Case Study.pptx

  • Uploaded by: Sathya
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Case Study.pptx as PDF for free.

More details

  • Words: 578
  • Pages: 6
Loading documents preview...
PUNEETH C -

1KF16AT025

ABOUT THE PROJECT NAME OF THE PROJECT : CATEGORY ARCHITECT

LOCATION

APPROACH  Approach to the NCBS is from 2 sides along.  the road is 2way road with width 9 mts wide.  The site surroundings contains residential layout.

:

NATIONAL CENTRE FOR BIOLOGICAL SCIENCES, BANGALORE

RESEARCH INSTITUTE BUILD ING : RAJ REWAL , ABRD ARCHITECTS, MISTRY ARCHITECTS AND SANJAY KANVINDE

The NCBS campus is located in the Gandhi Krishi Vigyan Kendra (GKVK), on Bellary Road, in the north of Bangalore. The 20 acre campus with lush greenery

has faculty.

accommodation for students, visitors and

THE CAMPUS CONSISTS :

1.ADMINISTRATION BUILDING 2.EASTERN LABROTRIES 3.SOUTHER LABROTRIES 4.ANIMAL HOUSE 5.CANTEEN 6.RECREATION BLOCK 7.INSTEM BLOCK 8.CAMPUS CLINICS 9.DHRH BLOCK ( CANTEEN) 10.HOSTEL BLOCK ( CHAMPAKA , MALLIGE, PARIJATHA

ADMIN BLOCK /EASTERN BLOCK • The research laboratories function around surroundings and provide ample space for interaction among the scientist. • The aim of design was to locate various functions in such a manner that it would look complete and humour in all respects yet and flexibility for further expansion. • Inter-linked courtyards surrounded by laboratories and classroom . • The maximum natural diffused light was used. • The informal spaces(balcony) are provided in front of each laboratories. • Balcony is facing towards courtyard. • All the service lines were hidden in perforated ducts. • Cetronela was used near courtyard to avoid insects.

SOUTHERN BLOCK The southern laboratory building is organized such that shared resources/ interactive spaces are located on the northern side. Large deck for outdoor functions, food court, exhibitions and lectures is located under pilotis on first floor. This provides interaction opportunities so critical for the scientific endeavour. The ground Floor has the 200 Seater Lecture Theatre, Spectrometry facility while the second floor has Lecture theatres, Library and Faculty Lounge. • The open laboratories are located on the south side separated by a large atrium. • The support facilities and services risers surround the labs on three sides connected by a service corridor which ensures unhindered and undisturbed access for maintenance and servicing of labs. • The colonnade space was used for exhibition and informal learning . • The libaray was facing toward landscape.

GROUND FLOORPLAN

SECTION FIiRSTFLOOR PLAN

SECOND FLOORPLAN

INSTEM CAMPUS

SERVICES

• The instem laboratory building is organized such that shared resources/ interactive spaces are located

Security

: CCTV Cameras Security room

Fire

: Fire extinguishers

inside the autrium. • The open laboratories are located towards atrium • The support facilities and services risers surround the labs on three sides connected by a service

Water supply : RAINWATER harvested lake.

Municipal water. Overhead storage tank.

corridor which ensures unhindered and undisturbed access for maintenance and servicing of labs. • The autrium space was used for exhibition and informal learning . • The service floor height is 2.3mts with a beams of 70cm .

Gas

: Gas Manifold rooms and Gas pipe line .

Electrical

: Transformer ,Generator was provided in separate block.

Vertical transportation

: Ramps, staircases

• The clearance height was 1.7mts.

INFERENCE

• Access to site is linear without obstructions. • The pedestrian path and vehicular movement is nicely segregated. • Rain water is used for toilets and landscape. • Pores pavements used to recharge ground water table. • Important areas(research lab, library ) are easily accessible. • The concept is based on Jaisalmer. • All the service lines are hidden in perforated ducts. • Greywater treatment is adopted in site.

Related Documents

Case
March 2021 0
Case Study
January 2021 2
Case Study
February 2021 0
Case Study
February 2021 0
Contract Case
January 2021 1

More Documents from "Sugi Malti"