SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan (Work Has Been Done)
Keterangan
Progress
No
Tanggal : 21 September 2016 Turbin 1
Disassembly Isolasi Turbin
100%
1
2
Disassembly Front Standard
30%
2
3
Disassembly Turning Gear
30%
3
4
Disassembly Kopling Turbin
0%
4
5
Disassembly Cover Bearing 1, 2, 3, 4
0%
6
Disassembly Stang MSV
100% 1
1 2
Aux. Turbin Disassembly CEP (Pengangkatan Motor CEP) Bongkar Flange Seal
100% 100%
3
Bongkar Baut Discharge
100%
4
Bongkar Pompa
20%
5
Lepas Baut Kopling
100%
Boiler 1
Scafolding di Furnace
10%
2
Disassembly Boiler Steam Drum
25%
3
Melepas Isolasi Steam Drum Man Hole
100%
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan (Work Has Been Done)
Keterangan
Progress
No
Tag No.
Tanggal : 21 September 2016 4
Drain Bunker Boiler
10%
Keterangan Semua Bidang
Koordinator Bidang PPC
Willy Pratama Derry Ferdiansyah
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin Disassembly Front Standard Disassembly Turning Gear Disassembly Kopling Turbin Disassembly Cover Bearing 1, 2, 3, 4 Aux. Turbin Bongkar Pompa Inspeksi MOT Drain ESP Drain Pasir di Furnace Cleaning Steam Drum PAF System SAF System
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Project Manager Site Manager
Keterangan
Sugianto Saeran Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Progress
10%
Tanggal : 22 September 2016 1
Turbin
SE0116013
Turbine Casing
SE0116013
Melepas baut dan pin casing turbin Turbine Bolt and Nut
50%
Progress
100%
Melepas Baut inlet steam turbin 2 SE0116064
Aux. Turbin Inspeksi MOT
Progress
25%
Inspection HE pada Vacuum Pump
Progress
20%
Bongkar HE No. 1 & 2
100%
Cleaning HE No. 1
30%
Bongkar Filter Inlet Cooling HE no. 1 & 2
100%
Buka Penekan Gland Packing No. 1 dan No. 2
80%
Inspection Saparator Tank Vacuum Pump
Progress
10% 100%
Membuka Manhole Sparator tank 1 & 2 3
10%
Aux Boiler PAF System Pelepasan Kopling PA Fan dan Data Alignment
Progress
10% 50%
No
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Progress
1%
Progress
2%
No
Tag No.
Tanggal : 22 September 2016 SAF System 4
Boiler Inspection Steam Drum
10%
Cleaning Steam Drum SE0116124 Inspeksi Air Heater
Progress
30%
Test Air Heater (Tidak ada kebocoran)
50%
Pembuatan Akses Manhole Air Heater
50%
Drain Pasir di Furnace Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7
Progress
90%
Progress
50%
Pekerjaan Pemasangan Scafolding di furnace
Progress
10%
Keterangan Semua Bidang
Koordinator Bidang PPC
Willy Pratama Derry Ferdiansyah
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Keterangan
Turbine Casing Melepas baut dan pin casing turbin Turbine Bolt and Nut
Aux. Turbin Inspeksi MOT Inspection HE pada Vacuum Pump Cleaning HE No. 1 Buka Penekan Gland Packing No. 1 dan No. 2 Inspection Saparator Tank
Aux Boiler PAF System Pelepasan Kopling PA Fan dan Data Alignment
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Keterangan
SAF System Boiler Inspection Steam Drum Cleaning Steam Drum Inspeksi Air Heater Test Air Heater (Hasil Baik) Pembuatan Akses Manhole Air Heater Drain Pasir di Furnace Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7
Project Manager Site Manager
Sugianto Saeran Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Progress
40%
Melepas baut dan pin casing turbin
Finished
100%
Pengangkatan Casing Turbin
Progress
10%
Inspeksi MOT
Progress
30%
Inspection HE pada Vacuum Pump
Progress
50%
Cleaning HE No. 1
Finished
100%
Cleaning HE No. 2
Finished
100%
Buka Penekan Gland Packing No. 1 dan No. 2
Progress
80%
Pelepasan Bearing Vacuum Pump No.1
Progress
50%
Finished
100%
Tanggal : 23 September 2016 Turbin Turbine Casing
Aux. Turbin
Inspection Saparator Tank Aux Boiler
Progress Progress
20%
Progress
100%
SAF System
Progress
1%
Cleaning Gas Duct
Progress
50%
PAF System Pelepasan Kopling PA Fan dan Data Alignment
No
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Progress
2%
Progress
10%
Progress
40%
Test Air Heater (Hasil Baik)
Progress
50%
Pembuatan Akses Manhole Air Heater
Progress
60%
Finished
100%
Progress
70%
Progress
20%
Progress
50%
Progress
50%
Tanggal : 23 September 2016
Boiler Inspection Steam Drum Cleaning Steam Drum Inspeksi Air Heater
Drain Pasir di Furnace Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7 Pekerjaan Pemasangan Scafolding di furnace Lepas Chevron dan Sparator di Steam Drum Melepas Coupling ID fan dan Pengambilan data before aligment
Keterangan
No
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
Tanggal : 23 September 2016 Koordinator Bidang Semua Bidang PPC
(Work Has
Keterangan
Progress
Willy Pratama Derry Ferdiansyah
No
Tag No.
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Keterangan
Turbin Turbine Casing Pengangkatan Casing Turbin
Aux. Turbin Inspeksi MOT Inspection HE pada Vacuum Pump Buka Penekan Gland Packing No. 1 dan No. 2 Pelepasan Bearing Vacuum Pump No.1
Aux Boiler PAF System SAF System Cleaning Gas Duct
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Boiler Inspection Steam Drum Cleaning Steam Drum Inspeksi Air Heater Test Air Heater (Hasil Baik) Pembuatan Akses Manhole Air Heater Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7 Pekerjaan Pemasangan Scafolding di furnace Lepas Chevron dan Sparator di Steam Drum Melepas Coupling ID fan dan Pengambilan data before aligment
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Project Manager Site Manager
Keterangan Sugianto Saeran Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Pengangkatan Casing Turbin
Finished
100%
Pengukuran Clearance Before
Progress
10%
Tanggal : 24 September 2016 Turbin SE0116013
Turbine Casing
Aux. Turbin SE0116027
Inspeksi MOT
Progress
30%
SE0116059
Inspection HE pada Vacuum Pump
Progress
60%
Progress
80%
Pelepasan Bearing Vacuum Pump No.1
Finished
100%
Tes Kebocoran HE No. 2 (Tidak ada Kebocoran
Finished
100%
Tes Kebocoran HE No. 1
Progress
50%
Buka Penekan Gland Packing No. 1 dan No. 2
Aux Boiler SE0116112
PAF System
Progress
20%
SE0116118
SAF System
Progress
1%
Cleaning Gas Duct (Back Pass)
Progress
50%
SE0116115 Melepas Coupling ID fan dan Pengambilan data before aligment
Finished
100%
Boiler
No
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
Keterangan
Progress
Progress
10%
Disassembly Steam Drum
Progress
60%
Lepas Chevron dan Separator di Steam Drum
Progress
75%
SE0116124 Test Air Heater
Progress
50%
SE0116124 Pembuatan Akses Manhole Air Heater
Finished
100%
SE0116100 Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7
Progress
70%
Progress
50%
Tag No.
(Work Has
No
Tag No.
Tanggal : 24 September 2016 SE0116078 Inspection Steam Drum
Pekerjaan Pemasangan Scafolding di furnace
Keterangan Semua Bidang
Koordinator Bidang PPC
Willy Pratama Derry Ferdiansyah
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Pengukuran Clearance Before
Keterangan
Lanjutan
Tes Aligment HE Tes Kebocoran HE
Cleaning Gas Duct
Lanjutan
Lanjutan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Keterangan
Disassembly Steam Drum
Lanjutan
Lepas Chevron dan Sparator di Steam Drum
Lanjutan
Test Air Heater (Hasil Baik) Pekerjaan Pemasangan Scafolding di furnace
Lanjutan
Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7
Lanjutan
Lanjutan
Membuka Isolasi LPH Membuka Manhole HPH
Project Manager Site Manager
Sugianto Saeran Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Double Row Curtis
Finished
100%
Pressure Stage P1-P17
Finished
100%
Front Gland
Finished
100%
Rear Gland
Finished
100%
Nozzle Diaparghm P1-P17
Progress
100%
Clearance Journal Bearing (1,2,3)
Finished
100%
Clearance Thrust
Finished
100%
Lifting Turbin
Progress
1%
Uncoupling Poros Turbin
Finished
100%
Melepas Upper Curtis
Finished
100%
Melepas Dummy Ring
Finished
100%
Contact Check Lower Bearing
Progress
50%
Progress
30%
Progress
60%
Progress
80%
Tanggal : 25 September 2016 Turbin Pengukuran Clearance Before
Aux. Turbin SE0116027
Inspeksi MOT
SE0116059 Inspection HE pada Vacuum Pump Buka Penekan Gland Packing No. 1 dan No. 2
No
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Tanggal : 25 September 2016 Tes Kebocoran HE No. 1 (no leak)
Finished
100%
Disassembly Bearing Vacuum Pump no.1 DE side
Finished
100%
Assembly bearing vacuum pump no.1
Finished
100%
Penutupan Flange Vacum Pump sisi Barat
Finished
100%
Penggantian filter flange sisi timur
Finished
100%
Buka Waterbox LPH 1
Finished
100%
Cleaning LPH No.1
Progress
50%
Membuka Waterbox LPH No. 2
Finished
100%
Cleaning LPH No.2
Progress
50%
Progress
10%
Disassembly Steam Drum
Progress
60%
Lepas Chevron dan Separator di Steam Drum
Progress
75%
SE0116124 Test Air Heater (3 titik kebocoran)
Finished
100%
SE0116100 Pelepasan Lance Cube & Inner Cube di Sootblower No. 5 dan No. 7 Pekerjaan Pemasangan Scafolding di furnace
Finished
100%
Progress
80%
Shaft Gland Cooler Exhaust fan
Boiler SE0116078 Inspection Steam Drum
No
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tag No.
Tanggal : 25 September 2016 Aux Boiler SE0116112 Pembukaan Manhole PA Fan
Finished
100%
Pembukaan Manhole ID Fan
Finished
100%
SE0116118 Pembukaan Manhole SA Fan
Finished
100%
Progress
50%
Cleaning Gas Duct (Back Pass)
Keterangan Semua Bidang
Koordinator Bidang PPC
Willy Pratama Derry Ferdiansyah
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin Pengukuran Clearance Before Diapgrahm Gland P1-P17 Lifting Turbin
Aux. Turbin Inspeksi MOT (menunggu pengangkatan rotor) Inspection HE pada Vacuum Pump Buka Penekan Gland Packing No. 1 & 2
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Boiler Inspection Steam Drum Disassembly Steam Drum Lepas Chevron dan Separator di Steam Drum Pekerjaan Pemasangan Scafolding di furnace
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Keterangan
Aux Boiler Cleaning Gas Duct (Back Pass)
Project Manager Site Manager
Sugianto Saeran Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tag No.
Tanggal : 26 September 2016 1 SE011613
2
Lifting Rotor Turbin
Finsihed
100%
Pengangkatan bearing lower no. 1dan no.2
Finsihed
100%
NDT PT Bearing no.1 dan no.2
Finsihed
100%
Melepas Diapraghm Lower
Finsihed
100%
Pengangkatan Bearing Upper No. 1 dan No.2
Progress
10% 2
Aux. Turbin SE0116027 Inspeksi MOT SE0116059 Inspection HE pada Vacuum Pump
Progress
40%
Progress
80%
Disassembly shaft fan gland steam no.1
Finished
100%
Disassembly shaft fan gland steam no.2
Finished
100%
Cleaning tube shaft gland steam
Progress
80%
Repair Lubang Baut fan no.1 dan no. 2
Progress
40%
Disassembly Condensate Pump
Progress
50%
Membuka Pompa Back Wash pump
Progress
Buka Penekan Gland Packing No. 1 & 2
3
1
Turbin
Boiler SE0116078 Inspection Steam Drum
3 Progress
40%
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Finished
100%
Finished Progress Progress
100% 90% 10%
No
Tag No.
Tanggal : 26 September 2016 Disassembly Steam Drum Lepas Chevron dan Separator di Steam Drum SE0116124 Pekerjaan Pemasangan Scafolding di furnace Cleaning dinding boiler
4
4
Aux Boiler SE0116112 Cleaning Gas Duct (Back Pass)
Progress
50%
Buka Cover Bearing ID Fan sisi Coupling
Finished
100%
Buka Cover bearing PA Fan sisi Free
Finished
100%
Buka Kopling dan pengukuran alignment pada SA Fan
Finished
100%
Progress
75%
SE0116124 Inspection Air Heater
Keterangan Koordinator Bidang
Willy Pratama
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
Tanggal : 26 September 2016 Semua Bidang PPC
(Work Has
Keterangan
Progress
Derry Ferdiansyah
No
Tag No.
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin Pengangkatan Bearing Upper No. 1 dan No.2 NDT PT Bearing Upper no.1 dan no.2 Melepas Diapraghm Upper
Aux. turbin Inspeksi MOT Buka Penekan Gland Packing No. 1 & 2 Cleaning tube shaft gland steam Repair Lubang Baut fan no.1 dan no. 2 Disassembly Condensate Pump Inspeksi Expantion Tank
Boiler Cleaning dinding boiler
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Keterangan
Inspection Steam Drum
Aux Boiler Cleaning Gas Duct (Back Pass) Buka Cover Bearing ID Fan sisi free Buka Cover bearing PA Fan sisi Coupling Buka Cover bearing SA Fan sisi Coupling Inspection Air Heater
Project Manager
Sugianto Saeran
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Site Manager
Keterangan Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tag No.
Tanggal : 01 Oktober 2016 (hari ke-13) 1
Turbin SE011613
2
1
Cleaning baut turbin
Progress
100%
Rotor Posisi
Progress
100%
NDT PT Diapraghm lower
Progress
100%
NDT PT Rotor
Progress
1%
Aux. turbin SE0116027 Inspeksi MOT
2 Progress
40%
Finished
100%
Progress
50%
Finished
100%
SE0116027 Disassembly Jacking Oil Pump no. 2
Progress
50%
Disassembly SAC No. 3
Progress
10%
Membuka manhole dan Storage Deaerator
Progress
40%
Cleaning shaft impeller dan casing CCWP
Progress
50%
Identifikasi & pembahasan temuan ketidaksesuaian di CCWP
Progress
50%
SE0116059 Inspeksi Condensate Pump no. 1 Disassembly Condensate Pump no. 1 Identifikasi & pembahasan temuan ketidaksesuaian Cleaning rumah impeller dan Discharge Cover
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tag No.
Tanggal : 01 Oktober 2016 (hari ke-13) Boiler SE0116078 Inspection & Cleaning Steam Drum
3 Progress
Pengelasan Crack dinding SE0116124 Cleaning Coal Bunker
45% Progress
70%
Pasang Bearing ID Fan
Progress
50%
Melepas Coupling PA Fan (Pemasangan Scafolding)
Progress
100%
Melepas Cover atas PA Fan
4
70%
100%
Melepas Cover bawah sisi DE PA Fan
Progress
50%
Retubbing Boiler (Preparation)
Progress
10%
Melepas Coupling SA Fan
Finshed
100%
Aux Boiler
4
SE0116112 Cleaning Gas Duct (Back Pass)
Progress
0%
SE0116124 Inspection Air Heater
Progress
75%
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tag No.
Tanggal : 01 Oktober 2016 (hari ke-13) Keterangan Semua Bidang
Koordinator Bidang PPC
Willy Pratama Derry Ferdiansyah
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin NDT PT Rotor
Aux. turbin Inspeksi MOT Disassembly Condensate Pump Disassembly Jacking Oil Pump no. 2 Disassembly IAC Membuka manhole dan Storage Deaerator Cleaning CCWP
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Boiler Inspection & Cleaning Steam Drum Pengelasan Crack dinding Cleaning Coal Bunker Pasang Bearing ID Fan Melepas Cover bawah sisi DE PA Fan Retubbing Boiler (Preparation)
Aux Boiler Cleaning Gas Duct (Back Pass) Inspection Air Heater
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Project Manager Site Manager
Keterangan
Sugianto Saeran Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tag No.
Tanggal : 02 Oktober 2016 (hari ke-14) 1
2
SE011613
Turbin
1
NDT PT Rotor
Progress
1%
Melepas Blade Ring Curtis Upper
Finished
100%
Melepas Blade Ring Curtis Lower
Finished
100%
Memasang Diapraghm Lower
Progress
20%
Aux. Turbin
2
SE0116027 Inspeksi MOT
Progress
40%
SE0116059 Inspeksi Condensate Pump no. 1
Progress
50%
Progress
50%
SE0116027 Inspeksi Jacking Oil Pump
Progress
70%
Inspeksi SAC
Progress
20%
Cleaning Inspeksi No. 3
Finished
100%
Disassembly SAC No. 2 & 3
Finished
100%
Progress
40%
Membuka Manhole Deaerator
Finished
100%
Cleaning Deaerator
Progress
70%
Identifikasi & pembahasan temuan ketidaksesuaian
Inspeksi Deaerator
Inspeksi CCWP
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Cleaning Shaft Impeller dan Casing CCWP
Finished
100%
Identifikasi & pembahasan temuan ketidaksesuaian
Progress
70%
Pengukuran Dimensi Shaft dan Impeller
Progress
50%
Progress
30%
Finished
100%
No
Tag No.
Tanggal : 02 Oktober 2016 (hari ke-14)
Inspeksi Turning Gear Disassmbly turning Gear 3
Boiler SE0116078 Inspection & Cleaning Steam Drum Pengelasan Crack dinding SE0116124 Cleaning Coal Bunker
4
3 Progress
80%
Progress
60%
Progress
75%
Aux Boiler
SE0116078 SE0116124 4
SE0116112 Cleaning Gas Duct (Back Pass)
Progress
0%
SE0116112
SE0116124 Inspection Air Heater
Progress
75%
SE0116124
Progress
30%
Progress
50%
Progress
40%
Finished
100%
Inspeksi ID Fan Pasang Bearing ID Fan Inspeksi PA Fan Melepas Cover bawah sisi DE PA Fan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tag No.
Tanggal : 02 Oktober 2016 (hari ke-14) Melepas Bearing sisi NDE
Finished
100%
Melepas Bearing sisi DE
Progress
1%
Keterangan Semua Bidang
Koordinator Bidang PPC
Willy Pratama Derry Ferdiansyah
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin NDT PT Rotor Memasang Diapraghm Lower
Aux. turbin Inspeksi MOT Inspeksi Condensate Pump no. 1 Identifikasi & pembahasan temuan ketidaksesuaian
Inspeksi Jacking Oil Pump Inspeksi SAC Cleaning Inspeksi No. 4
Inspeksi Deaerator Cleaning Deaerator
Inspeksi CCWP Identifikasi & pembahasan temuan ketidaksesuaian Pengukuran Dimensi Shaft dan Impeller
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Boiler Inspection & Cleaning Steam Drum Pengelasan Crack dinding Cleaning Coal Bunker Aux Boiler Cleaning Gas Duct (Back Pass) Inspection Air Heater Inspeksi ID Fan Pasang Bearing ID Fan Inspeksi PA Fan Melepas Bearing sisi DE
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Project Manager Site Manager
Keterangan
Sugianto Saeran Mudjianto
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
No
Tanggal : 06 Oktober 2016 (hari ke-18) 1
2
SE011613
Turbin
1
Pengangkatan Lower Casing Blade Ring Curtis Persiapan Pengambilan data Clearance Labyrinth seal Cleaning Area Turbin
Finished
100%
Finished
100%
Finished
100%
Cleaning Rotor Turbin
Finished
100%
Pemasangan Upper Labyrinth
Progress
45%
Aux. Turbin SE0116027 Inspeksi MOT
2 Progress
80%
Finished
100%
SE0116059 Inspeksi Condensate Pump no. 1
Progress
50%
SE0116027 Inspeksi Jacking Oil Pump
Progress
70%
Inspeksi Deaerator
Progress
50%
Inspeksi CCWP
Progress
30%
Inspeksi Turning Gear
Progress
30%
Inspeksi CWP
Progress
30%
Pengambilan data Bushing
Finished
100%
Pembuatan Spesial Tools (run Out)
Finished
100%
Disassembly Filter MOT
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Progress
50%
Finished
100%
No
Tanggal : 06 Oktober 2016 (hari ke-18) Inspeksi Shaft Gland Cooler Tes Kebocoran 3
Boiler SE0116078 Cleaning Coal Bunker Tools dan Meterial Penggantian (Sparator, SE0116124 Mobilisasi Chevron) Memasang Gland Manhole
4
3 Progress
80%
Progress
50%
Progress
40%
Pelepasan Supporting di steam drum
Progress
50%
Retubbing Boiler
Progress
35%
Remove tube (20 ea)
Progress
60%
Bevel Tube Install Tube no 3, 13, 16, 18
Progress
40%
Finished
100%
Aux Boiler
4
SE0116112 Cleaning Gas Duct (Back Pass)
Progress
0%
SE0116124 Inspection Air Heater
Progress
75%
Progress
30%
Progress
50%
Inspeksi ID Fan Pasang Bearing ID Fan
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
(Work Has
Keterangan
Progress
Inspeksi PA Fan
Progress
40%
Inspeksi PA Booster Fan
Progress
50%
Disassembly Bearing
Finished
100%
Progress
30%
membuat Spesial Tools SA Fan
Finished
100%
Disassembly Bearing DE
Finished
100%
Disassembly Bearing NDE
Progress
50%
Tanggal : 06 Oktober 2016 (hari ke-18)
Inspeksi SA Fan
Inspeksi BFP
Progress
Pengukuran Clearance Jurnal
Progress
100%
Pengecekan Clearance Thrust
Progress
100%
Cleaning Bearing Journal
Finished
100%
Pengambilan data Clearance After Cleaning
Progress
70%
Penetrant Test
Progress
10%
Expantion Joint
Progress
15%
Keterangan Koordinator Bidang
Willy Pratama
No
Tag No.
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN BIDANG No
Tag No.
MEKANIK Pekerjaan Yang Telah Dilaksanakan Been Done)
Tanggal : 06 Oktober 2016 (hari ke-18) Semua Bidang PPC
(Work Has
Keterangan
Progress
Derry Ferdiansyah
No
Tag No.
PT PJB SERVICES
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Turbin
Aux. Turbin
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Boiler
Aux Boiler
Keterangan
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do)
Project Manager
Keterangan
Sugianto Saeran
SERIOUS INSPECTION PLTU AMURANG UNIT 2 2016
LAPORAN HARIAN Pekerjaan Yang Akan Dilaksanakan Besok (Work To Do) Site Manager
Keterangan Mudjianto