate $ 5

$ 25,000

Un Faforable Idle Cap, Variance

$ (3,000) UF

Cost Accounting

3. Effeciancy Variance Actual hours at standard rate

$ 25,000

Standard hours at standard rate std hour 5200 rate $ 5

$ 26,000

Faforable Effeciance Variance

$ 1,000 F

FOH Variance 1. Spending Variance 2. Idle Capacity Variance 3. Effeciancy Variance Jumlah

= = = =

$ $ $ $

(1,500) (3,000) 1,000 (3,500)

Cost Accounting

FOUR – VARIANCE METHOD 1. 2. 3. 4.

Spending Variance Idle Capacity Variance Variable Effecience Varience Fixed Effecience Varience

Varieble Eff. Var. Actual hours x variable rate Less : standard hours x variable rate Fixed Eff. Var. Actual hours x fixed rate Less : standard hours x fixed rate Cost Accounting

3. Variabel Eff. Variance Actual hours at variable rate act hour 5000 rate var. $ 2

$ 10,000

At Standard hours at variable rate std hour 5200 rate var. $ 2

$ 10,400

Variabel Eff. Variance

$

4. Fixed Eff. Variance Act hour 5000 rate fixed $ 3

400 F

$ 15,000

At standard hours at fixed rate std hour 5200 rate fixed $ 3

$ 15,600

4. Fixed Eff. Variance

$

FOH Variance 1. Spending Variance 2. Idle Capacity Variance 3. Variabel Eff. Variance 4. Fixed Eff. Variance Jumlah

= = = = =

$ $ $ $ $

600

F

(1,500) (3,000) 400 600 (3,500)

UF UF F F UF

PENGERTIAN VARIANCE Controllable

: Mengukur variable variance dan menjadi tanggung jawab supervisor tiap bagian.

Volume

: Menyatakan kapasitas yang tidak digunakan. Pertanggungjawaban pada manajemen.

Spending

: Menganalisa biaya variable dan menjadi tanggung jawab supervisor yang harus selalu memperhatikan pengeluaan riil yang ada dalam jumlah yang terdapat dalam budget.

Idle Capacity

: Menyatakan kapasitas yang tidak digunakan, sebab jumlah jam riil kurang dari normal atas rate FOH. Tanggung jawab pada manajemen.

Effeciancy

: Dipengaruhi pada labor eff. variance baik biaya variabel maupun fixed, apabila labor cost atau jam kerjanya digunakan sebagai dasar dalam penggunaan FOH.

Cost Accounting

SELAMAT BELAJAR

Cost Accounting

Related Documents


More Documents from "Daniel Edwin Pramono"

Contoh Cv Profesional
February 2021 1
Bab Ii
January 2021 2
Hayooo
February 2021 5
February 2021 4
Laporan Kasus Difteri
January 2021 3