Loading documents preview...
Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station To Tung Tau II Estate Contract No.DC/2011/04

Near Miss Case Report on the failure of anchor eye of water tank at Zone W5 on 12 Dec 2012 1.

Record Information

Date of Event

:

12 Dec 2012

Time

:

Around 10:30am

Weather Condition

:

Fine

Event Classification

:

Near Miss Incident

Scene

:

Pipe Pile Zone W5

Injury

:

Nil

Loss of property

:

Nil

Public Impact

:

Nil

2.

Circumstance

This is the record of which a near miss incident was happened on 12 December 2012 at about 10:30am. In the cause of trial shifting of a water tank, the anchor eye welded on the water tank for fixing of pump discharge pipe was accidentally pulled out. The water tank was remained stationary on the platform; no property damage, personal injuries or public nuisance was caused.

3.

Cause of near miss

After deep investigation and analysis of the case by the Site Agent, Assistant Contruction Manager, Site Engineers, Safety Officer and Assistant Safety Officer, the probable causes could be summarised as follows: 3.1

The worker misunderstood the purpose of the anchor eye, which was not for lifting purpose.

3.2

No suitable identification sign or warning notice displayed to P1 of 4

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station To Tung Tau II Estate Contract No.DC/2011/04

Near Miss Case Report on the failure of anchor eye of water tank at Zone W5 on 12 Dec 2012 indicate the particular purpose of the anchor eye. 3.3

Inadequate frontline supervision.

4 Proposed Improvement Measures The proposed measures listed below should be followed: 4.1

All lifting operation should be monitored and supervised by an experienced foreman/supervisor

4.2

To prevent any misunderstanding or misusing, all unnecessary anchor eyes should be removed from the water tank.

4.3

Display warning notice “This eye is prohibited for lifting” in the vicinity of the anchor eye to warn the workers against misusing.

4.4

Share the lesson learnt from the finding of the near miss incident and clearly explain the particular purpose of the anchor eye to arouse the safety awareness among the workers. (Photo 1.)

4.5

Apply specific colour coding for the anchor eye for ease of identification. (Photo 2.)

P2 of 4

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station To Tung Tau II Estate Contract No.DC/2011/04

Near Miss Case Report on the failure of anchor eye of water tank at Zone W5 on 12 Dec 2012 Photo 1 –Case study briefing was conducted by Safety Officer on 14Dec-2012

P3 of 4

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station To Tung Tau II Estate Contract No.DC/2011/04

Near Miss Case Report on the failure of anchor eye of water tank at Zone W5 on 12 Dec 2012 Photo 2 – Proper warning notice “This eye is prohibited for lifting” was displayed on the anchor eye for fixing the pump discharge pipe of water tank. Also, specific colour coding for the anchor eye of water tank was applied.

Reported by :

Endorsed by :

_____________________ T.K. Tsang & Stephen Pang Safety Officer, Assistant Safety Officer 14 December 2012

_____________________ Stephen Leung Site Agent 14 December 2012

P4 of 4

Related Documents

Drill Report On Electric
February 2021 0
Report On 3d Printer.docx
February 2021 1
Project Report On Samsung
February 2021 1
Project Report On Sbi
February 2021 1
Training Report On Catia
January 2021 1

More Documents from "Vishal Pandey"