SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan (Work Has Been Done)

Keterangan

Progress

No

Tanggal : 21 September 2016 Turbin 1

Disassembly Isolasi Turbin

100%

1

2

Disassembly Front Standard

30%

2

3

Disassembly Turning Gear

30%

3

4

Disassembly Kopling Turbin

0%

4

5

Disassembly Cover Bearing 1, 2, 3, 4

0%

6

Disassembly Stang MSV

100% 1

1 2

Aux. Turbin Disassembly CEP (Pengangkatan Motor CEP) Bongkar Flange Seal

100% 100%

3

Bongkar Baut Discharge

100%

4

Bongkar Pompa

20%

5

Lepas Baut Kopling

100%

Boiler 1

Scafolding di Furnace

10%

2

Disassembly Boiler Steam Drum

25%

3

Melepas Isolasi Steam Drum Man Hole

100%

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan (Work Has Been Done)

Keterangan

Progress

No

Tag No.

Tanggal : 21 September 2016 4

Drain Bunker Boiler

10%

Keterangan Semua Bidang

Koordinator Bidang PPC

Willy Pratama Derry Ferdiansyah

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin Disassembly Front Standard Disassembly Turning Gear Disassembly Kopling Turbin Disassembly Cover Bearing 1, 2, 3, 4 Aux. Turbin Bongkar Pompa Inspeksi MOT Drain ESP Drain Pasir di Furnace Cleaning Steam Drum PAF System SAF System

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Project Manager Site Manager

Keterangan

Sugianto Saeran Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Progress

10%

Tanggal : 22 September 2016 1

Turbin

SE0116013

Turbine Casing

SE0116013

Melepas baut dan pin casing turbin Turbine Bolt and Nut

50%

Progress

100%

Melepas Baut inlet steam turbin 2 SE0116064

Aux. Turbin Inspeksi MOT

Progress

25%

Inspection HE pada Vacuum Pump

Progress

20%

Bongkar HE No. 1 & 2

100%

Cleaning HE No. 1

30%

Bongkar Filter Inlet Cooling HE no. 1 & 2

100%

Buka Penekan Gland Packing No. 1 dan No. 2

80%

Inspection Saparator Tank Vacuum Pump

Progress

10% 100%

Membuka Manhole Sparator tank 1 & 2 3

10%

Aux Boiler PAF System Pelepasan Kopling PA Fan dan Data Alignment

Progress

10% 50%

No

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Progress

1%

Progress

2%

No

Tag No.

Tanggal : 22 September 2016 SAF System 4

Boiler Inspection Steam Drum

10%

Cleaning Steam Drum SE0116124 Inspeksi Air Heater

Progress

30%

Test Air Heater (Tidak ada kebocoran)

50%

Pembuatan Akses Manhole Air Heater

50%

Drain Pasir di Furnace Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7

Progress

90%

Progress

50%

Pekerjaan Pemasangan Scafolding di furnace

Progress

10%

Keterangan Semua Bidang

Koordinator Bidang PPC

Willy Pratama Derry Ferdiansyah

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Keterangan

Turbine Casing Melepas baut dan pin casing turbin Turbine Bolt and Nut

Aux. Turbin Inspeksi MOT Inspection HE pada Vacuum Pump Cleaning HE No. 1 Buka Penekan Gland Packing No. 1 dan No. 2 Inspection Saparator Tank

Aux Boiler PAF System Pelepasan Kopling PA Fan dan Data Alignment

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Keterangan

SAF System Boiler Inspection Steam Drum Cleaning Steam Drum Inspeksi Air Heater Test Air Heater (Hasil Baik) Pembuatan Akses Manhole Air Heater Drain Pasir di Furnace Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7

Project Manager Site Manager

Sugianto Saeran Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Progress

40%

Melepas baut dan pin casing turbin

Finished

100%

Pengangkatan Casing Turbin

Progress

10%

Inspeksi MOT

Progress

30%

Inspection HE pada Vacuum Pump

Progress

50%

Cleaning HE No. 1

Finished

100%

Cleaning HE No. 2

Finished

100%

Buka Penekan Gland Packing No. 1 dan No. 2

Progress

80%

Pelepasan Bearing Vacuum Pump No.1

Progress

50%

Finished

100%

Tanggal : 23 September 2016 Turbin Turbine Casing

Aux. Turbin

Inspection Saparator Tank Aux Boiler

Progress Progress

20%

Progress

100%

SAF System

Progress

1%

Cleaning Gas Duct

Progress

50%

PAF System Pelepasan Kopling PA Fan dan Data Alignment

No

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Progress

2%

Progress

10%

Progress

40%

Test Air Heater (Hasil Baik)

Progress

50%

Pembuatan Akses Manhole Air Heater

Progress

60%

Finished

100%

Progress

70%

Progress

20%

Progress

50%

Progress

50%

Tanggal : 23 September 2016

Boiler Inspection Steam Drum Cleaning Steam Drum Inspeksi Air Heater

Drain Pasir di Furnace Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7 Pekerjaan Pemasangan Scafolding di furnace Lepas Chevron dan Sparator di Steam Drum Melepas Coupling ID fan dan Pengambilan data before aligment

Keterangan

No

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

Tanggal : 23 September 2016 Koordinator Bidang Semua Bidang PPC

(Work Has

Keterangan

Progress

Willy Pratama Derry Ferdiansyah

No

Tag No.

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Keterangan

Turbin Turbine Casing Pengangkatan Casing Turbin

Aux. Turbin Inspeksi MOT Inspection HE pada Vacuum Pump Buka Penekan Gland Packing No. 1 dan No. 2 Pelepasan Bearing Vacuum Pump No.1

Aux Boiler PAF System SAF System Cleaning Gas Duct

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Boiler Inspection Steam Drum Cleaning Steam Drum Inspeksi Air Heater Test Air Heater (Hasil Baik) Pembuatan Akses Manhole Air Heater Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7 Pekerjaan Pemasangan Scafolding di furnace Lepas Chevron dan Sparator di Steam Drum Melepas Coupling ID fan dan Pengambilan data before aligment

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Project Manager Site Manager

Keterangan Sugianto Saeran Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Pengangkatan Casing Turbin

Finished

100%

Pengukuran Clearance Before

Progress

10%

Tanggal : 24 September 2016 Turbin SE0116013

Turbine Casing

Aux. Turbin SE0116027

Inspeksi MOT

Progress

30%

SE0116059

Inspection HE pada Vacuum Pump

Progress

60%

Progress

80%

Pelepasan Bearing Vacuum Pump No.1

Finished

100%

Tes Kebocoran HE No. 2 (Tidak ada Kebocoran

Finished

100%

Tes Kebocoran HE No. 1

Progress

50%

Buka Penekan Gland Packing No. 1 dan No. 2

Aux Boiler SE0116112

PAF System

Progress

20%

SE0116118

SAF System

Progress

1%

Cleaning Gas Duct (Back Pass)

Progress

50%

SE0116115 Melepas Coupling ID fan dan Pengambilan data before aligment

Finished

100%

Boiler

No

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

Keterangan

Progress

Progress

10%

Disassembly Steam Drum

Progress

60%

Lepas Chevron dan Separator di Steam Drum

Progress

75%

SE0116124 Test Air Heater

Progress

50%

SE0116124 Pembuatan Akses Manhole Air Heater

Finished

100%

SE0116100 Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7

Progress

70%

Progress

50%

Tag No.

(Work Has

No

Tag No.

Tanggal : 24 September 2016 SE0116078 Inspection Steam Drum

Pekerjaan Pemasangan Scafolding di furnace

Keterangan Semua Bidang

Koordinator Bidang PPC

Willy Pratama Derry Ferdiansyah

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Pengukuran Clearance Before

Keterangan

Lanjutan

Tes Aligment HE Tes Kebocoran HE

Cleaning Gas Duct

Lanjutan

Lanjutan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Keterangan

Disassembly Steam Drum

Lanjutan

Lepas Chevron dan Sparator di Steam Drum

Lanjutan

Test Air Heater (Hasil Baik) Pekerjaan Pemasangan Scafolding di furnace

Lanjutan

Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7

Lanjutan

Lanjutan

Membuka Isolasi LPH Membuka Manhole HPH

Project Manager Site Manager

Sugianto Saeran Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Double Row Curtis

Finished

100%

Pressure Stage P1-P17

Finished

100%

Front Gland

Finished

100%

Rear Gland

Finished

100%

Nozzle Diaparghm P1-P17

Progress

100%

Clearance Journal Bearing (1,2,3)

Finished

100%

Clearance Thrust

Finished

100%

Lifting Turbin

Progress

1%

Uncoupling Poros Turbin

Finished

100%

Melepas Upper Curtis

Finished

100%

Melepas Dummy Ring

Finished

100%

Contact Check Lower Bearing

Progress

50%

Progress

30%

Progress

60%

Progress

80%

Tanggal : 25 September 2016 Turbin Pengukuran Clearance Before

Aux. Turbin SE0116027

Inspeksi MOT

SE0116059 Inspection HE pada Vacuum Pump Buka Penekan Gland Packing No. 1 dan No. 2

No

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Tanggal : 25 September 2016 Tes Kebocoran HE No. 1 (no leak)

Finished

100%

Disassembly Bearing Vacuum Pump no.1 DE side

Finished

100%

Assembly bearing vacuum pump no.1

Finished

100%

Penutupan Flange Vacum Pump sisi Barat

Finished

100%

Penggantian filter flange sisi timur

Finished

100%

Buka Waterbox LPH 1

Finished

100%

Cleaning LPH No.1

Progress

50%

Membuka Waterbox LPH No. 2

Finished

100%

Cleaning LPH No.2

Progress

50%

Progress

10%

Disassembly Steam Drum

Progress

60%

Lepas Chevron dan Separator di Steam Drum

Progress

75%

SE0116124 Test Air Heater (3 titik kebocoran)

Finished

100%

SE0116100 Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7 Pekerjaan Pemasangan Scafolding di furnace

Finished

100%

Progress

80%

Shaft Gland Cooler Exhaust fan

Boiler SE0116078 Inspection Steam Drum

No

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tag No.

Tanggal : 25 September 2016 Aux Boiler SE0116112 Pembukaan Manhole PA Fan

Finished

100%

Pembukaan Manhole ID Fan

Finished

100%

SE0116118 Pembukaan Manhole SA Fan

Finished

100%

Progress

50%

Cleaning Gas Duct (Back Pass)

Keterangan Semua Bidang

Koordinator Bidang PPC

Willy Pratama Derry Ferdiansyah

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin Pengukuran Clearance Before Diapgrahm Gland P1-P17 Lifting Turbin

Aux. Turbin Inspeksi MOT (menunggu pengangkatan rotor) Inspection HE pada Vacuum Pump Buka Penekan Gland Packing No. 1 & 2

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Boiler Inspection Steam Drum Disassembly Steam Drum Lepas Chevron dan Separator di Steam Drum Pekerjaan Pemasangan Scafolding di furnace

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Keterangan

Aux Boiler Cleaning Gas Duct (Back Pass)

Project Manager Site Manager

Sugianto Saeran Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tag No.

Tanggal : 26 September 2016 1 SE011613

2

Lifting Rotor Turbin

Finsihed

100%

Pengangkatan bearing lower no. 1dan no.2

Finsihed

100%

NDT PT Bearing no.1 dan no.2

Finsihed

100%

Melepas Diapraghm Lower

Finsihed

100%

Pengangkatan Bearing Upper No. 1 dan No.2

Progress

10% 2

Aux. Turbin SE0116027 Inspeksi MOT SE0116059 Inspection HE pada Vacuum Pump

Progress

40%

Progress

80%

Disassembly shaft fan gland steam no.1

Finished

100%

Disassembly shaft fan gland steam no.2

Finished

100%

Cleaning tube shaft gland steam

Progress

80%

Repair Lubang Baut fan no.1 dan no. 2

Progress

40%

Disassembly Condensate Pump

Progress

50%

Membuka Pompa Back Wash pump

Progress

Buka Penekan Gland Packing No. 1 & 2

3

1

Turbin

Boiler SE0116078 Inspection Steam Drum

3 Progress

40%

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Finished

100%

Finished Progress Progress

100% 90% 10%

No

Tag No.

Tanggal : 26 September 2016 Disassembly Steam Drum Lepas Chevron dan Separator di Steam Drum SE0116124 Pekerjaan Pemasangan Scafolding di furnace Cleaning dinding boiler

4

4

Aux Boiler SE0116112 Cleaning Gas Duct (Back Pass)

Progress

50%

Buka Cover Bearing ID Fan sisi Coupling

Finished

100%

Buka Cover bearing PA Fan sisi Free

Finished

100%

Buka Kopling dan pengukuran alignment pada SA Fan

Finished

100%

Progress

75%

SE0116124 Inspection Air Heater

Keterangan Koordinator Bidang

Willy Pratama

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

Tanggal : 26 September 2016 Semua Bidang PPC

(Work Has

Keterangan

Progress

Derry Ferdiansyah

No

Tag No.

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin Pengangkatan Bearing Upper No. 1 dan No.2 NDT PT Bearing Upper no.1 dan no.2 Melepas Diapraghm Upper

Aux. turbin Inspeksi MOT Buka Penekan Gland Packing No. 1 & 2 Cleaning tube shaft gland steam Repair Lubang Baut fan no.1 dan no. 2 Disassembly Condensate Pump Inspeksi Expantion Tank

Boiler Cleaning dinding boiler

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Keterangan

Inspection Steam Drum

Aux Boiler Cleaning Gas Duct (Back Pass) Buka Cover Bearing ID Fan sisi free Buka Cover bearing PA Fan sisi Coupling Buka Cover bearing SA Fan sisi Coupling Inspection Air Heater

Project Manager

Sugianto Saeran

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Site Manager

Keterangan Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tag No.

Tanggal : 01 Oktober 2016 (hari ke-13) 1

Turbin SE011613

2

1

Cleaning baut turbin

Progress

100%

Rotor Posisi

Progress

100%

NDT PT Diapraghm lower

Progress

100%

NDT PT Rotor

Progress

1%

Aux. turbin SE0116027 Inspeksi MOT

2 Progress

40%

Finished

100%

Progress

50%

Finished

100%

SE0116027 Disassembly Jacking Oil Pump no. 2

Progress

50%

Disassembly SAC No. 3

Progress

10%

Membuka manhole dan Storage Deaerator

Progress

40%

Cleaning shaft impeller dan casing CCWP

Progress

50%

Identifikasi & pembahasan temuan ketidaksesuaian di CCWP

Progress

50%

SE0116059 Inspeksi Condensate Pump no. 1 Disassembly Condensate Pump no. 1 Identifikasi & pembahasan temuan ketidaksesuaian Cleaning rumah impeller dan Discharge Cover

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tag No.

Tanggal : 01 Oktober 2016 (hari ke-13) Boiler SE0116078 Inspection & Cleaning Steam Drum

3 Progress

Pengelasan Crack dinding SE0116124 Cleaning Coal Bunker

45% Progress

70%

Pasang Bearing ID Fan

Progress

50%

Melepas Coupling PA Fan (Pemasangan Scafolding)

Progress

100%

Melepas Cover atas PA Fan

4

70%

100%

Melepas Cover bawah sisi DE PA Fan

Progress

50%

Retubbing Boiler (Preparation)

Progress

10%

Melepas Coupling SA Fan

Finshed

100%

Aux Boiler

4

SE0116112 Cleaning Gas Duct (Back Pass)

Progress

0%

SE0116124 Inspection Air Heater

Progress

75%

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tag No.

Tanggal : 01 Oktober 2016 (hari ke-13) Keterangan Semua Bidang

Koordinator Bidang PPC

Willy Pratama Derry Ferdiansyah

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin NDT PT Rotor

Aux. turbin Inspeksi MOT Disassembly Condensate Pump Disassembly Jacking Oil Pump no. 2 Disassembly IAC Membuka manhole dan Storage Deaerator Cleaning CCWP

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Boiler Inspection & Cleaning Steam Drum Pengelasan Crack dinding Cleaning Coal Bunker Pasang Bearing ID Fan Melepas Cover bawah sisi DE PA Fan Retubbing Boiler (Preparation)

Aux Boiler Cleaning Gas Duct (Back Pass) Inspection Air Heater

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Project Manager Site Manager

Keterangan

Sugianto Saeran Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tag No.

Tanggal : 02 Oktober 2016 (hari ke-14) 1

2

SE011613

Turbin

1

NDT PT Rotor

Progress

1%

Melepas Blade Ring Curtis Upper

Finished

100%

Melepas Blade Ring Curtis Lower

Finished

100%

Memasang Diapraghm Lower

Progress

20%

Aux. Turbin

2

SE0116027 Inspeksi MOT

Progress

40%

SE0116059 Inspeksi Condensate Pump no. 1

Progress

50%

Progress

50%

SE0116027 Inspeksi Jacking Oil Pump

Progress

70%

Inspeksi SAC

Progress

20%

Cleaning Inspeksi No. 3

Finished

100%

Disassembly SAC No. 2 & 3

Finished

100%

Progress

40%

Membuka Manhole Deaerator

Finished

100%

Cleaning Deaerator

Progress

70%

Identifikasi & pembahasan temuan ketidaksesuaian

Inspeksi Deaerator

Inspeksi CCWP

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Cleaning Shaft Impeller dan Casing CCWP

Finished

100%

Identifikasi & pembahasan temuan ketidaksesuaian

Progress

70%

Pengukuran Dimensi Shaft dan Impeller

Progress

50%

Progress

30%

Finished

100%

No

Tag No.

Tanggal : 02 Oktober 2016 (hari ke-14)

Inspeksi Turning Gear Disassmbly turning Gear 3

Boiler SE0116078 Inspection & Cleaning Steam Drum Pengelasan Crack dinding SE0116124 Cleaning Coal Bunker

4

3 Progress

80%

Progress

60%

Progress

75%

Aux Boiler

SE0116078 SE0116124 4

SE0116112 Cleaning Gas Duct (Back Pass)

Progress

0%

SE0116112

SE0116124 Inspection Air Heater

Progress

75%

SE0116124

Progress

30%

Progress

50%

Progress

40%

Finished

100%

Inspeksi ID Fan Pasang Bearing ID Fan Inspeksi PA Fan Melepas Cover bawah sisi DE PA Fan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tag No.

Tanggal : 02 Oktober 2016 (hari ke-14) Melepas Bearing sisi NDE

Finished

100%

Melepas Bearing sisi DE

Progress

1%

Keterangan Semua Bidang

Koordinator Bidang PPC

Willy Pratama Derry Ferdiansyah

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin NDT PT Rotor Memasang Diapraghm Lower

Aux. turbin Inspeksi MOT Inspeksi Condensate Pump no. 1 Identifikasi & pembahasan temuan ketidaksesuaian

Inspeksi Jacking Oil Pump Inspeksi SAC Cleaning Inspeksi No. 4

Inspeksi Deaerator Cleaning Deaerator

Inspeksi CCWP Identifikasi & pembahasan temuan ketidaksesuaian Pengukuran Dimensi Shaft dan Impeller

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Boiler Inspection & Cleaning Steam Drum Pengelasan Crack dinding Cleaning Coal Bunker Aux Boiler Cleaning Gas Duct (Back Pass) Inspection Air Heater Inspeksi ID Fan Pasang Bearing ID Fan Inspeksi PA Fan Melepas Bearing sisi DE

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Project Manager Site Manager

Keterangan

Sugianto Saeran Mudjianto

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

No

Tanggal : 06 Oktober 2016 (hari ke-18) 1

2

SE011613

Turbin

1

Pengangkatan Lower Casing Blade Ring Curtis Persiapan Pengambilan data Clearance Labyrinth seal Cleaning Area Turbin

Finished

100%

Finished

100%

Finished

100%

Cleaning Rotor Turbin

Finished

100%

Pemasangan Upper Labyrinth

Progress

45%

Aux. Turbin SE0116027 Inspeksi MOT

2 Progress

80%

Finished

100%

SE0116059 Inspeksi Condensate Pump no. 1

Progress

50%

SE0116027 Inspeksi Jacking Oil Pump

Progress

70%

Inspeksi Deaerator

Progress

50%

Inspeksi CCWP

Progress

30%

Inspeksi Turning Gear

Progress

30%

Inspeksi CWP

Progress

30%

Pengambilan data Bushing

Finished

100%

Pembuatan Spesial Tools (run Out)

Finished

100%

Disassembly Filter MOT

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Progress

50%

Finished

100%

No

Tanggal : 06 Oktober 2016 (hari ke-18) Inspeksi Shaft Gland Cooler Tes Kebocoran 3

Boiler SE0116078 Cleaning Coal Bunker Tools dan Meterial Penggantian (Sparator, SE0116124 Mobilisasi Chevron) Memasang Gland Manhole

4

3 Progress

80%

Progress

50%

Progress

40%

Pelepasan Supporting di steam drum

Progress

50%

Retubbing Boiler

Progress

35%

Remove tube (20 ea)

Progress

60%

Bevel Tube Install Tube no 3, 13, 16, 18

Progress

40%

Finished

100%

Aux Boiler

4

SE0116112 Cleaning Gas Duct (Back Pass)

Progress

0%

SE0116124 Inspection Air Heater

Progress

75%

Progress

30%

Progress

50%

Inspeksi ID Fan Pasang Bearing ID Fan

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

(Work Has

Keterangan

Progress

Inspeksi PA Fan

Progress

40%

Inspeksi PA Booster Fan

Progress

50%

Disassembly Bearing

Finished

100%

Progress

30%

membuat Spesial Tools SA Fan

Finished

100%

Disassembly Bearing DE

Finished

100%

Disassembly Bearing NDE

Progress

50%

Tanggal : 06 Oktober 2016 (hari ke-18)

Inspeksi SA Fan

Inspeksi BFP

Progress

Pengukuran Clearance Jurnal

Progress

100%

Pengecekan Clearance Thrust

Progress

100%

Cleaning Bearing Journal

Finished

100%

Pengambilan data Clearance After Cleaning

Progress

70%

Penetrant Test

Progress

10%

Expantion Joint

Progress

15%

Keterangan Koordinator Bidang

Willy Pratama

No

Tag No.

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN BIDANG No

Tag No.

MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)

Tanggal : 06 Oktober 2016 (hari ke-18) Semua Bidang PPC

(Work Has

Keterangan

Progress

Derry Ferdiansyah

No

Tag No.

PT PJB SERVICES

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin

Aux. Turbin

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Boiler

Aux Boiler

Keterangan

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)

Project Manager

Keterangan

Sugianto Saeran

SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016

LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Site Manager

Keterangan Mudjianto

Related Documents


More Documents from "sunil601"

Daily Report Mekanik.xlsx
February 2021 1
22sep17c.pdf
February 2021 0
1. Turbin Hp -l.xlsx
February 2021 0
22sep17b
February 2021 5
Ilmu Gizi
February 2021 2
Stream Mining
January 2021 2