Large Cryogenic above ground LNG Tank Full Containment (9% inner wall + PrePre-stressed concrete outer wall)
Typical Construction Sequence March 4th 2011
Storage & loading on site
SOFREGAZ
Storage & loading on site
SOFREGAZ
Storage & loading on site
SOFREGAZ
Soil Improvement STEP 1a – Soil Improvement (CMC)
SOFREGAZ
Soil Improvement STEP 1b – Controlled Modulus Columns (CMC)
Bottom Slab
Working Platform Level (CMC)
SOFREGAZ
Ground Level
Transition Layer
Controlled Modulus Columns
LNG Storage Tanks – erection Concrete slab STEP 1 - Bottom Slab
Corner Anchor to be installed before bottom slab concreting.
Concrete Wall
Corner Anchor (Carbon Steel) Bottom Slab
Stud Bolt Detail of “A” Re-bar
“A”
Bottom Slab Ground Level
SOFREGAZ
Concrete slab
SOFREGAZ
Slab reinforcement & prestressing cables casing
SOFREGAZ
LNG Storage Tanks - erection STEP 2 – Concrete wall
Re-bar
Reinforcement Concrete Forms
Anchor Plate to be installed.
Reinforcement
Bottom Slab Re-bar
Re-bar “B”
Detail of “B”
Concrete Form
Concrete Form Bottom Slab
SOFREGAZ
Ground Level
LNG Storage Tanks – erection STEP 3 – Concrete wall Re-bar Panel Reinforcement
Concrete Forms
Re-bar “C”
Platform
Concrete Form
Concrete Form Platform
Re-bar
Detail of “C”
Platform
Bottom Slab Ground Level
SOFREGAZ
LNG Storage Tanks – erection STEP 4 – Concrete wall Re-bar Panel
Reinforcement
Concrete Forms
“D”
Platform Re-bar Panel
Concrete Form
Hanger Platform
Platform
Hanger Platform
Hanger Platform Detail of “D” Bottom Slab
SOFREGAZ
Ground Level
Jumping formwork
SOFREGAZ
LNG Storage Tanks – erection STEP 6 – Assembly of roof center, outer supports & outside rain protection From Crane
Stairway Outer Support
Center Support
Outer Support
Ground Level
SOFREGAZ
Roof structure details
SOFREGAZ
Central temporary support
SOFREGAZ
Roof section lifting (25t)
SOFREGAZ
Roof section adjustment
SOFREGAZ
General view
SOFREGAZ
Roof plates welding
SOFREGAZ
Rainy weather impact Taking care of rainy weather conditions on site, bottom liner will be erected & welding as soon as the metallic roof is water tight
SOFREGAZ
LNG Storage Tanks – erection STEP 7 – Assembly of roof sections and liner plates From Crane
From Crane
Roof Rafter
Stairway
Top Ring
Center Support
Outer Support
Outer Support
Annular Plate
SOFREGAZ
Bottom Liner Plate
Ground Level
Bottom liner plates welding
SOFREGAZ
LNG Storage Tanks – erection STEP 8 – Assembly of Suspended deck
Roof
Suspended Rod
Temporary Support
Outer Support
Outer Support Suspended Deck Ground Level
SOFREGAZ
Suspended deck
SOFREGAZ
Suspended deck welding
SOFREGAZ
LNG Storage Tanks – erection STEP 9 – Insulation work on Annular space Concrete Wall
Secondary Annular
Outer Support Inner Annular Plate Foam glass Concrete Ring Beam
Corner Anchor
Detail of “E” Roof
Outer Support
Perlite Concrete
Suspended Rod
Outer Support Suspended Deck
“E” Ground Level
SOFREGAZ
LNG Storage Tanks – erection STEP 10 – Ring Plate(Compression Ring Plate) “F”
Ring Plate
Ring Plate Re-bar Support
Detail of “F”
Roof
Suspended Deck Ground Level
SOFREGAZ
Metallic compression ring
SOFREGAZ
Metallic compression ring
SOFREGAZ
LNG Storage Tanks – erection STEP 11 – Roof Air Raising
Roof
Suspended Deck Ground Level
SOFREGAZ
Roof at lowest position
SOFREGAZ
Venting equipment
SOFREGAZ
Air rising
SOFREGAZ
Connection with compression ring
SOFREGAZ
Roof climbing
SOFREGAZ
Final position
SOFREGAZ
LNG Storage Tanks – erection Roof Concrete
STEP 13 – Side Liner Plate (Vapor Barrier)
Hoist
Side Liner Plate
③ Installation ② Opening Fabrication ①
Ground Level
SOFREGAZ
Wall liner erection & welding
SOFREGAZ
Corner protection insulation
SOFREGAZ
Corner protection plates
SOFREGAZ
LNG Storage Tanks – erection Roof Concrete
STEP 12 – Roof Concreting & Pressurizing
Opening Compressor Ground Level
SOFREGAZ
Pressurization & concreting
SOFREGAZ
Pressurization & concreting
SOFREGAZ
LNG Storage Tanks – erection Roof Concrete
STEP 14 – Inner shell plates erection
Inner Shell Plate
Opening
Inner Shell Plate
Inner Shell Plate
Turning Table
Inner Shell Plate Ground Level
SOFREGAZ
LNG Storage Tanks – erection STEP 15 – Secondary barrier
Roof Concrete
Concrete Wall Inner Shell Plate
Secondary Barrier
PIR Inner Shell Plate
Inner Shell Plate “G”
Opening Detail of “G” Ground Level
SOFREGAZ
Inner tank shell erection
SOFREGAZ
Automatic welding machine
SOFREGAZ
Welding machine Operator
SOFREGAZ
Shell top stiffener
SOFREGAZ
LNG Storage Tanks – erection Roof Concrete
STEP 16 – Bottom Insulation and Plate
Secondary Bottom Plate(9%Ni) Inner Bottom Plate(9&Ni) Foam Glass Perlite Concrete Inner Shell Plate Bottom Slab Bottom Liner Plate(C.S.) Opening
Detail of “H”
Inner Shell Plate
“H” Ground Level
SOFREGAZ
Foam Glass layers installation
SOFREGAZ
LNG Storage Tanks – erection STEP 17 Pump Column
Roof Concrete
Inner Shell Plate
Opening
Pump Column
Ground Level
SOFREGAZ
Bottom inlet stand pipe
SOFREGAZ
Inlet top nozzle with splash plate
SOFREGAZ
Pump column prefabrication
SOFREGAZ
Pump column erection
SOFREGAZ
Stilling well and bottom connection
SOFREGAZ
Cool down ring
SOFREGAZ
Purge piping
SOFREGAZ
NDE
SOFREGAZ
DIMENSIONAL
SOFREGAZ
VACUUM BOX
SOFREGAZ
LIQUID PENETRANT TEST
SOFREGAZ
X-RAY INSPECTIONS
SOFREGAZ
ALLOY MATERIAL IDENTIFICATION
SOFREGAZ
PRESSURE TEST
SOFREGAZ
AUTOMATIC US TEST
SOFREGAZ
LNG Storage Tanks – erection STEP 18 Hydrostatic, vacuum and Pneumatic Test
PRV
Inner Shell Plate Hydrostatic Test Level
Pump Inner Stairway Column
Ground Level
SOFREGAZ
SEA WATER TEST
SOFREGAZ
Pumping station
SOFREGAZ
PRESSURE & VACUUM TEST
SOFREGAZ
LNG Storage Tanks – erection Platform
Walkway
STEP 19 TOP PLATFORM PRV Nozzle
Suspended Deck
Inner Shell Plate
Staircase
Pump Inner Stairway Column
Ground Level
SOFREGAZ
Metallic top platform
SOFREGAZ
SOFREGAZ
MAIN TOP PLATFORM
SOFREGAZ
SOFREGAZ
SOFREGAZ
SOFREGAZ
SOFREGAZ
SOFREGAZ
Instrumentation
SOFREGAZ
INSTRUMENTATION
SOFREGAZ
VACUUM VALVES
SOFREGAZ
SOFREGAZ
LNG Storage Tanks – erection STEP 20 Wall Insulation Glass Wool
Glass Wool Inner Shell Outer Shell
Gondola Side Liner
Inner Shell
Ground Level
SOFREGAZ
RESILIENT BLANKET
SOFREGAZ
RESILIENT BLANKET
SOFREGAZ
LNG Storage Tanks – erection STEP 21 Dome Space Insulation & Perlite Powder Filling
Walkway
PRV Nozzle Perlite Filling Nozzle
Glass Wool Suspended Deck Inner Shell Plate
Staircase
Pump Inner Stairway Column
Perlite Powder
Perlite Powder
Ground Level
SOFREGAZ
PERLITE FURNASE
SOFREGAZ
PERLITE VIBRATION & RESERVE
SOFREGAZ
SUSPENDED DECK INSULATION
SOFREGAZ
LNG Storage Tanks – erection Nitrogen Inlet Line
Oxygen Platform
STEP 22 Box-up and Nitrogen Purging
Walkway
PRV Nozzle Perlite Filling Nozzle
Glass Wool or Perlite powder
Suspended Deck Inner Shell Plate Perlite Powder Staircase
Pump Inner Stairway Column
Nitrogen
Ground Level
SOFREGAZ
DRYING EQUIPMENT
SOFREGAZ
N2 REGASIFICATION UNIT
SOFREGAZ
O2 ANALYSER & DEW POINT
SOFREGAZ