Client Project PRESSURE VESSEL
Test Plan Fabrication Site
Stages of Inspection / Inspection Activity
ITEM 1.0
2.0
Characteristics/ Properties to check.
DOCUMENTS 1.1
Quality Assurance Plan QAP
As per Doc No: QAP Rev0
1.2
WPS & PQR
a. Welding Procedures, W.R.T. Approved Drawing.
DOCUMENT CONTROL 2.1 Receive Documents from Client
3.0
MATERIAL CONTROL 3.1 Plates -Material Receiving Inspection a) Check Packing Condition for damage b) Check Material Physical condition c) Check Quantity d) Attach Material Traceability Identification
a. Visual & Dimensional. b. Verification of Mill Test Report & correlation with Heat Marks & stamping, if available OR Check Test for Physical & Chem. Prop
e) Unpacking Inspection
3.2 Flanges -Material Receiving Inspection
FM-QAS-62 (Rev.0, 05/17/2010)
Client Project Test Plan
PRESSURE VESSEL
Fabrication Site
ITEM
Stages of Inspection / Inspection Activity
Characteristics/ Properties to check.
a) Check Packing Condition for damage b) Check Material Physical condition c) Check Quantity d) Attach Material Traceability Identification
a. Visual & Dimensional. b. Verification of Manufacturer Test certificate & correlation with Heat Marks & stamping
e) Unpacking Inspection
3.3 Nozzle Pipes -Material Receiving Inspection a) Check Packing Condition for damage b) Check Material Physical condition c) Check Quantity d) Attach Material Traceability Identification
a. Visual & Dimensional. b. Verification of Manufacturers T.C. Correlation with Heat Marks & Stamping / Check Test for Physical & Chem. Prop
e) Unpacking Inspection
3.4 Fasteners -Material Receiving Inspection a) Check Packing Condition for damage a. Visual & Dimensional. b. Verification of Manufacturer Test
FM-QAS-62 (Rev.0, 05/17/2010)
Client Project Test Plan
PRESSURE VESSEL
Fabrication Site
ITEM
Stages of Inspection / Inspection Activity b) Check Material Physical condition c) Check Quantity d) Attach Material Traceability Identification
Characteristics/ Properties to check. a. Visual & Dimensional. b. Verification of Manufacturer Test Certificate & correlation with Heat Marks & stamping
e) Unpacking Inspection
3.5 Gaskets -Material Receiving Inspection a) Check Packing Condition for damage b) Check Material Physical condition c) Check Quantity
a. Visual & Dimensional. b. Verification of Manufacturers TC Approved
d) Attach Material Traceability Identification e) Unpacking Inspection
FM-QAS-62 (Rev.0, 05/17/2010)
Client Project PRESSURE VESSEL
Test Plan
a. Visual & Dimensional. b. Verification of Manufacturers TC Approved
Fabrication Site
Stages of Inspection / Inspection Activity
ITEM
Characteristics/ Properties to check.
3.6 Supports -Material Receiving Inspection a) Check Packing Condition for damage b) Check Material Physical condition c) Check Quantity
a. Visual & Dimensional. b. Chemical Analysis.
d) Attach Material Traceability Identification e) Unpacking Inspection
4.0
FABRICATION STAGES 4.1 Dishend forming
a. Visual & Dimensional Insp. b. D.P. Tets on Knuckle & S.F. c. Minimum Thickness.
4.2 Shell long seam setup
a. V-groove Dimensional & Joint alignment b. Curvature / Ovality c. Circumference & other Dimensions.
4.3 Long seam back chip a. D.P. Test
FM-QAS-62 (Rev.0, 05/17/2010)
Client Project Test Plan
PRESSURE VESSEL
Fabrication Site
Stages of Inspection / Inspection Activity
ITEM
Characteristics/ Properties to check.
Circumseam setup of
4.4 main shell
a. V-groove Dimensional, Joint alignment & shell alignment b. Straightness
4.5 Circumseam backchip of main shell a. D.P.Test.
4.6 Nozzle to Shell/. Dishend Setup
a. Nozzle Size & Flange dimensions b. V-groove Dimensions c. Orientation, Projection & Elevation
4.7 Backchip of Nozzle to Shell /Dishend a. D.P.Test.
4.8 Circumference Setup of Shell to Dishend
a. V-groove Dimensional & Joint alignment b. Straightness
4.9 Circumference Back chip of Shell to Dishend a. D.P.Test.
4.10 Radiography (Spot = .’T’ joints) a. Weld Defects
4.11 Shell to Skirt Setup
a. V-groove Dimensional & Joint alignment b. Straightness
FM-QAS-62 (Rev.0, 05/17/2010)
Client Project PRESSURE VESSEL
Test Plan Fabrication Site
Stages of Inspection / Inspection Activity
ITEM
5.0
Characteristics/ Properties to check. a. V-groove Dimensional & Joint alignment b. Straightness
FINAL INSPECTION 5.1 Visual & Dimensional before Hydro Test a. Visual & Dimension Check
5.2 Hydraulic test - shell side
a. Leakage b.Pressure Guage Test Certificate c. Hold Time – 1 Hr. Min
FM-QAS-62 (Rev.0, 05/17/2010)
Client Project PRESSURE VESSEL
Test Plan Fabrication Site
Stages of Inspection / Inspection Activity
ITEM 6.0
Characteristics/ Properties to check.
SURFACE TREATMENT & FINAL PAINTING 6.1
Sand Blasting /Mechanical cleaning finish & Painting
a. Inspection of Surface cleaning before painting b. Check humidity condition c. Check curing time a. DFT Check – 25 Micros DFT
7.0
FINAL STAMPING ON EQUIPMENT a. Name Plate Data b. Rub Off Marking c. Spares & loose items bolted on job
FM-QAS-62 (Rev.0, 05/17/2010)
Purchase Order No:
Documen
TAG No:
Rev
Drawing No:
Date
INSPECTION AND TEST PLAN Surveillance
Project Specification Procedure/ Document Reference
Approved DrAWINg As per ASME, Sec- IX,
Verifying Document)
Acceptance Criteria
As per ASME, Sec- VIII DIV-1, Edition 2013
Edition 2013 As per ASME, Sec- IX,
Edition 2013
Record/Form
Control Sheet WPS & PQR Checklist
P WPS & PQR
Distribution Matrix
Approved Drawing
ASME Sec-II
PO Pack
Material Control Procedure
Part A
and
Manufacturer
P
H
Material Receiving Inspection Reports Check Test Certificate
H
Material Receive List Equipment Drawing
FM-QAS-62 (Rev.0, 05/17/2010)
Purchase Order No:
Documen
TAG No:
Rev
Drawing No:
Date
INSPECTION AND TEST PLAN Surveillance
Project Specification Procedure/ Document Reference
Acceptance Criteria
Verifying Document)
Record/Form
Manufacturer
Approved Drawing
ASME Sec-II
PO Pack
Material Receiving Inspection Reports
W
Material Control Procedure
Part A
and
Material Receiving Inspection Reports
H
Material Receive List Equipment Drawing
Approved Drawing
ASME Sec-II
PO Pack
Material Control Procedure
Part A
and Material Receive List Equipment Drawing
FM-QAS-62 (Rev.0, 05/17/2010)
Purchase Order No:
Documen
TAG No:
Rev
Drawing No:
Date
INSPECTION AND TEST PLAN Surveillance
Project Specification Procedure/ Document Reference
Acceptance Criteria
Verifying Document)
Record/Form
Manufacturer
Approved Drawing
ASME Sec-II
PO Pack
Material Receiving Inspection Reports
R
Material Control Procedure
Part A
and
Material Receiving Inspection Reports
R
Material Receive List Equipment Drawing
Approved Drawing Material Control Procedure
MOC : As per Approved Drawing
PO Pack and Material Receive List Equipment Drawing
FM-QAS-62 (Rev.0, 05/17/2010)
Purchase Order No:
Documen
TAG No:
Rev
Drawing No:
Date
INSPECTION AND TEST PLAN Surveillance
Project Specification Procedure/ Document Reference
Approved Drawing
Acceptance Criteria
Verifying Document)
Record/Form
Manufacturer
MOC:
PO Pack
Material Receiving Inspection Reports
H
Material Control Procedure
and Material Receive List Equipment Drawing
Approved Drawing
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
Approved Drawing
H
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
ASME, Sec- V, Edition 2013
H
Inspection Report As per ASME, Sec- V, Edition 2013
H
FM-QAS-62 (Rev.0, 05/17/2010)
Purchase Order No:
Documen
TAG No:
Rev
Drawing No:
Date
INSPECTION AND TEST PLAN Surveillance
Project Specification Procedure/ Document Reference
Acceptance Criteria
Approved Drawing
Verifying Document)
Record/Form
Manufacturer
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
ASME, Sec- V, Edition 2013
H
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
Approved Drawing
H
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
Approved Drawing
H
Inspection Report As per ASME, Sec- V, Edition 2013
Approved Drawing
H
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
ASME, Sec- V, Edition 2013
H
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
Approved Drawing &
H
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
H
ASME, Sec- V, Edition 2013 Approved Drawing
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
H
FM-QAS-62 (Rev.0, 05/17/2010)
Purchase Order No:
Documen
TAG No:
Rev
Drawing No:
Date
INSPECTION AND TEST PLAN Surveillance
Project Specification Procedure/ Document Reference
Acceptance Criteria As per ASME, Sec- VIII DIV-1, Edition 2013
Approved Drawing
Verifying Document)
Record/Form
Inspection Report As per ASME, Sec- VIII DIV-1, Edition 2013
Approved Drawing
Manufacturer H
As per ASME, Sec- VIII DIV-1, Edition 2013. (No leakage)
H
Inspection Report H
FM-QAS-62 (Rev.0, 05/17/2010)
Purchase Order No:
Documen
TAG No:
Rev
Drawing No:
Date
INSPECTION AND TEST PLAN Surveillance
Project Specification Procedure/ Document Reference
Acceptance Criteria
Manufacturer Specification Approved Drawing
Approved Drawing
As per Drawing (Painting Specification) / ASME, Sec- VIII DIV1, Edition 2013.
As per Drawing
Verifying Document)
Record/Form
Equipment Drawing
Painting Inspection Report
Manufacturer
W
and Manual
Rub off H
FM-QAS-62 (Rev.0, 05/17/2010)
Document No. Rev: Date:
Surveillance Inspection
QA (Consultant)
A R/W
Remarks
Existing relevant WPS/PQR, will be reviewed In case any new WPS/PQR required, it will be done under QA (Consultant)
H
H
FM-QAS-62 (Rev.0, 05/17/2010)
Document No. Rev: Date:
Surveillance Inspection
QA (Consultant)
Remarks
R
H
FM-QAS-62 (Rev.0, 05/17/2010)
Document No. Rev: Date:
Surveillance Inspection
QA (Consultant)
Remarks
R
R
FM-QAS-62 (Rev.0, 05/17/2010)
Document No. Rev: Date:
Surveillance Inspection
QA (Consultant)
Remarks
R
W
RN
RN
FM-QAS-62 (Rev.0, 05/17/2010)
Document No. Rev: Date:
Surveillance Inspection
QA (Consultant)
Remarks
RN
RN
RN
RN
RN
RN
RN
W
FM-QAS-62 (Rev.0, 05/17/2010)
Document No. Rev: Date:
Surveillance Inspection
QA (Consultant) W
Remarks
H
H
FM-QAS-62 (Rev.0, 05/17/2010)
Document No. Rev: Date:
Surveillance Inspection
QA (Consultant)
Remarks
M
H
FM-QAS-62 (Rev.0, 05/17/2010)