Large Cryogenic above ground LNG Tank Full Containment (9% inner wall + PrePre-stressed concrete outer wall)

Typical Construction Sequence March 4th 2011

Storage & loading on site

SOFREGAZ

Storage & loading on site

SOFREGAZ

Storage & loading on site

SOFREGAZ

Soil Improvement STEP 1a – Soil Improvement (CMC)

SOFREGAZ

Soil Improvement STEP 1b – Controlled Modulus Columns (CMC)

Bottom Slab

Working Platform Level (CMC)

SOFREGAZ

Ground Level

Transition Layer

Controlled Modulus Columns

LNG Storage Tanks – erection Concrete slab STEP 1 - Bottom Slab

Corner Anchor to be installed before bottom slab concreting.

Concrete Wall

Corner Anchor (Carbon Steel) Bottom Slab

Stud Bolt Detail of “A” Re-bar

“A”

Bottom Slab Ground Level

SOFREGAZ

Concrete slab

SOFREGAZ

Slab reinforcement & prestressing cables casing

SOFREGAZ

LNG Storage Tanks - erection STEP 2 – Concrete wall

Re-bar

Reinforcement Concrete Forms

Anchor Plate to be installed.

Reinforcement

Bottom Slab Re-bar

Re-bar “B”

Detail of “B”

Concrete Form

Concrete Form Bottom Slab

SOFREGAZ

Ground Level

LNG Storage Tanks – erection STEP 3 – Concrete wall Re-bar Panel Reinforcement

Concrete Forms

Re-bar “C”

Platform

Concrete Form

Concrete Form Platform

Re-bar

Detail of “C”

Platform

Bottom Slab Ground Level

SOFREGAZ

LNG Storage Tanks – erection STEP 4 – Concrete wall Re-bar Panel

Reinforcement

Concrete Forms

“D”

Platform Re-bar Panel

Concrete Form

Hanger Platform

Platform

Hanger Platform

Hanger Platform Detail of “D” Bottom Slab

SOFREGAZ

Ground Level

Jumping formwork

SOFREGAZ

LNG Storage Tanks – erection STEP 6 – Assembly of roof center, outer supports & outside rain protection From Crane

Stairway Outer Support

Center Support

Outer Support

Ground Level

SOFREGAZ

Roof structure details

SOFREGAZ

Central temporary support

SOFREGAZ

Roof section lifting (25t)

SOFREGAZ

Roof section adjustment

SOFREGAZ

General view

SOFREGAZ

Roof plates welding

SOFREGAZ

Rainy weather impact  Taking care of rainy weather conditions on site, bottom liner will be erected & welding as soon as the metallic roof is water tight

SOFREGAZ

LNG Storage Tanks – erection STEP 7 – Assembly of roof sections and liner plates From Crane

From Crane

Roof Rafter

Stairway

Top Ring

Center Support

Outer Support

Outer Support

Annular Plate

SOFREGAZ

Bottom Liner Plate

Ground Level

Bottom liner plates welding

SOFREGAZ

LNG Storage Tanks – erection STEP 8 – Assembly of Suspended deck

Roof

Suspended Rod

Temporary Support

Outer Support

Outer Support Suspended Deck Ground Level

SOFREGAZ

Suspended deck

SOFREGAZ

Suspended deck welding

SOFREGAZ

LNG Storage Tanks – erection STEP 9 – Insulation work on Annular space Concrete Wall

Secondary Annular

Outer Support Inner Annular Plate Foam glass Concrete Ring Beam

Corner Anchor

Detail of “E” Roof

Outer Support

Perlite Concrete

Suspended Rod

Outer Support Suspended Deck

“E” Ground Level

SOFREGAZ

LNG Storage Tanks – erection STEP 10 – Ring Plate(Compression Ring Plate) “F”

Ring Plate

Ring Plate Re-bar Support

Detail of “F”

Roof

Suspended Deck Ground Level

SOFREGAZ

Metallic compression ring

SOFREGAZ

Metallic compression ring

SOFREGAZ

LNG Storage Tanks – erection STEP 11 – Roof Air Raising

Roof

Suspended Deck Ground Level

SOFREGAZ

Roof at lowest position

SOFREGAZ

Venting equipment

SOFREGAZ

Air rising

SOFREGAZ

Connection with compression ring

SOFREGAZ

Roof climbing

SOFREGAZ

Final position

SOFREGAZ

LNG Storage Tanks – erection Roof Concrete

STEP 13 – Side Liner Plate (Vapor Barrier)

Hoist

Side Liner Plate

③ Installation ② Opening Fabrication ①

Ground Level

SOFREGAZ

Wall liner erection & welding

SOFREGAZ

Corner protection insulation

SOFREGAZ

Corner protection plates

SOFREGAZ

LNG Storage Tanks – erection Roof Concrete

STEP 12 – Roof Concreting & Pressurizing

Opening Compressor Ground Level

SOFREGAZ

Pressurization & concreting

SOFREGAZ

Pressurization & concreting

SOFREGAZ

LNG Storage Tanks – erection Roof Concrete

STEP 14 – Inner shell plates erection

Inner Shell Plate

Opening

Inner Shell Plate

Inner Shell Plate

Turning Table

Inner Shell Plate Ground Level

SOFREGAZ

LNG Storage Tanks – erection STEP 15 – Secondary barrier

Roof Concrete

Concrete Wall Inner Shell Plate

Secondary Barrier

PIR Inner Shell Plate

Inner Shell Plate “G”

Opening Detail of “G” Ground Level

SOFREGAZ

Inner tank shell erection

SOFREGAZ

Automatic welding machine

SOFREGAZ

Welding machine Operator

SOFREGAZ

Shell top stiffener

SOFREGAZ

LNG Storage Tanks – erection Roof Concrete

STEP 16 – Bottom Insulation and Plate

Secondary Bottom Plate(9%Ni) Inner Bottom Plate(9&Ni) Foam Glass Perlite Concrete Inner Shell Plate Bottom Slab Bottom Liner Plate(C.S.) Opening

Detail of “H”

Inner Shell Plate

“H” Ground Level

SOFREGAZ

Foam Glass layers installation

SOFREGAZ

LNG Storage Tanks – erection STEP 17 Pump Column

Roof Concrete

Inner Shell Plate

Opening

Pump Column

Ground Level

SOFREGAZ

Bottom inlet stand pipe

SOFREGAZ

Inlet top nozzle with splash plate

SOFREGAZ

Pump column prefabrication

SOFREGAZ

Pump column erection

SOFREGAZ

Stilling well and bottom connection

SOFREGAZ

Cool down ring

SOFREGAZ

Purge piping

SOFREGAZ

NDE

SOFREGAZ

DIMENSIONAL

SOFREGAZ

VACUUM BOX

SOFREGAZ

LIQUID PENETRANT TEST

SOFREGAZ

X-RAY INSPECTIONS

SOFREGAZ

ALLOY MATERIAL IDENTIFICATION

SOFREGAZ

PRESSURE TEST

SOFREGAZ

AUTOMATIC US TEST

SOFREGAZ

LNG Storage Tanks – erection STEP 18 Hydrostatic, vacuum and Pneumatic Test

PRV

Inner Shell Plate Hydrostatic Test Level

Pump Inner Stairway Column

Ground Level

SOFREGAZ

SEA WATER TEST

SOFREGAZ

Pumping station

SOFREGAZ

PRESSURE & VACUUM TEST

SOFREGAZ

LNG Storage Tanks – erection Platform

Walkway

STEP 19 TOP PLATFORM PRV Nozzle

Suspended Deck

Inner Shell Plate

Staircase

Pump Inner Stairway Column

Ground Level

SOFREGAZ

Metallic top platform

SOFREGAZ

SOFREGAZ

MAIN TOP PLATFORM

SOFREGAZ

SOFREGAZ

SOFREGAZ

SOFREGAZ

SOFREGAZ

SOFREGAZ

Instrumentation

SOFREGAZ

INSTRUMENTATION

SOFREGAZ

VACUUM VALVES

SOFREGAZ

SOFREGAZ

LNG Storage Tanks – erection STEP 20 Wall Insulation Glass Wool

Glass Wool Inner Shell Outer Shell

Gondola Side Liner

Inner Shell

Ground Level

SOFREGAZ

RESILIENT BLANKET

SOFREGAZ

RESILIENT BLANKET

SOFREGAZ

LNG Storage Tanks – erection STEP 21 Dome Space Insulation & Perlite Powder Filling

Walkway

PRV Nozzle Perlite Filling Nozzle

Glass Wool Suspended Deck Inner Shell Plate

Staircase

Pump Inner Stairway Column

Perlite Powder

Perlite Powder

Ground Level

SOFREGAZ

PERLITE FURNASE

SOFREGAZ

PERLITE VIBRATION & RESERVE

SOFREGAZ

SUSPENDED DECK INSULATION

SOFREGAZ

LNG Storage Tanks – erection Nitrogen Inlet Line

Oxygen Platform

STEP 22 Box-up and Nitrogen Purging

Walkway

PRV Nozzle Perlite Filling Nozzle

Glass Wool or Perlite powder

Suspended Deck Inner Shell Plate Perlite Powder Staircase

Pump Inner Stairway Column

Nitrogen

Ground Level

SOFREGAZ

DRYING EQUIPMENT

SOFREGAZ

N2 REGASIFICATION UNIT

SOFREGAZ

O2 ANALYSER & DEW POINT

SOFREGAZ