Client:
GOVERNMENT OF ANDHRA Ref. No.: PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS Doc. No. WING NH CIRCLE VIJAYAWADA
TPI/201819/106
-
Project:
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
DESIGN OF DECK SLAB
DESIGN CHAINAGE: 37+284
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Client:
Ref. No.:
TPI/2018-19/106
Doc. No.
-
Project:
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
DESIGN OF DECK SLAB 12
0.175
1.1 0.225
0.3
0.3
0.225 0.5
1.8 Cantilever LHS
1.1
2.8
Total no of Girder Clear Span of Super Structure Width of Super Structure Thickness of Crash Barrier at Top Thickness of Crash Barrier at Bottom Depth of Crash Barrier Thickness of Weraring Coat Depth of Deck Slab Depth of Cantilever Slab at End Depth of Slab at Face of Girder Depth of Slab at Face of Girder at cantilever portion Width of Girder Flange Width of Girder Support Web Width of Haunch Width of Girder Mid Web Type of Exposure Condition Total Depth of Girder With Slab Distance Between Two Girder Width of Bearing Clear Cover of Main Reinforcement Width of footpath HEIGHT OF PARAPET BETWEEN FOOTPATH & CARRIAGE WAY WIDTH OF PARAPET BETWEEN FOOTPATH & CARRIAGE WAY Thk Of Footpath Clear Carriageway Width
1.8
= = = = = = = = = = = = = = = = = = = = =
4 25 12 0.175 0.5 1.1 75 0.225 0.225 0.3 0.3 0.8 0.3 0.6 0 Moderate 1.1 2.8 500 40 0
Nos m m m m m mm m m m m m m m m
=
0
mm
=
0
mm
= =
0 11
mm m
m m mm mm mm
Client:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Ref. No.:
TPI/2018-19/106
Doc. No.
-
Project:
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
DESIGN OF DECK SLAB
Material Properties Grade of Concrete Grade of Steel Density of Concrete Density of Wearing Coat
= = = =
35 500 25 22
fck Ecm fcm fctm fctm.fl α γm fcd fyd Modulus of Elasticity of Steel, ES
= = = = = = = = = =
35 32000 45 2.80 2.80 0.67 1.5 15.63 434.78 200000
Calculation For Cantilever Portion 1) Dead Load Height of Crash Barrier Weight of Crash Barrier Weight of Wearing Coat Weight of Footpath
= = = =
1.1 27.5 2.00 0.00
N/mm² N/mm² kN/m³ kN/m³ IRC:112-2011, Table-6.5 N/mm² N/mm² N/mm² N/mm² N/mm² For Basic & Seismic Combination N/mm² N/mm² N/mm²
m kN/m per m width kN/m² kN/m²
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Client:
Ref. No.:
TPI/2018-19/106
Doc. No.
-
Project:
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
DESIGN OF DECK SLAB
Unfactored Moment from STAAD
SW 4.30 0.00 6.60 0.00 6.71 2.44 2.38 0.00 0.85 0.00
Bending Moment kNm CB WC 12.31 0.42 0.00 0.00 15.81 0.81 0.00 0.00 17.57 0.69 4.87 0.37 11.96 0.00 0.00 0.44 8.22 0.00 0.00 0.44
LL 17.921 0 19.955 0 31.639 42.367 12.554 42.579 13.364 42.367
SW 7.51 9.75 9.47 4.97 2.72
Shear Force kN CB WC 13.75 1.29 13.75 1.80 9.35 2.10 9.35 0.90 9.35 0.25
LL 11.10 25.85 88.79 23.57 23.57
Location
Cantilever portion
Start of Haunch Face of Web Face of Web
Simply Supported
Start of Haunch Mid Span
Hogging sagging Hogging sagging Hogging sagging Hogging sagging Hogging sagging
Location Start of Haunch Face of Web Face of Web Start of Haunch Mid Span
Cantilever portion Simply Supported Factored Load
ULS
self Weight Crash Barrier Wearing coat Live Load
1.35 1.35 1.75 1.5
SLS Rare 1 1 1.2 1
Qausi 1 1 1.2 0
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Doc. No.
-
DESIGN OF DECK SLAB
Location Start of Haunch Face of Web Face of Web Simply Supported
TPI/2018-19/106
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: Total factored Moment & Shear force
Cantilever portion
Ref. No.:
Start of Haunch Mid Span
Hogging sagging Hogging sagging Hogging sagging Hogging sagging Hogging sagging
SW 5.81 0.00 8.91 0.00 9.06 3.29 3.22 0.00 1.14 0.00
ULS Bending Moment kNm CB WC LL 16.61 0.73 26.8815 0.00 0.00 0 21.35 1.42 29.9325 0.00 0.00 0 23.72 1.21 47.4585 6.58 0.64 63.5505 16.15 0.00 18.831 0.00 0.77 63.8685 11.10 0.00 20.046 0.00 0.77 63.5505
ULS Shear Force kN SW CB WC LL Start of Haunch Cantilever 10.14 18.56 2.26 16.65 Face of Web portion 13.16 18.56 3.15 38.77 Face of Web 12.78 12.63 3.67 133.19 Simply Start of Haunch 6.71 12.63 1.57 35.36 Supported Mid Span 3.67 12.63 0.44 35.36 *As per IRC : 112-2011 CL.B3.2 page 278 top slab need not to check for shear in live load
Total 50.03 0.00 61.61 0.00 81.45 74.06 38.19 64.64 32.28 64.32
Location
SW 4.30 0.00 6.60 0.00 6.71 2.44 2.38 0.00 0.85 0.00
SLS (RARE) Bending Moment kNm CB WC LL 12.31 0.50 17.921 0.00 0.00 0 15.81 0.97 19.955 0.00 0.00 0 17.57 0.83 31.639 4.87 0.44 42.367 11.96 0.00 12.554 0.00 0.53 42.579 8.22 0.00 13.364 0.00 0.53 42.367
Total 35.03 0.00 43.34 0.00 56.75 50.12 26.90 43.11 22.43 42.90
SW 7.51 9.75 9.47 4.97 2.72
SLS(RARE) Shear Force kN CB WC LL 13.75 1.55 11.10 13.75 2.16 25.85 9.35 2.52 88.79 9.35 1.08 23.57 9.35 0.30 23.57
Total 33.91 51.51 110.13 38.97 35.94
Location
Cantilever portion
Start of Haunch Face of Web Face of Web
Simply Supported
Start of Haunch Mid Span
Hogging sagging Hogging sagging Hogging sagging Hogging sagging Hogging sagging
Location Cantilever portion Simply Supported
Start of Haunch Face of Web Face of Web Start of Haunch Mid Span
Total 30.96 34.88 29.08 20.90 16.73
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Location Start of Haunch Face of Web Face of Web Simply Supported
Start of Haunch Mid Span
Simply Supported
Doc. No.
-
Hogging sagging Hogging sagging Hogging sagging Hogging sagging Hogging sagging
DESIGN OF DECK SLAB SLS (QUASI) Bending Moment kNm SW CB WC LL 4.30 12.31 0.50 0 0.00 0.00 0.00 0 6.60 15.81 0.97 0 0.00 0.00 0.00 0 6.71 17.57 0.83 0 2.44 4.87 0.44 0 2.38 11.96 0.00 0 0.00 0.00 0.53 0 0.85 8.22 0.00 0 0.00 0.00 0.53 0
Total 17.11 0.00 23.39 0.00 25.11 7.75 14.34 0.53 9.06 0.53
SLS(QUASI) Shear Force kN CB WC LL 13.75 1.55 0.00 13.75 2.16 0.00 9.35 2.52 0.00 9.35 1.08 0.00 9.35 0.30 0.00
Total 22.81 25.66 21.34 15.40 12.37
Location Cantilever portion
TPI/2018-19/106
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
Cantilever portion
Ref. No.:
Start of Haunch Face of Web Face of Web Start of Haunch Mid Span
SW 7.51 9.75 9.47 4.97 2.72
Client:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Ref. No.:
TPI/2018-19/106
Doc. No.
-
Project:
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
APPENDIX - I
Ultimate Limit State Combination Forces Summary for Basic Combination for ULS Combination Shear Bending Moment Element Location Section Force Hogging Sagging kN kNm kNm End of Crashbarrier A 30.96 50.03 0.00 Cantilever End of Haunch B 34.88 61.61 0.00 Deck End of Haunch C 29.08 81.45 74.06 Slab Simply Start of Haunch D 20.90 38.19 64.64 Supported Mid Span E 16.73 32.28 64.32 Grade of Concrete Grade of Reinforecement Modulus of Elasticity of Rienforcing of Steel Modulus of Elasticity of Concrete Tensile Strength of Concrete fcd fyd β1 β2 Clear Cover εcu 𝟎 𝟖𝟕 𝒇𝒚 𝑨𝒔𝒕
fck fy Es Ecm fctm
= = = = = = = = = = =
35 500 200000 32000 2.8 15.63 434.78 0.81 0.42 40 0.0035
Mpa Mpa Mpa Mpa Mpa Mpa Mpa
mm
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Client:
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
Project: work:
APPENDIX - I IRC:112-2011, Clause-16.5.1.1
𝟎. 𝟖𝟕 ∗ 𝒇𝒚 ∗ 𝑨𝒔𝒕 𝑫𝒆𝒑𝒕𝒉 𝒐𝒇 𝑵. 𝑨 = 𝟎. 𝟑𝟔 ∗ 𝒇𝒄𝒌 ∗ 𝒃
𝑴𝒐𝒎𝒆𝒏𝒕 𝒐𝒇 𝑹𝒆𝒔𝒊𝒔𝒕𝒂𝒏𝒄𝒆 = 𝟎. 𝟖𝟕 ∗ 𝒇𝒚 ∗ 𝑨𝒔𝒕 ∗ 𝒅 ∗ 𝟏 − 𝟎. 𝟒𝟐 ∗ 𝑨𝒔𝒕 =
Ref. No.:
𝑴𝒖 𝑿𝒖 𝟎. 𝟖𝟕 ∗ 𝒇𝒚 ∗ 𝒅 ∗ 𝟏 − 𝟎. 𝟒𝟐 ∗ 𝒅
𝑨𝒔𝒕, 𝒎𝒊𝒏 = 𝟎. 𝟐𝟔 ∗
𝑿𝒖 𝒅
% 𝒐𝒇 𝑺𝒕𝒆𝒆𝒍 =
𝟏𝟎𝟎 ∗ 𝑨𝒔𝒕 𝒃∗𝒅
𝒇𝒄𝒕𝒎 ∗ 𝒃𝒕 ∗ 𝒅 𝒃𝒖𝒕 𝒏𝒐𝒕 𝑳𝒆𝒔𝒔 𝒕𝒉𝒂𝒏 (𝟎. 𝟎𝟎𝟏𝟑 ∗ 𝒃𝒕 ∗ 𝒅) 𝒇𝒚𝒌
Main Reinforcement Sec. A B C D E
Sagging Moment kNm 0.00 0.00 74.06 64.64 64.32
H mm 279 300 300 225 225
Dia. mm 10 10 16 16 12
Reiforcement Spac. Dia. Spac. mm mm mm 250 0 250 250 0 250 200 0 200 200 0 200 200 12 200
d mm 234 255 252 177 179
Ast prov. mm² 314.16 314.16 1005.3 1005.3 1131
Ast Min. mm² 340.7 371.28 366.91 257.71 260.62
Ast Max. mm² 6975 7500 7500 5625 5625
Check
Xu
OK OK OK OK OK
mm 10.85 10.85 34.71 34.71 39.05
Xu,M ax mm 144.3 157.3 155.4 109.2 110.4
Chec k Xu OK OK OK OK OK
Z mm 229.5 250.5 237.6 162.6 162.8
Ast, Check Req. mm² 0.00 OK 0.00 OK 717.12 OK 914.88 OK 909.39 OK
Client:
Project: work: Hogging Sec. Moment kNm A 50.03 B 61.61 C 81.45 D 38.19 E 32.28
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
A to E A to E
Dia. mm 10 10
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
H mm 279 300 300 225 225
Dia. mm 12 12 12 12 12
Reiforcement Spac. Dia. Spac. mm mm mm 250 12 250 250 12 250 250 12 250 250 12 250 250 12 250
Distribution Reinforcement Sec.
Ref. No.:
Reiforcement Spac. Dia. mm mm 300 0 300 0
d mm 233 254 254 179 179
Ast prov. mm² 1131 1131 1131 1131 1131
APPENDIX - I Ast Ast Min. Max. mm² mm² 339.25 6975 369.82 7500 369.82 7500 260.62 5625 260.62 5625
Check
Xu
OK OK OK OK OK
mm 39.05 39.05 39.05 39.05 39.05
IRC:112-2011, Clause-16.6.1.1 (3)
Spac. mm 300 300
Ast Ast Check B.M prov. Req. mm² mm² 261.8 157.6 OK Hogging 261.8 183 OK Sagging
Xu,M ax mm 143.7 156.7 156.7 110.4 110.4
Chec k Xu OK OK OK OK OK
Z mm 216.8 237.8 237.8 162.8 162.8
Ast, Check Req. mm² 530.99 OK 596.07 OK 788.07 OK 539.97 OK 456.41 OK
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Ref. No.:
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: Check for Shear Reinforcement Required
APPENDIX - I IRC:112-2015,Clause-10.3.2
Shear is Checked Without Live Load as Dispersion is Calculated as per Annexure B-3, Clause-B-3.2 of IRC:112-2011 𝑽𝒓𝒅𝒄 = 𝟎. 𝟏𝟐 ∗ 𝑲 ∗ 𝟖𝟎 ∗ 𝒑𝟏 ∗ 𝒇𝒄𝒌 𝟎.𝟑𝟑 + 𝟎. 𝟏𝟓 ∗ 𝝈𝒄𝒑 ∗ 𝒃𝒘 ∗ 𝒅 𝑺𝒖𝒃𝒋𝒆𝒄𝒕𝒆𝒅 𝒕𝒐 𝒂 𝑴𝒊𝒏𝒊𝒎𝒖𝒎 𝒐𝒇 𝑽𝒓𝒅𝒄 = 𝑽𝒎𝒊𝒏 + 𝟎. 𝟏𝟓 ∗ 𝝈𝒄𝒑 ∗ 𝒃𝒘 ∗ 𝒅 𝟑
𝟏
𝑽𝒎𝒊𝒏 = 𝟎. 𝟎𝟑𝟏 ∗ 𝑲𝟐 ∗ 𝒇𝒄𝒌𝟐 𝑨𝒔𝒕 𝒑𝟏 = ≤ 𝟎. 𝟎𝟐 𝒃𝒘 ∗ 𝒅 𝒌=𝟏+
𝟐𝟎𝟎 ≤ 𝟐. 𝟎 𝒅
Sec.
Ved
d
k
Ast
p1
Vmin
Ned
σcp
Vrdc
Check
A B C D E
kN 30.96 34.88 29.08 20.90 16.73
mm 234 255 252 177 179
1.92 1.89 1.89 2.00 2.00
mm² 1131 1131 1131 1131 1131
0.005 0.004 0.004 0.006 0.006
kN 0.49 0.475 0.477 0.519 0.519
kN 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00
127.67 132.5 131.82 110.04 110.87
Shear Reinforcement Not Required Shear Reinforcement Not Required Shear Reinforcement Not Required Shear Reinforcement Not Required Shear Reinforcement Not Required
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
𝑽𝒓𝒅 𝒎𝒂𝒙 𝑽𝒓𝒅𝒔 γ
A B
= =
=
Vrd
Sec.
= = =
=
𝜸
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: Design of Shear Reinforcement Asw Z θ
Ref. No.:
=
Ved
d
kN 30.96 34.88
mm 234 255
APPENDIX - I IRC:112-2011,Clause-10.3
Cross- Sectional Area of Shear Reinforcement 0.9*d , Lever Arm for R.C Section 45 Degree Adopted θ for Calculation of Vrd max 𝒇𝒄𝒅 𝜶𝒄𝒘 ∗ 𝒃𝒘 ∗ 𝒁 ∗ 𝜸 ∗ 𝑪𝒐𝒕𝜽 + 𝒕𝒂𝒏𝜽 𝑨𝒔𝒘 ∗ 𝒁 ∗ 𝒇𝒚𝒘𝒅 ∗ 𝑪𝒐𝒕𝜽 𝑺 0.532 Is Strength Reduction Factor for Concrete Cracked in Shear 𝟎. 𝟔 ∗ 𝟏 −
𝒇𝒄𝒌 𝟑𝟏𝟎
For Member With Vertical Shear Reinforcement, the Shear Resistance Vrd is Smaller Value of "Vrds" and "Vrd,max"
Reinforcement Dia. Spac. mm mm 8 200 8 200
Asw
Z
mm² mm 251.3 210.6 251.3 229.5
αcw 1 1
Vrd, max kN 876.2 954.8
θ
Vrds
Vrd
Deg. 1.01 1.05
kN 6510 6863.76
kN 876.2 954.8
Check OK OK
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
A B C D E
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: Check for Shear Capacity
Sec.
Ref. No.:
APPENDIX - I
Ved
b
d
0.5*b*d*γ*fcd
Check Ved< 0.5*b*d*γ*fcd
kN 30.96 34.88 29.08 20.90 16.73
mm 1000 1000 1000 1000 1000
mm 234 255 252 177 179
973.55 1060.92 1048.44 736.41 744.73
OK OK OK OK OK
Check For Additional Shear ∆𝑭𝒅 = 𝟎. 𝟓 ∗ 𝑽𝒆𝒅 ∗ 𝑪𝒐𝒕𝜽
Sec. A B C D E
∆Fd kN 15.48 17.44 14.54 10.45 8.37
Sagging Moment kNm 0.00 0.00 74.06 64.64 64.32
∆Fd is Additional Tensile Force in the Longitudnal Reinforcement
Check for Sagging Moment Med/Z+ Mor/ Z Mor ∆Fd Z mm kN kNm kN 216.8 15.48 31.36 144.7 237.8 17.44 34.23 144 237.8 326.05 103.8 436.7 162.8 407.61 71.03 436.4 162.8 403.57 80 491.5
Check OK OK OK OK OK
Hoggin g kNm 50.03 61.61 81.45 38.19 32.28
Check for Hogging Moment Med/Z+ Mor/ Z Mor ∆Fd Z mm kN kNm kN 216.76 246.293 106.6 491.6 237.76 276.556 116.9 491.6 237.76 357.125 116.9 491.6 162.76 245.111 80 491.5 162.76 206.712 80 491.5
Check OK OK OK OK OK
Client:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Ref. No.:
TPI/2018-19/106
Doc. No.
-
Project:
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
APPENDIX - I
Serviceability Limit State-Rare & Quasi Combination Forces Summary for SLS Check Element
Location Cantilever
Deck Slab
Simply Supported
End of Crashbarrier End of Haunch End of Haunch Start of Haunch Mid Span
Sec. A B C D E
Rare-Combination Shear B.M. Force Hogging Sagging kN kNm kNm 33.91 35.03 0.00 51.51 43.34 0.00 110.13 56.75 50.12 38.97 26.90 43.11 35.94 22.43 42.90
Quasi-Combination Shear B.M. Force HoggingSagging kN kNm kNm 22.81 17.11 0.00 25.66 23.39 0.00 21.34 25.11 7.75 15.40 14.34 0.53 12.37 9.06 0.53
Stress Calculation in Concrete and Reinforcement Moduar Ratio ' m ' = Es/Ecm < Ecm' is Modulus of Elasticity Steel for Long Term Loading From IRC:112-2011, Clasue-6.4.2.5 Point No.4, Ecm can be Modified by a Factor (1/(1+Φ)) Accounting for Long Term Creep Effect Where Φ is the Creep Co-efficient Defien by EQ-6.9 and the Table 6.9. The Development of Creep With time may be taken as 𝟎.𝟑 𝒕 − 𝒕𝟎 𝜱 𝒕, 𝒕𝟎 = 𝜷 𝒕, 𝒕𝟎 ∗ 𝜱 𝜶, 𝒕𝟎 𝜷 𝒕, 𝒕𝟎 = 𝜷𝑯 + 𝒕 − 𝒕𝟎 Ac = 3E+05 mm² Cross Sectional Area u = 3600 mm Perimeter in Contact with atmoshpher Notational Size "ho" = 166.7 mm 2Ac/u
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: Where, t t0 (t-t0) RH RH0 α βH β(t-t0) Φ(α,to) Φ(t,to) E
Ref. No.:
APPENDIX - I = = = = = = = = = = =
25550 90 25460 80 100 1 619.9 0.993 1.38 1.37 32000
is the Age of Concrete in days at the time Considered. (70 Years) is the Age of Concrete in days at the time Loading. is the Actual Duration of Loading in days. % Relative Humidity Expressed as % % 𝜷𝑯 = 𝟏. 𝟓[𝟏 + 𝟏. 𝟐 ∗ <
1500
𝜷𝑯 = 𝟏. 𝟓[𝟏 + 𝟏. 𝟐 ∗
𝑹𝑯 𝑹𝑯𝟎
𝟏𝟖
𝑹𝑯 𝑹𝑯𝟎
𝟏𝟖
Mpa
Grade of Concrete = 35 Mpa Grade of Reinforecement = 500 Mpa Modulus of Elasticity of Steel, ES = 2E+05 Mpa Permissible Compressive Stress = 16.8 Mpa Permissible Compressive Stress = 12.6 Mpa Permissible Tensile Stress = 400 Mpa m = Modular Ratio Ast = Area of Provided Reinforcement b = Breadth of Structure
Rare Quasi
IRC:112-2011,Clause-12.2.1 (1) IRC:112-2011,Clause-12.2.2
𝒉𝟎 + 𝟐𝟓𝟎
𝒉𝟎 + 𝟐𝟓𝟎𝜶
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Ref. No.:
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
APPENDIX - I
d Xu
= =
Depth of Structure Depth of Neutral Axis
INA
= = =
Moment of Inertia Mean Flexural Tensile Strength Total Depth of Member
fctm H
𝒃𝒉𝟑 𝟏𝟐 𝒃 ∗ 𝑿𝒖𝟑 𝑰𝑵𝑨 𝑪𝒓𝒂𝒄𝒌𝒆𝒅 = + 𝒎 ∗ 𝑨𝒔𝒕 ∗ 𝒅 − 𝑿𝒖 𝟑
IRC:112-2011, Table-6.5
𝑰 𝑼𝒏𝒄𝒓𝒂𝒌𝒄𝒆𝒅 =
𝟐
𝑿𝒖 𝑰𝑵𝑨 𝒅 − 𝑿𝒖 𝑻𝒆𝒏𝒔𝒊𝒍𝒆 𝑺𝒕𝒓𝒆𝒔𝒔 𝒊𝒏 𝑺𝒕𝒆𝒆𝒍, 𝝈𝒔𝒕 = 𝒎 ∗ 𝑴 𝑹𝒂𝒓𝒆 ∗ 𝑰𝑵𝑨 𝑯 𝒇𝒄𝒕𝒎, 𝒇𝒍 = 𝑴𝒂𝒙 𝟏. 𝟔 − ∗ 𝒇𝒄𝒕𝒎, 𝒇𝒄𝒕𝒎 𝟏𝟎𝟎𝟎
𝑪𝒐𝒎𝒑𝒓𝒆𝒔𝒔𝒊𝒗𝒆 𝑺𝒕𝒓𝒆𝒔𝒔 𝒊𝒏 𝑪𝒐𝒏𝒄𝒓𝒆𝒕𝒆, 𝝈𝒄 = 𝑴 𝑹𝒂𝒓𝒆 ∗
IRC:112-2011, Clause-6.4.2.3, EQ-6.6
Sec.
B
D
u
Ac
ho
Φ(α,to)
𝟏 𝟏+𝜱
Ecm
A B C D
1400 800 800 800
225 300 300 225
3250 2200 2200 2050
3E+05 3E+05 3E+05 3E+05
184.62 272.73 272.73 292.68
1.38 1.35 1.35 1.34
0.419 0.426 0.426 0.428
13419 13643 13643 13695
Client:
Project:
E
work: 2000
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Ref. No.:
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
225
4450 3E+05
134.83
1.42
0.414
APPENDIX - I 13250
Client:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Ref. No.:
TPI/2018-19/106
Doc. No.
-
Project:
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work:
APPENDIX - I
Stress Check for SLS Load Combination (Rare) Ast, σc S.M H d Ecm I Y/2 fctm,fl Sec. Prov. Stress kNm mm mm mm² Mpa mm4 mm Mpa Mpa A 0.00 279 233 314.2 13419 1.1E+09 139.5 0.00 2.8 B 0.00 300 254 314.2 13643 1.4E+09 150 0.00 2.8 C 50.12 300 254 1005 13643 1.4E+09 150 5.51 2.8 D 43.11 225 179 1005 13695 4.8E+08 112.5 10.15 2.8 E 42.90 225 179 1131 13250 4.8E+08 112.5 10.10 2.8
Sec. A B C D E
H.M
H
d
kNm 35.03 43.34 56.75 26.90 22.43
mm 279 300 300 225 225
mm 233 254 254 179 179
Ast, Prov. mm² 1131 1131 1131 1131 1131
σc fctm,fl Stress Mpa mm4 mm Mpa Mpa 13419 1.1E+09 139.5 4.64 2.8 13643 1.4E+09 150 4.76 2.8 13643 1.4E+09 150 6.23 2.8 13695 4.8E+08 112.5 6.33 2.8 13250 4.8E+08 112.5 5.28 2.8 Ecm
I
Y/2
Crack/ Uncrack
m
Xu
INA
σc (C)
σst
Uncracked Uncracked Cracked Cracked Cracked
1E+01 14.66 14.66 14.6 15.09
mm 10.846 10.846 34.707 34.707 39.046
mm4 1E+09 1E+09 7E+08 3E+08 4E+08
Mpa 0.00 0.00 2.41 4.68 4.73
Mpa 0 0 223 284.2 255.8
Crack/ Uncrack
m
Xu
INA
σc (C)
σst
mm4 7E+08 8E+08 8E+08 3E+08 4E+08
Mpa 2.09 2.15 2.82 3.06 2.47
Mpa 154.8 173.8 227.6 160.1 133.8
Cracked Cracked Cracked Cracked Cracked
mm 14.9 39.046 14.66 39.046 14.66 39.046 14.6 39.046 15.09 39.046
Check OK OK OK OK OK
Check OK OK OK OK OK
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
A B C D E
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: APPENDIX - I Stress Check for SLS Load Combination (Quasi) Ast, σc S.M H d Ecm I Y/2 fctm,fl Crack/ Sec. Prov. Stress Uncrack kNm mm mm mm² Mpa mm4 mm Mpa Mpa Uncracked A 0.00 279 233 314.2 13419 1.1E+09 139.5 0.00 2.8 Uncracked B 0.00 300 254 314.2 13643 1.4E+09 150 0.00 2.8 Uncracked C 7.75 300 254 1005 13643 1.4E+09 150 0.85 2.8 Uncracked D 0.53 225 179 1005 13695 4.8E+08 112.5 0.12 2.8 Uncracked E 0.53 225 179 1131 13250 4.8E+08 112.5 0.12 2.8
Sec.
Ref. No.:
H.M
H
d
kNm 17.11 23.39 25.11 14.34 9.06
mm 279 300 300 225 225
mm 233 254 254 179 179
Ast, Prov. mm² 1131 1131 1131 1131 1131
σc fctm,fl Stress Mpa mm4 mm Mpa Mpa 13419 1.1E+09 139.5 2.26 2.80 13643 1.4E+09 150 2.57 2.80 13643 1.4E+09 150 2.76 2.80 13695 4.8E+08 112.5 3.38 2.80 13250 4.8E+08 112.5 2.13 2.80 Ecm
I
Y/2
m
Xu
mm 14.9 10.846 14.66 10.846 14.66 34.707 14.6 34.707 15.09 39.046
INA
σc (C)
σst
mm4 1E+09 1E+09 1E+09 5E+08 5E+08
Mpa 0.00 0.00 0.20 0.04 0.04
Mpa 0 0 18.25 2.333 2.339
Crack/ Uncrack
m
Xu
INA
σc (C)
σst
Uncracked Uncracked Uncracked Cracked Uncracked
14.9 14.66 14.66 14.6 15.09
mm 39.046 39.046 39.046 39.046 39.046
mm4 1E+09 1E+09 1E+09 3E+08 5E+08
Mpa 0.04 0.05 0.05 0.11 0.05
Mpa 3.15 3.68 3.95 5.85 2.65
Check OK OK OK OK OK
Check OK OK OK OK OK
Client:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
Project:
Doc. No.
-
APPENDIX - I
Minimum Area of Reinforcement for Crack Control may be Calculated as Follow
IRC:112-2011,Clasue-12.3.3
𝒌 ∗ 𝒌 ∗ 𝒇𝒄𝒕, 𝒆𝒇𝒇 ∗ 𝑨𝒄𝒕 𝝈𝒔
Act σs fct,eff k kc 𝑘𝑐 = 0.4 ∗ 1 −
k1
TPI/2018-19/106
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: Crack Width Check for SLS Load Combination (Quasi Permanent) 1) Check Ast,min For Crack Control
𝑨𝒔𝒎𝒊𝒏 =
Ref. No.:
= = = = =
is the Area of Concrete Within the Tensile Zone Act = b*(h-Xu) 500 Mpa Absolute Value of Max/ Stress Permitted 2.80 Mpa 1 is the Coeffecient Which allows for the effect of Non-linear self-equilibrating Stresses is the Coefficient Which takes account of the Stress Distribution within the Section.
σ𝑐 ≤1 ℎ 𝑘1 ∗ ∗ ∗ 𝑓𝑐𝑡, 𝑒𝑓𝑓 ℎ
=
1.5
if Ned is a Compressive Force
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
A B C D E
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: For Sagging Moment Sec.
Ref. No.:
H
d
mm 279 300 300 225 225
mm 233 254 254 179 179
APPENDIX - I Act
σc
mm² Mpa 2E+05 0.00 2E+05 0.00 2E+05 0.00 1E+05 0.00 1E+05 0.00
h*
fct,eff
k
k1
kc
mm 0.279 0.3 0.3 0.225 0.225
Mpa 2.80 2.80 2.80 2.80 2.80
1 1 1 1 1
0.6667 0.6667 0.6667 0.6667 0.6667
0.4 0.4 0.4 0.4 0.4
h*
fct,eff
k
k1
kc
mm 0.279 0.3 0.3 0.225 0.225
Mpa 2.80 2.80 2.80 2.80 2.80
1 1 1 1 1
0.6667 0.6667 0.6667 0.6667 0.6667
0.4 0.4 0.4 0.4 0.4
Ast, min mm² 497.63 544.67 491.22 323.22 313.5
Ast, Prov. mm² 314.2 314.2 1005 1005 1131
Ast, min mm² 434.46 481.5 481.5 313.5 313.5
Ast, Prov. mm² 1131 1131 1131 1131 1131
Check NOTOK NOTOK OK OK OK
For Hogging Moment Sec. A B C D E
H
d
mm 279 300 300 225 225
mm 233 254 254 179 179
Act
σc
mm² Mpa 2E+05 0.00 2E+05 0.00 2E+05 0.00 1E+05 0.00 1E+05 0.00
Check OK OK OK OK OK
Client:
Project:
2)
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: Check for Maximum Spacing
For Sagging Moment Bar Max Sec. Dai. Dai. mm mm A 10 32 B 10 32 C 16 32 D 16 32 E 12 32 3)
Ref. No.:
Spacing Prov. Req. mm mm 250 300 250 300 200 300 200 300 200 300
APPENDIX - I IRC:112-2011, Clause-12.3.6, Table-12.2, Table-12.3
Check OK OK OK OK OK
For Hogging Moment Bar Max Sec. Dai. Dai. mm mm A 12 32 B 12 32 C 12 32 D 12 32 E 12 32
Spacing Prov. Req. mm mm 250 300 250 300 250 300 250 300 250 300
Check OK OK OK OK OK
Check for Crack Width
The Crack Width, Wk, may be Calculated from
IRC:112-2011, Clause-12.3.4
𝑾𝒌 = 𝑺𝒓, 𝒎𝒂𝒙 ∗ (𝜺𝒔𝒎 − 𝜺𝒄𝒎) Sr,max
=
Maximum Crack Spacing 𝟎. 𝟏𝟕 ∗ 𝜱 𝑺𝒓, 𝒎𝒂𝒙 = 𝟑. 𝟒𝒄 + 𝒆𝒇𝒇 𝝆𝒑𝒆𝒇𝒇 𝝈𝒔𝒄 − 𝒌𝒕 ∗ 𝒇𝒄𝒕, ∗ 𝟏 + 𝜶𝒆 ∗ 𝝆𝒑𝒆𝒇𝒇 𝝆𝒑𝒆𝒇𝒇 𝑨𝒔 𝜺𝒔𝒎 − 𝜺𝒄𝒎 = 𝝆𝒑𝒆𝒇𝒇 = 𝐄𝐬 𝑨𝒄, 𝒆𝒇𝒇 kt = 0.5 Factor Dependent on the Duration of Load Crack Width = 0.3 mm
≥ 𝟎. 𝟔 ∗
𝝈𝒔𝒄 𝑬𝒔
Client:
Project:
GOVERNMENT OF ANDHRA PRADESHROAD AND BUILDING DEPARTMENT NATIONAL HIGHWAYS WING NH CIRCLE VIJAYAWADA
A B C D E
TPI/2018-19/106
Doc. No.
-
CONSTRUCTION OF PROPOSED TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LC NO.414 AT km 33/100 (RAILWAY CH.730/11-13) ON NH-326A IN THE STATE OF ANDHRA PRADESH.
work: For Sagging Moment Sec.
Ref. No.:
APPENDIX - I
hc,eff
Ac,eff
As
mm 89.385 96.385 88.431 63.431 61.985
mm² 89385 96385 88431 63431 61985
mm² 314.2 314.2 1005 1005 1131
ρpeff 0.004 0.003 0.011 0.016 0.018
Dia Φ mm 10 10 16 16 12
Clear Cover mm 40 40 40 40 40
Sr, max mm 619.7 657.6 375.3 307.6 247.8
Clear Cover mm 40 40 40 40 40
Sr, max mm 280.3 292.9 292.9 247.8 247.8
INA mm4 1E+09 1E+09 1E+09 5E+08 5E+08
Mor
σsc
Xu
kNm Mpa mm 31.219 0 10.85 34.089 0 10.85 104.7 18.249 34.71 71.904 2.3332 34.71 79.995 2.3391 39.05
αe
εsm-εcm
Wk
Check
6.25 6.25 6.25 6.25 6.25
0.0000 0.0000 0.0001 0.0000 0.0000
0 0 0.021 0.002 0.002
OK OK OK OK OK
αe
εsm-εcm
Wk
Check
6.25 6.25 6.25 6.25 6.25
0.0000 0.0000 0.0000 0.0000 0.0000
0.003 0.003 0.003 0.004 0.003
OK OK OK OK OK
For Hogging Moment Sec. A B C D E
hc,eff
Ac,eff
As
mm 79.985 86.985 86.985 61.985 61.985
mm² 79985 86985 86985 61985 61985
mm² 1131 1131 1131 1131 1131
ρpeff 0.014 0.013 0.013 0.018 0.018
Dia Φ mm 12 12 12 12 12
INA
Mor
σsc
Xu
mm4 1E+09 1E+09 1E+09 3E+08 5E+08
kNm 106.56 116.89 116.89 79.995 79.995
Mpa 3.15 3.68 3.95 5.85 2.65
mm 39.05 39.05 39.05 39.05 39.05