REFERENCE LIST LIST OF FBC BOILERS

S. NO.

CUSTOMER

TYPE OF BOILER

POWER PLANT EVP CAPACITY PRESS Kg/Cm² CAPACITY (TPH) (g)

TEMP °C

FUEL

INDUSTRY

STATUS

1

M/s. SHYAM DRI POWER LTD., SAMBALPUR, ORISSA

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

30 MW

1 X 135

67

490 ± 5

COAL / DOLO - CHAR / CPP IN SPONGE WASHERY REJECTS IRON PLANT

Commissioned in Dec 2009

2

M/s. VASWANI INDUSTRIES, RAIPUR (C.G)

BI-DRUM FBC BOILER

8 MW

1 X 27

68

495 ± 5

COAL & DOLO CHAR

CPP IN SPONGE IRON PLANT

Commissioned in Jan 2007

3

M/s. G.R. SPONGE & POWER LTD., RAIPUR

BI-DRUM FBC BOILER

8 MW

1 X 27

67

490 ± 5

COAL & DOLO CHAR

CPP IN SPONGE IRON PLANT

Commissioned in Apr 2008

4

M/s. SHYAM SEL LTD., MANGALPUR, WEST BENGAL

SINGLE - DRUM AFBC BOILER (OPEN BOTTOM TYPE)

12 MW

1 X 54

67

495 ± 5

COAL / DOLO -CHAR

CPP IN SPONGE IRON PLANT

Commissioned in Jul 2008

5

M/s. BVR PAPERS LTD., CHITTOOR, ANDRAPRADESH

BI – DRUM FBC BOILER

1.25 MW

1 X 20

45

440 ± 5

RICE HUSK / IMPORTED COAL

PAPER INDUSTRIES

Commissioned in Sep 2008

6

M/S.VIKAS METAL&POWER LTD., PURULIA (W.B.)

BI-DRUM FBC BOILER.

10 MW

1 X 15

66

495 ± 5

COAL & DOLO - CHAR

CPP IN SPONGE IRON PLANT

Commissioned in Sep 2009

7

M/s. MSP METALLICS LIMITED, JHARSUGUDA

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

25 MW

1 X 70

66

485 ± 5

COAL / CHAR / WASHERY REJECTS

CPP IN SPONGE IRON PLANT

Commissioned in May 2010

8

M/s. MSP STEEL POWER LTD. RAIGARH (C.G.)

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

18 MW

1 X 50

66

485 ± 5

COAL / CHAR / WASHERY REJECTS

CPP IN SPONGE IRON PLANT

Commissioned in Oct 2010

9

M/s. SOVA ISPAT LTD. WEST BENGAL.

SINGLE DRUM FBC BOILER.

15 MW

1 X 36

67

490 ± 5

COAL & DOLO - CHAR

CPP IN SPONGE IRON PLANT

Commisioning activities started

10

M/s. VISION SPONGE IRON PVT. LTD., PURULIA (W.B)

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

15 MW

1 X 40

90

520 ± 5

COAL & DOLO - CHAR

CPP IN SPONGE IRON PLANT

Commisioning activities started

11

M/s. SHYAM DRI POWER LTD., SAMBALPUR, ORISSA

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

30 MW

1 X 135

67

490 ± 5

COAL / DOLO -CHAR / CPP IN SPONGE WASHERY REJECTS IRON PLANT

Commisioning activities started

12

M/s. SHRI VENKATESWARA SPONGE & POWER PVT. LTD. SRI KALAHASTHI (A.P)

BI-DRUM FBC BOILER

12 MW

1 X 27.5

57

510 ± 5

COAL

CPP IN SPONGE IRON PLANT

13

M/s. SHYAM SEL LTD JAMURIA, (W.B)

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

12 MW

1 X 54

91

525±5

COAL / CHAR

CPP IN SPONGE IRON PLANT

Erection under progress

Erection Under Completion

REFERENCE LIST LIST OF FBC BOILERS

S. NO.

CUSTOMER

TYPE OF BOILER

POWER PLANT EVP CAPACITY PRESS Kg/Cm² CAPACITY (TPH) (g)

TEMP °C

FUEL

INDUSTRY

STATUS

14

M/s. SIAMTANYACHART COMPANY LIMITED., THAILAND

BIDRUM AFBC BOILER

-

1 X 35

67

490±5

RICE HUSK

CPP

Erection Under Progress

15

M/s. MAA KALI ALLOYS UDYOG (P) LTD CHATTISGARH

SINGLE DRUM AFBC BOILER

10 MW

1 X 35

66

490±5

COAL / CHAR / COAL FINES

CPP IN SPONGE IRON PLANT

Erection Under Progress

16

M/s. BALDEV ALLOYS (P) LTD., RAIPUR

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

8 MW

1 X 30

66

490±5

COAL / CHAR / COAL FINES

CPP IN SPONGE IRON PLANT

Erection Under Progress

17

SINGLE DRUM M/s. DHRUVDESH METASTEEL (P) LTD AFBC BOILER KARNATAKA (Open Bottom Type Furnace)

10 MW

1 X 30

66

485±5

COAL / CHAR / RICE HUSK

CPP IN SPONGE IRON PLANT

Erection Under Progress

18

M/s. RAIPUR POWER AND STEEL LIMITED, LUDHIANA

SINGLE DRUM AFBC BOILER

12 MW

1 X 35

67

490 ± 5

COAL & DOLO - CHAR

CPP IN SPONGE IRON PLANT

Erection under progress

19

M/s. MSP STEEL POWER LTD. RAIGARH (C.G.)

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

28 MW

1 X 120

92

525 ± 5

COAL / CHAR / WASHERY REJECTS

CPP IN SPONGE IRON PLANT

Underhold

20

M/s. THE GREAT INDIAN LINEN AND TEXTILE INFRASTRUCTURE CO. PVT. LTD. COIMBATORE

SINGLE DRUM AFBC BOILER

12 MW

1 X 52

87

520

IMPORTED COAL

CPP

Supply under progress

21

M/s. VAISHNAVI ISPAT (P) LTD, MEGHALAYA

SINGLE DRUM AFBC BOILER

10 MW

1 X 45

67

490±5

MEGHALAYA COAL / INDIAN COAL / CHAR

FERRO ALLOY PLANT

Supply under progress

22

M/s. TIMES STEEL AND POWER LTD ROURKELA

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

12 MW

1 X 40

67

490±5

COAL / CHAR

CPP

Supply under progress

23

M/s. TULSI PAPER MILLS (P) LTD., GUJARAT

SINGLE DRUM AFBC BOILER

3 MW

1 X 25

66

510±5

COAL / LIGNITE / BAGASSE

COGEN PLANT

Supply under progress

24

M/s. SPAC TAPIOCA PRODUCTS (INDIA) SINGLE DRUM AFBC LTD BOILER

4 MW

1x34

67

490±5

COAL

COGEN PLANT

Supply under progress

25

M/s. SHAH SPONGE AND POWER (P) LTD, JAMSHEDPUR

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

15 MW

1 x 55

66

490±5

COAL / CHAR / RICE HUSK

CPP IN SPONGE IRON PLANT

Supply under progress

SINGLE DRUM AFBC BOILER (Open Bottom Type Furnace)

15 MW

1 x 55

67

490±5

COAL/CHAR

CPP IN SPONGE IRON PLANT

Supply under progress

26 M/s SKY ALLOYHS & POWER (P) LTD

Related Documents

Boiler Installation - Afbc
February 2021 0
Boiler Installation
February 2021 0
Boiler
January 2021 7
Boiler
January 2021 4
Boiler
February 2021 2
Boiler Calculation
February 2021 1

More Documents from "FmJoy Dioko"

Boiler Installation - Afbc
February 2021 0
Tips For Energy Efficiency
February 2021 0
January 2021 4
Rapport Tp Assembleur
January 2021 2