PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT MONTHLY PROGRESS REPORT CONTENTS

1.0 EXECUTIVE SUMMARY 1.1 1.2 1.3 1.4 1.5

PROJECT DESCRIPTION. REPORT PERIOD. OVERALL PROJECT PROGRESS SUMMARY. QHSE SUMMARY AREA OF CONCERN

2.0 ATTACHMENTS

PJC 01-B3274-0908

ATTACHMENT (01)

Planning portion of monthly external progress report

3467-200 Rev.0 06/07/2011

PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT MONTHLY PROGRESS REPORT

PJC 01-B3274-0908

1.0 EXECUTIVE SUMMARY

3467-200 Rev.0 06/07/2011

PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT MONTHLY PROGRESS REPORT

3467-200 Rev.0 06/07/2011

1.1 Project Description PETROBEL is considering the development of new gas field in the RAS EL BARR concession, in the west Nile Delta area (Mediterranean Sea). The gas field SETH is located in water depth 83.3 m in the Mediterranean Sea, 11km west of Denise A, at about 60km off the Egyptian costs, North East of Damietta and North West of Port Said. The production shall be delivered to EL-GAMIL plant. SETH development plan includes D&C of two wells (i.e. SETH West Shallow & SETH West Deep) plus two future wells (SETH East Shallow & SETH East Deep), with total production flow rate of 4.5 MMSCFD.

Project comprises of the following facilities: 1)

4-legged unmanned platform (namely SETH, in approx. 83 m of water).

2)

Topside facilities (minimum production facilities).

3)

Construction of new dedicated sea line 16”x11 km length.

4)

Installation of SSIV close to platform.

The battery limit of this project Subsea Tie-in at Tuna PLEM by installation of new Seth PLEM

Major Scope Contents • • • • • • • • •

Project Management & Control. Design for Piles, Jacket, Risers, J-tube & Pre drilling template. Design for Deck and TSF. Construction of Piles, Jacket, Risers, J-tube & Pre drilling template. Construction of Deck and TSF. Construction of Pipeline rigid and Spools. Procurement Service for Subsea Equipment (PLEM & SSIV). Load-out & Sea-fastening. Offshore Hook-up & Commissioning.

PJC 01-B3274-0908

1.2 Report Period: This progress report covers the Work Performed during June 2011 Till the Cut-Off Date 25, June2011.

PETROBEL

SETH OFFSHORE DEVELOPMENT MONTHLY PROGRESS REPORT

EGYPT

3467-200 Rev.0 06/07/2011

1.3 Overall Project Progress Summary

Item Description

RW

Planned

Actual

ENPPI

44.83%

5.8%

6.5%

PETROJET

41.56%

18.0%

22.2%

TECNOMARE

13.61%

37.7%

39.5%

Total

100.00%

15.2%

17.5%

1.4 QHSE SUMMARY • Project Quality Plan is issued and in place • Project Scope and Procedures is issued and in place • HSE PLAN for engineering is in place • Project audit schedule is in place (periodical audit) • Review of Quality, HSE management system in suppliers’ offers is under implementation 1.5 AREA OF CONCERN A) Engineering Activities • Electrical load trend is showing increase in demand. A technical meeting will be arranged upon issuing the Electrical Load Analysis Report in order to discuss the possible solutions. B) Procurement Activities • Due to some delays of bidders response, and in order to avoid impact of August holidays with suppliers, it is important to maintain target to place FOC’s for critical items before the end of July.

PJC 01-B3274-0908

C) Construction Activities • None.

PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT MONTHLY PROGRESS REPORT

PJC 01-B3274-0908

2.0 ATTACHEMENTS

3467-200 Rev.0 06/07/2011

PAGE 17 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4. Attachments

GFL 003-0405

3467-200

PAGE 18 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.1. PROGRESS SUMMARY TABLES WITH RELEVANT S-CURVES

GFL 003-0405

3467-200

PAGE 19 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.1.1 Overall

GFL 003-0405

3467-200

3467-200, PTB, SETH DEVELOPMENT EPC PROJECT OVERALL PROGRESS AS OF 25-JUNE-11 ITEM DESCRIPTION

Relative Weight (%)

PLANNED %

ACTUAL %

ENPPI

44.83%

5.8%

6.5%

PETROJET

41.56%

18.0%

22.2%

TECNOMARE

13.61%

37.7%

39.5%

TOTAL

100.00%

15.2%

17.5%

     Project No:3467‐200      PTB, Seth Development EPC Project 

Progress Curve

Overall 

As of : 25‐Jun‐11

100

90

Planned   % =15.2 Actual      % = 17.5

80

70

Progress % ess %

60

50

40

30

20

10

0 Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Time / Date  Planned

Actual

Layout No. 1 Data'Nes System Release 2.21

PAGE 20 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.1.2 ENPPI

GFL 003-0405

3467-200

3467-200 PTB, SETH OFFSHORE DEVELOPMENT EPC PROJECT DELAY ANALYSIS AS OF 25-JUN-11 Discipline

Process

Pipipng

weighted delay % from Overall Project

Delay %

7.9

0.17

4.8

0.17

DELAYED ACTIVITIES Flame arrestor TER Safety equipment and life saving TER Fire Fighting package TER Injection fitting TER Insulation joint Injection fitting TER

PLANNED DATE EXPECTED DATE

Suppliers replies delays on ENPPI clarifications 23‐Jun‐11

15‐Jun‐11

21‐Jul‐11

24‐Jul‐11

Service water pump TER

Mechanical

Electrical

Instrumentation

7.2

0.08

5.9

0.11

8.4

0.20

7‐Jun‐11

Power system study Single line diagram Electrical cable list Choke valve TER Electrical hook‐up Drawing Hydraulic instruments layouts H d li i t t l t

10‐Jul‐11

Purchasing

Overall Project

4.0

0.07

15‐Jun‐11

20‐Jun‐11

8.4

0.11

0.9

Nouva oma (one of the bidder) request to submit ISO5199 pump  instead of ASME B73.1 as originally request in MR. instead of ASME B73.1 as originally request in MR. Received from Nouva Oma complete reply on 1st clarification,  his reply based on ISO 5199. Ruhrpumpen (one of the bidder) submit his reply on 1st  clarification, his offer based on pump ASME B73.1 . Receive acceptance from PTB on evaluating both pump types  ISO5199 and ASME B73.1

17‐Jul‐11

1‐Aug‐11

Delay is due to revised H&M balance issued during the detailed  engineering phase ‐The offered valves have noise levels exceeding the enviromental  Th ff d l h i l l di th i t l low ‐In progress Suppliers replies delays on ENPPI clarifications

13‐Jun‐11

Delay in receiving the commercial offers for the folloowing  commodities:Safety equipment and life saving ; Flame  arrestor; Fire Fighting package ; Injection fitting ; Choke valves  ; Electro hydraulic wellhead control panel ; Wing valves &  Service water pump Service water pump

Delay in receiving  the technical offers due to suppliers response  delay

In progress

Survival Module TER Offshore

CAUSE OF DELAY

12‐Jul‐11

Delay of issuance of TERs 

23‐Jun‐11

26‐Jul‐11

Overall project progress is ahead ( 6.52 % vs.5.75 %) because the material supply progress is ahead (1.99 % vs. 00%) 

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project Overall

As Of :

25-Jun-11

100 90

Planned % =

5.75

Actual

%=

6.52

1-May11

1-Jun11

80

Progress %

70 60

50 40 30 20 10 0 1-Mar11

1-Apr11

1-Jul-11 1-Aug11

1-Sep- 1-Oct-11 1-Nov11 11

1-Dec- 1-Jan-12 1-Feb11 12

1-Mar12

1-Apr12

1-May12

1-Jun12

1-Jul-12

Time / Date Actual

Planned

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI Item Description

Relative Weight

Planned %

Actual %

During %

W.P.2 DETAILED ENGINEERING

13.05%

38.38

32.60

7.78

W.P.3 PROCUREMENT SERVICES

3.33%

22.29

19.00

7.01

W.P.5 DECK AND TSF SUPPLY & FABRICATION

81.45%

0.00

1.99

1.99

W.P.9 OFFSHORE HOOK-UP & COMMISSIONING

2.16%

0.00

0.00

0.00

100.00%

5.75

6.51

2.87

Total

Thursday, June 30, 2011

Layout No. 1 Page 1 of 1

Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project As Of

Work Package

25-Jun-11

W.P.2 DETAILED ENGINEERING 100 90

Planned % = Actual

38.38

%=

32.60

May-11

Jun-11

80

70

Progress %

60 50 40 30

20 10 0 Mar-11

Apr-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date Actual

Planned

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project As Of

Work Package

25-Jun-11

W.P.3 PROCUREMENT SERVICES 100 90

Planned % = Actual

22.29

%=

19.27

May-11

Jun-11

80

70

Progress %

60 50 40 30

20 10 0 Mar-11

Apr-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date Actual

Planned

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project As Of

Work Package

25-Jun-11

W.P.5 DECK AND TSF SUPPLY & FABRICATION 100 90

Planned % = Actual

%=

0.00 1.99

80

70

Progress %

60 50 40 30

20 10 0 Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date Actual

Planned

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project As Of

Work Package

25-Jun-11

W.P.9 OFFSHORE HOOK-UP & COMMISSIONING 100 90

Planned % = Actual

%=

0.00 0.00

80

70

Progress %

60 50 40 30

20 10 0 Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date Actual

Planned

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI W.P.2 DETAILED ENGINEERING Item Description

Relative Weight

Planned %

Actual %

During %

PROCESS TECHNOLOGY DIVISION

16.98%

55.58

47.67

8.06

INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT

17.92%

47.16

38.74

17.79

PIPING ENGINEERING DIVISION

25.94%

28.58

23.76

3.69

ELECTRICAL ENGINEERING DIVISION

14.15%

43.90

38.00

7.97

OFFSHORE ENGINEERING DIVISION

12.74%

17.00

13.00

0.00

MECHANICAL ENGINEERING DEPARTMENT

8.49%

46.42

39.20

10.11

PRESSURE VESSELS ENGINEERING DEPARTMENT

3.77%

20.00

20.00

0.00

100.00%

38.38

32.32

7.50

Total

Wednesday, July 06, 2011

Layout No. 1 Page 1 of 4

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI W.P.3 PROCUREMENT SERVICES Item Description

Relative Weight

Planned %

Actual %

During %

FOREIGN PURCHASING DEPARTMENT

39.66%

53.17

44.73

16.83

EXPEDITING DEPART.

39.64%

3.03

3.17

0.84

SUPPLIER QUALITY SRVEILLANCE DEPART.

10.07%

0.00

0.00

0.00

TRAFFIC & LOGISTICS DEPARTMENT

10.63%

0.00

0.00

0.00

100.00%

22.29

19.00

Total

Wednesday, July 06, 2011

7.01

Layout No. 1 Page 2 of 4

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI W.P.5 DECK AND TSF SUPPLY & FABRICATION Item Description

METERIAL SUPPLY

Total

Relative Weight

Planned %

Actual %

During %

100.00%

0.00

1.99

1.99

100.00%

0.00

1.99

1.99

Wednesday, July 06, 2011

Layout No. 1 Page 3 of 4

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI W.P.9 OFFSHORE HOOK-UP & COMMISSIONING Item Description

COMMISSIONING

Total

Relative Weight

Planned %

Actual %

During %

100.00%

0.00

0.00

0.00

100.00%

0.00

0.00

0.00

Wednesday, July 06, 2011

Layout No. 1 Page 4 of 4

Data'Nes Systems, Release 2.21

PAGE 21 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.1.3 TECNOMARE

GFL 003-0405

3467-200

OVERALL PROGRESS 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

% Monthly Planned

33,89 3,83 1,66 1,70 7,75 5,14 22,10 1,13 7,71 0,45 0,50 1,54 0,25 11,37 0,00 0,00 0,99

% Monthly Actual

33,89 5,57

% Forecast Monthly % Cumulative Planned 33,89 37,72 39,38 41,07 48,82 53,96 76,07 77,20 84,91 85,36 85,86 87,40 87,64 99,01 99,01 99,01 100,0 % Cumulative Actual % Forecast Cumulative

33,89 39,46

Dec -12

% Progress M Monthly

50,00

1.1.1 - PROJECT SERVICES 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

% Monthly Planned

33,89 3,83 1,66 1,70 7,75 5,14 22,10 1,13 7,71 0,45 0,50 1,54 0,25 11,37 0,00 0,00 0,99

% Monthly Actual

33,89 5,57

% Forecast Monthly % Cumulative Planned 33,89 37,72 39,38 41,07 48,82 53,96 76,07 77,20 84,91 85,36 85,86 87,40 87,64 99,01 99,01 99,01 100,0 % Cumulative Actual % Forecast Cumulative

33,89 39,46

Dec -12

% Progress M Monthly

50,00

1.2 - DETAILED ENGINEERING 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

% Monthly Planned

40,05 9,34 3,64 1,42 10,80 11,69 3,48 2,27 0,79 0,29 1,16 0,00 0,58 12,18 0,00 0,00 2,31

% Monthly Actual

40,05 11,60

% Forecast Monthly % Cumulative Planned 40,05 49,39 53,03 54,45 65,25 76,94 80,42 82,69 83,48 83,77 84,93 84,93 85,51 97,69 97,69 97,69 100,0 % Cumulative Actual % Forecast Cumulative

40,05 51,65

Dec -12

% Progress M Monthly

50,00

1.2.1.Deck 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

% Monthly Planned

49,82 13,11 5,10 2,00 2,35 16,40 4,88 3,19 1,11 0,41 1,63

% Monthly Actual

49,82 16,28

% Forecast Monthly % Cumulative Planned 49,82 62,93 68,03 70,03 72,38 88,78 93,66 96,85 97,96 98,37 100,0 % Cumulative Actual % Forecast Cumulative

49,82 66,10

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.2.2 - SSIV/PLEM (TECHNICAL FOLLOW-UP) 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

% Monthly Planned

20,00 0,00 0,00 0,00 80,00

% Monthly Actual

20,00 0,00

% Forecast Monthly % Cumulative Planned 20,00 20,00 20,00 20,00 100,0 % Cumulative Actual % Forecast Cumulative

20,00 20,00

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.2.8 - AS BUILT DOSSIER 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11 % Monthly Planned % Monthly Actual

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

20,00 0,00 0,00 0,00 80,00 0,00 0,00

% Forecast Monthly % Cumulative Planned % Cumulative Actual % Forecast Cumulative

20,00 20,00 20,00 20,00 100,0 0,00 0,00

Dec -12

% Progress M Monthly

50,00

1.2.9 - CERTIFICATION (ASSISTANCE) 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11 % Monthly Planned % Monthly Actual

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

20,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 80,00 0,00 0,00

% Forecast Monthly % Cumulative Planned % Cumulative Actual % Forecast Cumulative

20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 100,0 0,00 0,00

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.2.10 - TECHNICAL FOLLOW-ON FOR T&I CONTRACTS 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

% Monthly Planned

20,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 80,00

% Monthly Actual

20,00 0,00

% Forecast Monthly % Cumulative Planned 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 100,0 % Cumulative Actual % Forecast Cumulative

20,00 20,00

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.3 - PROCUREMENT SERVICES 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

% Monthly Planned

32,01 4,20 5,99 21,77 8,44 8,89 0,00 10,27 6,43

% Monthly Actual

32,01 5,06

% Forecast Monthly % Cumulative Planned 32,01 36,21 42,60 63,58 74,42 83,30 83,30 93,57 100,0 % Cumulative Actual % Forecast Cumulative

32,01 37,07

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.3.3 - PROCUREMENT SERVICES - PLEM/SSIV 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

% Monthly Planned

20,00 6,00 16,00 48,00 10,00

% Monthly Actual

20,00 6,66

% Forecast Monthly % Cumulative Planned 20,00 26,00 42,00 90,00 100,0 % Cumulative Actual % Forecast Cumulative

20,00 26,66

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.3.6 - PROCUREMENT SERVICES - PLC/RTU 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

% Monthly Planned

40,00 3,00 0,00 3,00 11,40 14,80 0,00 17,10 10,70

% Monthly Actual

40,00 4,00

% Forecast Monthly % Cumulative Planned 40,00 43,00 43,00 46,00 57,40 72,20 72,20 89,30 100,0 % Cumulative Actual % Forecast Cumulative

40,00 44,00

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.4.9 Grout Seals and Schock Cells 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

% Monthly Planned

23,33 11,67 0,00 0,00 65,00

% Monthly Actual

23,33 11,67

% Forecast Monthly % Cumulative Planned 23,33 35,00 35,00 35,00 100,0 % Cumulative Actual % Forecast Cumulative

23,33 35,00

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.5.17 Other Instrumentation - PLC/RTU & instrumentation bulks 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12

% Monthly Planned

35,00 0,00 0,00 0,00 0,00 0,00 50,00 0,00 15,00

% Monthly Actual

35,00 0,00

% Forecast Monthly % Cumulative Planned 35,00 35,00 35,00 35,00 35,00 35,00 85,00 85,00 100,0 % Cumulative Actual % Forecast Cumulative

35,00 35,00

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

1.8.1.3 - HOOCK-UP, COMMISSIONING ACTIVITIES AND START UP 100,00 80,00 90,00 70,00 80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00 40,00 30,00 30,00 20,00 20,00

10,00

10,00

0,00

0,00

May Jun-11 11 % Monthly Planned % Monthly Actual

Jul11

Aug -11

Sep Oct- Nov -11 11 -11

Dec Jan- Feb Mar- Apr- May Jun-11 12 -12 12 12 -12 12 20,00 0,00 80,00

0,00 0,00

% Forecast Monthly % Cumulative Planned % Cumulative Actual % Forecast Cumulative

20,00 20,00 100,0 0,00 0,00

Jul12

Aug -12

Sep Oct- Nov -12 12 -12

Dec -12

% Progress M Monthly

50,00

PAGE 22 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.1.4 PETROJET

GFL 003-0405

3467-200

SETH DEVELOPM,ENT PROJECT OVER ALL LEVEL I MONTH

25‐Mar‐11

25‐Apr‐11 25‐May‐11

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

24.33%

27.71%

34.62%

41.43%

48.66%

56.35%

64.58%

73.87%

82.79%

PLAN %

0.00%

2.31%

9.71%

18.00%

ACT %

0.00%

4.51%

14.27%

22.34%

25‐Apr‐12 25‐May‐12 88.50%

93.61%

25‐Jun‐12

31‐Jul‐12

97.39%

100.00%

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 18.00 % Actual : 22.23 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00%

% PLAN

% ACT

1/9

PROJECT MANAGEMENT WP1 MONTH

25‐Mar‐11

25‐Apr‐11 25‐May‐11

PLAN %

0.00%

6.00%

ACT %

0.00%

6.00%

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

12.00%

18.00%

24.00%

30.00%

36.00%

42.00%

48.00%

54.00%

60.00%

66.00%

72.00%

12.00%

18.00%

25‐Apr‐12 25‐May‐12 78.00%

84.00%

25‐Jun‐12

31‐Jul‐12

90.00%

100.00%

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 18.00 % Actual : 18.00 22.23 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00%

% PLAN

% ACT

2/9

PROCUREMENT SERVICES WP3 MONTH

25‐Mar‐11

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

PLAN %

0.00%

25‐Apr‐11 25‐May‐11 6.00%

12.00%

18.00%

24.00%

30.00%

36.00%

42.00%

48.00%

54.00%

60.00%

66.00%

72.00%

ACT %

0.00%

6.00%

12.00%

18.00%

25‐Apr‐12 25‐May‐12 78.00%

84.00%

25‐Jun‐12

31‐Jul‐12

90.00%

100.00%

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 18.00 % Actual : 18.00 22.23 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00%

% PLAN

% ACT

3/9

SUBSTRUCTURE ( P.D.T, PILES AND JACKET ) FABRICATION WP4 MONTH

25‐Mar‐11

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

PLAN %

0.00%

25‐Apr‐11 25‐May‐11 9.95%

23.30%

32.53%

42.05%

47.86%

58.92%

68.59%

77.98%

84.58%

89.46%

97.26%

100.00%

ACT %

0.00%

10.00%

30.66%

44.27%

25‐Apr‐12 25‐May‐12 100.00%

100.00%

25‐Jun‐12

31‐Jul‐12

100.00%

100.00%

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 32.53 18.00 % Actual : 44.27 22.23 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00%

% PLAN

% ACT

4/9

DECK & TSF MATERIAL/EQUIPMENT SUPPLY AND FABRICATION WP5 MONTH

25‐Mar‐11

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

PLAN %

0.00%

25‐Apr‐11 25‐May‐11 1.11%

2.12%

15.01%

22.13%

24.22%

31.58%

39.16%

48.50%

61.08%

76.63%

92.21%

96.99%

ACT %

0.00%

2.12%

10.00%

16.82%

25‐Apr‐12 25‐May‐12 99.69%

100.00%

25‐Jun‐12

31‐Jul‐12

100.00%

100.00%

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 15.01 18.00 % Actual : 16.82 22.23 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00%

% PLAN

% ACT

5/9

PIPELINE SPOOLS FABRICATION WP6 MONTH

25‐Mar‐11

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

PLAN %

0.00%

25‐Apr‐11 25‐May‐11 0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

3.09%

56.69%

ACT %

0.00%

2.12%

10.00%

16.82%

25‐Apr‐12 25‐May‐12 100.00%

100.00%

25‐Jun‐12

31‐Jul‐12

100.00%

100.00%

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 00.00 % Actual : 00.00 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% 25‐Jan‐12

25‐Feb‐12

% PLAN

25‐Mar‐12

25‐Apr‐12

% ACT

6/9

LOAD OUT AND SEA FASTENING WP8 MONTH

25‐Mar‐11

PLAN %

0.00%

25‐Apr‐11 25‐May‐11 0.00%

0.00%

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

0.00%

0.00%

0.00%

0.00%

3.06%

3.06%

3.06%

3.06%

3.06%

40.73%

25‐Apr‐12 25‐May‐12 68.56%

100.00%

25‐Jun‐12

31‐Jul‐12

100.00%

100.00%

ACT %

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 00.00 % Actual : 00.00 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% 25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

% PLAN

25‐Feb‐12

25‐Mar‐12

25‐Apr‐12

25‐May‐12

25‐Jun‐12

% ACT

7/9

OFFSHORE HOOK‐UP AND COMMISSIONING WP9 MONTH

25‐Mar‐11

PLAN %

0.00%

25‐Apr‐11 25‐May‐11 0.00%

0.00%

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

25‐Apr‐12 25‐May‐12 0.00%

50.00%

25‐Jun‐12

31‐Jul‐12

100.00%

100.00%

ACT %

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 00.00 % Actual : 00.00 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% 25‐Apr‐12

25‐May‐12

% PLAN

25‐Jun‐12

% ACT

8/9

CRASHING COST MONTH

25‐Mar‐11

PLAN %

0.00%

25‐Apr‐11 25‐May‐11 0.00%

0.00%

25‐Jun‐11

25‐Jul‐11

25‐Aug‐11

25‐Sep‐11

25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

25‐Feb‐12

25‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

10.00%

30.00%

50.00%

70.00%

90.00%

25‐Apr‐12 25‐May‐12 100.00%

25‐Jun‐12

31‐Jul‐12

100.00%

ACT %

100.00% 90.00% 80.00%

As of Date : 25-06-2011 Plan : 00.00 % Actual : 00.00 %

70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% 25‐Oct‐11

25‐Nov‐11

25‐Dec‐11

25‐Jan‐12

% PLAN

25‐Feb‐12

25‐Mar‐12

25‐Apr‐12

25‐May‐12

% ACT

9/9

PAGE 23 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.2. CONTROL SHEETS

GFL 003-0405

3467-200

PAGE 24 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.2.1 ENPPI

GFL 003-0405

3467-200

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

9.44%

70.00%

70.00%

4.17%

70.00%

70.00%

1.39%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION DRAWING Process flow diagram

Start

03-Apr-11

06-Apr-11

Design

10-Apr-11

21-Apr-11

Final

19-Sep-11

20 50 20-Sep-11

30

Utility flow diagram

Start

06-Apr-11

03-Apr-11

Design

13-Apr-11

10-Apr-11

Final

26-Sep-11

20 50 27-Sep-11

30

Cause & Effect Chart

Start

09-May-11

25-Apr-11

Design

16-May-11

23-Jun-11

Construction

19-Sep-11

20 50 20-Sep-11

30

Process block diagram

Start

07-Jun-11

12-Jun-11

Design

14-Jun-11

20-Jun-11

Construction

26-Sep-11

20 50 27-Sep-11

30

Below Cellar deck Escape Route, safety and lifesaving equipment layout

Start

31-May-11

12-May-11

Design

07-Jun-11

17-May-11

Construction

03-Oct-11

20 50 04-Oct-11

30

Helideck - Escape way, safety and lifesaving equipment layout

Start

31-May-11

12-May-11

Design

07-Jun-11

17-May-11

Construction

20 50 04-Oct-11

03-Oct-11

30

Below Cellar deck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

20 50 27-Sep-11

26-Sep-11

30

Cellar Deck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

26-Sep-11

20 50 27-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

Page 1 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION DRAWING Main deck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

26-Sep-11

20 50 27-Sep-11

30

Helideck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

26-Sep-11

20 50 27-Sep-11

30

Below Cellar deck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

03-Oct-11

20 50 04-Oct-11

30

Cellar deck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

03-Oct-11

20 50 04-Oct-11

30

Main deck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

03-Oct-11

20 50 04-Oct-11

30

Helideck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

20 50 04-Oct-11

03-Oct-11

30

21.11%

70.00%

70.00%

REPORTS / TECHNICAL LIST Basis of design

Start

10-Apr-11

08-Apr-11

Design

12-Apr-11

12-Apr-11

Final

11-Jun-11

03-Apr-11

04-Apr-11

10-Apr-11

11-Apr-11

Final

19-Sep-11

1.94%

70.00%

70.00%

50

20 50 20-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

70.00%

30

Heat & Material balance report

Design

100.00%

20

07-Jul-11

Start

1.94%

Page 2 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

1.94%

70.00%

70.00%

1.94%

70.00%

20.00%

1.94%

0.00%

0.00%

1.94%

20.00%

70.00%

1.94%

70.00%

70.00%

2.50%

0.00%

0.00%

1.94%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION REPORTS / TECHNICAL LIST Project master equipment list

Start

08-May-11

03-May-11

Design

15-May-11

10-May-11

Construction

15-Sep-11

20 50 18-Sep-11

30

Process & Utilities report 20

Start

05-Jun-11

Design

12-Jun-11

24-Jun-11 12-Jul-11

50

Final

19-Sep-11

20-Sep-11

30

Blow down reprot

Start

03-Jul-11

26-Jul-11

Design

10-Jul-11

01-Aug-11

20 50

Final

29-Sep-11

02-Oct-11

30

Utilities load summary

Start

19-Jun-11

16-Jun-11

Design

26-Jun-11

23-Jun-11

Final

25-Sep-11

20 50 26-Sep-11

30

Hazardous Area classification report

Start

26-Apr-11

10-May-11

Design

04-May-11

16-May-11

Construction

26-Sep-11

20 50 27-Sep-11

30

Hazop report

Start

21-Jul-11

25-Aug-11

20

Final

04-Aug-11

12-Sep-11

80

HSE philosophy

Start

20-Apr-11

10-May-11

Design

27-Apr-11

16-May-11

Final

09-Oct-11

20 50 10-Oct-11

30

18.06%

50.62%

47.38%

MRQ Chemical injection package MRQ

1.67%

Start

03-Apr-11

01-Apr-11

20

For inquiry

06-Apr-11

03-Apr-11

80

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

Page 3 of 59

100.00%

100.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

1.67%

100.00%

100.00%

1.67%

100.00%

100.00%

1.67%

100.00%

100.00%

1.67%

100.00%

100.00%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION MRQ Flame arrestor MRQ

Start

20-Apr-11

15-Apr-11

20

For inquiry

27-Apr-11

19-Apr-11

80

Vent stack package MRQ

Start

02-May-11

25-Apr-11

20

For inquiry

09-May-11

28-Apr-11

80

Fire Fighting package MRQ

Start

06-Apr-11

01-Apr-11

20

For inquiry

12-Apr-11

03-Apr-11

80

Safety equipment and life saving MRQ

Start For inquiry

03-Apr-11 12-Apr-11

01-Apr-11

20

03-Apr-11

80

8.33%

100.00%

100.00%

TER Chemical injection package TER

Start

08-May-11

18-Apr-11

20

Finish

19-Jun-11

01-Jun-11

80

Flame arrestor TER

Start

26-May-11

Finish

23-Jun-11

06-Jun-11

Finish

04-Jul-11

21-Jul-11

11-May-11

Finish

09-Jun-11

Finish

08-May-11 12-Jun-11

3.06%

100.00%

20.00%

3.06%

20.00%

20.00%

3.06%

100.00%

20.00%

3.06%

100.00%

20.00%

20

01-Jun-11 26-Jul-11

80

20

26-Apr-11 05-Jul-11

80

Safety equipment and life saving TER

Start

100.00%

80

Fire Fighting package TER

Start

100.00%

20

02-Jun-11

Vent stack package TER

Start

3.06%

20

05-Apr-11 07-Jul-11

80

15.28%

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

Page 4 of 59

84.00%

36.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION MRP Chemical injection package MRP

Start

10-Jul-11

03-Jul-11

20

For Purchase

17-Jul-11

07-Jul-11

80

Flame arrestor MRP

Start

21-Jul-11

07-Aug-11

20

For Purchase

28-Jul-11

09-Aug-11

80

Vent stack package MRP

Start

03-Aug-11

21-Aug-11

20

For Purchase

10-Aug-11

22-Aug-11

80

Fire Fighting package MRP

Start For Purchase

05-Jul-11

20-Jul-11

20

11-Jul-11

21-Jul-11

80

Safety equipment and life saving MRP

Start For Purchase

10-Jul-11

07-Aug-11

20

17-Jul-11

11-Aug-11

80

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

4.17%

0.00%

0.00%

VENDOR PRINTS REVIEW Chemical injection package

Start

25-Jul-11

25-Jul-11

20

Finish

25-Dec-11

14-Dec-11

80

Flame arrestor

Start

07-Aug-11

04-Sep-11

20

Finish

07-Dec-11

01-Jan-12

80

Vent stack package

Start

23-Aug-11

20-Sep-11

20

Finish

26-Dec-11

17-Jan-12

80

Fire Fighting package

Start Finish

20-Jul-11

07-Aug-11

20

19-Dec-11

02-Jan-12

80

Safety signs,miscellaneous safety and life saving equipment package

Start Finish

25-Jul-11

21-Aug-11

20

24-Nov-11

21-Dec-11

80

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

Page 5 of 59

5.28%

0.00%

0.00%

2.78%

0.00%

0.00%

2.78%

0.00%

0.00%

3.89%

0.00%

0.00%

3.33%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

18.06%

0.00%

0.00%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION VENDOR PRINTS REVIEW

P&ID's Symbols for P & ID instrumentation

Start

10-Apr-11

14-Apr-11

20

Design

17-Apr-11

21-Apr-11

50

Construction

12-Sep-11

13-Sep-11

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

70.00%

0.83%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

20 50 30

20 50 30

20 50 13-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

70.00%

30

Unit 0230 - Blow-down system

Design

0.83%

50

13-Sep-11

Start

70.00%

20

Unit 0190 - Delivery system

Design

70.00%

50

13-Sep-11

Start

0.69%

30

Unit 0130 - Manifold

Design

70.00%

20

13-Sep-11

Start

70.00%

30

Unit 0120 - Chemical injection system (Corrosion inhibitor)

Design

0.69%

50

13-Sep-11

Start

70.00%

20

13-Sep-11

10-Apr-11

70.00%

30

Unit 0120 -Chem. Injec. Sys. (Hydrate inhibitor skid)

Start

0.69%

50 13-Sep-11

10-Apr-11

70.00%

20

Unit 0120 - Chemical injection system (Methanol skid)

Start

70.00%

30

Unit 0100 - Single completion wellhead DW001

Start

0.69%

Page 6 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

0.83%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION P&ID's Unit 0300 -Test Multiphase Meter

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

Unit 0420 -Fuel Gas system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

Unit 0420 -Fuel Gas system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

Unit 0470- Main Power Generation Package

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

Unit 0430- Diesel Fuel system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

Unit 0480- Diesel Electrical Generation Package

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

20 50 13-Sep-11

12-Sep-11

30

Unit 0730- Dry Firefighting system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

20 50 13-Sep-11

12-Sep-11

30

Unit 0540- Open Drain system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

Page 7 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION P&ID's Unit 0730- Helideck Foam Firefighting system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

Unit 0520- Service water system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

Unit 0570- Sanitary Discharge treatment package

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

TUTU Panel & SSIV

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20 50 13-Sep-11

30

15.00%

Total

PROCESS TECHNOLOGY DIVISION

100.00%

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

Page 8 of 59

70.00% 55.58%

70.00% 47.67%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

3.16%

70.00%

70.00%

1.58%

70.00%

70.00%

1.58%

70.00%

70.00%

1.58%

70.00%

0.00%

1.84%

70.00%

70.00%

1.32%

70.00%

0.00%

2.37%

70.00%

70.00%

1.32%

70.00%

0.00%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT DRAWING Interconnecting Wiring Diagram

Start

26-May-11

04-May-11

Design

02-Jun-11

11-May-11

Construction

14-Nov-11

20 50 15-Nov-11

30

Mechanical-Hook-up Drawing

Start

19-May-11

20-Apr-11

Design

26-May-11

27-Apr-11

Construction

10-Nov-11

20 50 13-Nov-11

30

Hydraulic hook-up Drawings

Start

19-May-11

20-Apr-11

Design

26-May-11

27-Apr-11

Construction

10-Nov-11

20 50 13-Nov-11

30

Electrical hook-up Drawing

Start

19-May-11

12-Jul-11

20

Design

26-May-11

19-Jul-11

50

Construction

10-Nov-11

13-Nov-11

30

Electrical instruments layout

Start

05-May-11

10-May-11

Design

12-May-11

16-May-11

Construction

25-Oct-11

20 50 26-Oct-11

30

Hydraulic instruments layouts

Start

05-May-11

06-Jul-11

Design

12-May-11

13-Jul-11

50

25-Oct-11

26-Oct-11

30

Construction

20

Electrical instrument cable routing layout

Start

12-May-11

07-Jun-11

Design

19-May-11

14-Jun-11

Construction

01-Nov-11

20 50 02-Nov-11

30

Hydraulic instruments Tube Routing layouts

Start

12-May-11

05-Jul-11

20

Design

19-May-11

12-Jul-11

50

01-Nov-11

02-Nov-11

30

Construction

14.74%

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM Tuesday, July 05, 2011

Page 9 of 59

70.00%

50.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

2.11%

70.00%

70.00%

2.11%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT REPORTS / TECHNICAL LIST Instrument Index

Start

26-Apr-11

10-May-11

Design

04-May-11

16-May-11

Construction

21-Sep-11

20 50 22-Sep-11

30

Instrument cable list

Start

26-May-11

07-Jun-11

Design

02-Jun-11

15-Jun-11

Construction

25-Oct-11

20 50 26-Oct-11

30

4.21%

70.00%

70.00%

MRQ Multiphase flow meter MRQ

Start

03-Apr-11

07-Apr-11

20

For inquiry

10-Apr-11

10-Apr-11

80

Electro Hydraulic Well Head panel MRQ

Start For inquiry

04-Apr-11 12-Apr-11

01-Apr-11

20

03-Apr-11

80

Choke valve MRQ

Start For inquiry

06-Apr-11 13-Apr-11

01-Apr-11

20

03-Apr-11

80

HIPPS System MRQ

Start

31-Mar-11

01-Apr-11

20

For inquiry

07-Apr-11

03-Apr-11

80

Wing valve MRQ

Start

06-Apr-11

01-Apr-11

20

For inquiry

13-Apr-11

03-Apr-11

80

Loose Instrument MRQ

Start

18-May-11

01-Jun-11

20

For inquiry

25-May-11

06-Jun-11

80

Sand & Corrosion probes MRQ

Start

25-May-11

20-Jun-11

20

For inquiry

01-Jun-11

26-Jun-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM Tuesday, July 05, 2011

Page 10 of 59

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

0.92%

100.00%

100.00%

0.92%

100.00%

20.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

0.92%

100.00%

100.00%

0.92%

100.00%

100.00%

0.92%

100.00%

100.00%

0.92%

100.00%

20.00%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT MRQ Instrument & Mechanical bulk materialMRQ

Start

26-May-11

01-May-11

20

For inquiry

02-Jun-11

03-May-11

80

Instrument cable and cable glandsMRQ

Start

16-May-11

15-Jun-11

20

For inquiry

23-May-11

22-Jun-11

80

Inst. Junction Box MRQ

Start

02-Jun-11

01-Jun-11

20

For inquiry

09-Jun-11

06-Jun-11

80

Instrument cable trays MRQ

Start

24-May-11

19-Jun-11

20

For inquiry

31-May-11

26-Jun-11

80

10.79%

100.00%

86.34%

TER Multiphase flow meter TER

Start

15-May-11

28-Apr-11

20

Finish

12-Jun-11

25-May-11

80

Electro Hydraulic Well Head panel TER

Start

15-May-11

10-Apr-11

20

Finish

02-Jun-11

16-Jun-11

80

Choke valve TER

Start

18-May-11

Finish

12-Jun-11

05-Jul-11

03-May-11

10-Apr-11

20

Finish

31-May-11

09-Jun-11

80

Wing valve TER

Finish

08-Jun-11

02-May-11

20

15-Jun-11

80

Loose Instrument TER

Start Finish

12-Jun-11 26-Jun-11

3.95%

100.00%

100.00%

2.63%

100.00%

20.00%

5.00%

100.00%

100.00%

2.63%

100.00%

100.00%

1.84%

20.00%

20.00%

20

20-Jun-11 24-Jul-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM Tuesday, July 05, 2011

100.00%

80

Start

16-May-11

100.00%

20

26-Apr-11

HIPPS System TER

Start

3.95%

Page 11 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

2.11%

20.00%

0.00%

2.11%

20.00%

20.00%

2.11%

100.00%

0.00%

2.11%

20.00%

20.00%

2.11%

20.00%

0.00%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT TER Sand & Corrosion probes TER

Start

16-Jun-11

11-Jul-11

20

Finish

07-Jul-11

04-Aug-11

80

Instrument & Mechanical bulk material TER

Start

19-Jun-11

Finish

03-Jul-11

20

26-May-11 14-Jul-11

80

Instrument cable and cable glandsTER

Start

06-Jun-11

10-Jul-11

20

Finish

20-Jun-11

01-Aug-11

80

Inst. Junction Box TER

Start Finish

23-Jun-11

20

21-Jun-11 21-Jul-11

07-Jul-11

80

Instrument cable trays TER

Start Finish

14-Jun-11

03-Jul-11

20

28-Jun-11

28-Jul-11

80

30.53%

73.10%

56.55%

1.05%

0.00%

100.00%

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

MRP Multiphase flow meter MRP

Start

10-Jul-11

16-Jun-11

20

For Purchase

17-Jul-11

23-Jun-11

80

Electro Hydraulic Well Head panel MRP

Start

04-Jul-11

13-Jul-11

20

For Purchase

11-Jul-11

14-Jul-11

80

Choke valve MRP

Start

05-Jul-11

27-Jul-11

20

For Purchase

12-Jul-11

02-Aug-11

80

HIPPS System MRP

Start For Purchase

28-Jun-11

07-Jul-11

20

05-Jul-11

13-Jul-11

80

Wing valve MRP

Start For Purchase

06-Jul-11

24-Jul-11

20

13-Jul-11

28-Jul-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM Tuesday, July 05, 2011

Page 12 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT MRP Loose Instrument MRP

Start

17-Jul-11

18-Aug-11

20

For Purchase

24-Jul-11

21-Aug-11

80

Sand & Corrosion probes MRP

Start

01-Aug-11

04-Sep-11

20

For Purchase

08-Aug-11

06-Sep-11

80

Instrument & Mechanical bulk material MRP

Start

24-Jul-11

07-Aug-11

20

For Purchase

31-Jul-11

11-Aug-11

80

Instrument cable and cable glands MRP

Start For Purchase

11-Jul-11

23-Aug-11

20

18-Jul-11

25-Aug-11

80

Inst. Junction Box MRP

Start For Purchase

28-Jul-11

17-Aug-11

20

04-Aug-11

18-Aug-11

80

Instrument cable trays MRP

Start

14-Jul-11

24-Aug-11

20

For Purchase

21-Jul-11

25-Aug-11

80

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

0.79%

0.00%

0.00%

0.79%

0.00%

0.00%

0.79%

0.00%

0.00%

0.79%

0.00%

0.00%

10.53%

0.00%

10.00%

VENDOR PRINTS REVIEW Instrument & Mechanical bulk material Vendor prints review

Start

08-Aug-11

21-Aug-11

20

Finish

24-Nov-11

07-Dec-11

80

Junction boxes Vendor prints review

Start

14-Aug-11

28-Aug-11

20

Finish

30-Nov-11

14-Dec-11

80

HIPPS Vendor prints review

Start Finish

13-Jul-11

24-Jul-11

20

22-Feb-12

01-Mar-12

80

Choke valves Vendor prints review

Start Finish

20-Jul-11

11-Aug-11

20

21-Nov-11

13-Dec-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM Tuesday, July 05, 2011

Page 13 of 59

0.79%

0.00%

0.00%

1.32%

0.00%

0.00%

3.95%

0.00%

0.00%

3.16%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT VENDOR PRINTS REVIEW Loose instrument Vendor prints review

Start

01-Aug-11

04-Sep-11

20

Finish

17-Nov-11

18-Dec-11

80

Instrument cable trays Vendor prints review

Start

31-Jul-11

04-Sep-11

20

Finish

15-Nov-11

18-Dec-11

80

Electro hydraulic wellhead control panel Vendor prints review

Start

25-Jul-11

21-Jul-11

20

Finish

24-Nov-11

21-Nov-11

80

Wing valves Vendor prints review

Start Finish

21-Jul-11

07-Aug-11

20

22-Nov-11

07-Dec-11

80

Instrument cable and cable glands Vendor prints review

Start Finish

26-Jul-11

28-Aug-11

20

28-Nov-11

28-Dec-11

80

Sand & Corrosion probes Vendor prints review

Start

16-Aug-11

14-Sep-11

20

Finish

05-Dec-11

28-Dec-11

80

Multi phase flow meter Vendor prints review

Start

25-Jul-11

20-Jul-11

20

Finish

25-Dec-11

07-Dec-11

80

Actuated valves Vendor prints review

Total

Start

04-May-11

Finish

10-Jan-12

0.00%

0.00%

1.05%

0.00%

0.00%

3.42%

0.00%

0.00%

3.16%

0.00%

0.00%

1.05%

0.00%

0.00%

1.84%

0.00%

0.00%

3.68%

0.00%

0.00%

3.95%

20.00%

20.00%

20

04-May-11 01-Mar-12

80

29.21%

2.70%

2.70%

100.00%

47.16%

38.74%

INSTRUMENTATION & CONTROLS ENGI

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM Tuesday, July 05, 2011

1.84%

Page 14 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

1.82%

70.00%

70.00%

1.82%

70.00%

70.00%

1.64%

70.00%

70.00%

1.64%

70.00%

70.00%

1.64%

70.00%

70.00%

1.27%

0.00%

0.00%

1.27%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

ENPPI W.P.2 DETAILED ENGINEERING PIPING ENGINEERING DIVISION DRAWING Heli deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20 50 20-Sep-11

30

Main deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20 50 20-Sep-11

30

Cellar deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20 50 20-Sep-11

30

Below cellar deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20 50 20-Sep-11

30

Vent boom plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20 50 20-Sep-11

30

Looking west elevation

Start

31-Oct-11

02-Nov-11

20

Construction

28-Nov-11

29-Nov-11

80

Looking north elevation

Start

31-Oct-11

02-Nov-11

20

Construction

28-Nov-11

29-Nov-11

80

Helideck piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Main deck piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 15 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING PIPING ENGINEERING DIVISION DRAWING Cellar deck piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Below cellar piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Vent boom piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Helideck piping support location

Start Construction

19-Dec-11

21-Dec-11

20

26-Dec-11

27-Dec-11

80

Main deck piping support location

Start Construction

19-Dec-11

21-Dec-11

20

26-Dec-11

27-Dec-11

80

Cellar deck piping support location

Start

19-Dec-11

21-Dec-11

20

Construction

26-Dec-11

27-Dec-11

80

Below cellar piping support location

Start

19-Dec-11

21-Dec-11

20

Construction

26-Dec-11

27-Dec-11

80

Vent boom piping support location

Start

19-Dec-11

21-Dec-11

20

Construction

26-Dec-11

27-Dec-11

80

Helideck piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Main deck piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 16 of 59

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING PIPING ENGINEERING DIVISION DRAWING Cellar deck piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Below cellar piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Vent boom piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Hydrotest maps

Start Construction

22-Nov-11

24-Nov-11

20

04-Dec-11

05-Dec-11

80

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

1.82%

0.00%

0.00%

23.82%

25.11%

25.11%

REPORTS / TECHNICAL LIST Line designation table

4.55%

Start

12-May-11

23-May-11

20

Design

19-May-11

01-Jun-11

50

Final

19-Sep-11

20-Sep-11

70.00%

70.00%

30

4.55%

70.00%

70.00%

MRQ Piping bulk MRQ

Start

31-Mar-11

01-Apr-11

20

For inquiry

07-Apr-11

03-Apr-11

80

Insulation joint MRQ

Start

13-Apr-11

01-Apr-11

20

For inquiry

20-Apr-11

11-Apr-11

80

Injection fitting MRQ

Start For inquiry

28-Jul-11 30-Nov-11

08-Apr-11

20

13-Apr-11

80

2.73%

100.00%

100.00%

1.82%

100.00%

100.00%

1.82%

0.00%

100.00%

71.43%

100.00%

6.36%

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 17 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

3.64%

100.00%

100.00%

2.73%

100.00%

0.00%

2.73%

100.00%

20.00%

ENPPI W.P.2 DETAILED ENGINEERING PIPING ENGINEERING DIVISION TER Piping bulk TER

Start

10-May-11

26-Apr-11

20

Finish

31-May-11

17-May-11

80

Injection fitting TER

Start

25-May-11

04-Jul-11

20

Finish

15-Jun-11

24-Jul-11

80

Insulation joint Injection fitting TER

Start

19-May-11

Finish

09-Jun-11

20

02-Jun-11 21-Jul-11

80

9.09%

100.00%

46.00%

MRP Piping bulk MRP

Start

19-Jun-11

05-Jul-11

20

For Purchase

26-Jun-11

07-Jul-11

80

Insulation Joint MRP

Start

10-Jul-11

14-Aug-11

20

For Purchase

17-Jul-11

16-Aug-11

80

Injection fitting MRP

Start

13-Jul-11

18-Aug-11

20

For Purchase

20-Jul-11

21-Aug-11

80

1.82%

20.00%

0.00%

1.45%

0.00%

0.00%

1.45%

0.00%

0.00%

4.73%

7.69%

0.00%

VENDOR PRINTS REVIEW Piping bulk Vendor prints review

Start Finish

04-Jul-11

20-Jul-11

20

04-Dec-11

07-Dec-11

80

Insulation Joint Vendor prints review

Start Finish

25-Jul-11

06-Sep-11

20

24-Nov-11

03-Jan-12

80

Injection fitting Vendor prints review

Start

28-Jul-11

06-Sep-11

20

Finish

30-Nov-11

03-Jan-12

80

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 18 of 59

3.64%

0.00%

0.00%

2.73%

0.00%

0.00%

2.73%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

4.36%

20.00%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING PIPING ENGINEERING DIVISION VENDOR PRINTS REVIEW Production Manifold Vendor prints review

Start

04-May-11

Finish

24-Jan-12

20.00%

20

20-Jun-11 15-Mar-12

80

13.45%

6.49%

6.49%

GA's Helideck piping plan GA

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Start

Below helideck piping plan GA

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Start

Main deck piping plan GA

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Start

Below main deck piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Celler deck piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Below celler deck piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Vent boom piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.18%

0.00%

0.00%

2.18%

0.00%

0.00%

17.09% * Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 19 of 59

0.00%

0.00% Layout No. 1

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING PIPING ENGINEERING DIVISION ISO's Piping isometric drawings package

16.36%

Start

27-Oct-11

31-Oct-11

20

Final

16-Nov-11

17-Nov-11

80

16.36%

0.00%

0.00%

0.00%

0.00%

Specification Piping material classes

4.55%

Start

16-May-11

17-May-11

20

Design

23-May-11

22-May-11

50

Final

13-Jun-11

14-Jul-11

PIPING ENGINEERING DIVISION

100.00%

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION) Tuesday, July 05, 2011

70.00%

30

4.55%

Total

100.00%

Page 20 of 59

100.00%

70.00%

28.58%

23.76%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

1.67%

70.00%

70.00%

1.67%

70.00%

70.00%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

1.00%

70.00%

70.00%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION DRAWING Helideck lighting & navigational aids layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20 50 17-Nov-11

30

Main deck lighting & navigational aids layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20 50 17-Nov-11

30

Cellar deck lighting layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20 50 17-Nov-11

30

Below cellar deck lighting layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20 50 17-Nov-11

30

Vent boom lighting layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20 50 17-Nov-11

30

Helideck hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

20 50 12-Oct-11

11-Oct-11

30

Main deck hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

20 50 12-Oct-11

11-Oct-11

30

Cellar deck hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

11-Oct-11

20 50 12-Oct-11

30

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 21 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

1.00%

70.00%

70.00%

1.00%

70.00%

70.00%

1.00%

70.00%

70.00%

1.00%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION DRAWING Below cellar deck hazard area classification layout

Start

10-May-11

13-May-11

Design

17-May-11

19-May-11

Construction

11-Oct-11

20 50 12-Oct-11

30

Vent boom hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

19-May-11

Construction

11-Oct-11

20 50 12-Oct-11

30

Helideck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

29-Sep-11

20 50 02-Oct-11

30

Main deck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

29-Sep-11

20 50 02-Oct-11

30

Cellar deck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

29-Sep-11

20 50 02-Oct-11

30

Below cellar deck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

20 50 02-Oct-11

29-Sep-11

30

Helideck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

20 50 04-Oct-11

03-Oct-11

30

Main deck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

03-Oct-11

20 50 04-Oct-11

30

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 22 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

0.00%

0.00%

2.00%

70.00%

0.00%

1.67%

0.00%

0.00%

2.33%

70.00%

70.00%

1.00%

20.00%

0.00%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION DRAWING Cellar deck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

03-Oct-11

20 50 04-Oct-11

30

Below cellar deck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

03-Oct-11

20 50 04-Oct-11

30

Lighting block diagram

Start

21-Oct-11

01-Nov-11

20

Construction

26-Oct-11

24-Nov-11

80

Single line diagram

Start

23-May-11

14-Jul-11

Design

30-May-11

21-Jul-11

20 50

Construction

18-Oct-11

19-Oct-11

30

E&I module equipment layout

Start

03-Jul-11

08-Sep-11

Design

03-Jul-11

08-Sep-11

20 50

Construction

25-Nov-11

29-Jan-12

30

Interconnection & wiring diagram

Start

17-Jun-11

03-May-11

Design

24-Jun-11

11-May-11

Construction

04-Oct-11

20 50 05-Oct-11

30

Cable sections

Start

22-Jun-11

26-Jul-11

Design

29-Jun-11

21-Aug-11

20 50

Construction

04-Oct-11

05-Oct-11

30

28.83%

62.20%

56.65%

REPORTS / TECHNICAL LIST Electrical cable list

1.33%

Start

08-Jun-11

10-Jul-11

Design

15-Jun-11

17-Jul-11

50

Construction

03-Oct-11

04-Oct-11

30

0.00%

20

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

70.00%

Page 23 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

2.33%

70.00%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION REPORTS / TECHNICAL LIST Power system study

Start

15-May-11

30-Jun-11

Design

24-May-11

14-Jul-11

50

Final

09-Oct-11

10-Oct-11

30

0.00%

20

3.67%

70.00%

0.00%

MRQ Electrical cable trays MRQ

Start

24-Apr-11

01-Apr-11

20

For inquiry

02-May-11

03-Apr-11

80

Electrical cables MRQ

Start For inquiry

02-May-11 09-May-11

01-Apr-11

20

03-Apr-11

80

Navigational aids system MRQ

Start For inquiry

09-May-11 16-May-11

24-Apr-11

20

27-Apr-11

80

Lighting material MRQ

Start

26-May-11

15-Jun-11

20

For inquiry

02-Jun-11

22-Jun-11

80

Earthing material MRQ

Start

30-May-11

29-May-11

20

For inquiry

06-Jun-11

20-Jun-11

80

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

10.00%

100.00%

100.00%

TER Navigational aids system TER

Start

30-May-11

Finish

27-Jun-11

20.00%

20.00%

4.33%

100.00%

100.00%

4.33%

100.00%

100.00%

20

16-May-11 10-Jul-11

80

Electrical cables TER

Start

23-May-11

05-Apr-11

20

Finish

20-Jun-11

10-Apr-11

80

Electrical cable trays TER

Start

22-May-11

05-Apr-11

20

Finish

19-Jun-11

10-Apr-11

80

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

8.33%

Page 24 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

4.33%

20.00%

0.00%

4.33%

20.00%

0.00%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION TER Lighting material TER

Start

08-Jun-11

10-Jul-11

20

Finish

06-Jul-11

04-Aug-11

80

Earthing material TER

Start

20-Jun-11

10-Jul-11

20

Finish

18-Jul-11

04-Aug-11

80

25.67%

47.01%

40.26%

MRP Electrical cables MRP

Start

13-Jul-11

10-Jul-11

20

For Purchase

20-Jul-11

14-Jul-11

80

Navigational aids system MRP

Start

19-Jul-11

07-Aug-11

20

For Purchase

26-Jul-11

08-Aug-11

80

Electrical Cable trays MRP

Start

10-Jul-11

30-Jun-11

20

For Purchase

17-Jul-11

30-Jun-11

80

Lighting material MRP

Start

27-Jul-11

28-Aug-11

20

For Purchase

01-Aug-11

04-Sep-11

80

Earthing material MRP

Start

08-Aug-11

28-Aug-11

20

For Purchase

15-Aug-11

06-Sep-11

80

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

10.00%

0.00%

0.00%

VENDOR PRINTS REVIEW Earthing Vendor prints review

Start Finish

23-Aug-11

11-Sep-11

20

28-Nov-11

11-Dec-11

80

Lighting material Vendor prints review

Start

11-Aug-11

11-Sep-11

20

Finish

14-Dec-11

08-Jan-12

80

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 25 of 59

2.67%

0.00%

0.00%

2.50%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION VENDOR PRINTS REVIEW Electrical Cable trays Vendor prints review

Start

25-Jul-11

18-Jul-11

20

Finish

24-Nov-11

02-Nov-11

80

Electrical Cables Vendor prints review

Start

01-Aug-11

21-Jul-11

20

Finish

04-Dec-11

21-Nov-11

80

Navigation aids system Vendor prints review

Start

02-Aug-11

16-Aug-11

20

Finish

05-Dec-11

18-Dec-11

80

E&I Module Vendor prints review

Start Finish

Total

04-May-11 24-Jan-12

0.00%

0.00%

2.50%

0.00%

0.00%

5.00%

0.00%

0.00%

6.67%

20.00%

20.00%

20

03-May-11 29-Mar-12

80

ELECTRICAL ENGINEERING DIVISION

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

2.50%

Page 26 of 59

21.83%

6.11%

6.11%

100.00%

43.90%

38.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING OFFSHORE ENGINEERING DIVISION DRAWING Cable trays supports for deck plan at el. +9700 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for cellar deck plan at el. +13500 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for mezzanine deck plan at el. +16000 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for main deck plan at el. +20500 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for Helideck plan at el. +26500 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

50.00%

0.00%

0.00%

MRQ Survival module MRQ

10.00%

Start

24-Apr-11

01-Apr-11

20

For inquiry

28-Apr-11

03-Apr-11

80

10.00%

100.00%

100.00%

100.00%

100.00%

TER Survival module TER

Start Finish

15.00%

01-Jun-11 28-Jun-11

20.00%

20

22-May-11 03-Jul-11

80

15.00%

* Weights of Activities are calculated relative to (OFFSHORE ENGINEERING DIVISION) Tuesday, July 05, 2011

20.00%

Page 27 of 59

20.00%

20.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING OFFSHORE ENGINEERING DIVISION MRP Survival module MRP

5.00%

Start

20-Jul-11

25-Jul-11

20

For Purchase

26-Jul-11

31-Jul-11

80

5.00%

0.00%

0.00%

0.00%

0.00%

VENDOR PRINTS REVIEW Survival module vendor prints review

Start Finish

20.00%

31-Mar-11

04-Aug-11

20

26-Jun-11

20-Sep-11

80

20.00%

Total

OFFSHORE ENGINEERING DIVISION

100.00%

* Weights of Activities are calculated relative to (OFFSHORE ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 28 of 59

20.00%

20.00% 17.00%

0.00%

0.00% 13.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

6.00%

70.00%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING MECHANICAL ENGINEERING DEPARTMENT DRAWING Material selection guide

Start

03-Jun-11

10-May-11

Design

18-Jun-11

17-May-11

Construction

19-Sep-11

70.00%

20 50 20-Sep-11

30

6.00%

70.00%

70.00%

REPORTS / TECHNICAL LIST Motor load list

10-Apr-11

20

19-Apr-11

14-Apr-11

30

21-Jul-11

23-Jun-11

Start

04-Apr-11

1st issue 2nd issue Final

22-Sep-11

02-May-11

02-Jul-11

09-May-11

09-Jun-11

Final

08-Jun-11

70.00%

7.78%

100.00%

50.00%

30

Maintenance and handling study

Design

50.00%

20 25-Sep-11

Start

6.67%

20 50 26-Jul-11

30

14.44%

76.92%

59.23%

MRQ Mono rail MRQ

Start

21-Jul-11

21-Aug-11

20

For inquiry

28-Jul-11

25-Aug-11

80

Turret crane MRQ

Start For inquiry

06-Apr-11 13-Apr-11

01-Apr-11

20

03-Apr-11

80

Service water pump MRQ

Start For inquiry

18-Apr-11 25-Apr-11

01-Apr-11

20

03-Apr-11

80

4.33%

0.00%

0.00%

4.00%

100.00%

100.00%

4.00%

100.00%

100.00%

12.33%

64.86%

64.86%

TER Turret crane TER

10.00%

Start

15-May-11

10-Apr-11

20

Finish

12-Jun-11

04-May-11

80

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT) Tuesday, July 05, 2011

Page 29 of 59

100.00%

100.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING MECHANICAL ENGINEERING DEPARTMENT TER Service water pump TER

Start

17-May-11

Finish

07-Jun-11

10.00%

100.00%

20.00%

5.56%

0.00%

0.00%

20

28-Apr-11 03-Jul-11

80

Monorail crane TER

Start

11-Aug-11

14-Sep-11

20

Finish

06-Sep-11

04-Oct-11

80

25.56%

78.26%

46.96%

3.33%

0.00%

100.00%

3.33%

0.00%

0.00%

3.33%

0.00%

0.00%

MRP Turret crane MRP

Start

04-Jul-11

16-Jun-11

20

For Purchase

11-Jul-11

16-Jun-11

80

Service water pump MRP

Start

11-Jul-11

26-Jul-11

20

For Purchase

18-Jul-11

28-Jul-11

80

Monorail crane MRP

Start

04-Oct-11

03-Nov-11

20

For Purchase

10-Oct-11

13-Nov-11

80

10.00%

0.00%

33.33%

VENDOR PRINTS REVIEW Service water pump Vendor prints review

Start

26-Jul-11

14-Aug-11

20

Finish

28-Nov-11

14-Dec-11

80

Turret crane crane Vendor prints review

Start Finish

19-Jul-11

13-Jul-11

20

19-Dec-11

07-Dec-11

80

Micro Turbine Vendor prints review

Start Finish

04-May-11

15-Mar-12

04-May-11

Finish

24-Jan-12

7.78%

0.00%

0.00%

7.78%

20.00%

20.00%

7.78%

20.00%

20.00%

20

15-Jun-11 29-Mar-12

80

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT) Tuesday, July 05, 2011

0.00%

80

Emergency GeneratorVendor prints review

Start

0.00%

20

24-May-11

24-Jan-12

4.44%

Page 30 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING MECHANICAL ENGINEERING DEPARTMENT VENDOR PRINTS REVIEW Monorail crane Vendor prints review

Total

3.89%

Start

04-Oct-11

03-Nov-11

20

Finish

01-Feb-12

01-Mar-12

80

MECHANICAL ENGINEERING DEPARTME

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT) Tuesday, July 05, 2011

Page 31 of 59

0.00%

0.00%

31.67%

9.82%

9.82%

100.00%

46.42%

39.20%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.2 DETAILED ENGINEERING PRESSURE VESSELS ENGINEERING DEPARTMENT VENDOR PRINTS REVIEW Pressure vessels

100.00%

Start

10-May-11

Finish

16-Jan-12

16-Jan-12

80

PRESSURE VESSELS ENGINEERING DE

* Weights of Activities are calculated relative to (PRESSURE VESSELS ENGINEERING DEPARTMENT) Tuesday, July 05, 2011

20.00%

20

10-May-11

100.00%

Total

20.00%

Page 32 of 59

100.00%

20.00% 20.00%

20.00% 20.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

3.26%

60.00%

40.00%

3.26%

60.00%

40.00%

4.19%

60.00%

70.00%

3.49%

60.00%

40.00%

3.26%

40.00%

40.00%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE Safety equipment and life saving

RFQ

12-Apr-11

03-Apr-11

Tech. offers open

26-Apr-11

05-Apr-11

Comm. offers open

12-Jun-11

Bid tab

20 20 17-Jul-11

20

26-Jun-11

24-Jul-11

10

F.O.C.

10-Jul-11

04-Aug-11

20

P.O.

24-Jul-11

18-Aug-11

10

Flame arrestor

RFQ

27-Apr-11

21-Apr-11

20

Tech. offers open

19-May-11

02-Jun-11

20

Comm. offers open

23-Jun-11

26-Jul-11

20

Bid tab

07-Jul-11

02-Aug-11

10

F.O.C.

21-Jul-11

07-Aug-11

20

P.O.

04-Aug-11

11-Aug-11

10

Chemical injection package

RFQ

06-Apr-11

03-Apr-11

20

Tech. offers open

27-Apr-11

18-Apr-11

20

Comm. offers open

19-Jun-11

12-Jun-11

20

Bid tab

03-Jul-11

16-Jun-11

10

F.O.C.

10-Jul-11

30-Jun-11

20

P.O.

24-Jul-11

10-Jul-11

10

Fire Fighting package

RFQ

20

13-Apr-11

03-Apr-11

Tech. offers open

26-Apr-11

26-Apr-11

Comm. offers open

14-Jun-11

10-Jul-11

20

Bid tab

28-Jun-11

14-Jul-11

10

F.O.C.

04-Jul-11

20-Jul-11

20

18-Jul-11

24-Jul-11

10

P.O.

20

Vent stack tips

RFQ

09-May-11

09-May-11

20

01-Jun-11

20

Tech. offers open

06-Jun-11

Comm. offers open

06-Jul-11

02-Aug-11

20

Bid tab

20-Jul-11

10-Aug-11

10

F.O.C.

03-Aug-11

21-Aug-11

20

P.O.

17-Aug-11

24-Aug-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

Page 33 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

3.73%

90.00%

90.00%

3.26%

60.00%

40.00%

3.26%

60.00%

20.00%

3.49%

40.00%

20.00%

3.49%

40.00%

20.00%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE Piping bulk

RFQ

07-Apr-11

03-Apr-11

20

Tech. offers open

28-Apr-11

05-Apr-11

20

Comm. offers open 30-May-11

12-Jun-11

20

Bid tab

13-Jun-11

15-Jun-11

10

F.O.C.

19-Jun-11

22-Jun-11

20

P.O.

03-Jul-11

07-Jul-11

10

Insulation Joint

RFQ

20-Apr-11

11-Apr-11

20

Tech. offers open

19-May-11

30-May-11

20

Comm. offers open

12-Jun-11

27-Jul-11

20

Bid tab

26-Jun-11

04-Aug-11

10

F.O.C.

10-Jul-11

14-Aug-11

20

P.O.

24-Jul-11

17-Aug-11

10

Injection fitting 20

RFQ

24-Apr-11

Tech. offers open

23-May-11

13-Apr-11 04-Jul-11

20

Comm. offers open

15-Jun-11

01-Aug-11

20

Bid tab

29-Jun-11

08-Aug-11

10

F.O.C.

13-Jul-11

18-Aug-11

20

P.O.

27-Jul-11

23-Aug-11

10

Earthing material 20

RFQ

06-Jun-11

Tech. offers open

20-Jun-11

07-Jul-11

20

Comm. offers open

18-Jul-11

10-Aug-11

20

Bid tab

01-Aug-11

21-Aug-11

10

F.O.C.

08-Aug-11

25-Aug-11

20

24-Aug-11

15-Sep-11

10

P.O.

21-Jun-11

Lighting material

RFQ

25-May-11

20

22-Jun-11

Tech. offers open

08-Jun-11

07-Jul-11

20

Comm. offers open

06-Jul-11

10-Aug-11

20

Bid tab

20-Jul-11

21-Aug-11

10

F.O.C.

27-Jul-11

25-Aug-11

20

P.O.

22-Aug-11

13-Sep-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

Page 34 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

3.73%

60.00%

90.00%

3.49%

60.00%

70.00%

3.49%

40.00%

40.00%

3.49%

40.00%

40.00%

3.49%

40.00%

40.00%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE Electrical Cable trays

RFQ

02-May-11

03-Apr-11

20

Tech. offers open

16-May-11

05-Apr-11

20

Comm. offers open

19-Jun-11

15-May-11

20

Bid tab

03-Jul-11

20-May-11

10

F.O.C.

10-Jul-11

30-May-11

20

P.O.

24-Jul-11

07-Jul-11

10

Electrical Cables

RFQ

09-May-11

03-Apr-11

20

Tech. offers open

23-May-11

05-Apr-11

20

Comm. offers open

22-Jun-11

07-Jun-11

20

Bid tab

06-Jul-11

15-Jun-11

F.O.C.

13-Jul-11

03-Jul-11

20

P.O.

27-Jul-11

10-Jul-11

10

10

Navigation aids system 20

RFQ

16-May-11

28-Apr-11

Tech. offers open

30-May-11

16-May-11

Comm. offers open

27-Jun-11

17-Jul-11

20

Bid tab

11-Jul-11

26-Jul-11

10

F.O.C.

18-Jul-11

01-Aug-11

20

P.O.

02-Aug-11

10-Aug-11

10

20

Instrument & Mechanical bulk material

RFQ

05-Jun-11

04-May-11

Tech. offers open

19-Jun-11

26-May-11

Comm. offers open

03-Jul-11

20 20 21-Jul-11

20

Bid tab

17-Jul-11

31-Jul-11

10

F.O.C.

24-Jul-11

04-Aug-11

20

07-Aug-11

18-Aug-11

10

P.O.

Inst. Junction Box

RFQ

09-Jun-11

07-Jun-11

Tech. offers open

23-Jun-11

20-Jun-11

20 20

Comm. offers open

07-Jul-11

27-Jul-11

20

Bid tab

21-Jul-11

07-Aug-11

10

F.O.C.

28-Jul-11

17-Aug-11

20

P.O.

11-Aug-11

21-Aug-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

Page 35 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

4.19%

70.00%

70.00%

3.73%

60.00%

40.00%

3.45%

40.00%

40.00%

3.49%

40.00%

0.00%

3.54%

70.00%

40.00%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE HIPPS

RFQ

07-Apr-11

03-Apr-11

20

Tech. offers open

28-Apr-11

05-Apr-11

20

Comm. offers open 31-May-11

16-Jun-11

20

Bid tab

23-Jun-11

14-Jun-11

10

F.O.C.

28-Jun-11

06-Jul-11

P.O.

12-Jul-11

14-Jul-11

20 10

Choke valves

RFQ

13-Apr-11

03-Apr-11

20

Tech. offers open

12-May-11

26-Apr-11

20

Comm. offers open

14-Jun-11

12-Jul-11

20

Bid tab

28-Jun-11

20-Jul-11

10

F.O.C.

05-Jul-11

26-Jul-11

20

P.O.

19-Jul-11

09-Aug-11

10

Loose instrument 20

RFQ

29-May-11

07-Jun-11

Tech. offers open

12-Jun-11

20-Jun-11

Comm. offers open

26-Jun-11

01-Aug-11

20

Bid tab

10-Jul-11

10-Aug-11

10

F.O.C.

17-Jul-11

21-Aug-11

20

P.O.

31-Jul-11

25-Aug-11

10

20

Instrument cable trays

RFQ

31-May-11

20

27-Jun-11

Tech. offers open

14-Jun-11

04-Jul-11

20

Comm. offers open

30-Jun-11

07-Aug-11

20

Bid tab

14-Jul-11

16-Aug-11

10

F.O.C.

14-Jul-11

24-Aug-11

20

28-Jul-11

29-Aug-11

10

P.O.

Electro hydraulic wellhead control panel

RFQ

14-Apr-11

05-Apr-11

Tech. offers open

15-May-11

05-Apr-11

20 20

Comm. offers open

06-Jun-11

30-Jun-11

20

Bid tab

20-Jun-11

06-Jul-11

10

F.O.C.

04-Jul-11

12-Jul-11

20

P.O.

14-Jul-11

18-Jul-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

Page 36 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

3.54%

70.00%

40.00%

3.49%

60.00%

20.00%

3.49%

40.00%

0.00%

3.73%

60.00%

90.00%

3.49%

60.00%

40.00%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE Wing valves 20

RFQ

13-Apr-11

03-Apr-11

Tech. offers open

12-May-11

02-May-11

Comm. offers open

08-Jun-11

03-Jul-11

20

Bid tab

22-Jun-11

10-Jul-11

10

F.O.C.

06-Jul-11

21-Jul-11

20

P.O.

20-Jul-11

04-Aug-11

10

20

Instrument cable and cable glands

RFQ

23-May-11

20

23-Jun-11

Tech. offers open

06-Jun-11

07-Jul-11

20

Comm. offers open

20-Jun-11

07-Aug-11

20

Bid tab

04-Jul-11

16-Aug-11

10

F.O.C.

11-Jul-11

23-Aug-11

20

P.O.

25-Jul-11

28-Aug-11

10

Sand & Corrosion probes 20

RFQ

02-Jun-11

Tech. offers open

16-Jun-11

10-Jul-11

20

Comm. offers open

11-Jul-11

11-Aug-11

20

25-Jul-11

23-Aug-11

10

F.O.C.

01-Aug-11

29-Aug-11

20

P.O.

15-Aug-11

11-Sep-11

10

Bid tab

27-Jun-11

Multi phase flow meter

10-Apr-11

20

09-May-11

28-Apr-11

20

12-Jun-11

09-Jun-11

20

Bid tab

26-Jun-11

13-Jun-11

10

F.O.C.

10-Jul-11

16-Jun-11

RFQ

10-Apr-11

Tech. offers open Comm. offers open

P.O.

20 03-Jul-11

24-Jul-11

10

Service water pump

RFQ

25-Apr-11

03-Apr-11

Tech. offers open

17-May-11

28-Apr-11

20 20

Comm. offers open

13-Jun-11

10-Jul-11

20

Bid tab

27-Jun-11

18-Jul-11

10

F.O.C.

11-Jul-11

25-Jul-11

20

P.O.

25-Jul-11

02-Aug-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

Page 37 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

4.19%

60.00%

100.00%

3.49%

0.00%

0.00%

3.73%

40.00%

40.00%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE Turret crane crane

RFQ

13-Apr-11

03-Apr-11

20

Tech. offers open

12-May-11

10-Apr-11

20

Comm. offers open

12-Jun-11

11-May-11

20

Bid tab

26-Jun-11

03-May-11

10

F.O.C.

10-Jul-11

29-May-11

20

P.O.

18-Jul-11

21-Jun-11

10

Monorail crane

28-Jul-11

28-Jul-11

20

Tech. offers open

11-Aug-11

11-Aug-11

20

Comm. offers open

06-Sep-11

06-Sep-11

20

Bid tab

20-Sep-11

20-Sep-11

10

F.O.C.

04-Oct-11

04-Oct-11

20

P.O.

17-Oct-11

17-Oct-11

10

RFQ

Survival module 20

RFQ

02-May-11

03-Apr-11

Tech. offers open

31-May-11

22-May-11

Comm. offers open

29-Jun-11

10-Jul-11

20

Bid tab

13-Jul-11

18-Jul-11

10

20

F.O.C.

19-Jul-11

24-Jul-11

20

P.O.

02-Aug-11

07-Aug-11

10

100.00%

Total

FOREIGN PURCHASING DEPARTMENT

100.00%

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

Page 38 of 59

53.17% 53.17%

44.73% 44.73%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES EXPEDITING DEPART. COMMODITIES ONE BY ONE Safety equipment and life saving

Start

10-Jul-11

04-Aug-11

10

Receiv. Supp. Key

29-Aug-11

25-Sep-11

20

Place Main Mat. S/

18-Sep-11

17-Oct-11

10

Receiv. Main Mat.s

17-Nov-11

13-Dec-11

20

07-Dec-11

01-Jan-12

40

Fabrication Finish

Flame arrestor

Start

21-Jul-11

11-Aug-11

10

Receiv. Supp. Key

09-Sep-11

10-Oct-11

20

Place Main Mat. S/

29-Sep-11

26-Oct-11

10

Receiv. Main Mat.s

29-Oct-11

27-Nov-11

20

Fabrication Finish

28-Nov-11

26-Dec-11

40

Chemical injection package

Start

10-Jul-11

05-Jul-11

Receiv. Supp. Key

18-Sep-11

11-Sep-11

20

Place Main Mat. S/

23-Sep-11

14-Sep-11

10

Receiv. Main Mat.s

27-Nov-11

20-Nov-11

20

Fabrication Finish

06-Jan-12

27-Dec-11

40

Start

05-Jul-11

20-Jul-11

Receiv. Supp. Key

03-Sep-11

19-Sep-11

20

Place Main Mat. S/

23-Sep-11

09-Oct-11

10

Receiv. Main Mat.s

12-Nov-11

24-Nov-11

20

Fabrication Finish

31-Dec-11

04-Jan-12

40

Start

08-Aug-11

05-Sep-11

10

Receiv. Supp. Key

07-Oct-11

06-Nov-11

20

Place Main Mat. S/

27-Oct-11

24-Nov-11

10

Fabrication Finish

06-Dec-11

02-Jan-12

40

Receiv. Main Mat.s

06-Dec-11

03-Jan-12

20

Piping bulk

19-Jun-11 05-Jan-12

1.86%

0.00%

0.00%

4.66%

0.00%

0.00%

3.73%

0.00%

0.00%

1.86%

0.00%

0.00%

3.50%

20.00%

0.00%

20

26-Jun-11 10-Jan-12

80

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.) Tuesday, July 05, 2011

0.00%

10

Vent stack tips

Fabrication Finish

0.00%

10

Fire Fighting package

Start

1.86%

Page 39 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES EXPEDITING DEPART. COMMODITIES ONE BY ONE Insulation Joint

Start

10-Jul-11

22-Aug-11

10

Receiv. Supp. Key

08-Sep-11

23-Oct-11

20

Place Main Mat. S/

18-Sep-11

31-Oct-11

10

Receiv. Main Mat.s

18-Oct-11

30-Nov-11

20

07-Dec-11

18-Jan-12

40

Fabrication Finish

Injection fitting

Start

13-Jul-11

18-Aug-11

10

Receiv. Supp. Key

11-Sep-11

23-Oct-11

20

Place Main Mat. S/

21-Sep-11

31-Oct-11

10

Receiv. Main Mat.s

21-Oct-11

30-Nov-11

20

Fabrication Finish

10-Dec-11

18-Jan-12

40

Earthing material

Start

08-Aug-11

25-Aug-11

20

Fabrication Finish

26-Dec-11

26-Dec-11

80

Lighting material

Start

27-Jul-11

24-Aug-11

20

Fabrication Finish

14-Dec-11

23-Dec-11

80

Electrical Cable trays

Start Fabrication Finish

10-Jul-11

06-Jul-11

20

18-Oct-11

02-Oct-11

80

Electrical Cables

Start Fabrication Finish

17-Jul-11

06-Jul-11

20

04-Dec-11

22-Nov-11

80

Navigation aids system

Start

18-Jul-11

01-Aug-11

10

Receiv. Supp. Key

16-Sep-11

27-Sep-11

20

Place Main Mat. S/

06-Oct-11

20-Oct-11

10

Receiv. Main Mat.s

26-Oct-11

09-Nov-11

20

Fabrication Finish

05-Dec-11

18-Dec-11

40

Instrument & Mechanical bulk material

Start

24-Jul-11

04-Aug-11

20

Fabrication Finish

01-Nov-11

05-Nov-11

80

0.00%

0.00%

1.86%

0.00%

0.00%

1.86%

0.00%

0.00%

2.33%

0.00%

0.00%

1.86%

0.00%

0.00%

2.33%

0.00%

0.00%

3.73%

0.00%

0.00%

1.86%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.) Tuesday, July 05, 2011

1.86%

Page 40 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES EXPEDITING DEPART. COMMODITIES ONE BY ONE Inst. Junction Box

Start

28-Jul-11

17-Aug-11

20

Finish

05-Nov-11

09-Nov-11

80

HIPPS

28-Jun-11

07-Jul-11

10

Receiv. Supp. Key

26-Oct-11

06-Nov-11

20

Place Main Mat. S/

15-Nov-11

24-Nov-11

10

Receiv. Main Mat.s

24-Jan-12

02-Feb-12

20

Fabrication Finish

24-Mar-12

17-Mar-12

40

Start

Choke valves

Start

05-Jul-11

27-Jul-11

Receiv. Supp. Key

02-Nov-11

24-Nov-11

20

Place Main Mat. S/

22-Nov-11

14-Dec-11

10

Receiv. Main Mat.s

31-Jan-12

22-Feb-12

20

Fabrication Finish

31-Mar-12

21-Apr-12

40

Start

17-Jul-11

15-Aug-11

20

Fabrication Finish

13-Jan-12

20-Feb-12

80

Instrument cable trays

Fabrication Finish

14-Jul-11

24-Aug-11

20

22-Oct-11

18-Nov-11

80

Electro hydraulic wellhead control panel

10-Jul-11

12-Jul-11

10

Receiv. Supp. Key

08-Oct-11

04-Oct-11

20

Place Main Mat. S/

07-Nov-11

03-Nov-11

10

Receiv. Main Mat.s

17-Dec-11

13-Dec-11

20

Fabrication Finish

06-Jan-12

01-Jan-12

40

Start

Wing valves

Start

06-Jul-11

24-Jul-11

10

Receiv. Supp. Key

04-Oct-11

20-Oct-11

20

Place Main Mat. S/

03-Nov-11

21-Nov-11

10

Receiv. Main Mat.s

13-Dec-11

29-Dec-11

20

Fabrication Finish

01-Apr-12

16-Apr-12

40

Instrument cable and cable glands

Start

11-Jul-11

14-Aug-11

20

Fabrication Finish

28-Nov-11

08-Nov-11

80

0.00%

4.66%

0.00%

0.00%

3.73%

0.00%

0.00%

1.86%

0.00%

0.00%

1.86%

0.00%

0.00%

3.73%

0.00%

0.00%

3.26%

0.00%

0.00%

1.86%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.) Tuesday, July 05, 2011

0.00%

10

Loose instrument

Start

1.86%

Page 41 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES EXPEDITING DEPART. COMMODITIES ONE BY ONE Sand & Corrosion probes

Start

01-Aug-11

30-Aug-11

10

Receiv. Supp. Key

30-Sep-11

27-Oct-11

20

Place Main Mat. S/

30-Oct-11

28-Nov-11

10

Receiv. Main Mat.s

09-Dec-11

07-Jan-12

20

Fabrication Finish

29-Dec-11

08-Jan-12

40

Multi phase flow meter

10-Jul-11

Receiv. Supp. Key

28-Sep-11

12-Sep-11

20

Place Main Mat. S/

08-Oct-11

20-Sep-11

10

Receiv. Main Mat.s

27-Nov-11

09-Nov-11

20

Fabrication Finish

06-Jan-12

21-Dec-11

40

20-Jun-11

Service water pump

Start

11-Jul-11

28-Jul-11

10

Receiv. Supp. Key

19-Sep-11

06-Oct-11

20

Place Main Mat. S/

09-Oct-11

26-Oct-11

10

Receiv. Main Mat.s

18-Nov-11

05-Dec-11

20

Fabrication Finish

28-Nov-11

14-Dec-11

40

Turret crane crane

10-Jul-11

Receiv. Supp. Key

01-Nov-11

Place Main Mat. S/

0.00%

3.73%

0.00%

10.00%

3.26%

0.00%

0.00%

4.66%

0.00%

10.00%

1.86%

0.00%

0.00%

3.26%

0.00%

0.00%

10

21-Jun-11 27-Sep-11

20

11-Nov-11

09-Oct-11

10

Receiv. Main Mat.s

20-Jan-12

18-Dec-11

20

Fabrication Finish

29-Feb-12

19-Feb-12

40

Monorail crane

Start

04-Oct-11

04-Oct-11

10

Receiv. Supp. Key

13-Dec-11

13-Dec-11

20

Place Main Mat. S/

23-Dec-11

23-Dec-11

10

Receiv. Main Mat.s

12-Jan-12

12-Jan-12

20

Fabrication Finish

01-Feb-12

01-Feb-12

40

Survival module

Start

11-Jul-11

28-Jul-11

10

Receiv. Supp. Key

09-Oct-11

26-Oct-11

20

Place Main Mat. S/

29-Oct-11

15-Nov-11

10

Fabrication Finish

28-Nov-11

14-Dec-11

40

Receiv. Main Mat.s

08-Dec-11

25-Dec-11

20

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.) Tuesday, July 05, 2011

0.00%

10

Start

Start

1.86%

Page 42 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

ENPPI W.P.3 PROCUREMENT SERVICES EXPEDITING DEPART. COMMODITIES ONE BY ONE Production Manifold 10

Start

19-Apr-11

Receiv. Supp. Key

17-Aug-11

17-Aug-11

20

Place Main Mat. S/

27-Aug-11

27-Aug-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

15-Dec-11

15-Dec-11

40

Fabrication Finish

24-May-11

E&I Module 10

Start

19-Apr-11

Receiv. Supp. Key

17-Aug-11

03-May-11 07-Sep-11

20

Place Main Mat. S/

27-Aug-11

27-Aug-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

Actuated valves 10

Start

19-Apr-11

19-Apr-11

Receiv. Supp. Key

17-Aug-11

05-Sep-11

20

Place Main Mat. S/

06-Sep-11

06-Sep-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

Emergency Generator 10

Start

19-Apr-11

Receiv. Supp. Key

17-Aug-11

23-May-11 03-Sep-11

20

Place Main Mat. S/

06-Sep-11

06-Sep-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

Micro Turbine 10

Start

19-Apr-11

03-May-11

Place Main Mat. S/

16-Sep-11

16-Sep-11

10

Receiv. Supp. Key

16-Sep-11

16-Sep-11

20

Receiv. Main Mat.s

25-Nov-11

25-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

100.00%

Total

EXPEDITING DEPART.

100.00%

3.03%

3.17% 3.17%

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.) Tuesday, July 05, 2011

3.03%

Page 43 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES SUPPLIER QUALITY SRVEILLANCE DEPART. COMMODITIES ONE BY ONE Safety equipment and life saving

NFI

30-Nov-11

25-Dec-11

20

RFS

07-Dec-11

01-Jan-12

80

Flame arrestor

NFI

21-Nov-11

19-Dec-11

20

RFS

28-Nov-11

26-Dec-11

80

Chemical injection package

NFI

30-Dec-11

20-Dec-11

20

RFS

06-Jan-12

27-Dec-11

80

Fire Fighting package

NFI RFS

24-Dec-11

28-Dec-11

20

31-Dec-11

04-Jan-12

80

Vent stack tips

NFI RFS

29-Nov-11

26-Dec-11

20

06-Dec-11

02-Jan-12

80

Piping bulk

NFI

29-Dec-11

03-Jan-12

20

RFS

05-Jan-12

10-Jan-12

80

Insulation Joint

NFI

30-Nov-11

11-Jan-12

20

RFS

07-Dec-11

18-Jan-12

80

Injection fitting

NFI

03-Dec-11

11-Jan-12

20

RFS

10-Dec-11

18-Jan-12

80

Earthing material

NFI

19-Dec-11

19-Dec-11

20

RFS

26-Dec-11

26-Dec-11

80

Lighting material

NFI

07-Dec-11

16-Dec-11

20

RFS

14-Dec-11

23-Dec-11

80

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.) Tuesday, July 05, 2011

Page 44 of 59

2.75%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

3.67%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES SUPPLIER QUALITY SRVEILLANCE DEPART. COMMODITIES ONE BY ONE Electrical Cable trays

NFI

11-Oct-11

25-Sep-11

20

RFS

18-Oct-11

02-Oct-11

80

Electrical Cables

NFI

27-Nov-11

15-Nov-11

20

RFS

04-Dec-11

22-Nov-11

80

Navigation aids system

NFI

28-Nov-11

11-Dec-11

20

RFS

05-Dec-11

18-Dec-11

80

Instrument & Mechanical bulk material

NFI RFS

25-Oct-11

25-Oct-11

20

01-Nov-11

03-Nov-11

80

Inst. Junction Box

NFI RFS

29-Oct-11

02-Nov-11

20

05-Nov-11

09-Nov-11

80

HIPPS

NFI

17-Mar-12

10-Mar-12

20

RFS

24-Mar-12

17-Mar-12

80

Choke valves

NFI

24-Mar-12

14-Apr-12

20

RFS

31-Mar-12

21-Apr-12

80

Loose instrument

NFI

06-Jan-12

04-Jan-12

20

RFS

13-Jan-12

10-Jan-12

80

Instrument cable trays

NFI

15-Oct-11

08-Nov-11

20

RFS

22-Oct-11

18-Nov-11

80

Electro hydraulic wellhead control panel

NFI

30-Dec-11

25-Dec-11

20

RFS

06-Jan-12

01-Jan-12

80

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.) Tuesday, July 05, 2011

Page 45 of 59

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

2.75%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

4.59%

0.00%

0.00%

3.67%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

3.67%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES SUPPLIER QUALITY SRVEILLANCE DEPART. COMMODITIES ONE BY ONE Wing valves

NFI

25-Mar-12

09-Apr-12

20

RFS

01-Apr-12

16-Apr-12

80

Instrument cable and cable glands

NFI

21-Nov-11

15-Nov-11

20

RFS

28-Nov-11

11-Dec-11

80

Sand & Corrosion probes

NFI

22-Dec-11

01-Jan-12

20

RFS

29-Dec-11

08-Jan-12

80

Multi phase flow meter

NFI RFS

30-Dec-11

14-Dec-11

20

06-Jan-12

21-Dec-11

80

Service water pump

NFI RFS

21-Nov-11

07-Dec-11

20

28-Nov-11

14-Dec-11

80

Turret crane crane

NFI

22-Feb-12

12-Feb-12

20

RFS

29-Feb-12

19-Feb-12

80

Monorail crane

NFI

25-Jan-12

25-Jan-12

20

RFS

01-Feb-12

01-Feb-12

80

Survival module

NFI

19-Dec-11

26-Dec-11

20

RFS

26-Dec-11

29-Dec-11

80

Production Manifold

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

E&I Module

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.) Tuesday, July 05, 2011

Page 46 of 59

3.67%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

3.67%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

2.75%

0.00%

0.00%

3.67%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES SUPPLIER QUALITY SRVEILLANCE DEPART. COMMODITIES ONE BY ONE Actuated valves

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

Emergency Generator

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

Micro Turbine

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

4.59%

0.00%

0.00%

4.59%

0.00%

0.00%

4.59%

0.00%

0.00%

100.00%

Total

SUPPLIER QUALITY SRVEILLANCE DEP

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.) Tuesday, July 05, 2011

Page 47 of 59

100.00%

0.00% 0.00%

0.00% 0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES TRAFFIC & LOGISTICS DEPARTMENT COMMODITIES ONE BY ONE Safety equipment and life saving

Mat. Deliv.to Dest. P 07-Dec-11

02-Jan-12

20

Mat. Deliv.to Ship. P 28-Dec-11

22-Jan-12

30

Customs Cleared

08-Jan-12

02-Feb-12

30

Material At Site

11-Jan-12

05-Feb-12

20

Flame arrestor

Mat. Deliv.to Dest. P 28-Nov-11

27-Dec-11

20

Mat. Deliv.to Ship. P 19-Dec-11

16-Jan-12

30

Customs Cleared

30-Dec-11

27-Jan-12

30

02-Jan-12

30-Jan-12

20

Material At Site

Chemical injection package

Mat. Deliv.to Dest. P 06-Jan-12

28-Dec-11

20

Mat. Deliv.to Ship. P 27-Jan-12

17-Jan-12

30

Customs Cleared

07-Feb-12

28-Jan-12

30

Material At Site

10-Feb-12

31-Jan-12

20

Fire Fighting package 05-Jan-12

20

Mat. Deliv.to Ship. P 21-Jan-12

25-Jan-12

30

Customs Cleared

01-Feb-12

05-Feb-12

30

Material At Site

04-Feb-12

08-Feb-12

20

Mat. Deliv.to Dest. P 01-Jan-12

Vent stack tips

Mat. Deliv.to Dest. P 06-Dec-11

03-Jan-12

20

Mat. Deliv.to Ship. P 27-Dec-11

23-Jan-12

30

Customs Cleared

07-Jan-12

03-Feb-12

30

Material At Site

10-Jan-12

06-Feb-12

20

Piping bulk 3rd batch

Mat. Deliv.to Dest. P 05-Jan-12

11-Jan-12

20

Mat. Deliv.to Ship. P 26-Jan-12

31-Jan-12

30

Customs Cleared

06-Feb-12

11-Feb-12

30

09-Feb-12

14-Feb-12

20

Material At Site

Insulation Joint

Mat. Deliv.to Dest. P 07-Dec-11

19-Jan-12

20

Mat. Deliv.to Ship. P 28-Dec-11

08-Feb-12

30

Customs Cleared

08-Jan-12

19-Feb-12

30

Material At Site

11-Jan-12

22-Feb-12

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT) Tuesday, July 05, 2011

Page 48 of 59

3.48%

0.00%

0.00%

3.48%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

2.61%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES TRAFFIC & LOGISTICS DEPARTMENT COMMODITIES ONE BY ONE Injection fitting

Mat. Deliv.to Dest. P 10-Dec-11

19-Jan-12

20

Mat. Deliv.to Ship. P 31-Dec-11

08-Feb-12

30

Customs Cleared

11-Jan-12

19-Feb-12

30

Material At Site

14-Jan-12

22-Feb-12

20

Earthing material

Mat. Deliv.to Dest. P 26-Dec-11

28-Dec-11

20

Mat. Deliv.to Ship. P 24-Jan-12

22-Jan-12

30

Customs Cleared

11-Feb-12

12-Feb-12

30

14-Feb-12

14-Feb-12

20

Material At Site

Lighting material

Mat. Deliv.to Dest. P 14-Dec-11

26-Dec-11

20

Mat. Deliv.to Ship. P 04-Jan-12

13-Jan-12

30

Customs Cleared

15-Jan-12

23-Dec-12

30

Material At Site

18-Jan-12

27-Jan-12

20

Electrical Cable trays 03-Oct-11

20

Mat. Deliv.to Ship. P 08-Nov-11

23-Oct-11

30

Customs Cleared

19-Nov-11

03-Nov-11

30

Material At Site

22-Nov-11

06-Nov-11

20

Mat. Deliv.to Dest. P 18-Oct-11

Electrical Cables

Mat. Deliv.to Dest. P 04-Dec-11

23-Nov-11

20

Mat. Deliv.to Ship. P 25-Dec-11

13-Dec-11

30

Customs Cleared

05-Jan-12

22-Dec-11

30

Material At Site

08-Jan-12

27-Dec-11

20

Navigation aids system

Mat. Deliv.to Dest. P 05-Dec-11

19-Dec-11

20

Mat. Deliv.to Ship. P 26-Dec-11

08-Jan-12

30

Customs Cleared

06-Jan-12

19-Jan-12

30

09-Jan-12

22-Jan-12

20

Material At Site

Instrument & Mechanical bulk material

Mat. Deliv.to Dest. P 01-Nov-11

03-Nov-11

Mat. Deliv.to Ship. P 22-Nov-11

23-Nov-11

30

Customs Cleared

03-Dec-11

07-Dec-11

30

Material At Site

06-Dec-11

07-Dec-11

20

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

3.48%

0.00%

0.00%

1.74%

0.00%

0.00%

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT) Tuesday, July 05, 2011

1.74%

Page 49 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES TRAFFIC & LOGISTICS DEPARTMENT COMMODITIES ONE BY ONE Inst. Junction Box

Mat. Deliv.to Dest. P 05-Nov-11

10-Nov-11

Mat. Deliv.to Ship. P 26-Nov-11

30-Nov-11

30

Customs Cleared

07-Dec-11

11-Dec-11

30

Material At Site

10-Dec-11

14-Dec-11

20

Mat. Deliv.to Dest. P 24-Mar-12

18-Mar-12

20

Mat. Deliv.to Ship. P 14-Apr-12

07-Apr-12

30

Customs Cleared

25-Apr-12

18-Apr-12

30

28-Apr-12

21-Apr-12

20

Choke valves 01-May-12

Mat. Deliv.to Ship. P 31-Mar-12

22-May-12

30

Customs Cleared

18-Apr-12

08-Jun-12

30

Material At Site

21-Apr-12

11-Jun-12

20

Loose instrument

Mat. Deliv.to Dest. P 13-Jan-12

10-Jan-12

20

Mat. Deliv.to Ship. P 10-Feb-12

06-Feb-12

30

Customs Cleared

21-Feb-12

18-Feb-12

30

Material At Site

24-Feb-12

20-Feb-12

20

Instrument cable trays

Mat. Deliv.to Dest. P 22-Oct-11

18-Nov-11

Mat. Deliv.to Ship. P 29-Oct-11

17-Nov-11

30

Customs Cleared

09-Nov-11

04-Dec-11

30

Material At Site

12-Nov-11

04-Nov-11

20

4.35%

0.00%

0.00%

3.48%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

3.48%

0.00%

0.00%

2.61%

0.00%

0.00%

20

Electro hydraulic wellhead control panel

Mat. Deliv.to Dest. P 06-Jan-12

02-Jan-12

20

Mat. Deliv.to Ship. P 27-Jan-12

22-Jan-12

30

Customs Cleared

08-Feb-12

02-Feb-12

30

11-Feb-12

05-Feb-12

20

Wing valves

Mat. Deliv.to Dest. P 01-Apr-12

17-Apr-12

20

Mat. Deliv.to Ship. P 22-Apr-12

07-May-12

30

Customs Cleared

03-May-12

18-May-12

30

Material At Site

06-May-12

21-May-12

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT) Tuesday, July 05, 2011

0.00%

20

Mat. Deliv.to Dest. P 10-Mar-12

Material At Site

0.00%

20

HIPPS

Material At Site

1.74%

Page 50 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES TRAFFIC & LOGISTICS DEPARTMENT COMMODITIES ONE BY ONE Instrument cable and cable glands

Mat. Deliv.to Dest. P 28-Nov-11

25-Nov-11

20

Mat. Deliv.to Ship. P 19-Dec-11

17-Dec-11

30

Customs Cleared

30-Dec-11

11-Jan-12

30

Material At Site

02-Jan-12

13-Jan-12

20

Sand & Corrosion probes

Mat. Deliv.to Dest. P 29-Dec-11

09-Jan-12

20

Mat. Deliv.to Ship. P 19-Jan-12

28-Jan-12

30

Customs Cleared

30-Jan-12

09-Feb-12

30

02-Feb-12

11-Feb-12

20

Material At Site

Multi phase flow meter

Mat. Deliv.to Dest. P 06-Jan-12

22-Dec-11

20

Mat. Deliv.to Ship. P 27-Jan-12

11-Jan-12

30

Customs Cleared

07-Feb-12

22-Jan-12

30

Material At Site

10-Feb-12

25-Jan-12

20

Service water pump

Mat. Deliv.to Dest. P 28-Nov-11

15-Dec-11

20

Mat. Deliv.to Ship. P 19-Dec-11

04-Jan-12

30

Customs Cleared

01-Jan-12

17-Jan-12

30

Material At Site

04-Jan-12

20-Jan-12

20

Turret crane crane

Mat. Deliv.to Dest. P 29-Feb-12

20-Feb-12

20

Mat. Deliv.to Ship. P 14-Mar-12

04-Mar-12

30

Customs Cleared

25-Mar-12

15-Mar-12

30

Material At Site

28-Mar-12

18-Mar-12

20

Monorail crane

Mat. Deliv.to Dest. P 01-Feb-12

01-Feb-12

Mat. Deliv.to Ship. P 22-Feb-12

22-Feb-12

30

Customs Cleared

04-Mar-12

04-Mar-12

30

Material At Site

07-Mar-12

07-Mar-12

20

0.00%

0.00%

1.74%

0.00%

0.00%

3.48%

0.00%

0.00%

2.61%

0.00%

0.00%

4.35%

0.00%

0.00%

2.61%

0.00%

0.00%

3.48%

0.00%

0.00%

20

Survival module

Mat. Deliv.to Dest. P 27-Dec-11

01-Jan-12

20

Mat. Deliv.to Ship. P 16-Jan-12

21-Jan-12

30

Customs Cleared

27-Jan-12

01-Feb-12

30

Material At Site

30-Jan-12

04-Feb-12

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT) Tuesday, July 05, 2011

1.74%

Page 51 of 59

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES TRAFFIC & LOGISTICS DEPARTMENT COMMODITIES ONE BY ONE Piping bulk 1st batch

Mat. Deliv.to Dest. P 09-Oct-11

10-Oct-11

20

Mat. Deliv.to Ship. P 30-Oct-11

30-Oct-11

30

Customs Cleared

10-Nov-11

10-Nov-11

30

Material At Site

13-Nov-11

13-Nov-11

20

Piping bulk 2nd batch

Mat. Deliv.to Dest. P 16-Nov-11

22-Nov-11

20

Mat. Deliv.to Ship. P 07-Dec-11

12-Dec-11

30

Customs Cleared

18-Dec-11

21-Dec-11

30

21-Dec-11

26-Dec-11

20

Material At Site

Micro Turbine

26-Dec-11

26-Dec-11

30

29-Dec-11

29-Dec-11

20

Mat. Deliv.to Dest. P 29-Dec-11

29-Dec-11

20

Mat. Deliv.to Ship. P 26-Jan-12

26-Jan-12

30

Customs Cleared Material At Site

Emergency Generator

26-Dec-11

26-Dec-11

30

Mat. Deliv.to Dest. P 29-Dec-11

29-Dec-11

20

Material At Site

29-Dec-11

29-Dec-11

20

Mat. Deliv.to Ship. P 26-Jan-12

26-Jan-12

30

Customs Cleared

E&I Module

Mat. Deliv.to Dest. P 15-Dec-11

15-Dec-11

20

Mat. Deliv.to Ship. P 12-Jan-12

12-Jan-12

30

Customs Cleared

23-Jan-12

23-Jan-12

30

Material At Site

26-Jan-12

26-Jan-12

20

Production Manifold

Mat. Deliv.to Dest. P 15-Dec-11

15-Dec-11

20

Mat. Deliv.to Ship. P 12-Jan-12

12-Jan-12

30

Customs Cleared

23-Jan-12

23-Jan-12

30

26-Jan-12

26-Jan-12

20

Material At Site

Actuated valves

Mat. Deliv.to Dest. P 15-Dec-11

15-Dec-11

20

Mat. Deliv.to Ship. P 12-Jan-12

12-Jan-12

30

Customs Cleared

23-Jan-12

23-Jan-12

30

Material At Site

26-Jan-12

26-Jan-12

20

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

100.00%

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT) Tuesday, July 05, 2011

Page 52 of 59

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.3 PROCUREMENT SERVICES TRAFFIC & LOGISTICS DEPARTMENT Total

TRAFFIC & LOGISTICS DEPARTMENT

100.00%

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT) Tuesday, July 05, 2011

Page 53 of 59

0.00%

0.00%

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.5 DECK AND TSF SUPPLY & FABRICATION METERIAL SUPPLY COMMODITIES ONE BY ONE Safety equipment and life saving

P.O.

24-Jul-11

18-Aug-11

15

Receiv. Supp. Key

29-Aug-11

26-Sep-11

20

Place Main Mat. S/

18-Sep-11

16-Oct-11

15

RFS

07-Dec-11

01-Jan-12

35

11-Jan-12

05-Feb-12

15

Material At Site

Flame arrestor

P.O.

04-Aug-11

11-Aug-11

15

Receiv. Supp. Key

09-Sep-11

10-Oct-11

20

Place Main Mat. S/

29-Sep-11

26-Oct-11

15

RFS

28-Nov-11

26-Dec-11

35

Material At Site

02-Jan-12

30-Jan-12

15

Chemical injection package

P.O.

24-Jul-11

10-Jul-11

Receiv. Supp. Key

18-Sep-11

11-Sep-11

20

Place Main Mat. S/

23-Sep-11

14-Sep-11

15

RFS

06-Jan-12

27-Dec-11

35

Material At Site

10-Feb-12

31-Jan-12

15

0.00%

0.00%

0.17%

0.00%

0.00%

9.06%

0.00%

0.00%

1.94%

0.00%

0.00%

1.30%

0.00%

0.00%

3.48%

0.00%

0.00%

15

Fire Fighting package

P.O.

18-Jul-11

24-Jul-11

Receiv. Supp. Key

03-Sep-11

19-Sep-11

20

Place Main Mat. S/

23-Sep-11

09-Oct-11

15

RFS

31-Dec-11

04-Jan-12

35

Material At Site

04-Feb-12

08-Feb-12

15

15

Vent stack tips

P.O.

17-Aug-11

24-Aug-11

15

Receiv. Supp. Key

07-Oct-11

06-Nov-11

20

Place Main Mat. S/

27-Oct-11

24-Nov-11

15

RFS

06-Dec-11

02-Jan-12

35

Material At Site

10-Jan-12

06-Feb-12

15

Piping bulk 3rd batch

P.O.

03-Jul-11

07-Jul-11

Place Main Mat. S/

26-Oct-11

02-Nov-11

15

RFS

05-Jan-12

11-Jan-12

35

Material At Site

09-Feb-12

14-Feb-12

15

35

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY) Tuesday, July 05, 2011

2.99%

Page 54 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.5 DECK AND TSF SUPPLY & FABRICATION METERIAL SUPPLY COMMODITIES ONE BY ONE Insulation Joint

P.O.

24-Jul-11

17-Aug-11

35

Place Main Mat. S/

18-Sep-11

31-Oct-11

15

RFS

07-Dec-11

18-Jan-12

35

Material At Site

11-Jan-12

22-Feb-12

15

Injection fitting

P.O.

27-Jul-11

23-Aug-11

35

Place Main Mat. S/

21-Sep-11

31-Oct-11

15

RFS

10-Dec-11

18-Jan-12

35

14-Jan-12

22-Feb-12

15

Material At Site

Earthing material

24-Aug-11

20-Aug-11

35

Place Main Mat. S/

13-Sep-11

10-Sep-11

15

RFS

26-Dec-11

23-Dec-11

35

Material At Site

14-Feb-12

22-Jan-12

15

P.O.

Lighting material 13-Sep-11

35

28-Sep-11

23-Oct-11

15

14-Dec-11

24-Dec-11

35

18-Jan-12

27-Jan-12

15

P.O.

22-Aug-11

Place Main Mat. S/ RFS Material At Site

Electrical Cable trays

P.O.

24-Jul-11

07-Jul-11

Place Main Mat. S/

19-Aug-11

07-Aug-11

15

RFS

18-Oct-11

02-Oct-11

35

Material At Site

22-Nov-11

06-Nov-11

15

P.O.

27-Jul-11

10-Jul-11

35

Place Main Mat. S/

13-Sep-11

28-Aug-11

15

RFS

04-Dec-11

22-Nov-11

35

08-Jan-12

27-Dec-11

15

Navigation aids system

02-Aug-11

15-Aug-11

15

Receiv. Supp. Key

16-Sep-11

28-Sep-11

20

Place Main Mat. S/

06-Oct-11

20-Oct-11

15

RFS

05-Dec-11

18-Dec-11

35

Material At Site

09-Jan-12

22-Jan-12

15

P.O.

0.00%

0.09%

0.00%

0.00%

0.15%

0.00%

0.00%

1.39%

0.00%

0.00%

2.78%

0.00%

0.00%

1.49%

0.00%

0.00%

8.17%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY) Tuesday, July 05, 2011

0.00%

35

Electrical Cables

Material At Site

0.18%

Page 55 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.5 DECK AND TSF SUPPLY & FABRICATION METERIAL SUPPLY COMMODITIES ONE BY ONE Instrument & Mechanical bulk material

P.O.

07-Aug-11

18-Aug-11

35

Place Main Mat. S/

30-Aug-11

05-Sep-11

15

RFS

01-Nov-11

06-Nov-11

35

Material At Site

06-Dec-11

07-Dec-11

15

Inst. Junction Box

P.O.

11-Aug-11

21-Aug-11

35

Place Main Mat. S/

13-Sep-11

28-Sep-11

15

RFS

05-Nov-11

09-Nov-11

35

10-Dec-11

14-Dec-11

15

Material At Site

HIPPS

12-Jul-11

14-Jul-11

15

23-Oct-11

01-Nov-11

20

Place Main Mat. S/

15-Nov-11

24-Nov-11

15

RFS

24-Mar-12

17-Mar-12

35

Material At Site

28-Apr-12

21-Apr-12

15

P.O. Receiv. Supp. Key

Choke valves

19-Jul-11

09-Aug-11

Receiv. Supp. Key

02-Nov-11

24-Nov-11

20

Place Main Mat. S/

22-Nov-11

14-Dec-11

15

RFS

31-Mar-12

21-Apr-12

35

21-Apr-12

11-Jun-12

15

Loose instrument

P.O.

31-Jul-11

25-Aug-11

35

Place Main Mat. S/

26-Oct-11

23-Oct-11

15

RFS

13-Jan-12

10-Jan-12

35

Material At Site

24-Feb-12

20-Feb-12

15

Instrument cable trays

P.O. Place Main Mat. S/

28-Jul-11

05-Aug-11

35

22-Aug-11

08-Sep-11

15

RFS

22-Oct-11

08-Nov-11

35

Material At Site

12-Nov-11

04-Dec-11

15

Electro hydraulic wellhead control panel

P.O.

18-Jul-11

18-Jul-11

15 20

Receiv. Supp. Key

08-Oct-11

04-Oct-11

Place Main Mat. S/

07-Nov-11

03-Nov-11

15

RFS

06-Jan-12

01-Jan-12

35

Material At Site

11-Feb-12

05-Feb-12

15

0.00%

0.33%

0.00%

0.00%

7.71%

0.00%

0.00%

3.32%

0.00%

0.00%

0.92%

0.00%

0.00%

1.68%

0.00%

0.00%

5.41%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY) Tuesday, July 05, 2011

0.00%

15

P.O.

Material At Site

1.44%

Page 56 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.5 DECK AND TSF SUPPLY & FABRICATION METERIAL SUPPLY COMMODITIES ONE BY ONE Wing valves

P.O.

20-Jul-11

04-Aug-11

15

Receiv. Supp. Key

04-Oct-11

20-Oct-11

20

Place Main Mat. S/

06-Dec-11

03-Jan-12

15

RFS

01-Apr-12

16-Apr-12

35

06-May-12

21-May-12

15

Material At Site

Instrument cable and cable glands

P.O.

25-Jul-11

28-Aug-11

35

Place Main Mat. S/

01-Sep-11

01-Sep-11

15

RFS

28-Nov-11

11-Dec-11

35

Material At Site

02-Jan-12

13-Jan-12

15

Sand & Corrosion probes

15-Aug-11

15-Sep-11

35

Place Main Mat. S/

30-Oct-11

09-Nov-11

15

RFS

29-Dec-11

09-Jan-12

35

Material At Site

02-Feb-12

11-Feb-12

15

P.O.

Multi phase flow meter

P.O.

24-Jul-11

03-Jul-11

Receiv. Supp. Key

18-Sep-11

18-Sep-11

20

Place Main Mat. S/

08-Oct-11

20-Sep-11

15

RFS

06-Jan-12

21-Dec-11

35

10-Feb-12

25-Jan-12

15

Material At Site

0.00%

0.00%

0.83%

0.00%

0.00%

0.50%

0.00%

0.00%

10.97%

0.00%

0.00%

0.54%

0.00%

0.00%

13.25%

0.00%

15.00%

15

Service water pump

P.O.

02-Aug-11

02-Aug-11

15

Receiv. Supp. Key

19-Sep-11

06-Oct-11

20

Place Main Mat. S/

09-Oct-11

26-Oct-11

15

RFS

28-Nov-11

14-Dec-11

35

Material At Site

04-Jan-12

20-Jan-12

15

Turret crane crane 15

P.O.

24-Jul-11

Receiv. Supp. Key

01-Nov-11

27-Sep-11

20

Place Main Mat. S/

11-Nov-11

09-Oct-11

15

RFS

29-Feb-12

19-Feb-12

35

Material At Site

28-Mar-12

18-Mar-12

15

21-Jun-11

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY) Tuesday, July 05, 2011

2.70%

Page 57 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.5 DECK AND TSF SUPPLY & FABRICATION METERIAL SUPPLY COMMODITIES ONE BY ONE Monorail crane

P.O.

17-Oct-11

17-Oct-11

15

Receiv. Supp. Key

13-Dec-11

13-Dec-11

20

Place Main Mat. S/

23-Dec-11

23-Dec-11

15

RFS

01-Feb-12

01-Feb-12

35

07-Mar-12

07-Mar-12

15

Material At Site

Survival module

P.O.

02-Aug-11

07-Aug-11

15

Receiv. Supp. Key

09-Oct-11

26-Oct-11

20

Place Main Mat. S/

29-Oct-11

15-Nov-11

15

RFS

26-Dec-11

29-Dec-11

35

Material At Site

30-Jan-12

04-Feb-12

15

Piping bulk 1st batch

P.O.

03-Jul-11

07-Jul-11

Place Main Mat. S/

28-Aug-11

04-Sep-11

15

RFS

09-Oct-11

10-Oct-11

35

Material At Site

13-Nov-11

13-Nov-11

15

0.00%

0.00%

3.10%

0.00%

0.00%

8.70%

0.00%

0.00%

5.22%

0.00%

0.00%

35

Piping bulk 2nd batch

P.O.

03-Jul-11

07-Jul-11

35

Place Main Mat. S/

16-Oct-11

23-Oct-11

15

RFS

16-Nov-11

22-Nov-11

35

21-Dec-11

26-Dec-11

15

Material At Site

0.17%

100.00%

Total

METERIAL SUPPLY

100.00%

0.00%

1.99% 1.99%

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY) Tuesday, July 05, 2011

0.00%

Page 58 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project Dates

Milestone Planned

Actual

Expected

Milestone Value

As Of : 25-Jun-11

* Relative Weight

Planned Progress%

Actual Progress%

ENPPI W.P.9 OFFSHORE HOOK-UP & COMMISSIONING COMMISSIONING SYSTEM BY SYSTEM Commissioning activities

100.00%

Start

01-Jun-12

01-Jun-12

20

Finish

30-Jun-12

30-Jun-12

80

100.00%

Total

COMMISSIONING

100.00%

0.00% 0.00%

0.00%

0.00% 0.00%

Layout No. 1

* Weights of Activities are calculated relative to (COMMISSIONING) Tuesday, July 05, 2011

0.00%

Page 59 of 59

Data'Nes Systems, Release 2.21

PAGE 25 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.2.2 TECNOMARE

GFL 003-0405

3467-200

ITEM DESCRIPTION

1.1

PROJECT MANAGEMENT

1.2

DETAILED ENGINEERING

1.3

PROCUREMENT SERVICES

1.4

SUBSTRUCTURE ( PREDRILLING TEMPLATE , PILES AND JACKET) FABRICATION

1.5

DECK AND TSF MATERIAL/EQUIPMENT SUPPLY AND FABRICATION

1.6

PIPELINE SPOOLS FABRICATION

1.7

LOAD OUT AND SEA FASTENING

1.8

OFFSHORE HOOK-UP AND COMMISSIONING

1.9

COST IMPACT DUE TO CRASHING THE SCHEDULE TO MEET TARGET DATE INCLUDING (INTERNALS BONUS FOR LABORS , THREE SHIFT WITH COMPLETE NDT , OVERTIME, ADDITIONAL SHIFTS , LABOR DAILY LOGISTICS ,..ETC )

TOTAL

Weight

Progress @ cut-off date

Monthly progress

Previous month Progress

%

%

%

%

14,17% 36,71% 1,35% 3,91% 37,25%

39,46% 51,65% 37,07% 35,00% 35,00%

5,57% 11,60% 5,06% 11,67% 0,00%

33,89% 40,05% 32,01% 23,33% 35,00%

6,61%

0,00%

0,00%

0,00%

100,00%

39,46%

5,57%

33,89%

14,17%

39,46%

5,57%

33,89%

14,17%

39,46%

5,57%

33,89%

26,16% 3,90%

66,10% 20,00%

16,28% 0,00%

49,82% 20,00%

1,06% 1,14% 4,45%

0,00% 0,00% 20,00%

0,00% 0,00% 0,00%

0,00% 0,00% 20,00%

36,71%

51,65%

11,60%

40,05%

0,54%

26,66%

6,66%

20,00%

1.1. PROJECT MANAGEMENT 1.1.1.

PROJECT SERVICES

1.1.2

QA/QC

1.1.3

HSE

1.1.4

SYSTEM INTEGRITY ASSURANCE

1.1.5

CLIENT FACILITIES

1.1.6

CONSORTIUM FACILITES

SUBTOTAL 1.1 1.2. DETAILED ENGINEERING 1.2.1

DECK

1.2.2

SSIV/PLEM (TECHNICAL FOLLOW UP)

1.2.4

LOAD OUT AND SEAFASTENING

1.2.5

OFFSHORE TRANSPORTATION

1.2.6

HOOKUP AND COMMISSIONING

1.2.7

MANUALS

1.2.8

AS BUILT DOSSIER

1.2.9

CERTIFICATION ( ASSISTANCE)

1.2.10

TECHNICAL FOLLOW ON FOR T & I CONTRACTS

SUBTOTAL 1.2 1.3. PROCUREMENT SERVICES 1.3.1

COMPANY PROVIDED ITEMS

1.3.2

CONTRACTOR PROVIDED ITEMS

1.3.3

PLEM/SSIV

1.3.4

HOOK-UP AND COMMISSIONING

1.3.5

LOAD OUT AND SEA FASTENING

1.3.6

PLC/RTU

0,81%

44,00%

4,00%

40,00%

SUBTOTAL 1.3

1,35%

37,07%

5,06%

32,01%

3,91%

35,00%

11,67%

23,33%

3,91%

35,00%

11,67%

23,33%

1.4. SUBSTRUCTURE 1.4.1

YARD MOBILIZATION

1.4.2

PRE_DRILLING TEMPLATE

1.4.3

PILES

1.4.4

JACKET STRUCTURES

1.4.5

BOAT LANDING, BARGE BUMPERS

1.4.6

ANODES INSTALLATION

1.4.7

RISERS, CAISSONS AND SUPPORTS,

1.4.8

BUOYANCY TANKS FABRICATION & ERECTION

1.4.9

GROUT SEALS AND SHOCK CELLS

1.4.10

WEIGHT CONTROL

1.4.11

SURFACE PREPARATION AND PAINTING

1.4.12

INSPECTIONS, TESTING AND PRE-COMMISSIONING

1.4.13

INSTALLATION AIDS ,BALLASTING AND GROUTING SYSTEM, WALK WAY ,STAIRS UPENDING TRENNIONS

1.4.14

BARGE PREPARATION (BERTHING , CLEANING , BLASTING , TEFLON, GRILLAGE LOAD AND OFFLOAD,..)

1.4.15

GRILLAGE SUPPLY, FABRICATION

SUBTOTAL 1.4

1.5 DECK MATERIAL/EQUIPMENT SUPPLY AND FABRICATION 1.5.1.

YARD MOBILIZATION

1.5.2.

MAIN STRUCTURES

1.5.3.

SECONDARY STRUCTURES

1.5.4.

MECHANICAL EQUIPMENT

1.5.5.

PIPING AND MANUAL VALVES

1.5.6

ELECTRICAL

1.5.7

INSTRUMENTATION

1.5.8

SURFACE PREPARATION AND PAINTING

1.5.9

INSULATION

1.5.10

MECHANICAL COMPLETION AND PRECOMMISSIONING

1.5.11

WEIGHT CONTROL

1.5.12

INSTALLATION AIDS FABRICATION AND GRILLAGE SUPPLY

1.5.13

BARGE PREPARATION (BERTHING , CLEANING , BLASTING , GRILLAGE LOAD AND OFFLOAD,..)

1.5.14

FIRE FIGHTING AND SAFETY EQUIPMENT

1.5.15

ARCHITECTURE

1.5.16

ELECTRICAL POWER GENERATION

1.5.17

OTHER INSTRUMENTATION

a.

MATERIAL/EQUIPMENT SUPPLY a.1 PLC/RTU

37,25%

35,00%

0,00%

35,00%

37,25%

35,00%

0,00%

35,00%

6,61%

0,00%

0,00%

0,00%

6,61%

0,00%

0,00%

0,00%

a.2 NAV AIDS a.3 INSTRUMENTATION BULKS b. 1.5.18

INSULATION UTILITY EQUIPMENT, FIRE FIGHTING SYSTEM

SUBTOTAL 1.5 1.6 PIPELINE AND SPOOLS SUBTOTAL 1.6 1.7 LOAD OUT AND SEAFASTENING SUBTOTAL 1.7 1.8 OFFSHORE HOOK - UP AND COMMISSIONING 1.8.1

OFFSHORE HOOK - UP AND COMMISSIONING

JACKET AND DECK

1.8.1.1 HOOK-UP AND COMMISSIONING SUPPLY OF MATERIALS 1.8.1.2 COMMISSIONING SPARE PARTS 1.8.1.3 HOOK-UP, COMMISSIONING ACTIVITIES AND TESTS 1.8.1.4 FIRST FILLING FOR DIESEL 1.8.1.5 ASISTANT DURING START UP

SUBTOTAL 1.8

PAGE 26 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.23 PETROJET

GFL 003-0405

3467-200

LEVEL I OVERALL WP

PETROJET

CLIENT :PETROBEL PROJECT : SETH DEVELOPMENT PROJECT

WK

14

R.W %

R.W %

25‐Jun‐11

DATE : ACTUAL %

Activity Name

Total Budgete Units (Hrs)

PETROJET WORK PACKAGE

€             16,500,000

WEEK NO.

13

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/  OVERALL

ITEM

OVERALL

ITEM

OVERALL

100%

22.34%

22.34%

18.00%

18.00%

31-Mar-11

31-Oct-12

4.34%

4.34%

WP1

PROJECT MANAGEMENT



2,125,000

13%

18.00%

2.32%

18.00%

2.32%

31-Mar-11

31-Oct-12

0.00%

0.00%

WP3

PROCUREMENT SERVICES



100,000

1%

18.00%

0.11%

18.00%

0.11%

31-Mar-11

31-Oct-12

0.00%

0.00%

WP4

SUBSTRUCTURE ( P.D.T, PILES AND JACKET ) FABRICATION



5,195,000

31%

44.27%

13.94%

32.53%

10.24%

31-Mar-11

15-Mar-12

11.74%

3.69%

WP5

DECK & TSF MATERIAL/EQUIPMENT SUPPLY AND FABRICATION



5,860,000

36%

16.82%

5.97%

15.01%

5.33%

31-Mar-11

29-Apr-12

1.81%

0.64%

WP6

PIPELINE SPOOLS FABRICATION



620,000

4%

0.00%

0.00%

0.00%

0.00%

23-Feb-12

25-Apr-12

0.00%

0.00%

WP8

LOAD OUT AND SEA FASTENING



1,400,000

8%

0.00%

0.00%

0.00%

0.00%

18-Oct-11

08-May-12

0.00%

0.00%

WP9

OFFSHORE HOOK-UP AND COMMISSIONING



900,000

5%

0.00%

0.00%

0.00%

0.00%

16-May-12

15-Jun-12

0.00%

0.00%

COST IMPACT DUE TO CRASHING THE SCHEDULE TO MEET TARGET DATE….



300,000

2%

0.00%

0.00%

0.00%

0.00%

15-Nov-11

15-Apr-12

0.00%

0.00%

8

1/40

WP1 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL

PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.1: PROJECT MANAGEMENT

WK

WEEK NO.

25‐Jun‐11

DATE :

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

580

18.00%

18.00%

18.00%

R.W %

ACTUAL %

13

PLANNED % DEV/ITEM

DEV/ OVERALL

Start Date

Finish Date

18.00%

31-Mar-11

31-Oct-12

0.00%

0.00%

M01

Apr-11

6.00%

25

100.00%

6.00%

100.00%

6.00%

31-Mar-11

25-Apr-11

0.00%

0.00%

M02

May-11

6.00%

29

100.00%

6.00%

100.00%

6.00%

26‐Apr‐11

25‐May‐11

0.00%

0.00%

M03

Jun-11

6.00%

30

100.00%

6.00%

100.00%

6.00%

26‐May‐11

25‐Jun‐11

0.00%

0.00%

M04

Jul-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Jun‐11

25‐Jul‐11

0.00%

0.00%

M05

Aug-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Jul‐11

25‐Aug‐11

0.00%

0.00%

M06

Sep-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Aug‐11

25‐Sep‐11

0.00%

0.00%

M07

Oct-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Sep‐11

25‐Oct‐11

0.00%

0.00%

M08

Nov-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Oct‐11

25‐Nov‐11

0.00%

0.00%

M09

Dec-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Nov‐11

25‐Dec‐11

0.00%

0.00%

M10

Jan-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Dec‐11

25‐Jan‐12

0.00%

0.00%

M11

Feb-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Jan‐12

25‐Feb‐12

0.00%

0.00%

M12

Mar-12

6.00%

28

0.00%

0.00%

0.00%

0.00%

26‐Feb‐12

25‐Mar‐12

0.00%

0.00%

M13

Apr-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Mar‐12

25‐Apr‐12

0.00%

0.00%

M14

May-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Apr‐12

25‐May‐12

0.00%

0.00%

M15

Jun-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐May‐12

25‐Jun‐12

0.00%

0.00%

M16

Jul-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Jun‐12

25‐Jul‐12

0.00%

0.00%

M17

Aug-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Jul‐12

25‐Aug‐12

0.00%

0.00%

M18

Sep-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Aug‐12

25‐Sep‐12

0.00%

0.00%

M19

Oct-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Sep‐12

25‐Oct‐12

0.00%

0.00%

02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

2/40

WP3 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL

PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.3: PROCUREMENT SERVICES

WK

WEEK NO.

25‐Jun‐11

DATE :

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

580

18.00%

18.00%

18.00%

R.W %

ACTUAL %

13

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

18.00%

31-Mar-11

31-Oct-12

0.0%

0.0%

M01

Apr-11

6.00%

25

100.00%

6.00%

100.00%

6.00%

31-Mar-11

25-Apr-11

0.0%

0.0%

M02

May-11

6.00%

29

100.00%

6.00%

100.00%

6.00%

26‐Apr‐11

25‐May‐11

0.0%

0.0%

M03

Jun-11

6.00%

30

100.00%

6.00%

100.00%

6.00%

26‐May‐11

25‐Jun‐11

0.0%

0.0%

M04

Jul-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Jun‐11

25‐Jul‐11

0.0%

0.0%

M05

Aug-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Jul‐11

25‐Aug‐11

0.0%

0.0%

M06

Sep-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Aug‐11

25‐Sep‐11

0.0%

0.0%

M07

Oct-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Sep‐11

25‐Oct‐11

0.0%

0.0%

M08

Nov-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Oct‐11

25‐Nov‐11

0.0%

0.0%

M09

Dec-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Nov‐11

25‐Dec‐11

0.0%

0.0%

M10

Jan-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Dec‐11

25‐Jan‐12

0.0%

0.0%

M11

Feb-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Jan‐12

25‐Feb‐12

0.0%

0.0%

M12

Mar-12

6.00%

28

0.00%

0.00%

0.00%

0.00%

26‐Feb‐12

25‐Mar‐12

0.0%

0.0%

M13

Apr-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Mar‐12

25‐Apr‐12

0.0%

0.0%

M14

May-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Apr‐12

25‐May‐12

0.0%

0.0%

M15

Jun-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐May‐12

25‐Jun‐12

0.0%

0.0%

M16

Jul-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Jun‐12

25‐Jul‐12

0.0%

0.0%

M17

Aug-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Jul‐12

25‐Aug‐12

0.0%

0.0%

M18

Sep-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Aug‐12

25‐Sep‐12

0.0%

0.0%

M19

Oct-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Sep‐12

25‐Oct‐12

0.0%

0.0%

02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

3/40

WP4 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL PROJECT : SETH DEVELOPMENT PROJECT Total Budgete Units (Hrs)

R.W %

262712

JACKET STRUCTURE FABRICATION MAIN STRUCTURE FABRICATION

Act ID

Activity Name

W.P.4: SUBSTRUCTURES (PILES, JACKET & PDT) FABRICATION

General

25‐Jun‐11

DATE :

WK

WEEK NO.

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

351

44.27%

44.27%

32.53%

246356

93.77%

351

45.22%

42.41%

133676

54.26%

344

70.65%

864

0.65%

344

ACTUAL %

13

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

32.53%

31-Mar-11

15-Mar-12

11.74%

11.74%

34.69%

32.53%

31‐Mar‐11

15‐Mar‐12

10.53%

9.87%

38.33%

54.94%

29.81%

31‐Mar‐11

08‐Mar‐12

15.70%

8.52%

0.00%

0.00%

0.00%

0.00%

31-Mar-11

08-Mar-12

0.00%

0.00%

100.00%

0.00%

100.00%

0.00%

31-Mar-11

31-Mar-11

0.00%

0.00%

PTJ2000

Jacket main structure fabrication start

0

0.00%

0

PTJ2210

Jacket main structure fabrication finish

0

0.00%

0

0.00%

0.00%

0.00%

29-Feb-12

29-Feb-12

0.00%

0.00%

PTJ2230

Jacket weighing

864

100 00% 100.00%

2

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

07‐Mar‐12

08‐Mar‐12

0 00% 0.00%

0 00% 0.00%

42224

31.59%

88

94.95%

29.99%

99.86%

31.54%

31-Mar-11

26-Jun-11

-4.91%

-1.55%

1596

3.78%

21

90.00%

3.40%

100.00%

3.78%

31-Mar-11

26-Apr-11

-10.00%

-0.38%

JACKET LEGS FABRICATION PTJ5000

PREPARATION OF SKID WAY

PTJ5010

PREPARATION LEG FOR ROW A & B TRIAL FIT

LEG A1 DIM 1400

544

1.29%

8

100.00%

1.29%

88.89%

1.15%

18-Jun-11

26-Jun-11

11.11%

0.14%

9992

23.66%

78

91.61%

21.68%

100.00%

23.66%

31-Mar-11

16-Jun-11

-8.39%

-1.98%

5520

55.24%

53

87.50%

48.34%

100.00%

55.24%

31-Mar-11

22-May-11

-12.50%

-6.91%

PTJ5160

LEG SPLICE FIT UP

1224

22.17%

9

95.00%

21.07%

100.00%

22.17%

31-Mar-11

10-Apr-11

-5.00%

-1.11%

PTJ5170

CANS FIT UP

1224

22.17%

9

80.00%

17.74%

100.00%

22.17%

11-Apr-11

21-Apr-11

-20.00%

-4.43%

PTJ5180

LEG SPLICE WELDING & NDT

1536

27.83%

12

95.00%

26.43%

100.00%

27.83%

23-Apr-11

8-May-11

-5.00%

-1.39%

PTJ5190

CAN WELDING & NDT

1536

27.83%

12

80.00%

22.26%

100.00%

27.83%

9-May-11

22-May-11

-20.00%

-5.57%

2564

25.66%

47

100.00%

25.66%

100.00%

25.66%

23-Apr-11

8-Jun-11

0.00%

0.00%

23-Apr-11

04-May-11

0.00%

0.00%

DIM 1200 PTJ5090

LEG SPLICE FIT UP

612

23.87%

9

100.00%

23.87%

100.00%

23.87%

PTJ5110

CANS FIT UP

272

10.61%

4

100.00%

10.61%

100.00%

10.61%

5-May-11

9-May-11

0.00%

0.00%

PTJ5100

CONE FIT UP

272

10.61%

4

100.00%

10.61%

100.00%

10.61%

10-May-11

14-May-11

0.00%

0.00%

PTJ5120

LEG SPLICE WELDING & NDT

768

29.95%

12

100.00%

29.95%

100.00%

29.95%

15-May-11

28-May-11

0.00%

0.00%

PTJ5130

CONE WELDING & NDT

320

12.48%

5

100.00%

12.48%

100.00%

12.48%

29-May-11

2-Jun-11

0.00%

0.00%

PTJ5140

CAN WELDING & NDT

320

12.48%

5

100.00%

12.48%

100.00%

12.48%

04-Jun-11

08-Jun-11

0.00%

0.00% -1.48%

1908

19.10%

33

92.24%

17.61%

100.00%

19.10%

15-May-11

16-Jun-11

-7.76%

PTJ5020

LEG SPLICE FIT UP

340

17.82%

5

100.00%

17.82%

100.00%

17.82%

15-May-11

19-May-11

0.00%

0.00%

PTJ5040

CANS FIT UP

272

14.26%

4

75.00%

10.69%

100.00%

14.26%

21-May-11

24-May-11

-25.00%

-3.56%

PTJ5030

CONE FIT UP

272

14.26%

4

100.00%

14.26%

100.00%

14.26%

25-May-11

29-May-11

0.00%

0.00%

DIM 1000

4/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

30-May-11

05-Jun-11

0.00%

0.00%

PTJ5050

LEG SPLICE WELDING & NDT

384

20.13%

6

100.00%

20.13%

100.00%

20.13%

PTJ5060

CONE WELDING & NDT

320

16.77%

5

100.00%

16.77%

100.00%

16.77%

6-Jun-11

11-Jun-11

0.00%

0.00%

PTJ5070

CAN WELDING & NDT

320

16.77%

5

75.00%

12.58%

100.00%

16.77%

12-Jun-11

16-Jun-11

-25.00%

-4.19%

10172

24.09%

78

98.55%

23.74%

100.00%

24.09%

31-Mar-11

16-Jun-11

-1.45%

-0.35%

5556

54.62%

53

100.00%

54.62%

100.00%

54.62%

31-Mar-11

22-May-11

0.00%

0.00%

LEG A2 DIM 1400 PTJ5350

LEG SPLICE FIT UP

1260

22.68%

9

100.00%

22.68%

100.00%

22.68%

31‐Mar‐11

10‐Apr‐11

0.00%

0.00%

PTJ5360

CANS FIT UP

1224

22.03%

9

100.00%

22.03%

100.00%

22.03%

11-Apr-11

21-Apr-11

0.00%

0.00%

PTJ5370

LEG SPLICE WELDING & NDT

1536

27.65%

12

100.00%

27.65%

100.00%

27.65%

23-Apr-11

08-May-11

0.00%

0.00%

PTJ5380

CAN WELDING & NDT

1536

27.65%

12

100.00%

27.65%

100.00%

27.65%

09-May-11

22-May-11

0.00%

0.00%

2772

27.25%

55

100.00%

27.25%

100.00%

27.25%

23‐Apr‐11

16‐Jun‐11

0.00%

0.00%

DIM 1200 PTJ5280

LEG SPLICE FIT UP

612

22.08%

9

100.00%

22.08%

100.00%

22.08%

23-Apr-11

04-May-11

0.00%

0.00%

PTJ5300

CANS FIT UP

272

9.81%

4

100.00%

9.81%

100.00%

9.81%

5-May-11 y

9-May-11 y

0.00%

0.00%

PTJ5290

CONE FIT UP

288

10.39%

8

100.00%

10.39%

100.00%

10.39%

10-May-11

18-May-11

0.00%

0.00%

PTJ5310

LEG SPLICE WELDING & NDT

832

30.01%

13

100.00%

30.01%

100.00%

30.01%

19-May-11

2-Jun-11

0.00%

0.00%

PTJ5320

CONE WELDING & NDT

384

13.85%

6

100.00%

13.85%

100.00%

13.85%

04-Jun-11

09-Jun-11

0.00%

0.00%

PTJ5330

CAN WELDING & NDT

DIM 1000

384

13.85%

6

100.00%

13.85%

100.00%

13.85%

11-Jun-11

16-Jun-11

0.00%

0.00%

1844

18.13%

33

91.97%

16.67%

100.00%

18.13%

10-May-11

11-Jun-11

-8.03%

-1.45%

PTJ5210

LEG SPLICE FIT UP

340

18.44%

5

100.00%

18.44%

100.00%

18.44%

10-May-11

15-May-11

0.00%

0.00%

PTJ5230

CANS FIT UP

272

14.75%

4

75.00%

11.06%

100.00%

14.75%

16-May-11

19-May-11

-25.00%

-3.69%

PTJ5220

CONE FIT UP

272

14.75%

4

100.00%

14.75%

100.00%

14.75%

21-May-11

24-May-11

0.00%

0.00%

PTJ5240

LEG SPLICE WELDING & NDT

384

20.82%

6

100.00%

20.82%

100.00%

20.82%

25-May-11

31-May-11

0.00%

0.00%

PTJ5250

CONE WELDING & NDT

256

13.88%

4

100.00%

13.88%

100.00%

13.88%

1-Jun-11

5-Jun-11

0.00%

0.00%

PTJ5260

CAN WELDING & NDT

320

17.35%

5

75.00%

13.02%

100.00%

17.35%

06‐Jun‐11

11‐Jun‐11

‐25.00%

‐4.34%

10072

23.85%

78

91.68%

21.87%

100.00%

23.85%

31-Mar-11

16-Jun-11

-8.32%

-1.98%

5520

54.81%

53

87.50%

47.95%

100.00%

54.81%

31-Mar-11

22-May-11

-12.50%

-6.85%

1224

22.17%

9

95.00%

21.07%

100.00%

22.17%

31-Mar-11

10-Apr-11

-5.00%

-1.11%

LEG B1 DIM 1400 PTJ5540

LEG SPLICE FIT UP

PTJ5550

CANS FIT UP

1224

22.17%

9

80.00%

17.74%

100.00%

22.17%

11-Apr-11

21-Apr-11

-20.00%

-4.43%

PTJ5560

LEG SPLICE WELDING & NDT

1536

27.83%

12

95.00%

26.43%

100.00%

27.83%

23-Apr-11

8-May-11

-5.00%

-1.39%

PTJ5570

CAN WELDING & NDT

1536

27.83%

12

80.00%

22.26%

100.00%

27.83%

9-May-11

22-May-11

-20.00%

-5.57%

2644

26.25%

50

100.00%

26.25%

100.00%

26.25%

23-Apr-11

11-Jun-11

0.00%

0.00%

DIM 1200 PTJ5470

LEG SPLICE FIT UP

612

23.15%

9

100.00%

23.15%

100.00%

23.15%

23‐Apr‐11

04‐May‐11

0.00%

0.00%

PTJ5490

CANS FIT UP

272

10.29%

4

100.00%

10.29%

100.00%

10.29%

05-May-11

09-May-11

0.00%

0.00%

5/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

PTJ5480

CONE FIT UP

272

10.29%

4

100.00%

10.29%

100.00%

10.29%

10-May-11

14-May-11

0.00%

0.00%

PTJ5500

LEG SPLICE WELDING & NDT

768

29.05%

12

100.00%

29.05%

100.00%

29.05%

15-May-11

28-May-11

0.00%

0.00%

PTJ5510

CONE WELDING & NDT

384

14.52%

6

100.00%

14.52%

100.00%

14.52%

29‐May‐11

04‐Jun‐11

0.00%

0.00%

PTJ5520

CAN WELDING & NDT

336

12.71%

6

100.00%

12.71%

100.00%

12.71%

05-Jun-11

11-Jun-11

0.00%

0.00%

1908

18.94%

33

92.24%

17.47%

100.00%

18.94%

15-May-11

16-Jun-11

-7.76%

-1.47%

PTJ5400

LEG SPLICE FIT UP

340

17.82%

5

100.00%

17.82%

100.00%

17.82%

15-May-11

19-May-11

0.00%

0.00%

PTJ5420

CANS FIT UP

272

14.26%

4

75.00%

10.69%

100.00%

14.26%

21-May-11

24-May-11

-25.00%

-3.56%

PTJ5410

CONE FIT UP

272

14.26%

4

100.00%

14.26%

100.00%

14.26%

25-May-11

29-May-11

0.00%

0.00%

PTJ5430

LEG SPLICE WELDING & NDT

384

20.13%

6

100.00%

20.13%

100.00%

20.13%

30-May-11

5-Jun-11

0.00%

0.00%

PTJ5440

CONE WELDING & NDT

320

16.77%

5

100.00%

16.77%

100.00%

16.77%

6-Jun-11

11-Jun-11

0.00%

0.00%

PTJ5450

CAN WELDING & NDT

320

16.77%

5

75.00%

12.58%

100.00%

16.77%

12-Jun-11

16-Jun-11

-25.00%

-4.19%

9848

23.32%

76

98.50%

22.97%

100.00%

23.32%

31-Mar-11

14-Jun-11

-1.50%

-0.35%

DIM 1000

LEG B2

5248

53 29% 53.29%

50

100 00% 100.00%

53 29% 53.29%

100 00% 100.00%

53 29% 53.29%

31 M 11 31-Mar-11

19 M 11 19-May-11

0.00%

0.00%

PTJ5730

LEG SPLICE FIT UP

1088

20.73%

8

100.00%

20.73%

100.00%

20.73%

31-Mar-11

9-Apr-11

0.00%

0.00%

PTJ5740

CANS FIT UP

1088

20.73%

8

100.00%

20.73%

100.00%

20.73%

10-Apr-11

19-Apr-11

0.00%

0.00%

PTJ5750

LEG SPLICE WELDING & NDT

1536

29.27%

12

100.00%

29.27%

100.00%

29.27%

20‐Apr‐11

05‐May‐11

0.00%

0.00%

PTJ5760

CAN WELDING & NDT

1536

29.27%

12

100.00%

29.27%

100.00%

29.27%

07-May-11

19-May-11

0.00%

0.00%

DIM 1400

2692

27.34%

50

100.00%

27.34%

100.00%

27.34%

20-Apr-11

8-Jun-11

0.00%

0.00%

PTJ5660

LEG SPLICE FIT UP

612

22.73%

9

100.00%

22.73%

100.00%

22.73%

20-Apr-11

2-May-11

0.00%

0.00%

PTJ5680

CANS FIT UP

272

10.10%

4

100.00%

10.10%

100.00%

10.10%

03-May-11

07-May-11

0.00%

0.00%

PTJ5670

CONE FIT UP

272

10.10%

4

100.00%

10.10%

100.00%

10.10%

8-May-11

11-May-11

0.00%

0.00%

PTJ5690

LEG SPLICE WELDING & NDT

768

28.53%

12

100.00%

28.53%

100.00%

28.53%

12-May-11

25-May-11

0.00%

0.00%

PTJ5700

CONE WELDING & NDT

384

14.26%

6

100.00%

14.26%

100.00%

14.26%

26‐May‐11

1‐Jun‐11

0.00%

0.00%

PTJ5710

CAN WELDING & NDT

DIM 1200

DIM 1000

384

14.26%

6

100.00%

14.26%

100.00%

14.26%

2‐Jun‐11

8‐Jun‐11

0.00%

0.00%

1908

19.37%

34

92.24%

17.87%

100.00%

19.37%

12-May-11

14-Jun-11

-7.76%

-1.50%

340

17.82%

5

100.00%

17.82%

100.00%

17.82%

12‐May‐11

17‐May‐11

0.00%

0.00%

PTJ5590

LEG SPLICE FIT UP

PTJ5610

CANS FIT UP

272

14.26%

4

75.00%

10.69%

100.00%

14.26%

18‐May‐11

22‐May‐11

‐25.00%

‐3.56%

PTJ5600

CONE FIT UP

272

14.26%

4

100.00%

14.26%

100.00%

14.26%

23‐May‐11

26‐May‐11

0.00%

0.00%

PTJ5620

LEG SPLICE WELDING & NDT

384

20.13%

6

100.00%

20.13%

100.00%

20.13%

28‐May‐11

2‐Jun‐11

0.00%

0.00%

PTJ5630

CONE WELDING & NDT

320

16.77%

5

100.00%

16.77%

100.00%

16.77%

4‐Jun‐11

8‐Jun‐11

0.00%

0.00%

PTJ5640

CAN WELDING & NDT

320

16.77%

5

75.00%

12.58%

100.00%

16.77%

9‐Jun‐11

14‐Jun‐11

‐25.00%

‐4.19%

35012

26.19%

189

86.21%

22.58%

33.60%

8.80%

31-Mar-11

05-Oct-11

52.61%

13.78%

8996

25.69%

59

88.67%

22.78%

0.00%

0.00%

8‐Aug‐11

5‐Oct‐11

88.67%

22.78%

JACKET BRACING FABRICATION BRACING ROW 1

6/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

SPLICING HORIZONTAL

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

8996

100.00%

59

88.67%

88.67%

0.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

0.00%

8‐Aug‐11

5‐Oct‐11

88.67%

88.67%

3304

36.73%

53

100.00%

36.73%

0.00%

0.00%

8‐Aug‐11

29‐Sep‐11

100.00%

36.73%

PTJ3180

FITUP HORIZONTAL BRACES ATELEV ‐56.2

324

9.81%

9

100.00%

9.81%

0.00%

0.00%

8‐Aug‐11

17‐Aug‐11

100.00%

9.81%

PTJ3170

FITUP HORIZONTAL BRACES AT ELEV ‐33.4

324

9.81%

9

100.00%

9.81%

0.00%

0.00%

18‐Aug‐11

28‐Aug‐11

100.00%

9.81%

PTJ3200

FITUP HORIZONTAL BRACES AT ELEV ‐79.0

324

9.81%

9

100.00%

9.81%

0.00%

0.00%

18‐Aug‐11

28‐Aug‐11

100.00%

9.81%

PTJ3270

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐56.2

384

11.62%

12

100.00%

11.62%

0.00%

0.00%

18‐Aug‐11

4‐Sep‐11

100.00%

11.62%

PTJ3160

FITUP HORIZONTAL BRACES AT ELEV ‐10.6

288

8.72%

8

100.00%

8.72%

0.00%

0.00%

29‐Aug‐11

10‐Sep‐11

100.00%

8.72%

PTJ3260

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐33.4

384

11.62%

12

100.00%

11.62%

0.00%

0.00%

29‐Aug‐11

14‐Sep‐11

100.00%

11.62%

PTJ3290

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐79.0

384

11.62%

12

100.00%

11.62%

0.00%

0.00%

29‐Aug‐11

14‐Sep‐11

100.00%

11.62%

PTJ3190

FITUP HORIZONTAL BRACES AT ELEV +6.4

252

7.63%

7

100.00%

7.63%

0.00%

0.00%

11‐Sep‐11

18‐Sep‐11

100.00%

7.63%

PTJ3250

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐10.6

320

9.69%

10

100.00%

9.69%

0.00%

0.00%

11‐Sep‐11

21‐Sep‐11

100.00%

9.69%

10

100.00%

9.69%

0.00%

0.00%

19‐Sep‐11

29‐Sep‐11

100.00%

9.69% 51.95%

PTJ3280

WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

DIAGONAL BRACES

320

9.69%

5692

63.27%

49

82.10%

51.95%

0.00%

0.00%

18‐Aug‐11

5‐Oct‐11

82.10%

PTJ3140

FITUP DIAGONAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

720

12.65%

20

100.00%

12.65%

0.00%

0.00%

18‐Aug‐11

13‐Sep‐11

100.00%

12.65%

PTJ3150

FITUP DIAGONAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

792

13.91%

22

75.00%

10.44%

0.00%

0.00%

18‐Aug‐11

15‐Sep‐11

75.00%

10.44%

PTJ3130

FITUP DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

576

10.12%

16

75.00%

7.59%

0.00%

0.00%

29‐Aug‐11

19‐Sep‐11

75.00%

7.59%

PTJ3120

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

468

8.22%

13

75.00%

6.17%

0.00%

0.00%

11‐Sep‐11

25‐Sep‐11

75.00%

6.17%

PTJ3230

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

896

15.74%

14

100.00%

15.74%

0.00%

0.00%

14‐Sep‐11

29‐Sep‐11

100.00%

15.74%

PTJ3240

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

960

16.87%

15

75.00%

12.65%

0.00%

0.00%

17‐Sep‐11

3‐Oct‐11

75.00%

12.65%

PTJ3220

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

704

12.37%

11

75.00%

9.28%

0.00%

0.00%

20‐Sep‐11

2‐Oct‐11

75.00%

9.28%

PTJ3210

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

BRACING ROW 2 SPLICING HORIZONTAL

576

10.12%

9

75.00%

7.59%

0.00%

0.00%

26‐Sep‐11

5‐Oct‐11

75.00%

7.59%

9964

28.46%

91

94.38%

26.86%

98.83%

28.13%

31‐Mar‐11

29‐Jun‐11

‐4.45%

‐1.27%

9964

100.00%

91

94.38%

94.38%

98.83%

98.83%

31‐Mar‐11

29‐Jun‐11

‐4.45%

‐4.45%

2428

24.37%

20

100.00%

24.37%

100.00%

24.37%

31‐Mar‐11

19‐Apr‐11

0.00%

0.00%

PTJ3340

FITUP HORIZONTAL BRACES AT ELEV ‐10.6

180

7.41%

5

100.00%

7.41%

100.00%

7.41%

31‐Mar‐11

5‐Apr‐11

0.00%

0.00%

PTJ3350

FITUP HORIZONTAL BRACES AT ELEV ‐33.4

252

10.38%

7

100.00%

10.38%

100.00%

10.38%

31‐Mar‐11

7‐Apr‐11

0.00%

0.00%

PTJ3360

FITUP HORIZONTAL BRACES AT ELEV ‐56.2

252

10.38%

7

100.00%

10.38%

100.00%

10.38%

31‐Mar‐11

7‐Apr‐11

0.00%

0.00%

PTJ3370

FITUP HORIZONTAL BRACES AT ELEV +6.4

180

7.41%

5

100.00%

7.41%

100.00%

7.41%

31‐Mar‐11

5‐Apr‐11

0.00%

0.00%

PTJ3380

FITUP HORIZONTAL BRACES AT ELEV ‐79.0

252

10.38%

7

100.00%

10.38%

100.00%

10.38%

31‐Mar‐11

7‐Apr‐11

0.00%

0.00%

PTJ3430

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐10.6

224

9.23%

7

100.00%

9.23%

100.00%

9.23%

6‐Apr‐11

13‐Apr‐11

0.00%

0.00%

PTJ3470

WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

224

9.23%

7

100.00%

9.23%

100.00%

9.23%

6‐Apr‐11

13‐Apr‐11

0.00%

0.00%

PTJ3440

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐33.4

288

11.86%

9

100.00%

11.86%

100.00%

11.86%

9‐Apr‐11

19‐Apr‐11

0.00%

0.00%

PTJ3450

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐56.2

288

11.86%

9

100.00%

11.86%

100.00%

11.86%

9‐Apr‐11

19‐Apr‐11

0.00%

0.00%

PTJ3460

WELDING & NDT HORIZONTAL BRACES AT ELEV ‐79.0

288

11.86%

9

100.00%

11.86%

100.00%

11.86%

9‐Apr‐11

19‐Apr‐11

0.00%

0.00%

5988

60.10%

65

100.00%

60.10%

100.00%

60.10%

6‐Apr‐11

9‐Jun‐11

0.00%

0.00%

DIAGONAL BRACES

7/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

8

100.00%

9.08%

100.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

9.08%

6‐Apr‐11

14‐Apr‐11

0.00%

0.00%

PTJ3300

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

544

9.08%

PTJ3310

FITUP DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

612

10.22%

9

100.00%

10.22%

100.00%

10.22%

9‐Apr‐11

19‐Apr‐11

0.00%

0.00%

PTJ3320

FITUP DIAGONAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

816

13.63%

12

100.00%

13.63%

100.00%

13.63%

9‐Apr‐11

23‐Apr‐11

0.00%

0.00%

PTJ3330

FITUP DIAGONAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

816

13.63%

12

100.00%

13.63%

100.00%

13.63%

9‐Apr‐11

23‐Apr‐11

0.00%

0.00%

PTJ3390

WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

512

8.55%

8

100.00%

8.55%

100.00%

8.55%

16‐Apr‐11

26‐Apr‐11

0.00%

0.00%

PTJ3400

WELDING DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

768

12.83%

12

100.00%

12.83%

100.00%

12.83%

20‐Apr‐11

5‐May‐11

0.00%

0.00%

PTJ3410

WELDING DIAGONAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

896

14.96%

14

100.00%

14.96%

100.00%

14.96%

7‐May‐11

22‐May‐11

0.00%

0.00%

PTJ3420

WELDING DIAGONAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

1024

17.10%

16

100.00%

17.10%

100.00%

17.10%

23‐May‐11

9‐Jun‐11

0.00%

0.00%

1548

15.54%

54

63.84%

9.92%

92.48%

14.37%

7‐May‐11

29‐Jun‐11

‐28.65%

‐4.45%

VERTICAL PTJ3970

FITUP VERTICAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

180

11.63%

5

75.00%

8.72%

100.00%

11.63%

7‐May‐11

11‐May‐11

‐25.00%

‐2.91%

PTJ8040

WELDING VERTICAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

224

14.47%

7

55.00%

7.96%

100.00%

14.47%

12‐May‐11

19‐May‐11

‐45.00%

‐6.51%

16.28%

7

75.00%

12.21%

100.00%

16.28%

23‐May‐11

30‐May‐11

‐25.00%

‐4.07% ‐9.30%

PTJ3980

FITUP VERTICAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

PTJ8050

WELDING VERTICAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

320

20.67%

10

55.00%

11.37%

100.00%

20.67%

31‐May‐11

11‐Jun‐11

‐45.00%

PTJ3990

FITUP VERTICAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

252

16.28%

7

75.00%

12.21%

100.00%

16.28%

11‐Jun‐11

18‐Jun‐11

‐25.00%

‐4.07%

PTJ8060

WELDING VERTICAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

‐1.79%

BRACING ROW 3

252

320

20.67%

10

55.00%

11.37%

63.64%

13.15%

19‐Jun‐11

29‐Jun‐11

‐8.64%

1716

4.90%

19

75.00%

3.68%

100.00%

4.90%

21‐May‐11

8‐Jun‐11

‐25.00%

‐1.23%

PTJ8120

FITUP BRACES BETWEEN ELEV ‐10.6 & ‐33.4

252

14.69%

7

75.00%

11.01%

100.00%

14.69%

21‐May‐11

28‐May‐11

‐25.00%

‐3.67%

PTJ8130

FITUP BRACES BETWEEN ELEV ‐33.4 & ‐56.2

252

14.69%

7

75.00%

11.01%

100.00%

14.69%

21‐May‐11

28‐May‐11

‐25.00%

‐3.67%

PTJ8140

FITUP BRACES BETWEEN ELEV ‐56.2 & ‐79.0

252

14.69%

7

75.00%

11.01%

100.00%

14.69%

21‐May‐11

28‐May‐11

‐25.00%

‐3.67%

PTJ8150

WELDING VERTICAL BRACES BETWEEN ELEV +10.6 & ‐33.4

320

18.65%

10

75.00%

13.99%

100.00%

18.65%

29‐May‐11

8‐Jun‐11

‐25.00%

‐4.66%

PTJ8160

WELDING VERTICAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

320

18.65%

10

75.00%

13.99%

100.00%

18.65%

29‐May‐11

8‐Jun‐11

‐25.00%

‐4.66%

PTJ8170

WELDING VERTICAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

320

18.65%

10

75.00%

13.99%

100.00%

18.65%

29‐May‐11

8‐Jun‐11

‐25.00%

‐4.66%

BRACING ROW A

5516

15.75%

59

76.52%

12.05%

0.00%

0.00%

27‐Jun‐11

24‐Aug‐11

76.52%

12.05%

FABRICATION

5516

100.00%

59

76.52%

76.52%

0.00%

0.00%

27‐Jun‐11

24‐Aug‐11

76.52%

76.52%

PTJ8210

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

408

7.40%

6

95.00%

7.03%

0.00%

0.00%

27‐Jun‐11

3‐Jul‐11

95.00%

7.03%

PTJ8220

FITUP DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

544

9.86%

8

95.00%

9.37%

0.00%

0.00%

4‐Jul‐11

12‐Jul‐11

95.00%

9.37%

PTJ8250

WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

576

10.44%

9

85.00%

8.88%

0.00%

0.00%

4‐Jul‐11

13‐Jul‐11

85.00%

8.88%

PTJ8230

FITUP DIAGONAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

680

12.33%

10

85.00%

10.48%

0.00%

0.00%

13‐Jul‐11

25‐Jul‐11

85.00%

10.48%

PTJ8260

WELDING DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

704

12.76%

11

85.00%

10.85%

0.00%

0.00%

13‐Jul‐11

26‐Jul‐11

85.00%

10.85%

PTJ8240

FITUP DIAGONAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

748

13.56%

11

85.00%

11.53%

0.00%

0.00%

26‐Jul‐11

7‐Aug‐11

85.00%

11.53%

PTJ8270

WELDING DIAGONAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

896

16.24%

14

65.00%

10.56%

0.00%

0.00%

26‐Jul‐11

10‐Aug‐11

65.00%

10.56%

PTJ8280

WELDING DIAGONAL BRACES BETWEEN ELEV ‐ 56.2 & ‐79.0

960

17.40%

15

45.00%

7.83%

0.00%

0.00%

8‐Aug‐11

24‐Aug‐11

45.00%

7.83%

BRACING ROW B

5516

15.75%

59

83.94%

13.22%

0.00%

0.00%

27‐Jun‐11

24‐Aug‐11

83.94%

13.22%

FABRICATION

5516

100.00%

59

83.94%

83.94%

0.00%

0.00%

27‐Jun‐11

24‐Aug‐11

83.94%

83.94%

408

7.40%

6

100.00%

7.40%

0.00%

0.00%

27‐Jun‐11

3‐Jul‐11

100.00%

7.40%

PTJ8330

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

8/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

8

100.00%

9.86%

0.00%

0.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

4‐Jul‐11

12‐Jul‐11

100.00%

9.86%

PTJ8340

FITUP DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

544

9.86%

PTJ8370

WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & ‐10.6

576

10.44%

9

100.00%

10.44%

0.00%

0.00%

4‐Jul‐11

13‐Jul‐11

100.00%

10.44%

PTJ8350

FITUP DIAGONAL BRACES BETWEEN ELEV ‐33.4 & ‐56.2

680

12.33%

10

100.00%

12.33%

0.00%

0.00%

13‐Jul‐11

25‐Jul‐11

100.00%

12.33%

PTJ8380

WELDING DIAGONAL BRACES BETWEEN ELEV ‐10.6 & ‐33.4

704

12.76%

11

100.00%

12.76%

0.00%

0.00%

13‐Jul‐11

26‐Jul‐11

100.00%

12.76%

PTJ8360

FITUP DIAGONAL BRACES BETWEEN ELEV ‐56.2 & ‐79.0

748

13.56%

11

65.00%

8.81%

0.00%

0.00%

26‐Jul‐11

7‐Aug‐11

65.00%

8.81%

PTJ8390

WELDING DIAGONAL BRACES BETWEEN ELEV ‐ 33.4 & ‐56.2

896

16.24%

14

100.00%

16.24%

0.00%

0.00%

26‐Jul‐11

10‐Aug‐11

100.00%

16.24%

PTJ8400

WELDING DIAGONAL BRACES BETWEEN ELEV ‐ 56.2 & ‐79.0

960

17.40%

15

35.00%

6.09%

0.00%

0.00%

8‐Aug‐11

24‐Aug‐11

35.00%

6.09%

1856

5.30%

26

85.00%

4.51%

5.16%

0.27%

25‐Jun‐11

20‐Jul‐11

79.84%

4.23%

PTJ8450

FITUP BRACES BETWEEN ELEV ‐10.6 & ‐33.4

252

13.58%

7

85.00%

11.54%

12.50%

1.70%

25‐Jun‐11

2‐Jul‐11

72.50%

9.84%

PTJ8460

FITUP BRACES BETWEEN ELEV ‐33.4 & ‐56.2

360

19.40%

10

85.00%

16.49%

9.09%

1.76%

25‐Jun‐11

5‐Jul‐11

75.91%

14.72%

PTJ8470

FITUP BRACES BETWEEN ELEV ‐56.2 & ‐79.0

252

13.58%

7

85.00%

11.54%

12.50%

1.70%

25‐Jun‐11

2‐Jul‐11

72.50%

9.84%

13.19%

0.00%

0.00%

3‐Jul‐11

12‐Jul‐11

85.00%

13.19%

BRACING ROW C

PTJ8480

WELDING BRACES BETWEEN ELEV ‐10.6 & ‐33.4

288

15.52%

9

85.00%

PTJ8490

WELDING BRACES BETWEEN ELEV ‐56.2 & ‐79.0

288

15.52%

9

85.00%

13.19%

0.00%

0.00%

3‐Jul‐11

12‐Jul‐11

85.00%

13.19%

PTJ8500

WELDING BRACES BETWEEN ELEV ‐33.4 & ‐56.2

416

22.41%

13

85.00%

19.05%

0.00%

0.00%

6‐Jul‐11

20‐Jul‐11

85.00%

19.05%

1448

4.14%

22

75.00%

3.10%

7.18%

0.30%

25‐Jun‐11

16‐Jul‐11

67.82%

2.80%

BRACING ROW D PTJ8540

FITUP BRACES BETWEEN ELEV ‐10.6 & ‐33.4

180

12.43%

5

75.00%

9.32%

20.00%

2.49%

25‐Jun‐11

29‐Jun‐11

55.00%

6.84%

PTJ8550

FITUP BRACES BETWEEN ELEV ‐33.4 & ‐56.2

288

19.89%

8

75.00%

14.92%

11.11%

2.21%

25‐Jun‐11

3‐Jul‐11

63.89%

12.71%

PTJ8560

FITUP BRACES BETWEEN ELEV ‐56.2 & ‐79.0

180

12.43%

5

75.00%

9.32%

20.00%

2.49%

25‐Jun‐11

29‐Jun‐11

55.00%

6.84%

PTJ8570

WELDING BRACES BETWEEN ELEV ‐10.6 & ‐33.4

224

15.47%

7

75.00%

11.60%

0.00%

0.00%

30‐Jun‐11

7‐Jul‐11

75.00%

11.60%

PTJ8580

WELDING BRACES BETWEEN ELEV ‐56.2 & ‐79.0

224

15.47%

7

75.00%

11.60%

0.00%

0.00%

30‐Jun‐11

7‐Jul‐11

75.00%

11.60%

PTJ8590

WELDING BRACES BETWEEN ELEV ‐33.4 & ‐56.2

352

24.31%

11

75.00%

18.23%

0.00%

0.00%

4‐Jul‐11

16‐Jul‐11

75.00%

18.23%

31088

23.26%

227

74.72%

17.38%

61.66%

14.34%

31-Mar-11

12-Nov-11

13.05%

3.04%

4280

13.77%

91

100.00%

13.77%

90.51%

12.46%

4‐Apr‐11

3‐Jul‐11

9.49%

1.31%

JACKET ELEVATIONS FABRICATION ELEV + 6400 FITUP

1260

29.44%

34

100.00%

29.44%

100.00%

29.44%

4‐Apr‐11

7‐May‐11

0.00%

0.00%

PTJ8630

FITUP OF SIZE 24"

720

57.14%

20

100.00%

57.14%

100.00%

57.14%

4‐Apr‐11

28‐Apr‐11

0.00%

0.00%

PTJ8640

FITUP OF SIZE 16"

324

25.71%

9

100.00%

25.71%

100.00%

25.71%

23‐Apr‐11

4‐May‐11

0.00%

0.00%

PTJ8650

FITUP OF SIZE 20"

WELDING&NDT

216

17.14%

6

100.00%

17.14%

100.00%

17.14%

30‐Apr‐11

7‐May‐11

0.00%

0.00%

1344

31.40%

23

100.00%

31.40%

100.00%

31.40%

8‐May‐11

30‐May‐11

0.00%

0.00% 0.00%

PTJ8660

WELDING OF SIZE 24"

768

57.14%

12

100.00%

57.14%

100.00%

57.14%

8‐May‐11

21‐May‐11

0.00%

PTJ8670

WELDING OF SIZE 16"

320

23.81%

5

100.00%

23.81%

100.00%

23.81%

22‐May‐11

26‐May‐11

0.00%

0.00%

PTJ8680

WELDING OF SIZE 20"

256

19.05%

4

100.00%

19.05%

100.00%

19.05%

26‐May‐11

30‐May‐11

0.00%

0.00%

CONDUCTORS AT ELEV + 6400 FITUP

1676

39.16%

44

100.00%

39.16%

75.77%

29.67%

21‐May‐11

3‐Jul‐11

24.23%

9.49%

504

30.07%

24

100.00%

30.07%

100.00%

30.07%

21‐May‐11

13‐Jun‐11

0.00%

0.00%

PTJ9100

FITUP OF CONDUCTOR

324

64.29%

9

100.00%

64.29%

100.00%

64.29%

21‐May‐11

30‐May‐11

0.00%

0.00%

PTJ9110

FITUP OF CONDUCTOR SUPPORT

180

35.71%

5

100.00%

35.71%

100.00%

35.71%

8‐Jun‐11

13‐Jun‐11

0.00%

0.00%

9/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

WELDING & NDT

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

512

30.55%

21

100.00%

30.55%

100.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

30.55%

31‐May‐11

20‐Jun‐11

0.00%

0.00% 0.00%

PTJ9120

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

100.00%

62.50%

31‐May‐11

11‐Jun‐11

0.00%

PTJ9130

WELDING OF CONDUCTOR SUPPORT

192

37.50%

6

100.00%

37.50%

100.00%

37.50%

14‐Jun‐11

20‐Jun‐11

0.00%

0.00%

61.54%

24.23%

CONDUCTORS ERECTION PTJ9140

ERECTION OF CONDUCTOR WITH ELEVATIONS

ELEV ‐ 10600

660

39.38%

13

100.00%

39.38%

38.46%

15.15%

21‐Jun‐11

3‐Jul‐11

660

100.00%

11

100.00%

100.00%

38.46%

38.46%

21‐Jun‐11

3‐Jul‐11

61.54%

61.54%

6716

21.60%

148

30.82%

6.66%

62.51%

13.50%

31-Mar-11

25-Aug-11

-31.69%

-6.85%

2448

36.45%

48

35.00%

12.76%

100.00%

36.45%

31-Mar-11

17-May-11

-65.00%

-23.69%

PTJ8700

FITUP OF SIZE 28"

1044

42.65%

29

35.00%

14.93%

100.00%

42.65%

31‐Mar‐11

7‐May‐11

‐65.00%

‐27.72%

PTJ8710

FITUP OF SIZE 20"

936

38.24%

26

35.00%

13.38%

100.00%

38.24%

12‐Apr‐11

15‐May‐11

‐65.00%

‐24.85%

PTJ8720

FITUP OF SIZE 16"

288

11.76%

8

35.00%

4.12%

100.00%

11.76%

2‐May‐11

10‐May‐11

‐65.00%

‐7.65%

PTJ8730

FITUP OF SIZE 14"

180

7.35%

5

35.00%

2.57%

100.00%

7.35%

12‐May‐11

17‐May‐11

‐65.00%

‐4.78%

5.79%

67.52%

26.06%

18‐May‐11

12‐Jul‐11

‐52.52%

‐20.27%

FITUP

2592

38.59%

56

15.00%

PTJ8740

WELDING OF SIZE 28"

1120

43.21%

35

15.00%

6.48%

95.12%

41.10%

18‐May‐11

27‐Jun‐11

‐80.12%

‐34.62%

PTJ8750

WELDING OF SIZE 20"

992

38.27%

31

15.00%

5.74%

61.11%

23.39%

4‐Jun‐11

9‐Jul‐11

‐46.11%

‐17.65%

PTJ8760

WELDING OF SIZE 16"

288

11.11%

9

15.00%

1.67%

27.27%

3.03%

23‐Jun‐11

3‐Jul‐11

‐12.27%

‐1.36%

PTJ8770

WELDING OF SIZE 14"

WELDING&NDT

CONDUCTORS AT ELEV ‐ 10600 FITUP

192

7.41%

6

15.00%

1.11%

0.00%

0.00%

6‐Jul‐11

12‐Jul‐11

15.00%

1.11%

1676

24.96%

54

49.16%

12.27%

0.00%

0.00%

3‐Jul‐11

25‐Aug‐11

49.16%

12.27%

504

30.07%

35

100.00%

30.07%

0.00%

0.00%

3‐Jul‐11

6‐Aug‐11

100.00%

30.07%

PTJ9150

FITUP OF CONDUCTOR

324

64.29%

9

100.00%

64.29%

0.00%

0.00%

3‐Jul‐11

12‐Jul‐11

100.00%

64.29%

PTJ9160

FITUP OF CONDUCTOR SUPPORT

180

35.71%

5

100.00%

35.71%

0.00%

0.00%

1‐Aug‐11

6‐Aug‐11

100.00%

35.71%

WELDING & NDT

512

30.55%

32

62.50%

19.09%

0.00%

0.00%

13‐Jul‐11

13‐Aug‐11

62.50%

19.09%

PTJ9170

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

0.00%

0.00%

13‐Jul‐11

25‐Jul‐11

100.00%

62.50%

PTJ9180

WELDING OF CONDUCTOR SUPPORT

192

37.50%

6

0.00%

0.00%

0.00%

0.00%

7‐Aug‐11

13‐Aug‐11

0.00%

0.00% 0.00%

CONDUCTORS ERECTION PTJ9190

ERECTION OF CONDUCTOR WITH ELEVATIONS

ELEV ‐ 33400 FITUP

660

39.38%

12

0.00%

0.00%

0.00%

0.00%

14‐Aug‐11

25‐Aug‐11

0.00%

660

100.00%

11

0.00%

0.00%

0.00%

0.00%

14‐Aug‐11

25‐Aug‐11

0.00%

0.00%

7092

22.81%

120

66.64%

15.20%

85.07%

19.41%

31-Mar-11

28-Jul-11

-18.43%

-4.20%

2664

37.56%

36

100.00%

37.56%

100.00%

37.56%

31-Mar-11

5-May-11

0.00%

0.00%

PTJ8790

FITUP OF SIZE 28"

1008

37.84%

14

100.00%

37.84%

100.00%

37.84%

31‐Mar‐11

16‐Apr‐11

0.00%

0.00%

PTJ8810

FITUP OF SIZE 16"

396

14.86%

11

100.00%

14.86%

100.00%

14.86%

9‐Apr‐11

21‐Apr‐11

0.00%

0.00%

PTJ8800

FITUP OF SIZE 24"

720

27.03%

10

100.00%

27.03%

100.00%

27.03%

17‐Apr‐11

30‐Apr‐11

0.00%

0.00%

PTJ8820

FITUP OF SIZE 20"

288

10.81%

8

100.00%

10.81%

100.00%

10.81%

23‐Apr‐11

3‐May‐11

0.00%

0.00%

PTJ8830

FITUP OF SIZE 18"

WELDING&NDT

252

9.46%

7

100.00%

9.46%

100.00%

9.46%

27‐Apr‐11

5‐May‐11

0.00%

0.00%

2752

38.80%

39

45.00%

17.46%

100.00%

38.80%

7-May-11

14-Jun-11

-55.00%

-21.34%

PTJ8840

WELDING OF SIZE 28"

1024

37.21%

16

45.00%

16.74%

100.00%

37.21%

7‐May‐11

24‐May‐11

‐55.00%

‐20.47%

PTJ8860

WELDING OF SIZE 16"

384

13.95%

6

45.00%

6.28%

100.00%

13.95%

24‐May‐11

30‐May‐11

‐55.00%

‐7.67%

10/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

27.91%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

26‐May‐11

8‐Jun‐11

‐55.00%

‐15.35%

PTJ8850

WELDING OF SIZE 24"

768

27.91%

12

45.00%

12.56%

PTJ8870

WELDING OF SIZE 20"

320

11.63%

5

45.00%

5.23%

100.00%

11.63%

7‐Jun‐11

12‐Jun‐11

‐55.00%

‐6.40%

PTJ8880

WELDING OF SIZE 18"

256

9.30%

4

45.00%

4.19%

100.00%

9.30%

11‐Jun‐11

14‐Jun‐11

‐55.00%

‐5.12%

1676

23.63%

54

49.16%

11.62%

36.83%

8.70%

5-Jun-11

28-Jul-11

12.33%

2.91%

504

30.07%

33

100.00%

30.07%

64.29%

19.33%

5‐Jun‐11

7‐Jul‐11

35.71%

10.74%

9

100.00%

64.29%

100.00%

64.29%

5‐Jun‐11

14‐Jun‐11

0.00%

0.00%

CONDUCTORS AT ELEV ‐ 33400 FITUP PTJ9200

FITUP OF CONDUCTOR

324

64.29%

PTJ9210

FITUP OF CONDUCTOR SUPPORT

180

35.71%

5

100.00%

35.71%

0.00%

0.00%

3‐Jul‐11

7‐Jul‐11

100.00%

35.71%

512

30.55%

30

62.50%

19.09%

57.29%

17.50%

15‐Jun‐11

14‐Jul‐11

5.21%

1.59%

PTJ9220

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

91.67%

57.29%

15‐Jun‐11

26‐Jun‐11

8.33%

5.21%

PTJ9230

WELDING OF CONDUCTOR SUPPORT

192

37.50%

6

0.00%

0.00%

0.00%

0.00%

9‐Jul‐11

14‐Jul‐11

0.00%

0.00%

660

39.38%

13

0.00%

0.00%

0.00%

0.00%

16‐Jul‐11

28‐Jul‐11

0.00%

0.00%

100.00%

11

0.00%

0.00%

0.00%

0.00%

16‐Jul‐11

28‐Jul‐11

0.00%

0.00%

7520

24.19%

140

94.34%

22.82%

67.34%

16.29%

31-Mar-11

17-Aug-11

27.00%

6.53%

2772

36.86%

54

100.00%

36.86%

100.00%

36.86%

31-Mar-11

23-May-11

0.00%

0.00% 0.00%

WELDING & NDT

CONDUCTORS ERECTION PTJ9240

ERECTION OF CONDUCTOR WITH ELEVATIONS

ELEV ‐ 56200 FITUP

660

PTJ8900

FITUP OF SIZE 28"

1044

37.66%

29

100.00%

37.66%

100.00%

37.66%

31‐Mar‐11

7‐May‐11

0.00%

PTJ8910

FITUP OF SIZE 24"

684

24.68%

19

100.00%

24.68%

100.00%

24.68%

26‐Apr‐11

18‐May‐11

0.00%

0.00%

PTJ8920

FITUP OF SIZE 16"

396

14.29%

11

100.00%

14.29%

100.00%

14.29%

28‐Apr‐11

11‐May‐11

0.00%

0.00%

PTJ8930

FITUP OF SIZE 20"

396

14.29%

11

100.00%

14.29%

100.00%

14.29%

9‐May‐11

21‐May‐11

0.00%

0.00%

PTJ8940

FITUP OF SIZE 18"

252

9.09%

7

100.00%

9.09%

100.00%

9.09%

16‐May‐11

23‐May‐11

0.00%

0.00%

3072

40.85%

42

100.00%

40.85%

73.55%

30.05%

24-May-11

4-Jul-11

26.45%

10.81%

WELDING&NDT PTJ8950

WELDING OF SIZE 28"

1152

37.50%

18

100.00%

37.50%

100.00%

37.50%

24‐May‐11

13‐Jun‐11

0.00%

0.00%

PTJ8970

WELDING OF SIZE 16"

448

14.58%

7

100.00%

14.58%

100.00%

14.58%

12‐Jun‐11

19‐Jun‐11

0.00%

0.00%

PTJ8960

WELDING OF SIZE 24"

768

25.00%

12

100.00%

25.00%

78.57%

19.64%

15‐Jun‐11

28‐Jun‐11

21.43%

5.36%

PTJ8980

WELDING OF SIZE 20"

448

14.58%

7

100.00%

14.58%

12.50%

1.82%

25‐Jun‐11

2‐Jul‐11

87.50%

12.76%

PTJ8990

WELDING OF SIZE 18"

256

8.33%

4

100.00%

8.33%

0.00%

0.00%

30‐Jun‐11

4‐Jul‐11

100.00%

8.33%

1676

22.29%

54

74.58%

16.62%

1.93%

0.43%

25-Jun-11

17-Aug-11

72.65%

16.19%

504

30.07%

34

100.00%

30.07%

6.43%

1.93%

25‐Jun‐11

CONDUCTORS AT ELEV ‐ 56200 FITUP

28‐Jul‐11

93.57%

28.14%

PTJ9250

FITUP OF CONDUCTOR

324

64.29%

9

100.00%

64.29%

10.00%

6.43%

25‐Jun‐11

4‐Jul‐11

90.00%

57.86%

PTJ9260

FITUP OF CONDUCTOR SUPPORT

180

35.71%

5

100.00%

35.71%

0.00%

0.00%

24‐Jul‐11

28‐Jul‐11

100.00%

35.71%

WELDING & NDT

512

30.55%

31

81.25%

24.82%

0.00%

0.00%

5‐Jul‐11

4‐Aug‐11

81.25%

24.82%

PTJ9270

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

0.00%

0.00%

5‐Jul‐11

16‐Jul‐11

100.00%

62.50%

PTJ9280

WELDING OF CONDUCTOR SUPPORT

192

37.50%

6

50.00%

18.75%

0.00%

0.00%

30‐Jul‐11

4‐Aug‐11

50.00%

18.75%

660

39.38%

12

50.00%

19.69%

0.00%

0.00%

6‐Aug‐11

17‐Aug‐11

50.00%

19.69%

660

100.00%

11

50.00%

50.00%

0.00%

0.00%

6‐Aug‐11

17‐Aug‐11

50.00%

50.00%

5480

17.63%

82

92.29%

16.27%

0.00%

0.00%

23-Aug-11

12-Nov-11

92.29%

16.27%

CONDUCTORS ERECTION PTJ9290 ELEV ‐ 79000

ERECTION OF CONDUCTOR WITH ELEVATIONS

11/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

FITUP

Total Budgete Units (Hrs)

R.W %

2664

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

48.61%

35

100.00%

48.61%

0.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

0.00%

23-Aug-11

26-Sep-11

100.00%

48.61%

PTJ9010

FITUP OF SIZE 28"

1080

40.54%

15

100.00%

40.54%

0.00%

0.00%

23‐Aug‐11

12‐Sep‐11

100.00%

40.54%

PTJ9020

FITUP OF SIZE 16"

648

24.32%

9

100.00%

24.32%

0.00%

0.00%

7‐Sep‐11

17‐Sep‐11

100.00%

24.32%

PTJ9030

FITUP OF SIZE 24"

720

27.03%

10

100.00%

27.03%

0.00%

0.00%

13‐Sep‐11

24‐Sep‐11

100.00%

27.03%

PTJ9040

FITUP OF SIZE 20"

WELDING&NDT

216

8.11%

6

100.00%

8.11%

0.00%

0.00%

20‐Sep‐11

26‐Sep‐11

100.00%

8.11%

2816

51.39%

47

85.00%

43.68%

0.00%

0.00%

27-Sep-11

12-Nov-11

85.00%

43.68%

PTJ9050

WELDING OF SIZE 28"

1152

40.91%

18

85.00%

34.77%

0.00%

0.00%

27‐Sep‐11

18‐Oct‐11

85.00%

34.77%

PTJ9060

WELDING OF SIZE 16"

640

22.73%

10

85.00%

19.32%

0.00%

0.00%

13‐Oct‐11

24‐Oct‐11

85.00%

19.32%

PTJ9070

WELDING OF SIZE 24"

768

27.27%

12

85.00%

23.18%

0.00%

0.00%

20‐Oct‐11

2‐Nov‐11

85.00%

23.18%

PTJ9080

WELDING OF SIZE 20"

256

9.09%

4

85.00%

7.73%

0.00%

0.00%

2‐Nov‐11

12‐Nov‐11

85.00%

7.73%

12832

9.60%

87

7.29%

0.70%

0.00%

0.00%

05-Dec-11

29-Feb-12

7.29%

0.70%

3208

25.00%

64

0.22%

0.06%

0.00%

0.00%

5-Dec-11

6-Feb-12

0.22%

0.06%

5.00%

PILE SLEEVES FABRICATION AT LEG B1 PTJ9460

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

4

0.22%

0.00%

0.00%

5‐Dec‐11

8‐Dec‐11

5.00%

0.22%

PTJ9500

GIRTH WELD OF PILE SLEEVE

1152

35 91% 35.91%

24

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

14‐Dec‐11

11‐Jan‐12

0 00% 0.00%

0 00% 0.00%

PTJ9470

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

4

0.00%

0.00%

0.00%

8‐Jan‐12

11‐Jan‐12

0.00%

0.00%

PTJ9510

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

0.00%

0.00%

12‐Jan‐12

25‐Jan‐12

0.00%

0.00%

PTJ9520

ERECTION OF PILE SLEEVE WITH LEGS

520

16.21%

10

0.00%

0.00%

0.00%

26‐Jan‐12

6‐Feb‐12

0.00%

0.00% 7.24%

3208

25.00%

64

28.95%

7.24%

0.00%

0.00%

5-Dec-11

6-Feb-12

28.95%

PTJ9320

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

4

5.00%

0.22%

0.00%

0.00%

5‐Dec‐11

8‐Dec‐11

5.00%

0.22%

PTJ9360

GIRTH WELD OF PILE SLEEVE

1152

35.91%

24

80.00%

28.73%

0.00%

0.00%

14‐Dec‐11

11‐Jan‐12

80.00%

28.73%

PTJ9330

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

4

0.00%

0.00%

0.00%

8‐Jan‐12

11‐Jan‐12

0.00%

0.00%

PTJ9370

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

0.00%

0.00%

12‐Jan‐12

25‐Jan‐12

0.00%

0.00%

PTJ9380

ERECTION OF PILE SLEEVE WITH LEGS

AT LEG A1

AT LEG A2

520

16.21%

10

3208

25.00%

64

0.00%

0.00%

0.00%

0.00%

26‐Jan‐12

6‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

28-Dec-11

29-Feb-12

0.00%

0.00%

PTJ9390

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

4

0.00%

0.00%

0.00%

28‐Dec‐11

1‐Jan‐12

0.00%

0.00%

PTJ9430

GIRTH WELD OF PILE SLEEVE

1152

35.91%

24

0.00%

0.00%

0.00%

8‐Jan‐12

4‐Feb‐12

0.00%

0.00%

PTJ9400

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

4

0.00%

0.00%

0.00%

31‐Jan‐12

4‐Feb‐12

0.00%

0.00%

PTJ9440

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

0.00%

0.00%

5‐Feb‐12

18‐Feb‐12

0.00%

0.00%

PTJ9450

ERECTION OF PILE SLEEVE WITH LEGS

AT LEG B2

520

16.21%

10

3208

25.00%

64

0.00%

0.00%

0.00%

0.00%

19‐Feb‐12

29‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

28-Dec-11

29-Feb-12

0.00%

0.00%

PTJ9530

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

4

0.00%

0.00%

0.00%

28‐Dec‐11

1‐Jan‐12

0.00%

0.00%

PTJ9570

GIRTH WELD OF PILE SLEEVE

1152

35.91%

24

0.00%

0.00%

0.00%

8‐Jan‐12

4‐Feb‐12

0.00%

0.00%

PTJ9540

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

4

0.00%

0.00%

0.00%

31‐Jan‐12

4‐Feb‐12

0.00%

0.00%

12/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL % ITEM

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

5‐Feb‐12

18‐Feb‐12

0.00%

0.00%

PTJ9580

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

PTJ9590

ERECTION OF PILE SLEEVE WITH LEGS

520

16.21%

10

0.00%

0.00%

0.00%

19‐Feb‐12

29‐Feb‐12

0.00%

0.00%

11656

8.72%

257

0.00%

0.00%

3.00%

0.26%

18-Jun-11

29-Feb-12

-3.00%

-0.26%

476

4.08%

8

0.00%

0.00%

0.00%

0.00%

21-Nov-11

28-Nov-11

0.00%

0.00%

476

100.00%

8

0.00%

0.00%

0.00%

0.00%

21‐Nov‐11

28‐Nov‐11

0.00%

0.00%

476

100.00%

7

0.00%

0.00%

0.00%

21‐Nov‐11

28‐Nov‐11

0.00%

0.00%

476

4.08%

9

0.00%

0.00%

0.00%

0.00%

4-Jan-12

12-Jan-12

0.00%

0.00%

476

100.00%

9

0.00%

0.00%

0.00%

0.00%

4‐Jan‐12

12‐Jan‐12

0.00%

0.00%

476

100.00%

7

0.00%

0.00%

0.00%

4‐Jan‐12

12‐Jan‐12

0.00%

0.00%

476

4.08%

8

0.00%

0.00%

0.00%

0.00%

13-Nov-11

20-Nov-11

0.00%

0.00%

476

100.00%

8

0.00%

0.00%

0.00%

0.00%

13‐Nov‐11

20‐Nov‐11

0.00%

0.00%

476

100.00%

7

0.00%

0.00%

0.00%

13‐Nov‐11

20‐Nov‐11

0.00%

0.00%

476

4.08%

8

0.00%

0.00%

0.00%

0.00%

30-Nov-11

7-Dec-11

0.00%

0.00%

476

100 00% 100.00%

8

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

30‐Nov‐11

7‐Dec‐11

0 00% 0.00%

0 00% 0.00%

476

100.00%

7

0.00%

0.00%

0.00%

30‐Nov‐11

7‐Dec‐11

0.00%

0.00%

2040

17.50%

148

0.00%

0.00%

17.16%

3.00%

18-Jun-11

12-Nov-11

-17.16%

-3.00%

2000

98.04%

146

0.00%

0.00%

17.50%

17.16%

18‐Jun‐11

10‐Nov‐11

‐17.50%

‐17.16%

0.00%

‐13.00%

JACKET ERECTION ELEV ‐79.0 ERECTION ON ROW2 PTJ9090

ERECTION OF ELEV AT ‐79 ON ROW 2

ELEV +6.4 ERECTION ON ROW2 PTJ8690

ERECTION OF ELEV AT + 6.4 ON ROW 2

ELEV ‐56.2 ERECTION ON ROW2 PTJ9000

ERECTION OF ELEV AT ‐56.2 ON ROW 2

ELEV ‐ 33.4 ERECTION ON ROW2 PTJ8890

ERECTION OF ELEV AT ‐33.4 ON ROW 2

ROW 2 ERECTION HORIZONTAL

500

25.00%

17

0.00%

52.00%

13.00%

18‐Jun‐11

4‐Jul‐11

‐52.00%

PTJ9340

FITUP OF HORIZONTAL ON LEG

180

36.00%

5

0.00%

100.00%

36.00%

18‐Jun‐11

22‐Jun‐11

‐100.00%

‐36.00%

PTJ9350

WELDING OF HORIZONTAL ON LEG

320

64.00%

10

0.00%

25.00%

16.00%

23‐Jun‐11

4‐Jul‐11

‐25.00%

‐16.00%

DIAGONAL BRACES

1000

50.00%

36

0.00%

9.00%

4.50%

23‐Jun‐11

28‐Jul‐11

‐9.00%

‐4.50%

PTJ8070

FITUP OF DIAGONAL ON LEG

360

36.00%

10

0.00%

25.00%

9.00%

23‐Jun‐11

4‐Jul‐11

‐25.00%

‐9.00%

PTJ8080

WELDING OF DIAGONAL ON LEG

640

64.00%

20

0.00%

0.00%

0.00%

5‐Jul‐11

28‐Jul‐11

0.00%

0.00%

VERTICAL

0.00%

500

25.00%

23

0.00%

0.00%

0.00%

19‐Oct‐11

10‐Nov‐11

0.00%

0.00%

PTJ8090

FITUP OF VERTICAL BRACES WITH ROW 2 BRACES

180

36.00%

5

0.00%

0.00%

0.00%

19‐Oct‐11

24‐Oct‐11

0.00%

0.00%

PTJ8100

WELDING OF VERTICAL BRACES WITH ROW 2 BRACES

320

64.00%

10

0.00%

0.00%

0.00%

25‐Oct‐11

10‐Nov‐11

0.00%

0.00%

0.00%

0.00%

0.00%

12‐Nov‐11

12‐Nov‐11

0.00%

0.00%

0.00%

0.00%

0.00%

12‐Nov‐11

12‐Nov‐11

0.00%

0.00%

0.00%

0.00%

18‐Dec‐11

25‐Dec‐11

0.00%

0.00%

LIFTING OVER TRUSS RUNNER PTJ8110

LIFTING OVER TRUSS RUNNERS

ELEV ‐10.6 ERECTION ON ROW2

0.00%

40

1.96%

1

40

100.00%

1

476

4.08%

8

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

18‐Dec‐11

25‐Dec‐11

0.00%

0.00%

0.00%

0.00%

0.00%

18‐Dec‐11

25‐Dec‐11

0.00%

0.00%

0.00%

476

100.00%

8

476

100.00%

7

1224

10.50%

108

0.00%

0.00%

0.00%

0.00%

13‐Sep‐11

29‐Dec‐11

0.00%

0.00%

1224

100.00%

108

0.00%

0.00%

0.00%

0.00%

13‐Sep‐11

29‐Dec‐11

0.00%

0.00%

PTJ8300

ERECTION X BRACES BETWEEN ‐56.2 & ‐79.0

408

33.33%

6

0.00%

0.00%

0.00%

13‐Sep‐11

19‐Sep‐11

0.00%

0.00%

PTJ8320

ERECTION X BRACES BETWEEN ‐33.4 & ‐56.2

272

22.22%

4

0.00%

0.00%

0.00%

21‐Nov‐11

24‐Nov‐11

0.00%

0.00%

PTJ8780

ERECTION OF ELEV AT ‐10.6 ON ROW 2

ROW A ERECTION

13/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

PTJ8310

ERECTION X BRACES BETWEEN ‐10.6 & ‐33.4

PTJ8290

ERECTION X BRACES BETWEEN +6.4 & ‐10.6

ROW B ERECTION

Total Budgete Units (Hrs)

R.W %

272

22.22%

Original Duration (Days)

ACTUAL % ITEM

4

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

8‐Dec‐11

12‐Dec‐11

0.00%

0.00%

272

22.22%

4

0.00%

0.00%

0.00%

26‐Dec‐11

29‐Dec‐11

0.00%

0.00%

1224

10.50%

106

0.00%

0.00%

0.00%

0.00%

20‐Sep‐11

3‐Jan‐12

0.00%

0.00%

1224

100.00%

106

0.00%

0.00%

0.00%

0.00%

20‐Sep‐11

3‐Jan‐12

0.00%

0.00%

PTJ8420

ERECTION X BRACES BETWEEN ‐56.2 & ‐79.0

408

33.33%

6

0.00%

0.00%

0.00%

20‐Sep‐11

26‐Sep‐11

0.00%

0.00%

PTJ8440

ERECTION X BRACES BETWEEN ‐33.4 & ‐56.2

272

22.22%

4

0.00%

0.00%

0.00%

26‐Nov‐11

29‐Nov‐11

0.00%

0.00%

PTJ8430

ERECTION X BRACES BETWEEN ‐10.6 & ‐33.4

272

22.22%

4

0.00%

0.00%

0.00%

13‐Dec‐11

17‐Dec‐11

0.00%

0.00%

PTJ8410

ERECTION X BRACES BETWEEN +6.4 & ‐10.6

272

22.22%

4

0.00%

0.00%

0.00%

31‐Dec‐11

3‐Jan‐12

0.00%

0.00%

816

7.00%

22

0.00%

0.00%

0.00%

21‐Nov‐11

12‐Dec‐11

0.00%

0.00%

ROW C

0.00%

PTJ8510

ERECTION ROW C BRACES BETWEEN ‐56.2 & ‐79.0

272

33.33%

4

0.00%

0.00%

0.00%

21‐Nov‐11

24‐Nov‐11

0.00%

0.00%

PTJ8520

ERECTION ROW C BRACES BETWEEN ‐33.4 & ‐56.2

272

33.33%

4

0.00%

0.00%

0.00%

8‐Dec‐11

12‐Dec‐11

0.00%

0.00%

PTJ8530

ERECTION ROW C BRACES BETWEEN ‐ 10.6 & ‐33.4

272

33.33%

4

0.00%

0.00%

0.00%

8‐Dec‐11

12‐Dec‐11

0.00%

0.00%

408

3.50%

29

0.00%

0.00%

0.00%

29‐Nov‐11

27‐Dec‐11

0.00%

0.00%

PTJ8600

ERECTION ROW D BRACES BETWEEN ‐56.2 & ‐79.0

136

33.33%

2

0.00%

0.00%

0.00%

29‐Nov‐11

30‐Nov‐11

0.00%

0.00%

PTJ8610

ERECTION ROW D BRACES BETWEEN ‐33.4 & ‐56.2

136

33.33%

2

0.00%

0.00%

0.00%

8‐Dec‐11

10‐Dec‐11

0.00%

0.00%

PTJ8620

ERECTION ROW D BRACES BETWEEN ‐10.6 & ‐33.4

136

33.33%

2

816

7.00%

5

ROW D

ROW 3

0.00%

0.00%

0.00%

0.00%

0.00%

26‐Dec‐11

27‐Dec‐11

0.00%

0.00%

0.00%

0.00%

0.00%

2‐Feb‐12

6‐Feb‐12

0.00%

0.00%

PTJ8180

ERECTION ROW 3 BRACES BETWEEN ‐10.6 & ‐33.4

272

33.33%

4

0.00%

0.00%

0.00%

2‐Feb‐12

6‐Feb‐12

0.00%

0.00%

PTJ8190

ERECTION ROW 3 BRACES BETWEEN ‐33.4 & ‐56.2

272

33.33%

4

0.00%

0.00%

0.00%

2‐Feb‐12

6‐Feb‐12

0.00%

0.00%

PTJ8200

ERECTION ROW 3 BRACES BETWEEN ‐56.2 & ‐79.0

272

33.33%

4

0.00%

0.00%

0.00%

2‐Feb‐12

6‐Feb‐12

0.00%

0.00%

2748

23.58%

152

0.00%

0.00%

0.00%

0.00%

1‐Oct‐11

29‐Feb‐12

0.00%

0.00%

500

18.20%

18

0.00%

0.00%

0.00%

0.00%

1‐Oct‐11

18‐Oct‐11

0.00%

0.00%

180

36.00%

5

0.00%

0.00%

0.00%

1‐Oct‐11

5‐Oct‐11

0.00%

0.00%

ROW 1 HORIZONTAL PTJ9480

FITUP OF HORIZONTAL ON LEG

PTJ9490

WELDING OF HORIZONTAL ON LEG

DIAGONAL BRACES PTJ9410

FITUP OF DIAGONAL ON LEG

PTJ9420

WELDING OF DIAGONAL ON LEG

ERECTION ROW 1

320

64.00%

10

1000

36.39%

40

360

36.00%

10

0.00%

0.00%

0.00%

0.00%

8‐Oct‐11

18‐Oct‐11

0.00%

0.00%

0.00%

0.00%

0.00%

8‐Oct‐11

16‐Nov‐11

0.00%

0.00%

0.00%

0.00%

0.00%

8‐Oct‐11

18‐Oct‐11

0.00%

0.00%

0.00%

0.00%

0.00%

19‐Oct‐11

16‐Nov‐11

0.00%

0.00%

0.00%

0.00%

0.00%

7‐Feb‐12

29‐Feb‐12

0.00%

0.00%

1

0.00%

0.00%

0.00%

7‐Feb‐12

7‐Feb‐12

0.00%

0.00%

640

64.00%

20

1248

45.41%

23

128

10.26%

0.00%

PTJ8000

LIFTING OF ROW 1 OVER ELAVATIONS & ROW A,B

PTJ8010

FITUP OF ROW 1 OVER ELAVATIONS & ROW A,B

160

12.82%

4

0.00%

0.00%

0.00%

8‐Feb‐12

12‐Feb‐12

0.00%

0.00%

PTJ8020

WELDING OF ROW 1 OVER ELAVATIONS & ROW A,B

960

76.92%

15

0.00%

0.00%

0.00%

13‐Feb‐12

29‐Feb‐12

0.00%

0.00%

108888

44.20%

342

6.89%

11.04%

4.88%

31‐Mar‐11

06‐Mar‐12

4.55%

2.01%

JACKET MISCELLANEOUS FABRICATION

15.59%

PTJ9600

Jacket miscellaneous fabrication start

0

0.00%

0

0.00%

0.00%

0.00%

3‐Sep‐11

3‐Sep‐11

0.00%

0.00%

PTJ11020

Jacket miscellaneous fabrication finish

0

0.00%

0

0.00%

0.00%

0.00%

6‐Mar‐12

6‐Mar‐12

0.00%

0.00%

8804

8.09%

65

0.00%

0.00%

0.00%

02-Jan-12

06-Mar-12

0.00%

0.00%

BOAT LAND

0.00%

14/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Main Legs

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

236

2.68%

5

0.00%

0.00%

0.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

0.00%

2‐Jan‐12

6‐Jan‐12

0.00%

0.00%

BL1000

Cutting & Assembly

108

45.76%

3

0.00%

0.00%

0.00%

2‐Jan‐12

4‐Jan‐12

0.00%

0.00%

BL1010

Welding & NDT

128

54.24%

4

0.00%

0.00%

0.00%

3‐Jan‐12

6‐Jan‐12

0.00%

0.00%

880

10.00%

20

0.00%

0.00%

0.00%

7‐Jan‐12

26‐Jan‐12

0.00%

0.00%

Back Elevation

0.00%

BL1040

Cutting & Assembly

400

45.45%

10

0.00%

0.00%

0.00%

7‐Jan‐12

16‐Jan‐12

0.00%

0.00%

BL1050

Welding & NDT

480

54.55%

15

0.00%

0.00%

0.00%

12‐Jan‐12

26‐Jan‐12

0.00%

0.00%

Front Elevation

3552

40.35%

21

0.00%

0.00%

0.00%

11‐Feb‐12

2‐Mar‐12

0.00%

0.00%

BL1020

Cutting & Assembly

1632

45.95%

12

0.00%

0.00%

0.00%

11‐Feb‐12

22‐Feb‐12

0.00%

0.00%

BL1030

Welding & NDT

1920

54.05%

15

0.00%

0.00%

0.00%

17‐Feb‐12

2‐Mar‐12

0.00%

0.00%

Plan at Elev. +2.6

0.00%

336

3.82%

14

0.00%

0.00%

0.00%

28‐Jan‐12

10‐Feb‐12

0.00%

0.00%

BL1060

Cutting & Assembly

144

42.86%

4

0.00%

0.00%

0.00%

28‐Jan‐12

31‐Jan‐12

0.00%

0.00%

BL1070

Welding & NDT

192

57.14%

6

0.00%

0.00%

0.00%

5‐Feb‐12

10‐Feb‐12

0.00%

0.00%

Plan at Elev. +2.4

0.00%

404

4.59%

15

0.00%

0.00%

0.00%

27‐Jan‐12

10‐Feb‐12

0.00%

0.00%

BL1080

Cutting & Assembly

180

44.55%

5

0.00%

0.00%

0.00%

27‐Jan‐12

31‐Jan‐12

0.00%

0.00%

BL1090

Welding & NDT

224

55.45%

7

0.00%

0.00%

0.00%

4‐Feb‐12

10‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

27‐Jan‐12

10‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

27‐Jan‐12

31‐Jan‐12

0.00%

0.00%

Plan at Elev. ‐30

404

4.59%

15

BL1100

Cutting & Assembly

180

44.55%

5

BL1110

Welding & NDT

224

55.45%

7

336

3.82%

10

BL1120

Cutting & Assembly

144

42.86%

4

BL1130

Welding & NDT

192

57.14%

6

56

0.64%

18

36

64.29%

1

Boat landing Sections (a,b.c,d,e)

Grating BL1140

Trial Fit and Grating Stopper Fixation

BL1150

Final Installation

Stairs & Ladders BL1160

Fabrication

BL1170

Installation

Handrails BL1200

Fabrication

BL1210

Installation

Mooring Cleat

20

35.71%

1

268

3.04%

8

160

59.70%

5

108

40.30%

3

200

2.27%

16

128

64.00%

4

72

36.00%

2

68

0.77%

2

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4‐Feb‐12

10‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

1‐Feb‐12

10‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

1‐Feb‐12

4‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

5‐Feb‐12

10‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

18‐Feb‐12

6‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

18‐Feb‐12

18‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

6‐Mar‐12

6‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

24‐Feb‐12

2‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

24‐Feb‐12

28‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

29‐Feb‐12

2‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

20‐Feb‐12

6‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

20‐Feb‐12

23‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

5‐Mar‐12

6‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

1‐Mar‐12

2‐Mar‐12

0.00%

0.00%

BL1220

Fabrication

32

47.06%

1

0.00%

0.00%

0.00%

1‐Mar‐12

1‐Mar‐12

0.00%

0.00%

BL1230

Installation

36

52.94%

1

0.00%

0.00%

0.00%

2‐Mar‐12

2‐Mar‐12

0.00%

0.00%

72

0.82%

1

0.00%

0.00%

0.00%

6‐Mar‐12

6‐Mar‐12

0.00%

0.00%

72

100.00%

1

0.00%

0.00%

0.00%

6‐Mar‐12

6‐Mar‐12

0.00%

0.00%

Rubber BL1240

Installation of Rubber & Tightening

0.00%

15/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Lower Support Fabrication

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

716

8.13%

27

0.00%

0.00%

0.00%

0.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

0.00%

5‐Feb‐12

2‐Mar‐12

0.00%

0.00%

540

75.42%

16

0.00%

0.00%

0.00%

5‐Feb‐12

20‐Feb‐12

0.00%

0.00%

BL1250

Cutting & Assembly

252

46.67%

7

0.00%

0.00%

0.00%

5‐Feb‐12

11‐Feb‐12

0.00%

0.00%

BL1260

Welding & NDT

288

53.33%

9

0.00%

0.00%

0.00%

12‐Feb‐12

20‐Feb‐12

0.00%

0.00%

176

24.58%

4

0.00%

0.00%

0.00%

28‐Feb‐12

2‐Mar‐12

0.00%

0.00%

80

45.45%

2

0.00%

0.00%

0.00%

28‐Feb‐12

29‐Feb‐12

0.00%

0.00%

Installation with Jacket legs BL1270

Profiling Template & Assembly with Legs

BL1280

Welding & NDT

Upper Support Fabrication

0.00%

96

54.55%

3

0.00%

0.00%

0.00%

29‐Feb‐12

2‐Mar‐12

0.00%

0.00%

972

11.04%

23

0.00%

0.00%

0.00%

0.00%

9‐Feb‐12

2‐Mar‐12

0.00%

0.00%

636

65.43%

19

0.00%

0.00%

0.00%

0.00%

9‐Feb‐12

27‐Feb‐12

0.00%

0.00%

BL1290

Cutting & Assembly

252

39.62%

7

0.00%

0.00%

0.00%

9‐Feb‐12

15‐Feb‐12

0.00%

0.00%

BL1300

Welding & NDT

384

60.38%

12

0.00%

0.00%

0.00%

16‐Feb‐12

27‐Feb‐12

0.00%

0.00%

336

34.57%

4

0.00%

0.00%

0.00%

28‐Feb‐12

2‐Mar‐12

0.00%

0.00%

Installation with Jacket legs

0.00%

BL1310

Profiling Template & Assembly with Legs

144

42.86%

2

0.00%

0.00%

0.00%

28‐Feb‐12

29‐Feb‐12

0.00%

0.00%

BL1320

Welding & NDT

192

57.14%

3

0.00%

0.00%

0.00%

29‐Feb‐12

2‐Mar‐12

0.00%

0.00%

304

3.45%

2

0.00%

0.00%

0.00%

3‐Mar‐12

4‐Mar‐12

0.00%

0.00%

304

100.00%

2

0.00%

0.00%

0.00%

3‐Mar‐12

4‐Mar‐12

0.00%

0.00%

2952

2.71%

30

0.00%

0.00%

0.00%

0.00%

06-Feb-12

06-Mar-12

0.00%

0.00%

0.00%

Boat landing trial fit BL1330

Boat Landing Trial Fit

BARGE BUMPER Main Pipe

0.00%

504

17.07%

15

0.00%

0.00%

0.00%

6‐Feb‐12

20‐Feb‐12

0.00%

0.00%

BB1000

Cutting & Assembly

216

42.86%

6

0.00%

0.00%

0.00%

6‐Feb‐12

11‐Feb‐12

0.00%

0.00%

BB1010

Welding & NDT

288

57.14%

9

0.00%

0.00%

0.00%

12‐Feb‐12

20‐Feb‐12

0.00%

0.00%

Upper Support

1312

44.44%

28

0.00%

0.00%

0.00%

0.00%

6‐Feb‐12

4‐Mar‐12

0.00%

0.00%

976

74.39%

23

0.00%

0.00%

0.00%

0.00%

6‐Feb‐12

28‐Feb‐12

0.00%

0.00%

BB1060

Cutting & Assembly

432

44.26%

12

0.00%

0.00%

0.00%

6‐Feb‐12

17‐Feb‐12

0.00%

0.00%

BB1070

Welding & NDT

544

55.74%

17

336

25.61%

5

42.86%

2

Fabrication

Installation with Jacket legs

0.00%

0.00%

0.00%

0.00%

12‐Feb‐12

28‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

29‐Feb‐12

4‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

29‐Feb‐12

1‐Mar‐12

0.00%

0.00%

BB1080

Profiling Template & Assembly with Legs

144

BB1090

Welding & NDT

192

57.14%

3

0.00%

0.00%

0.00%

2‐Mar‐12

4‐Mar‐12

0.00%

0.00%

976

33.06%

24

0.00%

0.00%

0.00%

0.00%

10‐Feb‐12

4‐Mar‐12

0.00%

0.00%

336

34.43%

5

0.00%

0.00%

0.00%

0.00%

29‐Feb‐12

4‐Mar‐12

0.00%

0.00%

Lower Support Installation with Jacket legs BB1040

Profiling Template & Assembly with Legs

144

42.86%

2

0.00%

0.00%

0.00%

29‐Feb‐12

1‐Mar‐12

0.00%

0.00%

BB1050

Welding & NDT

192

57.14%

3

0.00%

0.00%

0.00%

2‐Mar‐12

4‐Mar‐12

0.00%

0.00%

Fabrication

640

65.57%

19

0.00%

0.00%

0.00%

10‐Feb‐12

28‐Feb‐12

0.00%

0.00%

BB1020

Cutting & Assembly

288

45.00%

8

0.00%

0.00%

0.00%

10‐Feb‐12

17‐Feb‐12

0.00%

0.00%

BB1030

Welding & NDT

352

55.00%

11

0.00%

0.00%

0.00%

18‐Feb‐12

28‐Feb‐12

0.00%

0.00%

160

5.42%

2

0.00%

0.00%

0.00%

5‐Mar‐12

6‐Mar‐12

0.00%

0.00%

Barge Bumper Trial Fit

0.00%

0.00%

16/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

BB1100

Activity Name Barge Bumper Trial Fit

RISER 16" & CLAMPS

Total Budgete Units (Hrs)

R.W %

160

100.00%

2

2472

2.27%

62

Original Duration (Days)

ACTUAL % ITEM

0.00%

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

5‐Mar‐12

6‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

03-Sep-11

03-Nov-11

0.00%

0.00%

PTJ10590

RISER 16 " FABRICATION

792

32.04%

22

0.00%

0.00%

0.00%

3‐Sep‐11

27‐Sep‐11

0.00%

0.00%

PTJ10620

CLAMPS FOR RISER 16 " FABRICATION

648

26.21%

18

0.00%

0.00%

0.00%

3‐Sep‐11

22‐Sep‐11

0.00%

0.00%

PTJ10600

RISER COATING

168

6.80%

7

0.00%

0.00%

0.00%

28‐Sep‐11

5‐Oct‐11

0.00%

0.00%

PTJ10630

CLAMPS FOR RISER 16 " INSTALLATION

504

20.39%

14

0.00%

0.00%

0.00%

8‐Oct‐11

23‐Oct‐11

0.00%

0.00%

PTJ10610

RISER 16 " INSTALLATION

360

14.56%

10

0.00%

0.00%

0.00%

24‐Oct‐11

3‐Nov‐11

0.00%

0.00%

1440

1.32%

51

0.00%

0.00%

0.00%

03-Sep-11

23-Oct-11

0.00%

0.00%

504

35.00%

14

0.00%

0.00%

0.00%

3‐Sep‐11

18‐Sep‐11

0.00%

0.00%

J‐TUBE 16 " & CLAMPS

0.00%

PTJ10640

J‐TUBE16 " FABRICATION

PTJ10650

CLAMPS FOR J‐TUBE16 " FABRICATION

432

30.00%

12

0.00%

0.00%

0.00%

3‐Sep‐11

15‐Sep‐11

0.00%

0.00%

PTJ10660

CLAMPS FOR J‐TUBE16 " INSTALLATION

360

25.00%

10

0.00%

0.00%

0.00%

8‐Oct‐11

18‐Oct‐11

0.00%

0.00%

PTJ10680

J‐TUBE16 " INSTALLATION

144

10.00%

4

0.00%

0.00%

0.00%

19‐Oct‐11

23‐Oct‐11

0.00%

0.00%

504

0.46%

41

0.00%

0.00%

0.00%

03-Sep-11

13-Oct-11

0.00%

0.00%

FUTURE J‐TUBE CLAMPS

0.00%

PTJ10690

CLAMPS FOR FUTURE J‐TUBE FABRICATION

288

57.14%

8

0.00%

0.00%

0.00%

3‐Sep‐11

11‐Sep‐11

0.00%

0.00%

PTJ10700

CLAMPS FOR FUTURE J‐TUBE INSTALLATION

216

42.86%

6

0.00%

0.00%

0.00%

8‐Oct‐11

13‐Oct‐11

0.00%

0.00%

1384

1.27%

21

0.00%

0.00%

0.00%

14-Feb-12

05-Mar-12

0.00%

0.00%

SUMP CAISSON 30"

0.00%

PTJ10710

SUMP CAISSON 30 " FABRICATION

952

68.79%

14

0.00%

0.00%

0.00%

14‐Feb‐12

29‐Feb‐12

0.00%

0.00%

PTJ10720

SUPPORTS SUMP CAISSON 30 " FABRICATION

72

5.20%

2

0.00%

0.00%

0.00%

21‐Feb‐12

22‐Feb‐12

0.00%

0.00%

PTJ10730

SUPPORTS SUMP CAISSON 30 " INSTALLATION

216

15.61%

6

0.00%

0.00%

0.00%

23‐Feb‐12

29‐Feb‐12

0.00%

0.00%

PTJ10740

SUPPORTS SUMP CAISSON 30 " INSTALLATION

144

10.40%

4

0.00%

0.00%

0.00%

1‐Mar‐12

5‐Mar‐12

0.00%

0.00%

2880

2.64%

100

0.00%

0.00%

0.00%

03-Sep-11

11-Dec-11

0.00%

0.00%

MUD MAT

0.00%

PTJ10750

MUD MAT FABRICATION

2160

75.00%

60

0.00%

0.00%

0.00%

3‐Sep‐11

17‐Nov‐11

0.00%

0.00%

PTJ10760

MUD MAT INSTALLATION

720

25.00%

20

0.00%

0.00%

0.00%

19‐Nov‐11

11‐Dec‐11

0.00%

0.00%

1712

1.57%

55

0.00%

0.00%

0.00%

03-Sep-11

27-Oct-11

0.00%

0.00%

WALK WAY & STAIRS

0.00%

PTJ10350

FITUP OF WALK WAY & STARIR

384

22.43%

12

0.00%

0.00%

0.00%

3‐Sep‐11

15‐Sep‐11

0.00%

0.00%

PTJ10360

WELDING & NDT OF WALK WAY & STARIRS

512

29.91%

16

0.00%

0.00%

0.00%

17‐Sep‐11

4‐Oct‐11

0.00%

0.00%

PTJ10370

ERECTION WALK WAY ON TOP ELEVATION

816

47.66%

12

0.00%

0.00%

0.00%

15‐Oct‐11

27‐Oct‐11

0.00%

0.00%

19224

17.65%

141

85.67%

15.13%

62.53%

11.04%

31-Mar-11

18-Aug-11

23.14%

4.09%

9612

50.00%

141

85.67%

42.84%

62.53%

31.27%

31-Mar-11

18-Aug-11

23.14%

11.57%

3204

33.33%

59

85.67%

28.56%

100.00%

33.33%

31-Mar-11

28-May-11

LAUNCH RUNNERS AT ROW D FROM EL. ‐33400 TO ‐10600

-14.33%

-4.78%

PTJ9820

FITUP OF LUNCH TRUSS FROM EL ‐33.4 UP TO ‐10.6

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

31‐Mar‐11

14‐May‐11

‐5.00%

‐3.28%

PTJ9830

WELDING & NDT LUNCH TRUSS FROM EL ‐33.4 UP TO ‐10.6

1000

31.21%

25

75.00%

23.41%

100.00%

31.21%

26‐Apr‐11

25‐May‐11

‐25.00%

‐7.80%

PTJ9840

LIFTING OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56 ON SKID WAY

104

3.25%

2

0.00%

100.00%

3.25%

26‐May‐11

28‐May‐11

‐100.00%

‐3.25%

17/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

FROM EL. ‐56200 TO ‐33400

Total Budgete Units (Hrs)

R.W %

3204

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

33.33%

54

85.67%

28.56%

85.99%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

28.66%

15-May-11

7-Jul-11

-0.32%

-0.11%

PTJ9790

FITUP OF LUNCH TRUSS FROM EL ‐56 UP TO ‐33.4

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

15‐May‐11

23‐Jun‐11

‐5.00%

‐3.28%

PTJ9800

WELDING & NDT OF LUNCH TRUSS FROM EL ‐56 UP TO ‐33.4

1000

31.21%

25

75.00%

23.41%

65.52%

20.45%

7‐Jun‐11

5‐Jul‐11

9.48%

2.96%

PTJ9810

LIFTING OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56 ON SKID WAY

104

3.25%

2

0.00%

0.00%

0.00%

6‐Jul‐11

7‐Jul‐11

0.00%

0.00%

3204

33.33%

55

85.67%

28.56%

1.60%

0.53%

25-Jun-11

18-Aug-11

84.08%

28.03%

PTJ9760

FITUP OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56

2100

65.54%

35

95.00%

62.27%

2.44%

1.60%

25‐Jun‐11

4‐Aug‐11

92.56%

60.67%

PTJ9770

WELDING & NDT OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56

1000

31.21%

25

75.00%

23.41%

0.00%

0.00%

18‐Jul‐11

16‐Aug‐11

75.00%

23.41%

PTJ9780

LIFTING OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56 ON SKID WAY

104

3.25%

2

0.00%

0.00%

0.00%

17‐Aug‐11

18‐Aug‐11

0.00%

0.00%

9612

50.00%

141

85.67%

42.84%

62.53%

31.27%

31-Mar-11

18-Aug-11

23.14%

11.57%

3204

33.33%

59

85.67%

28.56%

100.00%

33.33%

31-Mar-11

28-May-11

-14.33%

-4.78%

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

31‐Mar‐11

14‐May‐11

‐5.00%

‐3.28%

25

75.00%

23.41%

100.00%

31.21%

26‐Apr‐11

25‐May‐11

‐25.00%

‐7.80%

FROM EL. ‐79000 TO ‐56200

AT ROW C FROM EL. ‐33400 TO ‐10600 PTJ9730

FITUP OF LUNCH TRUSS FROM EL ‐33.4 UP TO ‐10.6

PTJ9740

WELDING & NDT LUNCH TRUSS FROM EL ‐33.4 UP TO ‐10.6

PTJ9750

LIFTING OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56 ON SKID WAY

FROM EL. ‐79000 TO ‐56200

1000

31.21%

104

3.25%

2

0.00%

100.00%

3.25%

26‐May‐11

28‐May‐11

‐100.00%

‐3.25%

3204

33.33%

55

85.67%

28.56%

1.60%

0.53%

25-Jun-11

18-Aug-11

84.08%

28.03%

2.44%

1.60%

25‐Jun‐11

4‐Aug‐11

92.56%

60.67%

PTJ9670

FITUP OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56

2100

65.54%

35

95.00%

62.27%

PTJ9680

WELDING & NDT OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56

1000

31.21%

25

75.00%

23.41%

0.00%

0.00%

18‐Jul‐11

16‐Aug‐11

75.00%

23.41%

PTJ9690

LIFTING OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56 ON SKID WAY

104

3.25%

2

0.00%

0.00%

0.00%

17‐Aug‐11

18‐Aug‐11

0.00%

0.00%

3204

33.33%

54

85.67%

28.56%

85.99%

28.66%

15-May-11

7-Jul-11

-0.32%

-0.11%

PTJ9700

FITUP OF LUNCH TRUSS FROM EL ‐56 UP TO ‐33.4

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

15‐May‐11

23‐Jun‐11

‐5.00%

‐3.28%

PTJ9710

WELDING & NDT OF LUNCH TRUSS FROM EL ‐56 UP TO ‐33.4

1000

31.21%

25

75.00%

23.41%

65.52%

20.45%

7‐Jun‐11

5‐Jul‐11

9.48%

2.96%

PTJ9720

LIFTING OF LUNCH TRUSS FROM EL ‐79 UP TO ‐56 ON SKID WAY

104

3.25%

2

0.00%

0.00%

0.00%

6‐Jul‐11

7‐Jul‐11

0.00%

0.00%

0.46%

0.00%

0.00%

25-Aug-11

06-Mar-12

14.04%

0.46%

0.00%

0.00%

0.00%

25‐Aug‐11

12‐Sep‐11

0.00%

0.00%

FROM EL. ‐56200 TO ‐33400

3564

3.27%

195

PTJ10000

INSTALL ANODES FOR ROW A

468

13.13%

13

PTJ10140

INSTALL ANODES FOR ROW B

576

16.16%

8

10.51%

0.00%

0.00%

11‐Sep‐11

19‐Sep‐11

65.00%

10.51%

PTJ10220

INSTALL ANODES FOR ELEV ‐56.2

252

7.07%

7

0.00%

0.00%

0.00%

30‐Oct‐11

12‐Nov‐11

0.00%

0.00%

PTJ10230

INSTALL ANODES FOR ELEV ‐79.0

252

7.07%

7

0.00%

0.00%

0.00%

13‐Nov‐11

20‐Nov‐11

0.00%

0.00%

PTJ10180

INSTALL ANODES FOR ROW C

216

6.06%

6

0.00%

0.00%

0.00%

14‐Nov‐11

20‐Nov‐11

0.00%

0.00%

PTJ10190

INSTALL ANODES FOR ROW D

216

6.06%

6

0.00%

0.00%

0.00%

22‐Nov‐11

28‐Nov‐11

0.00%

0.00%

PTJ10210

INSTALL ANODES FOR ELEV ‐33.4

180

5.05%

5

0.00%

0.00%

0.00%

24‐Nov‐11

29‐Nov‐11

0.00%

0.00%

PTJ10200

INSTALL ANODES FOR ELEV ‐10.6

180

5.05%

5

0.00%

0.00%

0.00%

12‐Dec‐11

17‐Dec‐11

0.00%

0.00%

PTJ10150

INSTALL ANODES FOR ROW 1

360

10.10%

10

0.00%

0.00%

0.00%

18‐Jan‐12

29‐Jan‐12

0.00%

0.00%

PTJ10170

INSTALL ANODES FOR ROW 3

216

6.06%

6

0.00%

0.00%

0.00%

26‐Jan‐12

1‐Feb‐12

0.00%

0.00%

PTJ10160

INSTALL ANODES FOR ROW 2

360

10.10%

10

3.54%

0.00%

0.00%

11‐Feb‐12

21‐Feb‐12

35.00%

3.54%

PTJ10240

INSTALL ANODES FOR MUD MAT

252

7.07%

7

0.00%

0.00%

0.00%

28‐Feb‐12

6‐Mar‐12

0.00%

0.00%

PTJ10250

INSTALL ANODES FOR SUMP CASSOIN

36

1.01%

1

0.00%

0.00%

0.00%

6‐Mar‐12

6‐Mar‐12

0.00%

0.00%

ANODES

14.04%

65.00%

35.00%

18/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

BOUNCY TANKS

Total Budgete Units (Hrs)

R.W %

47488

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

43.61%

102

0.00%

0.00%

0.00%

0.00%

ACTUAL %

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

0.00%

03-Sep-11

13-Dec-11

0.00%

0.00%

11872

25.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

PTJ9850

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

6

0.00%

0.00%

0.00%

3‐Sep‐11

8‐Sep‐11

0.00%

0.00%

PTJ9860

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPORTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3‐Sep‐11

15‐Sep‐11

0.00%

0.00%

PTJ9870

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10‐Sep‐11

2‐Oct‐11

0.00%

0.00%

PTJ9880

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14‐Sep‐11

12‐Oct‐11

0.00%

0.00%

PTJ9890

ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13‐Oct‐11

15‐Nov‐11

0.00%

0.00%

PTJ9900

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16‐Nov‐11

13‐Dec‐11

0.00%

0.00%

PTJ9910

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16‐Nov‐11

27‐Nov‐11

0.00%

0.00%

AT LEG A1

11872

25.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

PTJ9920

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

6

0.00%

0.00%

0.00%

3‐Sep‐11

8‐Sep‐11

0.00%

0.00%

PTJ9930

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPORTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3‐Sep‐11

15‐Sep‐11

0.00%

0.00%

PTJ9940

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10‐Sep‐11

2‐Oct‐11

0.00%

0.00%

PTJ9950

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14‐Sep‐11

12‐Oct‐11

0.00%

0.00%

PTJ9960

ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13‐Oct‐11

15‐Nov‐11

0.00%

0.00%

PTJ9970

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16‐Nov‐11

13‐Dec‐11

0.00%

0.00%

PTJ9980

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16‐Nov‐11

27‐Nov‐11

0.00%

0.00%

AT LEG A2

0.00%

11872

25.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

PTJ10010

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPRTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3‐Sep‐11

15‐Sep‐11

0.00%

0.00%

PTJ9990

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

6

0.00%

0.00%

0.00%

3‐Sep‐11

8‐Sep‐11

0.00%

0.00%

PTJ10020

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10‐Sep‐11

2‐Oct‐11

0.00%

0.00%

PTJ10030

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14‐Sep‐11

12‐Oct‐11

0.00%

0.00%

PTJ10040

ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13‐Oct‐11

15‐Nov‐11

0.00%

0.00%

PTJ10050

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16‐Nov‐11

13‐Dec‐11

0.00%

0.00%

PTJ10060

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16‐Nov‐11

27‐Nov‐11

0.00%

0.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

AT LEG B1

0.00%

11872

25.00%

PTJ10070

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

6

0.00%

0.00%

0.00%

3‐Sep‐11

8‐Sep‐11

0.00%

0.00%

PTJ10080

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPORTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3‐Sep‐11

15‐Sep‐11

0.00%

0.00%

PTJ10090

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10‐Sep‐11

2‐Oct‐11

0.00%

0.00%

PTJ10100

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14‐Sep‐11

12‐Oct‐11

0.00%

0.00%

PTJ10110

ERECTION OF SUPPORTS& STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13‐Oct‐11

15‐Nov‐11

0.00%

0.00%

PTJ10120

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16‐Nov‐11

13‐Dec‐11

0.00%

0.00%

PTJ10130

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16‐Nov‐11

27‐Nov‐11

0.00%

0.00%

2160

1.98%

40

0.00%

0.00%

0.00%

15-Jan-12

23-Feb-12

0.00%

0.00%

AT LEG B2

BALLASTING & GROUTING SYSTEM

0.00%

0.00%

19/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL % ITEM

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

6‐Feb‐12

0.00%

0.00%

OVERALL

ITEM

OVERALL

0.00%

0.00%

15‐Jan‐12

PTJ10790

BALASTING INSTALLATION

720

33.33%

20

0.00%

PTJ10970

GROUTING INSTALLATION ON ROW 1

720

33.33%

20

0.00%

0.00%

0.00%

15‐Jan‐12

6‐Feb‐12

0.00%

0.00%

PTJ10980

GROUTING INSTALLATION ON ROW 2

720

33.33%

20

0.00%

0.00%

0.00%

1‐Feb‐12

23‐Feb‐12

0.00%

0.00%

12000

11.02%

148

0.00%

0.00%

0.00%

0.00%

15-Sep-11

09-Feb-12

0.00%

0.00%

12000

100.00%

120

0.00%

0.00%

0.00%

0.00%

15‐Sep‐11

9‐Feb‐12

0.00%

0.00%

1152

1.06%

38

0.00%

0.00%

0.00%

0.00%

03-Sep-11

10-Oct-11

0.00%

0.00%

GRILLAGE & SEA FASTENING PTJ10800

GRILLAGE & SEA FASTENING FABRICATION

INSTALLATION AIDS PTJ10770

INSTALLATION AIDS FABRICATION

792

68.75%

22

0.00%

0.00%

0.00%

3‐Sep‐11

27‐Sep‐11

0.00%

0.00%

PTJ10780

INSTALLATION AIDS INSTALLATION

360

31.25%

10

0.00%

0.00%

0.00%

28‐Sep‐11

10‐Oct‐11

0.00%

0.00%

1152

1.06%

19

0.00%

0.00%

0.00%

14-Jan-12

01-Feb-12

0.00%

0.00%

PTJ9300

FITUP OF PREBENT CONDUCTOR

576

50.00%

8

0.00%

0.00%

0.00%

14‐Jan‐12

22‐Jan‐12

0.00%

0.00%

PTJ9310

WELDING OF PREBENT CONDUCTOR

576

50.00%

9

0.00%

0.00%

0.00%

23‐Jan‐12

1‐Feb‐12

0.00%

0.00%

3312

1.34%

163

0.00%

0.00%

0.00%

05‐Oct‐11

15‐Mar‐12

0.00%

0.00%

0 00% 0.00%

0 00% 0.00%

5 Oct 11 5‐Oct‐11

13 Oct 11 13‐Oct‐11

0 00% 0.00%

0 00% 0.00%

PREBENT CONDUCTOR

PAINTING

0.00%

0.00%

PTJ10320

SPLASH PAINTING FOR MISC MISC. (H.R, (H R STAIRS, STAIRS ...ETC) ETC)

168

5 07% 5.07%

7

0 00% 0.00%

PTJ10300

SPLASH PAINTING FOR ROW A

168

5.07%

7

0.00%

0.00%

0.00%

18‐Dec‐11

25‐Dec‐11

0.00%

0.00%

PTJ10310

SPLASH PAINTING FOR ROW B

168

5.07%

7

0.00%

0.00%

0.00%

22‐Dec‐11

29‐Dec‐11

0.00%

0.00%

PTJ10340

ATMOSPHERIC PAINTING FOR TOP ELEV

336

10.14%

7

0.00%

0.00%

0.00%

27‐Dec‐11

3‐Jan‐12

0.00%

0.00%

PTJ10280

SPLASH PAINTING FOR ROW 1

168

5.07%

7

0.00%

0.00%

0.00%

30‐Jan‐12

6‐Feb‐12

0.00%

0.00%

PTJ10330

PILE MARKING

1344

40.58%

28

0.00%

0.00%

0.00%

13‐Feb‐12

15‐Mar‐12

0.00%

0.00%

PTJ10260

SPLASH PAINTING FOR BOAT LAND

672

20.29%

14

0.00%

0.00%

0.00%

19‐Feb‐12

5‐Mar‐12

0.00%

0.00%

PTJ10290

SPLASH PAINTING FOR ROW 2

168

5.07%

7

0.00%

0.00%

0.00%

22‐Feb‐12

29‐Feb‐12

0.00%

0.00%

PTJ10270

SPLASH PAINTING FOR BARGE BUMPER

120

3.62%

5

0.00%

0.00%

0.00%

11‐Mar‐12

15‐Mar‐12

0.00%

0.00%

480

0.19%

11

0.00%

0.00%

0.00%

25‐Feb‐12

06‐Mar‐12

0.00%

0.00%

INSPECTION, TESTING & PRE‐COMMISIONING

0.00%

PTJ10990

RISER HYDRO TEST

160

33.33%

10

0.00%

0.00%

0.00%

25‐Feb‐12

6‐Mar‐12

0.00%

0.00%

PTJ11000

BALLASTING SYSTEM TEST

160

33.33%

10

0.00%

0.00%

0.00%

25‐Feb‐12

6‐Mar‐12

0.00%

0.00%

PTJ11010

GROUTING SYSTEM TEST

PILES FABRICATION

160

33.33%

10

0.00%

0.00%

0.00%

25‐Feb‐12

6‐Mar‐12

0.00%

0.00%

11872

4.52%

178

15.95%

0.72%

0.00%

0.00%

02‐Jul‐11

26‐Dec‐11

15.95%

0.72%

100.00%

0.00%

0.00%

0.00%

2‐Jul‐11

2‐Jul‐11

100.00%

0.00%

0.00%

0.00%

0.00%

26‐Dec‐11

26‐Dec‐11

0.00%

0.00%

51.48%

12.87%

0.00%

0.00%

02‐Jul‐11

05‐Sep‐11

51.48%

12.87%

PTJ2030

Piiles fabrication start

0

0.00%

0

PTJ10380

Piiles fabrication finish

0

0.00%

0

2968

25.00%

66

AT LEG A1 PTJ10390

Manual fitup & welding 8 joints

1440

48.52%

24

50.00%

24.26%

0.00%

0.00%

2‐Jul‐11

30‐Jul‐11

50.00%

24.26%

PTJ10420

Automatic welding 4 joints

576

19.41%

24

100.00%

19.41%

0.00%

0.00%

6‐Jul‐11

3‐Aug‐11

100.00%

19.41%

PTJ10430

back weld manual 4 joints

192

6.47%

16

100.00%

6.47%

0.00%

0.00%

17‐Jul‐11

4‐Aug‐11

100.00%

6.47%

PTJ10410

Welding beads (41 joints)

160

5.39%

10

25.00%

1.35%

0.00%

0.00%

4‐Aug‐11

15‐Aug‐11

25.00%

1.35%

20/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

PTJ10400

Activity Name Welding for manual joint (4 joints)

AT LEG A2

Total Budgete Units (Hrs)

R.W %

600

20.22%

10

2968

25.00%

102

Original Duration (Days)

ACTUAL % ITEM

0.00%

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

22‐Aug‐11

5‐Sep‐11

0.00%

0.00%

0.00%

0.00%

0.00%

02‐Jul‐11

11‐Oct‐11

0.00%

0.00%

PTJ10440

Manual fitup & welding 8 joints

1440

48.52%

24

0.00%

0.00%

0.00%

2‐Jul‐11

30‐Jul‐11

0.00%

0.00%

PTJ10450

Automatic welding 4 joints

576

19.41%

24

0.00%

0.00%

0.00%

11‐Aug‐11

11‐Sep‐11

0.00%

0.00%

PTJ10460

back weld manual 4 joints

192

6.47%

16

0.00%

0.00%

0.00%

22‐Aug‐11

12‐Sep‐11

0.00%

0.00%

PTJ10480

Welding beads (41 joints)

160

5.39%

10

0.00%

0.00%

0.00%

12‐Sep‐11

22‐Sep‐11

0.00%

0.00%

PTJ10470

Welding for manual joint (4 joints)

AT LEG B1

600

20.22%

10

0.00%

0.00%

0.00%

29‐Sep‐11

11‐Oct‐11

0.00%

0.00%

2968

25.00%

143

12.33%

3.08%

0.00%

0.00%

02‐Jul‐11

21‐Nov‐11

12.33%

3.08%

PTJ10490

Manual fitup & welding 8 joints

1440

48.52%

24

23.75%

11.52%

0.00%

0.00%

2‐Jul‐11

30‐Jul‐11

23.75%

11.52%

PTJ10500

Automatic welding 4 joints

576

19.41%

24

0.00%

0.00%

0.00%

0.00%

19‐Sep‐11

17‐Oct‐11

0.00%

0.00%

PTJ10510

back weld manual 4 joints

192

6.47%

16

0.00%

0.00%

0.00%

0.00%

29‐Sep‐11

18‐Oct‐11

0.00%

0.00%

PTJ10530

Welding beads (41 joints)

160

5.39%

10

15.00%

0.81%

0.00%

0.00%

18‐Oct‐11

29‐Oct‐11

15.00%

0.81%

PTJ10520

Welding for manual joint (4 joints)

0.00%

0.00%

0.00%

10‐Nov‐11 10 Nov 11

21‐Nov‐11 21 Nov 11

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

02‐Jul‐11

26‐Dec‐11

0.00%

0.00%

AT LEG B2

600

20.22%

10

2968

25.00%

178

PTJ10540

Manual fitup & welding 8 joints

1440

48.52%

24

0.00%

0.00%

0.00%

2‐Jul‐11

30‐Jul‐11

0.00%

0.00%

PTJ10550

Automatic welding 4 joints

576

19.41%

24

0.00%

0.00%

0.00%

25‐Oct‐11

27‐Nov‐11

0.00%

0.00%

PTJ10560

back weld manual 4 joints

192

6.47%

16

0.00%

0.00%

0.00%

10‐Nov‐11

28‐Nov‐11

0.00%

0.00%

PTJ10580

Welding beads (41 joints)

160

5.39%

10

0.00%

0.00%

0.00%

28‐Nov‐11

8‐Dec‐11

0.00%

0.00%

PTJ10570

Welding for manual joint (4 joints)

600

20.22%

10

0.00%

0.00%

0.00%

15‐Dec‐11

26‐Dec‐11

0.00%

0.00%

4484

1.71%

85

66.77%

1.14%

0.00%

0.00%

16‐Jul‐11

08‐Oct‐11

66.77%

1.14%

0

0.00%

0

100.00%

0.00%

0.00%

0.00%

16‐Jul‐11

16‐Jul‐11

100.00%

0.00%

6.69%

0.00%

0.00%

16‐Jul‐11

20‐Jul‐11

100.00%

6.69%

PRE‐DRILLING TEMPLATE PTD000

Pre‐drilling template fabrication start

PTJ10810

cutting & assembly of bottom plate

300

6.69%

5

100.00%

PTJ10900

fabrication of cones

1020

22.75%

15

100.00%

22.75%

0.00%

0.00%

16‐Jul‐11

2‐Aug‐11

100.00%

22.75%

PTJ10820

welding & NDT of bottom plate

240

5.35%

6

100.00%

5.35%

0.00%

0.00%

3‐Aug‐11

9‐Aug‐11

100.00%

5.35%

PTJ10830

cutting, rolling and assembly of outer frame

360

8.03%

6

100.00%

8.03%

0.00%

0.00%

3‐Aug‐11

9‐Aug‐11

100.00%

8.03%

PTJ10840

welding & NDT of outer frame

200

4.46%

5

95.00%

4.24%

0.00%

0.00%

10‐Aug‐11

15‐Aug‐11

95.00%

4.24%

PTJ10850

fabrication of beams ( built up section )

360

8.03%

10

95.00%

7.63%

0.00%

0.00%

16‐Aug‐11

27‐Aug‐11

95.00%

7.63%

PTJ10860

installation of beams with bottom frame

252

5.62%

7

55.00%

3.09%

0.00%

0.00%

28‐Aug‐11

7‐Sep‐11

55.00%

3.09%

PTJ10870

cutting of conductor pipe

120

2.68%

2

75.00%

2.01%

0.00%

0.00%

8‐Sep‐11

10‐Sep‐11

75.00%

2.01%

PTJ10920

fabrication of pad eyes

180

4.01%

5

35.00%

1.40%

0.00%

0.00%

8‐Sep‐11

13‐Sep‐11

35.00%

1.40%

PTJ10880

fabrication & installation of shims plates

144

3.21%

4

25.00%

PTJ10930

installation of pad eyes

180

4.01%

5

PTJ10890

installation of conductor pipe

180

4.01%

5

35.00%

0.80%

0.00%

0.00%

11‐Sep‐11

14‐Sep‐11

25.00%

0.80%

0.00%

0.00%

0.00%

14‐Sep‐11

19‐Sep‐11

0.00%

0.00%

1.40%

0.00%

0.00%

15‐Sep‐11

20‐Sep‐11

35.00%

1.40%

21/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total Budgete Units (Hrs)

R.W %

360

8.03%

Original Duration (Days)

ACTUAL % ITEM

PLANNED %

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

18‐Sep‐11

28‐Sep‐11

0.00%

0.00%

PTJ10940

fabrication of lifting tool

PTJ10910

installation of cones

252

5.62%

7

3.37%

0.00%

0.00%

21‐Sep‐11

28‐Sep‐11

60.00%

3.37%

PTJ10950

painting of template

336

7.49%

7

0.00%

0.00%

0.00%

29‐Sep‐11

8‐Oct‐11

0.00%

0.00%

PTJ2010

Pre‐drilling template fabrication finish

0

0.00%

0

0.00%

0.00%

0.00%

8‐Oct‐11

8‐Oct‐11

0.00%

0.00%

10 60.00%

22/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL PROJECT : SETH DEVELOPMENT PROJECT Total Budgete Units (Hrs)

R.W %

165152

DECK FABRICATION General Activities

Activity Name

Act ID

W.P.5: DECK & TSF FABRICATION

25‐Jun‐11

DATE :

WK

WEEK NO.

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

396

16.82%

16.82%

15.01%

129068

78.15%

396

21.52%

16.82%

8768

6.79%

337

0.00% 100.00%

ACTUAL %

13

PLANNED %

DEV/ OVERALL

Start Date

Finish Date

DEV/ITEM

15.01%

31-Mar-11

29-Apr-12

1.81%

1.81%

19.20%

15.01%

31‐Mar‐11

29‐Apr‐12

2.32%

1.81%

0.00%

0.00%

0.00%

28‐May‐11

28‐Apr‐12

0.00%

0.00%

0.00%

100.00%

0.00%

28-May-11

28-May-11

0.00%

0.00%

0.00%

0.00%

0.00%

10-Aug-11

08-Dec-11

0.00%

0.00%

0.00%

0.00%

0.00%

03-Sep-11

03-Sep-11

100.00%

0.00%

PTJ2040

Deck primary structure fabrication start

0

0.00%

0

PTJ1150

Static equipment (by petrojet)

0

0.00%

120

PTJ2160

Deck secondray structure fabrication start

0

0.00%

0

PTJ1160

Piping & E&I supports (by petrojet)

0

0.00%

30

0.00%

0.00%

0.00%

16‐Nov‐11

16‐Dec‐11

0.00%

0.00%

PTJ2060

Deck pre-commisioning

6400

72.99%

40

0.00%

0.00%

0.00%

11-Feb-12

27-Mar-12

0.00%

0.00%

PTJ2090

Deck commisioning

2080

23.72%

26

0.00%

0.00%

0.00%

28-Mar-12

28-Apr-12

0.00%

0.00%

PTJ2065

Crane assembly and erection

0

0.00%

20

0.00%

0.00%

0.00%

28-Mar-12

21-Apr-12

0.00%

0.00%

PTJ2220

Deck weighing

288

3.28%

1

0.00%

0.00%

0.00%

21-Apr-12

22-Apr-12

0.00%

0.00%

104416

80.90%

395

26.60%

21.52%

23.74%

19.20%

31‐Mar‐11

29‐Apr‐12

2.86%

2.32%

3504

3.36%

56

100.00%

3.36%

100.00%

3.36%

31-Mar-11

25-May-11

0.00%

0.00%

22

100.00%

45.21%

100.00%

45.21%

31-Mar-11

27-Apr-11

0.00%

0.00%

Deck Structure Fabrication Deck Legs Fabrication

100.00%

PTD1000

Cutting & Assembly

1584

45.21%

PTD1005

Welding & NDT

1920

54.79%

30

100.00%

54.79%

100.00%

54.79%

19-Apr-11

25-May-11

0.00%

0.00%

728

0.70%

241

7.03%

0.05%

17.58%

0.12%

28-May-11

23-Jan-12

-10.55%

-0.07%

40.00%

7.03%

100.00%

17.58%

28-May-11

31-May-11

-60.00%

-10.55%

0.00%

0.00%

0.00%

05-Jan-12

12-Jan-12

0.00%

0.00%

Braces Below Cellar PTJD1020

Profiling Template

128

17.58%

4

PTD1030

Assembly

216

29.67%

6

PTD1040

Welding & NDT

384

52.75%

12

20912

20.03%

186

3776

18.06%

Cellar Deck Fabrication (+11.000) Joints Fabrication

0.00%

0.00%

0.00%

10-Jan-12

23-Jan-12

0.00%

0.00%

44.70%

8.95%

45.70%

9.15%

28-May-11

29-Nov-11

-1.00%

-0.20%

30

86.02%

15.53%

97.85%

17.67%

28-May-11

26-Jun-11

-11.83%

-2.14%

16

100.00%

44.07%

100.00%

44.07%

28-May-11

14-Jun-11

0.00%

0.00%

75.00%

41.95%

96.15%

53.78%

01-Jun-11

26-Jun-11

-21.15%

-11.83%

PTD1050

Cutting & Assembly

1664

44.07%

PTD1060

Welding & NDT

2112

55.93%

22

10784

51.57%

61

45.40%

23.41%

54.36%

28.03%

28-May-11

27-Jul-11

-8.96%

-4.62%

4896

45.40%

36

100.00%

45.40%

70.73%

32.11%

28-May-11

7-Jul-11

29.27%

13.29%

Main Beams Fabrication PTD1070

Cutting & Assembly

23/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

Activity Name

Act ID

PTD1080

Welding & NDT

Secondary Beams Fabrication

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

PLANNED % Start Date

ITEM

OVERALL

ITEM

OVERALL

Finish Date

DEV/ITEM

DEV/ OVERALL

5888

54.60%

46

0.00%

40.74%

22.24%

4-Jun-11

27-Jul-11

-40.74%

-22.24%

3376

16.14%

40

35.66%

5.76%

0.00%

0.00%

3-Sep-11

12-Oct-11

35.66%

5.76%

76.00%

35.66%

0.00%

0.00%

03-Sep-11

27-Sep-11

76.00%

35.66%

0.00%

0.00%

0.00%

10-Sep-11

12-Oct-11

0.00%

0.00%

0.00%

0.00%

0.00%

13-Oct-11

29-Nov-11

0.00%

0.00%

PTD1090

Cutting & Assembly

1584

46.92%

22

PTD1100

Welding & NDT

1792

53.08%

28

2976

14.23%

48

Embossed Plates

ACTUAL %

0.00%

PTD1110

Cutting & Assembly

1440

48.39%

20

0.00%

0.00%

0.00%

13-Oct-11

10-Nov-11

0.00%

0.00%

PTD1120

Welding & NDT

1536

51.61%

24

0.00%

0.00%

0.00%

27-Oct-11

29-Nov-11

0.00%

0.00%

716

0.69%

19

34.36%

0.24%

0.00%

0.00%

03‐Sep‐11

21‐Sep‐11

34.36%

0.24%

236

32.96%

8

49.32%

16.26%

0.00%

0.00%

03-Sep-11

10-Sep-11

49.32%

16.26%

PLAN AT EL. + 9.200 Main Beams Fabrication PTD1710

Cutting & Assembly

108

45.76%

3

90.00%

41.19%

0.00%

0.00%

03-Sep-11

05-Sep-11

90.00%

41.19%

PTD1720

Welding & NDT

128

54.24%

4

15.00%

8.14%

0.00%

0.00%

06-Sep-11

10-Sep-11

15.00%

8.14%

240

33.52%

5

54.00%

18.10%

0.00%

0.00%

11-Sep-11

15-Sep-11

54.00%

18.10%

90.00%

54.00%

0.00%

0.00%

11-Sep-11

12-Sep-11

90.00%

54.00%

0.00%

0.00%

0.00%

13-Sep-11

15-Sep-11

0.00%

0.00%

0.00%

0.00%

0.00%

17-Sep-11

21-Sep-11

0.00%

0.00%

Secondary Beams Fabrication PTD1730

Cutting & Assembly

144

60.00%

2

PTD1740

Welding & NDT

96

40.00%

3

240

33.52%

5

GRATING

0.00%

PTD1750

Cutting & Assembly

144

60.00%

2

0.00%

0.00%

0.00%

17-Sep-11

18-Sep-11

0.00%

0.00%

PTD1760

Welding & NDT

96

40.00%

3

0.00%

0.00%

0.00%

19-Sep-11

21-Sep-11

0.00%

0.00%

1824

1.75%

44

33.95%

0.59%

0.00%

0.00%

03‐Sep‐11

16‐Oct‐11

33.95%

0.59%

1184

64.91%

20

41.35%

26.84%

0.00%

0.00%

03-Sep-11

22-Sep-11

41.35%

26.84%

90.00%

41.35%

0.00%

0.00%

3-Sep-11

11-Sep-11

90.00%

41.35%

0.00%

0.00%

0.00%

12-Sep-11

22-Sep-11

0.00%

0.00%

PLAN AT EL. + 9.700 Main Beams Fabrication PTD1630

Cutting & Assembly

544

45.95%

8

PTD1640

Welding & NDT

640

54.05%

10

336

18.42%

11

38.57%

7.11%

0.00%

0.00%

24-Sep-11

04-Oct-11

38.57%

7.11%

90.00%

38.57%

0.00%

0.00%

24-Sep-11

27-Sep-11

90.00%

38.57%

0.00%

0.00%

0.00%

28-Sep-11

4-Oct-11

0.00%

0.00%

0.00%

0.00%

0.00%

05-Oct-11

16-Oct-11

0.00%

0.00%

Secondary Beams Fabrication PTD1650

Cutting & Assembly

144

42.86%

4

PTD1660

Welding & NDT

192

57.14%

6

304

16.67%

12

GRATING

0.00%

PTD1670

Cutting & Assembly

144

47.37%

4

0.00%

0.00%

0.00%

5-Oct-11

10-Oct-11

0.00%

0.00%

PTD1680

Welding & NDT

160

52.63%

5

0.00%

0.00%

0.00%

11-Oct-11

16-Oct-11

0.00%

0.00%

2704

2.59%

71

0.00%

0.00%

0.00%

03‐Sep‐11

12‐Nov‐11

0.00%

0.00%

WELL HEAD MEZZANINE AT (+ 16.000)

0.00%

24/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

Activity Name

Act ID

Joints Fabrication

Total Budgete Units (Hrs)

R.W %

548

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

20.27%

12

0.00%

0.00%

0.00%

ACTUAL %

PLANNED % DEV/ITEM

DEV/ OVERALL

Start Date

Finish Date

0.00%

03-Sep-11

14-Sep-11

0.00%

0.00%

PTD1530

Cutting & Assembly

260

47.45%

5

0.00%

0.00%

0.00%

3-Sep-11

7-Sep-11

0.00%

0.00%

PTD1540

Welding & NDT

288

52.55%

6

0.00%

0.00%

0.00%

8-Sep-11

14-Sep-11

0.00%

0.00%

1380

51.04%

26

0.00%

0.00%

0.00%

15-Sep-11

10-Oct-11

0.00%

0.00%

Main Beams Fabrication

0.00%

PTD1550

Cutting & Assembly

612

44.35%

9

0.00%

0.00%

0.00%

15‐Sep‐11

25‐Sep‐11

0.00%

0.00%

PTD1560

Welding & NDT

768

55.65%

12

0.00%

0.00%

0.00%

26-Sep-11

10-Oct-11

0.00%

0.00%

404

14.94%

14

0.00%

0.00%

0.00%

11-Oct-11

24-Oct-11

0.00%

0.00%

Secondary Beams Fabrication

0.00%

PTD1570

Cutting & Assembly

180

44.55%

5

0.00%

0.00%

0.00%

11-Oct-11

16-Oct-11

0.00%

0.00%

PTD1580

Welding & NDT

224

55.45%

7

0.00%

0.00%

0.00%

17‐Oct‐11

24‐Oct‐11

0.00%

0.00%

372

13.76%

19

0.00%

0.00%

0.00%

25-Oct-11

12-Nov-11

0.00%

0.00%

GRATING

0.00%

PTD1590

C tti  & A bl Cutting & Assembly

180

48 39% 48.39%

5

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

25 O t 11 25-Oct-11

30 O t 11 30-Oct-11

0 00% 0.00%

0 00% 0.00%

PTD1600

Welding & NDT

192

51.61%

6

0.00%

0.00%

0.00%

31-Oct-11

12-Nov-11

0.00%

0.00%

6592

6.31%

187

0.00%

27.18%

1.72%

28-May-11

30-Nov-11

-27.18%

-1.72%

28-May-11

12-Jun-11

-100.00%

-27.18%

Braces & Legs between Cellar and Main

0.00%

PTD1130

Profiling Template

1792

27.18%

14

0.00%

100.00%

27.18%

PTD1140

Assembly

1728

26.21%

24

0.00%

0.00%

0.00%

4-Oct-11

1-Nov-11

0.00%

0.00%

PTD1150

Welding & NDT

3072

46.60%

32

0.00%

0.00%

0.00%

19-Oct-11

30-Nov-11

0.00%

0.00%

21696

20.78%

170

37.79%

7.85%

28.38%

5.90%

28-May-11

13-Nov-11

9.41%

1.96%

4576

21.09%

53

78.18%

16.49%

56.36%

11.89%

28-May-11

19-Jul-11

21.82%

4.60%

2080

45.45%

20

100.00%

45.45%

100.00%

45.45%

28-May-11

19-Jun-11

0.00%

0.00%

Main Deck Fabrication (+17.000) Joints Fabrication PTD1160

Cutting & Assembly

PTD1170

Welding & NDT

Main Beams Fabrication

2496

54.55%

26

60.00%

32.73%

20.00%

10.91%

20-Jun-11

19-Jul-11

40.00%

21.82%

11040

50.88%

80

35.48%

18.05%

32.41%

16.49%

30-May-11

17-Aug-11

3.06%

1.56%

80.00%

35.48%

64.29%

28.51%

30‐May‐11

10‐Jul‐11

15.71%

6.97%

0.00%

7.02%

3.91%

22-Jun-11

17-Aug-11

-7.02%

-3.91%

PTD1180

Cutting & Assembly

4896

44.35%

36

PTD1190

Welding & NDT

6144

55.65%

48

3104

14.31%

38

22.73%

3.25%

0.00%

0.00%

3-Sep-11

10-Oct-11

22.73%

3.25%

PTD1200

Cutting & Assembly

1440

46.39%

20

49.00%

22.73%

0.00%

0.00%

3-Sep-11

25-Sep-11

49.00%

22.73%

PTD1210

Welding & NDT

1664

53.61%

26

0.00%

0.00%

0.00%

10-Sep-11

10-Oct-11

0.00%

0.00%

2976

13.72%

50

0.00%

0.00%

0.00%

25-Sep-11

13-Nov-11

0.00%

0.00%

Secondary Beams Fabrication

Embossed Plates

0.00%

PTD1220

Cutting & Assembly

1440

48.39%

20

0.00%

0.00%

0.00%

25-Sep-11

18-Oct-11

0.00%

0.00%

PTD1230

Welding & NDT

1536

51.61%

24

0.00%

0.00%

0.00%

11‐Oct‐11

13‐Nov‐11

0.00%

0.00%

2048

1.96%

255

0.00%

25.00%

0.49%

28-May-11

6-Feb-12

-25.00%

-0.49%

Braces & Legs Above Main

0.00%

25/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL % ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

PTD1240

Profiling Template

512

25.00%

8

0.00%

100.00%

25.00%

28-May-11

5-Jun-11

-100.00%

-25.00%

PTD1250

Assembly

576

28.13%

8

0.00%

0.00%

0.00%

24‐Jan‐12

1‐Feb‐12

0.00%

0.00%

PTD1260

Welding & NDT

960

46.88%

10

0.00%

0.00%

0.00%

26‐Jan‐12

6‐Feb‐12

0.00%

0.00%

3.78%

15.09%

1.35%

28-May-11

20-Dec-11

27.20%

2.43%

9328

8.93%

207

42.29%

PTD1270

Profiling Template

1408

15.09%

22

92.00%

13.89%

100.00%

15.09%

28‐May‐11

21‐Jun‐11

‐8.00%

‐1.21%

PTD1280

Assembly

2880

30.87%

40

92.00%

28.40%

0.00%

0.00%

18‐Oct‐11

8‐Dec‐11

92.00%

28.40%

PTD1290

Welding & NDT

5040

54.03%

35

0.00%

0.00%

0.00%

10‐Nov‐11

20‐Dec‐11

0.00%

0.00%

9440

9.04%

136

19.73%

1.78%

0.00%

0.00%

07-Aug-11

20-Dec-11

19.73%

1.78%

704

7.46%

33

50.91%

3.80%

0.00%

0.00%

7‐Aug‐11

8‐Sep‐11

50.91%

3.80%

Braces Below Heli Deck

Heli Deck Fabrication (+29.125) Joints Fabrication PTD1300

Cutting & Assembly

320

45.45%

8

100.00%

45.45%

0.00%

0.00%

7‐Aug‐11

15‐Aug‐11

100.00%

45.45%

PTD1310

Welding & NDT

384

54.55%

12

10.00%

5.45%

0.00%

0.00%

23‐Aug‐11

8‐Sep‐11

10.00%

5.45%

1408

14.92%

38

45.45%

6.78%

0.00%

0.00%

16‐Aug‐11

22‐Sep‐11

45.45%

6.78%

PTD1320

Cutting & Assembly

640

45 45% 45.45%

16

100 00% 100.00%

45 45% 45.45%

0 00% 0.00%

0 00% 0.00%

16 Aug 11 16‐Aug‐11

6 Sep 11 6‐Sep‐11

100 00% 100.00%

45 45% 45.45%

PTD1330

Welding & NDT

768

54.55%

24

0.00%

0.00%

0.00%

23‐Aug‐11

22‐Sep‐11

0.00%

0.00%

3776

40.00%

45

22.88%

9.15%

0.00%

0.00%

3‐Sep‐11

17‐Oct‐11

22.88%

9.15%

50.00%

22.88%

0.00%

0.00%

3‐Sep‐11

29‐Sep‐11

50.00%

22.88%

0.00%

0.00%

0.00%

10‐Sep‐11

17‐Oct‐11

0.00%

0.00%

0.00%

0.00%

0.00%

12‐Oct‐11

20‐Nov‐11

0.00%

0.00%

Main Beams Fabrication

Secondary Beams Fabrication PTD1340

Cutting & Assembly

1728

45.76%

24

PTD1350

Welding & NDT

2048

54.24%

32

2832

30.00%

40

Covering Plates

0.00%

PTD1360

Cutting & Assembly

1296

45.76%

18

0.00%

0.00%

0.00%

12‐Oct‐11

1‐Nov‐11

0.00%

0.00%

PTD1370

Welding & NDT

1536

54.24%

24

0.00%

0.00%

0.00%

18‐Oct‐11

20‐Nov‐11

0.00%

0.00%

472

5.00%

16

PTD1380

Cutting & Assembly

216

45.76%

6

PTD1390

Welding & NDT

Gutter

Landing Area

256

54.24%

8

248

2.63%

30

0.00%

0.00%

0.00%

0.00%

0.00%

21‐Nov‐11

6‐Dec‐11

0.00%

0.00%

0.00%

0.00%

0.00%

21‐Nov‐11

27‐Nov‐11

0.00%

0.00%

0.00%

0.00%

0.00%

28‐Nov‐11

6‐Dec‐11

0.00%

0.00%

0.00%

0.00%

0.00%

21‐Nov‐11

20‐Dec‐11

0.00%

0.00%

PTD1400

Cutting & Assembly

120

48.39%

6

0.00%

0.00%

0.00%

21‐Nov‐11

27‐Nov‐11

0.00%

0.00%

PTD1410

Welding & NDT

128

51.61%

8

0.00%

0.00%

0.00%

12‐Dec‐11

20‐Dec‐11

0.00%

0.00%

Misellaneuos

15820

15.15%

162

0.00%

0.00%

0.00%

0.00%

19-Nov-11

29-Apr-12

0.00%

0.00%

Fabrication

10656

67.36%

155

0.00%

0.00%

0.00%

0.00%

19‐Nov‐11

22‐Apr‐12

0.00%

0.00%

PTMD1010

Handrails & Cups

1536

14.41%

24

0.00%

0.00%

0.00%

19‐Nov‐11

15‐Dec‐11

0.00%

0.00%

PTMD1060

Safety Net

1792

16.82%

28

0.00%

0.00%

0.00%

21‐Nov‐11

22‐Dec‐11

0.00%

0.00%

PTMD1040

Monorail Beam

720

6.76%

10

0.00%

0.00%

0.00%

30‐Nov‐11

11‐Dec‐11

0.00%

0.00%

PTMD1020

Hatches

640

6.01%

20

0.00%

0.00%

0.00%

22‐Dec‐11

15‐Jan‐12

0.00%

0.00%

PTMD1090

Fire Wall

2448

22.97%

18

0.00%

0.00%

0.00%

25‐Dec‐11

15‐Jan‐12

0.00%

0.00%

26/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL % ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

PTMD1050

Name Plate

256

2.40%

8

0.00%

0.00%

0.00%

2‐Jan‐12

11‐Jan‐12

0.00%

0.00%

PTMD1000

Stairs & Walkways

2400

22.52%

24

0.00%

0.00%

0.00%

3‐Jan‐12

31‐Jan‐12

0.00%

0.00%

PTMD1030

Crane Boom Rest

192

1.80%

6

0.00%

0.00%

0.00%

9‐Jan‐12

15‐Jan‐12

0.00%

0.00%

PTMD1070

Pad Eyes

672

6.31%

6

0.00%

0.00%

0.00%

15‐Apr‐12

22‐Apr‐12

0.00%

0.00%

5164

32.64%

139

0.00%

0.00%

0.00%

12‐Dec‐11

29‐Apr‐12

0.00%

0.00% 0.00%

Installation

0.00%

PTMD1140

Monorail Beam

360

6.97%

10

0.00%

0.00%

0.00%

12‐Dec‐11

22‐Dec‐11

0.00%

PTMD1110

Handrails & Cups

864

16.73%

24

0.00%

0.00%

0.00%

2‐Jan‐12

30‐Jan‐12

0.00%

0.00%

PTMD1160

Safety Net

1152

22.31%

16

0.00%

0.00%

0.00%

4‐Jan‐12

23‐Jan‐12

0.00%

0.00%

PTMD1100

Stairs & Walkways

1080

20.91%

15

0.00%

0.00%

0.00%

24‐Jan‐12

9‐Feb‐12

0.00%

0.00%

PTMD1120

Hatches

288

5.58%

8

0.00%

0.00%

0.00%

24‐Jan‐12

1‐Feb‐12

0.00%

0.00%

PTMD1130

Crane Boom Rest

72

1.39%

2

0.00%

0.00%

0.00%

24‐Jan‐12

25‐Jan‐12

0.00%

0.00%

PTMD1150

Name Plate

144

2.79%

4

0.00%

0.00%

0.00%

24‐Jan‐12

28‐Jan‐12

0.00%

0.00%

PTMD1190

Fire Wall

864

16.73%

12

0.00%

0.00%

0.00%

24‐Jan‐12

6‐Feb‐12

0.00%

0.00%

PTMD1170

Pad Eyes

340

6.58%

5

0.00%

0.00%

0.00%

22‐Apr‐12

29‐Apr‐12

0.00%

0.00%

952

0.91%

79

0.00%

0.00%

0.00%

24‐Jan‐12

11‐Apr‐12

0.00%

0.00%

Deck Flare

0.00%

PTD1500

Cutting & Assembly

400

42.02%

20

0.00%

0.00%

0.00%

24‐Jan‐12

15‐Feb‐12

0.00%

0.00%

PTD1510

Welding & NDT

512

53.78%

32

0.00%

0.00%

0.00%

16‐Feb‐12

24‐Mar‐12

0.00%

0.00%

PTD1520

Trial Fit

40

4.20%

2

0.00%

0.00%

0.00%

10‐Apr‐12

11‐Apr‐12

0.00%

0.00%

8152

7.81%

241

0.00%

0.00%

21.20%

1.65%

28‐May‐11

23‐Jan‐12

‐21.20%

‐1.65%

1728

21.20%

27

0.00%

0.00%

100.00%

21.20%

28‐May‐11

23‐Jun‐11

‐100.00%

‐21.20%

1728

100.00%

24

0.00%

100.00%

100.00%

28‐May‐11

23‐Jun‐11

‐100.00%

‐100.00%

304

3.73%

2

0.00%

0.00%

0.00%

17‐Dec‐11

18‐Dec‐11

0.00%

0.00%

0.00%

0.00%

0.00%

17‐Dec‐11

18‐Dec‐11

0.00%

0.00%

0.00%

0.00%

0.00%

19‐Dec‐11

4‐Jan‐12

0.00%

0.00%

Deck Assembly Skid Beams & Shoes Preparation PTD1420

Skid Beams & Shoes Preparation

Lifting Deck Legs Over Skid Beams & Skid Shoes PTD1430

Lifting Deck Legs Over Skid Beams & Skid Shoes

Lifting Cellar Deck Over Deck Legs

304

100.00%

2

1584

19.43%

17

0.00%

0.00%

PTD1440

Lifting

592

37.37%

1

0.00%

0.00%

0.00%

19‐Dec‐11

19‐Dec‐11

0.00%

0.00%

PTD1450

Assembly

480

30.30%

6

0.00%

0.00%

0.00%

20‐Dec‐11

26‐Dec‐11

0.00%

0.00%

PTD1460

Welding & NDT

512

32.32%

8

0.00%

0.00%

0.00%

27‐Dec‐11

4‐Jan‐12

0.00%

0.00%

692

8.49%

6

0.00%

0.00%

0.00%

5‐Jan‐12

10‐Jan‐12

0.00%

0.00%

lifting of plan at + 9.2

0.00%

PTD1700

Lifting

592

85.55%

1

0.00%

0.00%

0.00%

5‐Jan‐12

5‐Jan‐12

0.00%

0.00%

PTD1770

Assembly

36

5.20%

1

0.00%

0.00%

0.00%

8‐Jan‐12

8‐Jan‐12

0.00%

0.00%

PTD1780

Welding & NDT

64

9.25%

2

0.00%

0.00%

0.00%

9‐Jan‐12

10‐Jan‐12

0.00%

0.00%

692

8.49%

6

592

85.55%

1

lifting of plan at + 9.7 PTD1610

Lifting

0.00%

0.00%

0.00%

0.00%

5‐Jan‐12

10‐Jan‐12

0.00%

0.00%

0.00%

0.00%

0.00%

5‐Jan‐12

5‐Jan‐12

0.00%

0.00%

27/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL %

PLANNED % Start Date

ITEM

OVERALL

ITEM

OVERALL

Finish Date

DEV/ITEM

DEV/ OVERALL

PTD1620

Assembly

36

5.20%

1

0.00%

0.00%

0.00%

8‐Jan‐12

8‐Jan‐12

0.00%

0.00%

PTD1690

Welding & NDT

64

9.25%

2

0.00%

0.00%

0.00%

9‐Jan‐12

10‐Jan‐12

0.00%

0.00%

800

9.81%

6

lifting of mezzanine deck at + 16

0.00%

0.00%

0.00%

5‐Jan‐12

10‐Jan‐12

0.00%

0.00%

1

0.00%

0.00%

0.00%

5‐Jan‐12

5‐Jan‐12

0.00%

0.00%

10.00%

1

0.00%

0.00%

0.00%

8‐Jan‐12

8‐Jan‐12

0.00%

0.00%

128

16.00%

2

0.00%

0.00%

0.00%

9‐Jan‐12

10‐Jan‐12

0.00%

0.00%

2352

28.85%

13

0.00%

0.00%

0.00%

11‐Jan‐12

23‐Jan‐12

0.00%

0.00%

PTD1790

Lifting

592

74.00%

PTD1800

Assembly

80

PTD1810

Welding & NDT

Lifting Main Deck Over cellar Deck

0.00%

0.00%

PTD1470

Lifting

736

31.29%

1

0.00%

0.00%

0.00%

11‐Jan‐12

11‐Jan‐12

0.00%

0.00%

PTD1480

Assembly

720

30.61%

5

0.00%

0.00%

0.00%

12‐Jan‐12

17‐Jan‐12

0.00%

0.00%

PTD1490

Welding & NDT

896

38.10%

7

0.00%

0.00%

0.00%

16‐Jan‐12

23‐Jan‐12

0.00%

0.00%

15548

12.05%

201

0.00%

0.00%

0.00%

22‐Sep‐11

09‐Apr‐12

0.00%

0.00%

Atmosphric Painting

0.00%

PT1110

Plane at + 9.2

960

6.17%

5

0.00%

0.00%

0.00%

22‐Sep‐11

27‐Sep‐11

0.00%

0.00%

PT1120

97 Plane at + 9.7

960

6 17% 6.17%

5

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

17 Oct 11 17‐Oct‐11

22 Oct 11 22‐Oct‐11

0 00% 0.00%

0 00% 0.00%

PT1130

Wellhead mezzanine

1920

12.35%

10

0.00%

0.00%

0.00%

13‐Nov‐11

23‐Nov‐11

0.00%

0.00%

PT1030

Cellar Deck & Braces Above Cellar

2880

18.52%

15

0.00%

0.00%

0.00%

1‐Dec‐11

18‐Dec‐11

0.00%

0.00%

PT1080

Piping Support

108

0.69%

9

0.00%

0.00%

0.00%

6‐Dec‐11

17‐Dec‐11

0.00%

0.00%

PT1010

Deck Legs

432

2.78%

6

0.00%

0.00%

0.00%

10‐Dec‐11

15‐Dec‐11

0.00%

0.00%

PT1020

Braces Below Cellar

120

0.77%

5

0.00%

0.00%

0.00%

13‐Dec‐11

18‐Dec‐11

0.00%

0.00%

PT1050

Heli Deck & Braces Below Heli

1728

11.11%

12

0.00%

0.00%

0.00%

21‐Dec‐11

3‐Jan‐12

0.00%

0.00%

PT1040

Main Deck

2880

18.52%

15

0.00%

0.00%

0.00%

24‐Dec‐11

10‐Jan‐12

0.00%

0.00%

PT1090

Cable Trays Supports

120

0.77%

10

0.00%

0.00%

0.00%

11‐Jan‐12

23‐Jan‐12

0.00%

0.00%

PT1045

Braces Above Main

80

0.51%

5

0.00%

0.00%

0.00%

18‐Jan‐12

23‐Jan‐12

0.00%

0.00%

PT1070

Piping painting

1008

6.48%

14

0.00%

0.00%

0.00%

18‐Jan‐12

4‐Feb‐12

0.00%

0.00%

PT1060

Miscellaneous (Stairs,H/R,...etc)

1344

8.64%

14

0.00%

0.00%

0.00%

22‐Jan‐12

6‐Feb‐12

0.00%

0.00%

PT1100

Deck Flare

1008

6.48%

14

0.00%

0.00%

0.00%

25‐Mar‐12

9‐Apr‐12

0.00%

0.00%

336

0.26%

9

0.00%

0.00%

0.00%

21‐Apr‐12

29‐Apr‐12

0.00%

0.00%

336

100.00%

7

0.00%

0.00%

0.00%

21‐Apr‐12

29‐Apr‐12

0.00%

0.00%

13280

8.04%

84

0.00%

0.00%

0.00%

16‐Dec‐11

09‐Mar‐12

0.00%

0.00%

Anti Skid Painting PT1000

Heli Deck

E&I

0.00%

0.00%

PTJ2080

E & I Work start

0

0.00%

0

0.00%

0.00%

0.00%

16‐Dec‐11

16‐Dec‐11

0.00%

0.00%

PTJ2100

E & I Work finish

0

0.00%

0

0.00%

0.00%

0.00%

9‐Mar‐12

9‐Mar‐12

0.00%

0.00%

13280

100.00%

84

0.00%

0.00%

0.00%

0.00%

16‐Dec‐11

09‐Mar‐12

0.00%

0.00%

6424

48.37%

84

0.00%

0.00%

0.00%

0.00%

16-Dec-11

09-Mar-12

0.00%

0.00%

E&I (onshore) Instrumentation

28/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM 0.00%

ACTUAL %

PLANNED % Start Date

OVERALL

ITEM

Finish Date

DEV/ITEM

OVERALL

DEV/ OVERALL

1336

20.80%

52

0.00%

0.00%

0.00%

16‐Dec‐11

6‐Feb‐12

0.00%

0.00%

E&I1090

Fabrication

832

62.28%

26

0.00%

0.00%

0.00%

16‐Dec‐11

11‐Jan‐12

0.00%

0.00%

E&I1100

Installation

504

37.72%

14

0.00%

0.00%

0.00%

23-Jan-12

06-Feb-12

0.00%

0.00%

1248

19.43%

26

0.00%

0.00%

0.00%

23‐Jan‐12

18‐Feb‐12

0.00%

0.00%

1248

100.00%

26

0.00%

0.00%

0.00%

23‐Jan‐12

18‐Feb‐12

0.00%

0.00%

800

12.45%

20

0.00%

0.00%

0.00%

10‐Feb‐12

1‐Mar‐12

0.00%

0.00%

Installation

800

100.00%

20

0.00%

0.00%

0.00%

10‐Feb‐12

1‐Mar‐12

0.00%

0.00%

HCU & Local Panels Activities

256

3.99%

16

256

100.00%

16

720

11.21%

18

720

100.00%

18

320

4.98%

20

320

100 00% 100.00%

20

160

2.49%

10

160

100.00%

10

128

1.99%

8

128

100.00%

8

1200

18.68%

25

1200

100.00%

25

128

1.99%

8

Cable Trays Supports

Cable Trays E&I1110

Installation

Tubing Activities E&I1120

E&I1130

HCU & Local Panels Activities

Fusible Plug & ESD Puch Bottons E&I1140

Fusible Plug & ESD Puch Bottons

J. Box Activities E&I1150

J Box Activities J.

Instrument Installation & Calibration E&I1160

Instrument Installation & Calibration

Air Gas Header E&I1170

Air Gas Header

Cable Laying & Termination E&I1180

Cable Laying & Termination

Fire & Gas activities E&I1190

Fire & Gas activities

Telecommunication System E&I1200

Telecommunication System

Electrical Cable Trays Supports

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6‐Feb‐12

24‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

6‐Feb‐12

24‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

6‐Feb‐12

26‐Feb‐12

0.00%

0.00%

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

6 Feb 12 6‐Feb‐12

26 Feb 12 26‐Feb‐12

0 00% 0.00%

0 00% 0.00%

0.00%

0.00%

0.00%

25‐Feb‐12

6‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

25‐Feb‐12

6‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

24‐Feb‐12

3‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

24‐Feb‐12

3‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

12‐Feb‐12

8‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

12‐Feb‐12

8‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1‐Mar‐12

9‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

1‐Mar‐12

9‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1-Mar-12

9-Mar-12

0.00%

0.00%

0.00%

0.00%

0.00%

1-Mar-12

9-Mar-12

0.00%

0.00%

0.00%

0.00%

16-Dec-11

01-Mar-12

0.00%

0.00%

8

6856

51.63%

76

0.00%

0.00%

1336

19.49%

52

0.00%

0.00%

0.00%

0.00%

16-Dec-11

6-Feb-12

0.00%

0.00%

26

0.00%

0.00%

0.00%

16‐Dec‐11

11‐Jan‐12

0.00%

0.00%

0.00%

0.00%

0.00%

23‐Jan‐12

6‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

23-Jan-12

18-Feb-12

0.00%

0.00%

0.00%

0.00%

0.00%

23‐Jan‐12

18‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

16-Dec-11

23-Jan-12

0.00%

0.00%

0.00%

0.00%

0.00%

16‐Dec‐11

23‐Jan‐12

0.00%

0.00%

0.00%

0.00%

0.00%

31-Dec-11

25-Jan-12

0.00%

0.00%

0.00%

0.00%

0.00%

31‐Dec‐11

25‐Jan‐12

0.00%

0.00%

14

1248

18.20%

26

1248

100.00%

26

912

13.30%

38

912

100.00%

38

1000

14.59%

25

1000

100.00%

25

Lighting Activities

0.00%

5‐Mar‐12

100.00%

37.72%

E&I1040

0.00%

5‐Mar‐12

128

504

Lighting Activities

0.00%

18‐Feb‐12 18‐Feb‐12

8

Installation

Installation

0.00%

0.00% 0.00%

8

E&I1010

E&I1030

0.00%

0.00% 0.00%

1.99%

832

Conduit Activities

0.00%

0.00% 0.00%

100.00%

Fabrication

Installation

0.00%

128

62.28%

E&I1020

0.00%

128

E&I1000

Cable Trays

0.00%

0.00%

0.00%

0.00%

29/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP5 PROGRESS Sheet

Activity Name

Act ID

Navigation Aids E&I1050

Navigation Aids

Earthing Activities E&I1060

Earthing Activities

Power & Small Equip. Inst. E&I1070

Power & Small Equip. Inst.

Cable Laying & Termination E&I1080

Cable Laying & Termination

EQUIPMENT

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ITEM

OVERALL

0.00%

240

3.50%

15

240

100.00%

15

280

4.08%

14

280

100.00%

14

240

3.50%

12

240

100.00%

12

1600

23.34%

25

1600

100.00%

25

5232

3.17%

71

ACTUAL %

0.00%

0.00%

0.00%

0.00%

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

16-Dec-11

31-Dec-11

0.00%

0.00%

0.00%

0.00%

0.00%

16‐Dec‐11

31‐Dec‐11

0.00%

0.00%

0.00%

0.00%

0.00%

16-Feb-12

1-Mar-12

0.00%

0.00%

0.00%

0.00%

0.00%

16‐Feb‐12

1‐Mar‐12

0.00%

0.00%

0.00%

0.00%

0.00%

16-Feb-12

28-Feb-12

0.00%

0.00%

0.00%

0.00%

0.00%

16‐Feb‐12

28‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

31-Jan-12

25-Feb-12

0.00%

0.00%

0.00%

0.00%

0.00%

31‐Jan‐12

25‐Feb‐12

0.00%

0.00%

0.00%

0.00%

0.00%

07‐Dec‐11

16‐Feb‐12

0.00%

0.00%

PTJ2070

Equipment installation start

0

0.00%

0

0.00%

0.00%

0.00%

23-Dec-11

23-Dec-11

0.00%

0.00%

PTJ2130

Equipment installation finish

0

0.00%

0

0.00%

0.00%

0.00%

16‐Feb‐12

16‐Feb‐12

0.00%

0.00%

5232

100.00%

71

0.00%

0.00%

0.00%

07‐Dec‐11

16‐Feb‐12

0.00%

0.00%

Equipement Installation (onshore)

0.00%

TSF1110

Installation of production manifold module on celler deck

288

5.50%

4

0.00%

0.00%

0.00%

7‐Dec‐11

10‐Dec‐11

0.00%

0.00%

TSF1090

Equipment Installation on Heli Deck

288

5.50%

4

0.00%

0.00%

0.00%

23‐Dec‐11

27‐Dec‐11

0.00%

0.00%

TSF1100

Installation of E & I module on main deck

288

5.50%

4

0.00%

0.00%

0.00%

7‐Jan‐12

10‐Jan‐12

0.00%

0.00%

TSF1070

Equipment Installation on Cellar Deck

2040

38.99%

15

0.00%

0.00%

0.00%

1-Feb-12

16-Feb-12

0.00%

0.00%

TSF1080

Equipment Installation on Main Deck

2040

38.99%

15

0.00%

0.00%

0.00%

1‐Feb‐12

16‐Feb‐12

0.00%

0.00%

TSF1060

Equipment Installation Below Cellar Deck

288

5.50%

4

0.00%

0.00%

0.00%

12‐Feb‐12

16‐Feb‐12

0.00%

0.00%

17572

10.64%

113

0.00%

0.00%

0.00%

19‐Nov‐11

11‐Mar‐12

0.00%

0.00%

PIPING

0.00%

PTJ2050

Piping & piping support fabrication start

0

0.00%

0

0.00%

0.00%

0.00%

19‐Nov‐11

19‐Nov‐11

0.00%

0.00%

PTJ2110

Piping & piping support erection finish

0

0.00%

0

0.00%

0.00%

0.00%

11‐Mar‐12

11‐Mar‐12

0.00%

0.00%

17572

100.00%

113

0.00%

0.00%

0.00%

19‐Nov‐11

11‐Mar‐12

0.00%

0.00%

C.S Piping Fab. & Erec., Valves Erection (onshore)

0.00%

TSF1000

Piping Fabrication

8960

50.99%

70

0.00%

0.00%

0.00%

19‐Nov‐11

28‐Jan‐12

0.00%

0.00%

TSF1010

Piping Supports Fabrication

1408

8.01%

22

0.00%

0.00%

0.00%

19‐Nov‐11

11‐Dec‐11

0.00%

0.00%

TSF1020

Piping Erection

4760

27.09%

35

0.00%

0.00%

0.00%

26‐Jan‐12

1‐Mar‐12

0.00%

0.00%

TSF1030

Piping Supports Erection

800

4.55%

20

0.00%

0.00%

0.00%

10‐Feb‐12

1‐Mar‐12

0.00%

0.00%

TSF1040

Valve Installation

300

1.71%

15

0.00%

0.00%

0.00%

15‐Feb‐12

1‐Mar‐12

0.00%

0.00%

PTJ2120

Piping hydrotest

1344

7.65%

21

0.00%

0.00%

0.00%

19‐Feb‐12

11‐Mar‐12

0.00%

0.00%

30/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP6 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL PROJECT : SETH DEVELOPMENT PROJECT Total Budgete Units (Hrs)

R.W %

W.P.6: PIPELINE SPOOLS FABRICATION

21752

SETH PLEM & EXISTING TUNA PLEM

25‐Jun‐11

DATE :

WK

WEEK NO.

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

59

0.00%

0.00%

0.00%

10992

50.53%

59

0.00%

0.00%

1948

17.72%

59

0.00%

BEFORE METROLOGY

1652

84.80%

59

PIPE LINE & BENDS

1652

100.00%

59

Activity Name

Act ID

SPOOL NO. S1 (CLOSING) ( P.L ‐ S2 )

ACTUAL %

13

PLANNED % DEV/ITEM

DEV/ OVERALL

Start Date

Finish Date

0.00%

23-Feb-12

25-Apr-12

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

25‐Apr‐12

0.00%

0.00%

0.00%

0.00%

0.00%

24‐Mar‐12

25‐Apr‐12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

SS740

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.91%

48

0.00%

0.00%

0.00%

16-Apr-12 p

18-Apr-12 p

0.00%

0.00%

SS750

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.87%

48

0.00%

0.00%

0.00%

18‐Apr‐12

21‐Apr‐12

0.00%

0.00%

SS690

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24-Mar-12

26-Mar-12

0.00%

0.00%

SS760

APPLY SHRINKABLE SLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS700

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26-Mar-12

29-Mar-12

0.00%

0.00%

SS710

FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29-Mar-12

4-Apr-12

0.00%

0.00%

SS730

COATING OF BENDS

384

23.24%

48

0.00%

0.00%

0.00%

14‐Apr‐12

21‐Apr‐12

0.00%

0.00%

SS720

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

04-Apr-12

14-Apr-12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

0

0.00%

60

0.00%

0.00%

0.00%

15-Apr-12

15-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS770

RECEVING METROLOGY

SS810

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23-Apr-12

24-Apr-12

0.00%

0.00%

SS800

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS820

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24-Apr-12

25-Apr-12

0.00%

0.00%

SS780

FIT UP AFTER METROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS790

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17-Apr-12

21-Apr-12

0.00%

0.00%

1716

15.61%

59

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

24‐Mar‐12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

32

1.86%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SPOOL NO. S2 ( S1 ‐ S3 ) PIPE LINE & BENDS SS910

PIGGING & HYDRO TEST

31/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL % ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

SS920

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24-Mar-12

24-Mar-12

0.00%

0.00%

SS880

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18-Mar-12

19-Mar-12

0.00%

0.00%

SS890

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20-Mar-12

21-Mar-12

0.00%

0.00%

SS830

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23-Feb-12

25-Feb-12

0.00%

0.00%

SS900

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SS840

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26-Feb-12

28-Feb-12

0.00%

0.00%

SS850

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29-Feb-12

5-Mar-12

0.00%

0.00%

SS870

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15-Mar-12

21-Mar-12

0.00%

0.00%

SS860

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6-Mar-12

14-Mar-12

0.00%

0.00%

1948

17.72%

59

0.00%

0.00%

0.00%

0.00%

24‐Mar‐12

25‐Apr‐12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100 00% 100.00%

59

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

24 12 24-Mar-12

23 A 12 23-Apr-12

0 00% 0.00%

0 00% 0.00%

SPOOL NO. S3 (CLOSING) ( S2 ‐ S4 )

SS980

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.91%

48

0.00%

0.00%

0.00%

16-Apr-12

18-Apr-12

0.00%

0.00%

SS990

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.87%

48

0.00%

0.00%

0.00%

18-Apr-12

21-Apr-12

0.00%

0.00%

SS930

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24-Mar-12

26-Mar-12

0.00%

0.00%

SS1000

APPLY SHRINKABLE SLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS940

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26-Mar-12

29-Mar-12

0.00%

0.00%

SS950

FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29-Mar-12

4-Apr-12

0.00%

0.00%

SS970

COATING OF BENDS

384

23.24%

48

0.00%

0.00%

0.00%

14-Apr-12

21-Apr-12

0.00%

0.00%

SS960

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

04‐Apr‐12

14‐Apr‐12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

0

0.00%

60

0.00%

0.00%

0.00%

15-Apr-12

15-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS1010

RECEVING METROLOGY

SS1050

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23-Apr-12

24-Apr-12

0.00%

0.00%

SS1040

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS1060

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24-Apr-12

25-Apr-12

0.00%

0.00%

SS1020

FIT UP AFTER METROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS1030

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17-Apr-12

21-Apr-12

0.00%

0.00%

1716

15.61%

59

0.00%

0.00%

0.00%

23‐Feb‐12

24‐Mar‐12

0.00%

0.00%

SPOOL NO. S4 ( S4 ‐ SETH PLEM )

0.00%

32/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP6 PROGRESS Sheet

Activity Name

Act ID

PIPE LINE & BENDS

Total Budgete Units (Hrs)

R.W %

1716

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

59

0.00%

0.00%

0.00%

ACTUAL %

PLANNED %

DEV/ OVERALL

Start Date

Finish Date

DEV/ITEM

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SS1150

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS1160

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24-Mar-12

24-Mar-12

0.00%

0.00%

SS1120

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18-Mar-12

19-Mar-12

0.00%

0.00%

SS1130

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20-Mar-12

21-Mar-12

0.00%

0.00%

SS1070

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23-Feb-12

25-Feb-12

0.00%

0.00%

SS1140

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS1080

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26-Feb-12

28-Feb-12

0.00%

0.00%

SS1090

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29-Feb-12

05-Mar-12

0.00%

0.00%

SS1110

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15-Mar-12

21-Mar-12

0.00%

0.00%

SS1100

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

06‐Mar‐12

14‐Mar‐12

0.00%

0.00%

1716

15.61%

59

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

24‐Mar‐12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S5 ( SETH PLEM ‐ S6 ) PIPE LINE & BENDS SS1250

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SS1260

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24-Mar-12

24-Mar-12

0.00%

0.00%

SS1220

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18-Mar-12

19-Mar-12

0.00%

0.00%

SS1230

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20-Mar-12

21-Mar-12

0.00%

0.00%

SS1170

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23-Feb-12

25-Feb-12

0.00%

0.00%

SS1240

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SS1180

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26-Feb-12

28-Feb-12

0.00%

0.00%

SS1190

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29-Feb-12

5-Mar-12

0.00%

0.00%

SS1210

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15-Mar-12

21-Mar-12

0.00%

0.00%

SS1200

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6-Mar-12

14-Mar-12

0.00%

0.00%

1948

17.72%

59

0.00%

0.00%

0.00%

0.00%

24‐Mar‐12

25‐Apr‐12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100.00%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

SPOOL NO. S6 (CLOSING) ( S5 ‐ TUNA PLEM )

SS1320

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.91%

48

0.00%

0.00%

0.00%

16-Apr-12

18-Apr-12

0.00%

0.00%

SS1330

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.87%

48

0.00%

0.00%

0.00%

18-Apr-12

21-Apr-12

0.00%

0.00%

33/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP6 PROGRESS Sheet

Activity Name

Act ID

SS1270

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

Total Budgete Units (Hrs)

R.W %

96

5.81%

Original Duration (Days)

ACTUAL % ITEM

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

0.00%

24-Mar-12

26-Mar-12

0.00%

0.00%

OVERALL

ITEM

OVERALL

48

0.00%

0.00%

SS1340

APPLY SHRINKABLE SLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS1280

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26‐Mar‐12

29‐Mar‐12

0.00%

0.00%

SS1290

FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29-Mar-12

4-Apr-12

0.00%

0.00%

SS1310

COATING OF BENDS

384

23.24%

48

0.00%

0.00%

0.00%

14-Apr-12

21-Apr-12

0.00%

0.00%

SS1300

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

4‐Apr‐12

14‐Apr‐12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

RECEVING METROLOGY

0

0.00%

60

0.00%

0.00%

0.00%

15-Apr-12

15-Apr-12

0.00%

0.00%

SS1390

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23‐Apr‐12

24‐Apr‐12

0.00%

0.00%

SS1380

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21‐Apr‐12

23‐Apr‐12

0.00%

0.00%

SS1400

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24‐Apr‐12

25‐Apr‐12

0.00%

0.00%

SS1360

FIT UP AFTER METROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS1370

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17‐Apr‐12

21‐Apr‐12

0.00%

0.00%

10760

49.47%

59

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

25‐Apr‐12

0.00%

0.00%

1948

18.10%

59

0.00%

0.00%

0.00%

0.00%

24‐Mar‐12

25‐Apr‐12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100.00%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

AFTER METROLOGY SS1350

SETH P/F & NEW SSIV SPOOL NO. S6 (CLOSING) ( S5 ‐ SETH P/F )

0.00%

SS600

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.91%

48

0.00%

0.00%

0.00%

16‐Apr‐12

18‐Apr‐12

0.00%

0.00%

SS610

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.87%

48

0.00%

0.00%

0.00%

18‐Apr‐12

21‐Apr‐12

0.00%

0.00%

SS550

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24‐Mar‐12

26‐Mar‐12

0.00%

0.00%

SS620

APPLY SHRINKABLE SLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21‐Apr‐12

23‐Apr‐12

0.00%

0.00%

SS560

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26‐Mar‐12

29‐Mar‐12

0.00%

0.00%

SS570

FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29‐Mar‐12

4‐Apr‐12

0.00%

0.00%

SS590

COATING OF BENDS

384

23.24%

48

0.00%

0.00%

0.00%

14‐Apr‐12

21‐Apr‐12

0.00%

0.00%

SS580

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

4‐Apr‐12

14‐Apr‐12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS630

RECEVING METROLOGY

0

0.00%

60

0.00%

0.00%

0.00%

15‐Apr‐12

15‐Apr‐12

0.00%

0.00%

SS670

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23‐Apr‐12

24‐Apr‐12

0.00%

0.00%

SS660

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21‐Apr‐12

23‐Apr‐12

0.00%

0.00%

SS680

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24‐Apr‐12

25‐Apr‐12

0.00%

0.00%

34/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL % ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

SS640

FIT UP AFTER METROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS650

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17‐Apr‐12

21‐Apr‐12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

24‐Mar‐12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00% 0.00%

SPOOL NO. S2 ( S1 ‐ SSIV ) PIPE LINE & BENDS SS230

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

SS240

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24‐Mar‐12

24‐Mar‐12

0.00%

0.00%

SS200

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18‐Mar‐12

19‐Mar‐12

0.00%

0.00%

SS210

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS150

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23‐Feb‐12

25‐Feb‐12

0.00%

0.00%

SS220

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS160

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26‐Feb‐12

28‐Feb‐12

0.00%

0.00%

SS170

FIT UP FOR LINE PIPE & BENDS

240

13 99% 13.99%

47

0 00% 0.00%

0 00% 0.00%

0 00% 0.00%

29 Feb 12 29‐Feb‐12

5 Mar 12 5‐Mar‐12

0 00% 0.00%

0 00% 0.00%

SS190

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS180

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6‐Mar‐12

14‐Mar‐12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

24‐Mar‐12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S3 ( SSIV ‐S4 ) PIPE LINE & BENDS SS330

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS340

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24‐Mar‐12

24‐Mar‐12

0.00%

0.00%

SS300

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18‐Mar‐12

19‐Mar‐12

0.00%

0.00%

SS310

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS250

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23‐Feb‐12

25‐Feb‐12

0.00%

0.00%

SS320

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS260

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26‐Feb‐12

28‐Feb‐12

0.00%

0.00%

SS270

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29‐Feb‐12

5‐Mar‐12

0.00%

0.00%

SS290

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS280

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6‐Mar‐12

14‐Mar‐12

0.00%

0.00%

1948

18.10%

59

0.00%

0.00%

0.00%

0.00%

24‐Mar‐12

25‐Apr‐12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100.00%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

48

2.91%

48

0.00%

0.00%

0.00%

16‐Apr‐12

18‐Apr‐12

0.00%

0.00%

SPOOL NO. S1 (CLOSING) ( P.L ‐ SETH PLEM )

SS060

FIT UP FLANGES AND FITTING WITH LINE PIPE

35/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

64

3.87%

Original Duration (Days)

ACTUAL % ITEM

PLANNED % DEV/ITEM

DEV/ OVERALL

Start Date

Finish Date

0.00%

18‐Apr‐12

21‐Apr‐12

0.00%

0.00%

OVERALL

ITEM

OVERALL

48

0.00%

0.00%

SS070

WELDING & NDT FOR FLANGES WITH LINE PIPE

SS 10

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24‐Mar‐12

26‐Mar‐12

0.00%

0.00%

SS080

APPLY SHRINKABLE SLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21‐Apr‐12

23‐Apr‐12

0.00%

0.00%

SS020

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26‐Mar‐12

29‐Mar‐12

0.00%

0.00%

SS030

FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29‐Mar‐12

4‐Apr‐12

0.00%

0.00%

SS050

COATING OF BENDS

384

23.24%

48

0.00%

0.00%

0.00%

14‐Apr‐12

21‐Apr‐12

0.00%

0.00%

SS040

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

4‐Apr‐12

14‐Apr‐12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS090

RECEVING METROLOGY

0

0.00%

60

0.00%

0.00%

0.00%

15‐Apr‐12

15‐Apr‐12

0.00%

0.00%

SS130

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23‐Apr‐12

24‐Apr‐12

0.00%

0.00%

SS120

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21‐Apr‐12

23‐Apr‐12

0.00%

0.00%

SS140

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24‐Apr‐12

25‐Apr‐12

0.00%

0.00%

SS100

FIT UP AFTER METROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15‐Apr‐12

17‐Apr‐12

0.00%

0.00%

SS110

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17‐Apr‐12

21‐Apr‐12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

24‐Mar‐12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S5 ( S4 ‐ S6 ) PIPE LINE & BENDS SS530

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS540

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24‐Mar‐12

24‐Mar‐12

0.00%

0.00%

SS500

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18‐Mar‐12

19‐Mar‐12

0.00%

0.00%

SS510

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS450

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23‐Feb‐12

25‐Feb‐12

0.00%

0.00%

SS520

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS460

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26‐Feb‐12

28‐Feb‐12

0.00%

0.00%

SS470

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29‐Feb‐12

5‐Mar‐12

0.00%

0.00%

SS490

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS480

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6‐Mar‐12

14‐Mar‐12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23‐Feb‐12

24‐Mar‐12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S4 ( S3 ‐ S5 ) PIPE LINE & BENDS SS430

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS440

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24‐Mar‐12

24‐Mar‐12

0.00%

0.00%

36/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total Budgete Units (Hrs)

R.W %

Original Duration (Days)

ACTUAL % ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

SS400

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18‐Mar‐12

19‐Mar‐12

0.00%

0.00%

SS410

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS350

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23‐Feb‐12

25‐Feb‐12

0.00%

0.00%

SS420

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22‐Mar‐12

23‐Mar‐12

0.00%

0.00%

SS360

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26‐Feb‐12

28‐Feb‐12

0.00%

0.00%

SS370

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29‐Feb‐12

05‐Mar‐12

0.00%

0.00%

SS390

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15‐Mar‐12

21‐Mar‐12

0.00%

0.00%

SS380

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

06‐Mar‐12

14‐Mar‐12

0.00%

0.00%

37/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP8 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL PROJECT : SETH DEVELOPMENT PROJECT

Activity Name

Act ID

W.P.8: LOAD‐OUT, SEA‐FASTENING, TRANSPORTATION & INSTALLATION

Total Budgete Units (Hrs)

R.W %

27456

25‐Jun‐11

DATE :

WK

WEEK NO.

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

204

0.00%

0.00%

0.00%

ACTUAL %

13

PLANNED % Start Date

Finish Date

DEV/ITEM

DEV/ OVERALL

0.00%

18-Oct-11

08-May-12

0.00%

0.00%

PTJ1070

Pre-drilling template seafastening and load out

840

3.06%

7

0.00%

0.00%

0.00%

18‐Oct‐11

24‐Oct‐11

0.00%

0.00%

PTJ1170

Sub Sea Spools Load out first trip

840

3.06%

7

0.00%

0.00%

0.00%

25‐Mar‐12

31‐Mar‐12

0.00%

0.00%

PTJ1180

Sub Sea Spools Load out second trip for closing spools

840

3.06%

7

0.00%

0.00%

0.00%

25-Apr-12

02-May-12

0.00%

0.00%

PTJ1060

Deck seafastening and load out

7896

28.76%

7

0.00%

0.00%

0.00%

02-May-12

08-May-12

0.00%

0.00%

PTJ1050

Jacket & Piles seafastening and load out

17040

62.06%

15

0.00%

0.00%

0.00%

17-Mar-12

31-Mar-12

0.00%

0.00%

38/40 02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

WP9 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.9: OFFSHORE HOOKUP, COMMISSIONING AND ASSISTANT FOR START UP

25‐Jun‐11

DATE :

WK

WEEK NO.

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

46

0.00%

0.00%

0.00%

R.W %

ACTUAL %

13

PLANNED % DEV/ITEM

DEV/ OVERALL

Start Date

Finish Date

0.00%

15-May-12

30-Jun-12

0.00%

0.00%

M01

May-12

50.00%

16

0.00%

0.00%

0.00%

0.00%

15-May-12

31-May-12

0.00%

0.00%

M02

Jun-12

50.00%

30

0.00%

0.00%

0.00%

0.00%

01-Jun-12

30-Jun-12

0.00%

0.00%

02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

39/40

CRASHING COST

PETROJET

CLIENT : PETROBEL PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.1: PROJECT MANAGEMENT

25‐Jun‐11

DATE :

WK

WEEK NO.

Original Duration (Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

182

0.00%

0.00%

0.00%

R.W %

ACTUAL %

13

PLANNED % DEV/ITEM

DEV/ OVERALL

Start Date

Finish Date

0.00%

01-Nov-11

01-May-12

0.00%

0.00%

M01

Nov-11

10.00%

24

0.00%

0.00%

0.00%

0.00%

01-Nov-11

25-Nov-11

0.00%

0.00%

M02

Dec-11

20.00%

29

0.00%

0.00%

0.00%

0.00%

26‐Nov‐11

25‐Dec‐11

0.00%

0.00%

M03

Jan-12

20.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Dec‐11

25‐Jan‐12

0.00%

0.00%

M04

Feb-12

20.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Jan‐12

25‐Feb‐12

0.00%

0.00%

M05

Mar-12

20.00%

28

0.00%

0.00%

0.00%

0.00%

26‐Feb‐12

25‐Mar‐12

0.00%

0.00%

M06

Apr-12

10.00%

30

0.00%

0.00%

0.00%

0.00%

26‐Mar‐12

25‐Apr‐12

0.00%

0.00%

02/07/201110:32 ‫ص‬

E:\SETH\WEEKLY & MONTHLY REPORT\MONTHLY\MONTHLY 25‐06‐11\

40/40

PAGE 27 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.3. UPDATED SCHEDULE

GFL 003-0405

3467-200

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

SETH OFFSHORE OFFS EPC PROJECT UPDATED SCHEDULE CONTRACTUAL MILESTONES CONTRACT

BL Project Finish

Start

335 31-Mar-11

31-Jul-12

28-Mar-11 A

31-Jul-12

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

Finish

Project start

0 31-Mar-11

A1030

Finishing the basic engineering review and Endorsement report iss...

0

31-Mar-11

31-Mar-11 A

A2320

Recieve PTB LLI's Technical Offers from PTB

0

31-Mar-11

31-Mar-11 A

A17

Recieving LOI from PTB

0

31-Mar-11

31-Mar-11 A

A2290

All LLI's awarded (By Petrobel)

0

19-Apr-11

19-Apr-11 A

A2330

PTB LLI's TER's by Enppi

0 19-Apr-11

A2360

EPC Contract Signature

0

29-Apr-11

29-Apr-11 A

ART6.1

Authorization for Predrilling template ready for sail out: transportati...

0

24-Oct-11

24-Oct-11*

ART6.7

Pipeline spools ready for load out in four weeks from company req...

0

23-Mar-12

23-Mar-12

ART6.3

Deck Mechanical Completion

0

01-Apr-12

31-Mar-12*

ART6.2.1

Jacket and Piles ready for load out

0

14-Apr-12

14-Apr-12*

ART6.2.2

Company Authorization for Jacket & Piles ready for Sail out

0

21-Apr-12

21-Apr-12*

ART6.4.1

Deck and Flare Ready for Load out

0

01-May-12

30-Apr-12*

ART6.4.2

Company authorization for ready for sail out of Deck and flare

0

10-May-12

08-May-12

ART6.5

Offshore hook up and Final commissioning

0

02-Jul-12

30-Jun-12

A6.6

Assistance for start up (1) week from Company request

0

31-Jul-12

30-Jul-12

A2

Project completion

0

31-Jul-12

31-Jul-12*

W.P.1: PRO PROJECT MANAGEMENT A2380

Design review (Internal meeting)

A1010

Management activities

W.P.2: ENG ENGINEERING PROCESS

31-Mar-11 A

31-Jul-12

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

12-Jul-11

21-Aug-11

23-Aug-11

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

255 31-Mar-11

21-Mar-12

31-Mar-11 A

08-Apr-12

254 03-Apr-11

21-Mar-12

03-Apr-11 A

08-Apr-12

Primary Baseline Actual Work

Baseline ...

Remaining...

2012 F M A M J JulA

19-Apr-11 A

31-Jul-12

Start Date:28-Mar-11 Finish Date:31-Jul-12 Critical Re... Data Date:25-Jun-11

Remaining Level of Effort

J

31-Mar-11 A

335 31-Mar-11

3 07-Jul-11

2011 A M J Jul A S O N D

A1

ENPPI

Page 1 of 64

By: Haytham A.Rahman Date 25-May-11

Revision Rev.0

Checked A.Maghawry

Approved A.Fathy

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID A2230

Activity Name HAZOP meeting

Drawings

Original BL Project Duration Start

BL Project Finish

Start

Finish

0 13-Jun-11

16-Jun-11

21-Jul-11

21-Jul-11

129 03-Apr-11

05-Oct-11

03-Apr-11 A

04-Oct-11

2011 A M J Jul A S O N D

A2420

UFD's IFD

5 06-Apr-11

13-Apr-11

06-Apr-11 A

10-Apr-11 A

A1410

PFD's IFD

5 03-Apr-11

10-Apr-11

03-Apr-11 A

10-Apr-11 A

A2430

Heat and material balance IFD

5 03-Apr-11

10-Apr-11

03-Apr-11 A

10-Apr-11 A

A1420

P&ID's IFD

5 10-Apr-11

17-Apr-11

10-Apr-11 A

21-Apr-11 A

A2570

Escape route and safety signs layouts IFD

5 31-May-11

07-Jun-11

10-May-11 A

16-May-11 A

A2560

Fire fighting and safety layouts IFD

5 05-May-11

12-May-11

05-May-11 A

17-May-11 A

A2410

Process block diagram IFD

5 07-Jun-11

14-Jun-11

12-Jun-11 A

20-Jun-11 A

A2190

Cause & Effect IFD

5 09-May-11

16-May-11

19-May-11 A

23-Jun-11 A

A1570

P&ID's IFC

7 05-Sep-11

14-Sep-11

05-Sep-11

13-Sep-11

A2200

Cause & Effect IFC

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A1560

PFD's IFF

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A4750

UFD's IFF

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4760

Fire fighting and safety layouts IFC

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4740

Process block flow diagram IFF

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4770

Escape route and safety signs layouts IFC

Technical Lists

Page 2 of 64

5 28-Sep-11

05-Oct-11

28-Sep-11

04-Oct-11

249 10-Apr-11

21-Mar-12

10-Apr-11 A

08-Apr-12

A5320

Design basis IFD

3 10-Apr-11

12-Apr-11

10-Apr-11 A

12-Apr-11 A

A2550

Safety philosophy IFD

5 20-Apr-11

27-Apr-11

20-Apr-11 A

27-Apr-11 A

A2540

Hazardous area classification schedule IFD

5 26-Apr-11

04-May-11

26-Apr-11 A

05-May-11 A

A2210

Equipment list IFD

5 08-May-11

15-May-11

08-May-11 A

11-May-11 A

A2460

Utility load summary IFD

3 19-Jun-11

26-Jun-11

15-Jun-11 A

23-Jun-11 A

A2440

Process report IFD

13 05-Jun-11

12-Jun-11

26-Jun-11

12-Jul-11

A2450

Blow down report IFD

5 03-Jul-11

10-Jul-11

26-Jul-11

01-Aug-11

A2240

HAZOP Report

10 21-Jul-11

04-Aug-11

25-Aug-11

12-Sep-11

A2220

Equipment list IFF

5 12-Sep-11

19-Sep-11

12-Sep-11

18-Sep-11

A4790

Process report IFF

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A4810

Utility load summary IFF

5 20-Sep-11

27-Sep-11

20-Sep-11

26-Sep-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Hazardous area classification schedule IFC

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4800

Blow down report IFF

5 26-Sep-11

03-Oct-11

26-Sep-11

02-Oct-11

A4830

Safety philosophy IFF

5 03-Oct-11

11-Oct-11

03-Oct-11

10-Oct-11

A2580

Precommissioning procedures IFD

5 22-Feb-12

29-Feb-12

11-Mar-12

15-Mar-12

A2590

Plant operating guide IFD

5 29-Feb-12

07-Mar-12

18-Mar-12

22-Mar-12

A4840

Precommissioning procedures IFF

5 07-Mar-12

14-Mar-12

25-Mar-12

29-Mar-12

A4850

Plant operating guide IFF

5 14-Mar-12

21-Mar-12

01-Apr-12

08-Apr-12

52 03-Apr-11

09-May-11

03-Apr-11 A

29-May-11 A

A2470

Chemical injection package MRQ

3 03-Apr-11

06-Apr-11

03-Apr-11 A

06-Apr-11 A

A2490

Safety equipment and life saving MRQ

7 03-Apr-11

12-Apr-11

03-Apr-11 A

12-Apr-11 A

A2480

Fire protection system MRQ

5 06-Apr-11

12-Apr-11

06-Apr-11 A

12-Apr-11 A

A2510

Flame arrestor MRQ

5 20-Apr-11

27-Apr-11

13-Apr-11 A

17-Apr-11 A

A2500

Vent stack tips MRQ

5 02-May-11

09-May-11

01-May-11 A

09-May-11 A

A1440

Process commodities MRQ's (Other equipment)

15 10-Apr-11

02-May-11

06-Apr-11 A

29-May-11 A

78 08-May-11

11-Jul-11

18-Apr-11 A

26-Jul-11

TER's A2600

Chemical injection package TER

30 08-May-11

19-Jun-11

18-Apr-11 A

01-Jun-11 A

A2610

Fire protection system TER

25 11-May-11

14-Jun-11

26-Apr-11 A

05-Jul-11

A2620

Safety equipment and life saving TER

25 08-May-11

12-Jun-11

26-Apr-11 A

07-Jul-11

A2640

Flame arrestor TER

20 26-May-11

23-Jun-11

26-Jun-11

21-Jul-11

A1450

Process commodities TER's

45 09-May-11

11-Jul-11

22-Apr-11 A

26-Jul-11

A2630

Vent stack tips TER

13 06-Jun-11

04-Jul-11

01-Jun-11 A

26-Jul-11

MRP

43 10-Jul-11

29-Aug-11

03-Jul-11

04-Sep-11

A2660

Chemical injection package MRP

5 10-Jul-11

17-Jul-11

03-Jul-11

07-Jul-11

A2670

Fire protection system MRP

5 10-Jul-11

14-Jul-11

19-Jul-11

25-Jul-11

A2680

Safety equipment and life saving MRP

5 10-Jul-11

17-Jul-11

07-Aug-11

11-Aug-11

A2700

Flame arrestor MRP

5 21-Jul-11

28-Jul-11

21-Aug-11

25-Aug-11

A1460

Process commodities MRP's

25 25-Jul-11

29-Aug-11

27-Jul-11

04-Sep-11

A2690

Vent stack tips MRP

10-Aug-11

24-Aug-11

04-Sep-11

5 03-Aug-11

2011 A M J Jul A S O N D

A4820

MRQ's

Page 3 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Vendor pr prints review A2720

Chemical injection package Vendor prints review

A2740

Safety equipment and life saving Vendor prints review

A1470

Vendor prints review

A2760

Flame arrestor Vendor prints review

A2730

Fire protection system Vendor prints review

A2750

Vent stack tips Vendor prints review

PIPING Drawings

Original BL Project Duration Start

BL Project Finish

Start

119 24-Jul-11

26-Dec-11

17-Jul-11

10-Jan-12

100 25-Jul-11

25-Dec-11

17-Jul-11

14-Dec-11

80 25-Jul-11

24-Nov-11

21-Aug-11

21-Dec-11

100 25-Jul-11

25-Dec-11

26-Jul-11

25-Dec-11

07-Dec-11

04-Sep-11

01-Jan-12

21-Dec-11

03-Aug-11

02-Jan-12

80 23-Aug-11

26-Dec-11

13-Sep-11

10-Jan-12

240 31-Mar-11

24-Jan-12

31-Mar-11 A

03-Jan-12

178 17-Apr-11

04-Jan-12

05-Apr-11 A

03-Jan-12

80 07-Aug-11 100 24-Jul-11

Finish

Plot Plan IFD

5 17-Apr-11

24-Apr-11

05-Apr-11 A

10-Apr-11 A

A1670

Plot Plan IFC

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A6220

GA's IFD

8 15-Sep-11

27-Sep-11

18-Sep-11

27-Sep-11

A1680

ISO's

10 31-Oct-11

20-Nov-11

31-Oct-11

17-Nov-11

A1690

GA's IFC

15 02-Nov-11

30-Nov-11

02-Nov-11

29-Nov-11

A2790

Hydro test maps IFC

7 24-Nov-11

06-Dec-11

24-Nov-11

05-Dec-11

A6190

Piping support plan IFC

5 14-Dec-11

21-Dec-11

14-Dec-11

20-Dec-11

A6200

Piping support location IFC

5 21-Dec-11

28-Dec-11

21-Dec-11

27-Dec-11

A6210

Piping penetration location IFC

5 28-Dec-11

04-Jan-12

28-Dec-11

03-Jan-12

145 12-May-11

14-Dec-11

19-May-11 A

13-Dec-11

A2780

Line Designation table (LDT) IFD

5 12-May-11

19-May-11

19-May-11 A

01-Jun-11 A

A4920

Line Designation table (LDT) IFC

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A6180

Piping support list IFC

Specifications Specificat A6230

Piping material classes IFD

A6240

Final Piping material classes

Model

2011 A M J Jul A S O N D

A1660

Technical Lists

Page 4 of 64

5 07-Dec-11

14-Dec-11

07-Dec-11

13-Dec-11

44 16-May-11

13-Jun-11

16-May-11 A

14-Jul-11

5 16-May-11

23-May-11

16-May-11 A

23-May-11 A

15 06-Jun-11

13-Jun-11

26-Jun-11

14-Jul-11

100 23-May-11

23-Nov-11

26-Jun-11

22-Nov-11

A1990

Model Review (30%)

14 23-May-11

26-May-11

26-Jun-11

13-Jul-11

A2000

Model Review (60%)

3 21-Jul-11

26-Jul-11

13-Sep-11

15-Sep-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID A2010

Activity Name Model Review (90%)

MRQ's

Original BL Project Duration Start

BL Project Finish

Start

Finish

3 20-Nov-11

23-Nov-11

20-Nov-11

22-Nov-11

16 31-Mar-11

24-Apr-11

31-Mar-11 A

29-May-11 A

Piping bulk MRQ

5 31-Mar-11

07-Apr-11

31-Mar-11 A

07-Apr-11 A

A5410

Injection fitting MRQ

5 17-Apr-11

24-Apr-11

17-Apr-11 A

24-Apr-11 A

A5400

Insulation Joint MRQ

5 13-Apr-11

20-Apr-11

22-May-11 A

29-May-11 A

55 10-May-11

15-Jun-11

28-Apr-11 A

24-Jul-11

A1730

Piping bulk TER

15 10-May-11

31-May-11

28-Apr-11 A

17-May-11 A

A5420

Insulation Joint TER

15 19-May-11

09-Jun-11

30-May-11 A

21-Jul-11

A5430

Injection fitting TER

19 25-May-11

15-Jun-11

28-Jun-11

24-Jul-11

46 20-Jun-11

20-Jul-11

26-Jun-11

28-Aug-11

MRP A1740

Piping bulk MRP

5 20-Jun-11

27-Jun-11

26-Jun-11

30-Jun-11

A5530

Injection fitting MRP

5 13-Jul-11

20-Jul-11

22-Aug-11

28-Aug-11

A5540

Insulation Joint MRP

5 10-Jul-11

17-Jul-11

22-Aug-11

28-Aug-11

180 04-May-11

24-Jan-12

14-Jun-11 A

03-Jan-12

Vendor pr prints review A6110

Production Manifold Vendor prints review

180 04-May-11

24-Jan-12

14-Jun-11 A

05-Dec-11

A1750

Piping bulk Vendor prints review

100 05-Jul-11

05-Dec-11

10-Jul-11

07-Dec-11

A5550

Injection fitting Vendor prints review

80 28-Jul-11

30-Nov-11

06-Sep-11

03-Jan-12

A5560

Insulation Joint Vendor prints review

80 25-Jul-11

24-Nov-11

06-Sep-11

03-Jan-12

224 24-Apr-11

24-Jan-12

04-Apr-11 A

08-Jan-12

141 24-Apr-11

20-Oct-11

20-Apr-11 A

17-Nov-11

ELECTRICAL ELECTRIC Drawings

2011 A M J Jul A S O N D

A1720

TER's

Page 5 of 64

A3210

Lighting and navigational aids layouts IFD

5 24-Apr-11

02-May-11

20-Apr-11 A

26-Apr-11 A

A5290

Earthing layouts IFD

5 10-May-11

17-May-11

10-May-11 A

16-May-11 A

A3190

Hazardous area classification layout IFD

5 10-May-11

17-May-11

10-May-11 A

19-May-11 A

A1240

Electrical layouts IFD

15 09-May-11

30-May-11

25-May-11 A

23-Jun-11 A

A3200

Cable routing layouts IFD

5 19-May-11

26-May-11

16-Jun-11 A

23-Jun-11 A

A1230

Single line diagram IFD

20 23-May-11

30-May-11

26-Jun-11

21-Jul-11

A3220

Earthing layouts IFC

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A1600

Electrical layouts IFC

8 21-Sep-11

03-Oct-11

21-Sep-11

02-Oct-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Cable routing layouts IFC

5 28-Sep-11

05-Oct-11

28-Sep-11

04-Oct-11

A5300

Interconnecting wiring diagram IFC

5 29-Sep-11

09-Oct-11

29-Sep-11

05-Oct-11

A5270

Hazardous area classification schedule IFC

5 05-Oct-11

13-Oct-11

05-Oct-11

12-Oct-11

A1590

Single line diagram IFF

7 11-Oct-11

20-Oct-11

11-Oct-11

19-Oct-11

A5280

Lighting and navigational aids layouts IFC

5 12-Oct-11

19-Oct-11

13-Nov-11

17-Nov-11

73 15-May-11

11-Oct-11

26-Jun-11

10-Oct-11

A1580

Power system study IFD

15 15-May-11

24-May-11

26-Jun-11

14-Jul-11

A1250

Power system study IFF

10 26-Sep-11

11-Oct-11

26-Sep-11

10-Oct-11

52 24-Apr-11

20-Jun-11

04-Apr-11 A

22-Jun-11 A

MRQ's A3030

Electrical Cables MRQ

5 02-May-11

09-May-11

04-Apr-11 A

10-Apr-11 A

A3040

Electrical Cable trays MRQ

5 24-Apr-11

02-May-11

05-Apr-11 A

10-Apr-11 A

A3050

Navigation aids system MRQ

5 09-May-11

16-May-11

20-Apr-11 A

26-Apr-11 A

A6130

Earthing material MRQ

17 30-May-11

06-Jun-11

29-May-11 A

20-Jun-11 A

A1980

Electrical commodities MRQ

15 30-May-11

20-Jun-11

10-Apr-11 A

22-Jun-11 A

A3060

Lighting material MRQ

18 26-May-11

02-Jun-11

25-May-11 A

22-Jun-11 A

55 22-May-11

18-Jul-11

20-Apr-11 A

04-Aug-11

TER's A3080

Electrical Cable trays TER

20 22-May-11

19-Jun-11

20-Apr-11 A

02-May-11 A

A3070

Electrical Cables TER

20 23-May-11

20-Jun-11

25-Apr-11 A

29-May-11 A

A3090

Navigation aids system TER

20 30-May-11

27-Jun-11

16-May-11 A

10-Jul-11

A1210

Electrical commodities TER

25 13-Jun-11

18-Jul-11

03-Jul-11

04-Aug-11

A3100

Lighting material TER

20 08-Jun-11

06-Jul-11

10-Jul-11

04-Aug-11

A6250

Earthing material TER

20 20-Jun-11

18-Jul-11

10-Jul-11

04-Aug-11

75 10-Jul-11

15-Sep-11

19-Jun-11 A

04-Oct-11

MRP

2011 A M J Jul A S O N D

A5310

Technical Lists

Page 6 of 64

A3110

Electrical Cables MRP

5 13-Jul-11

20-Jul-11

19-Jun-11 A

20-Jun-11 A

A3120

Electrical Cable trays MRP

8 10-Jul-11

17-Jul-11

26-Jun-11

05-Jul-11

A3130

Navigation aids system MRP

5 19-Jul-11

26-Jul-11

02-Aug-11

08-Aug-11

A3140

Lighting material MRP

3 27-Jul-11

01-Aug-11

28-Aug-11

04-Sep-11

A6310

Earthing material MRP

5 08-Aug-11

15-Aug-11

28-Aug-11

06-Sep-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID A1700

Activity Name Electrical commodities MRP

Vendor pr prints review

Original BL Project Duration Start

BL Project Finish

Start

Finish

15 22-Aug-11

15-Sep-11

14-Sep-11

04-Oct-11

170 04-May-11

24-Jan-12

09-Jun-11 A

08-Jan-12

Electrical Cable trays Vendor prints review

80 25-Jul-11

24-Nov-11

10-Jul-11

02-Nov-11

A3150

Electrical Cables Vendor prints review

80 01-Aug-11

04-Dec-11

21-Jul-11

21-Nov-11

A6100

E&I Module Vendor prints review

170 04-May-11

24-Jan-12

09-Jun-11 A

05-Dec-11

A3250

Earthing Vendor prints review

60 23-Aug-11

28-Nov-11

11-Sep-11

11-Dec-11

A3170

Navigation aids system Vendor prints review

80 02-Aug-11

05-Dec-11

16-Aug-11

18-Dec-11

A3180

Lighting material Vendor prints review

80 11-Aug-11

14-Dec-11

11-Sep-11

08-Jan-12

235 31-Mar-11

22-Feb-12

31-Mar-11 A

08-Mar-12

131 05-May-11

16-Nov-11

20-Apr-11 A

16-Nov-11

Drawings A3280

Instrumenthook up drawing IFD

5 19-May-11

26-May-11

20-Apr-11 A

28-Apr-11 A

A3310

Instrument junction box and wiring diagram IFD

5 26-May-11

02-Jun-11

02-May-11 A

08-May-11 A

A3290

Field instrument layout IFD

5 05-May-11

12-May-11

05-May-11 A

19-May-11 A

A3300

Cable drawings IFD

16 12-May-11

19-May-11

25-May-11 A

14-Jun-11 A

A1270

Instrument Layouts & Wiring drawings IFD

15 19-May-11

09-Jun-11

20-Apr-11 A

15-Jun-11 A

A5660

Field instrument layout IFC

5 20-Oct-11

27-Oct-11

20-Oct-11

26-Oct-11

A5670

Cable drawings IFC

5 27-Oct-11

03-Nov-11

27-Oct-11

02-Nov-11

A5690

Instrumenthook up drawing IFC

5 01-Nov-11

14-Nov-11

01-Nov-11

13-Nov-11

A5680

Instrument junction box and wiring diagram IFC

5 03-Nov-11

16-Nov-11

03-Nov-11

15-Nov-11

A1280

Instrument Layouts & Wiring drawings IFC

15 20-Oct-11

16-Nov-11

20-Oct-11

16-Nov-11

104 26-Apr-11

25-Sep-11

26-Apr-11 A

22-Sep-11

Technical Lists A1290

Instrument Index IFD

5 26-Apr-11

04-May-11

26-Apr-11 A

03-May-11 A

A2250

Instrument data sheets

8 26-May-11

07-Jun-11

01-Jun-11 A

12-Jun-11 A

A3320

Instrument cable schedule IFD

0 26-May-11

02-Jun-11

08-Jun-11 A

15-Jun-11 A

A1610

Instrument Index IFC

7 14-Sep-11

25-Sep-11

14-Sep-11

22-Sep-11

74 31-Mar-11

09-Jun-11

31-Mar-11 A

26-Jun-11

MRQ's

2011 A M J Jul A S O N D

A3640

INSTRUMENTATION INSTRUME

Page 7 of 64

A3330

HIPPS MRQ

5 31-Mar-11

07-Apr-11

01-Apr-11 A

03-Apr-11 A

A3340

Electro hydraulic wellhead control panel MRQ

5 04-Apr-11

12-Apr-11

31-Mar-11 A

07-Apr-11 A

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

10 03-Apr-11

17-Apr-11

02-Apr-11 A

10-Apr-11 A

Instrument commodities MRQ (HIPPS , Multiphase Flow Meter .....)

A3350

Multi phase flow meter MRQ

5 03-Apr-11

10-Apr-11

03-Apr-11 A

10-Apr-11 A

A3360

Wing valves MRQ

5 06-Apr-11

13-Apr-11

03-Apr-11 A

10-Apr-11 A

A3370

Choke valves MRQ

5 06-Apr-11

13-Apr-11

03-Apr-11 A

10-Apr-11 A

A5710

Instrument & Mechanical bulk material MRQ

5 26-May-11

02-Jun-11

25-Apr-11 A

03-May-11 A

A3380

Loose instrument MRQ

9 18-May-11

25-May-11

25-May-11 A

06-Jun-11 A

A5720

Junction boxes MRQ

0 02-Jun-11

09-Jun-11

25-May-11 A

06-Jun-11 A

A3390

Instrument cable and cable glands MRQ

22 16-May-11

23-May-11

25-May-11 A

23-Jun-11 A

A2310

Instrument commodities MRQ (Trays ,Bulks ,Cables .....)

35 20-Apr-11

09-Jun-11

25-May-11 A

26-Jun-11

A3400

Instrument Cable trays MRQ

20 24-May-11

31-May-11

31-May-11 A

26-Jun-11

A2820

Sand & Corrosion probes MRQ

22 25-May-11

01-Jun-11

25-May-11 A

26-Jun-11

73 24-Apr-11

07-Jul-11

02-Apr-11 A

18-Aug-11

A3430

Multi phase flow meter TER

20 15-May-11

12-Jun-11

28-Apr-11 A

25-May-11 A

A3410

HIPPS TER

20 03-May-11

31-May-11

26-Apr-11 A

09-Jun-11 A

A3440

Wing valves TER

20 16-May-11

13-Jun-11

02-May-11 A

15-Jun-11 A

A3420

Electro hydraulic wellhead control panel TER

20 15-May-11

12-Jun-11

21-Apr-11 A

16-Jun-11 A

A3450

Choke valves TER

20 18-May-11

15-Jun-11

26-Apr-11 A

05-Jul-11

A5950

Instrument & Mechanical bulk material TER

10 19-Jun-11

03-Jul-11

26-May-11 A

14-Jul-11

A3470

Instrument cable and cable glands TER

10 06-Jun-11

20-Jun-11

10-Jul-11

21-Jul-11

A5780

Junction boxes TER

10 23-Jun-11

07-Jul-11

21-Jun-11 A

21-Jul-11

A3460

Loose instrument TER

10 12-Jun-11

26-Jun-11

20-Jun-11 A

24-Jul-11

A3480

Instrument Cable trays TER

25 14-Jun-11

28-Jun-11

26-Jun-11

28-Jul-11

A5870

Sand & Corrosion probes TER

20 16-Jun-11

07-Jul-11

10-Jul-11

04-Aug-11

A2300

Instrument commodities TER's (Trays ,Bulks ,Cables .....)

35 19-May-11

07-Jul-11

26-Jun-11

11-Aug-11

A1340

Instrument commodities TER's (HIPPS , Multiphase Flow Meter .....)

40 24-Apr-11

20-Jun-11

02-Apr-11 A

18-Aug-11

57 16-Jun-11

08-Aug-11

22-Jun-11 A

13-Sep-11

MRP

2011 A M J Jul A S O N D

A1310

TER's

Page 8 of 64

A3510

Multi phase flow meter MRP

5 10-Jul-11

17-Jul-11

22-Jun-11 A

23-Jun-11 A

A3500

Electro hydraulic wellhead control panel MRP

5 12-Jul-11

19-Jul-11

06-Jul-11

12-Jul-11

A3490

HIPPS MRP

5 28-Jun-11

05-Jul-11

07-Jul-11

13-Jul-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Wing valves MRP

5 11-Jul-11

18-Jul-11

24-Jul-11

28-Jul-11

A3530

Choke valves MRP

5 10-Jul-11

17-Jul-11

27-Jul-11

02-Aug-11

A5960

Instrument & Mechanical bulk material MRP

5 24-Jul-11

31-Jul-11

07-Aug-11

11-Aug-11

A5790

Junction boxes MRP

5 28-Jul-11

04-Aug-11

14-Aug-11

18-Aug-11

A3550

Instrument cable and cable glands MRP

5 11-Jul-11

18-Jul-11

14-Aug-11

18-Aug-11

A3540

Loose instrument MRP

5 17-Jul-11

24-Jul-11

15-Aug-11

21-Aug-11

A3560

Cable trays MRP

5 14-Jul-11

21-Jul-11

16-Aug-11

22-Aug-11

A5380

Instrument cable trays MRP

5 14-Jul-11

21-Jul-11

16-Aug-11

22-Aug-11

A5880

Sand & Corrosion probes MRP

5 01-Aug-11

08-Aug-11

28-Aug-11

06-Sep-11

A1350

Instrument commodities MRP's

35 16-Jun-11

04-Aug-11

24-Jul-11

13-Sep-11

175 04-May-11

22-Feb-12

13-Jun-11 A

08-Mar-12

A3580

Electro hydraulic wellhead control panel Vendor prints review

80 27-Jul-11

29-Nov-11

21-Jul-11

21-Nov-11

A3600

Wing valves Vendor prints review

80 26-Jul-11

28-Nov-11

04-Aug-11

06-Dec-11

A6120

Shutdown and blowdown valves Vendor prints review

170 04-May-11

10-Jan-12

13-Jun-11 A

07-Dec-11

A3590

Multi phase flow meter Vendor prints review

100 25-Jul-11

25-Dec-11

10-Jul-11

07-Dec-11

A5970

Instrument & Mechanical bulk material Vendor prints review

70 08-Aug-11

24-Nov-11

21-Aug-11

07-Dec-11

A3610

Choke valves Vendor prints review

80 25-Jul-11

24-Nov-11

11-Aug-11

13-Dec-11

A5800

Junction boxes Vendor prints review

70 14-Aug-11

30-Nov-11

28-Aug-11

14-Dec-11

A3620

Loose instrument Vendor prints review

70 01-Aug-11

17-Nov-11

04-Sep-11

18-Dec-11

A5770

Instrument cable trays Vendor prints review

70 31-Jul-11

15-Nov-11

04-Sep-11

18-Dec-11

A5890

Sand & Corrosion probes Vendor prints review

70 16-Aug-11

05-Dec-11

11-Sep-11

25-Dec-11

A3630

Instrument cable and cable glands Vendor prints review

80 26-Jul-11

28-Nov-11

28-Aug-11

28-Dec-11

A3570

HIPPS Vendor prints review

150 13-Jul-11

22-Feb-12

24-Jul-11

01-Mar-12

A1360

Vendor prints Review

120 04-Aug-11

01-Feb-12

14-Sep-11

08-Mar-12

239 03-Apr-11

01-Feb-12

03-Apr-11 A

01-Feb-12

120 04-Apr-11

26-Sep-11

04-Apr-11 A

25-Sep-11

MECHANICAL MECHANIC Technical Lists

2011 A M J Jul A S O N D

A3520

Vendor pr prints review

Page 9 of 64

A1050

Issue motor load list 1st issue

10 04-Apr-11

19-Apr-11

04-Apr-11 A

14-Apr-11 A

A6320

Issue motor load list 2nd issue

0 07-Jul-11

21-Jul-11

14-Jun-11 A

23-Jun-11 A

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

A5480

Handling Study

A2390

Issue motor load list IFF

MRQ's

Original BL Project Duration Start

BL Project Finish

Start

Finish

0 02-May-11

09-May-11

26-Jun-11

26-Jun-11

10 12-Sep-11

26-Sep-11

12-Sep-11

25-Sep-11

84 03-Apr-11

28-Jul-11

03-Apr-11 A

28-Jul-11

5 06-Apr-11

13-Apr-11

03-Apr-11 A

10-Apr-11 A

10 03-Apr-11

17-Apr-11

03-Apr-11 A

25-Apr-11 A

Turret crane MRQ

A1060

Mechanical commodities MRQ's (Excluding Monorail crane)

A3650

Service water pump MRQ

5 18-Apr-11

25-Apr-11

18-Apr-11 A

25-Apr-11 A

A3680

Monorail crane MRQ

5 21-Jul-11

28-Jul-11

24-Jul-11

28-Jul-11

84 08-May-11

06-Sep-11

20-Apr-11 A

06-Sep-11

A3710

Turret crane TER

20 15-May-11

12-Jun-11

20-Apr-11 A

04-May-11 A

A3690

Service water pump TER

15 17-May-11

07-Jun-11

10-May-11 A

03-Jul-11

A1070

Mechanical commodities TER (Excluding Monorail crane)

25 08-May-11

12-Jun-11

20-Apr-11 A

04-Jul-11

A3720

Monorail crane TER

15 11-Aug-11

06-Sep-11

14-Aug-11

06-Sep-11

92 10-Jul-11

10-Oct-11

10-May-11 A

10-Oct-11

5 10-Jul-11

17-Jul-11

10-May-11 A

15-Jun-11 A

10 10-Jul-11

24-Jul-11

21-Jul-11

03-Aug-11

MRP A3750

Turret crane MRP

A1100

Mechanical commodities MRP

A3730

Service water pump MRP

5 11-Jul-11

18-Jul-11

28-Jul-11

03-Aug-11

A3760

Monorail crane MRP

3 04-Oct-11

10-Oct-11

05-Oct-11

10-Oct-11

181 04-May-11

01-Feb-12

26-May-11 A

01-Feb-12

Vendor pr prints review A6330

Receiving final weights and dimensions for mechanical equipment

A3810

Micro Turbine Vendor prints review

180 04-May-11

24-Jan-12

26-May-11 A

22-Nov-11

A3820

Emergency GeneratorVendor prints review

160 04-May-11

24-Jan-12

12-Jun-11 A

05-Dec-11

A3790

Turret crane crane Vendor prints review

100 25-Jul-11

25-Dec-11

10-Jul-11

07-Dec-11

A3770

Service water pump Vendor prints review

80 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

A1120

Vendor prints review

100 25-Jul-11

25-Dec-11

15-Aug-11

12-Jan-12

A3800

Monorail crane Vendor prints review

80 04-Oct-11

01-Feb-12

05-Oct-11

01-Feb-12

OFFSHORE OFFSHOR

155 31-Mar-11

05-Dec-11

10-Apr-11 A

04-Dec-11

Drawings

126 30-May-11

05-Dec-11

30-May-11 A

04-Dec-11

10 30-May-11

13-Jun-11

30-May-11 A

13-Jun-11 A

A2350

Tray / Piping Supports Drawings IFD

0 20-Sep-11

2011 A M J Jul A S O N D

A3670

TER's

Page 10 of 64

21-Sep-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

A5340

Tray / Piping Supports Drawings IFC

Model

Original BL Project Duration Start

BL Project Finish

Start

Finish

10 20-Nov-11

05-Dec-11

20-Nov-11

04-Dec-11

145 18-Apr-11

20-Nov-11

18-Apr-11 A

17-Nov-11

Generate PDS Modeling For Topsides

20 18-Apr-11

17-May-11

18-Apr-11 A

17-May-11 A

A5360

Finalize PDS Modeling For Topsides based on Tecnomare IFC dw...

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

5 24-Apr-11

28-Apr-11

10-Apr-11 A

14-Apr-11 A

5 24-Apr-11

28-Apr-11

10-Apr-11 A

14-Apr-11 A

20 01-Jun-11

28-Jun-11

22-May-11 A

03-Jul-11

20 01-Jun-11

28-Jun-11

22-May-11 A

03-Jul-11

5 20-Jul-11

26-Jul-11

25-Jul-11

31-Jul-11

5 20-Jul-11

26-Jul-11

25-Jul-11

31-Jul-11

60 31-Mar-11

26-Jun-11

26-Jun-11

20-Sep-11

60 31-Mar-11

26-Jun-11

26-Jun-11

20-Sep-11

261 06-Apr-11

11-May-12

03-Apr-11 A

21-Apr-12

261 06-Apr-11

28-Apr-12

03-Apr-11 A

21-Apr-12

261 06-Apr-11

28-Apr-12

03-Apr-11 A

21-Apr-12

87 06-Apr-11

02-Aug-11

03-Apr-11 A

07-Aug-11

A1490

Survival module MRQ

TER's A1500

Survival module TER

MRP A1510

Survival module MRP

Vendor pr prints review A1530

Vendor prints review

W.P.3: PROCUREMENT PRO SERVICES & MATERIAL SUPPLY EQUIPMENT EQUIPMEN ENPPI LO LONG LEAD ITEMS (Cranes ,Chemical unjec.,Fire protec. , Survival M... PURCHASING PURCHA

2011 A M J Jul A S O N D

A5350

MRQ's

Page 11 of 64

A3860

Chemical injection package Bidding

15 06-Apr-11

27-Apr-11

06-Apr-11 A

18-Apr-11 A

A4610

Turret crane Bidding

20 13-Apr-11

12-May-11

10-Apr-11 A

20-Apr-11 A

A4360

Electro hydraulic wellhead control panel Bidding

15 14-Apr-11

15-May-11

07-Apr-11 A

21-Apr-11 A

A4350

HIPPS Bidding

15 07-Apr-11

28-Apr-11

03-Apr-11 A

26-Apr-11 A

A3870

Fire protection system Bidding

10 13-Apr-11

26-Apr-11

13-Apr-11 A

26-Apr-11 A

A4370

Multi phase flow meter Bidding

20 10-Apr-11

09-May-11

10-Apr-11 A

28-Apr-11 A

A2080

Bidding (Multi phase flow , Chemical unjec.,Fire protec. , Survival ...

30 19-Apr-11

31-May-11

19-Apr-11 A

22-May-11 A

A4710

Survival module Bidding

22 02-May-11

31-May-11

14-Apr-11 A

22-May-11 A

A5140

Turret crane Issue Fax of commitment

3 12-Jun-11

10-Jul-11

25-May-11 A

29-May-11 A

B1040

Turret crane Issue PO

5 17-Jul-11

24-Jul-11

15-Jun-11 A

21-Jun-11 A

A5130

Multi phase flow meter Issue Fax of commitment

20 12-Jun-11

10-Jul-11

25-May-11 A

21-Jun-11 A

A4860

Chemical injection package Issue Fax of commitment

15 19-Jun-11

10-Jul-11

12-Jun-11 A

30-Jun-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Multi phase flow meter Issue PO

6 17-Jul-11

24-Jul-11

26-Jun-11

03-Jul-11

A5250

Electro hydraulic wellhead control panel Issue Fax of commitment

8 14-Jun-11

12-Jul-11

26-Jun-11

05-Jul-11

A5120

HIPPS Issue Fax of commitment

20 31-May-11

28-Jun-11

20-Jun-11 A

06-Jul-11

B1050

Chemical injection package Issue PO

1 17-Jul-11

24-Jul-11

10-Jul-11

10-Jul-11

B1010

HIPPS Issue PO

0 05-Jul-11

12-Jul-11

14-Jul-11

14-Jul-11

A5330

Fire protection system Issue Fax of commitment

9 19-Jun-11

07-Jul-11

06-Jul-11

18-Jul-11

A5150

Survival module Issue Fax of commitment

15 29-Jun-11

19-Jul-11

04-Jul-11

24-Jul-11

A1020

Fire protection system Issue PO

5 17-Jul-11

21-Jul-11

26-Jul-11

01-Aug-11

A2090

Issue Fax of commitments (Multi phase flow , Chemical unjec.,Fir...

30 08-Jun-11

19-Jul-11

03-Apr-11 A

04-Aug-11

B1030

Survival module Issue PO

5 27-Jul-11

02-Aug-11

01-Aug-11

07-Aug-11

267 28-Jun-11

24-Mar-12

25-Jun-11

17-Mar-12

A4450

Multi phase flow meter Fabrication up to release for shipment

180 10-Jul-11

06-Jan-12

25-Jun-11

21-Dec-11

A3920

Chemical injection package Fabrication up to release for shipment

180 10-Jul-11

06-Jan-12

01-Jul-11

27-Dec-11

A4720

Survival module Fabrication up to release for shipment

160 20-Jul-11

26-Dec-11

25-Jul-11

31-Dec-11

A4440

Electro hydrolic wellhead control panel Fabrication up to release fo...

180 12-Jul-11

08-Jan-12

06-Jul-11

01-Jan-12

A3930

Fire protection system Fabrication up to release for shipment

170 08-Jul-11

03-Jan-12

19-Jul-11

04-Jan-12

A2100

Fabrication up to release for shipment (Multi phase flow , Chemica...

200 29-Jun-11

14-Jan-12

26-Jun-11

11-Jan-12

A4650

Turret crane Fabrication up to release for shipment

240 10-Jul-11

06-Mar-12

25-Jun-11

19-Feb-12

A2260

Fabrication up to release for shipment (HIPPS)

255 28-Jun-11

24-Mar-12

07-Jul-11

17-Mar-12

144 30-Nov-11

28-Apr-12

30-Nov-11

21-Apr-12

SHIPPING SHIPPIN

2011 A M J Jul A S O N D

A1000

FABRICATION FABRICA

Page 12 of 64

A4480

Multi phase flow meter Shipping

21 06-Jan-12

27-Jan-12

22-Dec-11

11-Jan-12

A5210

Chemical injection package Shipping

21 06-Jan-12

27-Jan-12

28-Dec-11

17-Jan-12

A4730

Survival module Shipping

21 27-Dec-11

16-Jan-12

01-Jan-12

21-Jan-12

A4470

Electro hydraulic wellhead control panel Shipping

21 08-Jan-12

29-Jan-12

02-Jan-12

22-Jan-12

A5170

Multi phase flow meter Custom clearance & inland transportation

14 27-Jan-12

10-Feb-12

12-Jan-12

25-Jan-12

A2110

Shipping (Multi phase flow ,Chemical unjec.,Fire protec. , Survival...

60 30-Nov-11

29-Jan-12

30-Nov-11

28-Jan-12

A3990

Fire protection system Shipping

21 04-Jan-12

24-Jan-12

08-Jan-12

28-Jan-12

A3980

Chemical injection package Custom clearance & inland transportat...

14 27-Jan-12

10-Feb-12

18-Jan-12

31-Jan-12

A5200

Survival module Custom clearance & inland transportation

14 17-Jan-12

30-Jan-12

22-Jan-12

04-Feb-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Electro hydraulic wellhead control panel Custom clearance & inla...

14 29-Jan-12

12-Feb-12

23-Jan-12

05-Feb-12

A2120

Custom clearance & inland transportation (Multi phase flow ,Che...

45 29-Dec-11

12-Feb-12

29-Dec-11

11-Feb-12

A5190

Fire protection system Custom clearance & inland transportation

14 25-Jan-12

07-Feb-12

29-Jan-12

11-Feb-12

A4690

Turret crane Shipping

14 06-Mar-12

20-Mar-12

20-Feb-12

04-Mar-12

A5180

Turret crane Custom clearance & inland transportation

14 20-Mar-12

03-Apr-12

05-Mar-12

18-Mar-12

A4460

HIPPS Shipping

21 24-Mar-12

14-Apr-12

18-Mar-12

07-Apr-12

A2280

HIPPS Custom clearance & inland transportation

14 14-Apr-12

28-Apr-12

08-Apr-12

21-Apr-12

226 12-Apr-11

07-Mar-12

12-Apr-11 A

07-Mar-12

129 12-Apr-11

17-Oct-11

12-Apr-11 A

17-Oct-11

PURCHASING PURCHA A3880

Safety equipment and life saving Bidding

10 12-Apr-11

26-Apr-11

12-Apr-11 A

26-Apr-11 A

A3910

Service water pumps Bidding

15 25-Apr-11

17-May-11

25-Apr-11 A

10-May-11 A

A3900

Flame arrestor Bidding

15 27-Apr-11

19-May-11

17-Apr-11 A

19-May-11 A

A3890

Vent stack tips Bidding

20 09-May-11

06-Jun-11

09-May-11 A

01-Jun-11 A

B1060

Electro hydraulic wellhead control panel Issue PO

5 19-Jul-11

26-Jul-11

13-Jul-11

19-Jul-11

A1370

Bidding (Service pumps,Flame arrestor,Vent ,....).

25 02-May-11

06-Jun-11

25-Apr-11 A

21-Jul-11

A4900

Service water pumps Issue Fax of commitment

18 13-Jun-11

11-Jul-11

04-Jul-11

27-Jul-11

A4870

Safety equipment and life saving Issue Fax of commitment

20 12-Jun-11

10-Jul-11

10-Jul-11

04-Aug-11

B1080

Service water pumps Issue PO

5 18-Jul-11

25-Jul-11

04-Aug-11

10-Aug-11

A4620

Monorail crane Bidding

10 28-Jul-11

11-Aug-11

31-Jul-11

11-Aug-11

A4890

Flame arrestor Issue Fax of commitment

20 23-Jun-11

21-Jul-11

24-Jul-11

18-Aug-11

B1070

Safety equipment and life saving Issue PO

5 17-Jul-11

24-Jul-11

14-Aug-11

18-Aug-11

A1380

Issue Fax of commitments(Service pumps,Flame arrestor,Vent ,....).

25 29-Jun-11

03-Aug-11

20-Jul-11

23-Aug-11

A4880

Vent stack tips Issue Fax of commitment

20 06-Jul-11

03-Aug-11

27-Jul-11

23-Aug-11

B1090

Flame arrestor Issue PO

5 28-Jul-11

04-Aug-11

28-Aug-11

06-Sep-11

B1100

Issue POs (HCU.,Sea water pumps....).

25 13-Jul-11

17-Aug-11

03-Aug-11

11-Sep-11

B1110

Vent stack tips Issue PO

5 10-Aug-11

17-Aug-11

05-Sep-11

11-Sep-11

A5230

Monorail crane Issue Fax of commitment

20 06-Sep-11

04-Oct-11

07-Sep-11

04-Oct-11

B1120

Monorail crane Issue PO

5 10-Oct-11

17-Oct-11

11-Oct-11

17-Oct-11

189 10-Jul-11

01-Feb-12

28-Jul-11

01-Feb-12

FABRICATION FABRICA

2011 A M J Jul A S O N D

A5700

OTHER E EQUIPMENT (Service pumps,Flame arrestor,Vent ,....).

Page 13 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Service water pump Fabrication up to release for shipment

140 11-Jul-11

28-Nov-11

28-Jul-11

14-Dec-11

A3950

Vent stack tips Fabrication up to release for shipment

120 08-Aug-11

06-Dec-11

29-Aug-11

26-Dec-11

A3960

Flame arrestorFabrication up to release for shipment

130 21-Jul-11

28-Nov-11

19-Aug-11

26-Dec-11

A1390

Fabrication up to release for shipment (Service pumps,Flame arre...

150 10-Jul-11

07-Dec-11

05-Aug-11

01-Jan-12

A3940

Safety equipment and life saving Fabrication up to release for ship...

150 10-Jul-11

07-Dec-11

05-Aug-11

01-Jan-12

A4660

Monorail crane Fabrication up to release for shipment

120 04-Oct-11

01-Feb-12

05-Oct-11

01-Feb-12

88 15-Nov-11

07-Mar-12

11-Dec-11

07-Mar-12

A4670

Service water pump Shipping

21 28-Nov-11

19-Dec-11

15-Dec-11

04-Jan-12

A4010

Vent stack tips Shipping

21 06-Dec-11

27-Dec-11

27-Dec-11

16-Jan-12

A4020

Flame arrestor Shipping

21 28-Nov-11

19-Dec-11

27-Dec-11

16-Jan-12

A6030

Service water pump Custom clearance & inland transportation

14 21-Dec-11

04-Jan-12

07-Jan-12

20-Jan-12

A4000

Safety equipment and life saving Shipping

21 07-Dec-11

28-Dec-11

02-Jan-12

22-Jan-12

A1400

Shipping (Service pumps,Flame arrestor,Vent ,....).

50 15-Nov-11

04-Jan-12

11-Dec-11

29-Jan-12

A5510

Flame arrestor Custom clearance & inland transportation

14 19-Dec-11

02-Jan-12

17-Jan-12

30-Jan-12

A5520

Vent stack tips Custom clearance & inland transportation

14 27-Dec-11

10-Jan-12

17-Jan-12

30-Jan-12

A5500

Safety equipment and life saving Custom clearance & inland trans...

14 28-Dec-11

11-Jan-12

23-Jan-12

05-Feb-12

A1710

Custom clearance & inland transportation (Service pumps,Flame a...

35 14-Dec-11

18-Jan-12

09-Jan-12

12-Feb-12

A4700

Monorail crane Shipping

21 01-Feb-12

22-Feb-12

02-Feb-12

22-Feb-12

A6040

Monorail crane Custom clearance & inland transportation

14 22-Feb-12

07-Mar-12

23-Feb-12

07-Mar-12

318 19-Apr-11

26-Jan-12

29-Apr-11 A

01-Mar-12

307 19-Apr-11

15-Dec-11

29-Apr-11 A

15-Dec-11

PETROBEL LONG LEAD ITEMS PETROBE FABRICATION FABRICA

2011 A M J Jul A S O N D

A4630

SHIPPING SHIPPIN

Page 14 of 64

A6150

Manual Valves Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

23-Jun-11 A

12-Dec-11

A2160

Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

25-May-11 A

15-Dec-11

A4040

Micro Turbine Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

26-May-11 A

15-Dec-11

A4050

Diesel generator Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

20-Jun-11 A

15-Dec-11

A4060

E&I Module Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

21-Jun-11 A

15-Dec-11

A4070

Production Manifold Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

26-May-11 A

15-Dec-11

A4080

Shutdown and blowdown valves Fabrication up to release for ship...

240 19-Apr-11

15-Dec-11

29-Apr-11 A

15-Dec-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

SHIPPING SHIPPIN

Original BL Project Duration Start

BL Project Finish

Start

Finish

77 15-Dec-11

26-Jan-12

16-Dec-11

01-Mar-12

Micro Turbine Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

16-Dec-11

29-Dec-11

A6060

Diesel generator Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

16-Dec-11

29-Dec-11

A4130

Shutdown and blowdown valves Shipping

21 15-Dec-11

12-Jan-12

16-Dec-11

05-Jan-12

A6160

Manual Valves Shipping

21 15-Dec-11

05-Jan-12

16-Dec-11

05-Jan-12

A4110

E&I Module Shipping

28 15-Dec-11

12-Jan-12

16-Dec-11

12-Jan-12

A4120

Production Manifold Shipping

28 15-Dec-11

12-Jan-12

16-Dec-11

12-Jan-12

A6090

Shutdown and blowdown valves & inland transportation

14 12-Jan-12

26-Jan-12

06-Jan-12

19-Jan-12

A6170

Manual Valves & inland transportation

14 05-Jan-12

19-Jan-12

06-Jan-12

19-Jan-12

A4090

Micro Turbine Shipping

28 15-Dec-11

12-Jan-12

30-Dec-11

26-Jan-12

A4100

Diesel generator Shipping

28 15-Dec-11

12-Jan-12

30-Dec-11

26-Jan-12

A6070

E&I Module Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

13-Jan-12

26-Jan-12

A6080

Production Manifold Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

13-Jan-12

26-Jan-12

A2170

Shipping

35 15-Dec-11

19-Jan-12

20-Jan-12

23-Feb-12

A2180

Custom clearance & inland transportation

25 01-Jan-12

26-Jan-12

06-Feb-12

01-Mar-12

259 13-Apr-11

11-May-12

09-Apr-11 A

21-Apr-12

111 13-Apr-11

25-Aug-11

09-Apr-11 A

15-Sep-11

PURCHASING PURCHA

2011 A M J Jul A S O N D

A6050

E&I BULK

Page 15 of 64

A5390

Electrical Cable trays Bidding

10 02-May-11

16-May-11

10-Apr-11 A

20-Apr-11 A

A4240

Electrical Cables Bidding

10 09-May-11

23-May-11

09-Apr-11 A

25-Apr-11 A

A4390

Choke valves Bidding

20 13-Apr-11

12-May-11

10-Apr-11 A

26-Apr-11 A

A4380

Wing valves Bidding

20 13-Apr-11

12-May-11

10-Apr-11 A

02-May-11 A

A4250

Navigation aids system Bidding

10 16-May-11

30-May-11

26-Apr-11 A

16-May-11 A

A5980

Instrument & Mechanical bulk material Bidding

10 05-Jun-11

19-Jun-11

03-May-11 A

26-May-11 A

A5070

Electrical Cable trays Issue Fax of commitments

15 19-Jun-11

10-Jul-11

02-May-11 A

30-May-11 A

A4400

Loose instrument Bidding

10 29-May-11

12-Jun-11

09-Jun-11 A

20-Jun-11 A

A5810

Junction boxes Bidding

10 09-Jun-11

23-Jun-11

07-Jun-11 A

20-Jun-11 A

A4420

Instrument Cable trays Bidding

10 31-May-11

14-Jun-11

23-Jun-11 A

26-Jun-11

A5080

Electrical Cables Issue Fax of commitments

6 22-Jun-11

13-Jul-11

26-Jun-11

03-Jul-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Page 16 of 64

2011 A M J Jul A S O N D

A4410

Instrument cable and cable glands Bidding

10 23-May-11

06-Jun-11

26-Jun-11

07-Jul-11

A4260

Lighting material Bidding

10 25-May-11

08-Jun-11

22-Jun-11 A

07-Jul-11

A5900

Sand & Corrosion probes Bidding

10 02-Jun-11

16-Jun-11

27-Jun-11 A

07-Jul-11

A6260

Earthing material Bidding

10 06-Jun-11

20-Jun-11

21-Jun-11 A

07-Jul-11

C1040

Electrical Cables P.O

5 20-Jul-11

27-Jul-11

04-Jul-11

10-Jul-11

A1880

Bidding

35 09-May-11

27-Jun-11

20-Apr-11 A

11-Jul-11

C1020

Electrical Cable trays P.O

5 17-Jul-11

24-Jul-11

06-Jul-11

12-Jul-11

A5030

Wing valves Issue Fax of commitments

20 13-Jun-11

11-Jul-11

26-Jun-11

21-Jul-11

A5040

Choke valves Issue Fax of commitments

15 19-Jun-11

10-Jul-11

06-Jul-11

26-Jul-11

A5100

Navigation aids system Issue Fax of commitments

15 27-Jun-11

18-Jul-11

11-Jul-11

31-Jul-11

A5990

Instrument & Mechanical bulk material Issue Fax of commitments

15 03-Jul-11

24-Jul-11

17-Jul-11

04-Aug-11

C1000

Wing valves P.O

5 18-Jul-11

25-Jul-11

31-Jul-11

04-Aug-11

C1010

Choke valves P.O

5 17-Jul-11

24-Jul-11

03-Aug-11

09-Aug-11

A5060

Instrument cable and cable glands Issue Fax of commitments

15 20-Jun-11

11-Jul-11

24-Jul-11

11-Aug-11

A5830

Junction boxes Issue Fax of commitments

15 07-Jul-11

28-Jul-11

24-Jul-11

11-Aug-11

A5050

Loose instrument Issue Fax of commitments

15 26-Jun-11

17-Jul-11

25-Jul-11

14-Aug-11

A5090

Instrument Cable trays Issue Fax of commitments

10 30-Jun-11

14-Jul-11

02-Aug-11

15-Aug-11

C1060

Navigation aids system P.O

5 26-Jul-11

02-Aug-11

09-Aug-11

15-Aug-11

C1030

Instrument & Mechanical bulk material P.O

5 31-Jul-11

07-Aug-11

14-Aug-11

18-Aug-11

A5110

Lighting material Issue Fax of commitments

15 06-Jul-11

27-Jul-11

07-Aug-11

25-Aug-11

A5910

Sand & Corrosion probes Issue Fax of commitments

15 11-Jul-11

01-Aug-11

07-Aug-11

25-Aug-11

A6270

Earthing material Issue Fax of commitments

15 18-Jul-11

08-Aug-11

07-Aug-11

25-Aug-11

C1070

Instrument cable and cable glands P.O

5 18-Jul-11

25-Jul-11

21-Aug-11

25-Aug-11

C1050

Junction boxes P.O

5 04-Aug-11

11-Aug-11

21-Aug-11

25-Aug-11

A1890

E&I Bulk issue Fax of commitments

30 14-Jul-11

25-Aug-11

18-Jul-11

28-Aug-11

C1090

Loose instrument P.O

5 24-Jul-11

31-Jul-11

22-Aug-11

28-Aug-11

C1100

Instrument Cable trays P.O

5 21-Jul-11

28-Jul-11

23-Aug-11

29-Aug-11

C1080

Lighting material P.O

5 15-Aug-11

22-Aug-11

07-Sep-11

13-Sep-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Sand & Corrosion probes P.O

5 08-Aug-11

15-Aug-11

07-Sep-11

13-Sep-11

C1120

Earthing material P.O

5 17-Aug-11

24-Aug-11

11-Sep-11

15-Sep-11

267 10-Jul-11

06-Apr-12

25-Jun-11

17-Mar-12

100 10-Jul-11

18-Oct-11

25-Jun-11

02-Oct-11

A4530

Electrical Cable trays Fabrication up to release for shipment

A6000

Instrument & Mechanical bulk material Fabrication up to release fo...

90 24-Jul-11

01-Nov-11

05-Aug-11

02-Nov-11

A5820

Junction boxes Fabrication up to release for shipment

90 28-Jul-11

05-Nov-11

12-Aug-11

09-Nov-11

A4280

Instrument Cable trays Fabrication up to release for shipment

90 14-Jul-11

22-Oct-11

16-Aug-11

13-Nov-11

A4270

Electrical Cables Fabrication up to release for shipment

140 17-Jul-11

04-Dec-11

06-Jul-11

22-Nov-11

A4520

Instrument cable and cable glands Fabrication up to release for shi...

120 11-Jul-11

28-Nov-11

12-Aug-11

09-Dec-11

A4290

Navigation aids system Fabrication up to release for shipment

140 18-Jul-11

05-Dec-11

01-Aug-11

18-Dec-11

A4300

Lighting material Fabrication up to release for shipment

120 27-Jul-11

14-Dec-11

26-Aug-11

23-Dec-11

A6280

Earthing material Fabrication up to release for shipment

120 08-Aug-11

26-Dec-11

26-Aug-11

23-Dec-11

A5920

Sand & Corrosion probes Fabrication up to release for shipment

135 01-Aug-11

29-Dec-11

26-Aug-11

07-Jan-12

A4510

Loose instrument Fabrication up to release for shipment

155 17-Jul-11

13-Jan-12

15-Aug-11

16-Jan-12

A1900

E&I Bulk Fabrication up to release for shipment

180 20-Jul-11

16-Jan-12

22-Jul-11

17-Jan-12

A4500

Choke valves Fabrication up to release for shipment

210 10-Jul-11

05-Apr-12

27-Jul-11

21-Feb-12

A4490

Wing valves Fabrication up to release for shipment

240 11-Jul-11

06-Apr-12

22-Jul-11

17-Mar-12

136 18-Oct-11

11-May-12

03-Oct-11

21-Apr-12

SHIPPING

2011 A M J Jul A S O N D

C1110

FABRICATION FABRICA

Page 17 of 64

A4320

Electrical Cable trays Shipping

21 18-Oct-11

08-Nov-11

03-Oct-11

23-Oct-11

A4580

Electrical Cable trays Custom clearance & inland transportation

14 08-Nov-11

22-Nov-11

24-Oct-11

06-Nov-11

A5750

Instrument Cable trays Shipping

7 22-Oct-11

29-Oct-11

14-Nov-11

20-Nov-11

A6010

Instrument & Mechanical bulk material Shipping

21 01-Nov-11

22-Nov-11

03-Nov-11

23-Nov-11

A1910

1st batch of the E&I Bulk Shipping

21 05-Nov-11

26-Nov-11

10-Nov-11

30-Nov-11

A5840

Junction boxes Shipping

21 05-Nov-11

26-Nov-11

10-Nov-11

30-Nov-11

A5760

Instrument Cable trays Custom clearance & inland transportation

14 29-Oct-11

12-Nov-11

21-Nov-11

04-Dec-11

A6020

Instrument & Mechanical bulk material Custom clearance & inland ...

14 22-Nov-11

06-Dec-11

24-Nov-11

07-Dec-11

A4310

Electrical Cables Shipping

21 04-Dec-11

25-Dec-11

23-Nov-11

13-Dec-11

A1920

1st batch of the E&I Bulk Custom clearance & inland transportation

14 26-Nov-11

10-Dec-11

01-Dec-11

14-Dec-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Junction boxes Custom clearance & inland transportation

14 26-Nov-11

10-Dec-11

01-Dec-11

14-Dec-11

A5630

Electrical Cables Custom clearance & inland transportation

14 25-Dec-11

08-Jan-12

14-Dec-11

27-Dec-11

A4570

Instrument cable and cable glands Shipping

21 28-Nov-11

19-Dec-11

10-Dec-11

30-Dec-11

A4330

Navigation aids system Shipping

21 05-Dec-11

26-Dec-11

19-Dec-11

08-Jan-12

A4340

Lighting material Shipping

21 14-Dec-11

04-Jan-12

24-Dec-11

13-Jan-12

A5740

Instrument cable and cable glands Custom clearance & inland tran...

14 19-Dec-11

02-Jan-12

31-Dec-11

13-Jan-12

A5640

Navigation aids system Custom clearance & inland transportation

14 26-Dec-11

09-Jan-12

09-Jan-12

22-Jan-12

A6300

Earthing material Shipping

21 26-Dec-11

24-Jan-12

25-Dec-11

22-Jan-12

A5650

Lighting material Custom clearance & inland transportation

14 04-Jan-12

18-Jan-12

14-Jan-12

27-Jan-12

A5930

Sand & Corrosion probes Shipping

21 29-Dec-11

19-Jan-12

08-Jan-12

28-Jan-12

A4560

Loose instrument Shipping

21 13-Jan-12

10-Feb-12

17-Jan-12

06-Feb-12

A5940

Sand & Corrosion probes Custom clearance & inland transportation

14 19-Jan-12

02-Feb-12

29-Jan-12

11-Feb-12

A6290

Earthing material Custom clearance & inland transportation

14 24-Jan-12

14-Feb-12

23-Jan-12

12-Feb-12

A2020

2nd batch of the E&I Bulk Shipping

40 06-Jan-12

15-Feb-12

08-Jan-12

16-Feb-12

A5860

Loose instrument Custom clearance & inland transportation

14 10-Feb-12

24-Feb-12

07-Feb-12

20-Feb-12

A2030

2nd batch of the E&I Bulk Custom clearance & inland transportation

28 02-Feb-12

01-Mar-12

04-Feb-12

02-Mar-12

A6340

Choke valves Shipping

21

22-Feb-12

21-Mar-12

A4540

Wing valves Shipping

21 06-Apr-12

27-Apr-12

18-Mar-12

07-Apr-12

A4550

Choke valves Custom clearance & inland transportation

21 05-Apr-12

26-Apr-12

22-Mar-12

11-Apr-12

A5730

Wing valves Custom clearance & inland transportation

14 27-Apr-12

11-May-12

08-Apr-12

21-Apr-12

220 07-Apr-11

10-Feb-12

07-Apr-11 A

22-Feb-12

PURCHASING PURCHA

2011 A M J Jul A S O N D

A5850

PIPING BULK BU

Page 18 of 64

106 07-Apr-11

27-Jul-11

07-Apr-11 A

07-Sep-11

A4930

Piping Bulk Bidding

15 07-Apr-11

28-Apr-11

07-Apr-11 A

28-Apr-11 A

A5440

Insulation Joint Bidding

20 20-Apr-11

19-May-11

29-May-11 A

30-May-11 A

A1940

Piping Bulk Issue Fax of commitment

14 31-May-11

20-Jun-11

05-Jun-11 A

22-Jun-11 A

A5450

Injection fitting Bidding

20 24-Apr-11

23-May-11

24-Apr-11 A

26-Jun-11

C2000

Piping Bulk P.O

5 27-Jun-11

04-Jul-11

03-Jul-11

07-Jul-11

A5470

Insulation Joint Issue Fax of commitment

20 12-Jun-11

10-Jul-11

25-Jul-11

21-Aug-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

20 15-Jun-11

13-Jul-11

25-Jul-11

21-Aug-11

Injection fitting Issue Fax of commitment

C2010

Insulation Joint P.O

5 17-Jul-11

24-Jul-11

29-Aug-11

07-Sep-11

C2020

Injection fitting P.O

5 20-Jul-11

27-Jul-11

29-Aug-11

07-Sep-11

208 20-Jun-11

06-Jan-12

25-Jun-11

18-Jan-12

A1950

piping Bulk Fabrication up to release for shipment

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

A5570

Insulation Joint Fabrication up to release for shipment

150 10-Jul-11

07-Dec-11

22-Aug-11

18-Jan-12

A5580

Injection fitting Fabrication up to release for shipment

150 13-Jul-11

10-Dec-11

22-Aug-11

18-Jan-12

136 10-Oct-11

10-Feb-12

10-Oct-11

22-Feb-12

SHIPPING A1960

1st batch of the piping Bulk Shipping

21 10-Oct-11

31-Oct-11

10-Oct-11

30-Oct-11

A1970

1st batch of the piping Bulk Custom clearance & inland transport...

14 31-Oct-11

14-Nov-11

31-Oct-11

13-Nov-11

A2050

2nd batch of the piping Bulk Shipping

21 17-Nov-11

08-Dec-11

22-Nov-11

12-Dec-11

A2060

2nd batch of the piping Bulk Custom clearance & inland transport...

14 08-Dec-11

22-Dec-11

13-Dec-11

26-Dec-11

A2040

Last batch of the piping Bulk Shipping

21 06-Jan-12

27-Jan-12

11-Jan-12

31-Jan-12

A5590

Insulation Joint Shipping

21 07-Dec-11

28-Dec-11

19-Jan-12

08-Feb-12

A5620

Injection fitting Shipping

21 10-Dec-11

31-Dec-11

19-Jan-12

08-Feb-12

A2070

Last batch of the piping Bulk Custom clearance & inland transport...

14 27-Jan-12

10-Feb-12

01-Feb-12

14-Feb-12

A5600

Insulation Joint Custom clearance & inland transportation

14 28-Dec-11

11-Jan-12

09-Feb-12

22-Feb-12

A5610

Injection fitting Custom clearance & inland transportation

14 31-Dec-11

14-Jan-12

09-Feb-12

22-Feb-12

26 31-Mar-11

30-Apr-11

25-Jun-11

24-Jul-11

26 31-Mar-11

30-Apr-11

25-Jun-11

24-Jul-11

30 02-Jun-12

02-Jul-12

01-Jun-12

30-Jun-12

30 02-Jun-12

02-Jul-12

01-Jun-12

30-Jun-12

315 31-Mar-11

04-Jul-12

28-Mar-11 A

02-Jul-12

W.P.5: DEC DECK & TSF FABRICATION PTJ2200

Deck commisioning (Onshore)

W.P.9: OFF OFFSHORE HOOK-UP, COMMISSIONING AND ASSISTANCE TO STA... A2370

Deck Offshore Commissioning

TECNOMARE TECNOMAR 2

Start of project

TECNOMARE DRIVING MILESTONES TECNOMAR STRUCTURAL STRUCTU

0 31-Mar-11

2011 A M J Jul A S O N D

A5460

FABRICATION FABRICA

Page 19 of 64

31-Mar-11 A

293 31-Mar-11

04-Jun-12

28-Mar-11 A

03-Jun-12

293 31-Mar-11

04-Jun-12

31-Mar-11 A

03-Jun-12

19

Soil Data (PTB)

0 31-Mar-11

31-Mar-11 A

16

input - deck plot plan & equipment list IFD (ENPPI)

0 24-Apr-11

24-Apr-11 A

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Input- T&I contract ITT (PTB)

0 26-Jun-11

26-Jun-11*

64

Pressure Vessels Vendor Print out review (ENPPI)

0 31-Mar-11

26-Jun-11

69

Piping bulk & Valves MRP's (ENPPI)

0 27-Jun-11

03-Jul-11

54

Process Commodities MRP's (ENPPI)

0 29-Aug-11

05-Sep-11

17

input - deck final plot plan & equipment list (ENPPI)

0 21-Sep-11

21-Sep-11

13

input - crane barge (PTB)

0 24-Sep-11

24-Sep-11*

14

input - launching barge for jacket (PTB)

0 24-Sep-11

24-Sep-11*

79

Mechanical Vendor print review (ENPPI)

0 25-Dec-11

15-Jan-12

300

As built Markup documents (PTJ) for Jacket

0 07-May-12

07-May-12*

9

Load out structures

0 10-May-12

09-May-12*

310

As built Markup documents (PTJ) for deck

0 04-Jun-12

03-Jun-12

160 31-Mar-11

23-Nov-11

28-Mar-11 A

22-Nov-11

276

Plot Plan IFD (ENPPI)

0

24-Apr-11

28-Mar-11 A

106

Review of Basic Documents (Consortium feed endorsement)

0

31-Mar-11

31-Mar-11 A

158

SSIV vendor documents (PTB)

0

31-Mar-11

31-Mar-11 A

107

P & ID's ( IFD ) (ENPPI/PTB for LLI)

0

17-Apr-11

27-Apr-11 A

148

fire and gas requirements- HSE philosophy Fire Fighting Safety La...

0

24-Apr-11

02-May-11 A

112

C & E - issue for Design (ENPPI/PTB for LLI)

0

16-May-11

08-May-11 A

206

junction box wiring diagram for control & safety system IFD (ENPPI)

0

09-Jun-11

08-May-11 A

302

T4 for Radio Bridge (PTB)

0

08-Jun-11

08-Jun-11 A

128

Electrical interface with PLC/RTU (I/O list) (ENPPI)

0

30-May-11

08-Jun-11 A

138

Control and safety cable routing IFD (ENPPI)

0

09-Jun-11

20-Jun-11 A

136

Instrument TDS (ENPPI)

0

07-Jun-11

26-Jun-11

208

P & ID's ( IFC) (ENPPI/PTB for LLI)

0

14-Sep-11

13-Sep-11

286

Plot Plan IFC (ENPPI)

0

21-Sep-11

20-Sep-11

117

C & E - Issue for Construction (ENPPI/PTB for LLI)

0

21-Sep-11

20-Sep-11

198

3D model Review 90% Report (ENPPI)

0

23-Nov-11

22-Nov-11

W.P.1: PRO PROJECT MANAGEMENT

444 31-Mar-11

17-Jun-12

2011 A M J Jul A S O N D

59

INSTRUMENTATION INSTRUME

Finish

Page 20 of 64

31-Mar-11 A

15-Jun-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

technical coordination

444 31-Mar-11

17-Jun-12

31-Mar-11 A

15-Jun-12

43

engineering assistance to fab, load out & transportation home office

428 15-Apr-11

17-Jun-12

14-Apr-11 A

15-Jun-12

305

project services

444 31-Mar-11

17-Jun-12

31-Mar-11 A

15-Jun-12

315 31-Mar-11

04-Jul-12

31-Mar-11 A

02-Jul-12

196 31-Mar-11

01-Feb-12

31-Mar-11 A

31-Jan-12

STRUCTURAL STRUCTU

306 31-Mar-11

21-Jun-12

31-Mar-11 A

19-Jun-12

MILESTONES MILESTO

209 31-Mar-11

01-Feb-12

31-Mar-11 A

31-Jan-12

20

weight control

4

jacket main structure AFC dwg.s + MTO

0 31-Mar-11

31-Mar-11 A

6

deck AFC dwg.s + MTO main structure

0 04-Jul-11

12-Jul-11

5

jacket secondary structures AFC dwg.s + MTO

0 31-Jul-11

31-Jul-11*

7

deck AFC + MTO secondary structures (no equip. supports)

0 25-Sep-11

25-Sep-11

28

Weight Control Report 1st issue

0 25-Sep-11

25-Sep-11

8

deck AFC + MTO equip. supports

0 24-Oct-11

23-Oct-11

10

weight control report 2nd issue

0 24-Oct-11

23-Oct-11

11

weight control report 3rd issue

0 01-Feb-12

31-Jan-12

DECK DETAIL DE DESIGN

127 24-Apr-11

24-Oct-11

21-Apr-11 A

23-Oct-11

31

deck in service final analysis

15 24-Apr-11

16-May-11

21-Apr-11 A

09-Jun-11 A

29

deck & helideck lifting final analysis

20 24-Apr-11

23-May-11

21-Apr-11 A

15-Jun-11 A

32

deck seismic analysis

15 16-May-11

06-Jun-11

15-May-11 A

16-Jun-11 A

30

deck & helideck load out & transportation structural analysis updat...

15 23-May-11

13-Jun-11

22-May-11 A

22-Jun-11 A

33

deck & helideck joints local checks

15 13-Jun-11

04-Jul-11

23-Jun-11 A

11-Jul-11

34

deck main structure AFC dwg.s & MTO

50 24-Apr-11

04-Jul-11

24-Apr-11 A

11-Jul-11*

35

deck secondary structures design (no equipment support)

50 04-Jul-11

25-Sep-11

20-Jun-11 A

18-Sep-11

36

deck secondary structure AFC dwg.s & MTO (no equipment support)

100 24-Apr-11

25-Sep-11

24-Apr-11 A

22-Sep-11

45

Deck equipment supports design

15 21-Sep-11

13-Oct-11

21-Sep-11

12-Oct-11

44

Deck equipment supports & AFC dwg and MTO

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

178 25-Sep-11

21-Jun-12

25-Sep-11

19-Jun-12

105 25-Sep-11

06-Mar-12

25-Sep-11

06-Mar-12*

ASSISTANCE TO COMPANY ASSISTAN 38

liaison with Certifying Authority

2011 A M J Jul A S O N D

18

W.P.2: ENG ENGINEERING

Page 21 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

39

liason with Marine Warranty Surveyor

FOLLOW-ON OF T&I CONTRACT FOLLOW Analysis Finalization

Original BL Project Duration Start

BL Project Finish

Start

Finish

105 23-Jan-12

21-Jun-12

22-Jan-12

19-Jun-12

293 31-Mar-11

21-Jun-12

21-Apr-11 A

19-Jun-12

101 25-Sep-11

01-Mar-12

25-Sep-11

29-Feb-12

jacket launching naval final analysis

20 25-Sep-11

20-Oct-11

25-Sep-11

20-Oct-11

24

jacket launching structural analysis updating

15 23-Oct-11

10-Nov-11

23-Oct-11

10-Nov-11

25

jacket docking naval final analysis

20 13-Nov-11

08-Dec-11

13-Nov-11

08-Dec-11

27

jacket free floating & upending naval analysis - final analysis

20 01-Feb-12

01-Mar-12

31-Jan-12

29-Feb-12

293 31-Mar-11

21-Jun-12

21-Apr-11 A

19-Jun-12

49

ITT scope of work for T&I Contract

20 31-Mar-11

28-Apr-11

21-Apr-11 A

17-Jul-11

50

technical evaluation of the offers, clarification meetings & KOM

50 26-Jun-11

14-Sep-11

18-Jul-11

06-Oct-11

52

installation - transportation & installation procedures/manuals

39 17-Nov-11

29-Jan-12

16-Nov-11

25-Jan-12

51

post-award assistance

120 15-Sep-11

19-Mar-12

09-Oct-11

11-Apr-12

53

installation - engineering assistance during installation (at home of...

30 10-May-12

21-Jun-12

09-May-12

19-Jun-12

205 31-Mar-11

26-Jan-12

31-Mar-11 A

25-Jan-12

205 31-Mar-11

26-Jan-12

31-Mar-11 A

25-Jan-12

205 31-Mar-11

26-Jan-12

31-Mar-11 A

25-Jan-12

INSTRUMENTATION INSTRUME PLC/RTU - Telecom System CONTROL CONTRO

2011 A M J Jul A S O N D

26

Follow-up

Page 22 of 64

108

Review of PLC/RTU -ICSS Spec's

20 31-Mar-11

28-Apr-11

31-Mar-11 A

28-Apr-11 A

336

Junction Box wiring Diagram for SSIV issue for Design

21 17-Apr-11

17-May-11

14-Apr-11 A

17-May-11 A

246

F&G system layout issue for Design

22 02-May-11

01-Jun-11

21-Apr-11 A

24-May-11 A

156

ESD System Layout- issue for design

22 02-May-11

01-Jun-11

21-Apr-11 A

25-May-11 A

111

Functional / logic diagrams - issue for design

35 26-Apr-11

15-Jun-11

26-Apr-11 A

20-Jun-11 A

346

Junction Box wiring diagram for Seth ESD Pushbuttons issue for d...

26 18-May-11

23-Jun-11

10-May-11 A

22-Jun-11 A

188

Operator console - issue for design

18 29-May-11

22-Jun-11

22-May-11 A

22-Jun-11 A

110

I / O Database - issue for design

17 23-May-11

15-Jun-11

10-May-11 A

26-Jun-11

113

Simplified loop diagrams - issue for design

16 24-May-11

15-Jun-11

25-May-11 A

26-Jun-11

133

ESD/F&G - cable list issue for design

20 01-Jun-11

29-Jun-11

25-May-11 A

26-Jun-11

168

F&G cable routing layout - issue for design

22 09-Jun-11

11-Jul-11

01-Jun-11 A

19-Jul-11

178

ESD Pushbuttons cable routing layout - issue for design

22 09-Jun-11

11-Jul-11

01-Jun-11 A

19-Jul-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Functional / Logic diagrams - issue for construction

19 14-Sep-11

11-Oct-11

13-Sep-11

10-Oct-11

356

Junction Box wiring Diagram for SSIV issue for Construction

18 14-Sep-11

11-Oct-11

14-Sep-11

10-Oct-11

266

F&G system layout issue for Construction

18 21-Sep-11

18-Oct-11

21-Sep-11

17-Oct-11

386

ESD System Layout- issue for construction

18 21-Sep-11

18-Oct-11

21-Sep-11

17-Oct-11

115

I / O database - issue for construction

20 27-Sep-11

25-Oct-11

26-Sep-11

24-Oct-11

118

Simplified loop diagrams - issue for construction

14 12-Oct-11

01-Nov-11

11-Oct-11

31-Oct-11

121

Operator Console Layout - issue for construction

18 25-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

396

Junction Box wiring diagram for Seth ESD Pushbuttons issue for c...

21 28-Nov-11

26-Dec-11

28-Nov-11

26-Dec-11

236

F&G cable routing layout- issue for construction

23 23-Nov-11

11-Jan-12

22-Nov-11

10-Jan-12

326

ESD Pushbuttons cable routing layout- issue for construction

29 23-Nov-11

19-Jan-12

22-Nov-11

18-Jan-12

131

ESD / F&G - cable list - issue for construction

18 02-Jan-12

26-Jan-12

02-Jan-12

25-Jan-12

105 10-Apr-11

18-Aug-11

10-Apr-11 A

15-Sep-11

256

Review of Telecom Specs

23 10-Apr-11

11-May-11

10-Apr-11 A

10-May-11 A

166

J. B Wiring Diagram for Telecom System for Seth

23 08-May-11

07-Jun-11

10-May-11 A

20-May-11 A

126

Telecom System Layout for Seth

23 28-Apr-11

31-May-11

24-Apr-11 A

24-May-11 A

296

Telecommunication Cables List

20 31-May-11

28-Jun-11

19-May-11 A

21-Jun-11 A

226

Telecom cable routing layout

22 12-Jun-11

12-Jul-11

21-Jun-11 A

19-Jul-11

366

TDS for electrical bulk material/ Telecom Bulks

25 07-Jun-11

12-Jul-11

05-Jul-11

22-Aug-11

196

Electrical Bulk Material Requisition for Telecom Sys. Seth

23 03-Jul-11

16-Aug-11

31-Jul-11

13-Sep-11

306

SOW of Modification on El Gamil Plant

24 04-Jul-11

18-Aug-11

14-Aug-11

15-Sep-11

35 08-Jun-11

28-Jul-11

15-May-11 A

15-Aug-11

RADIO LINK LI ON T4 186

J. B Wiring Diagram for Telecom System for Temsah - 4

23 08-Jun-11

10-Jul-11

15-May-11 A

20-Jul-11

176

Telecom System Layout for Temsah - 4

23 08-Jun-11

10-Jul-11

26-Jun-11

26-Jul-11

297

SOW of Modification of Bridge Platform

24 27-Jun-11

28-Jul-11

20-Jun-11 A

15-Aug-11

114 31-May-11

13-Dec-11

26-Jun-11

13-Dec-11

114 31-May-11

13-Dec-11

26-Jun-11

13-Dec-11

41 07-May-12

04-Jul-12

07-May-12

02-Jul-12

22 07-May-12

05-Jun-12

07-May-12

05-Jun-12

TECHNICAL FOLLOW-UP TECHNIC 122

Vendor Print Review

AS-BUILT DRAWINGS 46

template, piles, jacket

2011 A M J Jul A S O N D

116

TELECOM TELECO

Page 23 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID 47

Activity Name deck, helideck & flare

SUBSEA S SYSTEM 103

Vendor Print Review

W.P.3: PROCUREMENT PRO SERVICES & MATERIAL SUPPLY PLC/RTU

Original BL Project Duration Start

BL Project Finish

Start

Finish

30 04-Jun-12

04-Jul-12

03-Jun-12

02-Jul-12

119 31-Mar-11

28-Sep-11

31-Mar-11 A

27-Sep-11

119 31-Mar-11

28-Sep-11

31-Mar-11 A

27-Sep-11

269 31-Mar-11

29-Apr-12

31-Mar-11 A

26-Apr-12

261 13-Apr-11

29-Apr-12

13-Apr-11 A

26-Apr-12

15 13-Apr-11

04-May-11

13-Apr-11 A

03-May-11 A

Technical Evaluation for PLC/RTU

143

Revised commercial submission by supplier

5 05-May-11

11-May-11

05-May-11 A

11-May-11 A

144

Commercial Evaluation

5 12-May-11

18-May-11

12-May-11 A

18-May-11 A

145

PO issuance for PLC/RTU

9 19-May-11

31-May-11

19-May-11 A

31-May-11 A

195

Submital of C&E IFD , Instrument commodities vendor print review...

0

04-Sep-11

14-Aug-11

185

Submital of I/O list IFD, TDS, JB wiring diag to th PLC/RTU Vendor

0

04-Sep-11

18-Aug-11

376

FAT Test

146

Expediting & Inspection for PLC/RTU

216 137

11 20-Dec-11

22-Jan-12

09-Jan-12

23-Jan-12

133 20-Jun-11

22-Jan-12

15-Jun-11 A

23-Jan-12

Delivery to Construction Yard

28 23-Jan-12

23-Feb-12

24-Jan-12

25-Feb-12

Onshore Precommissioning / Commissioning Assistance

42 11-Mar-12

29-Apr-12

10-Mar-12

26-Apr-12

11-Jan-12

31-Jul-11

19-Jan-12

7 13-Jul-11

24-Jul-11

31-Jul-11

09-Aug-11

10 24-Jul-11

07-Aug-11

09-Aug-11

23-Aug-11

116 13-Jul-11

189

RFQ Issuance for Telecom materials

190

Bidding for Telecom materials

241

Technical Evaluation for Telecom materials

7 07-Aug-11

16-Aug-11

23-Aug-11

01-Sep-11

202

Revised commercial submission by supplier

7 16-Aug-11

25-Aug-11

01-Sep-11

12-Sep-11

213

Commercial Evaluation

5 25-Aug-11

01-Sep-11

12-Sep-11

19-Sep-11

214

PO issuance for Telecom materials

3 01-Sep-11

06-Sep-11

19-Sep-11

22-Sep-11

235

Expediting & Inspection for Telecom materials

56 06-Sep-11

23-Nov-11

22-Sep-11

11-Dec-11

265

Transportation to site

28 23-Nov-11

10-Jan-12

11-Dec-11

18-Jan-12

275

Delivery to yard

GROUT SE SEALS

0

2011 A M J Jul A S O N D

142

TELECOM BULK MATERIALS

Page 24 of 64

11-Jan-12

19-Jan-12

119 31-Mar-11

28-Sep-11

31-Mar-11 A

28-Sep-11

150

Bidding for G S

5 31-Mar-11

07-Apr-11

31-Mar-11 A

07-Apr-11 A

151

Technical Evaluation for G S

5 10-Apr-11

14-Apr-11

10-Apr-11 A

14-Apr-11 A

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Revised commercial submission by supplier

5 17-Apr-11

21-Apr-11

17-Apr-11 A

21-Apr-11 A

153

Commercial Evaluation

5 24-Apr-11

28-Apr-11

24-Apr-11 A

28-Apr-11 A

154

PO issuance for G S

11 02-May-11

16-May-11

02-May-11 A

16-May-11 A

155

Expediting & Inspection for G S

68 17-May-11

31-Aug-11

25-May-11 A

31-Aug-11

165

Transportation to site

20 01-Sep-11

28-Sep-11

01-Sep-11

28-Sep-11

175

Delivery to yard

SHOCK CELLS CE

28-Sep-11

28-Sep-11

117 31-Mar-11

28-Sep-11

31-Mar-11 A

26-Sep-11

5 31-Mar-11

07-Apr-11

31-Mar-11 A

07-Apr-11 A

15 10-Apr-11

28-Apr-11

10-Apr-11 A

28-Apr-11 A

179

RFQ Issuance for Shock Cells

180

Bidding for Shock Cells

191

Technical Evaluation for Shock Cells

7 02-May-11

10-May-11

02-May-11 A

10-May-11 A

192

Revised commercial submission by supplier

5 11-May-11

17-May-11

11-May-11 A

17-May-11 A

203

Commercial Evaluation

7 18-May-11

26-May-11

18-May-11 A

26-May-11 A

204

PO issuance for Shock Cells

3 29-May-11

31-May-11

25-May-11 A

29-May-11 A

225

Expediting & Inspection for Shock Cells

57 01-Jun-11

31-Aug-11

30-May-11 A

29-Aug-11

245

Transportation to site

20 01-Sep-11

28-Sep-11

30-Aug-11

26-Sep-11

255

Delivery to yard

W.P.9: OFF OFFSHORE HOOK-UP, COMMISSIONING AND ASSISTANCE TO STA... ONSHORE FACILITIES

0

28-Sep-11

26-Sep-11

50 19-Apr-12

17-Jun-12

19-Apr-12

17-Jun-12

50 19-Apr-12

17-Jun-12

19-Apr-12

17-Jun-12

A1650

Installation Telephone System Uopgrading in El Gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12*

24-May-12

A1640

Installation of Radio Link Upgrading in El gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12

24-May-12

A1620

Installation of DCS Node Upgrading in El gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12

24-May-12

A1630

Installation of CCTV Upgrading in El gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12

24-May-12

A1040

Connecting cables (Including Emergency, control and F&G signals)

30 13-May-12

17-Jun-12

13-May-12

17-Jun-12

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

340 31-Mar-11

01-Mar-12

31-Mar-11 A

02-Mar-12

339 31-Mar-11

01-Mar-12

31-Mar-11 A

02-Mar-12

PETROJET PETROJET DRIVING MILESTONES PROCUREMENT PROCURE

2011 A M J Jul A S O N D

152

0

Page 25 of 64

PTJ1000

Structural material 1st & 2 nd batch (jacket primary, pile & deck leg...

0 31-Mar-11

31-Mar-11 A

PTJ1015

Structural material 3 rd batch (PDT) (PTB)

0 28-Apr-11

28-Apr-11 A

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Structural material 4 rd batch, deck primary (main beams, legs, no...

0 21-May-11

30-Apr-11 A

PTJ1020

Structural material 5 th batch (jacket secondary & deck secondary)...

0 31-Aug-11

31-Aug-11*

PTJ1080

Piping bulk material (1st batch) (ENPPI)

0 14-Nov-11

14-Nov-11

PTJ1110

E & I 1st batch) (ENPPI)

0 10-Dec-11

15-Dec-11

PTJ1100

Start receiving equipment (ENPPI)

0 17-Dec-11

12-Jan-12

PTJ1120

Equipment (100%) (PTB)

0

24-Jan-12

24-Jan-12*

PTJ4010

Equipment by (100%) (ENPPI)

0

12-Feb-12

11-Feb-12

PTJ4000

Piping bulk material (Last batch) (ENPPI)

0

10-Feb-12

14-Feb-12

PTJ4020

E & I (Last batch) (ENPPI)

0

01-Mar-12

02-Mar-12

234 31-Mar-11

20-Nov-11

31-Mar-11 A

PTJ150

Pre-drilling template AFC dwg's (by techno)

0 31-Mar-11

31-Mar-11 A

PTJ100

Jacket main structure AFC dwg's (by techno)

0 31-Mar-11

31-Mar-11 A

PTJ110

Deck main structure AFC dwg's (by techno)

0 04-Jul-11

15-Apr-11 A

PTJ140

Jacket secondary structure AFC dwg's (by techno)

0 31-Jul-11

31-Jul-11

PTJ130

E & I AFC dwg's (by ENPPI)

0 16-Nov-11

16-Nov-11

PTJ120

Piping AFC dwg's (by ENPPI)

0 20-Nov-11

18-Nov-11

W.P.1: PRO PROJECT MANAGEMENT PTJ000

Project managment

W.P.2: ENG ENGINEERING JACKET PTJ2170

Jacket main structure mark up drawing drawing

TSF PTJ2240

Rec final weight & dimension for static equipment

PTJ2190

TSF mark up drawing

DECK PTJ2180

Deck structure mark up drawing

W.P.4: SUBSTRUCTURES SUB (PILES, JACKET & PDT) FABRICATION JACKET STRUCTURE S FABRICATION

18-Nov-11

490 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

490 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

222 15-Sep-11

04-Jun-12

15-Sep-11

02-Jun-12

15 01-Apr-12

17-Apr-12

01-Apr-12

17-Apr-12

15 01-Apr-12

17-Apr-12

01-Apr-12

17-Apr-12

222 15-Sep-11

04-Jun-12

15-Sep-11

02-Jun-12

0

2011 A M J Jul A S O N D

PTJ1010

DESIGN

Page 26 of 64

15-Sep-11

15-Sep-11*

21 10-May-12

04-Jun-12

09-May-12

02-Jun-12

16 10-May-12

29-May-12

09-May-12

27-May-12

16 10-May-12

29-May-12

09-May-12

27-May-12

240 31-Mar-11

15-Mar-12

31-Mar-11 A

15-Mar-12

240 31-Mar-11

15-Mar-12

31-Mar-11 A

15-Mar-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

MAIN STR STRUCTURE FABRICATION General

Original BL Project Duration Start

BL Project Finish

Start

Finish

259 31-Mar-11

23-Feb-12

31-Mar-11 A

29-Jan-12

259 31-Mar-11

23-Feb-12

31-Mar-11 A

29-Jan-12

0 31-Mar-11

PTJ2210 Jacket main structure fabrication finish

0

15-Feb-12

PTJ2230 Jacket weighing

2 22-Feb-12

23-Feb-12

28-Jan-12

29-Jan-12

75 31-Mar-11

22-Jun-11

31-Mar-11 A

29-Jun-11

8 14-Jun-11

22-Jun-11

15-May-11 A

08-Jun-11 A

PTJ5000 PREPARATION OF SKID WAY

20 31-Mar-11

24-Apr-11

31-Mar-11 A

26-Jun-11

LEG A1

67 31-Mar-11

13-Jun-11

31-Mar-11 A

29-Jun-11

45 31-Mar-11

18-May-11

31-Mar-11 A

29-Jun-11

PTJ51 LEG SPLICE FIT UP

9 31-Mar-11

10-Apr-11

31-Mar-11 A

25-Jun-11

PTJ51 CANS FIT UP

8 11-Apr-11

20-Apr-11

11-Apr-11 A

27-Jun-11

PTJ51 LEG SPLICE WELDING & NDT

10 21-Apr-11

04-May-11

23-Apr-11 A

27-Jun-11

PTJ51 CAN WELDING & NDT

12 05-May-11

18-May-11

09-May-11 A

29-Jun-11

41 21-Apr-11

05-Jun-11

23-Apr-11 A

04-Jun-11 A

PTJ50 LEG SPLICE FIT UP

7 21-Apr-11

01-May-11

23-Apr-11 A

31-May-11 A

PTJ51 CANS FIT UP

4 02-May-11

05-May-11

05-May-11 A

31-May-11 A

PTJ51 CONE FIT UP

4 07-May-11

10-May-11

10-May-11 A

01-Jun-11 A

12 11-May-11

24-May-11

15-May-11 A

02-Jun-11 A

PTJ51 CONE WELDING & NDT

5 25-May-11

30-May-11

22-May-11 A

02-Jun-11 A

PTJ51 CAN WELDING & NDT

5 31-May-11

05-Jun-11

19-May-11 A

04-Jun-11 A

PTJ5010 PREPARATION LEG FOR ROW A & B TRIAL FIT

DIM 14 1400

DIM 12 1200

PTJ51 LEG SPLICE WELDING & NDT

DIM 10 1000

2011 A M J Jul A S O N D

PTJ2000 Jacket main structure fabrication start

JACKET LEGS FABRICATION

Page 27 of 64

31-Mar-11 A 21-Jan-12

36 11-May-11

13-Jun-11

15-Apr-11 A

29-Jun-11

PTJ50 CONE WELDING & NDT

5 02-Jun-11

07-Jun-11

07-May-11 A

11-May-11 A

PTJ50 LEG SPLICE WELDING & NDT

6 26-May-11

01-Jun-11

30-Apr-11 A

12-May-11 A

PTJ50 CONE FIT UP

4 22-May-11

25-May-11

18-May-11 A

24-May-11 A

PTJ50 LEG SPLICE FIT UP

5 11-May-11

16-May-11

15-Apr-11 A

02-Jun-11 A

PTJ50 CANS FIT UP

4 17-May-11

21-May-11

21-May-11 A

28-Jun-11

PTJ50 CAN WELDING & NDT

5 08-Jun-11

13-Jun-11

12-May-11 A

29-Jun-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

67 31-Mar-11

13-Jun-11

31-Mar-11 A

28-Jun-11

45 31-Mar-11

18-May-11

31-Mar-11 A

01-Jun-11 A

PTJ53 LEG SPLICE FIT UP

9 31-Mar-11

10-Apr-11

31-Mar-11 A

26-May-11 A

PTJ53 CANS FIT UP

8 11-Apr-11

20-Apr-11

11-Apr-11 A

28-May-11 A

PTJ53 LEG SPLICE WELDING & NDT

10 21-Apr-11

04-May-11

23-Apr-11 A

30-May-11 A

PTJ53 CAN WELDING & NDT

12 05-May-11

18-May-11

09-May-11 A

01-Jun-11 A

48 21-Apr-11

13-Jun-11

23-Apr-11 A

19-Jun-11 A

PTJ52 LEG SPLICE FIT UP

7 21-Apr-11

01-May-11

23-Apr-11 A

30-May-11 A

PTJ53 CANS FIT UP

4 02-May-11

05-May-11

05-May-11 A

30-May-11 A

PTJ52 CONE FIT UP

8 07-May-11

15-May-11

10-May-11 A

31-May-11 A

13 16-May-11

30-May-11

19-May-11 A

02-Jun-11 A

PTJ53 CAN WELDING & NDT

6 07-Jun-11

13-Jun-11

14-May-11 A

05-Jun-11 A

PTJ53 CONE WELDING & NDT

6 31-May-11

06-Jun-11

19-Jun-11 A

19-Jun-11 A

28 07-May-11

07-Jun-11

17-Apr-11 A

28-Jun-11

PTJ52 CONE FIT UP

4 17-May-11

21-May-11

07-May-11 A

02-Jun-11 A

PTJ52 LEG SPLICE WELDING & NDT

6 22-May-11

28-May-11

15-May-11 A

02-Jun-11 A

PTJ52 CONE WELDING & NDT

4 29-May-11

01-Jun-11

17-Apr-11 A

04-Jun-11 A

PTJ52 LEG SPLICE FIT UP

5 07-May-11

11-May-11

10-May-11 A

25-Jun-11

PTJ52 CANS FIT UP

4 12-May-11

16-May-11

16-May-11 A

26-Jun-11

PTJ52 CAN WELDING & NDT

5 02-Jun-11

07-Jun-11

06-May-11 A

28-Jun-11

67 31-Mar-11

13-Jun-11

31-Mar-11 A

29-Jun-11

LEG A2 DIM 14 1400

DIM 12 1200

PTJ53 LEG SPLICE WELDING & NDT

DIM 10 1000

LEG B1 DIM 14 1400

Finish

45 31-Mar-11

18-May-11

31-Mar-11 A

29-Jun-11

9 31-Mar-11

10-Apr-11

31-Mar-11 A

25-Jun-11

PTJ55 CANS FIT UP

8 11-Apr-11

20-Apr-11

11-Apr-11 A

27-Jun-11

PTJ55 LEG SPLICE WELDING & NDT

10 21-Apr-11

04-May-11

23-Apr-11 A

27-Jun-11

PTJ55 CAN WELDING & NDT

12 05-May-11

18-May-11

09-May-11 A

29-Jun-11

43 21-Apr-11

07-Jun-11

23-Apr-11 A

04-Jun-11 A

7 21-Apr-11

01-May-11

23-Apr-11 A

29-May-11 A

PTJ54 LEG SPLICE FIT UP

2011 A M J Jul A S O N D

PTJ55 LEG SPLICE FIT UP

DIM 12 1200

Page 28 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ54 CANS FIT UP

4 02-May-11

05-May-11

05-May-11 A

30-May-11 A

PTJ54 CONE FIT UP

4 07-May-11

10-May-11

10-May-11 A

30-May-11 A

12 11-May-11

24-May-11

15-May-11 A

01-Jun-11 A

PTJ55 CONE WELDING & NDT

6 25-May-11

31-May-11

14-May-11 A

02-Jun-11 A

PTJ55 CAN WELDING & NDT

6 01-Jun-11

07-Jun-11

20-May-11 A

04-Jun-11 A

29 11-May-11

13-Jun-11

14-May-11 A

29-Jun-11

PTJ54 LEG SPLICE FIT UP

5 11-May-11

16-May-11

15-May-11 A

31-May-11 A

PTJ54 CONE FIT UP

4 22-May-11

25-May-11

16-May-11 A

02-Jun-11 A

PTJ54 LEG SPLICE WELDING & NDT

6 26-May-11

01-Jun-11

19-May-11 A

02-Jun-11 A

PTJ54 CONE WELDING & NDT

5 02-Jun-11

07-Jun-11

14-May-11 A

04-Jun-11 A

PTJ54 CANS FIT UP

4 17-May-11

21-May-11

21-May-11 A

28-Jun-11

PTJ54 CAN WELDING & NDT

5 08-Jun-11

13-Jun-11

18-May-11 A

29-Jun-11

65 31-Mar-11

11-Jun-11

31-Mar-11 A

27-Jun-11

43 31-Mar-11

16-May-11

31-Mar-11 A

31-May-11 A

PTJ57 LEG SPLICE FIT UP

8 31-Mar-11

09-Apr-11

31-Mar-11 A

26-May-11 A

PTJ57 CANS FIT UP

7 10-Apr-11

18-Apr-11

10-Apr-11 A

28-May-11 A

PTJ57 LEG SPLICE WELDING & NDT

10 19-Apr-11

02-May-11

20-Apr-11 A

30-May-11 A

PTJ57 CAN WELDING & NDT

12 03-May-11

16-May-11

07-May-11 A

31-May-11 A

43 19-Apr-11

05-Jun-11

20-Apr-11 A

18-Jun-11 A

PTJ56 LEG SPLICE FIT UP

8 19-Apr-11

28-Apr-11

20-Apr-11 A

29-May-11 A

PTJ56 CANS FIT UP

4 30-Apr-11

03-May-11

03-May-11 A

30-May-11 A

PTJ55 LEG SPLICE WELDING & NDT

DIM 10 1000

LEG B2 DIM 14 1400

DIM 12 1200

PTJ56 CONE FIT UP

Finish

4 04-May-11

08-May-11

08-May-11 A

30-May-11 A

22-May-11

12-May-11 A

01-Jun-11 A

PTJ57 CONE WELDING & NDT

6 23-May-11

29-May-11

21-May-11 A

02-Jun-11 A

PTJ57 CAN WELDING & NDT

6 30-May-11

05-Jun-11

18-Jun-11 A

18-Jun-11 A

29 09-May-11

11-Jun-11

12-May-11 A

27-Jun-11

PTJ55 LEG SPLICE FIT UP

5 09-May-11

14-May-11

12-May-11 A

31-May-11 A

PTJ56 CONE FIT UP

4 19-May-11

23-May-11

19-May-11 A

02-Jun-11 A

DIM 10 1000

2011 A M J Jul A S O N D

12 09-May-11

PTJ56 LEG SPLICE WELDING & NDT

Page 29 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ56 LEG SPLICE WELDING & NDT

6 24-May-11

30-May-11

21-May-11 A

04-Jun-11 A

PTJ56 CONE WELDING & NDT

5 31-May-11

05-Jun-11

18-Jun-11 A

18-Jun-11 A

PTJ56 CANS FIT UP

4 15-May-11

18-May-11

18-May-11 A

25-Jun-11

PTJ56 CAN WELDING & NDT

5 06-Jun-11

11-Jun-11

21-May-11 A

27-Jun-11

161 31-Mar-11

28-Sep-11

31-Mar-11 A

16-Jul-11

50 03-Aug-11

28-Sep-11

11-Apr-11 A

14-Jul-11

50 03-Aug-11

28-Sep-11

11-Apr-11 A

14-Jul-11

45 03-Aug-11

22-Sep-11

11-Apr-11 A

18-Jun-11 A

PTJ3 FITUP HORIZONTAL BRACES ATELEV -56.2

9 03-Aug-11

13-Aug-11

08-May-11 A

26-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -79.0

9 14-Aug-11

23-Aug-11

18-May-11 A

30-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -33.4

9 14-Aug-11

23-Aug-11

18-May-11 A

03-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES ATN ELEV -56.2

10 14-Aug-11

27-Aug-11

18-May-11 A

03-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -79.0

10 24-Aug-11

07-Sep-11

21-May-11 A

07-Jun-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -10.6

6 24-Aug-11

03-Sep-11

29-Apr-11 A

10-Jun-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV +6.4

7 04-Sep-11

11-Sep-11

11-Apr-11 A

13-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -33.4

10 24-Aug-11

07-Sep-11

21-May-11 A

13-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -10.6

10 04-Sep-11

14-Sep-11

11-May-11 A

14-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

10 12-Sep-11

22-Sep-11

19-May-11 A

18-Jun-11 A

41 14-Aug-11

28-Sep-11

18-Apr-11 A

14-Jul-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

18 14-Aug-11

06-Sep-11

18-May-11 A

09-Jun-11 A

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV -33.4 ...

14 07-Sep-11

22-Sep-11

14-May-11 A

20-Jun-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

13 04-Sep-11

18-Sep-11

11-May-11 A

07-Jul-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

14 24-Aug-11

12-Sep-11

14-May-11 A

09-Jul-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

20 14-Aug-11

08-Sep-11

18-Apr-11 A

10-Jul-11

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV +6.4 &...

9 19-Sep-11

28-Sep-11

15-May-11 A

11-Jul-11

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV -10.6 ...

11 13-Sep-11

25-Sep-11

20-May-11 A

11-Jul-11

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV -56.2 ...

15 10-Sep-11

26-Sep-11

17-May-11 A

14-Jul-11

78 31-Mar-11

26-Jun-11

31-Mar-11 A

02-Jul-11

JACKET BRACING FABRICATION BRACING ROW 1 BRACIN SPLICING SPLIC HORIZONTAL HORI

DIAGONAL BRACES DIAG

BRACING ROW 2 BRACIN

Finish

Page 30 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

78 31-Mar-11

26-Jun-11

31-Mar-11 A

02-Jul-11

15 31-Mar-11

18-Apr-11

31-Mar-11 A

28-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV +6.4

5 31-Mar-11

05-Apr-11

31-Mar-11 A

25-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -10.6

5 31-Mar-11

05-Apr-11

31-Mar-11 A

25-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -33.4

7 31-Mar-11

07-Apr-11

31-Mar-11 A

26-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -56.2

7 31-Mar-11

07-Apr-11

31-Mar-11 A

26-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -79.0

7 31-Mar-11

07-Apr-11

31-Mar-11 A

26-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

7 06-Apr-11

13-Apr-11

06-Apr-11 A

26-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -10.6

7 06-Apr-11

13-Apr-11

06-Apr-11 A

26-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -33.4

8 09-Apr-11

18-Apr-11

09-Apr-11 A

28-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -56.2

8 09-Apr-11

18-Apr-11

09-Apr-11 A

28-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -79.0

8 09-Apr-11

18-Apr-11

09-Apr-11 A

28-May-11 A

56 06-Apr-11

06-Jun-11

06-Apr-11 A

25-Jun-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

8 06-Apr-11

14-Apr-11

06-Apr-11 A

31-May-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

8 09-Apr-11

18-Apr-11

09-Apr-11 A

31-May-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

11 09-Apr-11

21-Apr-11

09-Apr-11 A

02-Jun-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

11 09-Apr-11

21-Apr-11

09-Apr-11 A

02-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

7 16-Apr-11

24-Apr-11

16-Apr-11 A

05-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

10 19-Apr-11

02-May-11

20-Apr-11 A

08-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

14 03-May-11

18-May-11

07-May-11 A

18-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

16 19-May-11

06-Jun-11

23-May-11 A

25-Jun-11

SPLICING SPLIC HORIZONTAL HORI

DIAGONAL BRACES DIAG

VERTICAL VERT

Finish

Page 31 of 64

2011 A M J Jul A S O N D

47 03-May-11

26-Jun-11

07-May-11 A

02-Jul-11

PTJ3 FITUP VERTICAL BRACES BETWEEN ELEV -10.6 & -33.4

5 03-May-11

08-May-11

07-May-11 A

26-Jun-11

PTJ3 FITUP VERTICAL BRACES BETWEEN ELEV -33.4 & -56.2

7 19-May-11

26-May-11

23-May-11 A

26-Jun-11

PTJ3 FITUP VERTICAL BRACES BETWEEN ELEV -56.2 & -79.0

7 07-Jun-11

14-Jun-11

11-Jun-11 A

26-Jun-11

PTJ8 WELDING VERTICAL BRACES BETWEEN ELEV -10.6 & -33.4

7 09-May-11

16-May-11

12-May-11 A

29-Jun-11

PTJ8 WELDING VERTICAL BRACES BETWEEN ELEV -33.4 & -56.2

10 28-May-11

07-Jun-11

31-May-11 A

02-Jul-11

PTJ8 WELDING VERTICAL BRACES BETWEEN ELEV -56.2 & -79.0

10 15-Jun-11

26-Jun-11

19-May-11 A

02-Jul-11

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

17 17-May-11

05-Jun-11

21-May-11 A

29-Jun-11

PTJ812 FITUP BRACES BETWEEN ELEV -10.6 & -33.4

7 17-May-11

24-May-11

21-May-11 A

26-Jun-11

PTJ813 FITUP BRACES BETWEEN ELEV -33.4 & -56.2

7 17-May-11

24-May-11

21-May-11 A

26-Jun-11

PTJ814 FITUP BRACES BETWEEN ELEV -56.2 & -79.0

7 17-May-11

24-May-11

21-May-11 A

26-Jun-11

PTJ815 WELDING VERTICAL BRACES BETWEEN ELEV +10.6 & -33.4

10 25-May-11

05-Jun-11

21-May-11 A

29-Jun-11

PTJ816 WELDING VERTICAL BRACES BETWEEN ELEV -33.4 & -56.2

10 25-May-11

05-Jun-11

22-May-11 A

29-Jun-11

PTJ817 WELDING VERTICAL BRACES BETWEEN ELEV -56.2 & -79.0

10 25-May-11

05-Jun-11

22-May-11 A

29-Jun-11

51 23-Jun-11

20-Aug-11

27-Apr-11 A

13-Jul-11

51 23-Jun-11

20-Aug-11

27-Apr-11 A

13-Jul-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

6 23-Jun-11

29-Jun-11

27-Apr-11 A

30-Jun-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

8 30-Jun-11

09-Jul-11

04-May-11 A

30-Jun-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

9 30-Jun-11

10-Jul-11

04-May-11 A

02-Jul-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

9 10-Jul-11

20-Jul-11

13-May-11 A

02-Jul-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

10 10-Jul-11

21-Jul-11

13-May-11 A

03-Jul-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

11 21-Jul-11

02-Aug-11

15-May-11 A

04-Jul-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

14 21-Jul-11

06-Aug-11

14-May-11 A

07-Jul-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV - 56.2 & -79.0

15 03-Aug-11

20-Aug-11

08-May-11 A

13-Jul-11

103 23-Jun-11

20-Aug-11

13-Apr-11 A

16-Jul-11

103 23-Jun-11

20-Aug-11

13-Apr-11 A

16-Jul-11

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

5 23-Jun-11

29-Jun-11

27-Apr-11 A

09-Jun-11 A

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

8 30-Jun-11

09-Jul-11

04-May-11 A

12-Jun-11 A

9 30-Jun-11

BRACING ROW 3 BRACIN

BRACING ROW A BRACIN FABRICATION FABRI

BRACING ROW B BRACIN FABRICATION FABRI

PTJ83 WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

Finish

10-Jul-11

04-May-11 A

12-Jun-11 A

21-Jul-11

13-Apr-11 A

15-Jun-11 A

9 10-Jul-11

20-Jul-11

13-Apr-11 A

18-Jun-11 A

PTJ83 WELDING DIAGONAL BRACES BETWEEN ELEV - 33.4 & -56.2

14 21-Jul-11

06-Aug-11

10-May-11 A

29-Jun-11

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

11 21-Jul-11

02-Aug-11

16-May-11 A

04-Jul-11

PTJ84 WELDING DIAGONAL BRACES BETWEEN ELEV - 56.2 & -79.0

15 03-Aug-11

20-Aug-11

08-May-11 A

16-Jul-11

23 21-Jun-11

17-Jul-11

25-Apr-11 A

28-Jun-11

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

BRACING ROW C BRACIN

2011 A M J Jul A S O N D

10 10-Jul-11

PTJ83 WELDING DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

Page 32 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ845 FITUP BRACES BETWEEN ELEV -10.6 & -33.4

7 21-Jun-11

28-Jun-11

25-Apr-11 A

26-Jun-11

PTJ847 FITUP BRACES BETWEEN ELEV -56.2 & -79.0

7 21-Jun-11

28-Jun-11

25-Apr-11 A

26-Jun-11

PTJ846 FITUP BRACES BETWEEN ELEV -33.4 & -56.2

10 21-Jun-11

02-Jul-11

25-Apr-11 A

26-Jun-11

PTJ848 WELDING BRACES BETWEEN ELEV -10.6 & -33.4

9 29-Jun-11

09-Jul-11

03-May-11 A

27-Jun-11

PTJ849 WELDING BRACES BETWEEN ELEV -56.2 & -79.0

9 29-Jun-11

09-Jul-11

03-May-11 A

27-Jun-11

13 03-Jul-11

17-Jul-11

06-May-11 A

28-Jun-11

19 21-Jun-11

12-Jul-11

25-Apr-11 A

29-Jun-11

PTJ854 FITUP BRACES BETWEEN ELEV -10.6 & -33.4

5 21-Jun-11

26-Jun-11

25-Apr-11 A

26-Jun-11

PTJ856 FITUP BRACES BETWEEN ELEV -56.2 & -79.0

5 21-Jun-11

26-Jun-11

25-Apr-11 A

26-Jun-11

PTJ855 FITUP BRACES BETWEEN ELEV -33.4 & -56.2

8 21-Jun-11

29-Jun-11

25-Apr-11 A

26-Jun-11

PTJ857 WELDING BRACES BETWEEN ELEV -10.6 & -33.4

7 27-Jun-11

04-Jul-11

30-Apr-11 A

27-Jun-11

PTJ858 WELDING BRACES BETWEEN ELEV -56.2 & -79.0

7 27-Jun-11

04-Jul-11

30-Apr-11 A

27-Jun-11

PTJ859 WELDING BRACES BETWEEN ELEV -33.4 & -56.2

11 30-Jun-11

12-Jul-11

04-May-11 A

29-Jun-11

185 31-Mar-11

30-Oct-11

31-Mar-11 A

03-Oct-11

78 04-Apr-11

29-Jun-11

04-Apr-11 A

23-Jun-11 A

28 04-Apr-11

03-May-11

04-Apr-11 A

02-Jun-11 A

PTJ86 FITUP OF SIZE 24"

18 04-Apr-11

26-Apr-11

04-Apr-11 A

26-May-11 A

PTJ86 FITUP OF SIZE 16"

7 21-Apr-11

01-May-11

23-Apr-11 A

31-May-11 A

PTJ86 FITUP OF SIZE 20"

5 27-Apr-11

03-May-11

30-Apr-11 A

02-Jun-11 A

17 04-May-11

26-May-11

08-May-11 A

14-Jun-11 A

PTJ86 WELDING OF SIZE 24"

12 04-May-11

17-May-11

08-May-11 A

05-Jun-11 A

PTJ86 WELDING OF SIZE 16"

5 18-May-11

23-May-11

22-May-11 A

11-Jun-11 A

PTJ86 WELDING OF SIZE 20"

4 23-May-11

26-May-11

08-May-11 A

14-Jun-11 A

CONDUCTORS AT ELEV + 6400 COND

38 17-May-11

29-Jun-11

08-May-11 A

23-Jun-11 A

18 28-May-11

16-Jun-11

14-May-11 A

20-Jun-11 A

10 28-May-11

07-Jun-11

19-May-11 A

16-Jun-11 A

6 11-Jun-11

16-Jun-11

14-May-11 A

20-Jun-11 A

11 18-Jun-11

29-Jun-11

21-May-11 A

23-Jun-11 A

PTJ850 WELDING BRACES BETWEEN ELEV -33.4 & -56.2 BRACING ROW D BRACIN

JACKET ELEVATIONS FABRICATION ELEV + 6400 FITUP

WELDING&NDT WELD

WELDING & NDT WELD PTJ9 WELDING OF CONDUCTOR PTJ9 WELDING OF CONDUCTOR SUPPORT CONDUCTORS ERECTION COND

Finish

Page 33 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

11 18-Jun-11

29-Jun-11

21-May-11 A

23-Jun-11 A

21 17-May-11

09-Jun-11

08-May-11 A

19-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 17-May-11

26-May-11

18-May-11 A

14-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 05-Jun-11

09-Jun-11

08-May-11 A

19-Jun-11 A

159 31-Mar-11

21-Aug-11

31-Mar-11 A

03-Oct-11

41 31-Mar-11

14-May-11

31-Mar-11 A

24-Jul-11

PTJ87 FITUP OF SIZE 28"

26 31-Mar-11

03-May-11

31-Mar-11 A

13-Jul-11

PTJ87 FITUP OF SIZE 16"

8 28-Apr-11

07-May-11

02-May-11 A

17-Jul-11

PTJ87 FITUP OF SIZE 20"

23 12-Apr-11

11-May-11

12-Apr-11 A

21-Jul-11

PTJ87 FITUP OF SIZE 14"

5 09-May-11

14-May-11

12-May-11 A

24-Jul-11

48 15-May-11

09-Jul-11

15-May-11 A

13-Sep-11

PTJ87 WELDING OF SIZE 28"

35 15-May-11

23-Jun-11

18-May-11 A

28-Aug-11

PTJ87 WELDING OF SIZE 16"

9 20-Jun-11

29-Jun-11

23-May-11 A

04-Sep-11

PTJ87 WELDING OF SIZE 20"

31 31-May-11

05-Jul-11

15-May-11 A

10-Sep-11

PTJ87 WELDING OF SIZE 14"

6 03-Jul-11

09-Jul-11

15-May-11 A

13-Sep-11

CONDUCTORS AT ELEV - 10600 COND

79 29-Jun-11

21-Aug-11

13-May-11 A

03-Oct-11

30 29-Jun-11

01-Aug-11

15-May-11 A

18-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 29-Jun-11

09-Jul-11

15-May-11 A

15-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 27-Jul-11

01-Aug-11

15-May-11 A

18-Jun-11 A

59 10-Jul-11

08-Aug-11

13-May-11 A

20-Sep-11

9 10-Jul-11

20-Jul-11

13-May-11 A

23-Jun-11 A

PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS FITUP

ELEV - 10600 FITUP

WELDING&NDT WELD

FITUP

WELDING & NDT WELD PTJ9 WELDING OF CONDUCTOR PTJ9 WELDING OF CONDUCTOR SUPPORT

Finish

6 02-Aug-11

08-Aug-11

13-Sep-11

20-Sep-11

21-Aug-11

20-Sep-11

03-Oct-11

11 09-Aug-11

21-Aug-11

20-Sep-11

03-Oct-11

117 31-Mar-11

24-Jul-11

31-Mar-11 A

14-Aug-11

30 31-Mar-11

02-May-11

31-Mar-11 A

21-Jun-11 A

PTJ87 FITUP OF SIZE 28"

14 31-Mar-11

16-Apr-11

31-Mar-11 A

05-Jun-11 A

PTJ88 FITUP OF SIZE 16"

10 09-Apr-11

20-Apr-11

09-Apr-11 A

09-Jun-11 A

PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS ELEV - 33400 FITUP

2011 A M J Jul A S O N D

11 09-Aug-11

CONDUCTORS ERECTION COND

Page 34 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ88 FITUP OF SIZE 24"

8 17-Apr-11

27-Apr-11

17-Apr-11 A

16-Jun-11 A

PTJ88 FITUP OF SIZE 20"

6 21-Apr-11

30-Apr-11

23-Apr-11 A

19-Jun-11 A

PTJ88 FITUP OF SIZE 18"

6 25-Apr-11

02-May-11

27-Apr-11 A

21-Jun-11 A

34 03-May-11

11-Jun-11

24-Apr-11 A

25-Jul-11

PTJ88 WELDING OF SIZE 28"

16 03-May-11

21-May-11

07-May-11 A

04-Jul-11

PTJ88 WELDING OF SIZE 16"

6 21-May-11

26-May-11

24-Apr-11 A

10-Jul-11

PTJ88 WELDING OF SIZE 24"

12 23-May-11

05-Jun-11

26-Apr-11 A

19-Jul-11

PTJ88 WELDING OF SIZE 20"

5 04-Jun-11

08-Jun-11

07-May-11 A

23-Jul-11

PTJ88 WELDING OF SIZE 18"

4 07-Jun-11

11-Jun-11

11-May-11 A

25-Jul-11

CONDUCTORS AT ELEV - 33400 COND

61 01-Jun-11

24-Jul-11

05-May-11 A

14-Aug-11

29 01-Jun-11

04-Jul-11

05-May-11 A

19-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 01-Jun-11

11-Jun-11

05-May-11 A

18-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 29-Jun-11

04-Jul-11

08-May-11 A

19-Jun-11 A

41 12-Jun-11

11-Jul-11

15-May-11 A

01-Aug-11

10 12-Jun-11

22-Jun-11

15-May-11 A

20-Jun-11 A

6 05-Jul-11

11-Jul-11

25-Jul-11

01-Aug-11

11 12-Jul-11

24-Jul-11

01-Aug-11

14-Aug-11

11 12-Jul-11

24-Jul-11

01-Aug-11

14-Aug-11

133 31-Mar-11

13-Aug-11

31-Mar-11 A

03-Aug-11

46 31-Mar-11

19-May-11

31-Mar-11 A

22-Jun-11 A

PTJ89 FITUP OF SIZE 28"

26 31-Mar-11

03-May-11

31-Mar-11 A

15-Jun-11 A

PTJ89 FITUP OF SIZE 24"

18 24-Apr-11

15-May-11

26-Apr-11 A

16-Jun-11 A

PTJ89 FITUP OF SIZE 16"

10 26-Apr-11

08-May-11

28-Apr-11 A

20-Jun-11 A

PTJ89 FITUP OF SIZE 20"

11 05-May-11

17-May-11

09-May-11 A

21-Jun-11 A

PTJ89 FITUP OF SIZE 18"

7 12-May-11

19-May-11

16-May-11 A

22-Jun-11 A

36 21-May-11

30-Jun-11

07-May-11 A

13-Jul-11

PTJ89 WELDING OF SIZE 28"

18 21-May-11

09-Jun-11

17-May-11 A

22-Jun-11 A

PTJ89 WELDING OF SIZE 24"

12 12-Jun-11

25-Jun-11

15-May-11 A

24-Jun-11 A

WELDING&NDT WELD

FITUP

WELDING & NDT WELD PTJ9 WELDING OF CONDUCTOR PTJ9 WELDING OF CONDUCTOR SUPPORT CONDUCTORS ERECTION COND PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS ELEV - 56200 FITUP

WELDING&NDT WELD

Finish

Page 35 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ89 WELDING OF SIZE 16"

7 08-Jun-11

15-Jun-11

12-May-11 A

28-Jun-11

PTJ89 WELDING OF SIZE 20"

7 21-Jun-11

28-Jun-11

14-May-11 A

11-Jul-11

PTJ89 WELDING OF SIZE 18"

4 27-Jun-11

30-Jun-11

07-May-11 A

13-Jul-11

CONDUCTORS AT ELEV - 56200 COND

60 21-Jun-11

13-Aug-11

15-May-11 A

03-Aug-11

30 21-Jun-11

24-Jul-11

15-May-11 A

24-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 21-Jun-11

30-Jun-11

15-May-11 A

23-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 19-Jul-11

24-Jul-11

19-May-11 A

24-Jun-11 A

38 02-Jul-11

31-Jul-11

21-May-11 A

27-Jul-11

10 02-Jul-11

12-Jul-11

21-May-11 A

13-Jul-11

6 25-Jul-11

31-Jul-11

22-Jun-11 A

27-Jul-11

13 01-Aug-11

13-Aug-11

22-Jun-11 A

03-Aug-11

11 01-Aug-11

13-Aug-11

22-Jun-11 A

03-Aug-11

61 18-Aug-11

30-Oct-11

07-Apr-11 A

09-Aug-11

29 18-Aug-11

19-Sep-11

07-Apr-11 A

18-Jul-11

PTJ90 FITUP OF SIZE 28"

13 18-Aug-11

05-Sep-11

23-Apr-11 A

12-Jun-11 A

PTJ90 FITUP OF SIZE 16"

9 31-Aug-11

10-Sep-11

07-Apr-11 A

17-Jun-11 A

PTJ90 FITUP OF SIZE 24"

10 06-Sep-11

17-Sep-11

13-Apr-11 A

16-Jul-11

PTJ90 FITUP OF SIZE 20"

6 13-Sep-11

19-Sep-11

20-Apr-11 A

18-Jul-11

32 20-Sep-11

30-Oct-11

02-May-11 A

09-Aug-11

PTJ90 WELDING OF SIZE 28"

18 20-Sep-11

11-Oct-11

21-May-11 A

21-Jul-11

PTJ90 WELDING OF SIZE 16"

10 05-Oct-11

17-Oct-11

13-May-11 A

27-Jul-11

PTJ90 WELDING OF SIZE 24"

12 13-Oct-11

26-Oct-11

20-May-11 A

06-Aug-11

PTJ90 WELDING OF SIZE 20"

2 26-Oct-11

30-Oct-11

02-May-11 A

09-Aug-11

72 22-Nov-11

15-Feb-12

07-May-11 A

21-Jan-12

46 22-Nov-11

23-Jan-12

07-May-11 A

28-Dec-11

PTJ932 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 22-Nov-11

26-Nov-11

19-Jun-11 A

23-Nov-11

PTJ933 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 25-Dec-11

28-Dec-11

29-Nov-11

03-Dec-11

23 01-Dec-11

28-Dec-11

07-May-11 A

03-Dec-11

FITUP

WELDING & NDT WELD PTJ9 WELDING OF CONDUCTOR PTJ9 WELDING OF CONDUCTOR SUPPORT CONDUCTORS ERECTION COND PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS ELEV - 79000 FITUP

WELDING&NDT WELD

PILE SLEEVES SLE FABRICATION AT LEG A1

PTJ936 GIRTH WELD OF PILE SLEEVE

Finish

Page 36 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ937 ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

12 29-Dec-11

11-Jan-12

04-Dec-11

17-Dec-11

PTJ938 ERECTION OF PILE SLEEVE WITH LEGS

10 12-Jan-12

23-Jan-12

18-Dec-11

28-Dec-11

52 22-Nov-11

23-Jan-12

20-Jun-11 A

28-Dec-11

PTJ946 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 22-Nov-11

26-Nov-11

20-Jun-11 A

31-Oct-11

PTJ947 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 25-Dec-11

28-Dec-11

29-Nov-11

03-Dec-11

PTJ950 GIRTH WELD OF PILE SLEEVE

24 01-Dec-11

28-Dec-11

06-Nov-11

03-Dec-11

PTJ95

12 29-Dec-11

11-Jan-12

04-Dec-11

17-Dec-11

10 12-Jan-12

23-Jan-12

18-Dec-11

28-Dec-11

54 15-Dec-11

15-Feb-12

20-Nov-11

21-Jan-12

PTJ939 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 15-Dec-11

19-Dec-11

20-Nov-11

23-Nov-11

PTJ940 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 17-Jan-12

21-Jan-12

22-Dec-11

26-Dec-11

PTJ943 GIRTH WELD OF PILE SLEEVE

24 25-Dec-11

21-Jan-12

29-Nov-11

26-Dec-11

PTJ944 ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

12 22-Jan-12

04-Feb-12

27-Dec-11

09-Jan-12

PTJ945 ERECTION OF PILE SLEEVE WITH LEGS

10 05-Feb-12

15-Feb-12

10-Jan-12

21-Jan-12

54 15-Dec-11

15-Feb-12

20-Nov-11

21-Jan-12

PTJ953 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 15-Dec-11

19-Dec-11

20-Nov-11

23-Nov-11

PTJ954 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 17-Jan-12

21-Jan-12

22-Dec-11

26-Dec-11

PTJ957 GIRTH WELD OF PILE SLEEVE

24 25-Dec-11

21-Jan-12

29-Nov-11

26-Dec-11

PTJ958 ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

12 22-Jan-12

04-Feb-12

27-Dec-11

09-Jan-12

PTJ959 ERECTION OF PILE SLEEVE WITH LEGS

10 05-Feb-12

15-Feb-12

10-Jan-12

21-Jan-12

176 14-Jun-11

15-Feb-12

28-Jun-11

21-Jan-12

7 22-Dec-11

29-Dec-11

26-Oct-11

02-Nov-11

7 22-Dec-11

29-Dec-11

26-Oct-11

02-Nov-11

7 22-Dec-11

29-Dec-11

26-Oct-11

02-Nov-11

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

7 08-Nov-11

15-Nov-11

17-Aug-11

25-Aug-11

AT LEG B1

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

PTJ952 ERECTION OF PILE SLEEVE WITH LEGS AT LEG A2

AT LEG B2

JACKET ERECTION ELEV +6.4 + ERECTION ON ROW2 ERECT PTJ86 ERECTION OF ELEV AT + 6.4 ON ROW 2 ELEV -5 -56.2 ERECTION ON ROW2 ERECT PTJ90 ERECTION OF ELEV AT -56.2 ON ROW 2 ELEV -7 -79.0

Finish

Page 37 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

7 08-Nov-11

15-Nov-11

17-Aug-11

25-Aug-11

7 08-Nov-11

15-Nov-11

17-Aug-11

25-Aug-11

7 17-Nov-11

24-Nov-11

27-Aug-11

05-Sep-11

7 17-Nov-11

24-Nov-11

27-Aug-11

05-Sep-11

7 17-Nov-11

24-Nov-11

27-Aug-11

05-Sep-11

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

37 14-Jun-11

30-Oct-11

28-Jun-11

09-Aug-11

36 14-Jun-11

29-Oct-11

28-Jun-11

08-Aug-11

15 14-Jun-11

30-Jun-11

28-Jun-11

16-Jul-11

5 14-Jun-11

19-Jun-11

28-Jun-11

04-Jul-11

10 20-Jun-11

30-Jun-11

04-Jul-11

16-Jul-11

30 20-Jun-11

24-Jul-11

04-Jul-11

08-Aug-11

PTJ8 FITUP OF DIAGONAL ON LEG

10 20-Jun-11

30-Jun-11

04-Jul-11

16-Jul-11

PTJ8 WELDING OF DIAGONAL ON LEG

20 02-Jul-11

24-Jul-11

16-Jul-11

08-Aug-11

15 12-Oct-11

29-Oct-11

21-Jul-11

08-Aug-11

5 12-Oct-11

17-Oct-11

21-Jul-11

27-Jul-11

10 18-Oct-11

29-Oct-11

27-Jul-11

08-Aug-11

1 30-Oct-11

30-Oct-11

08-Aug-11

09-Aug-11

1 30-Oct-11

30-Oct-11

08-Aug-11

09-Aug-11

ERECTION ON ROW2 ERECT PTJ90 ERECTION OF ELEV AT -79 ON ROW 2 ELEV - 33.4 ERECTION ON ROW2 ERECT PTJ88 ERECTION OF ELEV AT -33.4 ON ROW 2 ELEV -1 -10.6 ERECTION ON ROW2 ERECT PTJ87 ERECTION OF ELEV AT -10.6 ON ROW 2 ROW 2 ERECTION ERECT HORIZONTAL HORI PTJ9 FITUP OF HORIZONTAL ON LEG PTJ9 WELDING OF HORIZONTAL ON LEG DIAGONAL BRACES DIAG

VERTICAL VERT PTJ8 FITUP OF VERTICAL BRACES WITH ROW 2 BRACES PTJ8 WELDING OF VERTICAL BRACES WITH ROW 2 BRACES LIFTING OVER TRUSS RUNNER LIFTIN PTJ81 LIFTING OVER TRUSS RUNNERS ROW C

Finish

19 08-Nov-11

29-Nov-11

17-Aug-11

10-Sep-11

4 08-Nov-11

12-Nov-11

17-Aug-11

22-Aug-11

PTJ853 ERECTION ROW C BRACES BETWEEN - 10.6 & -33.4

4 26-Nov-11

29-Nov-11

05-Sep-11

10-Sep-11

PTJ852 ERECTION ROW C BRACES BETWEEN -33.4 & -56.2

4 26-Nov-11

29-Nov-11

05-Sep-11

10-Sep-11

67 06-Sep-11

17-Dec-11

28-Jul-11

17-Oct-11

67 06-Sep-11

17-Dec-11

28-Jul-11

17-Oct-11

6 06-Sep-11

12-Sep-11

28-Jul-11

04-Aug-11

ROW A ERECTION ERECT PTJ83 ERECTION X BRACES BETWEEN -56.2 & -79.0

2011 A M J Jul A S O N D

ERECTION ROW C BRACES BETWEEN -56.2 & -79.0

PTJ85

Page 38 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ83 ERECTION X BRACES BETWEEN -33.4 & -56.2

4 08-Nov-11

12-Nov-11

17-Aug-11

22-Aug-11

PTJ83 ERECTION X BRACES BETWEEN -10.6 & -33.4

4 26-Nov-11

29-Nov-11

05-Sep-11

10-Sep-11

PTJ82 ERECTION X BRACES BETWEEN +6.4 & -10.6

4 13-Dec-11

17-Dec-11

12-Oct-11

17-Oct-11

65 13-Sep-11

21-Dec-11

04-Aug-11

22-Oct-11

65 13-Sep-11

21-Dec-11

04-Aug-11

22-Oct-11

PTJ84 ERECTION X BRACES BETWEEN -56.2 & -79.0

6 13-Sep-11

19-Sep-11

04-Aug-11

11-Aug-11

PTJ84 ERECTION X BRACES BETWEEN -33.4 & -56.2

4 13-Nov-11

16-Nov-11

22-Aug-11

27-Aug-11

PTJ84 ERECTION X BRACES BETWEEN -10.6 & -33.4

4 30-Nov-11

04-Dec-11

10-Sep-11

14-Sep-11

PTJ84 ERECTION X BRACES BETWEEN +6.4 & -10.6

4 18-Dec-11

21-Dec-11

17-Oct-11

22-Oct-11

41 16-Nov-11

14-Dec-11

25-Aug-11

15-Oct-11

PTJ860 ERECTION ROW D BRACES BETWEEN -56.2 & -79.0

2 16-Nov-11

17-Nov-11

25-Aug-11

28-Aug-11

PTJ86

ERECTION ROW D BRACES BETWEEN -33.4 & -56.2

2 26-Nov-11

27-Nov-11

05-Sep-11

07-Sep-11

PTJ862 ERECTION ROW D BRACES BETWEEN -10.6 & -33.4

2 13-Dec-11

14-Dec-11

12-Oct-11

15-Oct-11

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

PTJ818 ERECTION ROW 3 BRACES BETWEEN -10.6 & -33.4

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

PTJ819 ERECTION ROW 3 BRACES BETWEEN -33.4 & -56.2

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

PTJ820 ERECTION ROW 3 BRACES BETWEEN -56.2 & -79.0

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

170 24-Sep-11

15-Feb-12

04-Jul-11

21-Jan-12

15 24-Sep-11

11-Oct-11

04-Jul-11

21-Jul-11

5 24-Sep-11

28-Sep-11

04-Jul-11

10-Jul-11

10 29-Sep-11

11-Oct-11

10-Jul-11

21-Jul-11

ROW B ERECTION ERECT

ROW D

ROW 3

ROW 1 HORIZONTAL HORIZ PTJ94 FITUP OF HORIZONTAL ON LEG PTJ94 WELDING OF HORIZONTAL ON LEG DIAGONAL BRACES DIAGO

Finish

30 29-Sep-11

03-Nov-11

10-Jul-11

14-Aug-11

10 29-Sep-11

11-Oct-11

10-Jul-11

21-Jul-11

PTJ94 WELDING OF DIAGONAL ON LEG

20 12-Oct-11

03-Nov-11

21-Jul-11

14-Aug-11

20 24-Jan-12

15-Feb-12

29-Dec-11

21-Jan-12

PTJ80 LIFTING OF ROW 1 OVER ELAVATIONS & ROW A,B

1 24-Jan-12

24-Jan-12

29-Dec-11

29-Dec-11

PTJ80 FITUP OF ROW 1 OVER ELAVATIONS & ROW A,B

4 25-Jan-12

29-Jan-12

31-Dec-11

03-Jan-12

15 30-Jan-12

15-Feb-12

04-Jan-12

21-Jan-12

PTJ80 WELDING OF ROW 1 OVER ELAVATIONS & ROW A,B

2011 A M J Jul A S O N D

PTJ94 FITUP OF DIAGONAL ON LEG

ERECTION ROW 1 ERECT

Page 39 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

JACKET M MISCELLANEOUS FABRICATION

Original BL Project Duration Start

BL Project Finish

Start

206 31-Mar-11

21-Feb-12

31-Mar-11 A

PTJ9600 Jacket miscellaneous fabrication start

0 31-Aug-11

PTJ11020 Jacket miscellaneous fabrication finish

0

Finish 26-Jan-12

31-Aug-11 21-Feb-12

26-Jan-12

65 19-Dec-11

21-Feb-12

23-Nov-11

26-Jan-12

Main Le Legs

5 19-Dec-11

23-Dec-11

23-Nov-11

27-Nov-11

BL1000 Cutting & Assembly

3 19-Dec-11

21-Dec-11

23-Nov-11

25-Nov-11

BL1010 Welding & NDT

4 20-Dec-11

23-Dec-11

24-Nov-11

27-Nov-11

20 24-Dec-11

12-Jan-12

28-Nov-11

17-Dec-11

BL1040 Cutting & Assembly

10 24-Dec-11

02-Jan-12

28-Nov-11

07-Dec-11

BL1050 Welding & NDT

15 29-Dec-11

12-Jan-12

03-Dec-11

17-Dec-11

21 28-Jan-12

17-Feb-12

02-Jan-12

22-Jan-12

BL1020 Cutting & Assembly

12 28-Jan-12

08-Feb-12

02-Jan-12

13-Jan-12

BL1030 Welding & NDT

15 03-Feb-12

17-Feb-12

08-Jan-12

22-Jan-12

14 14-Jan-12

27-Jan-12

19-Dec-11

01-Jan-12

BL1060 Cutting & Assembly

4 14-Jan-12

17-Jan-12

19-Dec-11

22-Dec-11

BL1070 Welding & NDT

6 22-Jan-12

27-Jan-12

27-Dec-11

01-Jan-12

15 13-Jan-12

27-Jan-12

18-Dec-11

01-Jan-12

BL1080 Cutting & Assembly

5 13-Jan-12

17-Jan-12

18-Dec-11

22-Dec-11

BL1090 Welding & NDT

7 21-Jan-12

27-Jan-12

26-Dec-11

01-Jan-12

15 13-Jan-12

27-Jan-12

18-Dec-11

01-Jan-12

5 13-Jan-12

17-Jan-12

18-Dec-11

22-Dec-11

Front Elevation El

Plan at Elev. +2.6

Plan at Elev. +2.4

Plan at Elev. -30 BL1100 Cutting & Assembly BL1110 Welding & NDT

7 21-Jan-12

27-Jan-12

26-Dec-11

01-Jan-12

10 18-Jan-12

27-Jan-12

23-Dec-11

01-Jan-12

BL1120 Cutting & Assembly

4 18-Jan-12

21-Jan-12

23-Dec-11

26-Dec-11

BL1130 Welding & NDT

6 22-Jan-12

27-Jan-12

27-Dec-11

01-Jan-12

18 04-Feb-12

21-Feb-12

09-Jan-12

26-Jan-12

BL1140 Trial Fit and Grating Stopper Fixation

1 04-Feb-12

04-Feb-12

09-Jan-12

09-Jan-12

BL1150 Final Installation

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

Boat lan landing Sections (a,b.c,d,e)

Grating

2011 A M J Jul A S O N D

BOAT LAND LA

Back El Elevation

Page 40 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

8 10-Feb-12

17-Feb-12

15-Jan-12

22-Jan-12

BL1160 Fabrication

5 10-Feb-12

14-Feb-12

15-Jan-12

19-Jan-12

BL1170 Installation

3 15-Feb-12

17-Feb-12

20-Jan-12

22-Jan-12

16 06-Feb-12

21-Feb-12

11-Jan-12

26-Jan-12

BL1200 Fabrication

4 06-Feb-12

09-Feb-12

11-Jan-12

14-Jan-12

BL1210 Installation

2 20-Feb-12

21-Feb-12

25-Jan-12

26-Jan-12

2 16-Feb-12

17-Feb-12

21-Jan-12

22-Jan-12

BL1220 Fabrication

1 16-Feb-12

16-Feb-12

21-Jan-12

21-Jan-12

BL1230 Installation

1 17-Feb-12

17-Feb-12

22-Jan-12

22-Jan-12

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

27 22-Jan-12

17-Feb-12

27-Dec-11

22-Jan-12

4 14-Feb-12

17-Feb-12

19-Jan-12

22-Jan-12

BL127 Profiling Template & Assembly with Legs

2 14-Feb-12

15-Feb-12

19-Jan-12

20-Jan-12

BL128 Welding & NDT

3 15-Feb-12

17-Feb-12

20-Jan-12

22-Jan-12

16 22-Jan-12

06-Feb-12

27-Dec-11

11-Jan-12

BL125 Cutting & Assembly

7 22-Jan-12

28-Jan-12

27-Dec-11

02-Jan-12

BL126 Welding & NDT

9 29-Jan-12

06-Feb-12

03-Jan-12

11-Jan-12

23 26-Jan-12

17-Feb-12

31-Dec-11

22-Jan-12

19 26-Jan-12

13-Feb-12

31-Dec-11

18-Jan-12

7 26-Jan-12

01-Feb-12

31-Dec-11

06-Jan-12

12 02-Feb-12

13-Feb-12

07-Jan-12

18-Jan-12

4 14-Feb-12

17-Feb-12

19-Jan-12

22-Jan-12

BL131 Profiling Template & Assembly with Legs

2 14-Feb-12

15-Feb-12

19-Jan-12

20-Jan-12

BL132 Welding & NDT

3 15-Feb-12

17-Feb-12

20-Jan-12

22-Jan-12

2 18-Feb-12

19-Feb-12

23-Jan-12

24-Jan-12

2 18-Feb-12

19-Feb-12

23-Jan-12

24-Jan-12

30 23-Jan-12

21-Feb-12

28-Dec-11

26-Jan-12

Stairs & Ladders

Handrails Handrai

Mooring Cleat

Rubber BL1240 Installation of Rubber & Tightening Lower Support S Installation with Jacket legs Installa

Fabrication Fabrica

Upper Support S Fabrication Fabrica BL129 Cutting & Assembly BL130 Welding & NDT Installation with Jacket legs Installa

Boat lan landing trial fit BL1330 Boat Landing Trial Fit BARGE B BUMPER

Finish

Page 41 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

15 23-Jan-12

06-Feb-12

28-Dec-11

11-Jan-12

BB1000 Cutting & Assembly

6 23-Jan-12

28-Jan-12

28-Dec-11

02-Jan-12

BB1010 Welding & NDT

9 29-Jan-12

06-Feb-12

03-Jan-12

11-Jan-12

28 23-Jan-12

19-Feb-12

28-Dec-11

24-Jan-12

23 23-Jan-12

14-Feb-12

28-Dec-11

19-Jan-12

BB10 Cutting & Assembly

12 23-Jan-12

03-Feb-12

28-Dec-11

08-Jan-12

BB10 Welding & NDT

17 29-Jan-12

14-Feb-12

03-Jan-12

19-Jan-12

5 15-Feb-12

19-Feb-12

20-Jan-12

24-Jan-12

BB10 Profiling Template & Assembly with Legs

2 15-Feb-12

16-Feb-12

20-Jan-12

21-Jan-12

BB10 Welding & NDT

3 17-Feb-12

19-Feb-12

22-Jan-12

24-Jan-12

24 27-Jan-12

19-Feb-12

01-Jan-12

24-Jan-12

5 15-Feb-12

19-Feb-12

20-Jan-12

24-Jan-12

BB10 Profiling Template & Assembly with Legs

2 15-Feb-12

16-Feb-12

20-Jan-12

21-Jan-12

BB10 Welding & NDT

3 17-Feb-12

19-Feb-12

22-Jan-12

24-Jan-12

19 27-Jan-12

14-Feb-12

01-Jan-12

19-Jan-12

8 27-Jan-12

03-Feb-12

01-Jan-12

08-Jan-12

11 04-Feb-12

14-Feb-12

09-Jan-12

19-Jan-12

2 20-Feb-12

21-Feb-12

25-Jan-12

26-Jan-12

2 20-Feb-12

21-Feb-12

25-Jan-12

26-Jan-12

42 31-Aug-11

27-Oct-11

31-Aug-11

19-Oct-11

PTJ106 CLAMPS FOR RISER 16 " FABRICATION

18 31-Aug-11

20-Sep-11

31-Aug-11

20-Sep-11

PTJ105 RISER 16 " FABRICATION

22 31-Aug-11

25-Sep-11

31-Aug-11

25-Sep-11

7 26-Sep-11

03-Oct-11

26-Sep-11

03-Oct-11

PTJ106 CLAMPS FOR RISER 16 " INSTALLATION

14 29-Sep-11

16-Oct-11

21-Sep-11

08-Oct-11

PTJ106 RISER 16 " INSTALLATION

10 17-Oct-11

27-Oct-11

09-Oct-11

19-Oct-11

26 31-Aug-11

16-Oct-11

31-Aug-11

29-Sep-11

PTJ106 CLAMPS FOR J-TUBE16 " FABRICATION

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ106 J-TUBE16 " FABRICATION

14 31-Aug-11

15-Sep-11

31-Aug-11

15-Sep-11

Main Pi Pipe

Upper Support S Fabrication Fabrica

Installation with Jacket legs Installa

Lower Support S Installation with Jacket legs Installa

Fabrication Fabrica BB10 Cutting & Assembly BB10 Welding & NDT Barge Bumper B Trial Fit BB1100 Barge Bumper Trial Fit RISER 16" 1 & CLAMPS

PTJ106 RISER COATING

J-TUBE 16 " & CLAMPS

Finish

Page 42 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

10 29-Sep-11

11-Oct-11

14-Sep-11

25-Sep-11

4 12-Oct-11

16-Oct-11

26-Sep-11

29-Sep-11

14 31-Aug-11

05-Oct-11

31-Aug-11

15-Sep-11

PTJ106 CLAMPS FOR FUTURE J-TUBE FABRICATION

8 31-Aug-11

08-Sep-11

31-Aug-11

08-Sep-11

PTJ107 CLAMPS FOR FUTURE J-TUBE INSTALLATION

6 29-Sep-11

05-Oct-11

10-Sep-11

15-Sep-11

18 31-Jan-12

20-Feb-12

05-Jan-12

25-Jan-12

2 07-Feb-12

08-Feb-12

12-Jan-12

14-Jan-12

14 31-Jan-12

15-Feb-12

05-Jan-12

21-Jan-12

PTJ107 SUPPORTS SUMP CAISSON 30 " INSTALLATION

6 09-Feb-12

15-Feb-12

15-Jan-12

21-Jan-12

PTJ107 SUPPORTS SUMP CAISSON 30 " INSTALLATION

4 16-Feb-12

20-Feb-12

22-Jan-12

25-Jan-12

80 31-Aug-11

03-Dec-11

31-Aug-11

03-Dec-11

PTJ107 MUD MAT FABRICATION

60 31-Aug-11

09-Nov-11

31-Aug-11

09-Nov-11

PTJ107 MUD MAT INSTALLATION

20 10-Nov-11

03-Dec-11

10-Nov-11

03-Dec-11

47 31-Aug-11

25-Oct-11

31-Aug-11

25-Oct-11

PTJ103 FITUP OF WALK WAY & STARIR

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ103 WELDING & NDT OF WALK WAY & STARIRS

16 14-Sep-11

02-Oct-11

14-Sep-11

02-Oct-11

PTJ103 ERECTION WALK WAY ON TOP ELEVATION

12 12-Oct-11

25-Oct-11

12-Oct-11

25-Oct-11

118 31-Mar-11

14-Aug-11

31-Mar-11 A

14-Jul-11

118 31-Mar-11

14-Aug-11

31-Mar-11 A

14-Jul-11

87 31-Mar-11

24-May-11

31-Mar-11 A

10-Jul-11

PTJ98 FITUP OF LUNCH TRUSS FROM EL -33.4 UP TO -10.6

32 31-Mar-11

10-May-11

31-Mar-11 A

26-Jun-11

PTJ98 WELDING & NDT LUNCH TRUSS FROM EL -33.4 UP TO -10.6

24 24-Apr-11

22-May-11

26-Apr-11 A

07-Jul-11

2 23-May-11

24-May-11

07-Jul-11

10-Jul-11

50 11-May-11

04-Jul-11

15-Apr-11 A

12-Jul-11

PTJ97 FITUP OF LUNCH TRUSS FROM EL -56 UP TO -33.4

35 11-May-11

20-Jun-11

15-Apr-11 A

28-Jun-11

PTJ98 WELDING & NDT OF LUNCH TRUSS FROM EL -56 UP TO -33.4

25 04-Jun-11

02-Jul-11

07-May-11 A

10-Jul-11

PTJ98 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...

2 03-Jul-11

04-Jul-11

10-Jul-11

12-Jul-11

45 21-Jun-11

14-Aug-11

25-Apr-11 A

14-Jul-11

PTJ106 CLAMPS FOR J-TUBE16 " INSTALLATION PTJ106 J-TUBE16 " INSTALLATION FUTURE J-TUBE CLAMPS

SUMP C CAISSON 30" PTJ107 SUPPORTS SUMP CAISSON 30 " FABRICATION PTJ107 SUMP CAISSON 30 " FABRICATION

MUD MAT MA

WALK W WAY & STAIRS

LAUNCH RUNNERS AT ROW D FROM EL. -33400 TO -10600

PTJ98 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ... FROM EL. -56200 TO -33400

FROM EL. -79000 TO -56200

Finish

Page 43 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

34 21-Jun-11

31-Jul-11

25-Apr-11 A

30-Jun-11

PTJ97 WELDING & NDT OF LUNCH TRUSS FROM EL -79 UP TO -56

24 14-Jul-11

11-Aug-11

18-May-11 A

12-Jul-11

2 13-Aug-11

14-Aug-11

12-Jul-11

14-Jul-11

118 31-Mar-11

14-Aug-11

31-Mar-11 A

14-Jul-11

87 31-Mar-11

24-May-11

31-Mar-11 A

10-Jul-11

PTJ97 FITUP OF LUNCH TRUSS FROM EL -33.4 UP TO -10.6

32 31-Mar-11

10-May-11

31-Mar-11 A

26-Jun-11

PTJ97 WELDING & NDT LUNCH TRUSS FROM EL -33.4 UP TO -10.6

24 24-Apr-11

22-May-11

26-Apr-11 A

07-Jul-11

2 23-May-11

24-May-11

07-Jul-11

10-Jul-11

45 21-Jun-11

14-Aug-11

25-Apr-11 A

14-Jul-11

PTJ96 FITUP OF LUNCH TRUSS FROM EL -79 UP TO -56

34 21-Jun-11

31-Jul-11

25-Apr-11 A

30-Jun-11

PTJ96 WELDING & NDT OF LUNCH TRUSS FROM EL -79 UP TO -56

24 14-Jul-11

11-Aug-11

18-May-11 A

12-Jul-11

2 13-Aug-11

14-Aug-11

12-Jul-11

14-Jul-11

50 11-May-11

04-Jul-11

01-May-11 A

12-Jul-11

PTJ97 FITUP OF LUNCH TRUSS FROM EL -56 UP TO -33.4

35 11-May-11

20-Jun-11

01-May-11 A

28-Jun-11

PTJ97 WELDING & NDT OF LUNCH TRUSS FROM EL -56 UP TO -33.4

25 04-Jun-11

02-Jul-11

14-May-11 A

10-Jul-11

PTJ97 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...

2 03-Jul-11

04-Jul-11

10-Jul-11

12-Jul-11

167 21-Aug-11

21-Feb-12

11-Jun-11 A

26-Jan-12

PTJ100 INSTALL ANODES FOR ROW A

13 21-Aug-11

05-Sep-11

13-Jul-11

28-Jul-11

PTJ101 INSTALL ANODES FOR ROW B

8 04-Sep-11

12-Sep-11

14-Jun-11 A

04-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -56.2

7 23-Oct-11

30-Oct-11

01-Aug-11

09-Aug-11

PTJ101 INSTALL ANODES FOR ROW C

6 01-Nov-11

07-Nov-11

10-Aug-11

17-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -79.0

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

PTJ101 INSTALL ANODES FOR ROW D

6 09-Nov-11

15-Nov-11

18-Aug-11

25-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -33.4

5 12-Nov-11

16-Nov-11

21-Aug-11

27-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -10.6

5 29-Nov-11

04-Dec-11

27-Sep-11

03-Oct-11

PTJ101 INSTALL ANODES FOR ROW 3

6 12-Jan-12

18-Jan-12

16-Nov-11

22-Nov-11

PTJ101 INSTALL ANODES FOR ROW 1

10 04-Jan-12

15-Jan-12

10-Dec-11

20-Dec-11

PTJ101 INSTALL ANODES FOR ROW 2

10 28-Jan-12

07-Feb-12

11-Jun-11 A

12-Jan-12

AT ROW C FROM EL. -33400 TO -10600

PTJ97 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ... FROM EL. -79000 TO -56200

PTJ96 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ... FROM EL. -56200 TO -33400

ANODES

2011 A M J Jul A S O N D

PTJ97 FITUP OF LUNCH TRUSS FROM EL -79 UP TO -56

PTJ97 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...

Page 44 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ102 INSTALL ANODES FOR MUD MAT

7 14-Feb-12

21-Feb-12

19-Jan-12

26-Jan-12

PTJ102 INSTALL ANODES FOR SUMP CASSOIN

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ986 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPOR...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ987 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ988 SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ989 ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ99

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ993 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPOR...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ994 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ995 SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ996 ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ998 ERECTION OF BOUNCY TANK WITH LEGS

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

PTJ997 GIRTH WELD OF BOUNCY TANK

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ100 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPRT...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ100 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ100 SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ100 ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ100 ERECTION OF BOUNCY TANK WITH LEGS

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

PTJ100 GIRTH WELD OF BOUNCY TANK

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

BOUNCY TANKS AT LEG A1 PTJ985 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

ERECTION OF BOUNCY TANK WITH LEGS

PTJ990 GIRTH WELD OF BOUNCY TANK AT LEG A2 PTJ992 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

AT LEG B1 PTJ999 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

AT LEG B2

Finish

Page 45 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ100 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPOR...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ100 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ10

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ10

ERECTION OF SUPPORTS& STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ10

ERECTION OF BOUNCY TANK WITH LEGS

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

PTJ10

GIRTH WELD OF BOUNCY TANK

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

35 01-Jan-12

09-Feb-12

06-Dec-11

15-Jan-12

PTJ107 BALASTING INSTALLATION

20 01-Jan-12

23-Jan-12

06-Dec-11

28-Dec-11

PTJ109 GROUTING INSTALLATION ON ROW 1

20 01-Jan-12

23-Jan-12

06-Dec-11

28-Dec-11

PTJ109 GROUTING INSTALLATION ON ROW 2

20 18-Jan-12

09-Feb-12

24-Dec-11

15-Jan-12

120 22-Sep-11

09-Feb-12

08-Sep-11

26-Jan-12

120 22-Sep-11

09-Feb-12

08-Sep-11

26-Jan-12

32 31-Aug-11

08-Oct-11

31-Aug-11

08-Oct-11

PTJ107 INSTALLATION AIDS FABRICATION

22 31-Aug-11

25-Sep-11

31-Aug-11

25-Sep-11

PTJ107 INSTALLATION AIDS INSTALLATION

10 26-Sep-11

08-Oct-11

26-Sep-11

08-Oct-11

17 31-Dec-11

18-Jan-12

03-Nov-11

22-Nov-11

PTJ9300 FITUP OF PREBENT CONDUCTOR

8 31-Dec-11

08-Jan-12

03-Nov-11

12-Nov-11

PTJ9310 WELDING OF PREBENT CONDUCTOR

9 09-Jan-12

18-Jan-12

13-Nov-11

22-Nov-11

141 03-Oct-11

15-Mar-12

03-Oct-11

15-Mar-12

PTJ10320 SPLASH PAINTING FOR MISC. (H.R, STAIRS, ...ETC)

7 03-Oct-11

11-Oct-11

03-Oct-11

11-Oct-11

PTJ10300 SPLASH PAINTING FOR ROW A

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

PTJ10310 SPLASH PAINTING FOR ROW B

7 10-Dec-11

17-Dec-11

09-Oct-11

17-Oct-11

PTJ10340 ATMOSPHERIC PAINTING FOR TOP ELEV

7 14-Dec-11

21-Dec-11

18-Oct-11

25-Oct-11

PTJ10280 SPLASH PAINTING FOR ROW 1

7 16-Jan-12

23-Jan-12

21-Dec-11

28-Dec-11

PTJ10290 SPLASH PAINTING FOR ROW 2

7 08-Feb-12

15-Feb-12

14-Jan-12

21-Jan-12

14 05-Feb-12

20-Feb-12

10-Jan-12

25-Jan-12

5 11-Mar-12

15-Mar-12

11-Mar-12

15-Mar-12

PTJ100 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

BALLASTING & GROUTING SYSTEM BALLAS

GRILLAGE & SEA FASTENING GRILLAG PTJ108 GRILLAGE & SEA FASTENING FABRICATION INSTALLATION AIDS INSTALL

PREBENT CONDUCTOR PREBEN

PAINTING

PTJ10260 SPLASH PAINTING FOR BOAT LAND PTJ10270 SPLASH PAINTING FOR BARGE BUMPER

Finish

Page 46 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

PTJ10990 RISER HYDRO TEST

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

PTJ11000 BALLASTING SYSTEM TEST

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

PTJ11010 GROUTING SYSTEM TEST

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

17-Dec-11

15-Apr-11 A

17-Nov-11

PTJ10330 PILE MARKING INSPECTION, TESTING & PRE-COMMISIONING INSPECT

PILES FAB FABRICATION PTJ2030

Piiles fabrication start

PTJ10380 Piiles fabrication finish AT LEG A1

123 02-Jul-11 0 02-Jul-11 0

Finish

15-Apr-11 A 17-Dec-11

17-Nov-11

31-Aug-11

15-Apr-11 A

28-Jul-11

PTJ10420 Automatic welding 6 joints

24 06-Jul-11

02-Aug-11

24-Apr-11 A

11-Jun-11 A

PTJ10430 back weld manual 6 joints

16 16-Jul-11

02-Aug-11

02-May-11 A

12-Jun-11 A

PTJ10390 Manual fitup & welding 6 joints

23 02-Jul-11

28-Jul-11

15-Apr-11 A

06-Jul-11

PTJ10410 Welding beads (41 joints)

10 03-Aug-11

14-Aug-11

04-May-11 A

19-Jul-11

PTJ10400 Fitup & welding for manual joint (2 joints)

10 20-Aug-11

31-Aug-11

17-Jul-11

28-Jul-11

61 02-Jul-11

04-Oct-11

25-Jun-11

05-Sep-11

PTJ10440 Manual fitup & welding automatic 6 joints

24 02-Jul-11

28-Jul-11

25-Jun-11

21-Jul-11

PTJ10460 back weld manual 6 joints

16 18-Aug-11

06-Sep-11

19-Jul-11

07-Aug-11

PTJ10450 Automatic welding 6 joints

24 10-Aug-11

07-Sep-11

11-Jul-11

08-Aug-11

PTJ10480 Welding beads (41 joints)

10 08-Sep-11

19-Sep-11

08-Aug-11

20-Aug-11

PTJ10470 Fitup & welding for manual joint (2 joints)

10 24-Sep-11

04-Oct-11

23-Aug-11

05-Sep-11

87 02-Jul-11

12-Nov-11

02-May-11 A

13-Oct-11

PTJ10490 Manual fitup & welding automatic 6 joints

23 02-Jul-11

28-Jul-11

02-May-11 A

14-Jul-11

PTJ10500 Automatic welding 6 joints

24 15-Sep-11

13-Oct-11

15-Aug-11

13-Sep-11

PTJ10510 back weld manual 6 joints

16 26-Sep-11

15-Oct-11

25-Aug-11

14-Sep-11

PTJ10530 Welding beads (41 joints)

10 15-Oct-11

25-Oct-11

06-Jun-11 A

22-Sep-11

PTJ10520 Fitup & welding for manual joint (2 joints)

10 01-Nov-11

12-Nov-11

01-Oct-11

13-Oct-11

123 02-Jul-11

17-Dec-11

25-Jun-11

17-Nov-11

24 02-Jul-11

28-Jul-11

25-Jun-11

21-Jul-11

AT LEG B1

AT LEG B2 PTJ10540 Manual fitup & welding automatic 6 joints

2011 A M J Jul A S O N D

39 02-Jul-11

AT LEG A2

Page 47 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ10550 Automatic welding 6 joints

24 22-Oct-11

17-Nov-11

20-Sep-11

19-Oct-11

PTJ10560 back weld manual 6 joints

16 01-Nov-11

19-Nov-11

01-Oct-11

20-Oct-11

PTJ10580 Welding beads (41 joints)

10 19-Nov-11

29-Nov-11

19-Oct-11

31-Oct-11

PTJ10570 Fitup & welding for manual joint (2 joints)

10 06-Dec-11

17-Dec-11

06-Nov-11

17-Nov-11

79 16-Jul-11

03-Oct-11

02-Apr-11 A

17-Jul-11

PRE-DRILLING TEMPLATE PRE-DRIL PTD000

Pre-drilling template fabrication start

0 16-Jul-11

Finish

02-Apr-11 A

5 16-Jul-11

20-Jul-11

02-Apr-11 A

07-Apr-11 A

PTJ10820 welding & NDT of bottom plate

6 02-Aug-11

08-Aug-11

03-May-11 A

25-May-11 A

PTJ10830 cutting, rolling and assembly of outer frame

6 02-Aug-11

08-Aug-11

03-May-11 A

25-May-11 A

01-Aug-11

16-Apr-11 A

25-May-11 A

5 09-Aug-11

14-Aug-11

10-May-11 A

25-Jun-11

PTJ10850 fabrication of beams ( built up section )

10 15-Aug-11

25-Aug-11

16-May-11 A

25-Jun-11

PTJ10860 installation of beams with bottom frame

5 27-Aug-11

04-Sep-11

14-May-11 A

27-Jun-11

PTJ10870 cutting of conductor pipe

2 05-Sep-11

06-Sep-11

08-May-11 A

28-Jun-11

PTJ10920 fabrication of pad eyes

5 05-Sep-11

10-Sep-11

08-May-11 A

02-Jul-11

PTJ10880 fabrication & installation of shims plates

4 07-Sep-11

11-Sep-11

11-May-11 A

02-Jul-11

PTJ10890 installation of conductor pipe

5 12-Sep-11

17-Sep-11

15-May-11 A

05-Jul-11

PTJ10930 installation of pad eyes

5 11-Sep-11

15-Sep-11

02-Jul-11

07-Jul-11

PTJ10910 installation of cones

7 18-Sep-11

25-Sep-11

21-May-11 A

09-Jul-11

10 14-Sep-11

25-Sep-11

27-Jun-11

09-Jul-11

PTJ10840 welding & NDT of outer frame

PTJ10940 fabrication of lifting tool PTJ2010

Pre-drilling template fabrication finish

PTJ10950 painting of template W.P.5: DEC DECK & TSF FABRICATION DECK FABRICATION FAB General Activities A

14 16-Jul-11

0

03-Oct-11

17-Jul-11

7 26-Sep-11

03-Oct-11

09-Jul-11

17-Jul-11

271 31-Mar-11

03-May-12

31-Mar-11 A

01-May-12

271 31-Mar-11

03-May-12

31-Mar-11 A

01-May-12

268 28-May-11

29-Apr-12

03-Apr-11 A

26-Apr-12

PTJ2040 Deck primary structure fabrication start

0 28-May-11

03-Apr-11 A

PTJ2160 Deck secondray structure fabrication start

0 31-Aug-11

19-May-11 A

PTJ1150 Static equipment (by petrojet)

120 10-Aug-11

07-Dec-11

2011 A M J Jul A S O N D

PTJ10810 cutting & assembly of bottom plate

PTJ10900 fabrication of cones

Page 48 of 64

10-Aug-11

07-Dec-11*

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTJ1160 Piping & E&I supports (by petrojet)

30 20-Nov-11

20-Dec-11

18-Nov-11

17-Dec-11

PTJ2060 Deck pre-commisioning

40 12-Feb-12

29-Mar-12

11-Feb-12

27-Mar-12

PTJ2065 Crane assembly and erection

20 03-Apr-12

26-Apr-12

19-Mar-12

10-Apr-12

1 26-Apr-12

28-Apr-12

11-Apr-12

11-Apr-12

26 29-Mar-12

29-Apr-12

28-Mar-12

26-Apr-12

327 31-Mar-11

03-May-12

31-Mar-11 A

17-Apr-12

46 31-Mar-11

22-May-11

31-Mar-11 A

31-May-11 A

PTD100 Cutting & Assembly

20 31-Mar-11

25-Apr-11

31-Mar-11 A

27-Apr-11 A

PTD100 Welding & NDT

28 18-Apr-11

22-May-11

19-Apr-11 A

31-May-11 A

199 28-May-11

14-Jan-12

25-May-11 A

14-Jan-12

PTJD10 Profiling Template

4 28-May-11

31-May-11

25-May-11 A

27-Jun-11

PTD103 Assembly

6 28-Dec-11

03-Jan-12

28-Dec-11

03-Jan-12

12 01-Jan-12

14-Jan-12

01-Jan-12

14-Jan-12

145 28-May-11

21-Nov-11

28-Apr-11 A

14-Nov-11

26 28-May-11

26-Jun-11

28-Apr-11 A

30-Jun-11

PTD10 Cutting & Assembly

16 28-May-11

14-Jun-11

28-Apr-11 A

30-May-11 A

PTD10 Welding & NDT

22 01-Jun-11

26-Jun-11

01-May-11 A

30-Jun-11

70 28-May-11

26-Jul-11

28-Apr-11 A

16-Aug-11

PTD10 Cutting & Assembly

36 28-May-11

07-Jul-11

28-Apr-11 A

06-Jun-11 A

PTD10 Welding & NDT

46 04-Jun-11

26-Jul-11

25-Jun-11

16-Aug-11

Secondary Beams Fabrication Second

28 31-Aug-11

10-Oct-11

19-May-11 A

02-Oct-11

PTD10 Cutting & Assembly

22 31-Aug-11

25-Sep-11

19-May-11 A

06-Sep-11

PTD11 Welding & NDT

28 07-Sep-11

10-Oct-11

31-Aug-11

02-Oct-11

36 11-Oct-11

21-Nov-11

03-Oct-11

14-Nov-11

PTD11 Cutting & Assembly

20 11-Oct-11

02-Nov-11

03-Oct-11

26-Oct-11

PTD11 Welding & NDT

24 25-Oct-11

21-Nov-11

18-Oct-11

14-Nov-11

10 31-Aug-11

19-Sep-11

19-May-11 A

13-Sep-11

7 31-Aug-11

07-Sep-11

19-May-11 A

04-Sep-11

PTJ2220 Deck weighing PTJ2090 Deck commisioning Deck Structure Stru Fabrication Deck Leg Legs Fabrication

Braces Below B Cellar

PTD104 Welding & NDT Cellar De Deck Fabrication (+11.000) Joints Fabrication F

Main Be Beams Fabrication

Embossed Plates Emboss

PLAN AT EL. + 9.200 Main Be Beams Fabrication

Finish

Page 49 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

PTD17 Cutting & Assembly

3 31-Aug-11

03-Sep-11

19-May-11 A

31-Aug-11

PTD17 Welding & NDT

4 04-Sep-11

07-Sep-11

21-May-11 A

04-Sep-11

Secondary Beams Fabrication Second

7 08-Sep-11

13-Sep-11

19-May-11 A

07-Sep-11

PTD17 Cutting & Assembly

2 08-Sep-11

10-Sep-11

19-May-11 A

04-Sep-11

PTD17 Welding & NDT

3 11-Sep-11

13-Sep-11

04-Sep-11

07-Sep-11

5 14-Sep-11

19-Sep-11

07-Sep-11

13-Sep-11

PTD17 Cutting & Assembly

2 14-Sep-11

15-Sep-11

07-Sep-11

10-Sep-11

PTD17 Welding & NDT

3 17-Sep-11

19-Sep-11

10-Sep-11

13-Sep-11

25 31-Aug-11

13-Oct-11

19-May-11 A

01-Oct-11

10 31-Aug-11

20-Sep-11

19-May-11 A

12-Sep-11

8 31-Aug-11

08-Sep-11

19-May-11 A

31-Aug-11

10 10-Sep-11

20-Sep-11

31-Aug-11

12-Sep-11

Secondary Beams Fabrication Second

8 21-Sep-11

02-Oct-11

18-Jun-11 A

20-Sep-11

PTD16 Cutting & Assembly

4 21-Sep-11

25-Sep-11

18-Jun-11 A

13-Sep-11

PTD16 Welding & NDT

6 26-Sep-11

02-Oct-11

13-Sep-11

20-Sep-11

9 03-Oct-11

13-Oct-11

20-Sep-11

01-Oct-11

PTD16 Cutting & Assembly

4 03-Oct-11

08-Oct-11

20-Sep-11

25-Sep-11

PTD16 Welding & NDT

5 09-Oct-11

13-Oct-11

25-Sep-11

01-Oct-11

55 31-Aug-11

03-Nov-11

31-Aug-11

03-Nov-11

11 31-Aug-11

12-Sep-11

31-Aug-11

12-Sep-11

5 31-Aug-11

05-Sep-11

31-Aug-11

05-Sep-11

GRATING GRATIN

PLAN AT EL. + 9.700 Main Be Beams Fabrication PTD16 Cutting & Assembly PTD16 Welding & NDT

GRATING GRATIN

WELL HEAD H MEZZANINE AT (+ 16.000) Joints Fabrication F PTD15 Cutting & Assembly PTD15 Welding & NDT

Finish

6 06-Sep-11

12-Sep-11

06-Sep-11

12-Sep-11

08-Oct-11

13-Sep-11

08-Oct-11

9 13-Sep-11

22-Sep-11

13-Sep-11

22-Sep-11

12 24-Sep-11

08-Oct-11

24-Sep-11

08-Oct-11

Secondary Beams Fabrication Second

12 09-Oct-11

22-Oct-11

09-Oct-11

22-Oct-11

PTD15 Cutting & Assembly

5 09-Oct-11

13-Oct-11

09-Oct-11

13-Oct-11

PTD15 Welding & NDT

7 15-Oct-11

22-Oct-11

15-Oct-11

22-Oct-11

PTD15 Cutting & Assembly PTD15 Welding & NDT

2011 A M J Jul A S O N D

21 13-Sep-11

Main Be Beams Fabrication

Page 50 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

11 23-Oct-11

03-Nov-11

23-Oct-11

03-Nov-11

PTD15 Cutting & Assembly

5 23-Oct-11

27-Oct-11

23-Oct-11

27-Oct-11

PTD16 Welding & NDT

6 29-Oct-11

03-Nov-11

29-Oct-11

03-Nov-11

128 28-May-11

22-Nov-11

25-Jun-11

22-Nov-11

PTD113 Profiling Template

14 28-May-11

12-Jun-11

25-Jun-11

10-Jul-11

PTD114 Assembly

24 02-Oct-11

30-Oct-11

02-Oct-11

30-Oct-11

PTD115 Welding & NDT

32 17-Oct-11

22-Nov-11

17-Oct-11

22-Nov-11

131 28-May-11

05-Nov-11

28-Apr-11 A

29-Oct-11

46 28-May-11

19-Jul-11

28-Apr-11 A

06-Jul-11

PTD11 Cutting & Assembly

20 28-May-11

19-Jun-11

28-Apr-11 A

31-May-11 A

PTD11 Welding & NDT

26 20-Jun-11

19-Jul-11

07-May-11 A

06-Jul-11

70 30-May-11

16-Aug-11

30-Apr-11 A

18-Aug-11

PTD11 Cutting & Assembly

36 30-May-11

10-Jul-11

30-Apr-11 A

03-Jul-11

PTD11 Welding & NDT

48 22-Jun-11

16-Aug-11

25-Jun-11

18-Aug-11

Secondary Beams Fabrication Second

26 31-Aug-11

08-Oct-11

21-May-11 A

29-Sep-11

PTD12 Cutting & Assembly

20 31-Aug-11

22-Sep-11

21-May-11 A

12-Sep-11

PTD12 Welding & NDT

26 07-Sep-11

08-Oct-11

31-Aug-11

29-Sep-11

37 22-Sep-11

05-Nov-11

15-Sep-11

29-Oct-11

PTD12 Cutting & Assembly

20 22-Sep-11

16-Oct-11

15-Sep-11

09-Oct-11

PTD12 Welding & NDT

24 09-Oct-11

05-Nov-11

01-Oct-11

29-Oct-11

Braces & Legs Above Main

185 28-May-11

28-Jan-12

25-Jun-11

28-Jan-12

PTD124 Profiling Template

8 28-May-11

05-Jun-11

25-Jun-11

03-Jul-11

PTD125 Assembly

8 15-Jan-12

23-Jan-12

15-Jan-12

23-Jan-12

10 17-Jan-12

28-Jan-12

17-Jan-12

28-Jan-12

164 28-May-11

12-Dec-11

25-May-11 A

17-Nov-11

PTD127 Profiling Template

22 28-May-11

21-Jun-11

25-May-11 A

26-Jun-11

PTD128 Assembly

40 16-Oct-11

30-Nov-11

13-Jun-11 A

12-Oct-11

PTD129 Welding & NDT

35 02-Nov-11

12-Dec-11

09-Oct-11

17-Nov-11

GRATING GRATIN

Braces & Legs between Cellar and Main

Main Dec Deck Fabrication (+17.000) Joints Fabrication F

Main Be Beams Fabrication

Embossed Plates Emboss

PTD126 Welding & NDT Braces Below B Heli Deck

Finish

Page 51 of 64

2011 A M J Jul A S O N D

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

90 07-Aug-11

12-Dec-11

07-May-11 A

21-Nov-11

24 07-Aug-11

06-Sep-11

07-May-11 A

22-Aug-11

8 07-Aug-11

15-Aug-11

07-May-11 A

14-Jun-11 A

12 23-Aug-11

06-Sep-11

18-Jun-11 A

22-Aug-11

24 16-Aug-11

20-Sep-11

16-May-11 A

06-Sep-11

PTD13 Cutting & Assembly

14 16-Aug-11

04-Sep-11

16-May-11 A

23-Jun-11 A

PTD13 Welding & NDT

24 23-Aug-11

20-Sep-11

09-Aug-11

06-Sep-11

Secondary Beams Fabrication Second

32 31-Aug-11

15-Oct-11

21-May-11 A

08-Oct-11

PTD13 Cutting & Assembly

24 31-Aug-11

27-Sep-11

21-May-11 A

13-Sep-11

PTD13 Welding & NDT

32 07-Sep-11

15-Oct-11

31-Aug-11

08-Oct-11

29 10-Oct-11

12-Nov-11

02-Oct-11

05-Nov-11

PTD13 Cutting & Assembly

18 10-Oct-11

30-Oct-11

02-Oct-11

23-Oct-11

PTD13 Welding & NDT

24 16-Oct-11

12-Nov-11

09-Oct-11

05-Nov-11

14 13-Nov-11

28-Nov-11

06-Nov-11

21-Nov-11

PTD13 Cutting & Assembly

6 13-Nov-11

19-Nov-11

06-Nov-11

12-Nov-11

PTD13 Welding & NDT

8 20-Nov-11

28-Nov-11

13-Nov-11

21-Nov-11

14 13-Nov-11

12-Dec-11

06-Nov-11

21-Nov-11

PTD14 Cutting & Assembly

6 13-Nov-11

19-Nov-11

06-Nov-11

12-Nov-11

PTD14 Welding & NDT

8 04-Dec-11

12-Dec-11

13-Nov-11

21-Nov-11

Misellaneuos Misellane

153 10-Nov-11

03-May-12

23-Oct-11

17-Apr-12

Installation Installat

117 04-Dec-11

03-May-12

04-Dec-11

17-Apr-12

Heli Dec Deck Fabrication (+29.125) Joints Fabrication F PTD13 Cutting & Assembly PTD13 Welding & NDT Main Be Beams Fabrication

Covering Plates Coverin

Gutter

Landing Area

Finish

Page 52 of 64

2011 A M J Jul A S O N D

PTMD

Monorail Beam

10 04-Dec-11

14-Dec-11

04-Dec-11

14-Dec-11

PTMD

Safety Net

16 27-Dec-11

14-Jan-12

06-Dec-11

24-Dec-11

PTMD

Crane Boom Rest

2 15-Jan-12

16-Jan-12

15-Jan-12

16-Jan-12

PTMD

Name Plate

4 15-Jan-12

18-Jan-12

15-Jan-12

18-Jan-12

PTMD

Handrails & Cups

24 25-Dec-11

21-Jan-12

25-Dec-11

21-Jan-12

PTMD

Hatches

8 15-Jan-12

23-Jan-12

15-Jan-12

23-Jan-12

PTMD

Fire Wall

12 15-Jan-12

28-Jan-12

15-Jan-12

28-Jan-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name PTMD

Stairs & Walkways

PTMD

Pad Eyes

Fabrication Fabrica

Original BL Project Duration Start

BL Project Finish

Start

Finish

15 15-Jan-12

31-Jan-12

15-Jan-12

31-Jan-12

5 28-Apr-12

03-May-12

12-Apr-12

17-Apr-12

148 10-Nov-11

28-Apr-12

23-Oct-11

11-Apr-12

Safety Net

28 13-Nov-11

14-Dec-11

23-Oct-11

23-Nov-11

PTMD

Monorail Beam

10 22-Nov-11

03-Dec-11

22-Nov-11

03-Dec-11

PTMD

Handrails & Cups

24 10-Nov-11

07-Dec-11

10-Nov-11

07-Dec-11

PTMD

Name Plate

8 25-Dec-11

02-Jan-12

25-Dec-11

02-Jan-12

PTMD

Hatches

20 14-Dec-11

05-Jan-12

14-Dec-11

05-Jan-12

PTMD

Crane Boom Rest

6 31-Dec-11

05-Jan-12

31-Dec-11

05-Jan-12

PTMD

Fire Wall

18 17-Dec-11

05-Jan-12

17-Dec-11

05-Jan-12

PTMD

Stairs & Walkways

24 26-Dec-11

22-Jan-12

26-Dec-11

22-Jan-12

PTMD

Pad Eyes

6 21-Apr-12

28-Apr-12

05-Apr-12

11-Apr-12

68 29-Jan-12

17-Apr-12

28-Jan-12

15-Apr-12

PTD150 Cutting & Assembly

20 29-Jan-12

21-Feb-12

28-Jan-12

19-Feb-12

PTD151 Welding & NDT

32 21-Feb-12

29-Mar-12

20-Feb-12

27-Mar-12

2 15-Apr-12

17-Apr-12

14-Apr-12

15-Apr-12

173 28-May-11

14-Jan-12

25-Jun-11

14-Jan-12

24 28-May-11

23-Jun-11

25-Jun-11

21-Jul-11

24 28-May-11

23-Jun-11

25-Jun-11

21-Jul-11

2 08-Dec-11

10-Dec-11

08-Dec-11

10-Dec-11

2 08-Dec-11

10-Dec-11

08-Dec-11

10-Dec-11

PTD152 Trial Fit Deck Assembly Ass Skid Beams Be & Shoes Preparation PTD14 Skid Beams & Shoes Preparation Lifting Deck D Legs Over Skid Beams & Skid Shoes PTD14 Lifting Deck Legs Over Skid Beams & Skid Shoes Lifting Cellar C Deck Over Deck Legs

15 11-Dec-11

27-Dec-11

11-Dec-11

27-Dec-11

PTD14 Lifting

1 11-Dec-11

11-Dec-11

11-Dec-11

11-Dec-11

PTD14 Assembly

6 12-Dec-11

18-Dec-11

12-Dec-11

18-Dec-11

PTD14 Welding & NDT

8 19-Dec-11

27-Dec-11

19-Dec-11

27-Dec-11

4 28-Dec-11

01-Jan-12

28-Dec-11

01-Jan-12

PTD17 Lifting

1 28-Dec-11

28-Dec-11

28-Dec-11

28-Dec-11

PTD17 Assembly

1 29-Dec-11

29-Dec-11

29-Dec-11

29-Dec-11

lifting of plan at + 9.2

2011 A M J Jul A S O N D

PTMD

Deck Flare Fla

Page 53 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

2 31-Dec-11

01-Jan-12

31-Dec-11

01-Jan-12

4 28-Dec-11

01-Jan-12

28-Dec-11

01-Jan-12

PTD16 Lifting

1 28-Dec-11

28-Dec-11

28-Dec-11

28-Dec-11

PTD16 Assembly

1 29-Dec-11

29-Dec-11

29-Dec-11

29-Dec-11

PTD16 Welding & NDT

2 31-Dec-11

01-Jan-12

31-Dec-11

01-Jan-12

4 28-Dec-11

01-Jan-12

28-Dec-11

01-Jan-12

PTD17 Lifting

1 28-Dec-11

28-Dec-11

28-Dec-11

28-Dec-11

PTD18 Assembly

1 29-Dec-11

29-Dec-11

29-Dec-11

29-Dec-11

PTD18 Welding & NDT

2 31-Dec-11

01-Jan-12

31-Dec-11

01-Jan-12

11 02-Jan-12

14-Jan-12

02-Jan-12

14-Jan-12

PTD14 Lifting

1 02-Jan-12

02-Jan-12

02-Jan-12

02-Jan-12

PTD14 Assembly

5 03-Jan-12

08-Jan-12

03-Jan-12

08-Jan-12

PTD14 Welding & NDT

7 07-Jan-12

14-Jan-12

07-Jan-12

14-Jan-12

181 20-Sep-11

15-Apr-12

13-Sep-11

12-Apr-12

PTD17 Welding & NDT lifting of plan at + 9.7

lifting of mezzanine deck at + 16

Lifting Main M Deck Over cellar Deck

Atmosphric Painting Atmosphr

Finish

Page 54 of 64

2011 A M J Jul A S O N D

PT1110

Plane at + 9.2

5 20-Sep-11

25-Sep-11

13-Sep-11

19-Sep-11

PT1120

Plane at + 9.7

5 15-Oct-11

19-Oct-11

01-Oct-11

08-Oct-11

PT1130

Wellhead mezzanine

10 05-Nov-11

15-Nov-11

05-Nov-11

15-Nov-11

PT1050

Heli Deck & Braces Below Heli

12 13-Dec-11

26-Dec-11

22-Nov-11

05-Dec-11

PT1010

Deck Legs

6 01-Dec-11

07-Dec-11

01-Dec-11

07-Dec-11

PT1020

Braces Below Cellar

5 05-Dec-11

10-Dec-11

05-Dec-11

10-Dec-11

PT1030

Cellar Deck & Braces Above Cellar

15 23-Nov-11

10-Dec-11

23-Nov-11

10-Dec-11

PT1080

Piping Support

PT1040

Main Deck

PT1045

Braces Above Main

PT1090

9 06-Dec-11

17-Dec-11

06-Dec-11

17-Dec-11

15 15-Dec-11

01-Jan-12

15-Dec-11

01-Jan-12

5 09-Jan-12

14-Jan-12

09-Jan-12

14-Jan-12

Cable Trays Supports

10 15-Jan-12

26-Jan-12

16-Jan-12

26-Jan-12

PT1060

Miscellaneous (Stairs,H/R,...etc)

14 12-Jan-12

28-Jan-12

12-Jan-12

28-Jan-12

PT1070

Piping painting

14 19-Jan-12

05-Feb-12

19-Jan-12

04-Feb-12

PT1100

Deck Flare

14 29-Mar-12

15-Apr-12

28-Mar-12

12-Apr-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Anti Skid Painting P PT1000

Heli Deck

E&I

Original BL Project Duration Start

BL Project Finish

Start

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

80 16-Dec-11

11-Mar-12

21-Dec-11

09-Mar-12

PTJ2080

E & I Work start

0 16-Dec-11

PTJ2100

E & I Work finish

0

E&I (onsh (onshore)

Finish

21-Dec-11 11-Mar-12

09-Mar-12

11-Mar-12

21-Dec-11

09-Mar-12

72 16-Dec-11

02-Mar-12

21-Dec-11

01-Mar-12

Cable Trays T Supports

51 20-Dec-11

09-Feb-12

21-Dec-11

09-Feb-12

E&I100 Fabrication

26 20-Dec-11

15-Jan-12

21-Dec-11

15-Jan-12

E&I101 Installation

14 26-Jan-12

09-Feb-12

27-Jan-12

09-Feb-12

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

38 16-Dec-11

23-Jan-12

21-Dec-11

27-Jan-12

38 16-Dec-11

23-Jan-12

21-Dec-11

27-Jan-12

25 31-Dec-11

25-Jan-12

05-Jan-12

29-Jan-12

25 31-Dec-11

25-Jan-12

05-Jan-12

29-Jan-12

15 16-Dec-11

31-Dec-11

21-Dec-11

04-Jan-12

15 16-Dec-11

31-Dec-11

21-Dec-11

04-Jan-12

14 17-Feb-12

02-Mar-12

17-Feb-12

01-Mar-12

14 17-Feb-12

02-Mar-12

17-Feb-12

01-Mar-12

12 17-Feb-12

29-Feb-12

17-Feb-12

28-Feb-12

12 17-Feb-12

29-Feb-12

17-Feb-12

28-Feb-12

25 01-Feb-12

26-Feb-12

01-Feb-12

25-Feb-12

25 01-Feb-12

26-Feb-12

01-Feb-12

25-Feb-12

80 20-Dec-11

11-Mar-12

21-Dec-11

09-Mar-12

Cable Trays T Supports

51 20-Dec-11

09-Feb-12

21-Dec-11

09-Feb-12

E&I109 Fabrication

26 20-Dec-11

15-Jan-12

21-Dec-11

15-Jan-12

E&I110 Installation

14 26-Jan-12

09-Feb-12

27-Jan-12

09-Feb-12

Cable Trays T E&I102 Installation Conduit Activities E&I103 Installation Lighting Activities E&I104 Lighting Activities Navigation Aids Navigat E&I105 Navigation Aids Earthing Activities E&I106 Earthing Activities Power & Small Equip. Inst. E&I107 Power & Small Equip. Inst. Cable Laying L & Termination E&I108 Cable Laying & Termination Instrumentation Instrume

2011 A M J Jul A S O N D

80 16-Dec-11

Electrical

Page 55 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

20 12-Feb-12

03-Mar-12

11-Feb-12

01-Mar-12

20 12-Feb-12

03-Mar-12

11-Feb-12

01-Mar-12

16 20-Feb-12

07-Mar-12

19-Feb-12

05-Mar-12

16 20-Feb-12

07-Mar-12

19-Feb-12

05-Mar-12

18 09-Feb-12

27-Feb-12

10-Feb-12

27-Feb-12

18 09-Feb-12

27-Feb-12

10-Feb-12

27-Feb-12

20 09-Feb-12

29-Feb-12

10-Feb-12

29-Feb-12

20 09-Feb-12

29-Feb-12

10-Feb-12

29-Feb-12

10 27-Feb-12

08-Mar-12

26-Feb-12

06-Mar-12

10 27-Feb-12

08-Mar-12

26-Feb-12

06-Mar-12

8 26-Feb-12

05-Mar-12

25-Feb-12

03-Mar-12

E&I117 Air Gas Header

8 26-Feb-12

05-Mar-12

25-Feb-12

03-Mar-12

Cable Laying L & Termination

25 14-Feb-12

10-Mar-12

13-Feb-12

08-Mar-12

25 14-Feb-12

10-Mar-12

13-Feb-12

08-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

Cable Trays T E&I111 Installation Tubing Activities A E&I112 Installation HCU & Local Panels Activities E&I113 HCU & Local Panels Activities Fusible Plug & ESD Puch Bottons E&I114 Fusible Plug & ESD Puch Bottons J. Box A Activities E&I115 J. Box Activities Instrument Installation & Calibration Instrum E&I116 Instrument Installation & Calibration Air Gas Header

E&I118 Cable Laying & Termination Fire & G Gas activities E&I119 Fire & Gas activities Telecommunication System Telecom E&I120 Telecommunication System EQUIPMENT EQUIPMEN PTJ2070

Equipment installation start

0 23-Dec-11

PTJ2130

Equipment installation finish

0

Equipement Installation (onshore) Equipeme

Finish

Page 56 of 64

2011 A M J Jul A S O N D

18-Jan-12 17-Feb-12

16-Feb-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

TSF1110 Installation of production manifold module on celler deck

4 07-Dec-11

10-Dec-11

07-Dec-11*

10-Dec-11

TSF1100 Installation of E & I module on main deck

4 07-Jan-12

10-Jan-12

07-Jan-12*

10-Jan-12

TSF1090 Equipment Installation on Heli Deck

4 23-Dec-11

27-Dec-11

18-Jan-12

21-Jan-12

TSF1060 Equipment Installation Below Cellar Deck

4 13-Feb-12

17-Feb-12

13-Feb-12

16-Feb-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

TSF1070 Equipment Installation on Cellar Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

TSF1080 Equipment Installation on Main Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

113 20-Nov-11

13-Mar-12

20-Nov-11

11-Mar-12

PIPING PTJ2050

Piping & piping support fabrication start

0 20-Nov-11

PTJ2110

Piping & piping support erection finish

0

C.S Piping Fab. & Erec., Valves Erection (onshore)

Finish

20-Nov-11 13-Mar-12

11-Mar-12

13-Mar-12

20-Nov-11

11-Mar-12

TSF1010 Piping Supports Fabrication

22 20-Nov-11

12-Dec-11

20-Nov-11

11-Dec-11

TSF1000 Piping Fabrication

70 20-Nov-11

29-Jan-12

20-Nov-11

28-Jan-12

TSF1020 Piping Erection

35 28-Jan-12

03-Mar-12

27-Jan-12

01-Mar-12

TSF1030 Piping Supports Erection

20 12-Feb-12

03-Mar-12

11-Feb-12

01-Mar-12

TSF1040 Valve Installation

15 17-Feb-12

03-Mar-12

16-Feb-12

01-Mar-12

PTJ2120 Piping hydrotest

21 21-Feb-12

13-Mar-12

20-Feb-12

11-Mar-12

44 23-Feb-12

25-Apr-12

23-Feb-12

25-Apr-12

44 23-Feb-12

25-Apr-12

23-Feb-12

25-Apr-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE LI & BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS690 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS700 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS710 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS720 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS740 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS730 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS750 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS760 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

SETH PLEM PLE & EXISTING TUNA PLEM SPOOL N NO. S1 (CLOSING) ( P.L - S2 )

AFTER M METROLOGY SS770

RECEVING METROLOGY

0 15-Apr-12

SS780

FIT UP AFTER METROLOGY

3 15-Apr-12

15-Apr-12 17-Apr-12

2011 A M J Jul A S O N D

113 20-Nov-11

W.P.6: PIPELINE PIPE SPOOLS FABRICATION

Page 57 of 64

15-Apr-12

17-Apr-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS800

PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS810

APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS820

LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

SPOOL N NO. S2 ( S1 - S3 )

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS830

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS840

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS850

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS860

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS880

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS870

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS890

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS900

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS910

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS920

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

SPOOL N NO. S3 (CLOSING) ( S2 - S4 )

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE LI & BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS930 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS940 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS950 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS960 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS980 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS970 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS990 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS1000 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

AFTER M METROLOGY

2011 A M J Jul A S O N D

SS790

PIPE LINE LIN & BENDS

Page 58 of 64

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

0 15-Apr-12

SS1020 FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS1030 WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS1040 PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS1050 APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS1060 LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS1070 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS1080 CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS1090 FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS1100 WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS1120 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS1110 COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS1130 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS1140 APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS1150 PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS1160 LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS1170 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS1180 CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS1190 FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS1200 WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS1220 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS1210 COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS1230 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS1240 APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

PIPE LINE LIN & BENDS

SPOOL N NO. S5 ( SETH PLEM - S6 ) PIPE LINE LIN & BENDS

2011 A M J Jul A S O N D

SS1010 RECEVING METROLOGY

SPOOL N NO. S4 ( S4 - SETH PLEM )

Page 59 of 64

15-Apr-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

SS1250 PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS1260 LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE LI & BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS1270 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS1280 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS1290 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS1300 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS1320 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS1310 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS1330 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS1340 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

SPOOL N NO. S6 (CLOSING) ( S5 - TUNA PLEM )

AFTER M METROLOGY

Finish

0 15-Apr-12

SS1360 FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS1370 WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS1380 PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS1390 APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS1400 LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

44 23-Feb-12

25-Apr-12

23-Feb-12

25-Apr-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SPOOL N NO. S3 ( SSIV -S4 ) PIPE LINE LIN & BENDS

2011 A M J Jul A S O N D

SS1350 RECEVING METROLOGY

SETH P/F & NEW SSIV

Page 60 of 64

15-Apr-12

SS250

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS260

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS270

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS280

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS300

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS310

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS320

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS330

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS340

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

PIPE LINE LIN & BENDS SS150

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS160

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS170

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS180

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS200

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS190

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS210

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS220

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS230

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS240

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

SPOOL N NO. S4 ( S3 - S5 )

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

PIPE LINE LIN & BENDS

2011 A M J Jul A S O N D

SS290

SPOOL N NO. S2 ( S1 - SSIV )

Page 61 of 64

SS350

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS360

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS370

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS380

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS400

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS390

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS410

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS420

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS430

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

SPOOL N NO. S5 ( S4 - S6 )

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS440

PIPE LINE LIN & BENDS

Finish

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS460

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS470

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS480

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS500

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS490

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS510

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS520

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS530

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS540

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE LI & BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS020 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS030 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS040 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS060 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS050 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS070 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS080 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

SS 10

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

AFTER M METROLOGY

2011 A M J Jul A S O N D

SS450

SPOOL N NO. S1 (CLOSING) ( P.L - SETH PLEM )

Page 62 of 64

SS090

RECEVING METROLOGY

0 15-Apr-12

15-Apr-12

SS100

FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS110

WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS130

APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS140

LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE LI & BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS550 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS560 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS570 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS580 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS600 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS590 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS610 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS620 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

AFTER M METROLOGY SS630

RECEVING METROLOGY

0 15-Apr-12

SS640

FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS650

WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS660

PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS670

APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS680

LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

61 21-Feb-12

29-Mar-12

26-Jan-12

27-Mar-12

W.P.7: CER CERTIFICATION

15-Apr-12

PTJ1130

Jacket completion certificate

0

21-Feb-12

26-Jan-12

PTJ1090

Deck completion certificate

0

29-Mar-12

27-Mar-12

W.P.8: LOA LOAD-OUT, SEA-FASTENING, TRANSPORTATION & INSTALLATION PTJ1070

Pre-drilling template seafastening and load out

PTJ1050

Jacket & Piles seafastening and load out

PTJ1170

Sub Sea Spools Load out first trip

2011 A M J Jul A S O N D

SS120

SPOOL N NO. S6 (CLOSING) ( S5 - SETH P/F )

Page 63 of 64

204 18-Oct-11

10-May-12

18-Oct-11

08-May-12

7 18-Oct-11

24-Oct-11

18-Oct-11

24-Oct-11*

15 17-Mar-12

31-Mar-12

17-Mar-12

31-Mar-12*

7 25-Mar-12

31-Mar-12

25-Mar-12

31-Mar-12

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT UPDATED SCHEDULE AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

Finish

Sub Sea Spools Load out second trip for closing spools

7 25-Apr-12

02-May-12

25-Apr-12

02-May-12*

PTJ1060

Deck seafastening and load out

7 03-May-12

10-May-12

02-May-12

08-May-12*

31 17-May-12

17-Jun-12

16-May-12

15-Jun-12

31 17-May-12

17-Jun-12

16-May-12

15-Jun-12

PTJ1140

TSF Offshore hook-up activities

2011 A M J Jul A S O N D

PTJ1180

W.P.9: OFF OFFSHORE HOOK-UP, COMMISSIONING AND ASSISTANCE TO STA...

Page 64 of 64

J

2012 F M A M J JulA

PAGE 28 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.4. CRITICAL AND NEAR CRITICAL ACTIVITIES

GFL 003-0405

3467-200

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

SETH OFFSHORE OFFS EPC PROJECT UPDATED SCHEDULE CONTRACTUAL MILESTONES CONTRACT

BL Project Finish

Start

Finish

311 11-May-11

31-Jul-12

26-Apr-11 A

31-Jul-12

122 01-Apr-12

31-Jul-12

31-Mar-12

31-Jul-12

Deck Mechanical Completion

0

01-Apr-12

31-Mar-12*

ART6.4.1

Deck and Flare Ready for Load out

0

01-May-12

30-Apr-12*

A2

Project completion

0

31-Jul-12

31-Jul-12*

199 11-May-11

05-Apr-12

26-Apr-11 A

21-Feb-12

164 11-May-11

21-Dec-11

26-Apr-11 A

02-Jan-12

PROCESS

163 11-May-11

21-Dec-11

26-Apr-11 A

02-Jan-12

Drawings

7 05-Sep-11

14-Sep-11

05-Sep-11

13-Sep-11

7 05-Sep-11

14-Sep-11

05-Sep-11

13-Sep-11

25 11-May-11

14-Jun-11

26-Apr-11 A

05-Jul-11

25 11-May-11

W.P.2: ENG ENGINEERING

A1570

P&ID's IFC

TER's A2610

Fire protection system TER

Vendor pr prints review A2730

Fire protection system Vendor prints review

PIPING Drawings A1670

Plot Plan IFC

A1680

ISO's

INSTRUMENTATION INSTRUME TER's A3450

Choke valves TER

Vendor pr prints review A3610

Choke valves Vendor prints review

MECHANICAL MECHANIC Vendor pr prints review

14-Jun-11

26-Apr-11 A

05-Jul-11

100 24-Jul-11

21-Dec-11

03-Aug-11

02-Jan-12

100 24-Jul-11

21-Dec-11

03-Aug-11

02-Jan-12

42 14-Sep-11

20-Nov-11

14-Sep-11

17-Nov-11

42 14-Sep-11

20-Nov-11

14-Sep-11

17-Nov-11

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

10 31-Oct-11

20-Nov-11

31-Oct-11

17-Nov-11

144 18-May-11

24-Nov-11

26-Apr-11 A

13-Dec-11

20 18-May-11

15-Jun-11

26-Apr-11 A

05-Jul-11

20 18-May-11

15-Jun-11

26-Apr-11 A

05-Jul-11

80 25-Jul-11

24-Nov-11

11-Aug-11

13-Dec-11

80 25-Jul-11

24-Nov-11

11-Aug-11

13-Dec-11

81 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

81 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

Primary Baseline

Start Date:28-Mar-11 Finish Date:31-Jul-12 Critical Re... Data Date:25-Jun-11

Actual Work

Baseline ...

Remaining Level of Effort

Remaining...

2011 A M J Jul A S O N D

ART6.3

ENPPI

Page 1 of 5

J

2012 F M A M J JulA

By: Haytham A.Rahman Date 25-May-11

Revision Rev.0

Checked A.Maghawry

Approved A.Fathy

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11 Activity ID

Activity Name

A6330

Receiving final weights and dimensions for mechanical equipment

A3770

Service water pump Vendor prints review

OFFSHORE OFFSHOR Model A5360

Finalize PDS Modeling For Topsides based on Tecnomare IFC dw...

W.P.3: PROCUREMENT PRO SERVICES & MATERIAL SUPPLY EQUIPMENT EQUIPMEN ENPPI LO LONG LEAD ITEMS (Cranes ,Chemical unjec.,Fire protec. , Survival M... PURCHASING PURCHA A5330

Fire protection system Issue Fax of commitment

FABRICATION FABRICA A3930

Fire protection system Fabrication up to release for shipment

SHIPPING SHIPPIN

Original BL Project Duration Start

BL Project Finish

0 20-Sep-11

Start

Finish

80 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

164 19-Jun-11

05-Apr-12

25-Jun-11

21-Feb-12

148 19-Jun-11

12-Feb-12

06-Jul-11

11-Feb-12

148 19-Jun-11

12-Feb-12

06-Jul-11

11-Feb-12

9 19-Jun-11

07-Jul-11

06-Jul-11

18-Jul-11

9 19-Jun-11

07-Jul-11

06-Jul-11

18-Jul-11

170 08-Jul-11

03-Jan-12

19-Jul-11

04-Jan-12

170 08-Jul-11

03-Jan-12

19-Jul-11

04-Jan-12

45 29-Dec-11

12-Feb-12

29-Dec-11

11-Feb-12

A3990

Fire protection system Shipping

21 04-Jan-12

24-Jan-12

08-Jan-12

28-Jan-12

A2120

Custom clearance & inland transportation (Multi phase flow ,Che...

45 29-Dec-11

12-Feb-12

29-Dec-11

11-Feb-12

A5190

Fire protection system Custom clearance & inland transportation

14 25-Jan-12

07-Feb-12

29-Jan-12

11-Feb-12

156 19-Jun-11

05-Apr-12

06-Jul-11

21-Feb-12

15 19-Jun-11

10-Jul-11

06-Jul-11

26-Jul-11

15 19-Jun-11

10-Jul-11

06-Jul-11

26-Jul-11

210 10-Jul-11

05-Apr-12

27-Jul-11

21-Feb-12

210 10-Jul-11

05-Apr-12

27-Jul-11

21-Feb-12

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

35 10-Oct-11

14-Nov-11

10-Oct-11

13-Nov-11

E&I BULK PURCHASING PURCHA A5040

Choke valves Issue Fax of commitments

FABRICATION FABRICA A4500

Choke valves Fabrication up to release for shipment

PIPING BULK BU FABRICATION FABRICA A1950

piping Bulk Fabrication up to release for shipment

SHIPPING A1960

1st batch of the piping Bulk Shipping

21 10-Oct-11

31-Oct-11

10-Oct-11

30-Oct-11

A1970

1st batch of the piping Bulk Custom clearance & inland transport...

14 31-Oct-11

14-Nov-11

31-Oct-11

13-Nov-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

TECNOMARE TECNOMAR

2011 A M J Jul A S O N D

21-Sep-11

Page 2 of 5

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11 Activity ID

Activity Name

TECNOMARE DRIVING MILESTONES TECNOMAR STRUCTURAL STRUCTU 17

input - deck final plot plan & equipment list (ENPPI)

W.P.2: ENG ENGINEERING STRUCTURAL STRUCTU DECK DETAIL DE DESIGN 44

Deck equipment supports & AFC dwg and MTO

PETROJET PETROJET DRIVING MILESTONES PROCUREMENT PROCURE

Original BL Project Duration Start

BL Project Finish

Start

0 21-Sep-11

21-Sep-11

21-Sep-11

21-Sep-11

0 21-Sep-11

21-Sep-11

21-Sep-11

21-Sep-11

0 21-Sep-11

Finish

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

169 31-Aug-11

10-May-12

31-Aug-11

08-May-12

165 31-Aug-11

12-Feb-12

31-Aug-11

11-Feb-12

165 31-Aug-11

12-Feb-12

31-Aug-11

11-Feb-12

PTJ1020

Structural material 5 th batch (jacket secondary & deck secondary)...

0 31-Aug-11

31-Aug-11*

PTJ1080

Piping bulk material (1st batch) (ENPPI)

0 14-Nov-11

14-Nov-11

PTJ1120

Equipment (100%) (PTB)

0

24-Jan-12

24-Jan-12*

PTJ4010

Equipment by (100%) (ENPPI)

0

12-Feb-12

11-Feb-12

0 15-Sep-11

15-Sep-11

15-Sep-11

15-Sep-11

0 15-Sep-11

15-Sep-11

15-Sep-11

15-Sep-11

0

15-Sep-11

W.P.2: ENG ENGINEERING TSF PTJ2240

Rec final weight & dimension for static equipment

W.P.4: SUBSTRUCTURES SUB (PILES, JACKET & PDT) FABRICATION JACKET STRUCTURE S FABRICATION PAINTING PTJ10270 SPLASH PAINTING FOR BARGE BUMPER PTJ10330 PILE MARKING

15-Sep-11*

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

5 11-Mar-12

15-Mar-12

11-Mar-12

15-Mar-12

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

114 20-Nov-11

03-May-12

20-Nov-11

01-May-12

89 19-Jan-12

03-May-12

19-Jan-12

01-May-12

66 12-Feb-12

29-Apr-12

11-Feb-12

26-Apr-12

PTJ2060 Deck pre-commisioning

40 12-Feb-12

29-Mar-12

11-Feb-12

27-Mar-12

PTJ2090 Deck commisioning

26 29-Mar-12

29-Apr-12

28-Mar-12

26-Apr-12

68 29-Jan-12

17-Apr-12

28-Jan-12

15-Apr-12

W.P.5: DEC DECK & TSF FABRICATION DECK FABRICATION FAB General Activities A

Deck Structure Stru Fabrication

2011 A M J Jul A S O N D

21-Sep-11

Page 3 of 5

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11 Activity ID

Activity Name

Original BL Project Duration Start

BL Project Finish

Start

68 29-Jan-12

17-Apr-12

28-Jan-12

15-Apr-12

PTD150 Cutting & Assembly

20 29-Jan-12

21-Feb-12

28-Jan-12

19-Feb-12

PTD151 Welding & NDT

32 21-Feb-12

29-Mar-12

20-Feb-12

27-Mar-12

PTD152 Trial Fit

2 15-Apr-12

17-Apr-12

14-Apr-12

15-Apr-12

Atmosphric Painting Atmosphr

73 19-Jan-12

15-Apr-12

19-Jan-12

12-Apr-12

Deck Flare Fla

Finish

Piping painting

14 19-Jan-12

05-Feb-12

19-Jan-12

04-Feb-12

PT1100

Deck Flare

14 29-Mar-12

15-Apr-12

28-Mar-12

12-Apr-12

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

TSF1110 Installation of production manifold module on celler deck

4 07-Dec-11

10-Dec-11

07-Dec-11*

10-Dec-11

TSF1100 Installation of E & I module on main deck

4 07-Jan-12

10-Jan-12

07-Jan-12*

10-Jan-12

TSF1060 Equipment Installation Below Cellar Deck

4 13-Feb-12

17-Feb-12

13-Feb-12

16-Feb-12

TSF1070 Equipment Installation on Cellar Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

TSF1080 Equipment Installation on Main Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

113 20-Nov-11

13-Mar-12

20-Nov-11

11-Mar-12

Anti Skid Painting P PT1000

Heli Deck

EQUIPMENT EQUIPMEN Equipement Installation (onshore) Equipeme

PIPING PTJ2050

Piping & piping support fabrication start

0 20-Nov-11

C.S Piping Fab. & Erec., Valves Erection (onshore)

113 20-Nov-11

13-Mar-12

20-Nov-11

11-Mar-12

TSF1000 Piping Fabrication

70 20-Nov-11

29-Jan-12

20-Nov-11

28-Jan-12

TSF1020 Piping Erection

35 28-Jan-12

03-Mar-12

27-Jan-12

01-Mar-12

TSF1040 Valve Installation

15 17-Feb-12

03-Mar-12

16-Feb-12

01-Mar-12

PTJ2120 Piping hydrotest

21 21-Feb-12

13-Mar-12

20-Feb-12

11-Mar-12

0 29-Mar-12

29-Mar-12

27-Mar-12

27-Mar-12

0

29-Mar-12

W.P.7: CER CERTIFICATION PTJ1090

Deck completion certificate

W.P.8: LOA LOAD-OUT, SEA-FASTENING, TRANSPORTATION & INSTALLATION PTJ1070

Pre-drilling template seafastening and load out

PTJ1050

Jacket & Piles seafastening and load out

2011 A M J Jul A S O N D

PT1070

20-Nov-11

27-Mar-12

204 18-Oct-11

10-May-12

18-Oct-11

08-May-12

7 18-Oct-11

24-Oct-11

18-Oct-11

24-Oct-11*

15 17-Mar-12

31-Mar-12

17-Mar-12

31-Mar-12*

Page 4 of 5

J

2012 F M A M J JulA

3467-200, PETROBEL  SETH DEVELOPMENT EPC PROJECT CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11 Activity ID PTJ1060

Activity Name Deck seafastening and load out

Original BL Project Duration Start

BL Project Finish

Start

7 03-May-12

10-May-12

02-May-12

Finish

2011 A M J Jul A S O N D

08-May-12*

Page 5 of 5

J

2012 F M A M J JulA

PAGE 29 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.5. ONE MONTH LOOKAHEAD SCHEDULE

GFL 003-0405

3467-200

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING PROCESS TECHNOLOGY DIVISION REPORTS / TECHNICAL LIST Basis of design Final

11-Jun-11

07-Jul-11

12-Jun-11

12-Jul-11

100.00%

70.00%

1.94%

70.00%

20.00%

3.06%

100.00%

20.00%

3.06%

100.00%

20.00%

3.06%

100.00%

20.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

5.28%

0.00%

0.00%

30

Process & Utilities report Design

1.94%

50

TER Flame arrestor TER Finish

23-Jun-11

21-Jul-11

80

Fire Fighting package TER Finish

09-Jun-11

05-Jul-11

80

Safety equipment and life saving TER Finish

12-Jun-11

07-Jul-11

80

MRP Chemical injection package MRP Start

10-Jul-11

03-Jul-11

20

For Purchase

17-Jul-11

07-Jul-11

80

Fire Fighting package MRP Start

05-Jul-11

20-Jul-11

20

For Purchase

11-Jul-11

21-Jul-11

80

VENDOR PRINTS REVIEW Chemical injection package Start

25-Jul-11

25-Jul-11

20

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION) Tuesday, July 05, 2011

Page 1 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT DRAWING Electrical hook-up Drawing Start

19-May-11

12-Jul-11

20

Design

26-May-11

19-Jul-11

50

Hydraulic instruments layouts Start

05-May-11

06-Jul-11

20

Design

12-May-11

13-Jul-11

50

Hydraulic instruments Tube Routing layouts Start

12-May-11

05-Jul-11

20

Design

19-May-11

12-Jul-11

50

1.58%

70.00%

0.00%

1.32%

70.00%

0.00%

1.32%

70.00%

0.00%

2.63%

100.00%

20.00%

1.84%

20.00%

20.00%

2.11%

20.00%

0.00%

2.11%

20.00%

20.00%

2.11%

100.00%

0.00%

2.11%

20.00%

20.00%

2.11%

20.00%

0.00%

1.05%

0.00%

0.00%

TER Choke valve TER Finish

12-Jun-11

05-Jul-11

80

Loose Instrument TER Finish

26-Jun-11

24-Jul-11

80

Sand & Corrosion probes TER Start

16-Jun-11

11-Jul-11

20

Instrument & Mechanical bulk material TER Finish

03-Jul-11

14-Jul-11

80

Instrument cable and cable glandsTER Start

06-Jun-11

10-Jul-11

20

Inst. Junction Box TER Finish

07-Jul-11

21-Jul-11

80

Instrument cable trays TER Start

14-Jun-11

03-Jul-11

20

MRP Electro Hydraulic Well Head panel MRP Start

04-Jul-11

13-Jul-11

20

For Purchase

11-Jul-11

14-Jul-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTME Tuesday, July 05, 2011

Page 2 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT MRP HIPPS System MRP Start

28-Jun-11

07-Jul-11

20

For Purchase

05-Jul-11

13-Jul-11

80

Wing valve MRP Start

06-Jul-11

24-Jul-11

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

3.95%

0.00%

0.00%

3.42%

0.00%

0.00%

3.68%

0.00%

0.00%

20

VENDOR PRINTS REVIEW HIPPS Vendor prints review Start

13-Jul-11

24-Jul-11

20

Electro hydraulic wellhead control panel Vendor prints review Start

25-Jul-11

21-Jul-11

20

Multi phase flow meter Vendor prints review Start

25-Jul-11

20-Jul-11

20

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTME Tuesday, July 05, 2011

Page 3 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING PIPING ENGINEERING DIVISION TER Injection fitting TER Start

25-May-11

04-Jul-11

20

Finish

15-Jun-11

24-Jul-11

80

Insulation joint Injection fitting TER Finish

09-Jun-11

21-Jul-11

2.73%

100.00%

0.00%

2.73%

100.00%

20.00%

1.82%

20.00%

0.00%

3.64%

0.00%

0.00%

4.55%

100.00%

70.00%

80

MRP Piping bulk MRP Start

19-Jun-11

05-Jul-11

20

For Purchase

26-Jun-11

07-Jul-11

80

VENDOR PRINTS REVIEW Piping bulk Vendor prints review Start

04-Jul-11

20-Jul-11

20

Specification Piping material classes Final

13-Jun-11

14-Jul-11

30

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 4 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION DRAWING Single line diagram Start

23-May-11

14-Jul-11

20

Design

30-May-11

21-Jul-11

50

2.00%

70.00%

0.00%

1.33%

70.00%

0.00%

2.33%

70.00%

0.00%

8.33%

20.00%

20.00%

4.33%

20.00%

0.00%

4.33%

20.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.50%

0.00%

0.00%

2.50%

0.00%

0.00%

REPORTS / TECHNICAL LIST Electrical cable list Start

08-Jun-11

10-Jul-11

20

Design

15-Jun-11

17-Jul-11

50

Power system study Start

15-May-11

30-Jun-11

20

Design

24-May-11

14-Jul-11

50

TER Navigational aids system TER Finish

27-Jun-11

10-Jul-11

80

Lighting material TER Start

08-Jun-11

10-Jul-11

20

Earthing material TER Start

20-Jun-11

10-Jul-11

20

MRP Electrical cables MRP Start

13-Jul-11

10-Jul-11

20

For Purchase

20-Jul-11

14-Jul-11

80

Electrical Cable trays MRP Start

10-Jul-11

30-Jun-11

20

For Purchase

17-Jul-11

30-Jun-11

80

VENDOR PRINTS REVIEW Electrical Cable trays Vendor prints review Start

25-Jul-11

18-Jul-11

20

Electrical Cables Vendor prints review Start

01-Aug-11

21-Jul-11

20

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 5 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING ELECTRICAL ENGINEERING DIVISION VENDOR PRINTS REVIEW

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 6 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING OFFSHORE ENGINEERING DIVISION DRAWING Cable trays supports for deck plan at el. +9700 T.O.S. Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for cellar deck plan at el. +13500 T.O.S. Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for mezzanine deck plan at el. +16000 T. Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for main deck plan at el. +20500 T.O.S. Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for Helideck plan at el. +26500 T.O.S. Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

15.00%

20.00%

20.00%

5.00%

0.00%

0.00%

TER Survival module TER Finish

28-Jun-11

03-Jul-11

80

MRP Survival module MRP Start

20-Jul-11

25-Jul-11

20

* Weights of Activities are calculated relative to (OFFSHORE ENGINEERING DIVISION) Tuesday, July 05, 2011

Page 7 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.2 DETAILED ENGINEERING MECHANICAL ENGINEERING DEPARTMENT TER Service water pump TER Finish

07-Jun-11

03-Jul-11

10.00%

100.00%

20.00%

7.78%

0.00%

0.00%

80

VENDOR PRINTS REVIEW Turret crane crane Vendor prints review Start

19-Jul-11

13-Jul-11

20

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT) Tuesday, July 05, 2011

Page 8 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

* Relative Weight

Milestone Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE Safety equipment and life saving Comm. offers open

12-Jun-11

17-Jul-11

20

Bid tab

26-Jun-11

24-Jul-11

10

Chemical injection package F.O.C.

10-Jul-11

30-Jun-11

20

P.O.

24-Jul-11

10-Jul-11

10

Fire Fighting package Comm. offers open

14-Jun-11

10-Jul-11

20

Bid tab

28-Jun-11

14-Jul-11

10

F.O.C.

04-Jul-11

20-Jul-11

20

P.O.

18-Jul-11

24-Jul-11

10

Piping bulk P.O.

03-Jul-11

07-Jul-11

23-May-11

04-Jul-11

20-Jun-11

07-Jul-11

08-Jun-11

07-Jul-11

24-Jul-11

07-Jul-11

F.O.C.

13-Jul-11

03-Jul-11

20

P.O.

27-Jul-11

10-Jul-11

10

Navigation aids system 27-Jun-11

17-Jul-11

03-Jul-11

21-Jul-11

60.00%

40.00%

3.73%

90.00%

90.00%

3.26%

60.00%

20.00%

3.49%

40.00%

20.00%

3.49%

40.00%

20.00%

3.73%

60.00%

90.00%

3.49%

60.00%

70.00%

3.49%

40.00%

40.00%

3.49%

40.00%

40.00%

20

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

3.49%

20

Instrument & Mechanical bulk material Comm. offers open

70.00%

10

Electrical Cables

Comm. offers open

60.00%

20

Electrical Cable trays P.O.

4.19%

20

Lighting material Tech. offers open

40.00%

20

Earthing material Tech. offers open

60.00%

10

Injection fitting Tech. offers open

3.26%

Page 9 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

Milestone Value

* Relative Weight

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.3 PROCUREMENT SERVICES FOREIGN PURCHASING DEPARTMENT COMMODITIES ONE BY ONE HIPPS F.O.C.

28-Jun-11

06-Jul-11

20

P.O.

12-Jul-11

14-Jul-11

10

Choke valves Comm. offers open

14-Jun-11

12-Jul-11

20

Bid tab

28-Jun-11

20-Jul-11

10

Instrument cable trays Tech. offers open

14-Jun-11

04-Jul-11

Comm. offers open

06-Jun-11

30-Jun-11

20

Bid tab

20-Jun-11

06-Jul-11

10

F.O.C.

04-Jul-11

12-Jul-11

20

P.O.

14-Jul-11

18-Jul-11

10

Wing valves Comm. offers open

08-Jun-11

03-Jul-11

20

Bid tab

22-Jun-11

10-Jul-11

10

F.O.C.

06-Jul-11

21-Jul-11

20

Instrument cable and cable glands 06-Jun-11

07-Jul-11

16-Jun-11

10-Jul-11

24-Jul-11

03-Jul-11

60.00%

40.00%

3.49%

40.00%

0.00%

3.54%

70.00%

40.00%

3.54%

70.00%

40.00%

3.49%

60.00%

20.00%

3.49%

40.00%

0.00%

3.73%

60.00%

90.00%

3.49%

60.00%

40.00%

3.73%

40.00%

40.00%

10

Service water pump Comm. offers open

13-Jun-11

10-Jul-11

20

Bid tab

27-Jun-11

18-Jul-11

10

F.O.C.

11-Jul-11

25-Jul-11

20

Survival module Comm. offers open

29-Jun-11

10-Jul-11

20

Bid tab

13-Jul-11

18-Jul-11

10

F.O.C.

19-Jul-11

24-Jul-11

20

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT) Tuesday, July 05, 2011

3.73%

20

Multi phase flow meter P.O.

70.00%

20

Sand & Corrosion probes Tech. offers open

70.00%

20

Electro hydraulic wellhead control panel

Tech. offers open

4.19%

Page 10 of 12

Layout No. 1 Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

Milestone Value

* Relative Weight

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.3 PROCUREMENT SERVICES EXPEDITING DEPART. COMMODITIES ONE BY ONE Chemical injection package Start

10-Jul-11

05-Jul-11

05-Jul-11

20-Jul-11

10-Jul-11

06-Jul-11

17-Jul-11

06-Jul-11

28-Jun-11

07-Jul-11

10-Jul-11

12-Jul-11

06-Jul-11

24-Jul-11

0.00%

0.00%

2.33%

0.00%

0.00%

4.66%

0.00%

0.00%

3.73%

0.00%

0.00%

3.26%

0.00%

0.00%

10

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.) Tuesday, July 05, 2011

1.86%

10

Wing valves Start

0.00%

10

Electro hydraulic wellhead control panel Start

0.00%

20

HIPPS Start

3.73%

20

Electrical Cables Start

0.00%

10

Electrical Cable trays Start

0.00%

10

Fire Fighting package Start

4.66%

Page 11 of 12

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project Dates Milestone

Planned

Expected

Milestone Value

* Relative Weight

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned Actual Progress% Progress%

ENPPI W.P.5 DECK AND TSF SUPPLY & FABRICATION METERIAL SUPPLY COMMODITIES ONE BY ONE Chemical injection package P.O.

24-Jul-11

10-Jul-11

18-Jul-11

24-Jul-11

03-Jul-11

07-Jul-11

24-Jul-11

07-Jul-11

27-Jul-11

10-Jul-11

12-Jul-11

14-Jul-11

18-Jul-11

18-Jul-11

24-Jul-11

03-Jul-11

03-Jul-11

07-Jul-11

03-Jul-11

07-Jul-11

0.00%

0.00%

1.49%

0.00%

0.00%

7.71%

0.00%

0.00%

5.41%

0.00%

0.00%

10.97%

0.00%

0.00%

8.70%

0.00%

0.00%

5.22%

0.00%

0.00%

35

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY) Tuesday, July 05, 2011

2.78%

35

Piping bulk 2nd batch P.O.

0.00%

15

Piping bulk 1st batch P.O.

0.00%

15

Multi phase flow meter P.O.

3.48%

15

Electro hydraulic wellhead control panel P.O.

0.00%

35

HIPPS P.O.

0.00%

35

Electrical Cables P.O.

1.94%

35

Electrical Cable trays P.O.

0.00%

15

Piping bulk 3rd batch P.O.

0.00%

15

Fire Fighting package P.O.

9.06%

Page 12 of 12

Data'Nes Systems, Release 2.21

PAGE 30 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.6. PROCUREMENT STATUS

GFL 003-0405

3467-200

PAGE 31 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.6.1 ENPPI

GFL 003-0405

3467-200

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM MRQ

Commodity Name

TER

F.O.C

P.O

As of: Fab. Upto RFS

25-Jun

Shipping

Delivery at Site

(Supplier)

Process VENT STOCK TIPS PL

09-May-11

EXP

(112-04)

CHEMICAL INJECTION PACKAGE (115-01)

FLAME ARRESTORS

ACT

09-May-11

PL

06-Apr-11

27-Dec-11

10-Jan-12

26-Jul-11

23-Aug-11

11-Sep-11

26-Dec-11

16-Jan-12

30-Jan-12

19-Jun-11

10-Jul-11

24-Jul-11

06-Jan-12

27-Jan-12

10-Feb-12

30-Jun-11

10-Jul-11

27-Dec-11

17-Jan-12

31-Jan-12

01-Jun-11

PL

27-Apr-11

23-Jun-11

21-Jul-11

04-Aug-11

28-Nov-11

19-Dec-11

02-Jan-12

21-Jul-11

18-Aug-11

06-Sep-11

26-Dec-11

16-Jan-12

30-Jan-12

14-Jun-11

07-Jul-11

21-Jul-11

03-Jan-12

24-Jan-12

07-Feb-12

05-Jul-11

18-Jul-11

01-Aug-11

04-Jan-12

28-Jan-12

11-Feb-12

12-Jun-11

10-Jul-11

24-Jul-11

07-Dec-11

28-Dec-11

11-Jan-12

07-Jul-11

04-Aug-11

18-Aug-11

01-Jan-12

22-Jan-12

05-Feb-12

EXP

12-Apr-11

Tuesday, July 05, 2011

06-Dec-11

06-Apr-11

PL FIRE PROTECTION EXP SYSTEM PACKGE ACT (190-01)

(190-03)

17-Aug-11

ACT

17-Apr-11

LIFE SAVING EQUIPMENT

03-Aug-11

EXP

ACT

(119-02)

04-Jul-11

PL

12-Apr-11

12-Apr-11

EXP ACT

12-Apr-11

Page 1 of 7

PL: Planned EXP: Expect ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM MRQ

Commodity Name

TER

F.O.C

P.O

As of: Fab. Upto RFS

25-Jun

Shipping

Delivery at Site

(Supplier) SURVIVAL MODULE (197-02)

28-Apr-11

28-Jun-11

19-Jul-11

02-Aug-11

26-Dec-11

16-Jan-12

30-Jan-12

03-Jul-11

24-Jul-11

07-Aug-11

31-Dec-11

21-Jan-12

04-Feb-12

07-Jun-11

11-Jul-11

25-Jul-11

28-Nov-11

19-Dec-11

04-Jan-12

03-Jul-11

27-Jul-11

10-Aug-11

14-Dec-11

04-Jan-12

20-Jan-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

26-Jan-12

29-Dec-11

PL EXP ACT

14-Apr-11

PL

25-Apr-11

Mechanical SERVICE WATER PUMPS (131-15)

DIESEL GENERATOR (135-03)

MONORAIL CRANE (137-01)

EXP ACT

25-Apr-11

ACT

PL

28-Jul-11

06-Sep-11

04-Oct-11

17-Oct-11

01-Feb-12

22-Feb-12

07-Mar-12

EXP

28-Jul-11

06-Sep-11

04-Oct-11

17-Oct-11

01-Feb-12

22-Feb-12

07-Mar-12

13-Apr-11

12-Jun-11

10-Jul-11

24-Jul-11

06-Mar-12

20-Mar-12

03-Apr-12

19-Feb-12

04-Mar-12

18-Mar-12

ACT

TURRENT CRANE PL EXP

(137-02)

Tuesday, July 05, 2011

ACT

10-Apr-11

04-May-11

29-May-11

21-Jun-11

Page 2 of 7

PL: Planned EXP: Expect ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM MRQ

Commodity Name

TER

F.O.C

P.O

As of: Fab. Upto RFS

25-Jun

Shipping

Delivery at Site

(Supplier) MICROTURBINE

(172-01)

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

26-Jan-12

29-Dec-11

24-Jul-11

18-Oct-11

08-Nov-11

22-Nov-11

12-Jul-11

02-Oct-11

23-Oct-11

06-Nov-11

ACT

Electrical ELECTRICAL CABLE TRAYS (500-02)

NAVIGATIONAL AIDS (510-10)

E& I MODULE

(510-16)

ELECTRICAL CABLES (510-22)

Tuesday, July 05, 2011

PL

02-May-11

19-Jun-11

10-Jul-11

EXP ACT

10-Apr-11

02-May-11

30-May-11

PL

16-May-11

27-Jun-11

18-Jul-11

02-Aug-11

05-Dec-11

26-Dec-11

09-Jan-12

10-Jul-11

31-Jul-11

15-Aug-11

18-Dec-11

08-Jan-12

22-Jan-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

12-Jan-12

26-Jan-12

EXP ACT

26-Apr-11

ACT

PL

09-May-11

20-Jun-11

EXP ACT

10-Apr-11

13-Jul-11

27-Jul-11

04-Dec-11

25-Dec-11

08-Jan-12

03-Jul-11

10-Jul-11

22-Nov-11

13-Dec-11

27-Dec-11

29-May-11

Page 3 of 7

PL: Planned EXP: Expect ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM MRQ

TER

F.O.C

P.O

02-Jun-11

06-Jul-11

27-Jul-11

22-Aug-11

04-Aug-11

25-Aug-11

18-Jul-11

As of: Fab. Upto RFS

25-Jun

Shipping

Delivery at Site

14-Dec-11

04-Jan-12

18-Jan-12

13-Sep-11

23-Dec-11

13-Jan-12

27-Jan-12

08-Aug-11

24-Aug-11

26-Dec-11

24-Jan-12

14-Feb-12

04-Aug-11

25-Aug-11

15-Sep-11

23-Dec-11

22-Jan-12

12-Feb-12

26-Jun-11

17-Jul-11

31-Jul-11

13-Jan-12

10-Feb-12

24-Feb-12

24-Jul-11

14-Aug-11

28-Aug-11

16-Jan-12

06-Feb-12

20-Feb-12

15-Dec-11

05-Jan-12

19-Jan-12

12-Dec-11

05-Jan-12

19-Jan-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

05-Jan-12

19-Jan-12

Commodity Name (Supplier) LIGHTING MATERIAL (529-01)

EARTHING MATERIAL (550-01)

PL EXP ACT

22-Jun-11

PL

06-Jun-11

EXP ACT

20-Jun-11

PL

25-May-11

Instrument LOOSE INSTRUMENT (210-01)

EXP ACT

06-Jun-11

MANUAL VALVES PL EXP

(212-01)

SHUTDOWN & BLOWDOWN VALVES (212-04)

Tuesday, July 05, 2011

ACT

ACT

Page 4 of 7

PL: Planned EXP: Expect ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM Commodity Name

MRQ

TER

F.O.C

P.O

10-Apr-11

12-Jun-11

10-Jul-11

24-Jul-11

As of: Fab. Upto RFS

25-Jun

Shipping

Delivery at Site

06-Jan-12

27-Jan-12

10-Feb-12

03-Jul-11

21-Dec-11

11-Jan-12

25-Jan-12

(Supplier) MULTIPHASE FLOW METERS (221-06)

CHOKE VALVES

PL EXP ACT

10-Apr-11

25-May-11

21-Jun-11

PL

13-Apr-11

15-Jun-11

10-Jul-11

24-Jul-11

05-Apr-12

26-Apr-12

05-Jul-11

26-Jul-11

09-Aug-11

21-Feb-12

11-Apr-12

13-Jun-11

11-Jul-11

25-Jul-11

06-Apr-12

27-Apr-12

11-May-12

21-Jul-11

04-Aug-11

17-Mar-12

07-Apr-12

21-Apr-12

12-Jul-11

26-Jul-11

08-Jan-12

29-Jan-12

12-Feb-12

05-Jul-11

19-Jul-11

01-Jan-12

22-Jan-12

05-Feb-12

28-Jun-11

12-Jul-11

24-Mar-12

14-Apr-12

28-Apr-12

06-Jul-11

14-Jul-11

17-Mar-12

07-Apr-12

21-Apr-12

EXP

(234-06)

WING VALVES

ACT

10-Apr-11

PL

13-Apr-11

EXP

(239-02)

WELLHEAD CONTROL PANEL

ACT

10-Apr-11

15-Jun-11

PL

12-Apr-11

12-Jun-11

EXP ACT

07-Apr-11

16-Jun-11

HIGH INTEGRITY PL PRESSURE EXP PROTECTION ACT (252-14)

07-Apr-11

31-May-11

(252-10)

Tuesday, July 05, 2011

03-Apr-11

09-Jun-11

Page 5 of 7

PL: Planned EXP: Expect ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM MRQ

TER

PL

01-Jun-11

07-Jul-11

01-Aug-11

15-Aug-11

EXP

26-Jun-11

04-Aug-11

25-Aug-11

02-Jun-11

03-Jul-11

Commodity Name

F.O.C

P.O

As of: Fab. Upto RFS

25-Jun

Shipping

Delivery at Site

29-Dec-11

19-Jan-12

02-Feb-12

13-Sep-11

07-Jan-12

28-Jan-12

11-Feb-12

24-Jul-11

07-Aug-11

01-Nov-11

22-Nov-11

06-Dec-11

14-Jul-11

04-Aug-11

18-Aug-11

02-Nov-11

23-Nov-11

07-Dec-11

07-Jul-11

28-Jul-11

11-Aug-11

05-Nov-11

26-Nov-11

10-Dec-11

21-Jul-11

11-Aug-11

25-Aug-11

09-Nov-11

30-Nov-11

14-Dec-11

20-Jun-11

11-Jul-11

25-Jul-11

28-Nov-11

19-Dec-11

02-Jan-12

21-Jul-11

11-Aug-11

25-Aug-11

09-Dec-11

30-Dec-11

13-Jan-12

(Supplier) SAND PROBES

(281-08)

ACT

INSTRUMENT/ME PL CHANICAL BULK EXP MATERIAL ACT (291-01)

03-May-11

JUNCTION BOXES PL

09-Jun-11

EXP

(295-01)

INSTRUMENT CABLES (298-01)

INSTRUMENT CABLE TRAYS / CHANNELS (298-03)

ACT

06-Jun-11

PL

23-May-11

EXP ACT

23-Jun-11

PL

31-May-11

28-Jun-11

14-Jul-11

28-Jul-11

22-Oct-11

29-Oct-11

12-Nov-11

EXP

26-Jun-11

28-Jul-11

15-Aug-11

29-Aug-11

13-Nov-11

20-Nov-11

04-Dec-11

ACT

Piping Tuesday, July 05, 2011

Page 6 of 7

PL: Planned EXP: Expect ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM MRQ

Commodity Name

TER

F.O.C

P.O

As of: Fab. Upto RFS

25-Jun

Shipping

Delivery at Site

(Supplier) PIPING BULK MATERIAL (400-01)

INJECTION FITTINGS (400-02)

PL

07-Apr-11

31-May-11

20-Jun-11

EXP

04-Jul-11

06-Jan-12

27-Jan-12

10-Feb-12

07-Jul-11

10-Jan-12

31-Jan-12

14-Feb-12

ACT

07-Apr-11

17-May-11

22-Jun-11

PL

24-Apr-11

15-Jun-11

13-Jul-11

27-Jul-11

10-Dec-11

31-Dec-11

14-Jan-12

24-Jul-11

21-Aug-11

07-Sep-11

18-Jan-12

08-Feb-12

22-Feb-12

09-Jun-11

10-Jul-11

24-Jul-11

07-Dec-11

28-Dec-11

11-Jan-12

21-Jul-11

21-Aug-11

07-Sep-11

18-Jan-12

08-Feb-12

22-Feb-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

12-Jan-12

26-Jan-12

EXP ACT

24-Apr-11

PL

20-Apr-11

Pipeline INSULATING JOINTS (Pipeline) (612-03)

PRODUCTION MANIFOLD (642-03)

Tuesday, July 05, 2011

EXP ACT

29-May-11

ACT

Page 7 of 7

PL: Planned EXP: Expect ACT: Actual

PAGE 32 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0) Jun 2011

4.6.2 TECNOMARE

GFL 003-0405

3467-200

SETH DEVELOPMENT PROJECT Procurement Summary Status Report as of June 25th, 2011 Sr.

Commodity

Phase

1

PLC /RTU

Forecast

Plan

2

3

GROUT SEALS

SHOCK CELLS

RFQ's  Tech. Open Tech. Report Issued Date 11‐Mar‐11

13‐Apr‐11

3‐May‐11

Comm.  Open

Comm.  Report

Fax Of  Comm.

MRP Issued

P.O. Date

11‐May‐11

17‐May‐11

30‐May‐11

30‐May‐11

30‐May‐11

Delivery at  Delivery Ex‐ Delivery FOB site Work 12‐Jan‐12

27‐Jan‐12

25‐Feb‐12 23‐Feb‐12

Actual

11‐Mar‐11

25‐Mar‐11

20‐Apr‐11

21‐Apr‐11

29‐Apr‐11

2‐May‐11

2‐May‐11

2‐May‐11

Plan

31‐Mar‐11

10‐Apr‐11

14‐Apr‐11

24‐Apr‐11

28‐Apr‐11

15‐May‐11

15‐May‐11

15‐May‐11

4‐Sep‐11

18‐Sep‐11

28‐Sep‐11

4‐Sep‐11

18‐Sep‐11

28‐Sep‐11

Forecast Actual

15‐Mar‐11

5‐Apr‐11

14‐Apr‐11

14‐Apr‐11

26‐May‐11

26‐May‐11

26‐May‐11

26‐May‐11

Plan

31‐Mar‐11

29‐Apr‐11

9‐May‐11

17‐May‐11

25‐May‐11

30‐May‐11

30‐May‐11

30‐May‐11

21‐Mar‐11

14‐Apr‐11

4‐May‐11

9‐May‐11

6‐Jun‐11

9‐Jun‐11

9‐Jun‐11

9‐Jun‐11

Forecast Actual