D-01

DOOR TYPE DESCRIPTION

D-02

Double leaf door consisting of 25mm thick solid panelled timber door with brass studs bolted into panels, a flat top and frame posts curved in rosette motifs to details

D-03

900 mm wide single leaf solid hard wood pannelled door

D-04

NOTES GENERAL

1800 mmwide and 3000 mm high open entrance door

800 mm wide single leaf hardwood pannelled door.

ith mushrabiyyah above held by coral stone cladded wall; 100x100 mm banaa flying above the entrance. This massive entrance gives character to the space.

Ground Floor

/

170

31 31 108 86

FINISHES SCHEDULE.

161 412

40mm Carved rosette motif(coral rock

Veneered faced 12mm thick block board door panel

1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish.

61

110

244

119

26

114

88

217

91

114

26

119

244

117

21

61

58

mushrabiyy ah transom

29

150

ex.50mmx50mm mpingo inner frame with rectilinear relief at the straight edge.

150 58 150

58

150

58

4,000

58

150

570 720 820

150 58 150 58 150 58 150 58

. Finished floor level

75 50 50

150

75

58

50 50

Brass studs bolted into timber panel.

150

200

. Finished floor level

1800 mm wide opening

Finished floor level

a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203

a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203

a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203

b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE

b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE

b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE

d). oval cylinder brass escotheons (UNION

d). oval cylinder brass escotheons (UNION

d). oval cylinder brass escotheons (UNION

e).oval satin nickel door stop (UNION

e).oval satin nickel door stop (UNION

e).oval satin nickel door stop (UNION

)

SSS

IRON

MONGERY

SCHEDULE

NO

. HN -SBB-403020

)

.

CATALOGUE SSO - 1)

CATALOGUE NO

. DS - 01

SN )

)

SSS

NO

. HN -SBB-403020

)

.

CATALOGUE SSO - 1)

CATALOGUE NO

. DS - 01

SN )

84 58

150

75 50 50

200

11/2pairs100 mm . steel butt hinges.

200 670 820 920

2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.

58

1,178

1,178 200

. Finished floor level

75

Lime stucco plasterwor k architects approval

58

' ' cylinder lock UNION

11/2pairs100mm . steel butt hinges

50 50

Pull handle on both sides.

150

1,760 2,110

'UNION cylinder lock

cylinder lock mvule timber panels tongue and grooved together ex. 150mmx 100 mm mvule door post carved with wavy motifs denoting the . ocean

1510

2,110 1,760

Pull handle on both sides. ' UNION

1,760 2,110

2,110 1,760

2110

ELEVATION

Pull handle on both sides.

226

12 27 27 12 25 23 25

75

1,800

68

12 27 27 12 25 23 25

2870

4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.

)

SSS

NO

. HN -SBB-403020

)

REVISIONS NO. DATE

LEGEND

.

. DS - 01

DA - H

)

CATALOGUE NO . X 8513

DA - H

)

CATALOGUE NO . X 8513

SN )

DA - H

floor finish wall finish

1 2 3 4

f).hold open door double action floor spring (UNION f).hold open door double action floor spring (UNION f).hold open door double action floor spring (UNION CATALOGUE NO . X 8513

DESCRIPTION

Not applicable.

CATALOGUE SSO - 1)

CATALOGUE NO

STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course.

ELECTRICAL: 1. All conduits must be laid before plastering.

150

75

50 75 50

100mm* 100mm banaa flying above the entrance

58

Veneered faced 12 mm thick block board door panel

Brass studs bolted into timber panel.

50 50

820 720 570

100

ex. 50mmx 50mm mpingo inner frame with rectilinear relief at the straight edge

50

50 75 50

100

75

920 820 670

[D-07/01] Open

[ D- 05 01] Single leaf doo r

100

50 50

100

50

ex 50mmx50mm . mpingo inner frame with rectilinear relief at the straight edge

50

[D-05/01] Single leaf door

50

0.

CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.

MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.

PLAN

[D-07/01] Double leaf door

1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.

ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800

ceiling finish

skirting finish

PROJECT:

[01/01]

width permanent ventilation door type door number

CONSERVATION OF MBARAK

)

HINAWY STREET, MOMBASA OLD TOWN.

-building main entrances LOCATION

[ground floor.]

-Washroom main entrances

-w /c cubicals

DRAWING TITLE:

-Entrance on 1st floor from the stairs

DOOR SCHEDULE

along Mbarak hinawy road. SCALE: 1:100 DATE:

Monday, July 25, 2016

DRAWING BY:

DOOR SILL HEIGHT

KIGUAI KIHARA PHARIS

20 NO.

DOOR HEAD HEIGHT QUANTITY

3 NO.

DOOR SCHEDULE L(--)15

DOOR SCHEDULE

GSPublisherEngine 0.3.100.100

-

AB241-0635/2011

8 NO.

1 NO.

DRAWING NATURE:

WORKING DRAWING

PAPER SIZE:

A1

SHEET NO. Worksheet 1:100

12

DOOR SCHEDULE CONTINUATION

D-05

sigle leaf door consisiting of 25 mm thick timber

NOTES

WINDOW FIXING DETAILS

DOOR FIXING DETAILS

GENERAL 1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.

12mm thick lime washcoat on limeplaster, treated with water proo ng admixture.Coatsappliedto manufacturers' speci cations.

panels with brass motifs screwed to timber panels. Floral motifs are curved around the door

CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.

Beamto S.E.details

frame.

STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course.

panel as per schedule Mastic asphalt pointing

ex 25x125mm thick

51

1,760 2,110 200

200

100

1,178

2,110 1,760

75

570 720 820

75 50 50

10x10mm drip mould.

Wall finish as per schedule.

m hardwood (mangrove) architrave 75mmthick Mvule panels held to togetherby thebrass studs

SCALE: 1:25

Scale 1:1.25

12 mm thick lime wash coat on lime plaster treated with water proofing admixture Coats applied to manufacturers' specifications.

32

structural

88

.

e).oval satin nickel door stop (UNION

DA - H

)

Engineers

75mm thick Mvule panels held to together by the brass studs

15 59

75mmx20m m hardwood (mangrove) architrave

details

10 20

Heavy dutyR.H.S steel framepainted to approval

lime plaster treated with water

200x10mm pull handle on both sides

1 2 3 4

25mm timber

61

ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800

ceiling finish

skirting finish

[01/01]

width permanent ventilation door type door number

CONSERVATION OF MBARAK HINAWY STREET, MOMBASA

12

OLD TOWN.

DRAWING TITLE:

pointing

DOOR SCHEDULE, DOOR & WINDOW FIXING DETAILS

SCALE: 1:100, 1:50 DATE:

Monday, July 25, 2016

DRAWING BY:

111

KIGUAI KIHARA PHARIS 50x25mm R.H.S frame

WROUGHT IRON DOOR JAMB DETAIL A 003 Scale 1:2.5

floor finish wall finish

53

10x10mm lock keeper

2 NO.

LEGEND

Mastic asphalt panel as per

49

Rugged end wrought iron tail piece anchor cast insitu.

81

125

DESCRIPTION

10x10mm drip mould.

proofing admixture Coats specifications.

REVISIONS NO. DATE

PROJECT:

Scale 1:2.5

applied to manufacturers'

GSPublisherEngine 0.3.100.100

cast in situ

schedule.

300mm thickcoral stone wall

-access to balcony on second floor

tail piece anchor

TIMBER DOOR JAMB DETAIL A 002

12 mm thick lime wash coat on

4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.

Ruuged end steel Wall finish as per

SN )

f).hold open door double action floor spring (UNION CATALOGUE NO . X 8513

R.C. beam to

ex.50mmx50mm mpingo inner frame with rectilinear relief at the straight edge

CATALOGUE SSO - 1)

. DS - 01

51 191

)

d). oval cylinder brass escotheons (UNION CATALOGUE NO

12

155

10 13 6 14

. HN -SBB-403020

200

100

b)custom brass door knockers to architects details c).2 pairs, heavy duty wrought iron security hinge ball bearing 100 x 76 x 2 mm (UNION CATALOGUE NO

12

32

)

SSS

stone

6

a).72mm centers euro cylinder mortice entrance lock -satin steel ( UNION CATALOGUE no. 7203

300mm thick coral stonewall

1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish. 2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.

SILL DETAIL

ex.50mmx50mm mpingo inner frame Softwood with rectilinear relief packings at the straight edge TIMBER DOOR HEAD DETAIL A 001

ex. 150mm 100mm mvule door post carved with wavy motifs denoting the . ocean . Finished floor level

10 20

detail.

75mmx20m

mangrove

FINISHES SCHEDULE.

120

precast concrete sill

32

50 50

20

250x80mm bevelled

ELECTRICAL: 1. All conduits must be laid before plastering.

to Structural Engineer's

88

. ex150mmx100mm mangrove door frame carved with motifs.

Cement/ sand jointing.

120

12

6 10 15

32

Brass studs bolted into timber panel .

Pull handle on both sides. 'UNION cylinder lock Brass studs bolted . into timber panel

80

8 13

timber bead

13 14

59

ex.50mmx50mm mpingo inner frame with rectilinear relief at the straight edge

100

75

50 75 50

20mm quadrant

Rosette motif type onarched top to be carved out in abstracted abstracted . pattern

50

50 50

820 720 570

100

50

[D-01 /01] Single leaf door

12 25

to approval

59

155

window board painted

MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.

AB241-0635/2011

DRAWING NATURE:

WORKING DRAWING

PAPER SIZE:

A1

SHEET NO.

1 2

WINDOW TYPE

W-01

W-02

1200x2400 mm moulded inner mpingo wood 8 casement window with divided into upper and lower

DESCRIPTION

halves with an 8 mm clear glass external elaborately carved frame holding burglar proofing bars to detail

3

PLAN

W-02

12x2400 mm rectangular inner mpingo wood into upper and lower halves with an external elaborately carved frame holding burglar proofing bars to detail

1,200

W-02

1200mm *2400mm rectangular inner mpingo wood casement window with 8mm clear glass divided into upper and lower halves with an external elaborately carved frame holding burglar proofing bars and intergrated shutters to detail.

casement window with 8 clear glass mm divided

1,200

NOTES GENERAL

1200mm * 2400mm rectangular inner mpingo wood casement window with 8 mm transluscent glass divided into upper and lower halves with an external elaborately carved frame holding burglar proofing bars to detail.

1,200

1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent. CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose. STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course. MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.

1,200

ELECTRICAL: 1. All conduits must be laid before plastering. FINISHES SCHEDULE.

arched lintel carved with rossetes of the lotus

mpingo flower motif to detail and

LEVEL

with 125 mm lipping and stained to architect's approval

6

GALVANISED

IRON MONGERY

AND FINISHED IN LACQUER COATING b ) 2 LOCKABLE CASEMENT FASTENERS

c ) 4 No. LOCKABLE BRASS CASEMENT PEG STAYS . d ) 2 No. LEVER UPRIGHT MORTICE LOCK AS UNION

with lacquer coating

architect's approval

a ). 2 PAIRS PRESSED STEEL BUTT HINGES GALVANISED AND FINISHED IN LACQUER COATING

50 100

20 mm dia steel bars painted to approval grooved to both top centre and bottom rail

1 pair pressed steel butt hinges galvanised and finished with lacquer coating

100 mm thick bottom rail of carved mpingo flower motif

SCALE 1:20

to detail and with 125 mm lipping and stained to architect's approval

175

Ex 50x25 mm bevel raised hardwood panels for

170

casement window opening to the interior 100 mm thick bottom rail

170

325

casement window opening to the interior

600 mm

approval

20

hardwood panels for

100 mm thick bottom rail of carved

SCALE 1:20

carved mvule flower stained to architects

20

hardwood panels for casement

with 125 mm lipping and stained to

50

motif to detail and

25

Ex 50x25 mm bevel raised

mpingo flower motif to detail and

540

20

280 20

20 325

Ex 50x25 mm bevel raised window opening to the interior

20

1,700 100 20 20 20 20 25 175 175 175 175 175

250

hinges galvanised and finished

2,400

centre and bottom rail

250

lacquer coating

550

250 20 250 20

approval grooved to both top

1 pair pressed steel butt

600

540

550

50 50

50 300 20 300

2,400

galvanised and finished with

600 mm

a ). 2 PAIRS PRESSED STEEL BUTT HINGES

600

flower motif to detail and stained to architects approval

flower 100 mm top rail of

1,200

of carved mpingo flower

50

50

100 mm thick bottom rail of carved

100 mm top rail of carved mvule

20 mm dia steel bars painted to

40

25

window opening to the interior

1 pair pressed steel butt hinges

50

385

20

Ex 50x25 mm bevel raised . for casement hardwood panels

centre and bottom rail

50

20

lacquer coating

2000

20 385

centre and bottom rail

385

1,700

2,400

385

, . approval grooved to both top

stained to architects approval

approval grooved to both top

20 300

25

20 mm dia steel bars painted to

flower motif to detail and

20 mm dia steel bars painted to

20

stained to architects approval

galvanised and finished with

575 20 50 227 227 50

20 300

100

flower motif to detail and

1 pair pressed steel butt hinges

228

50

20 300

of the lotus flower 100 mm top rail of carved mvule

SCALE 1:20

5

400

600

arched lintel carved with rossetes

700

4

ELEVATION

227

625 20

20 250

50

50

595

50

1800

540

20

20

1,200 575 50 575 50 20 50 20 50 50 225 225 225 225 50

2,400

540

50

50

600

100 mm top rail of carved mvule

600

600

1,200

5050

1,200

SCALE 1:20

GALVANISED AND FINISHED IN LACQUER COATING

125 mm lipping and stained to architect's approval

600 mm

a ). 2 PAIRS PRESSED STEEL BUTT HINGES

motif to detail and with

600 mm

a ). 2 PAIRS PRESSED STEEL BUTT HINGES GALVANISED AND FINISHED IN LACQUER COATING

b ) 2 LOCKABLE CASEMENT FASTENERS

b ) 2 LOCKABLE CASEMENT FASTENERS

b ) 2 LOCKABLE CASEMENT FASTENERS

c ) 4 No . LOCKABLE BRASS CASEMENT PEG STAYS

c ) 4 No . LOCKABLE BRASS CASEMENT PEG STAYS

c ) 4 No . LOCKABLE BRASS CASEMENT PEG

d ) 2 No . LEVER UPRIGHT MORTICE LOCK AS UNION

d ) 2 No . LEVER UPRIGHT MORTICE LOCK AS UNION

STAYS .

1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish. 2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones. 4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.

REVISIONS NO. DATE

LEGEND

floor finish wall finish

1 2 3 4

AND SUPPLIED WITH MATCHING SCREWS AS

AND SUPPLIED WITH MATCHING SCREWS AS

NECESSARY

NECESSARY

NECESSARY

skirting finish

PROJECT:

[01/01]

width permanent ventilation door type door number

CONSERVATION OF MBARAK HINAWY STREET, MOMBASA OLD TOWN.

UNION

ALL IRON MONGERY TO BE APPROVED BY

ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800

ceiling finish

ALL IRON MONGERY TO BE APPROVED BY ARCHITECT . ALL IRON MONGERY TO BE APPROVED BY ARCHITECT ALL IRON MONGERY TO BE APPROVED BY ARCHITECT d ) 2 No LEVER UPRIGHT MORTICE LOCK AS AND SUPPLIED WITH MATCHING SCREWS AS

DESCRIPTION

DRAWING TITLE:

ARCHITECT

WINDOW SCHEDULE

AND SUPPLIED WITH MATCHING SCREWS AS NECESSARY SCALE: 1:100

7

-Windows on ground floor on facade along the main LOCATION

access road; Mbarak Hinawy Road and front facade facing Fort Jesus.

DATE:

-Windows on second floor on the facade -Windows on second floor, the Mbarak -Windows on third floor, exhibition

facing Fort Jesus.

Hinawy facing facade.

space. The windows should not allow vies to the exterior environment.

8 GSPublisherEngine 0.3.100.100

QUANTITY

4 NO.

2 NO.

2 NO.

4 NO.

Monday, July 25, 2016

DRAWING BY:

KIGUAI KIHARA PHARIS AB241-0635/2011

DRAWING NATURE:

WORKING DRAWING

PAPER SIZE:

A1

SHEET NO.

manroove (boriti)planks

200

170

125

170

125

170

125

3450 75

75

1,200

170

125

170

900

125

170

125

170

125

170

400

1,200

450

admixture Coats applied to manufacturers' specifications.

3,500

with adhesive on rendered background

1,175

with grouting to approval. 6 mm plate glass mirror at 80 mm c/c on plywood backing to detail.

300x300x10 mm thick ceramic tiles

partitions TYFORDS' Galerie countertop

715

2,390

2,410

150 mm thick coral stone masonry

basin 500x 400 mm with Panama mixer on 75 mm thick terrrazo finish concrete top. 500mm viterous china auto-cistern urinal bowl with exposed pipework and wall hangers to approval. 150X150mm 8mm mm thick fully evitrified non-slip ceramic floor tiles laid on 32mm 1:4 cement:sand screed to approval.

900 AIR-LOCK

AIR-LOCK

Ceramic tile coping

continuous joints in both directions fixed

2,100

900

2,100

CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.

plaster treated with water proofing

1,290

1,475

170

125

500

pv

800

2,100

170

125

tiles 1200mm high with 100 mm straight

GENTS 2,100 W/ROOM

800

pv

2,100

3a4c

170

125

300mmx300mmx20mm thick glazed ceramic

pv

800

1d2c

170

125

1,800

W

1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.

12 mm thick lime wash coat on lime

1,110 1,110

pv

1,800

1,200

1,800

W/ROOM

1,200

pv

GENERAL

alternate with lime infill

W1

900

LADIES

W

600

SECTION W 1 SCALE 1: 25

2,100

900

skirting 300x100 mm

plaster,treated with water proofing

-

admixture coats applied to

+100

thick ceramic tiles

manufacturers' specifications. Countersunk screw with chrome srew cap 6 mm thick plate mirror at 80mm/cc 5 mm wide plywood backing

WASHROOM PLAN

20 mm thick lime mortar

manroove (boriti)planks

150 mm thick masonry walling finish

alternate with lime infill

300

SCALE 1:25

125

170

125

170

125

170

125

170

125

170

125

coral stone wall

alternate with lime infill

the interior spaces allowing for cross ventilation.

300mmx300mmx20mm glazed 1200mm with 100mm jointsinbothdirectionsfixedwith adhesive with .

300mmx300mmx20mm thick high with 100 mm straight continuous joints in both on rendered background with

Inspection Trap In-let Out-let

grouting to approval.

fully evitrified non-slip ceramic

400

1:25

100

LEGEND

12 mm thick lime wash coat on lime plaster treated with water proofing admixture Coats applied to manufacturers' specifications.

high with 100 mm straight

Rugged end wrought iron tail piece anchor cast insitu

continuous joints in both on rendered background with grouting to approval. Rugged end wrought iron tail

wash hand basin mm with hot

( )002

300

Inspection chamber

Out-let pipe

SCALE 1:25

825x 325 mm & cold mixer 8 mm granite top laid to approval finish to schedule

GSPublisherEngine 0.3.100.100

SCALE 1: 25

Elevation

Elevation

SCALE 1: 25

Building Section

[01/01]

CONSERVATION OF MBARAK

DRAWING TITLE:

WASHROOM DETAILS

SCALE: 1:100, 1:25

WASHHAND BASIN SCALE 1: 25

DATE:

Monday, July 25, 2016

DRAWING BY:

150 mm masonry walling

E-66

skirting finish

width permanent ventilation door type door number

OLD TOWN.

TWYFORDS' double

Trap In-let

S:25

ceiling finish

HINAWY STREET, MOMBASA

S.E detail.

to wall washdown w.c suite.

approval.

ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800

100 mm thick r.c top to

floor tiles laid on 32mm 1:4

SECTION

1 2 3 4 PROJECT:

TWFORDS' Galerie back

cement:sand screed to

SECTION W-W

floor finish wall finish

.

Toilet paper roll holder to detail.

320

150X150mm 8mm mm thick

DESCRIPTION

glazed ceramic tiles insitu.

780

directions fixed with adhesive

Elevation

directions fixed with adhesive

2,100

glazed ceramic tiles 1200mm

glazed ceramic tiles 1200mm

600

140

cross ventilation.

1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish.

40

the interior spaces allowing for

3,500

3,500 1,505

1,372

300mmx300mmx20mm thick

1

from top to bottom screening

FINISHES SCHEDULE.

from top to bottom screening

915mm wide by 1715 mm mangroove strips crisscrossing

ELECTRICAL: 1. All conduits must be laid before plastering.

REVISIONS NO. DATE

SCALE 1 25

mangroove strips crisscrossing

pointed arched 90o

1,428

MIRROR FIXING A

pointed arched 90o

1320

1460

595

mangroove (boriti)planks

to schedule

915mm wide by 1715 mm

MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.

4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.

146 200

400 mm thick

100 mm dia. cylindrical cut

300

100 mm dia. cylindrical cut

STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course.

2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.

12 mm thick lime wash coat on lime

600

150 150 150 300 300 1,000 1,100 1,150 1,125 700

pv

±0

NOTES

100 mm dia. cylindrical cut

400

2,100

1,550

4,990

W1

3,100 -100 300 100 150 150 1,200 1,475 1,450

KIGUAI KIHARA PHARIS AB241-0635/2011

DRAWING NATURE:

WORKING DRAWING

PAPER SIZE:

A1

SHEET NO.

DRAINAGE CHANNEL DETAILS

BALCONY DETAILS

NOTES GENERAL

360

854

244

120

a porous character to the facade creating swwahili architecture

349 50 47

100 100 50

43 107

1,300

1,100 1818 17 17 17 5049 2017 2117 4012 100 79 105 147 104

61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 19 39 39 39 396139 39 39 39 3961396139 39 39 39 39 39 39 21

320

50

250

900mm high Mvule wood balustrades with Swahili decorations with three coats of polyurethane clear lacquer finish to detail .

350

50

50 50 100 100

50 100 50

50 100 50

1,804

320

47 100 50

.

approval 200 mm thick RC load bearing

steel metal grating with

slab ribbed to approval.

angle iron over drainage

Reinforcement structure to

channel painted to

Structural Engineer's details.

approval.

ELECTRICAL: 1. All conduits must be laid before plastering.

STEEL GRATING PLAN

DRAINAGE CHANNEL SECTION

SCALE 1 : 20

SCALE

1 : 20

285 wide treads

BALCONY RAILING SECOND FLOOR. ( scale 1:20 )

STAIRCASE DETAILS

1250

1

2

3

4

5

6

7

8

9

polished terazzo nish on landing and terazzo on risers and treads

150 2,790 250

150 1500

300 1800

laid on entry lobby to

20

19 18

17

tread= 285 mm riser = 175 mm

16

GROUND FLOOR SHOPS&RESTAURANT LEVEL

250mm thick reinforced coral rag stairs slab s.e details with terrazzo stair soffit finish to approval

15

22

14

17 16 21 15 20 14

13

19 18

granito tiles

12

Reinforced coral rag landing to structural engineer 's detail and to approval 19 mm deep nosing on the treads Terrazzo finished tread and risers with non -slip corborandum strips on trends to detail

polished

11

4800 1500

300mm *450mm reinforced coral rag beam to structural engineer 's details to approval

300mm*300mm

10

FIRST FLOOR OFFICES LEVEL

up

approval Terrazzo finished trends and risers with non-slip

Arrow showing the direction of movement

carborandum strips groove to approval

STAIRCASE PLAN SCALE1:10

corborandum on the terrazzo tread finish to approval 300 mm tread with varnished terrazzo finish 150 mm high riser with a varnished terrazzo finish

20

175

285

15 0 17 0

150 mm thick reinforced concrete stair slab with terrazzo stair soffit finish

Steel brackets holding balusters and painted to mahogany varnish effect TREAD & RISER SCALE1:10

Varnished terrazzo floor finish

150mmx 100mmhigh concrete on which balusters are cased varnished terrazzo finish on the side BALUSTRADE & HANDRAIL

GSPublisherEngine 0.3.100.100

SCALE 1:10

4.CEILING FINISH a. 9mm first coat 1:4 lime/sand screed and 3mm second coat of lime plaster, smooth trowelled on structural slab. b. Painted waterproofed rough cast lime finish c. Mahogany timber strips T&G d. Emulsion paint. e.25mm thick suspended gypsum ceiling board and plaster on lime soffit f.Square cut mangrove(boriti) planks alternate with lime infill.

REVISIONS NO. DATE

LEGEND

DESCRIPTION

floor finish wall finish

1 2 3 4

ROOMroom number WINDOW/DOOR [0/07] height floor level pv 2100x1800

ceiling finish

skirting finish

PROJECT:

[01/01]

width permanent ventilation door type door number

CONSERVATION OF MBARAK HINAWY STREET, MOMBASA

275

25

275

25

275

STAIRCASE, DRAINGE CHANNEL & BALCONY

1,525 25

Steel brackets holding balusters and painted to mahogany varnish effect

2.WALL FINISHES. a.12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats applied to manufacturers' specifications. b. Moulded mahogany timber railing above coral stone walling 1000mm from finished floor level c. Exposed random cut coral stone d. 300mm x300mm x20mm thick glazed ceramic tiles 1200mm high with 100mm straight continuous joints in both directions fixed with adhesive on rendered background with grouting to approval. e.Coral lime plaster finish containing egg white (2 to 3 coats) f. Emulsion paint. g. Moulded mahogany timber railing 1200mm high. 3.SKIRTING FINISHES a. 300mm x100mm thick ceramic tiles. b. 10mm Lime mortar on 25mm thick lime mortar screed. c. 150mm high polished in-situ terrazzo d. ex.150mm x25mm thick Mangrove nailed on wall. e. 100mm x25mm dressed coral stone tiles f. Random cut and stacked mazeras stones.

DRAWING TITLE:

50 50 50

50mm dia . thick masonary baluster screwed to washers encased in consrete to structural engineer detail and moulded to approval 20 mm deep nosing

30 x 12 mm thick non - slip

1.FLOOR FINISHES. a. 200mm thick coral aggregate slab to SE's details treated with hardener/sealer, laid to falls with a ribbed finish. b. 6 mm thick polished terrazzo laid on lime mortar screed,50% chops, with 25x3mm dividing strips set off to architects approval. Total floor slab thickness=200mm. c. 400mm x200 mm x30mm granito tiles on 1:4 mortar mix, laid on lime mortar screed. Total floor slab thickness=200mm. d. 300x300 x10mm thick glazed ceramic tiles e. Approved 200*65*20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm 1:4 lime sand screed. f. 20mm thick random cut mazeras stone on lime mortar screed g.40mm screed smooth finish.

OLD TOWN.

25 900 25 150 50 660 25 150 50 660

SCALE 1:10

Mahogany balustrade screwed to steel brackets encased in concrete to structuralengineer detail and moulded to approval

200 200 200

STAIRCASE SECTION

ex . 75mm thick varnished mahogany railing screwed to steel brackets

STRUCTURAL WORKS. 1. Depth of foundation to be determined on site to S.E's approval. 2. For all Coral aggregate reinforcement works refer to Structural Engineers details. 3. All adjascent Coral aggregate reinforcement works and masonry walls to be tied with strap wrought iron at every course. 4. All walls less than 200mm thick to be reinforced with hoop wrought iron at every alternate course. MECHANICAL. 1.All plumbing and drainage to comply with LamuCountyCouncil specifications. 2.All service ducts to be accesible fromall floors. 3. SVP denotes soil vent pipe to be provided at at the head of drainage 4. Drains passing beneath buildings and walkways to be encased in 150mm concrete surround. 5. All underground foul and waste drain pipes to be class 41 golden brown pvc pipe 6. Minimum slope in the drain to be 1% 7.All mechanical work must be coordinated with electrical and any conflictsbe clarified before work begins.

reinforced coral rag and lime staircases, of 175 mm high risers &

2,000

Ex 25mm thick * 900mm high balusters cut and curved out to detail, mortised to handrail and secret nailed to wooden floor finish . 100mm diameter mahogany railing decorated to detail

CIVIL WORKS. 1. All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50-75mm coral screed on 50-100mm hardcore(coral rag base). 2. All soils under slab to be treated for termite control. 3. All soils on cut embarkments to be stabilised. The slope should not exceed natural angle of repose.

FINISHES SCHEDULE.

300 mm coral aggregate slab

50 100 50

1,804

grating with angle iron over

300 mm thick 600 mm by 600 mm coral stone carved motifs on balustrades securing the balcony .

Floor finish to schedules

50 100 50

drain channel with steel metal

30

120

255 399 50

1,239

Wide arched openings gives

2,200

318

50 100 50

51 43

50 100 50

1,800

300

drainage channel painted to

300 mm thick coral masonary wall . Lime mortar as binder 1800

900

30

120 120 120 120 30 30 30 30 30

961

12mm thick lime wash coat on lime plaster , treated with water proofing admixture . Coats applied to manufacturers ' specifications .

1.Drawings not to be scaled. Only figured dimensions to beused. 2. All dimensions are shown in mm unless otherwise stated. 3. P.V. denotes permanent vent.

300mm wide & 200 mm deep

25

275

25

275

25

100mm diameter mahogany railing decorated to approval Ex 25mm thick * 900mm high balusters cut and curved out to detail mortised to handrail and secret nailed to wooden floor finish . 20mm polished terrazo floor finish on landing 200mm thick reinforced concrete slab to structural engineer 's details

BALUSTRADE & HANDRAIL SCALE 1:20

DETAILS

SCALE: 1:100, 1:20 DATE:

Monday, July 25, 2016

DRAWING BY:

KIGUAI KIHARA PHARIS AB241-0635/2011

DRAWING NATURE:

WORKING DRAWING

PAPER SIZE:

A1

SHEET NO.

Related Documents

Details
January 2021 3
Maintenance Details
February 2021 1
Roof Details
January 2021 1
Details Stairs
January 2021 1
Construction Details
January 2021 1
January Details
January 2021 1

More Documents from "radha"

Details
January 2021 3