KEMENTERIAN AGAMA REPUBLIK INDONESIA

KANTOR WILAYAH KEMENTERIAN AGAMA PROVINSI MALUKU Jln. Jend. Sudirman, Hative Kecil - Kota Ambon Telp. (0911) 352633 - (0911) 311707 e-mail : [email protected] web : maluku.kemenag.go.id

BILL of QUANTITY [BoQ] PEMBANGUNAN BALAI NIKAH DAN MANASIK HAJI KECAMATAN SERAM UTARA BARAT KABUPATEN MALUKU TENGAH 10

9

8

7

6 BALAI NIKAH & MANASIK HAJI KANTOR URUSAN AGAMA KECAMATAN SERAM UTARA BARAT

5

4

3

2

1 A

B

C

D

E

F

G

H

I

TAHUN ANGGARAN 2019

J

K

KOP PERUSAHAAN BILL OF QUANTITY (BOQ) REKAPITULASI BIAYA SATUAN KERJA

: KEMENTERIAN AGAMA REPUBLIK INDONESIA

PAKET PEKERJAAN

: PEMBANGUNAN BALAI NIKAH DAN MANASIK HAJI

LOKASI

: KECAMATAN SERAM UTARA BARAT, KABUPATEN MALUKU TENGAH

TAHUN ANGGARAN

: 2019

KANTOR WILAYAH KEMENTERIAN AGAMA PROVINSI MALUKU

NO

JENIS PEKERJAAN

1

2

A.

JUMLAH BIAYA (Rp) 3

BIYA FISIK PEMBANGUNAN BALAI NIKAH DAN MANASIK HAJI I. II. III. IV. V. VI. VII. VIII. IX. X. XI. XII. XIII.

a. b. c. d.

PEKERJAAN PERSIAPAN PEKERJAAN TANAH DAN PONDASI PEKERJAAN BETON PEKERJAAN PASANGAN DINDING DAN PLASTERAN PEKERJAAN PASANGAN KOSEN PINTU /JENDELA DAN ACCESSORIES PEKERJAAN PASANGAN PENUTUP LANTAI DAN DINDING PEKERJAAN PASANGAN RANGKA ATAP PEKERJAAN PASANGANN PLAFOND DAN SHADING SOLAR PEKERJAAN FINISHING PENGECATAN PEKERJAAN SANITEIR PEKERJAAN INSTALASI LISTRIK PEKERJAAN AKHIR PEKERJAAN LAIN - LAIN TOTAL BIAYA FISIK BANGUNAN (I s/d XIII)

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

JUMLAH BIAYA PPN = 10 % x Jumlah Biaya Fisik Bangunan JUMLAH TOTAL (a + b) JUMLAH DI BULATKAN

Rp Rp Rp Rp -

TERBILANG : Rupiah .-

Ambon …………………….. 2019 Penawar, PT/CV/Fa, .........................................

Nama Jelas Jabatan

DAFTAR KUANTITAS DAN HARGA SATUAN KERJA

: KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR WILAYAH KEMENTERIAN AGAMA PROVINSI MALUKU : PEMBANGUNAN BALAI NIKAH DAN MANASIK HAJI : KECAMATAN SERAM UTARA BARAT, KABUPATEN MALUKU TENGAH : 2019

PAKET PEKERJAAN LOKASI TAHUN ANGGARAN

HARGA NO 1 A. I.

II.

III.

URAIAN PEKERJAAN

SAT

2

3

BIYA FISIK PEMBANGUNAN BALAI NIKAH DAN MANASIK HAJI PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi Pekerjaan 2 Pengukuran dan Pemasangan Bouwplank 3 Pembuatan Gudang Material dan Bangsal Pekerja 4 Pembuatan Papan Nama Proyek 5 Air Kerja Proyek 6 Listrik Kerja Proyek 7 Laporan dan Dokumentasi PEKERJAAN TANAH DAN PONDASI 1 Galian Tanah a. Pondasi Pasangan Batu Kali b. Pondasi Tapak c. Pondasi Rolaag dan Anak Tangga 2 Urugan Kembali Bekas Galian Pondasi a. Pondasi Pasangan Batu Kali b. Pondasi Tapak c. Pondasi Rolaag dan Anak Tangga 3 Urugan Pasir a. Bawah Pondasi Pondasi Batu Kali b. Pondasi Tapak c. Pondasi Rolaag dan Anak Tangga d. Bawah Lantai 4 Urugan Tanah Bawah Lantai dan Anak Tangga 5 Pasangan Pondasi Rolaag (Anak Tangga Teras) ad. 1PC : 4PS 6 Pasangan Pondasi Batu Kali ad. 1PC : 4PS 7 Pasangan Batu Kosong PEKERJAAN BETON 1 Pekerjaan Pondasi Tapak 1.1. Pondasi Tapak Ukuran 100 x 100 x 30 MM a. Pembetonan Site Mix (K.200) b. Pembesian 97,42 Kg/M3 c. Bekesting (2 x Pakai) 1,00 M2/M3 2 Pekerjaan Pembetonan Sloof 2.1. Sloof Type SL Ukuran 15 x 20 Cm a. Pembetonan Site Mix (K.200) b. Pembesian 171,02 Kg/M3 c. Bekesting (2 x Pakai) 13,33 M2/M3 3 Pekerjaan Pembetonan Kolom 3.1 Kolom Type K1 Ukuran 20 x 20 Cm a. Pembetonan Site Mix (K.200) b. Pembesian 167,73 Kg/M3 c. Bekesting (2 x Pakai) 20,00 M2/M3 3.2 Kolom Type K2 Ukuran 25 x 25 Cm a. Pembetonan Site Mix (K.200) b. Pembesian 136,40 Kg/M3

1 - 4

VOLUME 4

SATUAN

JUMLAH

(Rp)

(Rp)

5

6

Ls M Ls Ls Ls Ls Ls

1,00 125,50 1,00 1,00 1,00 1,00 1,00 SUB. JUMLAH BIAYA - I

-

M3 M3 M3

67,77 17,28 2,66

-

-

M3 M3 M3

67,77 17,28 2,66

-

-

M3 M3 M3 M3 M3 M3 M3 M3

11,30 1,15 0,27 20,48 95,23 15,26 43,93 22,59 SUB. JUMLAH BIAYA - II

-

M3 Kg M2

2,40 233,80 2,40

-

-

M3 Kg M2

3,77 643,90 50,20

-

-

M3 Kg M2

1,39 232,48 27,72

-

-

M3 Kg

3,09 421,98

-

-

HARGA NO

URAIAN PEKERJAAN

1

4

5

6 7

IV.

V.

SAT

2 c. Bekesting (2 x Pakai) 16,00 3.3 Kolom Type K3 Ukuran 30 x 30 Cm a. Pembetonan Site Mix (K.200) b. Pembesian 165,45 c. Bekesting (2 x Pakai) 13,33 3.4 Pembetonan Kolom Praktis Type - Kp Pekerjaan Pembetonan Balok 4.1. Pembetonan Balok Ukuran 15 x 30 Cm a. Pembetonan Site Mix (K.200) b. Pembesian 214,51 c. Bekesting Balok 16,67 Pekerjaan Pembetonan Plat Dak 5.1 Plat Dak tebal 100 MM a. Pembetonan Site Mix (K.200) b. Pembesian 86,74 c. Bekesting Plat 10,00 5.2 Plat Talang Beton Tebal 100 MM a. Pembetonan Site Mix (K.200) b. Pembesian 86,74 c. Bekesting Plat 10,00 5.3 Plat Dak Sun Screen Tebal 100 MM a. Pembetonan Site Mix (K.200) b. Pembesian 86,74 c. Bekesting Plat 10,00 Pekerjaan Pembetonan Ring Balok/Sopi-sopi Pembentukan Tiang Pilar Depan Ukuran Diameter Bawah Diameter Atas 35 Cm

VOLUME

SATUAN

JUMLAH

(Rp)

(Rp)

3 M2

4 49,50

5 -

6 -

M3 Kg M2 M

1,06 175,71 14,16 92,25

-

-

Kg/M3 M2/M3

M3 Kg M2

3,42 733,62 57,00

-

-

Kg/M3 M2/M3

M3 Kg M2

4,60 399,03 46,00

-

-

Kg/M3 M2/M3

M3 Kg M2

2,04 176,96 20,40

-

-

M3 Kg M2 M Ls

1,35 117,01 13,49 88,00 2,00

-

-

M2/M3

Kg/M3 M2/M3

Kg/M3 M2/M3 50 Cm

PEKERJAAN PASANGAN DINDING DAN PLASTERAN 1 Pekerjaan Pasangan Dinding CB 10 Ad. 1PC : 4 PS 2 Pekerjaan Penebalan Dinding CB 10 Ad. 1PC : 4 PS 3 Pekerjaan Plasteran Dinding CB10, Ad. 1PC : 4PS 4 Pekerjaan Partisi Dinding Tripleks 4 mm Rangka Kayu Kls. II 5 Pekerjaan Acian Plasteran 6 Pekerjaan Acian Beton (Plat Dak dan Talang Beton) PEKERJAAN PASANGAN KOSEN PINTU /JENDELA DAN ACCESSORIES 1 Pekerjaan Kusen Pintu dan Jendela Kayu Kls. I 1.1 Kusen Pintu Utama - PU.01 (1 Bh) 1.2 Kusen Pintu Utama - PU.02 (1 Bh) 1.3 Kusen Pintu - P.01 (3 Bh) 1.4 Kusen Pintu - P.02 (3 Bh) 1.5 Kusen Pintu - P.03 (1 Bh) 1.6 Kusen Pintu Jendela - PJ.01 (1 Bh) 1.7 Kusen Pintu Jendela - PJ.02 (1 Bh) 1.8 Kusen Pintu Jendela - PJ.03 (1 Bh) 1.9 Kusen Pintu Jendela - PJ.04 (2 Bh) 1.10 Kusen Jendela - J.01 (9 Bh) 1.11 Kusen Jendela - V.01 (4Bh) 1.12 Kusen Jendela - V.02 (1 Bh) 2 Pekerjaan Daun Pintu 2.1 Daun Pintu Utama - PU.01 (1 Bh) Pintu Panil Kayu Kls. I 2.2 Daun Pintu Utama - PU.02 (1 Bh) Pintu Panil Kayu Kls. I 2.3 Daun Pintu - P.01 (3 Bh) Lapis Taekwood + Multipleks 2.4 Daun Pintu - P.02 (3 Bh) Lapis Taekwood + Multipleks 2.5 Daun Pintu - P.03 (1 Bh) Lapis Taekwood + Multipleks 3 Pekerjaan Bingkai Daun Jendela dan Ventilasi Kayu Kls. I 3.1 Komp Jendela - J.01 (9 bh) 3.2 Komp Ventilasi - V.02 (1 bh) 4 Pekerjaan Pasangan Kaca tebal 5 mm 4.1 Pasang Kaca 5 mm - PU.02 (1 Bh) 4.2 Pasang Kaca 5 mm - P.01 (3 Bh)

2 - 4

SUB. JUMLAH BIAYA - III

-

M2 M2 M2 M2 M2 M2

314,79 50,61 654,85 70,81 654,85 100,03 SUB. JUMLAH BIAYA - IV

-

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3

0,03 0,05 0,15 0,14 0,02 0,05 0,07 0,09 0,22 0,50 0,07 0,03

-

-

M2 M2 M2 M2 M2

3,14 1,94 5,19 4,56 0,99

-

-

M2 M2

7,34 0,30

-

-

M2 M2

0,41 1,22

-

-

HARGA NO

URAIAN PEKERJAAN

1

5

SAT

2 4.3 Pasang Kaca 5 mm - P.02 (3 Bh) 4.4 Pasang Kaca 5 mm - P.03 (1 Bh) 4.5 Pasang Kaca 5 mm - PJ.01 (1 Bh) 4.6 Pasang Kaca 5 mm - PJ.02 (1 Bh) 4.7 Pasang Kaca 5 mm - PJ.03 (1 Bh) 4.8 Pasang Kaca 5 mm - PJ.04 (2 Bh) 4.9 Pasang Kaca 5 mm - J.01 (9 Bh) 4.10 Pasang Kaca 5 mm - V.01 (4 Bh) 4.11 Pasang Kaca 5 mm - V.02 (1 Bh) Pekerjaan Pasangan Accessories Pintu dan Jendela 5.1 Kunci Tanam Pintu Utama 5.2 Kunci Tanam Pintu 5.3 Kunci Tanam Pintu KM/WC 5.4 Full Handle Stenless 30 Cm Ex, Solid - Pintu Utama 5.5 Engsel Pintu 5.6 Engsel Jendela dan Ventilasi 5.7 Grendel Tanam Pintu Kebaya 5.8 Grendel Jendela 5.9 Hak Angin Jendela dan Pintu Kebaya

VOLUME

SATUAN

JUMLAH

(Rp)

(Rp)

3 M2 M2 M2 M2 M2 M2 M2 M2 M2

4 1,08 0,41 1,38 2,27 3,41 8,84 12,36 1,26 0,30

5 -

6 -

Set Set Set Set Set Set Set Set Set

1,00 10,00 3,00 1,00 13,00 10,00 1,00 10,00 11,00

-

-

SUB. JUMLAH BIAYA - V VI.

VII.

VIII.

IX.

X.

PEKERJAAN PASANGAN PENUTUP LANTAI DAN DINDING 1 Penutup Lantai 1.1 Pasangan Lantai Keramik 40/40 CM 1.2 Pasangan Lantai Keramik Teras 40/40 CM Anti Slip 1.3 Pasangan Lantai Keramik 20/20 Anti Slip KM/WC 2 Penutup Dinding 1.1 Pasangan Dinding Keramik 20/25 KM/WC

-

-

M2 M2 M2

182,13 13,98 11,38

-

M2

34,77 SUB. JUMLAH BIAYA - VI

-

PEKERJAAN PASANGAN RANGKA ATAP 1 Pasangan Rangka Atap Baja Ringan 2 Pasangan Penutup Atap dengan Zincalum Warna 3 Pasangan List Plank (Kalsiplank) 30 Cm

M2 M2 M

156,43 156,43 65,70 SUB. JUMLAH BIAYA - VII

-

PEKERJAAN PASANGANN PLAFOND DAN SHADING SOLAR 1 Pekerjaan Rangka Plafound Kayu Kls II 2 Pekerjaan Penutup Plafound Tripleks 4 mm 3 Pekerjaan Pasangan List Plafound Kayu diprofil

M2 M2 M

183,95 183,95 266,35 SUB. JUMLAH BIAYA - VIII

-

PEKERJAAN FINISHING PENGECATAN 1 Cat Kusen Kayu Pintu & Jendela 2 Cat Kayu Daun Pintu & Jendela 3 Cat Dinding Luar & Dalam 4 Pengecatan Listplank kayu 5 Pengecatan Plafound Tripleks 6 Pengecatan Plat Dak Sun Screen dan Talang Beton 7 Melapisi Dak dan Talang Beton dengan Cat Watterproof

M2 M2 M2 M2 M2 M2 M3

50,01 23,46 725,65 23,00 183,95 44,67 55,37 SUB. JUMLAH BIAYA - IX

-

PEKERJAAN SANITEIR 1 2 3

Pasangan Closet Duduk ex TOTO Pasangan Wastafel Meja ex TOTO Pasangan Cabinet Meja Wastafel Lapis Keramik Homogenus Ukuran 600 x 600 MM

Bh Bh Bh

2,00 1,00 1,00

-

-

4 5 6 7 8 9 10 11

Pasangan Jet Sparay ex San-Ei Pasangan Kran Air ex TOTO Pasang Tempat Tisu ex TOTO Pasangan Floor Drain ex TOTO Pasangan Kaca Cermin Wastafel tebal 5 MM Pasangan Instalasi Air Bersih dengan Pipa PVC dia 3/4" Pasangan Instalasi Air Kotor dengan Pipa PVC dia 2" Pasangan Instalasi Air Kotor dengan Pipa PVC dia 4"

Bh Bh Bh Bh Ls M M M

2,00 4,00 2,00 4,00 1,00 30,00 10,00 30,00

-

-

3 - 4

HARGA NO

URAIAN PEKERJAAN

1 12 13

XI.

XII. 1 2 3

SAT

2 Pasangan Instalasi Air Hujan dengan Pipa PVC dia 3" Posisi Pipa Vertikal di dalam Kolom Pasangan Septick Tank dan Resapan

PEKERJAAN INSTALASI LISTRIK 1 Titik Penerangan Instalasi Penerangan 2 Pasangan Lampu Down Light SL 14 Watt In Bouw 3 Pasangan Lampu Down Light SL 11 Watt In Bouw 4 Saklar Tunggal Tanam ex Panasonic 5 Saklar Ganda Tanam ex Panasonic 6 Stop Kontak Tanam ex Panasonic 7 Stop Kontak Tanam Lantai ex Panasonic 10 Box MCB lengkap dengan MCB 11 Panel Meteran Komplit Daya 1300 W PEKERJAAN AKHIR As Build Drawing Laporan Akhir Pelaksanaan Pembersihan Akhir

XIII. PEKERJAAN LAIN - LAIN A. PEKERJAAN PAVING BLOCK UNTUK HALAM dan PARKIRAN 1 Pasangan Paving Block B. PEMBUATAN PAGAR KELILING HALAMAN KANTOR 1 Pekerjaan Tanah a. Galian Tanah Pondasi b. Urugan Pasir bawah Pondasi c. Urug Tanah bekas Galian 2 Pekerjaan Pasangan a. Pas. Batu Kosong b. Pas. Batu Kali ad. 1 : 4 c. Pas. Batako ad. 1 : 5 3 Pekerjaan Beton a. Sloof Beton b. Kolom Beton c. Balok Beton 4 Pekerjaan Plesteran dan Acian Dinding a. Pek. Plesteran Pagar Luar Dalam, ad. 1 : 4 b. Pek. Penebalan Kolom dan Dindng Pagar c. Pek. Acian Pagar Luar Dalam d. Pek. Acian Kolom Dan Balok 5 Pekerjaan Pengecatan a. Cat Tembok Pagar Luar dan Dalam b. Cat Kolom Dan Balok 6 Pengadaan Pintu Pagar Besi (Pintu Dorong)

4 - 4

VOLUME

SATUAN

JUMLAH

(Rp)

(Rp)

3 M

4 30,00

5 -

6 -

Ls

2,00

-

-

SUB. JUMLAH BIAYA - X

-

M Bh Bh Bh Bh Bh Bh Bh Unit

75,00 30,00 6,00 9,00 7,00 13,00 8,00 1,00 1,00 SUB. JUMLAH BIAYA - XI

-

Ls Ls Ls

1,00 1,00 1,00 SUB. JUMLAH BIAYA - XII

-

M2

163,75

-

-

M3 M3 M3

86,47 9,61 86,47

-

-

M3 M3 M2

19,22 30,63 130,75

-

-

M3 M M

3,60 59,45 110,10

-

-

M2 M2 M2 M2

261,50 47,56 261,50 66,06

-

-

M2 M2 Ls

261,50 66,06 2,00 SUB. JUMLAH BIAYA - XIII

-

DAFTAR HARGA SATUAN UPAH

NO

URAIAN

KODE

SATUAN

HARGA SATUAN

KETERANGAN

1

2

3

4

5

6

A.

DAFTAR BIAYA UPAH KERJA

1 2

Mandor Kepala Tukang : - Kepala Tukang Pasangan Atap - Kepala Tukang Batu - Kepala Tukang Besi - Kepala Tukang Besi Profil (Konstruksi Baja) - Kepala Tukang Cat - Kepala Tukang Gali - Kepala Tukang Pasangan Kaca - Kepala Tukang Kayu - Kepala Tukang Las - Kepala Tukang Plumbing/Instalasi Air - Kepala Tukang Instalasi Listrik - Kepala Tukang Plafond - Kepala Tukang Keramik Tukang : - Tukang Pasangan Atap - Tukang Batu - Tukang Besi - Tukang Besi Profil (Konstruksi Baja) - Tukang Cat - Tukang Gali - Tukang Pasangan Kaca - Tukang Kayu untuk Kayu Kasar & Perancah - Tukang Kayu untuk Pekerjaan Kosen - Tukang Las - Tukang Plumbing/Instalasi Air - Tukang Instalasi Listrik - Tukang Plafond

Org/Hari

Rp -

Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Pekerja

Org/Hari

Rp -

3

4

DAFTAR HARGA SATUAN BAHAN

NO

URAIAN

SPESIFIKASI

SATUAN

HARGA SATUAN

KETERANGAN

1

2

3

4

5

6

B.

JENIS AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADI.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Air Tanah Urug Lokal Pasir urug Sirtu Pasir Halus/Pasir Pasang Pasir Kasar/Pasir Beton Batu pecah lokal Batu karang/Kali Bata Merah Batako ( CB. 10 ) Batako ( CB. 15 ) Paving Block Kanstin Batu Kerikil 1 - 2 Semen Gresik Semen putih Semen warna Minyak Bekesting Tali Ijuk Strorox - 100 Waterstop lebar 150 mm Waterstop lebar 200 mm Waterstop lebar 230 mm - 320 mm

C.

BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA

24

Cat Tembok Produk ICI DULUX Dulux Weathershield Pro Dulux Weathershield Max Dulux Weathershield Max Dulux Pentalite Cat Tembok Merek Catilac Cat Tembok Merek Metrolite Cat Tembok Produk NIPPON PAINT Matex Putty Matex Putty Matex Putty Vinilex 5180 Wall Sealer Vinilex 5180 Wall Sealer Nippon Alkali Primer 3 In 1 Nippon Alkali Primer 3 In 1 NIPPONWEATHERBOND NIPPONWEATHERBOND Cat Tembok Mowilex 1 Mowilex Exterior a. Warna Standar b. Warna Spesial 2 Mowilex Interior a. Warna Standar b. Warna Spesial Cat Tembok JOTUN 1 Jotun Majestic Optima

26 27 28

29

30

Liter M³ M³ M³ M³ M³ M³ M³ Bh bh bh M2 M M3 zak zak kg Ltr Kg kg M M m

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Kemasan 20 Kg Kemasan 20 Kg Kemasan 20 Kg Kemasan 20 Kg

Peil Peil Peil Peil Kg Kg

Rp Rp Rp Rp Rp Rp -

Rp Rp Rp Rp -

Kemasan 1 Kg Kemasan 5 Kg Kemasan 30 Kg Kemasan 5 Kg Kemasan 25 Kg Kemansan 5 Kg Kemasan 25 Kg Kemasan 2,5 Kg Kemasan 25 Kg

1 Kg 5 Kg 30 Kg 5 Kg 25 Kg 5 Kg 25 Kg 2,5 Kg 25 Kg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Kg Kg

Rp Rp -

Kg Kg

Rp Rp -

Lokal Lokal Lokal Lokal

Kemasan 40 Kg

Page 1 of 5

Rp Rp -

Rp Rp -

NO 1

URAIAN

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

2 a. Jotun Majestic Optima Putih b. Jotun Majestic Optima Standar c. Jotun Majestic Optima Premium 2 Jorun Pearl Silk a. Jotun Pearl Silk Putih b. Jotun Pearl Silk Standar c. Jotun Pearl Silk Premium 3 Jotun Matt a. Jotun Matt Putih b. Jotun Matt Standar c. Jotun Matt Premium 4 Jotun Glaze Spesial 5 Jotun Metalic Starlight 6 Jotun Strax Matt Putih 7 Jotun Strax Matt Standar 8 Jotun Strax Matt Premium 9 Jotun Jotaplast Putih 10 Jotun Jotaplast Standar 11 Jotun Jotaplast Premium Cat Minyak 1 Nippe 2000 a. Warna Standar b. Warna Spesial 2 Danacryl a. Warna Standar b. Warna Spesial 3 Plantone Kuas 3" Kuas 4" Kuas Rol Dempul halus / Impra (Wood Filler) Thinner Ampelas Dempul kayu Plamir Tembok Meni besi / kayu Cat kayu Cat besi Cat dasar tembok, Indo 9000 Sealer Water Base Cat Dasar Kayu Residu Melamik Wall Filler (Impra) Sending Siller (Ompra) Famcy (Impra)

D.

BAHAN KAYU BERIKUT BAHAN JADINYA

50 51 52

54 55

Bambu dia 5 - 7 Cm Bambu dia 7 - 10 Cm Kayu Klas I : a. Balok b. Papan Kayu Klas II : a. Balok b. Papan Dolken dia 8 s/d 10 cm/ Kayu Bulat Klas II List profil kayu klas 5 cm

E.

BAHAN PENUTUP RANGKA PLAFOND

56 57

Gypsum Board 120 x 240 cm ex DN G R C

31

53

Page 2 of 5

SPESIFIKASI

SATUAN

HARGA SATUAN

3

4 Kg Kg Kg

5 Rp Rp Rp -

Kg Kg Kg

Rp Rp Rp -

Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Kg Kg

Rp Rp -

Kg Kg Kg bh bh Bh kg ltr lbr kg kg kg kg kg kg kg kg kg Kg Kg Kg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

btg btg

Rp Rp -

M³ M³

Rp Rp -

M³ M³ btg M¹

Rp Rp Rp Rp -

lbr lbr

Rp Rp -

KETERANGAN 6

NO

URAIAN

1 58

61 62 63 64 65 66 67 68 69 70 71 72 73

2 Plafond Akustik Amstrong a. Ukuran 30 x 30 cm b. Ukuran 30 x 60 cm c. Ukuran 60 x 120 cm Asbes Semen Kalsium Silikat Ukuran 240 x 120 cm a. Tebal 3,5 MM b. Tebal 4,5 MM c. Tebal 6 MM d. Tebal 9 MM e. Tebal 12 MM Aluminium Composit Panel (ACP) List Gipsump 10 cm Plywood 3 mm 1,20 x 2,40 Plywood 4 mm 1,20 x 2,40 Plywood 9 mm, uk. 1,20 x 2,40 Plywood 12 mm, uk. 1,20 x 2,40 Plywood 18 mm, uk. 1,20 x 2,40 Teakwood 3 mm, uk. 1,20 x 2,40 Besi Hollow Galvanis ukuran 40x40 MM Besi Hollow Galvanis ukuran 40x20 MM Sekrup Hollow 2 inci Sekrup Hollow 1 inci Kusen Aluminium 4"

59 60

F.

BAHAN LANTAI DAN PELAPIS DINDING.

74 75 76

Lantai Keramik Homogenus 20x20 cm Lantai Keramik Homogenus 40x40 cm Keramik dinding 20/25, corak warna,

G.

BAHAN SALURAN AIR KOTOR / BERSIH

76 77 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 H. 140 141 142 143 144 145 146 147 148

SPESIFIKASI

SATUAN

HARGA SATUAN

KETERANGAN

3

4

5

6

Lbr Lbr Lbr M2

Rp Rp Rp Rp -

Lbr Lbr Lbr Lbr Lbr M2 M¹ lbr lbr lbr lbr lbr lbr Btg Btg Kg Kg M'

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Roman/Setara Roman/Setara Roman/Setara

Bh Bh Bh

Rp Rp Rp -

SII SII SII SII SII SII SII SII SII SII SII SII SII SII SII SII SII

M M M M M M M M M M M M M M M M M

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

kg kg kg kg Btg Btg kg kg kg

Rp Rp Rp Rp Rp Rp Rp Rp Rp -

4 Meter 4 Meter

Pipa Pralon PVC (AW) dia 1/2", Sekualitas Maspion Pipa Pralon PVC (AW) dia 3/4", Sekualitas Maspion Pipa Pralon PVC (AW) dia 2", Sekualitas Maspion Pipa Pralon PVC (AW) dia 2 1/2", Sekualitas Maspion Pipa Pralon PVC (AW) dia 3", Sekualitas Maspion Pipa Pralon PVC (AW) dia 4", Sekualitas Maspion Pipa GIP Ø 1/2 inci Medium A Pipa GIP Ø 3/4 inci Medium A Pipa GIP Ø 1 inci Medium A Pipa GIP Ø 1 1/4 inci Medium A Pipa GIP Ø 1,5 inci Medium A Pipa GIP Ø 2 inci Medium A Pipa GIP Ø 2,5 inci Medium A Pipa GIP Ø 3 inci Medium A Pipa GIP Ø 4 inci Medium A Pipa GIP Ø 5 inci Medium A Pipa GIP Ø 8 inci Medium A BAHAN LOGAM DAN BAHAN JADINYA Baja Tulangan U-39, ulir Baja Tulangan U-24, polos Kawat beton Baja Profil Baja ringan C-75,0.8mm Baja ringan C-75,0.6mm Besi Siku Besi Plat Hitam Kawat Duri

Page 3 of 5

Rp Rp -

Rp Rp Rp -

NO 1 149 150 151 152 153 154 155 156 157 158 159 160 I. 161 162 163 164 165 166 167 168 169 170 171 J. 172 173 174 175 176 177 178 179 180 K. 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202

URAIAN 2 Besi Strip Kawat Las Lem kuning (Aibon) Lem putih fox Paku Biasa Paku anti karat u/ genteng metal ( 35.00 m2 /kg ) Paku seng Paku triplex Paku gipsum anti karat ( 20.00 m2 / kg ) Paku sekrup Besi begel Kuda-kuda Mur Baut untuk Kuda2 Kayu Panjang 15 s/d 25 cm

SPESIFIKASI

SATUAN

HARGA SATUAN

3

4 kg kg kg kg kg kg kg kg kg kg kg bh

5 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

bh bh bh bh bh bh bh bh bh bh Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

M2 M M² roll Bh M2 M Lbr Lbr

Rp Rp Rp Rp Rp Rp Rp Rp Rp -

Unit Unit Unit Bh Bh Bh Bh Bh Bh Unit Unit Unit Unit Unit Bh Bh bh bh Bh Bh Bh Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

BAHAN UNTUK PERALATAN SANITAIR Jet Spray Kran tembok San Ei Ø 1/2 " Tempat sabun porselein Floor drain Lokal Wastafel Gantung Lengkap Kloset Jongkok TOTO Kloset duduk porselen TOTO, warna standard lengkap Urinoir TOTO Bac Kip Bak Air Fiber Glass Bak Cuci Piring 1 Lubang BAHAN PENUTUP ATAP. Genteng Aspal Atap Genteng metal (Zinkalum) Polos tebal 0,5 mm Nok Atap Genteng Metal Alumunium foil Atap Sirap Atap Aluminium/Spandek Nok Atap Aluminium Seng Gelombang Seng Plat BAHAN ELEKTRIKAL Armatur Down Light Inbouw Dia 6 Inci Armatur Lampu Down Light Out Bouw Type Kotak Armatur Lampu Down Light Out Bouw Type Bulat Armatur Lampu Pixture Lamp + Reflektor, Ex Artolitre 4 x 36 Watt Armatur Lampu Pixture Lamp + Reflektor, Ex Artolitre 3 x 36 Watt Armatur Lampu Pixture Lamp + Reflektor, Ex Artolitre 2 x 36 Watt Armatur Lampu Pixture Lamp + Reflektor, Ex Artolitre 4 x 18 Watt Armatur Lampu Pixture Lamp + Reflektor, Ex Artolitre 3 x 18 Watt Armatur Lampu Pixture Lamp + Reflektor, Ex Artolitre 2 x 18 Watt Lampu Spot LED 50 Watt Type Bulat Lampu Spot LED 50 Watt Type Kotak Lampu Spot LED 30 Watt Type Bulat Lampu Spot LED 30 Watt Type Kotak Lampu Wastafel 18 Watt Lampu Baret TLC 32 Wat + TL Ring Lampu Baret TLC 22 Wat + TL Ring Lampu PLC 23 Watt, Philips Lampu PLC 18 Watt, Philips Lampu PLC 11 Watt, Philips Lampu PLC 7 Watt, Philips Lampu LED Type PLC 13 Watt Lampu LED Type PLC 10 Watt

Page 4 of 5

KETERANGAN 6

NO

URAIAN

SPESIFIKASI

SATUAN

2

3

4 Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh bh M M M M M M M M M M M M M M M M M M M M M Bh Btg

5 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

bh bh bh bh bh bh bh bh bh bh psg bh M2 M2 M2 M2 M2 M2 M2 M2 M2

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp -

1 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238

Lampu LED Type PLC 7 Wat Watt Lampu LED Type PLC 5 Watt Lampu TL LED 36 Watt Lamou TL LED 18 Watt Terminal Kabel Saklar Tunggal Panasonic Saklar Double Panasonic Stop Kontak Panasonic Outlet Telepon Outlet TV M C B 10 A M C B 6 A Box MCB Kap 6 MCB Legrand Kabel NYA 1 x 1,5 MM2 Kabel NYA 1 x 2,5 MM2 Kabel NYA 1 x 4 MM2 Kabel NYA 1 x 6 MM2 Kabel NYA 1 x 10 MM2 Kabel NYM 2 x 2,5 MM2 Kabel NYM 3 x 2,5 MM2 Kabel NYM 2 x 4 MM2 Kabel NYM 3 x 4 MM2 Kabel NYM 2 x 6 MM2 Kabel NYM 3 x 6 MM2 Kabel NYM 2 x 10 MM2 Kabel NYM 3 x 10 MM2 Kabel NYFBY 2 x 2,5 MM2 Kabel NYFBY 3 x 2,5 MM2 Kabel NYFBY 2 x 4 MM2 Kabel NYFBY 3 x 4 MM2 Kabel NYFBY 2 x 6 MM2 Kabel NYFBY 3 x 6 MM2 Kabel NYFBY 2 x 10 MM2 Kabel NYFBY 3 x 10 MM2 Isolasi besar Pipa Listrik

L.

BAHAN GANTUNGAN DAN KACA

239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259

Kunci Antik Kunci Pintu Slinder 2 x Slaag Logo Kunci Tanam KM/WC Handle Pintu Kunci pintu KM/WC, ALPHA Grendel tanam pintu ganda ( espagnolet ) Grendel jendela biasa 15 cm Hak angin stainless Engsel Angin Engsel Stenless 3 Inci Engsel Stenless 4 Inci Grendel jendela ( spring knip ) Kaca Bening Tebal 3 MM Kaca Bening Tebal 5 MM Kaca Bening Tebal 6 MM Kaca Bening Tebal 8 MM Kaca Bening Tebal 10 MM Kaca Cermin Tebal 5 MM Kaca Cermin Tebal 8 MM Wireglassed Tebal 5 MM Kaca Patry

Page 5 of 5

HARGA SATUAN

KETERANGAN 6

ANALISA HARGA SATUAN PEKERJAAN

A.2.2.1.

HARGA SATUAN PEKERJAAN PERSIAPAN

A.2.2.1.1.

PEMBUATAN 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER

No A

B

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,400 0,200 0,020 0,020

Harga Satuan Jumlah Harga (Rp) (Rp) -

Batang Kg m3 m3 m3 Kg Liter

1,250 5,000 0,005 0,009 0,072 0,060 0,400

-

-

15,00% x D

-

PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER

No A

Satuan

B a h a n Dolken kayu φ 8-10/400 cm Semen portland Pasir beton Koral beton Kayu 5/7 Paku biasa 2” – 5” Residu

C

A.2.2.1.2.

Kode

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,200 0,400 0,020 0,020

Harga Satuan Jumlah Harga (Rp) (Rp) -

Batang Kg Lbr m3 m3 m3 Kg Liter

1,250 2,500 1,200 0,005 0,009 0,072 0,060 0,450

-

B a h a n Dolken kayu φ 8-10/400 cm Semen portland Seng gelombang Pasir beton Koral beton Kayu 5/7 Paku biasa 2” – 5” Meni besi

C

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

-

15,00% x D

-

Page 1 of 38

A.2.2.1.3.

PEMBUATAN 1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,80 METER

No A

B

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,200 0,300 0,020 0,020

Harga Satuan Jumlah Harga (Rp) (Rp) -

Batang Kg Kg m3 m3 Kg

1,000 2,000 25,000 0,005 0,009 0,060

-

-

15,00% x D

-

PENGUKURAN DAN PEMASANGAN BOUW PLANK 1,00 METER

No A

Satuan

B a h a n Dolken kayu φ 8-10/400 cm Semen portland Kawat duri Pasir beton Koral beton Paku biasa 2” – 5”

C

A.2.2.1.4.

Kode

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,100 0,100 0,010 0,005

m3 Kg m3

0,120 0,020 0,007 -

B a h a n Kayu balok 5/7 Paku 2”-3” Kayu papan 3/20

C

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

-

Page 2 of 38

A.2.2.1.7.

PEMBUATAN GUDANG SEMEN DAN PERALATAN

No

Uraian

A

B

T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,000 2,000 0,200 0,050

Harga Satuan Jumlah Harga (Rp) (Rp) -

Batang m3 Kg Kg m3 m3 Lbr Lbr

1,700 0,210 0,300 10,500 0,030 0,050 1,500 0,250

-

-

15,00% x D

-

PEMBUATAN 1M2 BEDENG PEKERJA

No A

Satuan

B a h a n Dolken kayu diameter 8-10/400 cm Kayu Paku biasa Semen Portland Pasir beton Koral beton Seng gelombang Seng plat

C

A.2.2.1.8.

Kode

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,000 2,000 0,200 0,050

Harga Satuan Jumlah Harga (Rp) (Rp) -

Batang m3 Kg Kg m3 m3 Lbr Lbr

1,250 0,186 0,300 18,000 0,030 0,050 1,500 1,350

-

B a h a n Dolken kayu diameter 8-10/400 cm Kayu Paku biasa Semen Portland Pasir beton Koral beton Seng gelombang Plywood 4mm

C

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

-

15,00% x D

-

Page 3 of 38

A.2.2.1.9.

PEMBERSIHAN 1 M2 LAPANGAN DAN PERATAAN

No

Uraian

A

T e n a g a Pekerja Mandor

Kode

Satuan

L.01 L.04

OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,100 0,050 Koefisien

B

B a h a n

-

C

P e r a l a t a n

-

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

15,00% x D

-

A.2.3.1.

HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1.

PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 M

No

Uraian

A

T e n a g a Pekerja Mandor

-

Kode

Satuan

L.01 L.04

OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,750 0,025 Koefisien

B

B a h a n

-

C

P e r a l a t a n

-

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

15,00% x D

-

A.2.3.1.9. PENGURUGAN KEMBALI 1 M3 GALIAN TANAH Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian No A

Uraian T e n a g a Pekerja Mandor

Kode

Satuan

L.01 L.04

OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,250 0,008 Koefisien

B

B a h a n

-

C

P e r a l a t a n

-

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

15,00% x D

Page 4 of 38

-

A.2.3.1.11.

PENGURUGAN 1 M3 DENGAN PASIR URUG

No A

B

Uraian T e n a g a Pekerja Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Uraian T e n a g a Pekerja Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

Kode

Satuan

L.01 L.04

OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,250 0,025 -

m3

1,200 -

Koefisien

-

15,00% x D

-

HARGA SATUAN PEKERJAAN PONDASI PEMASANGAN 1 M3 PONDASI BATU BELAH 1SP : 3PP

No

B

15,00% x D

B a h a n Sirtu P e r a l a t a n

A

-

C

A.3.2.1. A.3.2.1.1.

OH OH

PENGURUGAN 1 M3 SIRTU PADAT

No

B

L.01 L.04

Harga Satuan Jumlah Harga (Rp) (Rp) 0,300 0,010 Koefisien

1,200 -

P e r a l a t a n

A

Satuan

B a h a n Pasir urug

C

A.2.3.1.14.

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,500 0,750 0,075 0,075

m3 Kg m3

1,200 202,000 0,485

B a h a n Batu belah Semen Portlan Pasir Pasang

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 5 of 38

-

A.3.2.1.2.

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 4PP

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.3.2.1.3.

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

1,500 0,750 0,075 0,075

m3 Kg m3

1,200 163,000 0,520 -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,500 0,750 0,075 0,075

m3 Kg m3

1,200 136,000 0,544 -

-

15,00% x D

-

PEMASANGAN 1M3 BATU KOSONG (AANSTAMPING)

No

B

OH OH OH OH

B a h a n Batu belah Semen Portland Pasir Pasang P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.3.2.1.9.

Koefisien

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 5PP

No A

Satuan

B a h a n Batu belah Semen Portlan Pasir Pasang

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,780 0,390 0,039 0,039

m3 m3

1,200 0,432 -

B a h a n Batu belah Pasir urug

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 6 of 38

-

A.4.4.1. A.4.4.1.21.

HARGA SATUAN PEKERJAAN PASANGAN DINDING PEMASANGAN 1 M2 DINDING CONBLOCK HB 10 CAMPURAN 1SP : 4PP

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,300 0,100 0,010 0,015

Bh Kg m3 Kg

12,500 12,130 0,388 0,280

-

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0,300 0,150 0,015 0,015

Kg m3

7,776 0,023 -

-

15,00% x D

-

PEMASANGAN PLASTERAN 1M2 PLESTERAN 1SP : 4PP TEBAL 15 MM

No

B

OH OH OH OH

B a h a n Semen Portland Pasir Pasang P e r a l a t a n

A

L.01 L.02 L.03 L.04

Harga Satuan Jumlah Harga (Rp) (Rp) -

-

C

A.4.4.2.4.

Koefisien

HARGA SATUAN PEKERJAAN PLASTERAN PEMASANGAN PLASTERAN 1M2 PLESTERAN 1SP : 3PP TEBAL 15 MM

No A

Satuan

B a h a n HB-10 Semen Portland Pasir Pasang Besi angker dia 8

C

A.4.4.2. A.4.4.2.3.

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0,300 0,150 0,015 0,015

Kg m3

6,240 0,024 -

B a h a n Semen Portland Pasir Pasang

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 7 of 38

-

A.4.4.2.27.

PEMASANGAN 1M2 ACIAN

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.4.3. A.4.4.3.10.4

B

Uraian T e n a g a Pekerja Tukang Batu Kepala tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,200 0,100 0,010 0,010

Kg

3,250 -

-

15,00% x D

-

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,250 0,125 0,013 0,013

Harga Satuan Jumlah Harga (Rp) (Rp) -

Bh kg Kg M3

6,630 9,800 1,300 0,045

-

-

15,00% x D

-

PEMASANGAN 1 M2 LANTAI KERAMIK HOMOGENUS UKURAN 40 x 40 CM Anti Slip

No

B

OH OH OH OH

B a h a n Ubin Keramik Homogenus 40 x 40 cm Semen Portland Semen warna Pasir pasang P e r a l a t a n

A

L.01 L.03 L.03 L.04

-

C

A.4.4.3.10.4.a

Koefisien

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 40 x 40 CM

No A

Satuan

B a h a n Semen PC

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,260 0,130 0,013 0,013

Harga Satuan Jumlah Harga (Rp) (Rp) -

Bh kg Kg M3

6,630 9,800 1,300 0,045

-

B a h a n Ubin Keramik Homogenus 40 x 40 cm Semen Portland Semen warna Pasir pasang

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 8 of 38

-

A.4.4.3.36.

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 20 CM x 20 CM

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Uraian T e n a g a Pekerja Tukang Batu Kepala tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,700 0,350 0,035 0,035

Bh Kg M3 Kg

26,500 10,400 0,045 1,620

-

-

15,00% x D

-

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,900 0,450 0,045 0,045

Harga Satuan Jumlah Harga (Rp) (Rp) -

Bh Kg M3 Kg

20,000 9,300 0,018 1,940

-

-

15,00% x D

-

HARGA SATUAN PEKERJAAN BETON MEMBUAT 1 M3 BETON MUTU f'c = 7,4 Mpa (K100), SLUMP (12 + 2) CM, w/c = 0,87

No

B

OH OH OH OH

B a h a n Keramik Dinding ukuran 20 x 25 cm Semen Portland Pasir Pasang Semen warna P e r a l a t a n

A

L.01 L.02 L.03 L.04

Harga Satuan Jumlah Harga (Rp) (Rp) -

-

C

A.4.1.1. A.4.1.1.1.

Koefisien

PEMASANGAN 1 M2 DINDING KERAMIK 20 CM x 25 CM

No A

Satuan

B a h a n Ubin Keramik Homogenus 20 x 20 cm Semen Portland Pasir pasang Semen warna

C

A.4.4.3.54.2

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,650 0,275 0,028 0,083

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

247,000 869,000 999,000 215,000

-

B a h a n Semen Portland Pasir Beton Kerikil (Maks 30mm) Air

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 9 of 38

-

A.4.1.1.2.

MEMBUAT 1 M3 BETON MUTU f'c = 9,8 Mpa (K125), SLUMP (12 + 2) CM, w/c = 0,78

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

C

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,650 0,275 0,028 0,083

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

276,000 828,000 1.012,000 215,000

-

-

15,00% x D

Uraian

No A

B

-

T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,650 0,275 0,028 0,083

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

299,000 799,000 1.017,000 215,000

-

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air P e r a l a t a n

-

D J u m l a h (A + B + C) E Overhead & Profit 15,00% x D F Harga Satuan Pekerjaan (D + E) CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

A.4.1.1.4.

-

MEMBUAT 1 M3 BETON MUTU f'c = 12,2 Mpa (K150), SLUMP (12 + 2) CM, w/c = 0,72

No A

Satuan

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air

C

A.4.1.1.3.

Kode

-

MEMBUAT 1 M3 LANTAI KERJA BETON MUTU f'c = 7,4 Mpa (K100), SLUMP (3-6) CM, w/c = 0,87 Harga Satuan Jumlah Harga Uraian Kode Satuan Koefisien (Rp) (Rp) T e n a g a Pekerja L.01 OH 1,200 Tukang Batu L.02 OH 0,200 Kepala Tukang L.03 OH 0,020 Mandor L.04 OH 0,060 B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

kg kg kg Liter

230,000 893,000 1.027,000 200,000

-

-

15,00% x D

Page 10 of 38

-

A.4.1.1.5.

MEMBUAT 1 M3 BETON MUTU f'c = 14,5 Mpa (K175), SLUMP (12 ± 2) CM, w/c = 0,66

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

1,650 0,275 0,028 0,083

kg kg kg Liter

326,000 760,000 1.029,000 215,000

-

-

15,00% x D

-

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,650 0,275 0,028 0,083

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

352,000 731,000 1.031,000 215,000

-

-

15,00% x D

-

MEMBUAT 1 M3 BETON MUTU f'c = 19,3 Mpa (K225), SLUMP (12 ± 2) CM, w/c = 0,58

No

B

OH OH OH OH

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air P e r a l a t a n

A

L.01 L.02 L.03 L.04

Harga Satuan Jumlah Harga (Rp) (Rp) -

-

C

A.4.1.1.7.

Koefisien

MEMBUAT 1 M3 BETON MUTU f'c = 16,9 Mpa (K200), SLUMP (12 ± 2) CM, w/c = 0,61

No A

Satuan

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air

C

A.4.1.1.6.

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,650 0,275 0,028 0,083

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

371,000 698,000 1.047,000 215,000

-

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 11 of 38

-

A.4.1.1.8.

MEMBUAT 1 M3 BETON MUTU f'c = 21,7 Mpa (K250), SLUMP (12 ± 2) CM, w/c = 0,56

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

1,650 0,275 0,028 0,083

kg kg kg Liter

384,000 692,000 1.039,000 215,000

-

-

15,00% x D

-

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,650 0,275 0,028 0,083

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

406,000 684,000 1.026,000 215,000

-

-

15,00% x D

-

MEMBUAT 1 M3 BETON MUTU f'c = 26,4 Mpa (K300), SLUMP (12 ± 2) CM, w/c = 0,52

No

B

OH OH OH OH

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air P e r a l a t a n

A

L.01 L.02 L.03 L.04

Harga Satuan Jumlah Harga (Rp) (Rp) -

-

C

A.4.1.1.10.

Koefisien

MEMBUAT 1 M3 BETON MUTU f'c = 24,0 Mpa (K275), SLUMP (12 ± 2) CM, w/c = 0,53

No A

Satuan

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air

C

A.4.1.1.9.

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,650 0,275 0,028 0,083

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

413,000 681,000 1.021,000 215,000

-

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 12 of 38

-

A.4.1.1.11.

MEMBUAT 1 M3 BETON MUTU f'c = 28,8 Mpa (K325), SLUMP (12 ± 2) CM, w/c = 0,49

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

2,100 0,350 0,035 0,105

kg kg kg Liter

439,000 670,000 1.006,000 215,000

-

-

15,00% x D

-

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

2,100 0,350 0,035 0,105

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg kg kg Liter

448,000 667,000 1.000,000 215,000

-

-

15,00% x D

-

MEMBUAT 1 M3 BETON KEDAP AIR DENGAN STROROX - 100

No

B

OH OH OH OH

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air P e r a l a t a n

A

L.01 L.02 L.03 L.04

Harga Satuan Jumlah Harga (Rp) (Rp) -

-

C

A.4.1.1.13.

Koefisien

MEMBUAT 1 M3 BETON MUTU f'c = 31,2 Mpa (K350), SLUMP (12 ± 2) CM, w/c = 0,48

No A

Satuan

B a h a n Semen Portland Pasir Beton Kerikil(Maks 30mm) Air

C

A.4.1.1.12.

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

2,100 0,350 0,035 0,105

Harga Satuan Jumlah Harga (Rp) (Rp) -

kg m3 m3 kg

400,000 0,480 0,800 1,200

-

B a h a n Semen Portland Pasir Beton Kerikil (2cm/3cm) Strorox – 100

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 13 of 38

-

A.4.1.1.14.

PEMASANGAN 1 M PVC WATERSTOP LEBAR 150 MM

No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.1.1.15.

B

Uraian T e n a g a Pekerja Tukang Batu/Pipa Kepala Tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,060 0,030 0,003 0,003

m

1,050 -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,070 0,035 0,004 0,007

m

1,050 -

15,00% x D

-

PEMASANGAN 1 M PVC WATERSTOP LEBAR 230 - 320 MM

No

B

OH OH OH OH

B a h a n Waterstop lebar 200 mm P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.4.1.1.16.

Koefisien

PEMASANGAN 1 M PVC WATERSTOP LEBAR 200 MM

No A

Satuan

B a h a n Waterstop lebar 150 mm

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,080 0,040 0,004 0,004

m

1,050 -

B a h a n Waterstop lebar 230 mm - 320 mm

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 14 of 38

-

A.4.1.1.17.

PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR

No A

B

Uraian T e n a g a Pekerja Tukang Besi Kepala Tukang Mandor

P e r a l a t a n

D E F G

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E) Harga Satuan Pekerjaan Per Kg

A.4.1.1.18.

B

Uraian T e n a g a Pekerja Tukang Besi Kepala Tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,070 0,070 0,007 0,004

kg kg

10,500 0,150 -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,050 0,050 0,005 0,003

kg kg

10,500 0,100 -

-

15,00% x D

-

PEMASANGAN 10 KG JARING KAWAT BAJA (WIREMESH)

No

B

OH OH OH OH

B a h a n Besi beton (polos/ulir) Kawat beton P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.4.1.1.19.

Koefisien

PEMASANGAN 10 KG KABEL PRESSTRESSED POLOS/STARANDS

No A

Satuan

B a h a n Besi beton (polos/ulir) Kawat beton

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang Besi Kepala Tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,025 0,025 0,025 0,001

kg kg

10,200 0,050 -

B a h a n Jaring kawat baja dilas Kawat beton

C

P e r a l a t a n

D E F G

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E) Harga Satuan Pekerjaan Per Kg

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 15 of 38

-

A.4.1.1.20.

PEMASANGAN 1 M2 BEKESTING UNTUK PONDASI

No A

B

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

No

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,520 0,260 0,026 0,026

m3 kg Liter

0,040 0,300 0,100 -

-

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,520 0,260 0,026 0,026

m3 kg Liter

0,045 0,300 0,100 -

-

15,00% x D

A.4.1.1.22.

PEMASANGAN 1 M2 BEKESTING UNTUK KOLOM

No

Uraian

B

OH OH OH OH

B a h a n Kayu kelas III Paku 5 cm – 10 cm Minyak bekisting

C

A

L.01 L.02 L.03 L.04

15,00% x D

PEMASANGAN 1 M2 BEKESTING UNTUK SLOOF

B

Koefisien

-

A.4.1.1.21.

A

Satuan

B a h a n Kayu kelas III Paku 5 – 10 cm Minyak bekisting

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,660 0,330 0,033 0,033

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter m3 Lbr Batang

0,040 0,400 0,200 0,015 0,350 2,000

-

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10 cm – panjang 4 m

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

-

15,00% x D

Page 16 of 38

-

A.4.1.1.23.

PEMASANGAN 1 M2 BEKESTING UNTUK BALOK

No

Uraian

A

B

T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,660 0,330 0,033 0,033

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter m3 Lbr Batang

0,040 0,400 0,200 0,018 0,350 2,000

-

-

15,00% x D

A.4.1.1.24.

PEMASANGAN 1 M2 BEKESTING UNTUK LANTAI

No

Uraian

B

Satuan

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10 cm – panjang 4 m

C

A

Kode

T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,660 0,330 0,033 0,033

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter m3 Lbr Batang

0,040 0,400 0,200 0,015 0,350 6,000

-

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10 cm – panjang 4 m

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

-

15,00% x D

Page 17 of 38

-

A.4.1.1.25.

PEMASANGAN 1 M2 BEKESTING UNTUK DINDING

No A

B

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,660 0,330 0,033 0,033

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter m3 Lbr Batang Buah

0,030 0,400 0,200 0,020 0,350 3,000 4,000

-

-

15,00% x D

-

PEMASANGAN 1 M2 BEKESTING UNTUK TANGGA

No A

Satuan

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10 cm – panjang 4 m Penjaga jarak bekisting/spacer

C

A.4.1.1.26.

Kode

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,660 0,330 0,033 0,033

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter m3 Lbr Batang

0,030 0,400 0,150 0,015 0,350 2,000

-

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10 cm – panjang 4 m

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 18 of 38

-

A.4.1.1.27.

PEMASANGAN 1 M2 JEMBATAN UNTUK PENGECORAN BETON

No A

B

Uraian T e n a g a Pekerja Tukang Kayu Kepala Tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,150 0,050 0,005 0,008

m3 kg Batang

Harga Satuan Jumlah Harga (Rp) (Rp) -

0,026 0,600 0,500 -

-

15,00% x D

-

MEMBUAT 1 M3 PONDASI BETON BERTULANG (150 KG BESI + BEKESTING)

No A

Satuan

B a h a n Kayu kelas III (papan) Paku 5 cm – 12 cm Dolken kayu φ 8-10 cm – panjang 4 m

C

A.4.1.1.28.

Kode

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

5,300 0,275 1,300 1,050 0,262 0,265

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter kg kg kg m3 m3

0,200 1,500 0,400 157,500 2,250 336,000 0,540 0,810

-

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 19 of 38

-

A.4.1.1.29.

MEMBUAT 1 M3 SLOOF BETON BERTULANG (200 KG BESI +BEKESTING)

No A

B

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

5,650 0,275 1,560 1,400 0,323 0,283

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter kg kg kg m3 m3

0,270 2,000 0,600 210,000 3,000 336,000 0,540 0,810

-

-

15,00% x D

-

MEMBUAT 1 M3 KOLOM BETON BERTULANG (300 KG BESI + BEKESTING)

No A

Satuan

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil

C

A.4.1.1.30.

Kode

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

7,050 0,275 1,650 2,100 0,403 0,353

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter kg kg kg m3 m3 M3 Lbr Batang

0,400 4,000 2,000 315,000 4,500 336,000 0,540 0,810 0,150 3,500 20,000

-

B a h a n Kayu kelas III Paku 5 cm – 12cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu φ (8-10) cm, panjang 4 m

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 20 of 38

-

A.4.1.1.31.

MEMBUAT 1 M3 BALOK BETON BERTULANG (200 KG BESI + BEKESTING)

No A

B

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

6,350 0,275 1,650 1,400 0,333 0,318

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter kg kg kg m3 m3 M3 Lbr Batang

0,320 3,200 1,600 210,000 3,000 336,000 0,540 0,810 0,140 2,800 16,000

-

-

15,00% x D

-

MEMBUAT 1 M3 KOLOM BETON BERTULANG (150 KG BESI + BEKESTING)

No A

Satuan

B a h a n Kayu kelas III Paku 5 cm – 12cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu φ (8-10) cm, panjang 4 m

C

A.4.1.1.32.

Kode

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

5,300 0,275 1,300 1,050 0,265 0,265

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter kg kg kg m3 m3 M3 Lbr Batang

0,320 3,200 1,600 157,500 2,250 336,000 0,540 0,810 0,120 2,800 32,000

-

B a h a n Kayu kelas III Paku 5 cm – 12cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu φ (8-10) cm, panjang 4 m

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 21 of 38

-

A.4.1.1.33.

MEMBUAT 1 M3 DINDING BETON BERTULANG (150 KG BESI + BEKESTING)

No A

B

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

5,300 0,275 1,300 1,050 0,262 0,265

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter kg kg kg m3 m3 M3 Lbr Batang

0,240 3,200 1,600 157,500 2,250 336,000 0,540 0,810 0,160 2,800 24,000

-

-

15,00% x D

-

MEMBUAT 1 M3 DINDING BETON BERTULANG (200 KG BESI + BEKESTING)

No A

Satuan

B a h a n Kayu kelas III Paku 5 cm – 12cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu φ (8-10) cm, panjang 4 m

C

A.4.1.1.34.

Kode

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

5,650 0,275 1,560 1,400 0,323 0,283

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Liter kg kg kg m3 m3 M3 Lbr Batang

0,250 3,000 1,200 210,000 3,000 336,000 0,540 0,810 0,105 2,500 14,000

-

B a h a n Kayu kelas III Paku 5 cm – 12cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu φ (8-10) cm, panjang 4 m

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 22 of 38

-

A.4.1.1.35.

MEMBUAT 1 M KOLOM PRAKTIS BETON BERTULANG (11 x 11) CM

No A

B

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.1.1.36.

B

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

0,180 0,020 0,020 0,020 0,006 0,009

m3 kg Liter kg kg kg m3 m3

0,002 0,010 3,000 0,450 4,000 0,006 0,009 -

-

15,00% x D

-

MEMBUAT 1 M RING BALOK BETON BERTULANG (10 x 15) CM

No A

Satuan

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

0,297 0,033 0,033 0,033 0,010 0,015

m3 kg Liter kg kg kg m3 m3

0,003 0,020 3,600 0,050 5,500 0,009 0,015 -

B a h a n Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 23 of 38

-

A.4.6.2. A.4.6.2.1.

HARGA SATUAN PEKERJAAN KUNCI DAN KACA PEMASANGAN 1 BUAH KUNCI TANAM ANTIK

No

Uraian

A

B

T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.6.2.2.

B

T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

0,060 0,600 0,060 0,003

Bh

1,000 -

-

-

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,010 0,500 0,050 0,005

Bh

1,000 -

B a h a n Kunci tanam biasa

D E F

-

-

15,00% x D

-

PEMASANGAN 1 BUAH KUNCI KAMAR MANDI

No

B

OH OH OH OH

15,00% x D

Uraian

P e r a l a t a n

A

L.01 L.03 L.03 L.04

-

C

A.4.6.2.3.

Koefisien

PEMASANGAN 1 BUAH KUNCI TANAM BIASA

No A

Satuan

B a h a n Kunci tanam antik

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,005 0,500 0,050 0,003

Bh

1,000 -

B a h a n Kunci tanam KM

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

-

15,00% x D

Page 24 of 38

-

A.4.6.2.4.

PEMASANGAN 1 BUAH KUNCI SILINDER

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.6.2.5.

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,005 0,500 0,050 0,003

Bh

1,000 -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,015 0,150 0,015 0,001

Bh

1,000 -

-

-

15,00% x D

-

PEMASANGAN 1 BUAH ENGSEL JENDELA KUPU-KUPU

No

B

OH OH OH OH

B a h a n Engsel pintu

P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.4.6.2.6.

Koefisien

PEMASANGAN 1 BUAH ENGSEL PINTU

No A

Satuan

B a h a n Kunci silinder

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,010 0,100 0,010 0,001

Bh

1,000 -

B a h a n Engsel kupu-kupu

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

-

15,00% x D

Page 25 of 38

-

A.4.6.2.7.

PEMASANGAN 1 BUAH ENGSEL ANGIN

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.6.2.8.

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,100 0,200 0,020 0,001

Bh

1,000 -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,015 0,150 0,015 0,008

Bh

1,000 -

-

-

15,00% x D

-

PEMASANGAN 1 BUAH KAIT ANGIN

No

B

OH OH OH OH

B a h a n Spring knip

P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.4.6.2.9.

Koefisien

PEMASANGAN 1 BUAH SPRING KNIP

No A

Satuan

B a h a n Engsel angin

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,015 0,150 0,015 0,008

Bh

1,000 -

B a h a n Kait angin

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

-

15,00% x D

Page 26 of 38

-

A.4.6.2.10.

PEMASANGAN 1 BUAH DOOR CLOSER

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.6.2.11.

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,050 0,500 0,050 0,003

set

1,000 -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,020 0,200 0,020 0,001

Bh

1,000 -

-

-

15,00% x D

-

PEMASANGAN 1 BUAH DOOR HOLDER

No

B

OH OH OH OH

B a h a n Kunci slot

P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.4.6.2.12.

Koefisien

PEMASANGAN 1 BUAH KUNCI SLOT

No A

Satuan

B a h a n Door closer

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,050 0,500 0,050 0,003

Bh

1,000 -

B a h a n Door holder

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

-

15,00% x D

Page 27 of 38

-

A.4.6.2.13.

PEMASANGAN 1 BUAH DOOR STOP

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.6.2.17.

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,010 0,100 0,010 0,005

Bh

1,000 -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,015 0,150 0,015 0,0008

m2

1,100 -

-

15,00% x D

-

PEMASANGAN 1M2 KACA TEBAL 8 MM

No

B

OH OH OH OH

B a h a n Kaca tebal 5 mm P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.4.6.2.18.

Koefisien

PEMASANGAN 1M2 KACA TEBAL 5 MM

No A

Satuan

B a h a n Door stop

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,017 0,170 0,017 0,0009

m2

1,100 -

B a h a n Kaca tebal 8 mm

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

-

15,00% x D

Page 28 of 38

-

A.4.6.2.19.

PEMASANGAN 1 M2 KACA BURAM TEBAL 10 MM

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.6.1. A.4.6.1.1.

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

0,025 0,250 0,025 0,001

m2

1,100 -

15,00% x D

-

-

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

7,000 21,000 2,100 0,350

m3 Kg Kg

1,100 1,250 1,000 -

B a h a n Balok kayu Paku 10 cm Lem kayu

D E

-

15,00% x D

-

PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA KAYU KELAS II ATAU KELAS III

No

B

OH OH OH OH

PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA KAYU KELAS I

P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.4.6.1.2.

Koefisien

HARGA SATUAN PEKERJAAN KAYU

No A

Satuan

B a h a n Kaca Buram tebal 10 mm

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

6,000 18,000 1,800 0,300

m3 Kg Kg

1,200 1,250 1,000 -

B a h a n Balok kayu Paku 10 cm Lem kayu

C

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

-

Page 29 of 38

A.4.6.1.5.

PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL, KAYU KELAS I ATAU KELAS II

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

A.4.6.1.9. No A

B

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A

B

L.01 L.03 L.03 L.04

OH OH OH OH

1,000 3,000 0,300 0,050

m3 Kg

0,040 0,500 -

-

15,00% x D

-

B a h a n Papan kayu Paku 1 cm – 2,5 cm Lem kayu Plywood 4 mm (90 x 220) cm P e r a l a t a n

No

Koefisien

PEMBUATAN 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I ATAU KELAS II Harga Satuan Jumlah Harga Uraian Kode Satuan Koefisien (Rp) (Rp) T e n a g a Pekerja L.01 OH 0,800 Tukang kayu L.03 OH 2,400 Kepala tukang L.03 OH 0,240 Mandor L.04 OH 0,040 -

C

A.4.6.1.6.

Satuan

B a h a n Papan kayu Lem kayu

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

m3 kg kg Lembar

0,0256 0,0300 0,5000 1,0000

-

-

15,00% x D

-

PEMBUATAN DAN PEMASANGAN 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I ATAU KELAS II Harga Satuan Jumlah Harga Uraian Kode Satuan Koefisien (Rp) (Rp) T e n a g a Pekerja L.01 OH 0,800 Tukang kayu L.03 OH 2,400 Kepala tukang L.03 OH 0,240 Mandor L.04 OH 0,040 B a h a n Papan kayu Lem kayu

C

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

m3 Kg

0,024 0,300 -

-

15,00% x D

-

Page 30 of 38

A.4.6.1.22.

PEMASANGAN 1 M LIST PLANK UKURAN (3 x 30) CM, KAYU KELAS I ATAU KELAS II

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.6.1.24.

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

0,100 0,200 0,020 0,005

Lbr kg

0,250 0,050 -

-

15,00% x D

-

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0,150 0,450 0,045 0,008

Harga Satuan Jumlah Harga (Rp) (Rp) -

m3 kg Lembar kg

0,028 0,150 0,860 0,560

-

-

15,00% x D

-

PEMASANGAN 1 M2 RANGKA LANGIT-LANGIT (60x60) CM, KAYU KELAS II ATAU KELAS III

No

B

OH OH OH OH

B a h a n Balok kayu, 6 x 12 Paku 5 dan 10 Teakwood 4 mm, 120 x 240 Lem kayu P e r a l a t a n

A

L.01 L.03 L.03 L.04

-

C

A.4.6.1.20.

Koefisien

PEMASANGAN 1 M2 DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II

No A

Satuan

B a h a n Lisplank Kalsiplank Paku 5 dan 7 cm

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0,200 0,300 0,030 0,010

m3 kg

0,016 0,250 -

B a h a n Kaso-kaso 5 x 7 cm Paku 7 – 10 cm

C

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

-

Page 31 of 38

A.4.5.1. A.4.5.1.5.

HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) PEMASANGAN 1 M2 LANGIT-LANGIT TRIPLEKS UKURAN (120 x 240) CM, TEBAL 3MM,4MM & 6MM

No A

B

Uraian T e n a g a Pekerja Tukang kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,100 0,100 0,010 0,005

B a h a n Tripleks, Tebal 4 MM Paku tripleks

C

P e r a l a t a n

D E

J u m l a h (A + B + C) Overhead & Profit

F

Harga Satuan Pekerjaan (D + E)

A.4.5.2.

Kode

Lembar kg

Harga Satuan Jumlah Harga (Rp) (Rp) -

0,375 0,030 -

-

15,00% x D

-

HARGA SATUAN PEKERJAAN PENUTUP ATAP Mengerjakan 1 M2 Kuda-Kuda Baja Ringan + Reng Untuk Atap Spandek

No A

B

Uraian T e n a g a Pekerja Tukang Kayu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0,200 0,450 0,010 0,050

Harga Satuan Jumlah Harga (Rp) (Rp) -

M' M' Bh Bh M'

1,488 2,232 28,000 1,600 3,600

-

-

15,00% x D

-

PEMASANGAN 1 M2 ATAP ALUMINIUM

No A

Satuan

B a h a n Baja C-75,0.8 Baja C-75,0.6 Baut (screw driver) Dynabolt Reng 0.5

C

A.4.5.2.40.

Kode

Uraian T e n a g a Pekerja Tukang Kayu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0,150 0,750 0,080 0,006

Lbr Kg

1,050 0,020 -

B a h a n Almn gelombang tebal 0,55 Paku hak panjang 15 cm

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 32 of 38

-

A.4.7.1. A.4.7.1.4. No A

B

HARGA SATUAN PEKERJAAN PENGECATAN 1M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Harga Satuan Jumlah Harga Uraian Kode Satuan Koefisien (Rp) (Rp) T e n a g a Pekerja L.01 OH 0,070 Tukang cat L.02 OH 0,009 Kepala tukang L.03 OH 0,006 Mandor L.04 OH 0,003 B a h a n Cat menie Plamuur Cat dasar Cat penutup Kwas Pengencer Ampelas

Kg Kg Kg Kg Bh Kg Lbr

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.4.7.1.10. No A

B

15,00% x D

-

B a h a n Plamuur Cat dasar

Kg Kg

0,100 0,100 -

-

Cat penutup

Kg

0,260 -

-

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

-

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG PEMASANGAN 1 BUAH CLOSET DUDUK/MONOBLOCK

No

B

-

PENGECATAN 1 M2 TEMBOK BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Harga Satuan Jumlah Harga Uraian Kode Satuan Koefisien (Rp) (Rp) T e n a g a Pekerja L.01 OH 0,020 Tukang cat L.02 OH 0,063 Kepala tukang L.03 OH 0,0063 Mandor L.04 OH 0,003 -

P e r a l a t a n

A

-

-

C

A.5.1.1.. A.5.1.1.1.

0,200 0,150 0,170 0,260 0,010 0,030 0,200

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

3,300 1,100 0,010 0,160

Unit Ls

1,000 6,00% -

B a h a n Closet duduk Perlengkapan

C

P e r a l a t a n

D

J u m l a h (A + B + C)

E F

Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 33 of 38

-

A.5.1.1.14.

PEMASANGAN 1 BUAH FLOOR DRAIN

No A

B

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.5.1.1.19.

B

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

0,010 0,100 0,010 0,005

Unit

1,000 -

15,00% x D

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,010 0,400 0,040 0,005

M Buah

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

1,000 0,025 -

-

15,00% x D

-

PEMASANGAN 1 BUAH WASTAFEL

No

B

OH OH OH OH

B a h a n Kran air Sealtape P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.5.1.1.5.

Koefisien

PEMASANGAN 1 BUAH KRAN DIAMETER 1/2 INCI ATAU 3/4 INCI

No A

Satuan

B a h a n Floor drain

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1,200 1,450 0,150 0,060

Harga Satuan Jumlah Harga (Rp) (Rp) -

Unit Kg M3 %

1,200 6,000 0,010 12,00%

-

B a h a n Wastafel Semen Portland Pasir pasang Perlengkapan

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

-

15,00% x D

Page 34 of 38

-

A.5.1.1.26.

PEMASANGAN 1 M PIPA PVC TYPE AW DIAMTER 3/4 INCI

No A

B

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

A.5.1.1.29.

B

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

0,036 0,060 0,006 0,002

M %

1,200 35,00% -

-

15,00% x D

-

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,054 0,090 0,009 0,003

M %

1,200 35,00% -

-

15,00% x D

-

PEMASANGAN 1 M PIPA PVC TYPE AW DIAMTER 3 INCI

No

B

OH OH OH OH

B a h a n Pipa PVC 2” Perlengkapan P e r a l a t a n

A

L.01 L.02 L.03 L.04

-

C

A.5.1.1.31.

Koefisien

PEMASANGAN 1 M PIPA PVC TYPE AW DIAMTER 2 INCI

No A

Satuan

B a h a n Pipa PVC 1/2” Perlengkapan

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,081 0,135 0,014 0,004

M %

1,200 35,00% -

B a h a n Pipa PVC 3” Perlengkapan

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 35 of 38

-

A.5.1.1.32.

PEMASANGAN 1 M PIPA PVC TYPE AW DIAMTER 4 INCI

No A

B

Uraian T e n a g a Pekerja Tukang batu Kepala tukang Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

No

Uraian T e n a g a Pekerja Tukang Listrik Kepala Tukang Listrik Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

0,081 0,135 0,014 0,004

M %

1,200 35,00% -

-

-

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,286 0,143 0,143 -

M M M Bh Bh Bh Bh Bh

5,000 1,000 4,000 2,000 2,000 5,000 6,000 0,250

Koefisien

-

-

15,00% x D

-

1 BUAH PEMASANGAN LAMPU DOWN LIGHT LED 11 WATT

No A

OH OH OH OH

B a h a n Kabel NYM 2 x 2,5 MM² Fleksibel Conduit dia 20 MM U PVC Conduit dia 20 MM Sok dia 20 MM Tee Dust 20 MM Klem Conduit dia 20 MM Fisher Isolasi

C

A.8.4.6.9.

L.01 L.02 L.03 L.04

15,00% x D

HARGA SATUAN PEKERJAAN ELEKTRIKAL 1 TITIK PEMASANGAN INSTALASI PENERANGAN

B

Koefisien

-

A.8.4.6. A.8.4.6.1.

A

Satuan

B a h a n Pipa PVC 4” Perlengkapan

C

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

Uraian T e n a g a Pekerja Tukang Listrik Kepala Tukang Listrik Mandor

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,200 0,200 -

Bh Bh

1,000 1,000 -

B a h a n Armatur Lampu Down Light Lampu LED Philips 11 Watt

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Koefisien

-

15,00% x D

Page 36 of 38

-

A.8.4.6.9.

1 BUAH PEMASANGAN LAMPU DOWN LIGHT LED 14 WATT

No A

B

Uraian T e n a g a Pekerja Tukang Listrik Kepala Tukang Listrik Mandor

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

B

Uraian T e n a g a Pekerja Tukang Listrik Kepala Tukang Listrik Mandor

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

1,000 1,000 -

-

15,00% x D

-

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,133 0,133 -

Bh Bh Bh

1,000 1,000 0,010 -

Koefisien

-

15,00% x D

-

1 BUAH PEMASANGAN SAKLAR GANDA PANASONIC

No

B

Bh Bh

B a h a n Armatur Saklar Tunggal Panasonic Inbouw Dust Isolasi P e r a l a t a n

A

OH OH OH OH

-

C

A.8.4.6.28.

L.01 L.02 L.03 L.04

Harga Satuan Jumlah Harga (Rp) (Rp) 0,200 0,200 Koefisien

1 BUAH PEMASANGAN SAKLAR TUNGGAL PANASONIC

No A

Satuan

B a h a n Armatur Lampu Down Light Lampu LED Philips 14 Watt

C

A.8.4.6.27.

Kode

Uraian T e n a g a Pekerja Tukang Listrik Kepala Tukang Listrik Mandor

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,133 0,133 -

Bh Bh Bh

1,000 1,000 0,010 -

B a h a n Armatur Saklar Ganda Panasonic Inbouw Dust Isolasi

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Koefisien

-

15,00% x D

Page 37 of 38

-

A.8.4.6.29.

1 BUAH PEMASANGAN STOP KONTAK PANASONIC

No A

B

Uraian T e n a g a Pekerja Tukang Listrik Kepala Tukang Listrik Mandor

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Harga Satuan Jumlah Harga (Rp) (Rp) 0,133 0,133 -

Bh Bh Bh

1,000 1,000 0,010 -

B a h a n Armatur Stop Kontak Panasonic Inbouw Dust Isolasi

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Koefisien

-

15,00% x D

-

1 M2 PASANGAN PAVING BLOCK WARNA (6 CM) No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Batu Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,250 0,500 0,025 0,003

M2 M3

1,010 0,100 -

B a h a n Paving Block Pasir pasangan

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

-

1 M Kanstin Trap Uk 15.25.40 ; K-175 No A

B

Uraian T e n a g a Pekerja Tukang Batu Kepala Tukang Batu Mandor

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0,050 0,050 0,025 0,001

Zak M3 M

0,054 0,005 1,000 -

B a h a n Semen portland Pasir pasangan Kanstin Trap Uk 15.25.40

C

P e r a l a t a n

D E F

J u m l a h (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga (Rp) (Rp) -

Kode

-

15,00% x D

Page 38 of 38

-