CONTROL CENTER MAIN CONSOLE Operation Work Station 1

Operation Work Station 2

Engineering Work Station

Engineering Work Station SCADA SERVER 1

PRINTER

FIRE WALL

switch

SCADA SERVER 2

GPS Front End Server Front End Server

switch

MORESCO 1 CORPORATE NETWORK MORESCO 1 SUBSTATIONS

SCADA NETWORK DIAGRAM CONTROL CENTER

SWITCH

/IP)

IC (DNP3 TCP

FIBER OPT

switch

FIBER OPT

IC (DNP3 TCP

/IP)

switch

switch

switch RTU / CONCENTRATOR / GATEWAY

RTU / CONCENTRATOR / GATEWAY

PAGAWAN SUBSTATION

RTU / CONCENTRATOR / GATEWAY TALAKAG SUBSTATION

SAN ISIDRO SUBSTATION

RTU / CONCENTRATOR / GATEWAY MAMBUAYA SUBSTATION

switch switch switch

switch RTU / CONCENTRATOR / GATEWAY

RTU / CONCENTRATOR / GATEWAY LUMBO SUBSTATION

RTU / CONCENTRATOR / GATEWAY

RTU / CONCENTRATOR / GATEWAY

QUIBONBON SUBSTATION

PATAG SUBSTATION

CANITOAN SUBSTATION

SUBSTATION AUTOMATION SYSTEM ARCHITECTURE CONTROL CENTER

SWITCH

DI / DO

AI

PROTOCOL CONVERTER

IEC61850

ABS 1, ABS 2, ABS N

TRANSFORMER OIL TEMPERATURE

ABB DPU2000-DNP3

RELAY 1, RELAY N

CB 1, CB 2, CB N

TRANSFORMER WINDING TEMPERATURE

ABB PLD2000-DNP3

POWER METER 1, POWER METER N

SAS HMI

TRANSFORMER FAN

SIEMEMS 76T6-IEC60870-5-103

REMOTE / LOCAL SWITCH

SIEMEMS 75S662-IEC60870-5-103 CHARGER - MODBUS OLTC MR - MODBUS ACREL METERS - MODBUS

RTU / CONCENTRATOR / GATEWAY

SUBSTATION DETAILS PAGAWAN Substation Equipment to be controlled & supervised 69kV AB Switch 1 AB Switch 2 AB Switch 3 Circuit Breakers 1 @ 220Vac (CB1) Circuit Breakers 2 (CB2) Local & Remote Switch for CB1 Local & Remote Switch for CB2 Protection Relay CB1 (ABB DPU2000 ) Protection Relay for CB2

Power Transformer OLTC- Relay (NONE) FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA) 13.2kV Circuit Breakers 3 (CB3) Circuit Breakers 4 (CB4) Circuit Breakers 5 (CB5) Local & Remote Switch 3 for CB3 Local & Remote Switch 4 for CB4 Local & Remote Switch 5 for CB5 Protection Relay for CB3 (ABB PCD2000 ) Protection Relay for CB4 (ABB PCD2000 ) Protection Relay for CB5 (ABB PCD2000 )

DI (Status)

DO (Control)

2 2 2 2 2 2 2

2 2 2 2 2 2 2

2

AI

Com. Port For Retrofit

DNP3.0 IEC61850

RS485 Ethernet

DNP3.0 DNP3.0 DNP3.0

RS485 RS485 RS485

IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet

2 1 1

2 2 2 2 2 2

2 2 2 2 2 2

POWER Meter 1 Future Installation POWER Meter 2 Future Installation POWER Meter 3 Future Installation POWER Meter 4 Future Installation POWER Meter 5 Future Installation POWER Meter 6 Future Installation DC volts Main (IEC61850) Future Installation Charger Status ( IEC61850) Future Installation Generator SynC-Relay Future Installation Protection Relay for Generator Future Installation Sub-Total SPARES TOTAL

Protocol

28 10 38

28 10 38

2 2 4

0 0

LUMBO Substation Equipment to be controlled & supervised 69kV AB Switch 1 AB Switch 2 AB Switch 3 AB Switch 4 AB Switch 5 Circuit Breakers 1 (CB1) Circuit Breakers 2 (CB2) Circuit Breakers 3 (CB3) Local & Remote Switch for CB1 Local & Remote Switch for CB2 Local & Remote Switch for CB3 Protection Relay for CB1 (ABB DPU2000 ) Protection Relay for CB2 Protection Relay for CB3

Power Transformer OLTC- Relay (NONE) FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA) 13.2kV Circuit Breakers 4 (CB4) Circuit Breakers 5 (CB5) Circuit Breakers 6 (CB6) Circuit Breakers 7 (CB7) Local & Remote Switch 4 for CB4 Local & Remote Switch 5 for CB5 Local & Remote Switch 6 for CB6 Local & Remote Switch 7 for CB7 Protection Relay for CB4 (ABB DPU2000 ) Protection Relay for CB5 (ABB DPU2000 ) Protection Relay for CB6 Protection Relay for CB7

DI (Status)

DO (Control)

2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2

2

AI

Protocol

Com. Port For Retrofit

DNP3.0 IEC61850 IEC61850

RS485 Ethernet Ethernet

2 1 1

2 2 2 2 2 2 2 2

1 1

2 2 2 2 2 2 2 2 DNP3.0 DNP3.0 IEC61850 IEC61850

RS485 RS485 Ethernet Ethernet

POWER Meter 1 Future Installation POWER Meter 2 Future Installation POWER Meter 3 Future Installation POWER Meter 4 Future Installation POWER Meter 5 Future Installation POWER Meter 6 Future Installation

IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet

DC volts Main (IEC61850) Future Installation Charger Status ( IEC61850) Future Installation

IEC61850 IEC61850

Ethernet Ethernet

Sub-Total SPARES TOTAL

40 10 50

40 10 50

2 2 4

2 2

SAN ISIDRO Substation Equipment to be controlled & supervised 69kV AB Switch 1 Circuit Breakers 1 (CB1) Local & Remote Switch for CB1 Protection Relay CB1 (SIEMENS 7UT6 )

Power Transformer OLTC- Relay (NONE) FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA) 13.2kV Circuit Breakers 2 (CB2) Circuit Breakers 3 (CB3) Circuit Breakers 4 (CB4) Circuit Breakers 5 (CB5) Circuit Breakers 6 (CB6) Local & Remote Switch 2 for CB2 Local & Remote Switch 3 for CB3 Local & Remote Switch 4 for CB4 Local & Remote Switch 5 for CB5 Local & Remote Switch 6 for CB6 Protection Relay for CB2 (ABB PCD2000 ) Protection Relay for CB3 Protection Relay for CB4 Protection Relay for CB5 Protection Relay for CB6

DI (Status)

DO (Control)

2 2 2

2 2 2

2

AI

Com. Port For Retrofit

IEC60870-5-103

RS485

DNP3.0 IEC61850 IEC61850 IEC61850 IEC61850

RS485 Ethernet Ethernet Ethernet Ethernet

IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet

2 1 1

2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2

POWER Meter 1 Future Installation POWER Meter 2 Future Installation POWER Meter 3 Future Installation POWER Meter 4 Future Installation POWER Meter 5 Future Installation POWER Meter 6 Future Installation DC volts Main (IEC61850) Future Installation Charger Status ( IEC61850) Future Installation Generator Syn-Relay Future Installation Protection Relay for Generator Future Installation Sub-Total SPARES TOTAL

Protocol

28 10 38

28 10 38

2 2 4

0 0

QUIBONBON Substation Equipment to be controlled & supervised 69kV AB Switch 1 AB Switch 2 AB Switch 3 AB Switch 4 AB Switch 5 Circuit Breakers 1 (CB1) Circuit Breakers 2 (CB2) Circuit Breakers 3 (CB3) Local & Remote Switch for CB1 Local & Remote Switch for CB2 Local & Remote Switch for CB3 Protection Relay CB1 (SIEMENS 7UT6 2) Protection Relay for CB2 Protection Relay for CB3

Power Transformer OLTC- Relay FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA)

DI (Status)

DO (Control)

2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2

AI

Protocol

Com. Port For Retrofit

IEC60870-5-103 RS485 IEC61850 Ethernet IEC61850 Ethernet

Modbus

RS485

IEC60870-5-103 IEC60870-5-103 IEC60870-5-103 IEC60870-5-103

RS485 RS485 RS485 RS485

POWER Meter 1 Future Installation POWER Meter 2 Future Installation POWER Meter 3 Future Installation POWER Meter 4 Future Installation POWER Meter 5 Future Installation POWER Meter 6 Future Installation

IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet

DC volts Main (IEC61850) Future Installation Charger Status ( IEC61850) Future Installation

IEC61850 IEC61850

Ethernet Ethernet

13.2kV Circuit Breakers 4 (CB4) Circuit Breakers 5 (CB5) Circuit Breakers 6 (CB6) Circuit Breakers 7 (CB7) Local & Remote Switch 4 for CB4 Local & Remote Switch 5 for CB5 Local & Remote Switch 6 for CB6 Local & Remote Switch 7 for CB7 Protection Relay for CB4 (SIEMENS 7SJ62) Protection Relay for CB5 (SIEMENS 7SJ62) Protection Relay for CB6 (SIEMENS 7SJ62) Protection Relay for CB7 (SIEMENS 7SJ62)

Sub-Total SPARES TOTAL

2

2 1 1

2 2 2 2 2 2 2 2

40 10 50

2 2 2 2 2 2 2 2

40 10 50

2 2 4

0 0

PATAG Substation Equipment to be controlled & supervised 69kV AB Switch 1 Circuit Breakers 1 (CB1) Local & Remote Switch for CB1 Protection Relay CB1 (DPU2000 )

Power Transformer OLTC- Relay (NONE) FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA) 13.2kV Circuit Breakers 2 (CB2) Circuit Breakers 3 (CB3) Circuit Breakers 4 (CB4) Circuit Breakers 5 (CB5) Local & Remote Switch 2 for CB2 Local & Remote Switch 3 for CB3 Local & Remote Switch 4 for CB4 Local & Remote Switch 5 for CB5 Protection Relay for CB2 (ABB PCD2000 ) Protection Relay for CB3 (ABB PCD2000 ) Protection Relay for CB4 (ABB PCD2000 ) Protection Relay for CB5 (ABB PCD2000 )

DI (Status)

DO (Control)

2 2 2

2 2 2

AI

DNP3.0

2

Com. Port For Retrofit

RS485

2 1 1

2 2 2 2 2 2 2 2

24 10 34

1 1

2 2 2 2 2 2 2 2

POWER Meter 1 Future Installation POWER Meter 2 Future Installation POWER Meter 3 Future Installation POWER Meter 4 Future Installation POWER Meter 5 Future Installation DC volts Main (IEC61850) Future Installation Charger Status ( IEC61850) Future Installation Sub-Total SPARES TOTAL

Protocol

24 10 34

2 2 4

DNP3.0 DNP3.0 DNP3.0 DNP3.0

RS485 RS485 RS485 RS485

IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet 2 2

CANITUAN Substation Equipment to be controlled & supervised 69kV AB Switch 1 AB Switch 2 AB Switch 3 AB Switch 4 AB Switch 5 Circuit Breakers 1 (CB1) Circuit Breakers 2 (CB2) Circuit Breakers 3 (CB3) Local & Remote Switch for CB1 Local & Remote Switch for CB2 Local & Remote Switch for CB3 Protection Relay for CB1 Protection Relay for CB2 Protection Relay for CB3

Power Transformer OLTC- Relay FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA) 13.2kV Circuit Breakers 4 (CB4) Circuit Breakers 5 (CB5) Circuit Breakers 6 (CB6) Circuit Breakers 7 (CB7) Local & Remote Switch 4 for CB4 Local & Remote Switch 5 for CB5 Local & Remote Switch 6 for CB6 Local & Remote Switch 7 for CB7 Protection Relay for CB4 (ABB PCD2000 ) Protection Relay for CB5 (ABB PCD2000 ) Protection Relay for CB6 (ABB PCD2000 ) Protection Relay for CB7 (ABB PCD2000 )

DI (Status)

DO (Control)

2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2

2

AI

Com. Port For Retrofit

IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet

DNP3.0 DNP3.0 DNP3.0 DNP3.0

RS485 RS485 RS485 RS485

IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet Ethernet

2 1 1

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

POWER Meter 1 Future Installation POWER Meter 2 Future Installation POWER Meter 3 Future Installation POWER Meter 4 Future Installation POWER Meter 5 Future Installation POWER Meter 6 Future Installation POWER Meter 7 Future Installation DC volts Main (IEC61850) Future Installation Charger Status ( IEC61850) Future Installation Generator Syn-Relay Future Installation Protection Relay for Generator Future Installation Sub-Total SPARES TOTAL

Protocol

40 10 50

40 10 50

2 2 4

0 0

MAMBUAYA Substation Equipment to be controlled & supervised 69kV AB Switch 1 AB Switch 2 AB Switch 3 AB Switch 4 AB Switch 5 Circuit Breakers 1 (CB1) Circuit Breakers 2 (CB2) Circuit Breakers 3 (CB3) Circuit Breakers 4 (CB4) Local & Remote Switch for CB1 Local & Remote Switch for CB2 Local & Remote Switch for CB3 Local & Remote Switch for CB4 Protection Relay for CB1 (NR) Protection Relay for CB2 Protection Relay for CB3 Protection Relay for CB4 Power Transformer OLTC- Relay FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA) 34.5/13.2kV Circuit Breakers 5 (CB5) Circuit Breakers 6 (CB6) Circuit Breakers 7 (CB7) Circuit Breakers 8 (CB7) Local & Remote Switch 5 for CB5 Local & Remote Switch 6 for CB6 Local & Remote Switch 7 for CB7 Local & Remote Switch 8 for CB7 Protection Relay for CB5 (NR ) Protection Relay for CB6 (NR ) Protection Relay for CB7 (NR ) Protection Relay for CB8 (NR )

DI (Status)

DO (Control)

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

2 2 2 2

2 2 2 2

2

AI

42 10 52

IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet

MODBUS MODBUS

RS485 RS485

IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet

MODBUS MODBUS MODBUS MODBUS MODBUS IEC61850 IEC61850 IEC61850 IEC61850 MODBUS

RS485 RS485 RS485 RS485 RS485 Ethernet Ethernet Ethernet Ethernet RS485

2 2 2 2 2 2 2 2

POWER Meter 1 (Acrel) POWER Meter 2 (Acrel) POWER Meter 3 (Acrel) POWER Meter 4 (Acrel) POWER Meter 5 (Acrel) POWER Meter 6 Future Installation POWER Meter 7 Future Installation POWER Meter 8 Future Installation DC volts Main (IEC61850) Future Installation Charger Status Sub-Total SPARES TOTAL

Com. Port For Retrofit

2 1 1

2 2 2 2 2 2 2 2

Protocol

42 10 52

2 2 4

0 0

TALAKAG Substation Equipment to be controlled & supervised 69kV AB Switch 1 Circuit Breakers 1 (CB1) Local & Remote Switch for CB1 Protection Relay CB1 (NR )

Power Transformer OLTC- Relay (NONE) FAN Transformer Winding Temperature (4-20mA) Transformer Oil Temperature (4-20mA) 13.2kV Circuit Breakers 2 (CB2) Circuit Breakers 3 (CB3) Circuit Breakers 4 (CB4) Circuit Breakers 5 (CB5) Local & Remote Switch 2 for CB2 Local & Remote Switch 3 for CB3 Local & Remote Switch 4 for CB4 Local & Remote Switch 5 for CB5 Protection Relay for CB2 (NR) Protection Relay for CB3 (NR) Protection Relay for CB4 (NR) Protection Relay for CB5 (NR)

DI (Status)

DO (Control)

2 2 2

2 2 2

2

AI

Com. Port For Retrofit

IEC61850

Ethernet

IEC61850 IEC61850 IEC61850 IEC61850

Ethernet Ethernet Ethernet Ethernet

MODBUS MODBUS MODBUS MODBUS MODBUS IEC61850 IEC61850 MODBUS IEC61850 IEC61850

RS485 RS485 RS485 RS485 RS485 Ethernet Ethernet RS485 Ethernet Ethernet

2 1 1

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

POWER Meter 1 (Acrel) POWER Meter 2 (Acrel) POWER Meter 3 (Acrel) POWER Meter 4 (Acrel) POWER Meter 5 (Acrel) POWER Meter 6 Future Installation DC volts Main (IEC61850) Future Installation Charger Status Generator Syn-Relay Future Installation Protection Relay for Generator Future Installation Sub-Total SPARES TOTAL

Protocol

24 10 34

24 10 34

2 2 4

0 0

DOCUMENT CODE : ESD-20-JSL-201701-1

Y

PROPOSE MODULAR GENSET

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

FORM CODE : ESD-20

MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan.3 2017

JSLigutom

REVISION/REMARKS

REV. NO.

TITLE :

SINGLE LINE DIAGRAM M2-PAGAWAN SUBSTATION Embedded with 2.0MW DIESEL PLANT

MMLagumbay JBUbay-ubay

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC.

SHEET No. : LOCATION : SHEET No. : FILE NAME :

REVISION No.: 0

ESD-20-JSL-201701-1r0

DWG. No. :

ESD-20-JSL-201701-1

EFFECTIVITY DATE : DECEMBER 28, 2015

DOCUMENT CODE : ESD-20-JSL-201701-3 LEGEND:

PROPOSE MODULAR GENSET

24 KV,1250A BUS AIR INSULATED SWGR. (TYPE TESTED)

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

FORM CODE : ESD-20

MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan.3 2017

JSLigutom

MMLagumbay

REVISION/REMARKS

REV. NO.

TITLE :

SINGLE LINE DIAGRAM M1-LUMBO SUBSTATION Embedded with 2.0MW DIESEL PLANT

JBUbay-ubay

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC.

SHEET No. : LOCATION : SHEET No. : FILE NAME :

REVISION No.: 0

ESD-20-JSL-201701-3r0

DWG. No. :

ESD-20-JSL-201701-3

EFFECTIVITY DATE : DECEMBER 28, 2015

INCOMING 69 KV LINE

LEGEND:

24 KV,1250A BUS AIR INSULATED SWGR. (TYPE TESTED)

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC. MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan. 3, 2017

JSLigutom

ML/RMS

REVISION/REMARKS

JBUbay-Ubay DRAWN

REV. NO. r1

TITLE / LOCATION :

S I N G LE LI N E D I A G R A M M14 -SAN ISIDRO LAGUINDINGAN Embedded with 2.0MW DIESEL PLANT PROVINCE

FILE NAME :

16016-25-03r0

DWG. No. :

16016-25-03

MISAMIS ORIENTAL

ZONE

ROUTE

GRADE

DOCUMENT CODE : ESD-20-JSL-201701-4 LEGEND:

PROPOSE MODULAR GENSET

24 KV,1250A BUS AIR INSULATED SWGR. (TYPE TESTED)

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

FORM CODE : ESD-20

MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan.3 2017

JSLigutom

REVISION/REMARKS

REV. NO.

TITLE :

SINGLE LINE DIAGRAM M7-QUIBONBON SUBSTATION Embedded with 2.0MW DIESEL PLANT

MMLagumbay JBUbay-ubay

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC.

SHEET No. : LOCATION : SHEET No. : FILE NAME :

REVISION No.: 0

ESD-20-JSL-201701-4r0

DWG. No. :

ESD-20-JSL-201701-4

EFFECTIVITY DATE : DECEMBER 28, 2015

DOCUMENT CODE : ESD-20-JSL-201701-5

Y

PROPOSE MODULAR GENSET

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

FORM CODE : ESD-20

MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan.3 2017

JSLigutom

REVISION/REMARKS

REV. NO.

TITLE :

SINGLE LINE DIAGRAM M6-PATAG SUBSTATION Embedded with 2.0MW DIESEL PLANT

MMLagumbay JBUbay-ubay

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC.

SHEET No. : LOCATION : SHEET No. : FILE NAME :

REVISION No.: 0

ESD-20-JSL-201701-5r0

DWG. No. :

ESD-20-JSL-201701-5

EFFECTIVITY DATE : DECEMBER 28, 2015

DOCUMENT CODE : ESD-20-JSL-201701-6

Y

PROPOSE MODULAR GENSET

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

FORM CODE : ESD-20

MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan.3 2017

JSLigutom

REVISION/REMARKS

REV. NO.

TITLE :

SINGLE LINE DIAGRAM M15-CANITOAN SUBSTATION Embedded with 2.0MW DIESEL PLANT

MMLagumbay JBUbay-ubay

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC.

SHEET No. : LOCATION : SHEET No. : FILE NAME :

ESD-20-JSL-201701-6r0

REVISION No.: 0

DWG. No. :

ESD-20-JSL-201701-6

EFFECTIVITY DATE : DECEMBER 28, 2015

DOCUMENT CODE : ESD-20-JSL-201701-7 LEGEND:

PROPOSE MODULAR GENSET

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

FORM CODE : ESD-20

MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan.3 2017

JSLigutom

REVISION/REMARKS

REV. NO.

TITLE :

SINGLE LINE DIAGRAM M3-MAMBUAYA SUBSTATION Embedded with 2.0MW DIESEL PLANT

MMLagumbay JBUbay-ubay

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC.

SHEET No. : LOCATION : SHEET No. : FILE NAME :

REVISION No.: 0

ESD-20-JSL-201701-7r0

DWG. No. :

ESD-20-JSL-201701-7

EFFECTIVITY DATE : DECEMBER 28, 2015

DOCUMENT CODE : ESD-20-JSL-201701-8 LEGEND:

PROPOSE MODULAR GENSET

2.0 MW DIESEL PLANT

DATE

CONFIDENTIAL THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED HEREIN ARE CONFIDENTIAL AND PROPERTY OF MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC., (MORESCO-1) NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER EXCEPT WITH PRIOR WRITTEN CONSENT.

FORM CODE : ESD-20

MORESCO - 1

DRWN BY: CHKD BY: APP'D BY:

Jan.3 2017

JSLigutom

REVISION/REMARKS

REV. NO.

TITLE :

SINGLE LINE DIAGRAM M5-TALAKAG SUBSTATION Embedded with 2.0MW DIESEL PLANT

MMLagumbay JBUbay-ubay

MISAMIS ORIENTAL RURAL ELECTRIC SERVICE COOPERATIVE, INC.

SHEET No. : LOCATION : SHEET No. : FILE NAME :

REVISION No.: 0

ESD-20-JSL-201701-8r0

DWG. No. :

ESD-20-JSL-201701-8

EFFECTIVITY DATE : DECEMBER 28, 2015