KOP SURAT PENYEDIA JASA

Daftar Kuantitas dan Harga / BoQ Fisik Konstruksi Rehabilitasi/Renovasi Museum Kars Indonesia

I II III IV V

Terbilang :

PEKERJAAN PERSIAPAN PEKERJAAN BONGKARAN PEKERJAAN STRUKTUR PEKERJAAN ARSITEKTUR PEKERJAAN MEKANIKAL ELETRIKAL PLUMBING

Rp. Rp. Rp. Rp. Rp.

81,895,000.00 265,652,713.43 1,860,218,620.17 1,170,714,365.47 39,571,820.13

JUMLAH BIAYA KONSTRUKSI . ………………… Rp. PPN 10% . ………………… Rp.

3,418,052,519.19 341,805,251.92

JUMLAH BIAYA + PPN . ………………… Rp.

3,759,857,771.11

DIBULATKAN . ………………… Rp. 3,759,857,771.00 tiga milyar tujuh ratus lima puluh sembilan juta delapan ratus lima puluh tujuh ribu tujuh ratus tujuh puluh satu rupiah ###

Bekasi, 31 Dsember 2019 PT. JAYA SAE KONSUL

TTD

EVALIN KRISTINA Direktur

NO

URAIAN PEKERJAAN

SATUAN

CATATAN : Sebelum mengisi harga, kontraktor wajib membaca Dokumen Tender dan Catatan Harga dengan seksama agar sudah mengetahui kondisi yang di minta. I.

PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG

1

Gambar Shop Drawing dan As Built Drawing a. Sebelum kontraktor bekerja wajib membuat gambar shop drawing yang menyangkut semua aspek dalam pelaksanaan dimana gambar tersebut harus di setujui pengawas lapangan/ MK, perencana atau pemberi tugas dalam rangkap 3 set (bila diperlukan sesuai petunjuk Pengawas lapangan/MK).

lot

b. Setelah Selesai pekerjaan maka kontraktor harus membuat gambar As-Built Drawing, dimana gambar tersebut menunjukan segala sesuatunya harus sesuai dengan kondisi material atau unit terpasang dan diserahkan kepada Pengawas Lapangan/MK atau Pemberi Tugas dalam bentuk : 1 (satu) buah Disket Master, 3 (tiga) set Blue Print yang telah disetujui.

c. Dalam pembuatan gambar harus menggunakan sistem AutoCad atau setara. d. Semua biaya item (a),(b) dan (c) menjadi tanggung jawab kontraktor atau kontraktor. 2

Photo-photo Progress Kemajuan Pekerjaan a. Kontaktor wajib membuat photo progress yang dilakukan tiap minggunya dalam papan board untuk diserahkan dengan Pengawas lapangan/MK hingga masa menyerahan pertama.

lot

b. Photo kemajuan pekerjaan dibuat photo minimal 5 (lima) lembar untuk setiap sub bidang pekerjaan atau sesuai dengan keperluan Pengawas Lapangan/MK atau Pemberi tugas. c. Kontaktor wajib membuat daftar laporan progress tertulis sesuai dengan progres pekerjaan. d. Direksi lapangan berhak untuk memeriksa progress dari kontraktor dan berhak menolak atau menerima yang disebabkan ketidaksesuaian dengan kondisi progress yang diajukan. e. Semua biaya item (a), (b) dan (c) menjadi tanggung jawab kontraktor. 3

SMK2 (Sistem Manajemen Keselamatan Konstruksi)

lot

Kontraktor wajib mengadakan kotak P3K , alat pemadam kebakaran portable, Asuransi Tenaga Kerja, Alat Perlindungan Tenaga Kerja guna untuk pencegahan kebakaran. Sesuai dengan anjuran atau saran dari perusahaan asuransi dan instansi yang berwenang.

4

Keamanan Proyek dan Perlindungan pekerjaan kontraktor bertanggung jawab atas keamanan, penerangan dan perlindungan terhadap pekerjaan baik sebelum dan sesudah dikerjakan terutama pekerjaan yang penting dan dapat membahayakan selama pelaksanaan Kontrak siang dan malam. Pemberi Tugas tidak bertanggung jawab terhadap kontraktor dan Sub-kontraktor atas keselamatan pekerja dan pekerjaan, kehilangan atau kerusakan bahan-bahan bangunan atau peralatan atau pekerjaan yang sedang dalam pelaksaan. Pengadaan jaring dan atau pagar pengaman pada sekeliling bangunan, Koordinasi Keamanan di lokasi Bangunan menjadi tanggung jawab kontraktor.

lot

5

lot

Mobilisasi atau transportasi peralatan dan bahan Disesuaikan dengan kebutuhan kontraktor, sudah termasuk untuk semua peralatan utama dan peralatan bantu.

JUMLAH PEKERJAAN PER

HARGA SATUAN

JUMLAH HARGA

Rp.

Rp.

1.00

9,900,000.00

9,900,000.00

1.00

2,640,000.00

2,640,000.00

1.00

31,185,000.00

31,185,000.00

1.00

16,170,000.00

16,170,000.00

VOLUME

1.00

22,000,000.00

22,000,000.00

JUMLAH PEKERJAAN PERSIAPAN & PENUNJANG Rp.

81,895,000.00

NO 1 II II.A 1 2 3 4 5 6 7 8 9 10

III. III.A III.A.1 1 2 3 4

URAIAN PEKERJAAN 2 PEKERJAAN PEMBONGKARAN PEK. PAS. BONGKARAN Pek. Bongkaran Kusen Pek. Bongkaran Atap Pek. Bongkaran Struktur Gedung Pek. Bongkaran MEP Gedung Pek. Bongkaran Kolam Pek. Bongkaran Tangga dan Ramp Pek. Bongkaran Plat Lantai Pek. Bongkaran Dinding Beton Pek. Bongkaran Turap Pek. Buangan Bekas Galian

PEKERJAAN STRUKTUR PEKERJAAN STRUKTUR LANSEKAP PEKERJAAN TANAH Pek. Pemasangan bouwplank Pek. Galian Strauss Pile Ø300mm Pek. Galian Tanah Pek. Buangan Tanah Bekas Galian

III.A.2 PEKERJAAN STRUKTUR ELV. -0.050 1 Pek. Strauss Pile Ø300mm T=8 meter - Cor Beton - Besi Tulangan 6 D13 - Besi tulangan Ø8-150 (spiral) 2

Pek. Pas. Turap Tipe 1 Tinggi = 2,5 m - Galian Tanah - Urugan pasir - Lantai Kerja - Batu belah

3

Pek. Pas. Turap Tipe 2 Tinggi = 1,55 m - Galian Tanah - Urugan pasir - Lantai Kerja - Batu belah

4

Pek. Pas. Turap Tipe 3 Tinggi = 0,2 m to 3,5 m - Galian Tanah - Urugan pasir - Lantai Kerja - Batu belah

5

Pek. Pas. Trap tangga - Rollag Bata - Urugan Pasir - Lantai Kerja - Besi tulangan Ø8-150 - Batu belah

- Cor Beton - Bekisting 7

Pek. Pas. Ramp Depan - Urugan Pasir - Lantai Kerja - Cor beton - Wiremesh M8 (2 layer) - Bekisting

8

Pek. Pas. Batu Belah Entrance - Galian Tanah - Urugan pasir - Lantai Kerja - Batu belah

9

Pek. Pas. Turap Ram Entrance - Galian Tanah - Urugan pasir - Lantai Kerja - Batu belah

10

Pek. Pas. Ramp Kiri-Kanan - Urugan Pasir - Lantai Kerja - Cor beton - Wiremesh M8 (2 layer) - Bekisting

11

Pek. Pas. Trap tangga Samping (kiri) - Rollag Bata - Urugan pasir - Lantai Kerja - Besi tulangan Ø8-150 - Cor beton - Batu belah - Bekisting

12

Pek. Pas. Trap tangga Samping (kanan) - Rollag Bata - Urugan pasir - Lantai Kerja - Besi tulangan Ø8-150 - Cor beton - Batu belah - Bekisting

III.B III.B.1 1 2 3 4 5 6

PEKERJAAN STRUKTUR BANGUNAN PEKERJAAN TANAH Pek. Pemasangan bouwplank Pek. Galian tanah untuk pondasi dan Tie Beam Pek. Urugan kembali bekas galian Pek. Buangan Tanah Bekas Galian Pek. Galian Tanah Strauss Ø300mm T=8 meter Pek. Urugan pasir di bawah pondasi & Tie Beam

7

Pek. Lantai kerja di bawah pondasi & Tie Beam

III.B.2 PEKERJAAN STRUKTUR ELV. -0.050 1 Pek. Strauss Pile Ø300mm T=8 meter - Cor Beton - Besi Tulangan 6 D13 - Besi tulangan Ø10-150 (spiral) 2

Pek. Pas. Pondasi Pile Cap tipe P1 700x700x250 - Cor beton - Besi Ø12-100 - Bekisting

3

Pek. Pas. Tie Beam TB1 150x300 - Cor beton - Besi tulangan 6 D16 - Besi Tulangan Ø10 - 150 - Bekisting

4

Pek. Kolom Pedestal - Cor Beton - Besi 8 D16 - Besi Ø8-100 - Bekisting

5

Pek. Pas. Plat lantai T.10 elv. - 0.500 - Cor Beton - Wiremesh M6 (2 layer) - Standed Bar - Bekisting

III.B.3 PEKERJAAN STRUKTUR ELV. -0.050 s/d + 6.000 1 Pek. Kolom K1 H BEAM 200.200.8.12 - Base Plat T.10 mm - Fischer Bolt (Angkur) - Plat Sirip T.10 mm - H BEAM 200.200.8.12 - Baut HTB 3D19 - Pengecatan Anti Karat 2

Pek. Cor Kolom - Cor Beton Kolom K1 - Besi 6 Ø8 - Bekisting

3

Pek. Dinding Bata - Dinding Bata - Plesteran - Acian - Pengecatan Dinding

4

Pek. Kolom K2 WF-2 IWF 150.75.5.7

- Plat Penghubung T.10 mm - Baut HTB 2D19 - IWF 150.75.5.7 - Pengecatan Anti Karat 5

Pek. Kuda-kuda Tipe 1 WF-1 IWF 200.100.5.8 L=10 m - Plat Penghubung T.10 mm - Plat Sirip T.10 mm - Plat Stifner T.10 mm - Baut HTB 3D19 - IWF 200.100.5.8 - Vote IWF 200.100.5.9 - Pengecatan Anti Karat

6

Pek. Kuda-kuda Tipe 1 WF-1 IWF 200.100.5.8 L=9,4 m - Plat Penghubung T.10 mm - Plat Sirip T.10 mm - Plat Stifner T.10 mm - Baut HTB 3D19 - IWF 200.100.5.8 - Vote IWF 200.100.5.9 - Pengecatan Anti Karat

7

Pek. Kuda-kuda Tipe 2 WF-2 IWF 300.150.6,5.9 L=9,4 m - Plat Penghubung T.10 mm - Plat Sirip T.10 mm - Plat Stifner T.10 mm - Baut HTB 3D19 - IWF 300.150.6,5.9 - Vote IWF 300.150.6,5.9 - Pengecatan Anti Karat

8

Pek. Pas. Rangka Atap - Lipped channel 150.65.20.2,3 - Besi Siku 50.50.5 - Ikatan angin Ø12 - Trekstang Ø8 - Water mur - Pengecatan Anti Karat

9

Pek. Balok baja WF3 IWF 150.75.5.7 - IWF 150.75.5.7 - Plat penghubung T.10mm - Vote IWF 150x400 - Baut HTB 4 D22 - Pengecatan Anti Karat

10

Pek. Pas. Plat dak T.10 elv. +6,000 - Cor Beton - Wiremesh M6 (2 layer) - Standed Bar - Bekisting

11

Pek. Dinding Beton Tinggi = 6 m - Cor Beton - Wiremesh M6 (2 layer) - Standed Bar

- Bekisting

III.C III.C.1 1 2 3 4 5 6

PEKERJAAN STRUKTUR KOLAM PEKERJAAN TANAH Pek. Pemasangan bouwplank Pek. Galian tanah untuk pondasi dan Tie Beam Pek. Urugan kembali bekas galian Pek. Buangan Tanah Bekas Galian Pek. Urugan pasir di bawah pondasi & Tie Beam Pek. Lantai kerja di bawah pondasi & Tie Beam

III.C.2 PEKERJAAN STRUKTUR ELV. -0.050 1 Pek. Pas. Pondasi Tiang P1 300x300x300 - Cor beton - Besi Ø12-150 - Besi Ø10-150 - Waterproofing Integral - Bekisting 2

Pek. Struktur Tiang Ø8" - Pipa PVC 8" - Cor beton isian tiang - Besi Tulangan 6 Ø12 - Besi tulangan Ø8-150

3

Pek. Pas. Plat lantai T.15 elv. - 0.600 - Cor Beton - Wiremesh M6 (2 layer) - Standed Bar - Waterproofing Integral - Bekisting

4

Pek. Dinding Kolam T= 0,75 m - Cor Beton - Wiremesh M6 (2 layer) - Standed Bar - Waterproofing Integral - Bekisting

5

Pek. Dinding Kolam T= 1,15 m - Cor Beton - Wiremesh M6 (2 layer) - Standed Bar - Waterproofing Integral - Bekisting

RKS & SPESIFIKASI TEKNIS

SATUAN

VOLUME

3

4

5

m2 m2 m2 m2 m2 m2 m3 m3 m3 ls

21.10 191.53 77.30 147.60 56.80 319.20 101.10 77.30 230.04 1.00

HARGA SATUAN Rp. 6

49,162.50 62,100.00 62,100.00 57,787.50 115,575.00 57,787.50 465,750.00 465,750.00 465,750.00 24,150,246.68

JUMLAH PEKERJAAN BONGKARAN Rp.

m1 m1 m3 m3

72.00 224.00 2,838.50 3,253.89

69,888.50 191,400.00 96,574.50 78,155.00

JUMLAH PEKERJAAN TANAH Rp.

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTD 40 (ulir) Mutu baja BJTP 24 (polos)

m3 kg kg

0.27 48.37 33.61

953,486.29 12,389.30 12,273.80

Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Camp 1 PC : 3 Ps

m3 m3 m3 m3

72.50 2.35 544.60 239.93

96,574.50 236,362.50 734,074.39 826,672.00

Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Camp 1 PC : 3 Ps

m3 m3 m3 m3

23.00 1.25 0.63 10.90

96,574.50 236,362.50 734,074.39 826,672.00

Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Camp 1 PC : 3 Ps

m3 m3 m3 m3

155.25 13.50 6.75 113.40

96,574.50 236,362.50 734,074.39 826,672.00

Bata Merah, Camp 1 : 3 Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Mutu baja BJTP 24 (polos) Camp 1 PC : 3 Ps

m2 m3 m3 kg m3

6.30 1.26 0.63 136.92 19.95

191,253.70 236,362.50 734,074.39 12,273.80 826,672.00

Beton Mutu f'c = 21,70 Mpa (K-250)

m3 m3

1.89 0.27

953,486.29 316,954.00

Pasir Urug

m3

2.00

236,362.50

Camp. 1 PC : 3 Ps + 5 Sp

m3

1.00

734,074.39

Beton Mutu f'c = 21,70 Mpa (K-250)

kg

2.40

953,486.29

m3 m2

217.95 3.36

10,493.45 452,226.50

Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Camp 1 PC : 3 Ps

m3 m3 m3 m3

2.18 1.81 0.91 2.83

96,574.50 236,362.50 734,074.39 826,672.00

Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Camp 1 PC : 3 Ps

m3 m3 m3 m3

112.21 5.58 2.79 15.77

96,574.50 236,362.50 734,074.39 826,672.00

m3 m3 m3 m3 m2

7.19 3.59 8.63 783.33 14.39

236,362.50 734,074.39 953,486.29 10,493.45 452,226.50

m2 m3 m3 kg m3 m3 m2

2.10 0.21 0.11 49.92 0.63 0.86 2.73

191,253.70 236,362.50 734,074.39 12,273.80 953,486.29 826,672.00 316,954.00

m2 m3 m3 kg m3 m3 m2

2.10 0.21 0.11 49.92 0.63 0.86 2.73

191,253.70 236,362.50 734,074.39 12,273.80 953,486.29 826,672.00 316,954.00

Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Beton Mutu f'c = 21,70 Mpa (K-250)

Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Mutu baja BJTP 24 (polos) Beton Mutu f'c = 21,70 Mpa (K-250)

Bata Merah, Camp 1 : 3 Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Mutu baja BJTP 24 (polos) Beton Mutu f'c = 21,70 Mpa (K-250)

JUMLAH PEKERJAAN STRUKTUR ELV. -0.050 Rp.

Pasir Urug

m1 m3 m3 m3 m1 m3

82.50 16.14 11.64 4.50 136.00 1.66

69,888.50 96,574.50 48,675.00 28,710.00 191,400.00 236,362.50

Camp. 1 PC : 3 Ps + 5 Sp

m3

1.66

734,074.39

JUMLAH PEKERJAAN TANAH Rp.

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 40 (Ulir) Mutu baja BJTP 24 (polos)

m3 kg kg

9.61 1,033.14 625.11

953,486.29 12,389.30 12,273.80

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos)

m3 kg m2

1.18 259.12 6.72

953,486.29 12,273.80 234,773.00

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 40 (Ulir) Mutu baja BJTP 24 (polos)

m3 kg kg m2

3.65 835.55 286.53 48.66

953,486.29 12,389.30 12,273.80 253,198.00

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 40 (Ulir) Mutu baja BJTP 24 (polos)

m3 kg kg m2

0.33 191.09 22.05 4.46

953,486.29 12,389.30 12,273.80 465,426.50

Beton Mutu f'c = 21,70 Mpa (K-250)

m3 kg bh m2

9.00 579.33 40.00 39.00

953,486.29 10,493.45 12,273.80 452,226.50

Mutu baja BJTP 24 (polos)

JUMLAH PEKERJAAN STRUKTUR ELV. -0.050 Rp.

ST 37 HTB ST 37 ST 37 HTB Cat Anti Karat

kg bh kg kg bh m2

84.78 36.00 25.91 359.28 72.00 9.33

23,287.00 12,500.00 23,287.00 23,287.00 12,500.00 79,920.50

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos)

m3 kg m2

0.36 21.56 5.76

953,486.29 10,493.45 465,426.50

Bata Merah MU Plester (50kg) MU Acian (40kg) Cat dasar Vinilex 5180 Wall Sealer Alkali Resisting Cat tembok interior, Vinilex White

m2 m2 m2 m2

15.36 30.72 30.72 30.72

222,536.50 82,307.50 44,426.25 38,704.60

ST 37 HTB ST 37 Cat Anti Karat

kg bh kg m2

3.14 16.00 261.80 11.22

23,287.00 12,500.00 23,287.00 79,920.50

ST 37 ST 37 ST 37 HTB ST 37 ST 37 Cat Anti Karat

kg kg kg bh kg kg m2

1.57 3.14 6.28 28.00 426.00 6.39 16.36

23,287.00 23,287.00 23,287.00 12,500.00 23,287.00 23,287.00 79,920.50

ST 37 ST 37 ST 37 HTB ST 37 ST 37 Cat Anti Karat

kg kg kg bh kg kg m2

1.57 3.14 6.28 28.00 400.44 6.39 15.40

23,287.00 23,287.00 23,287.00 12,500.00 23,287.00 23,287.00 79,920.50

ST 37 ST 37 ST 37 HTB ST 37 ST 37 Cat Anti Karat

kg kg kg bh kg kg m2

3.14 6.91 6.28 12.00 689.96 16.52 15.60

23,287.00 23,287.00 23,287.00 12,500.00 23,287.00 23,287.00 79,920.50

ST 37 ST 37 Mutu baja BJTP 24 (polos) Mutu baja BJTP 24 (polos) Cat Anti Karat

kg kg kg kg bh m2

1,397.00 11.31 65.70 25.17 9.00 163.17

23,287.00 23,287.00 12,389.30 12,273.80 12,500.00 79,920.50

ST 37 ST 37 ST 37 HTB Cat Anti Karat

kg kg kg bh m2

270.20 169.56 15.75 40.00 12.73

23,287.00 23,287.00 23,287.00 12,500.00 79,920.50

Beton Mutu f'c = 21,70 Mpa (K-250)

m3 kg bh m2

1.25 80.46 27.00 26.10

953,486.29 10,493.45 12,273.80 452,226.50

m3 kg bh

8.64 309.75 72.00

953,486.29 10,493.45 12,273.80

Mutu baja BJTP 24 (polos)

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos)

m2

72.00

344,839.00

JUMLAH PEKERJAAN STRUKTUR ELV. +6.000 Rp.

m1 m3 m3 m3 m3 m3

144.40 43.05 34.07 8.98 4.36 4.36

69,888.50 96,574.50 48,675.00 28,710.00 236,362.50 734,074.39

JUMLAH PEKERJAAN TANAH Rp.

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos) Mutu baja BJTP 24 (polos) Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos) Mutu baja BJTP 24 (polos)

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos) Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos) Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika

Beton Mutu f'c = 21,70 Mpa (K-250) Mutu baja BJTP 24 (polos) Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika

m3 kg kg kg m2

0.27 48.37 33.61 0.95 3.60

953,486.29 12,389.30 12,273.80 4,427.50 234,773.00

m1 m3 kg m2

72.50 2.35 544.60 239.93

140,662.50 953,486.29 12,273.80 12,273.80

m3 kg bh kg m2

12.69 544.57 55.00 44.42 8.13

953,486.29 10,493.45 12,273.80 4,427.50 452,226.50

m3 kg bh kg m2

4.87 716.57 55.00 17.05 40.58

953,486.29 10,493.45 12,273.80 4,427.50 452,226.50

m3 kg bh kg m2

9.00 579.33 40.00 22.47 39.00

953,486.29 10,493.45 12,273.80 4,427.50 452,226.50

JUMLAH PEKERJAAN STRUKTUR ELV. -0.050 Rp. TOTAL PEKERJAAN STRUKTUR Rp.

JUMLAH HARGA Rp. (5X6)

1,037,328.75 11,894,013.00 4,800,330.00 8,529,435.00 6,564,660.00 18,445,770.00 47,087,325.00 36,002,475.00 107,141,130.00 24,150,246.68 265,652,713.43

5,031,972.00 42,873,600.00 274,126,718.25 254,307,772.95 576,340,063.20

257,441.30 599,270.44 412,522.42

7,001,651.25 555,451.88 399,776,914.35 198,343,412.96

2,221,213.50 295,453.13 462,466.87 9,010,724.80

14,993,191.13 3,190,893.75 4,955,002.15 93,744,604.80

1,204,898.31 297,816.75 462,466.87 1,680,528.70 16,492,106.40

1,802,089.08 85,577.58

472,725.00 734,074.39 2,288,367.09 2,287,047.43 1,519,481.04

210,532.41 427,816.13 668,007.70 2,339,481.76

10,836,624.65 1,318,902.75 2,048,067.56 13,036,617.44

1,699,446.38 2,635,327.07 8,228,586.65 8,219,834.19 6,507,539.34

401,632.77 49,636.13 80,748.18 612,708.10 600,696.36 710,937.92 865,284.42

401,632.77 49,636.13 80,748.18 612,708.10 600,696.36 710,937.92 865,284.42 829,967,465.09

5,765,801.25 1,558,712.43 566,577.00 129,195.00 26,030,400.00 392,361.75

1,218,563.49 35,661,610.92

9,163,003.21 12,799,881.40 7,672,475.12

1,125,113.82 3,180,387.06 1,577,674.56 3,480,224.94 10,351,879.62 3,516,811.91 12,320,614.68

314,650.47 2,367,471.34 270,637.29 2,075,802.19

8,581,376.57 6,079,170.39 490,952.00 17,636,833.50 103,004,960.06

1,974,271.86 450,000.00 603,366.17 8,366,553.36 900,000.00 745,658.27

343,255.06 226,238.78 2,680,856.64

3,418,160.64 2,528,486.40 1,364,774.40 1,189,005.31

73,121.18 200,000.00 6,096,536.60 896,708.01

36,560.59 73,121.18 146,242.36 350,000.00 9,920,262.00 148,803.93 1,307,499.38

36,560.59 73,121.18 146,242.36 350,000.00 9,325,046.28 148,803.93 1,230,775.70

73,121.18 160,913.17 146,242.36 150,000.00 16,067,098.52 384,701.24 1,246,759.80

32,531,939.00 263,375.97 813,977.01 308,931.55 112,500.00 13,040,627.99

6,292,147.40 3,948,543.72 366,770.25 500,000.00 1,017,387.97

1,191,857.86 844,302.99 331,392.60 11,803,111.65

8,238,121.51 3,250,346.14 883,713.60

24,828,408.00 184,146,323.62

10,091,899.40 4,157,532.23 1,658,357.25 257,815.80 1,030,540.50 3,200,564.35 20,396,709.53

257,441.30 599,270.44 412,522.42 4,206.13 845,182.80

10,198,031.25 2,240,692.77 6,684,311.48 2,944,852.83

12,099,740.97 5,714,418.07 675,059.00 196,669.55 3,676,601.45

4,643,478.21 7,519,291.47 675,059.00 75,488.88 18,351,351.37

8,581,376.57 6,079,170.39 490,952.00 99,485.93 17,636,833.50 110,701,487.75 1,860,218,620.17

NO

URAIAN PEKERJAAN

1

2

IV IV.1 1 2

PEKERJAAN ARSITEKTUR PEK. PAS. DINDING DAN PELAPISAN DINDING Pek. Pas. Dinding 1/2 Bata Merah Pek. Pas. Dinding 1/2 Bata Merah Lansekap

3 4

Pek. Pas. Pelapisan Dinding Batu Gamping Pek. Pas. Pelapisan Dinding Batu Templek

5 6 7 8

Pek. Pas. Plesteran Dinding 1/2 Bata Merah Pek. Pas. Plesteran Lubang Kusen Pek. Pas. Acian Dinding 1/2 Bata Merah Pek. Pas. Acian Lubang Kusen

10

Pek. Pas. Kolom praktis 100x150 - Cor Beton - Besi 4 Ø10 - Besi Ø8 - 100 - Bekisting

6

Pek. Pas. Balok praktis 100x200 - Cor Beton - Besi 4 Ø10 - Besi Ø8 - 100 - Bekisting

IV.2 1

PEK. PAS. PELAPISAN LANTAI Pek. Pas. Homogenous Tile 800x800 mm

IV.3 1 3 4

PEK. PAS. PLAFOND Pek. Pas. Rangka Plafond gypsum Pek. Pas. Plafond gypsum t+9mm ex. Jayaboard Pek. Pas. Plafond ACP

5

Pek. Pas. List plafond

IV.4 1

PEK. PAS. KUSEN Pek. Pas. Pintu

2

Pek. Pas. Jendela 1

3

Pek. Pas. Jendela 2

IV.5 1 2

PEK. PAS. FINISHING DAN PENGECATAN Pek. Pas. Pengecatan Tembok Interior Pek. Pas. Pengecatan Tembok Eksterior

NO 3 IV.6 1

URAIAN PEKERJAAN Pek. Pas. Pengecatan Plafond PEK. PAS. RANGKA DAN PENUTUP ATAP Pek. Pas. Atap Genteng Metaldeck

2 3 4 0

Pek. Pas. Nok Atap Pek. Pas. Listplank Pek. Pas. Flashing Pek. Pas. Dinding ACP

IV.7 1

PEK. PAS. LANSEKAP Pek. Pas. Railling

2

Pek. Pas. Rumput - Tanah Urug - Tanah Subur t.20 cm - Rumput

3

Pek. Pas. Paving Block 200x300 mm - Pemadatan tanah - Base course T.25 cm - Amparan 2-3, T.5cm - Amparan 1-2, T.5cm - Paving block T.8 cm

4

Pek. Pas. Pelapisan Batu Andesit 300x600 mm - Pemadatan tanah - Base course T.25 cm - Amparan 2-3, T.5cm - Amparan 1-2, T.5cm - Abu Batu, T.5cm - Batu Andesit, T.5cm

5

Pek. Pas. Agregat Pembatas Tepian Paving Block - Pek. Pas. Bata Merah - Pek. Pas. Plesteran - Pek. Pas. Acian

6

Pek. Pas. Agregat Pembatas Tepian Batu Andesit - Pemadatan tanah - Base course T.25 cm - Amparan 2-3, T.5cm - Amparan 1-2, T.5cm - Urugan Pasir, T.5cm - Lantai Kerja, T.10cm - Batu Andesit, T.5cm 7 Pek. Perbaikan Area Lansekap (Paving Block) - Bongkaran Paving Block Eksisting - Amparan 2-3, T.5cm - Amparan 1-2, T.5cm - Paving block T.8 cm - Buangan Paving Bekas Bongkaran

NO

URAIAN PEKERJAAN

8 Pek. Pas. Ornamen Lampu 9 Pek. Pas. Pengecatan Tiang Ornamen Kolam 10 Pek. Pas. Led Strip 11 Pek. Pas. Saluran U-ditch 600x600mm - Galian tanah - Pasir urug - Lantai kerja - U ditch 600x600 - Cover U ditch 12

Pek. Pas. Saluran U-ditch 300x300mm - Galian tanah - Pasir urug - Lantai kerja - U ditch 300x300 - Cover U ditch

RKS & SPESIFIKASI TEKNIS

SATUAN

VOLUME

3

4

5

Bata Merah Bata Merah

m2 m2

19.38 92.37

Batu Gamping Batu templek

m2 m2

90.75 76.00

MU Plester (50kg) MU Plester (50kg) MU Acian (40kg) MU Acian (40kg)

m2 m1 m2 m1

45.33 62.00 45.33 62.00

m3 kg kg m2

0.33 79.66 43.30 6.52

m3 kg kg m2

0.56 90.15 62.22 11.22

Homogeneous Tile 800x800, ex. Indogress

m2

119.70

Metal square hollow 40/40 Gypsumboard T.9mm, Merk :Jayaboard, Knauf Metal square Galvanis hollow 40/40 Alumunium composite panel T.4mm, Anti UV,Merk : Maco List plafond profil aluminium U, 1cm

m2 m2 m2

172.50 172.50 70.55

m1

38.77

Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Daun Pintu Kaca Tempered 12mm Kaca polos T.10mm, setara Asahimas Aksesoris Err:509 Err:509

unit

1.00

Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kaca polos T.10mm, setara Asahimas

unit

2.00

Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kaca polos T.10mm, setara Asahimas

unit

2.00

Cat dasar petalux alkali sealer white Cat tembok interior, setara Petalux Cat dasar Attaboy OS Super Primer White

m2

45.33

m2

45.33

RKS & SPESIFIKASI TEKNIS

SATUAN

Cat tembok eksterior, Merk : Attaboy Facade Cat plafond, setara Petalux

m2

172.50

m2

273.28

Alumunium composite panel T.4mm, Anti UV,Merk : Maco

m1 m1 m1 m2

11.50 21.00 36.00 53.60

Pipa Galvanis 2", 'Pipa Galvanis 1,5"

m1

80.00

Tanah Top Soil Rumput Gajah Mini

m3 m3 m2

17.28 55.90 279.48

Sirtu Amparan 2-3 Batu Split 1-2 Paving Block 8cm Natural, Pasir Beton, T.5cm

m2 m3 m3 m3 m2

348.00 87.00 17.40 17.40 348.00

Sirtu Batu Split 2-3 Batu Split 1-2 Abu Batu Batu Andesit

m2 m3 m3 m3 m3 m2

300.42 75.11 15.02 15.02 15.02 310.42

m2 m2 m2

13.37 13.37 13.37

m2 m3 m3 m3 m3 m3 m2

54.60 13.65 2.73 2.73 2.73 5.46 54.60

m2 m3 m3 m2 m3

1,120.00 28.00 28.00 1,120.00 89.60

Metal deck Hi-Tensile G550, Spandeck, 0,45 TCT COLOR BOND, Merk : Flexideck Baut, Aluminium foil single layer serat fiber, Glasswool, Roofmesh Alumunium composite panel T.4mm, Anti UV,Merk : Maco

Bata Merah

Sirtu Batu Split 2-3 Batu Split 1-2 Pasir Urug Camp. 1 PC : 3 Ps + 5 Sp Batu Andesit, Agregat campuran 1:3

Amparan 2-3 Batu Split 1-2 Paving Block 8cm Natural, Pasir Beton, T.5cm

VOLUME

RKS & SPESIFIKASI TEKNIS

SATUAN

VOLUME

GRC Cetak Lampu Tape/Strip LED merk Philips - 31059

unit m2 unit

10.00 36.00 10.00

U-ditch 600x600 Cover U-ditch 600

m3 m3 m3 m1 m1

10.20 1.51 0.76 20.20 20.20

U-ditch 300x300 Cover U-ditch 300

m3 m3 m3 m1 m1

10.57 2.48 1.24 68.00 68.00

JUMLAH PEKERJAAN ARSITE

HARGA SATUAN Rp. 6

JUMLAH HARGA Rp. (5X6)

222,536.50 222,536.50

4,312,757.37 20,555,696.51

295,412.00 278,162.00

26,808,639.00 21,140,312.00

82,307.50 52,827.50 44,426.25 33,129.25

3,730,998.98 3,275,305.00 2,013,841.91 2,054,013.50

953,486.29 12,273.80 12,273.80 465,426.50

314,650.47 977,730.91 531,455.54 3,034,580.78

953,486.29 12,273.80 12,273.80 465,426.50

533,952.32 1,106,483.07 763,675.84 5,222,085.33

335,893.80

40,206,487.86

101,563.00 48,936.80 730,303.48

17,519,617.50 8,441,598.00 51,522,910.16

31,328.00

1,214,586.56

16,524,459.60

16,524,459.60

6,313,956.00

12,627,912.00

6,313,956.00

12,627,912.00

38,704.60

1,754,479.52

48,517.52

2,199,299.03

HARGA SATUAN Rp.

JUMLAH HARGA Rp.

28,867.78

4,979,692.27

335,450.50

91,671,912.64

96,940.80 508,962.30 48,510.00 730,303.48

1,114,819.20 10,688,208.30 1,746,360.00 39,144,266.26

560,130.88

44,810,470.41

48,675.00 221,265.00 36,100.39

841,104.00 12,368,713.50 10,089,337.35

48,675.00 291,637.50 331,433.03 325,080.53 175,567.58

16,938,900.00 25,372,462.50 5,766,934.64 5,656,401.14 61,097,516.54

48,675.00 291,637.50 331,433.03 325,080.53 350,490.53 277,638.75

14,622,943.50 21,904,892.63 4,978,124.04 4,882,709.49 5,264,367.69 86,184,620.78

222,536.50 82,307.50 44,426.25

2,975,313.01 1,100,451.28 593,978.96

48,675.00 291,637.50 331,433.03 325,080.53 236,362.50 734,074.39 301,162.00

2,657,655.00 3,980,851.88 904,812.16 887,469.83 645,269.63 4,008,046.19 16,443,445.20

51,521.53 331,433.03 325,080.53 175,567.58 78,155.00

57,704,108.00 9,280,124.70 9,102,254.70 196,635,685.40 7,002,688.00

HARGA SATUAN Rp. 844,887.75 48,517.52 547,773.75

JUMLAH HARGA Rp. 8,448,877.50 1,746,630.60 5,477,737.50

96,574.50 236,362.50 734,074.39 1,169,575.00 638,409.20

985,059.90 356,907.38 557,896.54 23,625,415.00 12,895,865.84

96,574.50 236,362.50 734,074.39 697,675.00 317,625.00

1,020,792.47 586,179.00 910,252.25 47,441,900.00 21,598,500.00

JUMLAH PEKERJAAN ARSITEKTUR Rp.

1,170,714,365.47

NO 1 V. V.A IV.A.1 1

3

IV.B 1

2

3

3

SATUAN

VOLUME

3

4

5

PEKERJAAN MEKANIKAL ELETRIKAL PLUMBING PEKERJAAN PLUMBING Pekerjaan Instalasi Air Bersih Peralatan Utama 1 Ground Reservoir - Floating valve dia. 20 2

2

RKS & SPESIFIKASI TEKNIS

Pompa Sirkulasi lengkap dengan filter air & accessories - Instalasi daya listrik Pompa Pipa dari Sumber air eksisting ke kolam, PVC dia 20 mm

Instalasi pemipaan Pemipaan air bersih menggunakan PVC kelas AW lengkap fitting dan alat bantunya. dia. 65 mm dia. 40 mm dia. 32 mm dia. 25 mm dia. 22 mm dia. 20 mm Gate valve dia. 40 mm Gate valve dia. 32 mm

HARGA SATUAN Rp. 6

JUMLAH HARGA Rp. (5X6)

bh

2.00

78,795.75

157,591.50

Unit

1.00

2,009,425.00

2,009,425.00

ttk m'

1.00 52.00

370,071.43 48,965.40

370,071.43 2,546,200.80

m' m' m' m' m' m' bh bh

28.00 1.00 2.00 27.00 22.00 43.00 1.00 1.00

59,360.40 53,420.40 50,598.90 50,153.40 48,965.40 48,965.40 331,862.30 247,162.30

1,662,091.20 53,420.40 101,197.80 1,354,141.80 1,077,238.80 2,105,512.20 331,862.30 247,162.30

PEKERJAAN PLUMBING Rp.

12,015,915.53

Pompa Celup Sirkulasi

PVC Kelas AW PVC Kelas AW PVC Kelas AW PVC Kelas AW PVC Kelas AW PVC Kelas AW

PEKERJAAN ELEKTRIKAL Pekerjaan Penerangan dan Stop Kontak Daya - Lampu TL LED 19 Watt, Philips - Lampu Downlight, 14 Watt, Philips - Lampu LED Strip, Philips - Lampu Taman, T.1,2 meter, setara Philips

bh bh bh bh

8.00 3.00 10.00 18.00

102,301.10 90,751.10 547,773.75 447,700.00

818,408.80 272,253.30 5,477,737.50 8,058,600.00

Saklar ( frame & plate ) metal lengkap material bantu - Saklar Ganda - Sensor Photo cell - Stop Kontak

bh bh bh

2.00 3.00 4.00

45,375.00 211,475.00 40,177.50

90,750.00 634,425.00 160,710.00

Titik instalasi penerangan, cable gland, sealant & alat penunjang lainnya - Titik Instalasi penerangan, kabel NYM 3 x 2,5 mm2 - Titik Instalasi penerangan, kabel NYFBGY

m1 m1

11.00 28.00

262,020.00 289,740.00

2,882,220.00 8,112,720.00

Titik instalasi stop kontak daya, cable gland, sealant & alat penunjang lainnya - Titik Instalasi stop kontak standard, NYM 3 x 2,5 mm2

m1

4.00

262,020.00

1,048,080.00

PEKERJAAN ELEKTRIKAL Rp. TOTAL Rp.

27,555,904.60 39,571,820.13

ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN Gambar Shop Drawing dan As Built Drawing NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Shop Drawing

lbr

10.00

150,000.00

As Build Drawing

lbr

50.00

150,000.00

7,500,000.00

JUMLAH TENAGA KERJA

9,000,000.00

B.

BAHAN

C.

PERALATAN

1,500,000.00

JUMLAH HARGA BAHAN JUMLAH HARGA PERALATAN D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

9,000,000.00 900,000.00 9,900,000.00

Photo-photo Progress Kemajuan Pekerjaan NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Photo Progres

B.

BAHAN

C.

PERALATAN

minggu

16.00

150,000.00

2,400,000.00

JUMLAH TENAGA KERJA

2,400,000.00

JUMLAH HARGA BAHAN JUMLAH HARGA PERALATAN D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

2,400,000.00 240,000.00 2,640,000.00

Keamanan Proyek dan Perlindungan pekerjaan NO A

URAIAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

bln

4.00

3,000,000.00

12,000,000.00

JUMLAH TENAGA KERJA

12,000,000.00

BAHAN Pagar Pengaman

C.

SATUAN

TENAGA Satpam (1 orang)

B.

KODE

m

12.00

225,000.00

2,700,000.00

JUMLAH HARGA BAHAN

2,700,000.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

14,700,000.00 1,470,000.00 16,170,000.00

SMK2 (Sistem Manajemen Keselamatan Konstruksi) NO

URAIAN

A

TENAGA

B.

BAHAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

JUMLAH TENAGA KERJA

C.

Safety shoes

psg

40.00

145,000.00

5,800,000.00

Topi Pelindung (Safety Helmet)

bh

40.00

75,000.00

3,000,000.00

Pelindung Mata (Goggles, Spectacles)

bh

40.00

25,000.00

1,000,000.00

Celemek (Apron/Coveralls)

bh

40.00

40,000.00

1,600,000.00

Pelindung Telinga (Ear Plug, Ear Muff)

bh

40.00

50,000.00

2,000,000.00

Pelindung Pernafasan Dan Mulut (Masker)

bh

20.00

5,000.00

100,000.00

Jasa petugas K3

ls

1.00

14,850,000.00

14,850,000.00

JUMLAH HARGA BAHAN

28,350,000.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

28,350,000.00 2,835,000.00 31,185,000.00

Jasa petugas K3 NO

URAIAN

A

TENAGA

B.

BAHAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

JUMLAH TENAGA KERJA Ahli K3

org/bln

Petugas K3

org/bln

-

Petugas Tanggap Darurat

org/bln

-

-

Petugas P3K

org/bln

-

-

Ass Petugas K3/ Safety Man/Pengatur Lalu Lintas (Flagman )

org/bln

-

3.00

4,500,000.00

JUMLAH HARGA BAHAN

C.

13,500,000.00

13,500,000.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

13,500,000.00 1,350,000.00 14,850,000.00

Mobilisasi atau transportasi peralatan dan bahan NO

URAIAN

A

TENAGA

B.

BAHAN

C.

PERALATAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN Biaya mobilisasi dan demobilisasi

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

Ls

1.00

20,000,000.00

20,000,000.00

JUMLAH HARGA PERALATAN

20,000,000.00 20,000,000.00 2,000,000.00 22,000,000.00

ANALISA HARGA SATUAN PEKERJAAN PEMBONGKARAN A.2.2.1.13. Pembongkaran 1 m3 Beton Bertulang NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

2.7000

75,000.00

202,500.00

Mandor

L.04

OH

1.5000

135,000.00

202,500.00

JUMLAH TENAGA KERJA

405,000.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C)

405,000.00

E. Overhead & Profit 15% F.

60,750.00

Harga Satuan Pekerjaan (D+E)

465,750.00

Pembongkaran 1 m2 Kusen NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.3000

75,000.00

22,500.00

Mandor

L.04

OH

0.1500

135,000.00

20,250.00

JUMLAH TENAGA KERJA

42,750.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C) E. Overhead & Profit 15% F.

Harga Satuan Pekerjaan (D+E)

42,750.00 6,412.50 49,162.50

Pembongkaran 1 m2 Atap NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.4500

75,000.00

33,750.00

Mandor

L.04

OH

0.1500

135,000.00

20,250.00

JUMLAH TENAGA KERJA

54,000.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C)

54,000.00

E. Overhead & Profit 15% F.

8,100.00

Harga Satuan Pekerjaan (D+E)

62,100.00

A.2.2.1.14. Pembongkaran 1 m2 Lantai NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

2.7000

75,000.00

202,500.00

Mandor

L.04

OH

1.5000

135,000.00

202,500.00

JUMLAH TENAGA KERJA

405,000.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C) E. Overhead & Profit 15% F.

Harga Satuan Pekerjaan (D+E)

405,000.00 60,750.00 465,750.00

A.2.2.1.14. Pembongkaran 1 m2 Ramp NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.4000

75,000.00

30,000.00

Mandor

L.04

OH

0.1500

135,000.00

20,250.00

JUMLAH TENAGA KERJA

50,250.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C)

50,250.00

E. Overhead & Profit 15% F.

7,537.50

Harga Satuan Pekerjaan (D+E)

57,787.50

A.2.2.1.14. Pembongkaran 1 m2 MEP NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.4000

75,000.00

30,000.00

Mandor

L.04

OH

0.1500

135,000.00

20,250.00

JUMLAH TENAGA KERJA

50,250.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C) E. Overhead & Profit 15% F.

Harga Satuan Pekerjaan (D+E)

50,250.00 7,537.50 57,787.50

A.2.2.1.14. Pembongkaran 1 m2 Tangga NO A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.4000

75,000.00

30,000.00

Mandor

L.04

OH

0.1500

135,000.00

20,250.00

JUMLAH TENAGA KERJA

50,250.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C) E. Overhead & Profit 15% F. Harga Satuan Pekerjaan (D+E)

50,250.00 7,537.50 57,787.50

A.2.2.1.14. Pembongkaran 1 m2 Kolam NO A

URAIAN TENAGA Pekerja Mandor

KODE

SATUAN

L.01 L.04

OH OH

KOEFISIEN

HARGA SATUAN (Rp)

0.8000 75,000.00 0.3000 135,000.00 JUMLAH TENAGA KERJA

JUMLAH HARGA (Rp) 60,000.00 40,500.00 100,500.00

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C) E. Overhead & Profit 15% F. Harga Satuan Pekerjaan (D+E)

100,500.00 15,075.00 115,575.00

Pembongkaran Area Parkir ( Paving Block) NO A

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

KOEFISIEN

HARGA SATUAN (Rp)

0.2500 75,000.00 0.2500 100,000.00 0.0250 120,000.00 0.0007 135,000.00 JUMLAH TENAGA KERJA

JUMLAH HARGA (Rp) 18,750.00 25,000.00 3,000.00 87.75 46,837.75

B. BAHAN JUMLAH HARGA BAHAN C. PERALATAN JUMLAH HARGA PERALATAN D. Jumlah (A+B+C) E. Overhead & Profit 10% F. Harga Satuan Pekerjaan (D+E)

46,837.75 4,683.78 51,521.53

ANALISA HARGA SATUAN PEKERJAAN STRUKTUR A.2.2.1.4. Pengukuran dan pemasangan 1 m1 Bouwplank NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.100

Tukang Kayu

L.02

OH

0.100

Kepala Tukang

L.03

OH

0.010

Mandor

L.04

OH

0.005

TENAGA

JUMLAH TE B.

BAHAN Balok Kayu Kelas IV

m3

0.012

Paku Biasa 2" - 3"

kg

0.020

Kayu Papan Kelas IV

m3

0.007

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.2.3.1.1. Penggalian 1 m3 Tanah Biasa Sedalam 1m NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

1.050

Mandor

L.04

OH

0.067

TENAGA

JUMLAH TE B.

BAHAN

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.2.3.1.8. Pembuangan 1 m3 Tanah Sejauh 30 meter NO A

URAIAN TENAGA

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.3300

Mandor

L.04

OH

0.0100

JUMLAH TE B.

BAHAN

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.2.3.1.9. Pengurugan Kembali 1 m3 Galian Tanah NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.500

Mandor

L.04

OH

0.050

TENAGA

JUMLAH TE B.

BAHAN

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1 m1 Galian Bore pile NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.480

Mandor

L.04

OH

0.320

TENAGA

JUMLAH TE B.

BAHAN Mesin Bore tanah dan peralatan utama lainnya

jam

0.220

Operator alat berat

OH

0.360

JUMLAH H C.

PERALATAN Alat Bantu

lot

0.200

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.2.3.1.11. Pengurugan 1 m3 Dengan Pasir Urug NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.500

Mandor

L.04

OH

0.025

TENAGA

JUMLAH TE B.

BAHAN Pasir Urug

m3

1.200

JUMLAH H

C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.4. Membuat 1 m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa Slump (3-6)cm, w/c = 0,87 NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

1.200

Tukang Batu

L.02

OH

0.200

Kepala Tukang

L.03

OH

0.020

Mandor

L.04

OH

0.060

TENAGA

JUMLAH TE B.

BAHAN Semen Portland

kg

230.000

Pasir Beton

kg

893.000

Kerikil (Maks 30mm)

kg

1,027.000

Air

ltr

200.000

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

Membuat 1 m3 Beton Mutu f'c = 21,40 Mpa (K-250) NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

1.650

Tukang Batu

L.02

OH

0.275

Kepala Tukang

L.03

OH

0.028

Mandor

L.04

OH

0.083

TENAGA

JUMLAH TE B.

BAHAN Semen Portland

kg

384.000

Pasir Beton

kg

692.000

Kerikil (Maks 30mm)

kg

1,039.000

Air

ltr

215.000

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.3.2.1.9. Pemasangan 1 m3 Batu Kosong (Aanstamping) NO

URAIAN

KODE

SATUAN

KOEFISIEN

NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.7800

Tukang Batu

L.02

OH

0.3900

Kepala Tukang

L.03

OH

0.0390

Mandor

L.04

OH

0.0390

TENAGA

JUMLAH TE B.

BAHAN Batu Belah

m3

1.2000

Pasir Urug

m3

0.4320

JUMLAH H

C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.3.2.1.3. Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 3PP NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

1.500

Tukang Batu

L.02

OH

0.750

Kepala Tukang

L.03

OH

0.075

Mandor

L.04

OH

0.075

TENAGA

JUMLAH TE B.

BAHAN Batu Belah

m3

1.200

Semen Portland

kg

202.000

Pasir Pasang

m3

0.485

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.17. Pembesian 1 kg dengan Besi Polos NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.007

Tukang besi

L.02

OH

0.007

Kepala Tukang

L.03

OH

0.001

Mandor

L.04

OH

0.000

TENAGA

JUMLAH TE B.

BAHAN Besi Beton Polos

kg

1.050

Kawat Beton

kg

0.015

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.17. Pembesian 1 kg dengan Besi Ulir NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.007

Tukang besi

L.02

OH

0.007

Kepala Tukang

L.03

OH

0.001

Mandor

L.04

OH

0.000

TENAGA

JUMLAH TE

B.

BAHAN Besi Beton Ulir

kg

1.050

Kawat Beton

kg

0.015

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.19. Pemasangan 1 kg Jaring Kawat Baja (Wiremesh) NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.015

Tukang besi

L.02

OH

0.0015

Kepala Tukang

L.03

OH

0.0015

Mandor

L.04

OH

0.0001

TENAGA

JUMLAH TE B.

BAHAN Jaring Kawat Baja Dilas

kg

1.020

Kawat Beton

kg

0.005

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.20. Pemasangan 1 m2 Bekisting Untuk Pondasi NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.520

Tukang kayu

L.02

OH

0.260

Kepala Tukang

L.03

OH

0.026

Mandor

L.04

OH

0.026

TENAGA

JUMLAH TE B.

BAHAN Kayu Kelas III

m3

0.040

Paku 5-10cm

kg

0.300

Minyak Bekisting

ltr

0.100

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.21. Pemasangan 1 m2 Bekisting Untuk Sloof NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.520

Tukang kayu

L.02

OH

0.260

Kepala Tukang

L.03

OH

0.026

Mandor

L.04

OH

0.026

TENAGA

JUMLAH TE B.

BAHAN Kayu Kelas III

m3

0.045

Paku 5-10cm

kg

0.300

Minyak Bekisting

ltr

0.100

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.22. Pemasangan 1 m2 Bekisting Untuk Kolom NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.660

Tukang kayu

L.02

OH

0.330

Kepala Tukang

L.03

OH

0.033

Mandor

L.04

OH

0.033

TENAGA

JUMLAH TE B.

BAHAN Kayu Kelas III

m3

0.040

Paku 5-10cm

kg

0.400

Minyak Bekisting

ltr

0.200

Balok Kayu Kelas III

m3

0.008

Plywood tebal 9mm

lbr

0.350

JUMLAH H C.

PERALATAN Sewa Main Frame

bh

2.400

Sewa Joint Pin

bh

2.400

Sewa Cross Brase

bh

2.400

Sewa Head Jack

bh

2.400

Sewa Base Jack

bh

2.400

Sewa PIpa Support + Accesories

bh

1.000

JUMLAH HARGA

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.22. Pemasangan 1 m2 Bekisting Untuk Kolom Praktis NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.660

Tukang kayu

L.02

OH

0.330

Kepala Tukang

L.03

OH

0.033

Mandor

L.04

OH

0.033

TENAGA

JUMLAH TE

B.

BAHAN Kayu Papan Albasiah

m3

0.040

Paku 5-10cm

kg

0.400

Minyak Bekisting

ltr

0.200

Balok Kayu Albasiah

m3

0.008

Plywood tebal 9mm

lbr

0.350

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.23. Pemasangan 1 m2 Bekisting Untuk Balok NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.660

Tukang kayu

L.02

OH

0.330

Kepala Tukang

L.03

OH

0.033

Mandor

L.04

OH

0.033

TENAGA

JUMLAH TE B.

BAHAN Kayu Kelas III

m3

0.040

Paku 5-10cm

kg

0.400

Minyak Bekisting

ltr

0.200

Balok Kayu Kelas III

m3

0.009

Plywood tebal 9mm

lbr

0.350

JUMLAH H C.

PERALATAN Sewa Main Frame

bh

2.400

Sewa Joint Pin

bh

2.400

Sewa Cross Brase

bh

2.400

Sewa Head Jack

bh

2.400

Sewa Base Jack

bh

2.400

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.23. Pemasangan 1 m2 Bekisting Untuk Balok Praktis NO A

URAIAN TENAGA

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.660

Tukang kayu

L.02

OH

0.330

Kepala Tukang

L.03

OH

0.033

Mandor

L.04

OH

0.033

JUMLAH TE B.

BAHAN Kayu Papan Albasiah

m3

0.040

Paku 5-10cm

kg

0.400

Minyak Bekisting

ltr

0.200

Balok Kayu Albasiah

m3

0.009

Plywood tebal 9mm

lbr

0.350

JUMLAH H

C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.24. Pemasangan 1 m2 Bekisting Untuk Lantai NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.660

Tukang kayu

L.02

OH

0.330

Kepala Tukang

L.03

OH

0.033

Mandor

L.04

OH

0.033

TENAGA

JUMLAH TE B.

BAHAN Kayu Kelas III

m3

0.040

Paku 5-10cm

kg

0.400

Minyak Bekisting

ltr

0.200

Balok Kayu Kelas III

m3

0.008

Plywood tebal 9mm

lbr

0.350

JUMLAH H C.

PERALATAN Sewa Main Frame

bh

2.400

Sewa Joint Pin

bh

2.400

Sewa Cross Brase

bh

2.400

Sewa Head Jack

bh

2.400

Sewa Base Jack

bh

2.400

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.25. Pemasangan 1 m2 Bekisting Untuk Dinding NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.6600

Tukang kayu

L.02

OH

0.3300

Kepala Tukang

L.03

OH

0.0330

Mandor

L.04

OH

0.0330

TENAGA

JUMLAH TE B.

BAHAN Kayu Kelas III

m3

0.0300

Paku 5-10cm

kg

0.4000

Minyak Bekisting

ltr

0.2000

Balok Kayu Kelas III

m3

0.0200

Plywood tebal 9mm

lbr

0.3500

Penjaga Jarak Bekisting/Spacer

bh

4.0000

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.26. Pemasangan 1 m2 Bekisting Untuk Tangga NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.6600

Tukang kayu

L.02

OH

0.3300

Kepala Tukang

L.03

OH

0.0330

Mandor

L.04

OH

0.0330

TENAGA

JUMLAH TE B.

BAHAN Kayu Kelas III

m3

0.0300

Paku 5-10cm

kg

0.4000

Minyak Bekisting

ltr

0.1500

Balok Kayu Kelas III

m3

0.0150

Plywood tebal 9mm

lbr

0.3500

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Bekisting Batako NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.322

Tukang kayu

L.02

OH

0.181

Kepala Tukang

L.03

OH

0.016

Mandor

L.04

OH

0.008

TENAGA

JUMLAH TE B.

BAHAN Batako

bh

13.000

Semen PC 50kg

zak

0.041

Pasir pasang

m3

0.012

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1 kg Pekerjaan baja Profil NO

URAIAN

KODE

SATUAN

KOEFISIEN

NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.060

Tukang besi profil

L.02

OH

0.060

Kepala Tukang

L.03

OH

0.006

Mandor

L.04

OH

0.003

TENAGA

JUMLAH TE B.

BAHAN Baja Profil, setara DN

kg

1.150

JUMLAH H

C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

A.4.1.1.14. Pemasangan 1 m1 PVC Waterstop Lebar 150mm NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.0600

Tukang

L.02

OH

0.0300

Kepala Tukang

L.03

OH

0.0030

Mandor

L.04

OH

0.0030

TENAGA

JUMLAH TE B.

BAHAN Waterstop Lebar 150 mm

m1

1.0500

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1 m2 Bondeck NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.013

Tukang besi profil

L.02

OH

0.008

Kepala tukang

L.03

OH

0.005

Mandor

L.04

OH

0.003

TENAGA

JUMLAH TE B.

BAHAN Bondeck, tipe : Floor Deck T.1mm, Lapis lindung : Dip Hot Galvanized

m2

1.050

JUMLAH H C.

PERALATAN Peralatan Bantu

lot

0.020

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m3 Galian Strauss Pile

NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.4800

Mandor

L.04

OH

0.3200

TENAGA

JUMLAH TE B.

BAHAN

JUMLAH H

C.

PERALATAN Mesin Bore tanah dan peralatan utama lainnya

Jam

0.2200

Bensin/Solar

ltr

2.0000

Operator

OH

0.3600

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

Pengerjaan 1 kg Pekerjaan Base Plat NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.0600

Tukang Besi

L.02

OH

0.0600

Kepala Tukang

L.03

OH

0.0060

Mandor

L.04

OH

0.0030

TENAGA

JUMLAH TE B.

BAHAN Baja Profil, Setara DN

kg

1.1500

JUMLAH H C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1 m3 Galian Struktur dengan Kedalaman 2-4 meter NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

0.4800

Mandor

L.04

OH

0.0464

TENAGA

JUMLAH TE B.

BAHAN

JUMLAH H C.

PERALATAN Excavator

Jam

0.0058

Bulldozer

Jam

0.0145

Alat Bantu

Ls

1.0000

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1 m3 Galian Struktur dengan Kedalaman 3 meter NO A

URAIAN

KODE

SATUAN

KOEFISIEN

Pekerja

L.01

OH

1.0500

Mandor

L.04

OH

0.0670

TENAGA

JUMLAH TE B.

BAHAN

JUMLAH H

C.

PERALATAN

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1 M3 Pekerjaan Angkutan Material Sisa Galian Sejauh 10 Km (Dengan Dump Truck) NO A

URAIAN

KODE

SATUAN

KOEFISIEN

TENAGA

JUMLAH TE B.

BAHAN

JUMLAH H C.

PERALATAN Swa Dump Truck 3-5 m3

Unit/Jam

0.4060

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1 M1 Pemasangan Pipa PVC ø8" NO A

URAIAN

KODE

SATUAN

KOEFISIEN

TENAGA Ongkos Pasang

Ls

1.0000

JUMLAH TE B.

BAHAN Pipa PVC 8"

Batang

0.2500

JUMLAH H C.

PERALATAN Alat dan Material Bantu

Ls

1.0000

JUMLAH HARGA D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Rollag Bata NO A

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

KOEFISIEN

0.1200 0.4000 0.0400 0.0600

JUMLAH TE B.

C.

BAHAN Bata Merah Semen Portland Pasir Pasang

bh kg m3

140.0000 32.9500 0.0910 JUMLAH H

PERALATAN

JUMLAH HARGA D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

ISA HARGA SATUAN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

7,500.00

100,000.00

10,000.00

120,000.00

1,200.00

135,000.00

675.00

JUMLAH TENAGA KERJA

19,375.00

2,300,000.00

27,600.00

23,000.00

460.00

2,300,000.00

16,100.00

JUMLAH HARGA BAHAN

44,160.00

JUMLAH HARGA PERALATAN 63,535.00 6,353.50 69,888.50

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

78,750.00

135,000.00

9,045.00

JUMLAH TENAGA KERJA

87,795.00

JUMLAH HARGA BAHAN JUMLAH HARGA PERALATAN 87,795.00 8,779.50 96,574.50

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

24,750.00

135,000.00

1,350.00

JUMLAH TENAGA KERJA

26,100.00

JUMLAH HARGA BAHAN JUMLAH HARGA PERALATAN 26,100.00 2,610.00 28,710.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

37,500.00

135,000.00

6,750.00

JUMLAH TENAGA KERJA

44,250.00

JUMLAH HARGA BAHAN JUMLAH HARGA PERALATAN 44,250.00 4,425.00 48,675.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

36,000.00

135,000.00

43,200.00

JUMLAH TENAGA KERJA

79,200.00

110,000.00

24,200.00

135,000.00

48,600.00

JUMLAH HARGA BAHAN

72,800.00

152,000.00

30,400.00

JUMLAH HARGA PERALATAN

30,400.00 182,400.00 18,240.00 200,640.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

37,500.00

135,000.00

3,375.00

JUMLAH TENAGA KERJA

40,875.00

145,000.00

174,000.00

JUMLAH HARGA BAHAN

174,000.00

JUMLAH HARGA PERALATAN 214,875.00 21,487.50 236,362.50

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

90,000.00

100,000.00

20,000.00

120,000.00

2,400.00

135,000.00

8,100.00

JUMLAH TENAGA KERJA

120,500.00

1,160.00

266,800.00

132.50

118,322.50

153.57

157,717.86

20.00

4,000.00

JUMLAH HARGA BAHAN

546,840.36

JUMLAH HARGA PERALATAN 667,340.36 66,734.04 734,074.39

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

123,750.00

100,000.00

27,500.00

120,000.00

3,360.00

135,000.00

11,205.00

JUMLAH TENAGA KERJA

165,815.00

1,160.00

445,440.00

132.50

91,690.00

153.57

159,560.71

20.00

4,300.00

JUMLAH HARGA BAHAN

700,990.71

JUMLAH HARGA PERALATAN 866,805.71 86,680.57 953,486.29

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

58,500.00

100,000.00

39,000.00

120,000.00

4,680.00

135,000.00

5,265.00

JUMLAH TENAGA KERJA

107,445.00

180,000.00

216,000.00

145,000.00

62,640.00

JUMLAH HARGA BAHAN

278,640.00

JUMLAH HARGA PERALATAN 386,085.00 38,608.50 424,693.50

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

112,500.00

100,000.00

75,000.00

120,000.00

9,000.00

135,000.00

10,125.00

JUMLAH TENAGA KERJA

206,625.00

180,000.00

216,000.00

1,160.00

234,320.00

195,000.00

94,575.00

JUMLAH HARGA BAHAN

544,895.00

JUMLAH HARGA PERALATAN 751,520.00 75,152.00 826,672.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

525.00

100,000.00

700.00

120,000.00

84.00

135,000.00

54.00

JUMLAH TENAGA KERJA

1,363.00

9,000.00

9,450.00

23,000.00

345.00

JUMLAH HARGA BAHAN

9,795.00

JUMLAH HARGA PERALATAN 11,158.00

1,115.80 12,273.80

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

525.00

100,000.00

700.00

120,000.00

84.00

135,000.00

54.00

JUMLAH TENAGA KERJA

1,363.00

9,100.00

9,555.00

23,000.00

345.00

JUMLAH HARGA BAHAN

9,900.00

JUMLAH HARGA PERALATAN 11,263.00 1,126.30 12,389.30

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

1,125.00

100,000.00

150.00

120,000.00

180.00

135,000.00

13.50

JUMLAH TENAGA KERJA

1,468.50

7,800.00

7,956.00

23,000.00

115.00

JUMLAH HARGA BAHAN

8,071.00

JUMLAH HARGA PERALATAN 9,539.50 953.95 10,493.45

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

39,000.00

100,000.00

26,000.00

120,000.00

3,120.00

135,000.00

3,510.00

JUMLAH TENAGA KERJA

71,630.00

3,350,000.00

134,000.00

22,000.00

6,600.00

12,000.00

1,200.00

JUMLAH HARGA BAHAN

141,800.00

JUMLAH HARGA PERALATAN 213,430.00 21,343.00 234,773.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

39,000.00

100,000.00

26,000.00

120,000.00

3,120.00

135,000.00

3,510.00

JUMLAH TENAGA KERJA

71,630.00

3,350,000.00

150,750.00

22,000.00

6,600.00

12,000.00

1,200.00

JUMLAH HARGA BAHAN

158,550.00

JUMLAH HARGA PERALATAN 230,180.00 23,018.00 253,198.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

49,500.00

100,000.00

33,000.00

120,000.00

3,960.00

135,000.00

4,455.00

JUMLAH TENAGA KERJA

90,915.00

3,350,000.00

134,000.00

22,000.00

8,800.00

12,000.00

2,400.00

3,350,000.00

25,125.00

102,500.00

35,875.00

JUMLAH HARGA BAHAN

206,200.00

10,000.00

24,000.00

10,000.00

24,000.00

12,000.00

28,800.00

7,500.00

18,000.00

8,000.00

19,200.00

12,000.00

12,000.00

JUMLAH HARGA PERALATAN

126,000.00

423,115.00 42,311.50 465,426.50

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

49,500.00

100,000.00

33,000.00

120,000.00

3,960.00

135,000.00

4,455.00

JUMLAH TENAGA KERJA

90,915.00

2,600,000.00

104,000.00

22,000.00

8,800.00

12,000.00

2,400.00

2,600,000.00

19,500.00

102,500.00

35,875.00

JUMLAH HARGA BAHAN

170,575.00

JUMLAH HARGA PERALATAN

261,490.00 26,149.00 287,639.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

49,500.00

100,000.00

33,000.00

120,000.00

3,960.00

135,000.00

4,455.00

JUMLAH TENAGA KERJA

90,915.00

3,350,000.00

134,000.00

22,000.00

8,800.00

12,000.00

2,400.00

3,350,000.00

30,150.00

102,500.00

35,875.00

JUMLAH HARGA BAHAN

211,225.00

10,000.00

24,000.00

10,000.00

24,000.00

12,000.00

28,800.00

7,500.00

18,000.00

8,000.00

19,200.00

JUMLAH HARGA PERALATAN

114,000.00 416,140.00 41,614.00 457,754.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

49,500.00

100,000.00

33,000.00

120,000.00

3,960.00

135,000.00

4,455.00

JUMLAH TENAGA KERJA

90,915.00

2,600,000.00

104,000.00

22,000.00

8,800.00

12,000.00

2,400.00

2,600,000.00

23,400.00

102,500.00

35,875.00

JUMLAH HARGA BAHAN

174,475.00

JUMLAH HARGA PERALATAN

265,390.00 26,539.00 291,929.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

49,500.00

100,000.00

33,000.00

120,000.00

3,960.00

135,000.00

4,455.00

JUMLAH TENAGA KERJA

90,915.00

3,350,000.00

134,000.00

22,000.00

8,800.00

12,000.00

2,400.00

3,350,000.00

25,125.00

102,500.00

35,875.00

JUMLAH HARGA BAHAN

206,200.00

10,000.00

24,000.00

10,000.00

24,000.00

12,000.00

28,800.00

7,500.00

18,000.00

8,000.00

19,200.00

JUMLAH HARGA PERALATAN

114,000.00 411,115.00 41,111.50 452,226.50

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

49,500.00

100,000.00

33,000.00

120,000.00

3,960.00

135,000.00

4,455.00

JUMLAH TENAGA KERJA

90,915.00

3,350,000.00

100,500.00

22,000.00

8,800.00

12,000.00

2,400.00

3,350,000.00

67,000.00

102,500.00

35,875.00

2,000.00

8,000.00

JUMLAH HARGA BAHAN

222,575.00

JUMLAH HARGA PERALATAN 313,490.00 31,349.00 344,839.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

49,500.00

100,000.00

33,000.00

120,000.00

3,960.00

135,000.00

4,455.00

JUMLAH TENAGA KERJA

90,915.00

3,350,000.00

100,500.00

22,000.00

8,800.00

12,000.00

1,800.00

3,350,000.00

50,250.00

102,500.00

35,875.00

JUMLAH HARGA BAHAN

197,225.00

JUMLAH HARGA PERALATAN 288,140.00 28,814.00 316,954.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

24,135.00

100,000.00

18,050.00

120,000.00

1,896.00

135,000.00

1,120.50

JUMLAH TENAGA KERJA

45,201.50

3,300.00

42,900.00

58,000.00

2,405.84

195,000.00

2,262.00

JUMLAH HARGA BAHAN

47,567.84

JUMLAH HARGA PERALATAN 92,769.34 9,276.93 102,046.27

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

4,500.00

100,000.00

6,000.00

120,000.00

720.00

135,000.00

405.00

JUMLAH TENAGA KERJA

11,625.00

8,300.00

9,545.00

JUMLAH HARGA BAHAN

9,545.00

JUMLAH HARGA PERALATAN 21,170.00 2,117.00 23,287.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

4,500.00

100,000.00

3,000.00

120,000.00

360.00

135,000.00

405.00

JUMLAH TENAGA KERJA

8,265.00

16,500.00

17,325.00

JUMLAH HARGA BAHAN

17,325.00

JUMLAH HARGA PERALATAN 25,590.00 2,559.00 28,149.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

937.50

100,000.00

750.00

120,000.00

600.00

135,000.00

337.50

JUMLAH TENAGA KERJA

2,625.00

145,000.00

152,250.00

JUMLAH HARGA BAHAN

152,250.00

154,875.00

3,097.50

JUMLAH HARGA PERALATAN

3,097.50 157,972.50 15,797.25 173,769.75

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

36,000.00

135,000.00

43,200.00

JUMLAH TENAGA KERJA

79,200.00

JUMLAH HARGA BAHAN

110,000.00

24,200.00

11,000.00

22,000.00

135,000.00

48,600.00

JUMLAH HARGA PERALATAN

94,800.00 174,000.00 17,400.00 191,400.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

4,500.00

100,000.00

6,000.00

120,000.00

720.00

135,000.00

405.00

JUMLAH TENAGA KERJA

11,625.00

8,300.00

9,545.00

JUMLAH HARGA BAHAN

9,545.00

JUMLAH HARGA PERALATAN

21,170.00 2,117.00 23,287.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

36,000.00

135,000.00

6,264.00

JUMLAH TENAGA KERJA

42,264.00

JUMLAH HARGA BAHAN 383,294.39

2,223.11

402,799.43

5,841.40

2,000.00

2,000.00

JUMLAH HARGA PERALATAN

10,064.50 52,328.50 5,232.85

57,561.36

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

75,000.00

78,750.00

135,000.00

9,045.00

JUMLAH TENAGA KERJA

87,795.00

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN 87,795.00 8,779.50 96,574.50

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN 175,000.00

71,050.00

JUMLAH HARGA PERALATAN

71,050.00 71,050.00 7,105.00 78,155.00

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

46,500.00

46,500.00

JUMLAH TENAGA KERJA

46,500.00

310,000.00

77,500.00

JUMLAH HARGA BAHAN

77,500.00

3,875.00

3,875.00

JUMLAH HARGA PERALATAN

3,875.00 127,875.00 12,787.50 140,662.50

HARGA SATUAN (Rp) 75,000.00 100,000.00 120,000.00 135,000.00

JUMLAH HARGA (Rp) 9,000.00 40,000.00 4,800.00 8,100.00

JUMLAH TENAGA KERJA

61,900.00

400.00 1,160.00 195,000.00 JUMLAH HARGA BAHAN

56,000.00 38,222.00 17,745.00 111,967.00

JUMLAH HARGA PERALATAN 173,867.00 17,386.70 191,253.70

ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR A.4.4.1.1. Pemasangan 1 m2 Dinding Bata Merah (5x11x12)cm Tebal 1 Batu Campuran 1SP:2PP NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.6000 75,000.00 0.2000 100,000.00 0.0200 120,000.00 0.0300 135,000.00 JUMLAH TENAGA KERJA

45,000.00 20,000.00 2,400.00 4,050.00 71,450.00

bh kg m3

140.0000 400.00 43.5000 1,160.00 0.0800 195,000.00 JUMLAH HARGA BAHAN

56,000.00 50,460.00 15,600.00 122,060.00

BAHAN Bata Merah Semen Portland Pasir Pasang

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 15%

F.

Harga Satuan Pekerjaan (D+E)

193,510.00 29,026.50 222,536.50

A.4.4.2.5. Pemasangan 1 m2 plesteran tebal 15mm NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.3000 75,000.00 0.1500 100,000.00 0.0150 120,000.00 0.0150 135,000.00 JUMLAH TENAGA KERJA

22,500.00 15,000.00 1,800.00 2,025.00 41,325.00

kg

10.0000 3,350.00 JUMLAH HARGA BAHAN

33,500.00 33,500.00

BAHAN MU Plester (50kg)

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

74,825.00 7,482.50 82,307.50

Pemasangan 1 m1 plesteran tebal 15mm NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.3000 75,000.00 0.1500 100,000.00 0.0150 120,000.00 0.0150 135,000.00 JUMLAH TENAGA KERJA

22,500.00 15,000.00 1,800.00 2,025.00 41,325.00

kg

2.0000 3,350.00 JUMLAH HARGA BAHAN

6,700.00 6,700.00

BAHAN MU Plester (50kg)

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

48,025.00 4,802.50 52,827.50

A.4.4.2.27. Pemasangan 1 m2 acian NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN MU Acian (40kg)

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.2000 75,000.00 0.1000 100,000.00 0.0100 120,000.00 0.0100 135,000.00 JUMLAH TENAGA KERJA

15,000.00 10,000.00 1,200.00 1,350.00 27,550.00

kg

3.2500 3,950.00 JUMLAH HARGA BAHAN

12,837.50 12,837.50

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

40,387.50 4,038.75 44,426.25

Pemasangan 1 m1 acian NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN MU Acian (40kg)

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.2000 75,000.00 0.1000 100,000.00 0.0100 120,000.00 0.0100 135,000.00 JUMLAH TENAGA KERJA

15,000.00 10,000.00 1,200.00 1,350.00 27,550.00

kg

0.6500 3,950.00 JUMLAH HARGA BAHAN

2,567.50 2,567.50

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

30,117.50 3,011.75 33,129.25

Pemasangan 1 m2 dinding batu Gamping NO

A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.70

75,000.00

52,500.00

Tukang Batu

L.02

OH

0.35

100,000.00

35,000.00

Kepala Tukang

L.03

OH

0.04

120,000.00

4,200.00

Mandor

L.04

OH

0.04

135,000.00

4,725.00

JUMLAH TENAGA K B.

C.

96,425.00

BAHAN Batu Gamping

m2

1.000

140,000.00

140,000.00

Semen Portland

kg

11.75

1,160.00

13,630.00

Pasir Pasang

m3

0.04

195,000.00

6,825.00

JUMLAH HARGA B

160,455.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 15%

F.

Harga Satuan Pekerjaan (D+E)

256,880.00 38,532.00 295,412.00

Pemasangan 1 m2 dinding batu templek NO

A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.70

75,000.00

52,500.00

Tukang Batu

L.02

OH

0.35

100,000.00

35,000.00

Kepala Tukang

L.03

OH

0.04

120,000.00

4,200.00

Mandor

L.04

OH

0.04

135,000.00

4,725.00

JUMLAH TENAGA K B.

C.

96,425.00

BAHAN Batu templek

m2

1.000

125,000.00

125,000.00

Semen Portland

kg

11.75

1,160.00

13,630.00

Pasir Pasang

m3

0.04

195,000.00

6,825.00

JUMLAH HARGA B

145,455.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 15%

F.

Harga Satuan Pekerjaan (D+E)

241,880.00 36,282.00 278,162.00

A.4.5.1.10. Pemasangan 1 m2 rangka langit-langit 1200x600 NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Metal square hollow 40/40 Acssesoris (Perkuatan,Las,dll)

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.1400 75,000.00 0.1400 100,000.00 0.0140 120,000.00 0.0140 135,000.00 JUMLAH TENAGA KERJA

10,500.00 14,000.00 1,680.00 1,890.00 28,070.00

m1 ls

4.0000 15,300.00 1.0000 3,060.00 JUMLAH HARGA BAHAN

61,200.00 3,060.00 64,260.00

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

92,330.00 9,233.00 101,563.00

A.4.5.1.7. Pemasangan 1 m2 Langit - langit gypsum board ukuran (120x240x9) mm, tebal 9mm NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.1000 75,000.00 0.0500 100,000.00 0.0050 120,000.00 0.0050 135,000.00 JUMLAH TENAGA KERJA

7,500.00 5,000.00 600.00 675.00 13,775.00

lbr kg kg

0.3640 67,000.00 0.1100 35,000.00 0.5500 4,500.00 JUMLAH HARGA BAHAN

24,388.00 3,850.00 2,475.00 30,713.00

BAHAN Gypsumboard T.9mm, Merk :Jayaboard, Knauf Sekrup Compound

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

44,488.00 4,448.80 48,936.80

A.4.5.1.9. Pemasangan 1 m1 List langit-langit NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.0500 75,000.00 0.0500 100,000.00 0.0050 120,000.00 0.0030 135,000.00 JUMLAH TENAGA KERJA

3,750.00 5,000.00 600.00 405.00 9,755.00

m1 kg

1.0500 17,500.00 0.0100 35,000.00 JUMLAH HARGA BAHAN

18,375.00 350.00 18,725.00

BAHAN List plafond profil aluminium U, 1cm Sekrup

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

28,480.00 2,848.00 31,328.00

Pemasangan 1 m2 Dinding keramik ukuran 150mm x 600mm ex. Roman NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Keramik, uk. 150x600, ex. Roman Drymix TA water repellent (40kg) Semen Warna

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.7000 75,000.00 0.3500 100,000.00 0.0350 120,000.00 0.0350 135,000.00 JUMLAH TENAGA KERJA

52,500.00 35,000.00 4,200.00 4,725.00 96,425.00

m2 zak kg

1.0500 72,000.00 0.1250 85,000.00 0.5000 6,500.00 JUMLAH HARGA BAHAN

75,600.00 10,625.00 3,250.00 89,475.00

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

185,900.00 18,590.00 204,490.00

Pemasangan 1 m2 lantai Homogenous Tile ukuran 800mm x 800mm ex. Indogress NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.2500 75,000.00 0.1250 100,000.00 0.0130 120,000.00 0.0130 135,000.00 JUMLAH TENAGA KERJA

18,750.00 12,500.00 1,560.00 1,755.00 34,565.00

m2 kg kg m3

1.0500 235,000.00 9.8000 1,160.00 0.6000 6,500.00 0.0450 195,000.00 JUMLAH HARGA BAHAN

246,750.00 11,368.00 3,900.00 8,775.00 270,793.00

BAHAN Homogeneous Tile 800x800, ex. Indogress Semen Portland Semen warna Pasir Pasang

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

305,358.00 30,535.80 335,893.80

A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis cat dasar, 2 lapis cat penutup) interior NO A

B.

C.

URAIAN TENAGA pekerja tukang cat kepala tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.0200 75,000.00 0.0630 100,000.00 0.0063 120,000.00 0.0030 135,000.00 JUMLAH TENAGA KERJA

1,500.00 6,300.00 756.00 405.00 8,961.00

ltr pail pail bh lot lbr

0.1000 25,000.00 0.0083 1,050,000.00 0.0125 55,000.00 0.0100 55,000.00 1.0000 12,487.50 0.2500 5,000.00 JUMLAH HARGA BAHAN

2,500.00 8,750.00 687.50 550.00 12,487.50 1,250.00 26,225.00

BAHAN Thinner OS 2000 Cat dasar petalux alkali sealer white Cat tembok interior, setara Petalux Rol cat Steger werk Ampelas tembok

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

35,186.00 3,518.60 38,704.60

A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis cat dasar, 2 lapis cat penutup) eksterior NO A

B.

C.

URAIAN TENAGA pekerja tukang cat kepala tukang Mandor BAHAN Thinner OS 2000 Cat dasar Attaboy OS Super Primer White Cat tembok eksterior, Merk : Attaboy Facade Rol cat Steger werk Ampelas tembok

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.0200 75,000.00 0.0630 100,000.00 0.0063 120,000.00 0.0030 135,000.00 JUMLAH TENAGA KERJA

1,500.00 6,300.00 756.00 405.00 8,961.00

ltr pail pail bh lot lbr

0.1000 25,000.00 0.0083 1,550,000.00 0.0125 78,500.00 0.0100 55,000.00 1.0000 16,947.92 0.2500 5,000.00 JUMLAH HARGA BAHAN

2,500.00 12,916.67 981.25 550.00 16,947.92 1,250.00 35,145.83

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

44,106.83 4,410.68 48,517.52

1 m2 Pengecatan plafond NO A

B.

C.

URAIAN TENAGA pekerja tukang cat kepala tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.1000 75,000.00 0.1500 100,000.00 0.0150 120,000.00 0.0050 135,000.00 JUMLAH TENAGA KERJA

7,500.00 15,000.00 1,800.00 675.00 24,975.00

pail bh lot

0.0125 55,000.00 0.0100 55,000.00 0.0250 1,237.50 JUMLAH HARGA BAHAN

687.50 550.00 30.94 1,268.44

BAHAN Cat plafond, setara Petalux Rol cat Steger werk

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

26,243.44 2,624.34 28,867.78

1 m2 Pengecatan Besi cat Duco NO A

B.

C.

URAIAN TENAGA Pekerja Tukang cat Kepala Tukang Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.1300 75,000.00 0.2000 100,000.00 0.0200 120,000.00 0.0100 135,000.00 JUMLAH TENAGA KERJA

9,750.00 20,000.00 2,400.00 1,350.00 33,500.00

ltr ltr ltr ltr ltr lbr bh

0.1670 140,000.00 0.2000 135,000.00 0.1000 65,000.00 0.1000 24,000.00 0.1000 20,500.00 0.4000 7,000.00 0.0500 20,000.00 JUMLAH HARGA BAHAN

23,380.00 27,000.00 6,500.00 2,400.00 2,050.00 2,800.00 1,000.00 65,130.00

BAHAN Cat duco polyurethane clear matt MV-3, Merk : Petalac 2K Cat epoxy undercoat, Merk : Petalac Cat polyster putty, Merk : Petalac Thinner P.U. Thinner slow dry Ampelas besi Kwas 3"

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

98,630.00 9,863.00 108,493.00

Pemasangan 1 m2 Penutup Atap Metaldeck NO A

B.

C.

D. E. F.

URAIAN TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor BAHAN Metal deck Hi-Tensile G550, Spandeck, 0,45 TCT COLOR BOND, Merk : Flexideck Baut Aluminium foil single layer, serat fiber Glasswool Aluminium foil single layer, serat fiber Roofmesh PERALATAN Alat dan material bantu

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.4500 75,000.00 0.4500 100,000.00 0.0450 120,000.00 0.0300 135,000.00 JUMLAH TENAGA KERJA

33,750.00 45,000.00 5,400.00 4,050.00 88,200.00

m2 kg m2 m2 m2 m2

1.1000 105,000.00 0.2000 30,250.00 1.0000 16,500.00 1.0000 32,000.00 1.0000 16,500.00 1.0000 10,500.00 JUMLAH HARGA BAHAN

115,500.00 6,050.00 16,500.00 32,000.00 16,500.00 10,500.00 197,050.00

1.0000 19,705.00 JUMLAH HARGA PERALATAN

19,705.00 19,705.00

ls

KOEFISIEN

HARGA SATUAN (Rp)

KODE

304,955.00 30,495.50 335,450.50

1 m1 Nok atap NO A

URAIAN

KODE

C.

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Ongkos pasang

B.

SATUAN

ls

0.2000

73,440.00

14,688.00

JUMLAH TENAGA KERJA

14,688.00

BAHAN Nok Atap

m1

1.2000

41,200.00

Safe Top Nail

bh

8.0000

3,000.00

49,440.00 24,000.00

JUMLAH HARGA BAHAN

73,440.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

88,128.00 8,812.80 96,940.80

1 m1 listplank Aluminium Composite Panel NO A

URAIAN

KODE

C.

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Upah Pasang

B.

SATUAN

ls

1.0000

50,000.00

50,000.00

JUMLAH TENAGA KERJA

50,000.00

BAHAN Alumunium composite panel T.4mm, Anti UV,Merk : Maco

m2

0.8400

299,000.00

Bending

Ls

1.0000

3,000.00

251,160.00 3,000.00

Rangka metal square zincalume/Galvanized

m2

0.8400

120,000.00

100,800.00

Sekrup

kg

0.8400

35,000.00

29,400.00

Sealant untuk ACP

m1

0.8400

7,500.00

6,300.00

JUMLAH HARGA BAHAN

390,660.00

PERALATAN Peralatan dan material bantu

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

22,033.00

22,033.00

JUMLAH HARGA PERALATAN

1.0000

22,033.00 462,693.00 46,269.30 508,962.30

1 m2 Aluminium Composite Panel NO A

URAIAN

KODE

C.

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Upah Pasang

B.

SATUAN

ls

1.0000

150,000.00

150,000.00

JUMLAH TENAGA KERJA

150,000.00

BAHAN Alumunium composite panel T.4mm, Anti UV,Merk : Maco

m2

1.0500

299,000.00

Bending

Ls

1.0000

10,000.00

313,950.00 10,000.00

Rangka metal square zincalume/Galvanized

m2

1.0500

120,000.00

126,000.00

Sekrup

kg

1.0500

35,000.00

36,750.00

Sealant untuk ACP

m1

1.0500

7,500.00

7,875.00

JUMLAH HARGA BAHAN

494,575.00

PERALATAN Peralatan dan material bantu

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

19,337.25

19,337.25

JUMLAH HARGA PERALATAN

1.0000

19,337.25 663,912.25 66,391.23 730,303.48

1 m1 Flashing atap NO A

URAIAN TENAGA

KODE

SATUAN

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

B.

C.

D. E. F.

Upah pasang

ls

1.0000 7,000.00 JUMLAH TENAGA KERJA

7,000.00 7,000.00

BAHAN Flashing atap

m1

1.0000 35,000.00 JUMLAH HARGA BAHAN

35,000.00 35,000.00

PERALATAN Alat dan Material Bantu

Ls

1.0000 2,100.00 JUMLAH HARGA PERALATAN

2,100.00 2,100.00

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

44,100.00 4,410.00 48,510.00

1 M1 Pipa Galvanis 2" NO A

B.

C.

D. E. F.

URAIAN

KODE

TENAGA Ongkos pasang

SATUAN

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

ls

1.0000 9,856.83 JUMLAH TENAGA KERJA

9,856.83 9,856.83

BAHAN Pipa Galvanis 2" Pengecatan Besi Duco

m1 m2

1.0000 67,500.00 0.3140 98,630.00 JUMLAH HARGA BAHAN

67,500.00 30,969.82 98,469.82

PERALATAN Material & alat Bantu

ls

0.0200 4,923.49 JUMLAH HARGA PERALATAN

98.47 98.47

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

108,425.12 10,842.51 119,267.63

1 M1 Pipa Galvanis 1,5" NO A

B.

C.

D. E. F.

URAIAN

KODE

TENAGA Ongkos Pabrikasi Ongkos pasang

SATUAN

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

ls ls

1.0000 105,353.77 1.0000 52,676.89 JUMLAH TENAGA KERJA

105,353.77 52,676.89 158,030.66

BAHAN Pipa Galvanis 2" Pipa Galvanis 1,5" Base Plat Besi Dyna Bolt Pengecatan Besi Duco

m1 m1 kg bh m2

1.0000 67,500.00 2.2500 58,000.00 0.7850 8,300.00 10.0000 12,500.00 0.4396 98,630.00 JUMLAH HARGA BAHAN

67,500.00 130,500.00 6,515.50 125,000.00 43,357.75 305,373.25

PERALATAN Material & alat Bantu

ls

1.0000 45,805.99 JUMLAH HARGA PERALATAN

45,805.99 45,805.99

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

509,209.89 50,920.99 560,130.88

1 m3 Urugan Tanah Subur/Top Soil NO A

B.

C.

D. E. F.

URAIAN TENAGA Pekerja Mandor BAHAN Tanah Top Soil PERALATAN Material & alat Bantu

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

JUMLAH HARGA (Rp)

SATUAN

L.01 L.04

OH OH

0.25 75,000.00 0.03 135,000.00 JUMLAH TENAGA KERJA

18,750.00 3,375.00 22,125.00

m3

1.10 155,000.00 JUMLAH HARGA BAHAN

170,500.00 170,500.00

1.00 8,525.00 JUMLAH HARGA PERALATAN

8,525.00 8,525.00

ls

KOEFISIEN

HARGA SATUAN (Rp)

KODE

201,150.00 20,115.00 221,265.00

1 m2 Rumput gajah mini NO A

B.

C.

D. E. F.

URAIAN

JUMLAH HARGA (Rp)

SATUAN

L.04

OH OH OH OH OH OH

0.0013 135,000.00 0.0050 120,000.00 0.0050 100,000.00 0.0050 75,000.00 0.0050 75,000.00 0.0050 75,000.00 JUMLAH TENAGA KERJA

168.75 600.00 500.00 375.00 375.00 375.00 2,393.75

BAHAN Bensin/Solar Oli Tanah Top Soil Pupuk Kandang (1 karung : 40 Kg) Furadan Atonik/Rotone Pupuk Kompos (5kg) Rumput Gajah Mini

ltr ltr m3 krg kg btl kntg m2

0.0250 11,000.00 0.0020 40,000.00 0.0500 155,000.00 0.0100 30,000.00 0.0100 23,000.00 0.0020 165,000.00 0.0400 10,000.00 1.1000 16,000.00 JUMLAH HARGA BAHAN

275.00 80.00 7,750.00 300.00 230.00 330.00 400.00 17,600.00 26,965.00

PERALATAN Mobil Operasional Mobil Tanki air 5000 lt Truk engkel Linggis/Blencong Cangkul pH Meter Karung Plastik Selang Penyiraman Biaya Lain-Lain

hari hari hari hari hari hari buah jam ls

0.0005 450,000.00 0.0020 600,000.00 0.0005 600,000.00 0.0020 10,000.00 0.0020 8,000.00 0.0020 3,000.00 0.0050 1,000.00 0.0050 25,000.00 1.0000 1,562.79 JUMLAH HARGA PERALATAN

225.00 1,200.00 300.00 20.00 16.00 6.00 5.00 125.00 1,562.79 3,459.79

TENAGA Mandor Supir Tukang Gali Tukang Tanam Tukang Penyiraman Pekerja

L.01

KOEFISIEN

HARGA SATUAN (Rp)

KODE

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

32,818.54 3,281.85 36,100.39

A.2.3.1.10. Pemadatan Tanah 1 m3 tanah (Per 20cm) NO A

URAIAN TENAGA Pekerja Mandor

B.

BAHAN

C.

PERALATAN

KODE

SATUAN

L.01 L.04

OH OH

KOEFISIEN

HARGA SATUAN (Rp)

0.5000 75,000.00 0.0500 135,000.00 JUMLAH TENAGA KERJA

JUMLAH HARGA (Rp) 37,500.00 6,750.00 44,250.00

JUMLAH HARGA BAHAN JUMLAH HARGA PERALATAN D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

44,250.00 4,425.00 48,675.00

A.2.3.1.14. Pengurugan 1 m3 Sirtu Padat NO A

B.

C.

URAIAN TENAGA Pekerja Mandor

JUMLAH HARGA (Rp)

SATUAN

L.01 L.04

OH OH

0.2500 75,000.00 0.0250 135,000.00 JUMLAH TENAGA KERJA

18,750.00 3,375.00 22,125.00

kg

1.2000 202,500.00 JUMLAH HARGA BAHAN

243,000.00 243,000.00

BAHAN Sirtu

KOEFISIEN

HARGA SATUAN (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

265,125.00 26,512.50 291,637.50

1 m3 Amparan 1/2 NO A

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

KODE

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

KOEFISIEN

0.3210 0.1800 0.0150 0.0080

HARGA SATUAN (Rp) 75,000.00 100,000.00 120,000.00 135,000.00

JUMLAH HARGA (Rp) 24,075.00 18,000.00 1,800.00 1,080.00

B.

C.

D. E. F.

BAHAN Batu pecah mesin 1-2 PERALATAN Peralatan Utama dan alat bantu

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

44,955.00

m3

1.1000 215,000.00 JUMLAH HARGA BAHAN

236,500.00 236,500.00

jam

0.0500 281,455.00 JUMLAH HARGA PERALATAN

14,072.75 14,072.75 295,527.75 29,552.78 325,080.53

1 m3 Amparan 2/3 NO A

B.

C.

D. E. F.

URAIAN

JUMLAH HARGA (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.3210 75,000.00 0.1800 100,000.00 0.0150 120,000.00 0.0080 135,000.00 JUMLAH TENAGA KERJA

24,075.00 18,000.00 1,800.00 1,080.00 44,955.00

BAHAN Batu pecah mesin 2-3

m3

1.1000 220,000.00 JUMLAH HARGA BAHAN

242,000.00 242,000.00

PERALATAN Peralatan Utama dan alat bantu

jam

0.0500 286,955.00 JUMLAH HARGA PERALATAN

14,347.75 14,347.75

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

KOEFISIEN

HARGA SATUAN (Rp)

KODE

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

301,302.75 30,130.28 331,433.03

1 m3 Lapisan Pengisi 1/2 NO A

B.

C.

D. E. F.

URAIAN

JUMLAH HARGA (Rp)

SATUAN

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

0.3210 75,000.00 0.1800 100,000.00 0.0150 120,000.00 0.0080 135,000.00 JUMLAH TENAGA KERJA

24,075.00 18,000.00 1,800.00 1,080.00 44,955.00

BAHAN Amparan batu pecah mesin 1-2

L.04

#N/A

1.1000 215,000.00 JUMLAH HARGA BAHAN

236,500.00 236,500.00

0.0500 281,455.00 JUMLAH HARGA PERALATAN

14,072.75 14,072.75

PERALATAN Peralatan Utama dan alat bantu

jam

KOEFISIEN

HARGA SATUAN (Rp)

KODE

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

295,527.75 29,552.78 325,080.53

1 m3 Abu Batu NO A

B.

C.

D. E. F.

URAIAN

JUMLAH HARGA (Rp)

SATUAN

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

0.3210 75,000.00 0.1800 100,000.00 0.0150 120,000.00 0.0080 135,000.00 JUMLAH TENAGA KERJA

24,075.00 18,000.00 1,800.00 1,080.00 44,955.00

BAHAN Abu Batu

L.04

m3

1.1000 235,000.00 JUMLAH HARGA BAHAN

258,500.00 258,500.00

jam

0.0500 303,455.00 JUMLAH HARGA PERALATAN

15,172.75 15,172.75

PERALATAN Peralatan Utama dan alat bantu

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

KOEFISIEN

HARGA SATUAN (Rp)

KODE

318,627.75 31,862.78 350,490.53

A.4.4.3.65. Pemasangan 1 m2 Paving Block Natural tebal 8cm NO A

B.

C.

URAIAN TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

HARGA SATUAN (Rp)

SATUAN

L.01 L.02 L.03 L.04

OH OH OH OH

0.5000 75,000.00 0.5000 100,000.00 0.0500 120,000.00 0.0013 135,000.00 JUMLAH TENAGA KERJA

37,500.00 50,000.00 6,000.00 175.50 93,675.50

bh m3

25.0000 2,000.00 0.0500 318,627.75 JUMLAH HARGA BAHAN

50,000.00 15,931.39 65,931.39

BAHAN Paving Block 8cm Natural Abu Batu

KOEFISIEN

JUMLAH HARGA (Rp)

KODE

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

-

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

159,606.89 15,960.69 175,567.58

A.4.4.3.57. Pemasangan 1 m2 Batu Andesit NO

A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.70

75,000.00

52,500.00

Tukang Batu

L.02

OH

0.35

100,000.00

35,000.00

Kepala Tukang

L.03

OH

0.04

120,000.00

4,200.00

Mandor

L.04

OH

0.04

135,000.00

4,725.00

JUMLAH TENAGA K B.

C.

96,425.00

BAHAN Batu Andesit

m2

1.00

145,000.00

145,000.00

Semen Portland

kg

11.75

1,160.00

13,630.00

Pasir Pasang

m3

0.04

195,000.00

6,825.00

JUMLAH HARGA B

165,455.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 15%

F.

Harga Satuan Pekerjaan (D+E)

261,880.00 39,282.00 301,162.00

A.4.4.3.57. Pemasangan 1 m2 Batu Andesit NO

A

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.70

75,000.00

52,500.00

Tukang Batu

L.02

OH

0.35

100,000.00

35,000.00

Kepala Tukang

L.03

OH

0.04

120,000.00

4,200.00

Mandor

L.04

OH

0.04

135,000.00

4,725.00

JUMLAH TENAGA K B.

BAHAN Batu Andesit

C.

96,425.00

m2

1.00

145,000.00

145,000.00

JUMLAH HARGA B

145,000.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 15%

F.

Harga Satuan Pekerjaan (D+E)

241,425.00 36,213.75 277,638.75

1 Unit Ornamen NO URAIAN

A

KODE

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

B.

C.

D. E. F.

L.01 L.02 L.03 L.04

SATUAN

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

OH OH OH OH

2.00 1.00 1.00 0.50

75,000.00 100,000.00 120,000.00 135,000.00 JUMLAH TENAGA K

150,000.00 100,000.00 120,000.00 67,500.00 437,500.00

BAHAN GRC Cetak t=15 mm Acrilic Alat Pengikat

m2 m2 lot

0.65 0.65 1.00

150,000.00 210,000.00 30,000.00 JUMLAH HARGA B

96,750.00 135,450.00 30,000.00 262,200.00

PERALATAN Alat dan Material Bantu

Ls

1.00

34,985.00 JUMLAH HARGA P

34,985.00 34,985.00

Jumlah (A+B+C) Overhead & Profit 15% Harga Satuan Pekerjaan (D+E)

734,685.00 110,202.75 844,887.75

1 m2 Pengecatan Zinchromate NO A

B.

C.

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.2200

75,000.00

16,500.00

Tukang cat

L.02

OH

0.3300

100,000.00

33,000.00

Kepala Tukang

L.03

OH

0.0330

120,000.00

3,960.00

Mandor

L.04

OH

0.0110

135,000.00

1,485.00

JUMLAH TENAGA KERJA

54,945.00

BAHAN Cat zinchromat, setara Meiji

kg

0.2200

46,500.00

10,230.00

Ampelas besi

lbr

0.4400

7,000.00

3,080.00

Thinner

ltr

0.1650

22,000.00

3,630.00

Kwas cat rata-rata

bh

0.0550

14,000.00

770.00

JUMLAH HARGA BAHAN

17,710.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

72,655.00 7,265.50 79,920.50

1 kg Waterproofing formdex WP system NO A

URAIAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

ls

1.00

525.00

525.00

JUMLAH TENAGA KERJA

525.00

BAHAN Waterproofing formdex WP system, Merk : Hitchins, Sika, Fosroc

C.

SATUAN

TENAGA Upah pasang

B.

KODE

kg

1.00

3,500.00

3,500.00

JUMLAH HARGA BAHAN

3,500.00

PERALATAN JUMLAH HARGA PERALATAN

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

4,025.00 402.50 4,427.50

Pemasangan 1 m1 U-ditch 600x600mm NO A

URAIAN

KODE

ls

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

1.0000

175,000.00

175,000.00

JUMLAH TENAGA KERJA

175,000.00

BAHAN U-ditch 600x600

C.

KOEFISIEN

TENAGA Ongkos Pasang

B.

SATUAN

bh

1.7000

475,000.00

807,500.00

JUMLAH HARGA BAHAN

807,500.00

PERALATAN Material dan Alat Bantu

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

80,750.00

80,750.00

JUMLAH HARGA PERALATAN

1.0000

80,750.00 1,063,250.00 106,325.00 1,169,575.00

Pemasangan 1 m1 Cover U-ditch 600x600mm NO A

URAIAN

KODE

ls

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

1.0000

65,000.00

65,000.00

JUMLAH TENAGA KERJA

65,000.00

BAHAN Cover U-ditch 600

C.

KOEFISIEN

TENAGA Ongkos Pasang

B.

SATUAN

bh

1.7000

275,600.00

468,520.00

JUMLAH HARGA BAHAN

468,520.00

PERALATAN Material dan Alat Bantu

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

46,852.00

46,852.00

JUMLAH HARGA PERALATAN

1.0000

46,852.00 580,372.00 58,037.20 638,409.20

Pemasangan 1 m1 U-ditch 300x300mm NO A

URAIAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

ls

1.0000

120,000.00

120,000.00

JUMLAH TENAGA KERJA

120,000.00

BAHAN U-ditch 300x300

C.

SATUAN

TENAGA Ongkos Pasang

B.

KODE

bh

1.7000

275,000.00

467,500.00

JUMLAH HARGA BAHAN

467,500.00

PERALATAN Material dan Alat Bantu

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

46,750.00

46,750.00

JUMLAH HARGA PERALATAN

1.0000

46,750.00 634,250.00 63,425.00 697,675.00

Pemasangan 1 m1 Cover U-ditch 300x300mm NO A

URAIAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

ls

1.0000

55,000.00

55,000.00

JUMLAH TENAGA KERJA

55,000.00

BAHAN Cover U-ditch 300

C.

SATUAN

TENAGA Ongkos Pasang

B.

KODE

bh

1.7000

125,000.00

212,500.00

JUMLAH HARGA BAHAN

212,500.00

PERALATAN Material dan Alat Bantu

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

21,250.00

21,250.00

JUMLAH HARGA PERALATAN

1.0000

21,250.00 288,750.00 28,875.00 317,625.00

ANALISA HARGA SATUAN PEKERJAAN KUSEN 1 unit Pintu Hall NO A

B.

C.

URAIAN

KODE

TENAGA Ongkos Pasang

SATUAN

ls

BAHAN Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Sudah termasuk metal close untuk engsel Daun Pintu Kaca Tempered 12mm Kaca polos T.10mm, setara Asahimas Aksesoris

KOEFISIEN

HARGA SATUAN (Rp)

1.00 1,200,000.00 JUMLAH TENAGA KERJA

JUMLAH HARGA (Rp) 1,200,000.00 1,200,000.00

m1

46.00

110,000.00

5,060,000.00

bh m2 lot

2.00 1,550,000.00 14.37 220,000.00 1.00 2,500,000.00 JUMLAH HARGA BAHAN

3,100,000.00 3,162,236.00 2,500,000.00 13,822,236.00

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

15,022,236.00 1,502,223.60 16,524,459.60

1 unit Jendela tipe J1 NO A

B.

C.

URAIAN

KODE

TENAGA Ongkos Pasang BAHAN Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kaca polos T.10mm, setara Asahimas Sealant Karet

SATUAN

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

ls

1.00 600,000.00 JUMLAH TENAGA KERJA

600,000.00 600,000.00

m1 m2 m1 m1

21.00 110,000.00 12.60 220,000.00 3.60 7,500.00 3.60 8,600.00 JUMLAH HARGA BAHAN

2,310,000.00 2,772,000.00 27,000.00 30,960.00 5,139,960.00

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

5,739,960.00 573,996.00 6,313,956.00

1 unit Jendela tipe J2 NO A

B.

C.

URAIAN TENAGA Ongkos Pasang BAHAN Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kaca polos T.10mm, setara Asahimas Sealant Karet

KODE

SATUAN

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

ls

1.00 600,000.00 JUMLAH TENAGA KERJA

600,000.00 600,000.00

m1 m2 m1 m1

21.00 110,000.00 12.60 220,000.00 3.60 7,500.00 3.60 8,600.00 JUMLAH HARGA BAHAN

2,310,000.00 2,772,000.00 27,000.00 30,960.00 5,139,960.00

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

5,739,960.00 573,996.00 6,313,956.00

ANALISA HARGA SATUAN PEKERJAAN MEP Memasang 1 bh floting valve 10K 1" (20 mm) NO A

B.

URAIAN

KODE

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.150

75,000.00

11,250.00

Tukang

L.02

OH

0.150

100,000.00

15,000.00

Kepala tukang

L.03

OH

0.002

120,000.00

180.00

Mandor

L.04

OH

0.002

135,000.00

202.50

JUMLAH TENAGA KERJA

26,632.50

BAHAN Ploating valve dia 25 mm

C.

SATUAN

bh

1.000

45,000.00

45,000.00

JUMLAH HARGA BAHAN

45,000.00

PERALATAN Alat dan Material bantu

ls

1.000

-

JUMLAH HARGA PERALATAN D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

71,632.50 7,163.25 78,795.75

Memasang 1 bh pompa Sirkulasi NO A

B.

C.

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

1.300

75,000.00

97,500.00

Tukang

L.02

OH

1.700

100,000.00

170,000.00

Kepala tukang

L.03

OH

0.700

120,000.00

84,000.00

Mandor

L.04

OH

0.700

135,000.00

94,500.00

JUMLAH TENAGA KERJA

446,000.00

BAHAN Pompa Sirkulasi, kapasitas : 250 Watt

Unit

1.000

1,250,000.00

1,250,000.00

Filter

Unit

1.000

65,000.00

65,000.00

JUMLAH HARGA BAHAN

1,315,000.00

PERALATAN Alat dan Material Bantu

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

65,750.00

65,750.00

JUMLAH HARGA PERALATAN

1.000

65,750.00 1,826,750.00 182,675.00 2,009,425.00

Memasang 1 m1 PVC dia 20 mm, Kelas AW NO A

B.

URAIAN

KODE

KOEFISIEN

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.108

75,000.00

8,100.00

Tukang

L.02

OH

0.180

100,000.00

18,000.00

Kepala tukang

L.03

OH

0.018

120,000.00

2,160.00

Mandor

L.04

OH

0.005

135,000.00

729.00

JUMLAH TENAGA KERJA

28,989.00

BAHAN PVC dia 20 mm, Kelas AW

C.

SATUAN

HARGA

m1

1.000

11,500.00

11,500.00

JUMLAH HARGA BAHAN

11,500.00

PERALATAN Perlengkapan

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1.000

4,025.00

4,025.00

JUMLAH HARGA PERALATAN

4,025.00 44,514.00 4,451.40 48,965.40

Memasang 1 m1 PVC dia 22 mm, Kelas AW NO A

B.

URAIAN

SATUAN

KOEFISIEN

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.108

75,000.00

8,100.00

Tukang

L.02

OH

0.180

100,000.00

18,000.00

Kepala tukang

L.03

OH

0.018

120,000.00

2,160.00

Mandor

L.04

OH

0.005

135,000.00

729.00

JUMLAH TENAGA KERJA

28,989.00

BAHAN PVC dia 20 mm, Kelas AW

C.

KODE

HARGA

m1

1.000

11,500.00

11,500.00

JUMLAH HARGA BAHAN

11,500.00

PERALATAN Perlengkapan

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

1.000

4,025.00

4,025.00

JUMLAH HARGA PERALATAN

4,025.00 44,514.00 4,451.40 48,965.40

Memasang 1 m1 PVC dia 25 mm, Kelas AW NO A

B.

URAIAN

KODE

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.108

75,000.00

8,100.00

Tukang

L.02

OH

0.180

100,000.00

18,000.00

Kepala tukang

L.03

OH

0.018

120,000.00

2,160.00

Mandor

L.04

OH

0.005

135,000.00

729.00

JUMLAH TENAGA KERJA

28,989.00

BAHAN PVC dia 25 mm, Kelas AW

C.

SATUAN

m1

1.000

12,300.00

12,300.00

JUMLAH HARGA BAHAN

12,300.00

PERALATAN Perlengkapan

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1.000

4,305.00

4,305.00

JUMLAH HARGA PERALATAN

4,305.00 45,594.00 4,559.40 50,153.40

Memasang 1 m1 PVC dia 32 mm, Kelas AW NO A

B.

URAIAN

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.108

75,000.00

8,100.00

Tukang

L.02

OH

0.180

100,000.00

18,000.00

Kepala tukang

L.03

OH

0.018

120,000.00

2,160.00

Mandor

L.04

OH

0.005

135,000.00

729.00

JUMLAH TENAGA KERJA

28,989.00

BAHAN PVC dia 32 mm, Kelas AW

C.

KODE

m1

1.000

12,600.00

12,600.00

JUMLAH HARGA BAHAN

12,600.00

PERALATAN Perlengkapan

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

4,410.00

4,410.00

JUMLAH HARGA PERALATAN

1.000

4,410.00 45,999.00 4,599.90 50,598.90

Memasang 1 m1 PVC dia 40 mm, Kelas AW NO A

B.

URAIAN

KODE

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.108

75,000.00

8,100.00

Tukang

L.02

OH

0.180

100,000.00

18,000.00

Kepala tukang

L.03

OH

0.018

120,000.00

2,160.00

Mandor

L.04

OH

0.005

135,000.00

729.00

JUMLAH TENAGA KERJA

28,989.00

BAHAN PVC dia 40 mm, Kelas AW

C.

SATUAN

m1

1.000

14,500.00

14,500.00

JUMLAH HARGA BAHAN

14,500.00

PERALATAN Perlengkapan

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1.000

5,075.00

5,075.00

JUMLAH HARGA PERALATAN

5,075.00 48,564.00 4,856.40 53,420.40

Memasang 1 m1 PVC dia 65 mm, Kelas AW NO A

B.

URAIAN

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.108

75,000.00

8,100.00

Tukang

L.02

OH

0.180

100,000.00

18,000.00

Kepala tukang

L.03

OH

0.018

120,000.00

2,160.00

Mandor

L.04

OH

0.005

135,000.00

729.00

JUMLAH TENAGA KERJA

28,989.00

BAHAN PVC dia 65 mm, Kelas AW

C.

KODE

m1

1.000

18,500.00

18,500.00

JUMLAH HARGA BAHAN

18,500.00

PERALATAN Perlengkapan

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

6,475.00

6,475.00

JUMLAH HARGA PERALATAN

1.000

6,475.00 53,964.00 5,396.40 59,360.40

Memasang 1 bh Gate valve 10K 1,5" (40 mm) NO A

B.

URAIAN

KODE

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.050

75,000.00

3,750.00

Tukang

L.02

OH

0.050

100,000.00

5,000.00

Kepala tukang

L.03

OH

0.010

120,000.00

1,200.00

Mandor

L.04

OH

0.002

135,000.00

243.00

JUMLAH TENAGA KERJA

10,193.00

BAHAN Gate valve 10 K dia. dia. 40 mm

C.

SATUAN

bh

1.000

265,000.00

265,000.00

JUMLAH HARGA BAHAN

265,000.00

PERALATAN Perlengkapan

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1.000

26,500.00

26,500.00

JUMLAH HARGA PERALATAN

26,500.00 301,693.00 30,169.30 331,862.30

Memasang 1 bh Gate valve 10K 1 1/4" (32 mm) NO A

B.

URAIAN

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.050

75,000.00

3,750.00

Tukang

L.02

OH

0.050

100,000.00

5,000.00

Kepala tukang

L.03

OH

0.010

120,000.00

1,200.00

Mandor

L.04

OH

0.002

135,000.00

243.00

JUMLAH TENAGA KERJA

10,193.00

BAHAN Gate valve 10 K dia. dia. 32 mm

C.

KODE

bh

1.000

195,000.00

195,000.00

JUMLAH HARGA BAHAN

195,000.00

PERALATAN Perlengkapan

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

19,500.00

19,500.00

JUMLAH HARGA PERALATAN

1.000

19,500.00 224,693.00 22,469.30 247,162.30

Memasang 1 ttk Instalasi daya listrik pompa transfer air bersih NO A

B.

URAIAN

KODE

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.214

75,000.00

16,071.43

Tukang

L.02

OH

0.214

100,000.00

21,428.57

Kepala tukang

L.03

OH

0.143

120,000.00

17,142.86

Mandor

L.04

OH

0.143

135,000.00

19,285.71

JUMLAH TENAGA KERJA

73,928.57

BAHAN NYY 3 x4 MM2

C.

SATUAN

m1

20.000

12,500.00

250,000.00

JUMLAH HARGA BAHAN

250,000.00

PERALATAN Perlengkapan

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1.000

12,500.00

12,500.00

JUMLAH HARGA PERALATAN

12,500.00 336,428.57 33,642.86 370,071.43

Memasang Lampu TL LED 1 x 19 Watt watt / TKI NO A

B.

URAIAN

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.166

75,000.00

12,450.00

Tukang

L.02

OH

0.166

100,000.00

16,600.00

Kepala tukang

L.03

OH

0.033

120,000.00

3,960.00

Mandor

L.04

OH

0.017

135,000.00

2,241.00

JUMLAH TENAGA KERJA

35,251.00

BAHAN TL, LED 1 X 19 W / TKI

C.

KODE

bh

1.000

55,000.00

55,000.00

JUMLAH HARGA BAHAN

55,000.00

PERALATAN Perlengkapan Instalasi

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

2,750.00

2,750.00

JUMLAH HARGA PERALATAN

1.000

2,750.00 93,001.00 9,300.10 102,301.10

Memasang Lampu Down Light LED 14 watt NO A

B.

URAIAN

KODE

HARGA

(Rp)

(Rp)

L.01

OH

0.166

75,000.00

12,450.00

L.02

OH

0.166

100,000.00

16,600.00

Kepala tukang

L.03

OH

0.033

120,000.00

3,960.00

Mandor

L.04

OH

0.017

135,000.00

2,241.00

JUMLAH TENAGA KERJA

35,251.00

BAHAN bh

1.000

45,000.00

45,000.00

JUMLAH HARGA BAHAN

45,000.00

PERALATAN ls

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1.000

2,250.00

2,250.00

JUMLAH HARGA PERALATAN

2,250.00 82,501.00

1 m1 LED Strip NO URAIAN

C.

JUMLAH

Tukang

D.

B.

HARGA SATUAN

Pekerja

Perlengkapan Instalasi

A

KOEFISIEN

TENAGA

Lampu Downlight Led Philips eridani 14 watt C.

SATUAN

8,250.10 90,751.10

KODE

SATUAN

KOEFISIEN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

TENAGA Ongkos Pasang

Ls

1.00

147,825.00 JUMLAH TENAGA KE

147,825.00 147,825.00

BAHAN Lampu Tape/Strip LED merk Philips - 31059

m1

0.90

365,000.00 JUMLAH HARGA BA

328,500.00 328,500.00

PERALATAN JUMLAH HARGA PERALATAN

D. E. F.

Jumlah (A+B+C) Overhead & Profit 15% Harga Satuan Pekerjaan (D+E)

476,325.00 71,448.75 547,773.75

Memasang Lampu Taman, T.1,2 meter NO A

URAIAN

C.

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Upah Pasang

B.

KODE

L.01

Lot

1.000

50,000.00

50,000.00

JUMLAH TENAGA KERJA

50,000.00

BAHAN Lampu Taman, T.1,2 meter

bh

1.000

240,000.00

Pondasi

bh

1.000

100,000.00

240,000.00 100,000.00

JUMLAH HARGA BAHAN

340,000.00

PERALATAN Perlengkapan Instalasi

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

ls

17,000.00

17,000.00

JUMLAH HARGA PERALATAN

1.000

17,000.00 407,000.00 40,700.00

F.

Harga Satuan Pekerjaan (D+E)

447,700.00

Memasang Lampu Taman, T.3 meter NO A

B.

URAIAN

KODE

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.166

75,000.00

12,450.00

Tukang

L.02

OH

0.166

100,000.00

16,600.00

Kepala tukang

L.03

OH

0.033

120,000.00

3,960.00

Mandor

L.04

OH

0.017

135,000.00

2,241.00

JUMLAH TENAGA KERJA

35,251.00

BAHAN Lampu Taman, T.1,2 meter

C.

SATUAN

bh

1.000

105,000.00

105,000.00

JUMLAH HARGA BAHAN

105,000.00

PERALATAN Perlengkapan Instalasi

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

5,250.00

5,250.00

JUMLAH HARGA PERALATAN

1.000

5,250.00 145,501.00 14,550.10 160,051.10

Memasang Saklar Ganda NO A

URAIAN

KOEFISIEN

SATUAN

HARGA

(Rp)

(Rp)

L.01

lot

1.000

15,000.00

15,000.00

JUMLAH TENAGA KERJA

15,000.00

BAHAN Saklar Ganda

C.

SATUAN

JUMLAH

TENAGA Upah Pasang

B.

KODE

HARGA

bh

1.000

25,000.00

25,000.00

JUMLAH HARGA BAHAN

25,000.00

PERALATAN Perlengkapan Instalasi

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

1.000

1,250.00

1,250.00

JUMLAH HARGA PERALATAN

1,250.00 41,250.00 4,125.00 45,375.00

Memasang Sensor Photo Cell NO A

URAIAN

L.01

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

Lot

1.000

40,000.00

40,000.00

JUMLAH TENAGA KERJA

40,000.00

BAHAN Sensor Photo Cell

C.

SATUAN

TENAGA Upah Pasang

B.

KODE

bh

1.000

145,000.00

145,000.00

JUMLAH HARGA BAHAN

145,000.00

PERALATAN Perlengkapan Instalasi

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

1.000

7,250.00

7,250.00

JUMLAH HARGA PERALATAN

7,250.00 192,250.00 19,225.00 211,475.00

Memasang 1 buah instalasi titik Lampu NO A

B.

C.

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.150

75,000.00

11,250.00

Tukang

L.02

OH

0.150

100,000.00

15,000.00

Kepala tukang

L.03

OH

0.180

120,000.00

21,600.00

Mandor

L.04

OH

0.150

135,000.00

20,250.00

JUMLAH TENAGA KERJA

68,100.00

BAHAN NYM 3 x 2,5 MM2

m1

12.000

8,500.00

Pipa Conduit

m1

10.000

6,000.00

102,000.00 60,000.00

JUMLAH HARGA BAHAN

162,000.00

PERALATAN Perlengkapan Instalasi

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

8,100.00

8,100.00

JUMLAH HARGA PERALATAN

1.000

8,100.00 238,200.00 23,820.00 262,020.00

Memasang 1 buah instalasi titik Lampu Taman NO A

B.

C.

URAIAN

KODE

SATUAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

TENAGA Pekerja

L.01

OH

0.150

75,000.00

11,250.00

Tukang

L.02

OH

0.150

100,000.00

15,000.00

Kepala tukang

L.03

OH

0.180

120,000.00

21,600.00

Mandor

L.04

OH

0.150

135,000.00

20,250.00

JUMLAH TENAGA KERJA

68,100.00

BAHAN NYFGBY

m1

12.000

10,500.00

126,000.00

Pipa Conduit

m1

10.000

6,000.00

60,000.00

JUMLAH HARGA BAHAN

186,000.00

PERALATAN Perlengkapan Instalasi

ls

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

9,300.00

9,300.00

JUMLAH HARGA PERALATAN

1.000

9,300.00 263,400.00 26,340.00 289,740.00

Memasang Stop Kontak daya 1 Ph NO A

URAIAN

KOEFISIEN

HARGA

JUMLAH

SATUAN

HARGA

(Rp)

(Rp)

L.01

lot

1.000

15,000.00

15,000.00

JUMLAH TENAGA KERJA

15,000.00

BAHAN Stop Kontak 10 A/16A/1Phase

C.

SATUAN

TENAGA Upah Pasang

B.

KODE

bh

1.000

20,500.00

20,500.00

JUMLAH HARGA BAHAN

20,500.00

PERALATAN Perlengkapan Instalasi

D.

Jumlah (A+B+C)

E.

Overhead & Profit 10%

F.

Harga Satuan Pekerjaan (D+E)

ls

1,025.00

1,025.00

JUMLAH HARGA PERALATAN

1.000

1,025.00 36,525.00 3,652.50 40,177.50

HARGA SATUAN DAN UPAH NO I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 41 42 43 44 45 46 47 48 49 50 51 53 54 55 56

URAIAN HARGA BAHAN ARSITEKTUR DAN STRUKTUR Air Aluminium foil single layer, serat fiber Alumunium composite panel T.4mm, Anti UV,Merk : Maco Batu pecah mesin 1-2 Batu pecah mesin 2-3 Batu pecah mesin 5-7 Ampelas besi Ampelas Tembok Baja Profil, setara DN Balok Kayu Albasiah Balok Kayu Kamper Samarinda Oven Balok Kayu Kelas III Balok Kayu Kelas IV Base Plat Besi Batako Bata Merah Bata Ringan Tebal 10cm, Merk : Hebel, Liebel Batu Andesit Batu Belah Batu Gamping Batu pecah mesin 1-2 Batu Templek Baut Baut HTB Besi Beton Polos Besi Beton Ulir Besi Siku L 40 x 40 x 4 Besi Siku L 50 x 50 x 5 Besi Siku L 60 x 60 x 6 Bondeck, tipe : Floor Deck T.1mm, Lapis lindung : Dip Hot Galvanized C Profile Cat dasar Attaboy OS Super Primer White Cat dasar petalux alkali sealer white Cat duco polyurethane clear matt MV-3, Merk : Petalac 2K Cat epoxy undercoat, Merk : Petalac Cat plafond, setara Petalux Cat polyster putty, Merk : Petalac Cat tembok eksterior, Merk : Attaboy Facade Cat tembok interior, setara Petalux Compound Daun Pintu Solid lapis Megateak 3mm Drymix TA water repellent (40kg) Duo Composite Membrane Duo Kit Sealant Duo Primer Fastener and Mechano Plate Flashing atap GRC t.6mm Gypsumboard T.9mm, Merk :Jayaboard, Knauf Homogeneous Tile 800x800, ex. Indogress Jaring Kawat Baja Dilas Kaca polos T.6mm, setara Asahimas Kalsiplank 8mm, Jati, uk. 0,2x3m Kayu Kelas III

SAT

ltr m2 m2 m3 m3 m3 lbr lbr kg m3 m3 m3 m3 kg bh bh m3 m2 m3 m2 kg m2 kg bh kg kg m' m' m' m2 pcs pail pail ltr ltr pail ltr pail pail kg m2 zak roll tube pile pcs m1 lbr lbr m2 kg m2 lbr m3

HARGA SATUAN ( Rp )

20.00 16,500.00 299,000.00 215,000.00 220,000.00 222,000.00 7,000.00 5,000.00 8,300.00 2,600,000.00 3,850,000.00 3,350,000.00 2,300,000.00 8,300.00 3,300.00 400.00 680,000.00 145,000.00 180,000.00 140,000.00 153.57 125,000.00 30,250.00 12,500.00 9,000.00 9,100.00 190,000.00 195,000.00 261,000.00 145,000.00 3,000.00 1,550,000.00 1,050,000.00 140,000.00 135,000.00 55,000.00 65,000.00 78,500.00 55,000.00 4,500.00 550,000.00 85,000.00 375,000.00 45,000.00 740,000.00 5,500.00 35,000.00 104,000.00 67,000.00 235,000.00 7,800.00 270,000.00 75,000.00 3,350,000.00

NO 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115

URAIAN Kayu Papan Albasiah Kayu Papan Kelas IV Kawat Beton Keramik, uk. 150x600, ex. Roman Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kwas 3" Kwas cat rata-rata List plafond profil aluminium U, 1cm Metal deck Hi-Tensile G550, Spandeck, 0,45 TCT COLOR BOND, Merk : Flexideck Metal square hollow 40/40 Minyak Bekisting MU Acian (40kg) MU Plester (50kg) Multiplek 9mm Multiplek 12mm Multiplek 15mm Nok Atap Paku 5-10cm Paku Biasa 2" - 3" Pasir Beton Pasir Beton Pasir Pasang Pasir Urug Paving Block 8cm Natural Pipa Galvanis 1,5" Pipa Galvanis 2" Plat stainless steel Plat strip stainless Plywood tebal 9mm Rangka daun Jendela Aluminium, setara Powder Coating Merk : YKK Rangka metal square zincalume/Galvanized Rol cat Sealant untuk ACP Semen PC 50kg Semen Portland Semen warna Seng Gelombang Thinner Thinner OS 2000 Thinner P.U. Thinner slow dry Lampu Tape/Strip LED merk Philips - 31059 GRC Cetak t=15 mm Sewa Main Frame Sewa Joint Pin Sewa Cross Brase Sewa Head Jack Sewa Base Jack Sewa PIpa Support + Accesories Accessoris Pintu dan Jendela Pull Handle, setara Dekson, Solid Lockcase swing, setara Dekson, Solid Cylinder, setara Dekson, Solid Rumput : Bensin/Solar Oli Tanah Top Soil Pupuk Kandang (1 karung : 40 Kg) Furadan

m3 m3 kg m2 m1 bh bh m1 m2 m1 ltr kg kg lbr lbr lbr m1 kg kg m3 kg m3 m3 bh m1 m1 m2 m1 lbr m1 m2 bh m1 zak kg kg lbr ltr ltr ltr ltr m1 m2 bh bh bh bh bh bh

HARGA SATUAN ( Rp ) 2,600,000.00 2,300,000.00 23,000.00 72,000.00 110,000.00 20,000.00 14,000.00 17,500.00 105,000.00 15,300.00 12,000.00 3,950.00 3,350.00 102,500.00 154,000.00 185,000.00 41,200.00 22,000.00 23,000.00 212,000.00 132.50 195,000.00 145,000.00 2,000.00 58,000.00 67,500.00 405,000.00 175,000.00 102,500.00 110,000.00 120,000.00 55,000.00 7,500.00 58,000.00 1,160.00 6,500.00 53,000.00 22,000.00 25,000.00 24,000.00 20,500.00 365,000.00 150,000.00 10,000.00 10,000.00 12,000.00 7,500.00 8,000.00 12,000.00

bh set bh

225,000.00 125,000.00 295,000.00

ltr ltr m3 krg kg

11,000.00 40,000.00 155,000.00 30,000.00 23,000.00

SAT

NO

URAIAN

116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138

Atonik/Rotone Pupuk Kompos (5kg) Rumput Gajah Mini Mobil Operasional Mobil Tanki air 5000 lt Truk engkel Linggis/Blencong Cangkul pH Meter Karung Plastik Selang Penyiraman Safe Top Nail Sekrup Semen PC 50kg Semen Portland Semen warna Sirtu Waterproofing Formdex Uniflex Cementitious Membrance, Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika Merk : Hitchins, Penetron, Sika Waterstop Lebar 150 mm Sealant Karet

II. 1 2 3 4 5 6 7 8 9 10 11 12 13 14

HARGA UPAH Pekerja Tukang Tukang Batu Tukang Besi Tukang besi profil Tukang Cat Tukang Kayu Tukang Las Kepala Tukang Mandor Supir Tukang Gali Tukang Tanam Tukang Penyiraman

SAT btl kntg m2 hari hari hari hari hari hari buah jam bh kg zak kg kg kg m2 kg

HARGA SATUAN ( Rp ) 165,000.00 10,000.00 16,000.00 450,000.00 600,000.00 600,000.00 10,000.00 8,000.00 3,000.00 1,000.00 25,000.00 3,000.00 35,000.00 58,000.00 1,160.00 6,500.00 202,500.00 322,500.00 3,500.00

m1 m1 m1

16,500.00 7,500.00 8,600.00

OH OH OH OH OH OH OH OH OH OH OH OH OH OH

75,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 120,000.00 135,000.00 120,000.00 100,000.00 75,000.00 75,000.00

Bekasi, 31 Dsember 2019 PT. JAYA SAE KONSUL

TTD

EVALIN KRISTINA Direktur

JADWAL WAKTU PELA Fisik Konstruksi Rehabilitasi/Renovasi

No.

I. 1 2 3 4 5 II II.A III. III.A III.A.1 III.A.2 III.B III.B.1 III.B.2 III.B.3 III.C III.C.1 III.C.2 IV IV.1 IV.2 IV.3 IV.4 IV.5 IV.6

Jenis Pekerjaan

PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG Gambar Shop Drawing dan As Built Drawing Photo-photo Progress Kemajuan Pekerjaan SMK2 (Sistem Manajemen Keselamatan Konstruksi) Keamanan Proyek dan Perlindungan pekerjaan Mobilisasi atau transportasi peralatan dan bahan PEKERJAAN PEMBONGKARAN PEK. PAS. BONGKARAN PEKERJAAN STRUKTUR PEKERJAAN STRUKTUR LANSEKAP PEKERJAAN TANAH PEKERJAAN STRUKTUR ELV. -0.050 PEKERJAAN STRUKTUR BANGUNAN PEKERJAAN TANAH PEKERJAAN STRUKTUR ELV. -0.050 PEKERJAAN STRUKTUR ELV. -0.050 s/d + 6.000 PEKERJAAN STRUKTUR KOLAM PEKERJAAN TANAH PEKERJAAN STRUKTUR ELV. -0.050 PEKERJAAN ARSITEKTUR PEK. PAS. DINDING DAN PELAPISAN DINDING PEK. PAS. PELAPISAN LANTAI PEK. PAS. PLAFOND PEK. PAS. KUSEN PEK. PAS. FINISHING DAN PENGECATAN PEK. PAS. RANGKA DAN PENUTUP ATAP

Jumlah Rp.

9,900,000.00 2,640,000.00 31,185,000.00 16,170,000.00 22,000,000.00

Bobot %

265,652,713.43

0.290 0.077 0.912 0.473 0.644 7.772

576,340,063.20 829,967,465.09

16.862 24.282

35,661,610.92 103,004,960.06 184,146,323.62

1.043 3.014 5.387

20,396,709.53 110,701,487.75

0.597 3.239

96,376,178.52 40,206,487.86 78,698,712.22 41,780,283.60 8,933,470.81 144,365,566.40

2.820 1.176 2.302 1.222 0.261 4.224

1

2

3

4

5

1 s/d 7

8 s/d 14

15 s/d 21

22 s/d 28

29 s/d 35

0.145 0.019 0.054

0.054

0.054

0.054

0.054

0.028

0.028

0.028

0.028

0.028

0.215

0.215 2.591

2.591

2.591

2.810

2.810

2.810

2.810

3.469

3.469 0.522

IV.7 V. V.A IV.A.1 IV.B

PEK. PAS. LANSEKAP PEKERJAAN MEKANIKAL ELETRIKAL PLUMBING PEKERJAAN PLUMBING Pekerjaan Instalasi Air Bersih PEKERJAAN ELEKTRIKAL

760,353,666.05

22.245

12,015,915.53 27,555,904.60

0.352 0.806

PROGRESS MINGGUAN %

100.00 (%)

0.460

5.697

5.482

8.951

6.882

KOMULATIF MINGGUAN %

(%)

0.460

6.157

11.640

20.591

27.473

JUMLAH

3,418,052,519.19

WAL WAKTU PELAKSANAAN

ksi Rehabilitasi/Renovasi Museum Kars Indonesia Waktu Pelaksanaan : 120 (Seratus Dua Puluh ) Hari Kalender Minggu Ke : 7 8 9 10 11 12 Hari Ke -

6 36 s/d 42

43 s/d 49

50 s/d 56

Chart Title 57 s/d 63

64 s/d 70

71 s/d 77

78 s/d 84

13

14

15

16

17

18

85 s/d 91

92 s/d 98

99 s/d 105

106s/d112

113s/d119

120

0.145 0.019

0.019

0.019

0.054

0.054

0.054

0.054

0.054

0.054

0.054

0.054

0.054

0.054

0.054

0.054

0.028

0.028

0.028

0.028

0.028

0.028

0.028

0.028

0.028

0.028

0.028

0.028 0.215

2.810

3.469

3.469

3.469

1.005

1.005

1.347

1.347

3.469

3.469

1.347

1.347

P

2.810

0.522

H

1.005

0.940

1.080

1.080

0.940

0.940 0.588

1.080

0.588 1.151

0.611

O

0.597

1.151

0.611 0.261

1.408

1.408

1.408

3.178

3.178

3.178

3.178

3.178

3.178

3.178

0.352 0.806

7.906

8.712

5.902

7.842

11.502

7.886

6.709

4.411

3.521

3.259

3.259

1.618

35.379

44.091

49.993

57.835

69.337

77.223

83.932

88.343

91.863

95.123

98.382

100.000

Bekasi, 31 Dsember 2019 PT. JAYA SAE KONSUL

TTD

EVALIN KRISTINA Direktur

100.000

Ket

100,000

90,000

80,000

70,000

60,000

50,000

40,000

30,000

20,000

10,000

30,000

20,000

10,000 0,000

Formulir Rekapitulasi Perhitungan Tingkat Komponen Dalam Negeri (TKDN) Nilai Gabungan Barang/Jasa (Rp) Uraian Pekerjaan (1)

DN

LN

(2)

(3)

TOTAL Ribu Rp (4)

% KDN (5)

Barang I. II. A. Jasa III.

Material Langsung (Bahan Baku) Peralatan (Barang Jadi) Sub-Total Barang

IV. V. VI. B.

Manajemen Proyek dan Perekayasaan Alat Kerja/Fasilitas Kerja Konstruksi dan Fabrikasi Jasa Umum Sub-Total Jasa

C.

TOTAL Biaya (A+B)

2,460,997,813.82 2,460,997,813.82

-

2,460,997,813.82 2,460,997,813.82

100% -

85,451,312.98

-

85,451,312.98

100%

871,603,392.39 957,054,705.37

-

871,603,392.39 957,054,705.37

100% -

3,418,052,519.19

-

3,418,052,519.19 Bekasi, 31 Dsember 2019 PT. JAYA SAE KONSUL TTD

EVALIN KRISTINA Direktur

am Negeri

si, 31 Dsember 2019

TKDN

Barang/ Jasa (7)

Gabungan (8)

2,460,997,813.82 2,460,997,813.82

72.00% 72.00%

85,451,312.98

2.50%

871,603,392.39 957,054,705.37

25.50% 28.00%

3,418,052,519.19

100.00%

SPESIFIKASI TEKNIS NO I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 41 42 43 44 45 46 47 48 49 50 51

NAMA BAHAN / MATERIAL HARGA BAHAN ARSITEKTUR DAN STRUKTUR Air Aluminium foil single layer, serat fiber Alumunium composite panel T.4mm, Anti UV,Merk : Maco Batu pecah mesin 1-2 Batu pecah mesin 2-3 Batu pecah mesin 5-7 Ampelas besi Ampelas Tembok Baja Profil, setara DN Balok Kayu Albasiah Balok Kayu Kamper Samarinda Oven Balok Kayu Kelas III Balok Kayu Kelas IV Base Plat Besi Batako Bata Merah Bata Ringan Tebal 10cm, Merk : Hebel, Liebel Batu Andesit Batu Belah Batu Gamping Batu pecah mesin 1-2 Batu Templek Baut Baut HTB Besi Beton Polos Besi Beton Ulir Besi Siku L 40 x 40 x 4 Besi Siku L 50 x 50 x 5 Besi Siku L 60 x 60 x 6 Bondeck, tipe : Floor Deck T.1mm, Lapis lindung : Dip Hot Galvanized C Profile Cat dasar Attaboy OS Super Primer White Cat dasar petalux alkali sealer white Cat duco polyurethane clear matt MV-3, Merk : Petalac 2K Cat epoxy undercoat, Merk : Petalac Cat plafond, setara Petalux Cat polyster putty, Merk : Petalac Cat tembok eksterior, Merk : Attaboy Facade Cat tembok interior, setara Petalux Compound Daun Pintu Solid lapis Megateak 3mm Drymix TA water repellent (40kg) Duo Composite Membrane Duo Kit Sealant Duo Primer Fastener and Mechano Plate Flashing atap GRC t.6mm Gypsumboard T.9mm, Merk :Jayaboard, Knauf Homogeneous Tile 800x800, ex. Indogress

SAT

ltr m2 m2 m3 m3 m3 lbr lbr kg m3 m3 m3 m3 kg bh bh m3 m2 m3 m2 kg m2 kg bh kg kg m' m' m' m2 pcs pail pail ltr ltr pail ltr pail pail kg m2 zak roll tube pile pcs m1 lbr lbr m2

NO 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107

NAMA BAHAN / MATERIAL Jaring Kawat Baja Dilas Kaca polos T.6mm, setara Asahimas Kalsiplank 8mm, Jati, uk. 0,2x3m Kayu Kelas III Kayu Papan Albasiah Kayu Papan Kelas IV Kawat Beton Keramik, uk. 150x600, ex. Roman Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kwas 3" Kwas cat rata-rata List plafond profil aluminium U, 1cm Metal deck Hi-Tensile G550, Spandeck, 0,45 TCT COLOR BOND, Merk : Flexideck Metal square hollow 40/40 Minyak Bekisting MU Acian (40kg) MU Plester (50kg) Multiplek 9mm Multiplek 12mm Multiplek 15mm Nok Atap Paku 5-10cm Paku Biasa 2" - 3" Pasir Beton Pasir Beton Pasir Pasang Pasir Urug Paving Block 8cm Natural Pipa Galvanis 1,5" Pipa Galvanis 2" Plat stainless steel Plat strip stainless Plywood tebal 9mm Rangka daun Jendela Aluminium, setara Powder Coating Merk : YKK Rangka metal square zincalume/Galvanized Rol cat Sealant untuk ACP Semen PC 50kg Semen Portland Semen warna Seng Gelombang Thinner Thinner OS 2000 Thinner P.U. Thinner slow dry Lampu Tape/Strip LED merk Philips - 31059 GRC Cetak t=15 mm Sewa Main Frame Sewa Joint Pin Sewa Cross Brase Sewa Head Jack Sewa Base Jack Sewa PIpa Support + Accesories Accessoris Pintu dan Jendela Pull Handle, setara Dekson, Solid

SAT kg m2 lbr m3 m3 m3 kg m2 m1 bh bh m1 m2 m1 ltr kg kg lbr lbr lbr m1 kg kg m3 kg m3 m3 bh m1 m1 m2 m1 lbr m1 m2 bh m1 zak kg kg lbr ltr ltr ltr ltr m1 m2 bh bh bh bh bh bh bh

NO 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136

NAMA BAHAN / MATERIAL Lockcase swing, setara Dekson, Solid Cylinder, setara Dekson, Solid Rumput : Bensin/Solar Oli Tanah Top Soil Pupuk Kandang (1 karung : 40 Kg) Furadan Atonik/Rotone Pupuk Kompos (5kg) Rumput Gajah Mini Mobil Operasional Mobil Tanki air 5000 lt Truk engkel Linggis/Blencong Cangkul pH Meter Karung Plastik Selang Penyiraman Safe Top Nail Sekrup Semen PC 50kg Semen Portland Semen warna Sirtu Waterproofing Formdex Uniflex Cementitious Membrance, Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika Merk : Hitchins, Penetron, Sika Waterstop Lebar 150 mm

SAT set bh ltr ltr m3 krg kg btl kntg m2 hari hari hari hari hari hari buah jam bh kg zak kg kg kg m2 kg m1

NO 137 138

NAMA BAHAN / MATERIAL Sealant Karet

SAT m1 m1

Bekasi, 31 Dsember 2019 PT. JAYA SAE KONSUL

TTD

EVALIN KRISTINA Direktur

S MERK/TYPE

Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan

MERK/TYPE Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan

MERK/TYPE Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan

MERK/TYPE Sesuai spesifikasi yang telah ditentukan Sesuai spesifikasi yang telah ditentukan

si, 31 Dsember 2019 JAYA SAE KONSUL

VALIN KRISTINA

DUKUNGAN BAHAN 1 NO I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

URAIAN HARGA BAHAN ARSITEKTUR DAN STRUKTUR Air Aluminium foil single layer, serat fiber Alumunium composite panel T.4mm, Anti UV,Merk : Maco Batu pecah mesin 1-2 Batu pecah mesin 2-3 Batu pecah mesin 5-7 Ampelas besi Ampelas Tembok Baja Profil, setara DN Balok Kayu Albasiah Balok Kayu Kamper Samarinda Oven Balok Kayu Kelas III Balok Kayu Kelas IV Base Plat Besi Batako Bata Merah Bata Ringan Tebal 10cm, Merk : Hebel, Liebel Batu Andesit Batu Belah Batu Gamping Batu pecah mesin 1-2 Batu Templek Baut Baut HTB Besi Beton Polos Besi Beton Ulir Besi Siku L 40 x 40 x 4 Besi Siku L 50 x 50 x 5 Besi Siku L 60 x 60 x 6 Bondeck, tipe : Floor Deck T.1mm, Lapis lindung : Dip Hot Galvanized C Profile Cat dasar Attaboy OS Super Primer White Cat dasar petalux alkali sealer white Cat duco polyurethane clear matt MV-3, Merk : Petalac 2K Cat epoxy undercoat, Merk : Petalac Cat plafond, setara Petalux Cat polyster putty, Merk : Petalac Cat tembok eksterior, Merk : Attaboy Facade Cat tembok interior, setara Petalux Cat zinchromat, setara Meiji Compound Daun Pintu Solid lapis Megateak 3mm Drymix TA water repellent (40kg) Duo Composite Membrane Duo Kit Sealant Duo Primer Fastener and Mechano Plate Flashing atap GRC t.6mm Gypsumboard T.9mm, Merk :Jayaboard, Knauf

SAT

ltr m2 m2 m3 m3 m3 lbr lbr kg m3 m3 m3 m3 kg bh bh m3 m2 m3 m2 kg m2 kg bh kg kg m' m' m' m2 pcs pail pail ltr ltr pail ltr pail pail kg kg m2 zak roll tube pile pcs m1 lbr lbr

51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107

Homogeneous Tile 800x800, ex. Indogress Kaca Tempered 12mm, Merk : Asahimas Jaring Kawat Baja Dilas Kaca polos T.6mm, setara Asahimas Kalsiplank 8mm, Jati, uk. 0,2x3m Kayu Kelas III Kayu Papan Albasiah Kayu Papan Kelas IV Kawat Beton Keramik, uk. 150x600, ex. Roman Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kwas 3" Kwas cat rata-rata List plafond profil aluminium U, 1cm Metal deck Hi-Tensile G550, Spandeck, 0,45 TCT COLOR BOND, Merk : Flexideck Metal square hollow 40/40 Minyak Bekisting MU Acian (40kg) MU Plester (50kg) Multiplek 9mm Multiplek 12mm Multiplek 15mm Nok Atap Paku 5-10cm Paku Biasa 2" - 3" Pasir Beton Pasir Beton Pasir Pasang Pasir Urug Paving Block 8cm Natural Pipa Galvanis 1,5" Pipa Galvanis 2" Plat stainless steel Plat strip stainless Plywood tebal 9mm Rangka daun Jendela Aluminium, setara Powder Coating Merk : YKK Rangka metal square zincalume/Galvanized Rol cat Sealant untuk ACP Semen PC 50kg Semen Portland Semen warna Seng Gelombang Thinner Thinner OS 2000 Thinner P.U. Thinner slow dry Lampu Tape/Strip LED merk Philips - 31059 GRC Cetak t=15 mm Sewa Main Frame Sewa Joint Pin Sewa Cross Brase Sewa Head Jack Sewa Base Jack Sewa PIpa Support + Accesories Accessoris Pintu dan Jendela Pull Handle, setara Dekson, Solid

m2 m2 kg m2 lbr m3 m3 m3 kg m2 m1 bh bh m1 m2 m1 ltr kg kg lbr lbr lbr m1 kg kg m3 kg m3 m3 bh m1 m1 m2 m1 lbr m1 m2 bh m1 zak kg kg lbr ltr ltr ltr ltr m1 m2 bh bh bh bh bh bh bh

108

Lockcase swing, setara Dekson, Solid

set

109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138

Cylinder, setara Dekson, Solid Rumput : Bensin/Solar Oli Tanah Top Soil Pupuk Kandang (1 karung : 40 Kg) Furadan Atonik/Rotone Pupuk Kompos (5kg) Rumput Gajah Mini Mobil Operasional Mobil Tanki air 5000 lt Truk engkel Linggis/Blencong Cangkul pH Meter Karung Plastik Selang Penyiraman Safe Top Nail Sekrup Semen PC 50kg Semen Portland Semen warna Sirtu Waterproofing Formdex Uniflex Cementitious Membrance, Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika Merk : Hitchins, Penetron, Sika Waterstop Lebar 150 mm Sealant Karet

bh ltr ltr m3 krg kg btl kntg m2 hari hari hari hari hari hari buah jam bh kg zak kg kg kg m2 kg m1 m1 m1

DUKUNGAN BAHAN 1 HARGA SATUAN ( Rp )

20.00 16,500.00 299,000.00 215,000.00 220,000.00 222,000.00 7,000.00 5,000.00 8,300.00 2,600,000.00 3,450,000.00 3,250,000.00 2,300,000.00 8,300.00 3,300.00 400.00 680,000.00 140,000.00 180,000.00 140,000.00 153.57 125,000.00 30,000.00 12,500.00 9,000.00 8,500.00 190,000.00 195,000.00 261,000.00 145,000.00 3,000.00 1,380,000.00 890,000.00 125,000.00 110,000.00 720,000.00 65,000.00 78,500.00 55,000.00 4,500.00 550,000.00 75,000.00 375,000.00 45,000.00 740,000.00 5,500.00 32,000.00 104,000.00 67,000.00

235,000.00 7,800.00 97,000.00 75,000.00 3,250,000.00 2,600,000.00 2,300,000.00 23,000.00 72,000.00 110,000.00 20,000.00 14,000.00 17,500.00 105,000.00 15,300.00 11,500.00 3,950.00 3,350.00 102,500.00 154,000.00 185,000.00 41,200.00 22,000.00 23,000.00 212,000.00 132.50 195,000.00 140,000.00 2,000.00 58,000.00 67,500.00 405,000.00 175,000.00 102,500.00 110,000.00 120,000.00 55,000.00 7,500.00 58,000.00 1,160.00 6,500.00 53,000.00 22,000.00 25,000.00 24,000.00 20,500.00 365,000.00 150,000.00 10,000.00 8,000.00 11,000.00 7,500.00 8,000.00 12,000.00 225,000.00

125,000.00

295,000.00 11,000.00 40,000.00 155,000.00 30,000.00 23,000.00 125,000.00 10,000.00 16,000.00 450,000.00 600,000.00 600,000.00 10,000.00 8,000.00 3,000.00 1,000.00 25,000.00 3,000.00 35,000.00 58,000.00 1,160.00 6,500.00 202,500.00 322,500.00 3,500.00 16,500.00 7,500.00 8,600.00

DUKUNGAN BAHAN 2 NO I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

URAIAN HARGA BAHAN ARSITEKTUR DAN STRUKTUR Air Aluminium foil single layer, serat fiber Alumunium composite panel T.4mm, Anti UV,Merk : Maco Batu pecah mesin 1-2 Batu pecah mesin 2-3 Batu pecah mesin 5-7 Ampelas besi Ampelas Tembok Baja Profil, setara DN Balok Kayu Albasiah Balok Kayu Kamper Samarinda Oven Balok Kayu Kelas III Balok Kayu Kelas IV Base Plat Besi Batako Bata Merah Bata Ringan Tebal 10cm, Merk : Hebel, Liebel Batu Andesit Batu Belah Batu Gamping Batu pecah mesin 1-2 Batu Templek Baut Baut HTB Besi Beton Polos Besi Beton Ulir Besi Siku L 40 x 40 x 4 Besi Siku L 50 x 50 x 5 Besi Siku L 60 x 60 x 6 Bondeck, tipe : Floor Deck T.1mm, Lapis lindung : Dip Hot Galvanized C Profile Cat dasar Attaboy OS Super Primer White Cat dasar petalux alkali sealer white Cat duco polyurethane clear matt MV-3, Merk : Petalac 2K Cat epoxy undercoat, Merk : Petalac Cat plafond, setara Petalux Cat polyster putty, Merk : Petalac Cat tembok eksterior, Merk : Attaboy Facade Cat tembok interior, setara Petalux Cat zinchromat, setara Meiji Compound Daun Pintu Solid lapis Megateak 3mm Drymix TA water repellent (40kg) Duo Composite Membrane Duo Kit Sealant Duo Primer Fastener and Mechano Plate Flashing atap GRC t.6mm Gypsumboard T.9mm, Merk :Jayaboard, Knauf

SAT

ltr m2 m2 m3 m3 m3 lbr lbr kg m3 m3 m3 m3 kg bh bh m3 m2 m3 m2 kg m2 kg bh kg kg m' m' m' m2 pcs pail pail ltr ltr pail ltr pail pail kg kg m2 zak roll tube pile pcs m1 lbr lbr

51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107

Homogeneous Tile 800x800, ex. Indogress Kaca Tempered 12mm, Merk : Asahimas Jaring Kawat Baja Dilas Kaca polos T.6mm, setara Asahimas Kalsiplank 8mm, Jati, uk. 0,2x3m Kayu Kelas III Kayu Papan Albasiah Kayu Papan Kelas IV Kawat Beton Keramik, uk. 150x600, ex. Roman Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kwas 3" Kwas cat rata-rata List plafond profil aluminium U, 1cm Metal deck Hi-Tensile G550, Spandeck, 0,45 TCT COLOR BOND, Merk : Flexideck Metal square hollow 40/40 Minyak Bekisting MU Acian (40kg) MU Plester (50kg) Multiplek 9mm Multiplek 12mm Multiplek 15mm Nok Atap Paku 5-10cm Paku Biasa 2" - 3" Pasir Beton Pasir Beton Pasir Pasang Pasir Urug Paving Block 8cm Natural Pipa Galvanis 1,5" Pipa Galvanis 2" Plat stainless steel Plat strip stainless Plywood tebal 9mm Rangka daun Jendela Aluminium, setara Powder Coating Merk : YKK Rangka metal square zincalume/Galvanized Rol cat Sealant untuk ACP Semen PC 50kg Semen Portland Semen warna Seng Gelombang Thinner Thinner OS 2000 Thinner P.U. Thinner slow dry Lampu Tape/Strip LED merk Philips - 31059 GRC Cetak t=15 mm Sewa Main Frame Sewa Joint Pin Sewa Cross Brase Sewa Head Jack Sewa Base Jack Sewa PIpa Support + Accesories Accessoris Pintu dan Jendela Pull Handle, setara Dekson, Solid

m2 m2 kg m2 lbr m3 m3 m3 kg m2 m1 bh bh m1 m2 m1 ltr kg kg lbr lbr lbr m1 kg kg m3 kg m3 m3 bh m1 m1 m2 m1 lbr m1 m2 bh m1 zak kg kg lbr ltr ltr ltr ltr m1 m2 bh bh bh bh bh bh bh

108

Lockcase swing, setara Dekson, Solid

set

109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138

Cylinder, setara Dekson, Solid Rumput : Bensin/Solar Oli Tanah Top Soil Pupuk Kandang (1 karung : 40 Kg) Furadan Atonik/Rotone Pupuk Kompos (5kg) Rumput Gajah Mini Mobil Operasional Mobil Tanki air 5000 lt Truk engkel Linggis/Blencong Cangkul pH Meter Karung Plastik Selang Penyiraman Safe Top Nail Sekrup Semen PC 50kg Semen Portland Semen warna Sirtu Waterproofing Formdex Uniflex Cementitious Membrance, Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika Merk : Hitchins, Penetron, Sika Waterstop Lebar 150 mm Sealant Karet

bh ltr ltr m3 krg kg btl kntg m2 hari hari hari hari hari hari buah jam bh kg zak kg kg kg m2 kg m1 m1 m1

DUKUNGAN BAHAN 2 HARGA SATUAN ( Rp )

20.00 16,500.00 295,000.00 215,000.00 220,000.00 222,000.00 7,000.00 5,000.00 8,300.00 2,600,000.00 3,420,000.00 3,240,000.00 2,300,000.00 8,300.00 3,300.00 400.00 680,000.00 144,000.00 180,000.00 140,000.00 153.57 125,000.00 31,000.00 12,500.00 9,000.00 8,700.00 190,000.00 195,000.00 261,000.00 145,000.00 3,000.00 1,360,000.00 895,000.00 125,000.00 110,000.00 710,000.00 62,000.00 77,500.00 55,000.00 4,500.00 550,000.00 73,000.00 375,000.00 45,000.00 740,000.00 5,500.00 32,000.00 104,000.00 67,000.00

230,000.00 7,800.00 98,000.00 75,000.00 3,240,000.00 2,600,000.00 2,300,000.00 21,000.00 70,500.00 108,000.00 20,000.00 14,000.00 17,000.00 105,000.00 15,000.00 11,200.00 3,925.00 3,330.00 101,500.00 154,000.00 185,000.00 41,200.00 22,000.00 23,000.00 212,000.00 132.50 195,000.00 143,000.00 2,000.00 58,000.00 67,500.00 405,000.00 175,000.00 101,500.00 108,000.00 120,000.00 50,000.00 7,500.00 58,000.00 1,160.00 6,500.00 53,000.00 22,000.00 25,000.00 24,000.00 20,500.00 365,000.00 145,000.00 10,000.00 8,500.00 11,500.00 7,500.00 8,000.00 12,000.00 225,000.00

125,000.00

295,000.00 11,200.00 40,000.00 155,000.00 30,000.00 23,000.00 125,000.00 10,000.00 16,000.00 450,000.00 600,000.00 600,000.00 10,000.00 8,000.00 3,000.00 1,000.00 25,000.00 3,000.00 35,000.00 58,000.00 1,160.00 6,500.00 202,500.00 322,500.00 3,400.00 16,500.00 7,500.00 8,600.00

DUKUNGAN BAHAN 3 NO I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

URAIAN HARGA BAHAN ARSITEKTUR DAN STRUKTUR Air Aluminium foil single layer, serat fiber Alumunium composite panel T.4mm, Anti UV,Merk : Maco Batu pecah mesin 1-2 Batu pecah mesin 2-3 Batu pecah mesin 5-7 Ampelas besi Ampelas Tembok Baja Profil, setara DN Balok Kayu Albasiah Balok Kayu Kamper Samarinda Oven Balok Kayu Kelas III Balok Kayu Kelas IV Base Plat Besi Batako Bata Merah Bata Ringan Tebal 10cm, Merk : Hebel, Liebel Batu Andesit Batu Belah Batu Gamping Batu pecah mesin 1-2 Batu Templek Baut Baut HTB Besi Beton Polos Besi Beton Ulir Besi Siku L 40 x 40 x 4 Besi Siku L 50 x 50 x 5 Besi Siku L 60 x 60 x 6 Bondeck, tipe : Floor Deck T.1mm, Lapis lindung : Dip Hot Galvanized C Profile Cat dasar Attaboy OS Super Primer White Cat dasar petalux alkali sealer white Cat duco polyurethane clear matt MV-3, Merk : Petalac 2K Cat epoxy undercoat, Merk : Petalac Cat plafond, setara Petalux Cat polyster putty, Merk : Petalac Cat tembok eksterior, Merk : Attaboy Facade Cat tembok interior, setara Petalux Cat zinchromat, setara Meiji Compound Daun Pintu Solid lapis Megateak 3mm Drymix TA water repellent (40kg) Duo Composite Membrane Duo Kit Sealant Duo Primer Fastener and Mechano Plate Flashing atap GRC t.6mm Gypsumboard T.9mm, Merk :Jayaboard, Knauf

SAT

ltr m2 m2 m3 m3 m3 lbr lbr kg m3 m3 m3 m3 kg bh bh m3 m2 m3 m2 kg m2 kg bh kg kg m' m' m' m2 pcs pail pail ltr ltr pail ltr pail pail kg kg m2 zak roll tube pile pcs m1 lbr lbr

51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107

Homogeneous Tile 800x800, ex. Indogress Kaca Tempered 12mm, Merk : Asahimas Jaring Kawat Baja Dilas Kaca polos T.6mm, setara Asahimas Kalsiplank 8mm, Jati, uk. 0,2x3m Kayu Kelas III Kayu Papan Albasiah Kayu Papan Kelas IV Kawat Beton Keramik, uk. 150x600, ex. Roman Kusen Aluminium 4", T.1,2mm, fin. Powder Coating setara YKK Kwas 3" Kwas cat rata-rata List plafond profil aluminium U, 1cm Metal deck Hi-Tensile G550, Spandeck, 0,45 TCT COLOR BOND, Merk : Flexideck Metal square hollow 40/40 Minyak Bekisting MU Acian (40kg) MU Plester (50kg) Multiplek 9mm Multiplek 12mm Multiplek 15mm Nok Atap Paku 5-10cm Paku Biasa 2" - 3" Pasir Beton Pasir Beton Pasir Pasang Pasir Urug Paving Block 8cm Natural Pipa Galvanis 1,5" Pipa Galvanis 2" Plat stainless steel Plat strip stainless Plywood tebal 9mm Rangka daun Jendela Aluminium, setara Powder Coating Merk : YKK Rangka metal square zincalume/Galvanized Rol cat Sealant untuk ACP Semen PC 50kg Semen Portland Semen warna Seng Gelombang Thinner Thinner OS 2000 Thinner P.U. Thinner slow dry Lampu Tape/Strip LED merk Philips - 31059 GRC Cetak t=15 mm Sewa Main Frame Sewa Joint Pin Sewa Cross Brase Sewa Head Jack Sewa Base Jack Sewa PIpa Support + Accesories Accessoris Pintu dan Jendela Pull Handle, setara Dekson, Solid

m2 m2 kg m2 lbr m3 m3 m3 kg m2 m1 bh bh m1 m2 m1 ltr kg kg lbr lbr lbr m1 kg kg m3 kg m3 m3 bh m1 m1 m2 m1 lbr m1 m2 bh m1 zak kg kg lbr ltr ltr ltr ltr m1 m2 bh bh bh bh bh bh bh

108

Lockcase swing, setara Dekson, Solid

set

109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138

Cylinder, setara Dekson, Solid Rumput : Bensin/Solar Oli Tanah Top Soil Pupuk Kandang (1 karung : 40 Kg) Furadan Atonik/Rotone Pupuk Kompos (5kg) Rumput Gajah Mini Mobil Operasional Mobil Tanki air 5000 lt Truk engkel Linggis/Blencong Cangkul pH Meter Karung Plastik Selang Penyiraman Safe Top Nail Sekrup Semen PC 50kg Semen Portland Semen warna Sirtu Waterproofing Formdex Uniflex Cementitious Membrance, Waterproofing formdex WP system, Merk : Hitchins, Pentens, Sika Merk : Hitchins, Penetron, Sika Waterstop Lebar 150 mm Sealant Karet

bh ltr ltr m3 krg kg btl kntg m2 hari hari hari hari hari hari buah jam bh kg zak kg kg kg m2 kg m1 m1 m1

DUKUNGAN BAHAN 3 HARGA SATUAN ( Rp )

20.00 16,500.00 293,000.00 215,000.00 220,000.00 222,000.00 7,000.00 5,000.00 8,300.00 2,600,000.00 3,425,000.00 3,245,000.00 2,300,000.00 8,300.00 3,300.00 400.00 680,000.00 141,000.00 180,000.00 140,000.00 153.57 125,000.00 31,500.00 12,500.00 9,000.00 8,300.00 190,000.00 195,000.00 261,000.00 145,000.00 3,000.00 1,355,000.00 885,000.00 124,000.00 112,000.00 712,000.00 62,000.00 77,500.00 54,000.00 4,500.00 550,000.00 72,000.00 375,000.00 45,000.00 740,000.00 5,500.00 31,000.00 104,000.00 67,000.00

233,000.00 7,800.00 98,000.00 75,000.00 3,245,000.00 2,600,000.00 2,300,000.00 22,500.00 71,500.00 109,000.00 20,000.00 14,000.00 16,000.00 105,000.00 15,000.00 11,200.00 3,925.00 3,330.00 101,500.00 154,000.00 185,000.00 41,200.00 22,000.00 23,000.00 212,000.00 132.50 195,000.00 143,500.00 2,000.00 58,000.00 67,500.00 405,000.00 175,000.00 101,500.00 109,000.00 120,000.00 50,000.00 7,500.00 58,000.00 1,160.00 6,500.00 53,000.00 22,000.00 25,000.00 24,000.00 20,500.00 365,000.00 146,000.00 10,000.00 8,500.00 11,500.00 7,500.00 8,000.00 12,000.00 225,000.00

125,000.00

295,000.00 11,200.00 40,000.00 155,000.00 30,000.00 23,000.00 121,000.00 10,000.00 16,000.00 450,000.00 600,000.00 600,000.00 10,000.00 8,000.00 3,000.00 1,000.00 25,000.00 3,000.00 35,000.00 58,000.00 1,160.00 6,500.00 202,500.00 322,500.00 3,400.00 16,500.00 7,500.00 8,600.00

Related Documents

Boq
March 2021 0
Hvac Boq
January 2021 2
Apartment Boq
March 2021 0

More Documents from "Randa"