D-01
DOOR TYPE DESCRIPTION
D-02
Double leaf door consisting of 25mm thick solid panelled timber door with brass studs bolted into panels, a flat top and frame posts curved in rosette motifs to details
D-03
900 mm wide single leaf solid hard wood pannelled door
D-04
NOTES GENERAL
1800 mmwide and 3000 mm high open entrance door
800 mm wide single leaf hardwood pannelled door.
ith mushrabiyyah above held by coral stone cladded wall; 100x100 mm banaa flying above the entrance. This massive entrance gives character to the space.
Ground Floor
/
170
31 31 108 86
FINISHES SCHEDULE.
161 412
40mm Carved rosette motif(coral rock
Veneered faced 12mm thick block board door panel
1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish.
61
110
244
119
26
114
88
217
91
114
26
119
244
117
21
61
58
mushrabiyy ah transom
29
150
ex.50mmx50mm mpingo inner frame with rectilinear relief at the straight edge.
150 58 150
58
150
58
4,000
58
150
570 720 820
150 58 150 58 150 58 150 58
. Finished floor level
75 50 50
150
75
58
50 50
Brass studs bolted into timber panel.
150
200
. Finished floor level
1800 mm wide opening
Finished floor level
a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203
a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203
a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203
b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE
b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE
b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE
d). oval cylinder brass escotheons (UNION
d). oval cylinder brass escotheons (UNION
d). oval cylinder brass escotheons (UNION
e).oval satin nickel door stop (UNION
e).oval satin nickel door stop (UNION
e).oval satin nickel door stop (UNION
)
SSS
IRON
MONGERY
SCHEDULE
NO
. HN -SBB-403020
)
.
CATALOGUE SSO - 1)
CATALOGUE NO
. DS - 01
SN )
)
SSS
NO
. HN -SBB-403020
)
.
CATALOGUE SSO - 1)
CATALOGUE NO
. DS - 01
SN )
84 58
150
75 50 50
200
11/2pairs100 mm . steel butt hinges.
200 670 820 920
2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.
58
1,178
1,178 200
. Finished floor level
75
Lime stucco plasterwor k architects approval
58
' ' cylinder lock UNION
11/2pairs100mm . steel butt hinges
50 50
Pull handle on both sides.
150
1,760 2,110
'UNION cylinder lock
cylinder lock mvule timber panels tongue and grooved together ex. 150mmx 100 mm mvule door post carved with wavy motifs denoting the . ocean
1510
2,110 1,760
Pull handle on both sides. ' UNION
1,760 2,110
2,110 1,760
2110
ELEVATION
Pull handle on both sides.
226
12 27 27 12 25 23 25
75
1,800
68
12 27 27 12 25 23 25
2870
4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.
)
SSS
NO
. HN -SBB-403020
)
REVISIONS NO. DATE
LEGEND
.
. DS - 01
DA - H
)
CATALOGUE NO . X 8513
DA - H
)
CATALOGUE NO . X 8513
SN )
DA - H
floor finish wall finish
1 2 3 4
f).hold open door double action floor spring (UNION f).hold open door double action floor spring (UNION f).hold open door double action floor spring (UNION CATALOGUE NO . X 8513
DESCRIPTION
Not applicable.
CATALOGUE SSO - 1)
CATALOGUE NO
STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course.
ELECTRICAL: 1. All conduits must be laid before plastering.
150
75
50 75 50
100mm* 100mm banaa flying above the entrance
58
Veneered faced 12 mm thick block board door panel
Brass studs bolted into timber panel.
50 50
820 720 570
100
ex. 50mmx 50mm mpingo inner frame with rectilinear relief at the straight edge
50
50 75 50
100
75
920 820 670
[D-07/01] Open
[ D- 05 01] Single leaf doo r
100
50 50
100
50
ex 50mmx50mm . mpingo inner frame with rectilinear relief at the straight edge
50
[D-05/01] Single leaf door
50
0.
CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.
MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.
PLAN
[D-07/01] Double leaf door
1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.
ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800
ceiling finish
skirting finish
PROJECT:
[01/01]
width permanent ventilation door type door number
CONSERVATION OF MBARAK
)
HINAWY STREET, MOMBASA OLD TOWN.
-building main entrances LOCATION
[ground floor.]
-Washroom main entrances
-w /c cubicals
DRAWING TITLE:
-Entrance on 1st floor from the stairs
DOOR SCHEDULE
along Mbarak hinawy road. SCALE: 1:100 DATE:
Monday, July 25, 2016
DRAWING BY:
DOOR SILL HEIGHT
KIGUAI KIHARA PHARIS
20 NO.
DOOR HEAD HEIGHT QUANTITY
3 NO.
DOOR SCHEDULE L(--)15
DOOR SCHEDULE
GSPublisherEngine 0.3.100.100
-
AB241-0635/2011
8 NO.
1 NO.
DRAWING NATURE:
WORKING DRAWING
PAPER SIZE:
A1
SHEET NO. Worksheet 1:100
12
DOOR SCHEDULE CONTINUATION
D-05
sigle leaf door consisiting of 25 mm thick timber
NOTES
WINDOW FIXING DETAILS
DOOR FIXING DETAILS
GENERAL 1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.
12mm thick lime washcoat on limeplaster, treated with water proo ng admixture.Coatsappliedto manufacturers' speci cations.
panels with brass motifs screwed to timber panels. Floral motifs are curved around the door
CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.
Beamto S.E.details
frame.
STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course.
panel as per schedule Mastic asphalt pointing
ex 25x125mm thick
51
1,760 2,110 200
200
100
1,178
2,110 1,760
75
570 720 820
75 50 50
10x10mm drip mould.
Wall finish as per schedule.
m hardwood (mangrove) architrave 75mmthick Mvule panels held to togetherby thebrass studs
SCALE: 1:25
Scale 1:1.25
12 mm thick lime wash coat on lime plaster treated with water proofing admixture Coats applied to manufacturers' specifications.
32
structural
88
.
e).oval satin nickel door stop (UNION
DA - H
)
Engineers
75mm thick Mvule panels held to together by the brass studs
15 59
75mmx20m m hardwood (mangrove) architrave
details
10 20
Heavy dutyR.H.S steel framepainted to approval
lime plaster treated with water
200x10mm pull handle on both sides
1 2 3 4
25mm timber
61
ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800
ceiling finish
skirting finish
[01/01]
width permanent ventilation door type door number
CONSERVATION OF MBARAK HINAWY STREET, MOMBASA
12
OLD TOWN.
DRAWING TITLE:
pointing
DOOR SCHEDULE, DOOR & WINDOW FIXING DETAILS
SCALE: 1:100, 1:50 DATE:
Monday, July 25, 2016
DRAWING BY:
111
KIGUAI KIHARA PHARIS 50x25mm R.H.S frame
WROUGHT IRON DOOR JAMB DETAIL A 003 Scale 1:2.5
floor finish wall finish
53
10x10mm lock keeper
2 NO.
LEGEND
Mastic asphalt panel as per
49
Rugged end wrought iron tail piece anchor cast insitu.
81
125
DESCRIPTION
10x10mm drip mould.
proofing admixture Coats specifications.
REVISIONS NO. DATE
PROJECT:
Scale 1:2.5
applied to manufacturers'
GSPublisherEngine 0.3.100.100
cast in situ
schedule.
300mm thickcoral stone wall
-access to balcony on second floor
tail piece anchor
TIMBER DOOR JAMB DETAIL A 002
12 mm thick lime wash coat on
4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.
Ruuged end steel Wall finish as per
SN )
f).hold open door double action floor spring (UNION CATALOGUE NO . X 8513
R.C. beam to
ex.50mmx50mm mpingo inner frame with rectilinear relief at the straight edge
CATALOGUE SSO - 1)
. DS - 01
51 191
)
d). oval cylinder brass escotheons (UNION CATALOGUE NO
12
155
10 13 6 14
. HN -SBB-403020
200
100
b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE NO
12
32
)
SSS
stone
6
a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203
300mm thick coral stonewall
1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish. 2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.
SILL DETAIL
ex.50mmx50mm mpingo inner frame Softwood with rectilinear relief packings at the straight edge TIMBER DOOR HEAD DETAIL A 001
ex. 150mm 100mm mvule door post carved with wavy motifs denoting the . ocean . Finished floor level
10 20
detail.
75mmx20m
mangrove
FINISHES SCHEDULE.
120
precast concrete sill
32
50 50
20
250x80mm bevelled
ELECTRICAL: 1. All conduits must be laid before plastering.
to Structural Engineer's
88
. ex150mmx100mm mangrove door frame carved with motifs.
Cement/ sand jointing.
120
12
6 10 15
32
Brass studs bolted into timber panel .
Pull handle on both sides. 'UNION cylinder lock Brass studs bolted . into timber panel
80
8 13
timber bead
13 14
59
ex.50mmx50mm mpingo inner frame with rectilinear relief at the straight edge
100
75
50 75 50
20mm quadrant
Rosette motif type onarched top to be carved out in abstracted abstracted . pattern
50
50 50
820 720 570
100
50
[D-01 /01] Single leaf door
12 25
to approval
59
155
window board painted
MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.
AB241-0635/2011
DRAWING NATURE:
WORKING DRAWING
PAPER SIZE:
A1
SHEET NO.
1 2
WINDOW TYPE
W-01
W-02
1200x2400 mm moulded inner mpingo wood 8 casement window with divided into upper and lower
DESCRIPTION
halves with an 8 mm clear glass external elaborately carved frame holding burglar proofing bars to detail
3
PLAN
W-02
12x2400 mm rectangular inner mpingo wood into upper and lower halves with an external elaborately carved frame holding burglar proofing bars to detail
1,200
W-02
1200mm *2400mm rectangular inner mpingo wood casement window with 8mm clear glass divided into upper and lower halves with an external elaborately carved frame holding burglar proofing bars and intergrated shutters to detail.
casement window with 8 clear glass mm divided
1,200
NOTES GENERAL
1200mm * 2400mm rectangular inner mpingo wood casement window with 8 mm transluscent glass divided into upper and lower halves with an external elaborately carved frame holding burglar proofing bars to detail.
1,200
1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent. CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose. STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course. MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.
1,200
ELECTRICAL: 1. All conduits must be laid before plastering. FINISHES SCHEDULE.
arched lintel carved with rossetes of the lotus
mpingo flower motif to detail and
LEVEL
with 125 mm lipping and stained to architect's approval
6
GALVANISED
IRON MONGERY
AND FINISHED IN LACQUER COATING b ) 2 LOCKABLE CASEMENT FASTENERS
c ) 4 No. LOCKABLE BRASS CASEMENT PEG STAYS . d ) 2 No. LEVER UPRIGHT MORTICE LOCK AS UNION
with lacquer coating
architect's approval
a ). 2 PAIRS PRESSED STEEL BUTT HINGES GALVANISED AND FINISHED IN LACQUER COATING
50 100
20 mm dia steel bars painted to approval grooved to both top centre and bottom rail
1 pair pressed steel butt hinges galvanised and finished with lacquer coating
100 mm thick bottom rail of carved mpingo flower motif
SCALE 1:20
to detail and with 125 mm lipping and stained to architect's approval
175
Ex 50x25 mm bevel raised hardwood panels for
170
casement window opening to the interior 100 mm thick bottom rail
170
325
casement window opening to the interior
600 mm
approval
20
hardwood panels for
100 mm thick bottom rail of carved
SCALE 1:20
carved mvule flower stained to architects
20
hardwood panels for casement
with 125 mm lipping and stained to
50
motif to detail and
25
Ex 50x25 mm bevel raised
mpingo flower motif to detail and
540
20
280 20
20 325
Ex 50x25 mm bevel raised window opening to the interior
20
1,700 100 20 20 20 20 25 175 175 175 175 175
250
hinges galvanised and finished
2,400
centre and bottom rail
250
lacquer coating
550
250 20 250 20
approval grooved to both top
1 pair pressed steel butt
600
540
550
50 50
50 300 20 300
2,400
galvanised and finished with
600 mm
a ). 2 PAIRS PRESSED STEEL BUTT HINGES
600
flower motif to detail and stained to architects approval
flower 100 mm top rail of
1,200
of carved mpingo flower
50
50
100 mm thick bottom rail of carved
100 mm top rail of carved mvule
20 mm dia steel bars painted to
40
25
window opening to the interior
1 pair pressed steel butt hinges
50
385
20
Ex 50x25 mm bevel raised . for casement hardwood panels
centre and bottom rail
50
20
lacquer coating
2000
20 385
centre and bottom rail
385
1,700
2,400
385
, . approval grooved to both top
stained to architects approval
approval grooved to both top
20 300
25
20 mm dia steel bars painted to
flower motif to detail and
20 mm dia steel bars painted to
20
stained to architects approval
galvanised and finished with
575 20 50 227 227 50
20 300
100
flower motif to detail and
1 pair pressed steel butt hinges
228
50
20 300
of the lotus flower 100 mm top rail of carved mvule
SCALE 1:20
5
400
600
arched lintel carved with rossetes
700
4
ELEVATION
227
625 20
20 250
50
50
595
50
1800
540
20
20
1,200 575 50 575 50 20 50 20 50 50 225 225 225 225 50
2,400
540
50
50
600
100 mm top rail of carved mvule
600
600
1,200
5050
1,200
SCALE 1:20
GALVANISED AND FINISHED IN LACQUER COATING
125 mm lipping and stained to architect's approval
600 mm
a ). 2 PAIRS PRESSED STEEL BUTT HINGES
motif to detail and with
600 mm
a ). 2 PAIRS PRESSED STEEL BUTT HINGES GALVANISED AND FINISHED IN LACQUER COATING
b ) 2 LOCKABLE CASEMENT FASTENERS
b ) 2 LOCKABLE CASEMENT FASTENERS
b ) 2 LOCKABLE CASEMENT FASTENERS
c ) 4 No . LOCKABLE BRASS CASEMENT PEG STAYS
c ) 4 No . LOCKABLE BRASS CASEMENT PEG STAYS
c ) 4 No . LOCKABLE BRASS CASEMENT PEG
d ) 2 No . LEVER UPRIGHT MORTICE LOCK AS UNION
d ) 2 No . LEVER UPRIGHT MORTICE LOCK AS UNION
STAYS .
1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish. 2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones. 4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.
REVISIONS NO. DATE
LEGEND
floor finish wall finish
1 2 3 4
AND SUPPLIED WITH MATCHING SCREWS AS
AND SUPPLIED WITH MATCHING SCREWS AS
NECESSARY
NECESSARY
NECESSARY
skirting finish
PROJECT:
[01/01]
width permanent ventilation door type door number
CONSERVATION OF MBARAK HINAWY STREET, MOMBASA OLD TOWN.
UNION
ALL IRON MONGERY TO BE APPROVED BY
ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800
ceiling finish
ALL IRON MONGERY TO BE APPROVED BY ARCHITECT . ALL IRON MONGERY TO BE APPROVED BY ARCHITECT ALL IRON MONGERY TO BE APPROVED BY ARCHITECT d ) 2 No LEVER UPRIGHT MORTICE LOCK AS AND SUPPLIED WITH MATCHING SCREWS AS
DESCRIPTION
DRAWING TITLE:
ARCHITECT
WINDOW SCHEDULE
AND SUPPLIED WITH MATCHING SCREWS AS NECESSARY SCALE: 1:100
7
-Windows on ground floor on facade along the main LOCATION
access road; Mbarak Hinawy Road and front facade facing Fort Jesus.
DATE:
-Windows on second floor on the facade -Windows on second floor, the Mbarak -Windows on third floor, exhibition
facing Fort Jesus.
Hinawy facing facade.
space. The windows should not allow vies to the exterior environment.
8 GSPublisherEngine 0.3.100.100
QUANTITY
4 NO.
2 NO.
2 NO.
4 NO.
Monday, July 25, 2016
DRAWING BY:
KIGUAI KIHARA PHARIS AB241-0635/2011
DRAWING NATURE:
WORKING DRAWING
PAPER SIZE:
A1
SHEET NO.
manroove (boriti)planks
200
170
125
170
125
170
125
3450 75
75
1,200
170
125
170
900
125
170
125
170
125
170
400
1,200
450
admixture Coats applied to manufacturers' specifications.
3,500
with adhesive on rendered background
1,175
with grouting to approval. 6 mm plate glass mirror at 80 mm c/c on plywood backing to detail.
300x300x10 mm thick ceramic tiles
partitions TYFORDS' Galerie countertop
715
2,390
2,410
150 mm thick coral stone masonry
basin 500x 400 mm with Panama mixer on 75 mm thick terrrazo finish concrete top. 500mm viterous china auto-cistern urinal bowl with exposed pipework and wall hangers to approval. 150X150mm 8mm mm thick fully evitrified non-slip ceramic floor tiles laid on 32mm 1:4 cement:sand screed to approval.
900 AIR-LOCK
AIR-LOCK
Ceramic tile coping
continuous joints in both directions fixed
2,100
900
2,100
CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.
plaster treated with water proofing
1,290
1,475
170
125
500
pv
800
2,100
170
125
tiles 1200mm high with 100 mm straight
GENTS 2,100 W/ROOM
800
pv
2,100
3a4c
170
125
300mmx300mmx20mm thick glazed ceramic
pv
800
1d2c
170
125
1,800
W
1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.
12 mm thick lime wash coat on lime
1,110 1,110
pv
1,800
1,200
1,800
W/ROOM
1,200
pv
GENERAL
alternate with lime infill
W1
900
LADIES
W
600
SECTION W 1 SCALE 1: 25
2,100
900
skirting 300x100 mm
plaster,treated with water proofing
-
admixture coats applied to
+100
thick ceramic tiles
manufacturers' specifications. Countersunk screw with chrome srew cap 6 mm thick plate mirror at 80mm/cc 5 mm wide plywood backing
WASHROOM PLAN
20 mm thick lime mortar
manroove (boriti)planks
150 mm thick masonry walling finish
alternate with lime infill
300
SCALE 1:25
125
170
125
170
125
170
125
170
125
170
125
coral stone wall
alternate with lime infill
the interior spaces allowing for cross ventilation.
300mmx300mmx20mm glazed 1200mm with 100mm jointsinbothdirectionsfixedwith adhesive with .
300mmx300mmx20mm thick high with 100 mm straight continuous joints in both on rendered background with
Inspection Trap In-let Out-let
grouting to approval.
fully evitrified non-slip ceramic
400
1:25
100
LEGEND
12 mm thick lime wash coat on lime plaster treated with water proofing admixture Coats applied to manufacturers' specifications.
high with 100 mm straight
Rugged end wrought iron tail piece anchor cast insitu
continuous joints in both on rendered background with grouting to approval. Rugged end wrought iron tail
wash hand basin mm with hot
( )002
300
Inspection chamber
Out-let pipe
SCALE 1:25
825x 325 mm & cold mixer 8 mm granite top laid to approval finish to schedule
GSPublisherEngine 0.3.100.100
SCALE 1: 25
Elevation
Elevation
SCALE 1: 25
Building Section
[01/01]
CONSERVATION OF MBARAK
DRAWING TITLE:
WASHROOM DETAILS
SCALE: 1:100, 1:25
WASHHAND BASIN SCALE 1: 25
DATE:
Monday, July 25, 2016
DRAWING BY:
150 mm masonry walling
E-66
skirting finish
width permanent ventilation door type door number
OLD TOWN.
TWYFORDS' double
Trap In-let
S:25
ceiling finish
HINAWY STREET, MOMBASA
S.E detail.
to wall washdown w.c suite.
approval.
ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800
100 mm thick r.c top to
floor tiles laid on 32mm 1:4
SECTION
1 2 3 4 PROJECT:
TWFORDS' Galerie back
cement:sand screed to
SECTION W-W
floor finish wall finish
.
Toilet paper roll holder to detail.
320
150X150mm 8mm mm thick
DESCRIPTION
glazed ceramic tiles insitu.
780
directions fixed with adhesive
Elevation
directions fixed with adhesive
2,100
glazed ceramic tiles 1200mm
glazed ceramic tiles 1200mm
600
140
cross ventilation.
1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish.
40
the interior spaces allowing for
3,500
3,500 1,505
1,372
300mmx300mmx20mm thick
1
from top to bottom screening
FINISHES SCHEDULE.
from top to bottom screening
915mm wide by 1715 mm mangroove strips crisscrossing
ELECTRICAL: 1. All conduits must be laid before plastering.
REVISIONS NO. DATE
SCALE 1 25
mangroove strips crisscrossing
pointed arched 90o
1,428
MIRROR FIXING A
pointed arched 90o
1320
1460
595
mangroove (boriti)planks
to schedule
915mm wide by 1715 mm
MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.
4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.
146 200
400 mm thick
100 mm dia. cylindrical cut
300
100 mm dia. cylindrical cut
STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course.
2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.
12 mm thick lime wash coat on lime
600
150 150 150 300 300 1,000 1,100 1,150 1,125 700
pv
±0
NOTES
100 mm dia. cylindrical cut
400
2,100
1,550
4,990
W1
3,100 -100 300 100 150 150 1,200 1,475 1,450
KIGUAI KIHARA PHARIS AB241-0635/2011
DRAWING NATURE:
WORKING DRAWING
PAPER SIZE:
A1
SHEET NO.
DRAINAGE CHANNEL DETAILS
BALCONY DETAILS
NOTES GENERAL
360
854
244
120
a porous character to the facade creating swwahili architecture
349 50 47
100 100 50
43 107
1,300
1,100 1818 17 17 17 5049 2017 2117 4012 100 79 105 147 104
61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 19 39 39 39 396139 39 39 39 3961396139 39 39 39 39 39 39 21
320
50
250
900mm high Mvule wood balustrades with Swahili decorations with three coats of polyurethane clear lacquer finish to detail .
350
50
50 50 100 100
50 100 50
50 100 50
1,804
320
47 100 50
.
approval 200 mm thick RC load bearing
steel metal grating with
slab ribbed to approval.
angle iron over drainage
Reinforcement structure to
channel painted to
Structural Engineer's details.
approval.
ELECTRICAL: 1. All conduits must be laid before plastering.
STEEL GRATING PLAN
DRAINAGE CHANNEL SECTION
SCALE 1 : 20
SCALE
1 : 20
285 wide treads
BALCONY RAILING SECOND FLOOR. ( scale 1:20 )
STAIRCASE DETAILS
1250
1
2
3
4
5
6
7
8
9
polished terazzo nish on landing and terazzo on risers and treads
150 2,790 250
150 1500
300 1800
laid on entry lobby to
20
19 18
17
tread= 285 mm riser = 175 mm
16
GROUND FLOOR SHOPS&RESTAURANT LEVEL
250mm thick reinforced coral rag stairs slab s.e details with terrazzo stair soffit finish to approval
15
22
14
17 16 21 15 20 14
13
19 18
granito tiles
12
Reinforced coral rag landing to structural engineer 's detail and to approval 19 mm deep nosing on the treads Terrazzo finished tread and risers with non -slip corborandum strips on trends to detail
polished
11
4800 1500
300mm *450mm reinforced coral rag beam to structural engineer 's details to approval
300mm*300mm
10
FIRST FLOOR OFFICES LEVEL
up
approval Terrazzo finished trends and risers with non-slip
Arrow showing the direction of movement
carborandum strips groove to approval
STAIRCASE PLAN SCALE1:10
corborandum on the terrazzo tread finish to approval 300 mm tread with varnished terrazzo finish 150 mm high riser with a varnished terrazzo finish
20
175
285
15 0 17 0
150 mm thick reinforced concrete stair slab with terrazzo stair soffit finish
Steel brackets holding balusters and painted to mahogany varnish effect TREAD & RISER SCALE1:10
Varnished terrazzo floor finish
150mmx 100mmhigh concrete on which balusters are cased varnished terrazzo finish on the side BALUSTRADE & HANDRAIL
GSPublisherEngine 0.3.100.100
SCALE 1:10
4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.
REVISIONS NO. DATE
LEGEND
DESCRIPTION
floor finish wall finish
1 2 3 4
ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800
ceiling finish
skirting finish
PROJECT:
[01/01]
width permanent ventilation door type door number
CONSERVATION OF MBARAK HINAWY STREET, MOMBASA
275
25
275
25
275
STAIRCASE, DRAINGE CHANNEL & BALCONY
1,525 25
Steel brackets holding balusters and painted to mahogany varnish effect
2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.
DRAWING TITLE:
50 50 50
50mm dia . thick masonary baluster screwed to washers encased in consrete to structural engineer detail and moulded to approval 20 mm deep nosing
30 x 12 mm thick non - slip
1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish.
OLD TOWN.
25 900 25 150 50 660 25 150 50 660
SCALE 1:10
Mahogany balustrade screwed to steel brackets encased in concrete to structuralengineer detail and moulded to approval
200 200 200
STAIRCASE SECTION
ex . 75mm thick varnished mahogany railing screwed to steel brackets
STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course. MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.
reinforced coral rag and lime staircases, of 175 mm high risers &
2,000
Ex 25mm thick * 900mm high balusters cut and curved out to detail, mortised to handrail and secret nailed to wooden floor finish . 100mm diameter mahogany railing decorated to detail
CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.
FINISHES SCHEDULE.
300 mm coral aggregate slab
50 100 50
1,804
grating with angle iron over
300 mm thick 600 mm by 600 mm coral stone carved motifs on balustrades securing the balcony .
Floor finish to schedules
50 100 50
drain channel with steel metal
30
120
255 399 50
1,239
Wide arched openings gives
2,200
318
50 100 50
51 43
50 100 50
1,800
300
drainage channel painted to
300 mm thick coral masonary wall . Lime mortar as binder 1800
900
30
120 120 120 120 30 30 30 30 30
961
12mm thick lime wash coat on lime plaster , treated with water proofing admixture . Coats applied to manufacturers ' specifications .
1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.
300mm wide & 200 mm deep
25
275
25
275
25
100mm diameter mahogany railing decorated to approval Ex 25mm thick * 900mm high balusters cut and curved out to detail mortised to handrail and secret nailed to wooden floor finish . 20mm polished terrazo floor finish on landing 200mm thick reinforced concrete slab to structural engineer 's details
BALUSTRADE & HANDRAIL SCALE 1:20
DETAILS
SCALE: 1:100, 1:20 DATE:
Monday, July 25, 2016
DRAWING BY:
KIGUAI KIHARA PHARIS AB241-0635/2011
DRAWING NATURE:
WORKING DRAWING
PAPER SIZE:
A1
SHEET NO.