P Process, QS & Operation QS & O ti Process & Design Design & Process S Suppliers & Fabricators li & F b i
Or project O Bid submitted ccancelation Conceptual design close‐out 10% Design revieew #1‐Bid clarrification Plant design com mmences
Procurement& QA/QC 2nd/3rd phases
CORE DESIGN & CORE DESIGN & ANALYSIS ANALYSIS
CONSTRUCTION
Base line schedule Base line sched le
PROCUREMENT
Detail schedule D t il h d l Plant piping deliverables
Model setup
FABRICATION DETAILS
yellow‐Off FABRICATION DETAILS (made to order) FABRICATION DETAILS (made to order) AS FABRICATED
QCP S h d l C t l QCP Schedule Control Piping test‐packs & punches SKID VENDOR MOBILISATION
Tim ming
CLIENT DOCUMENTATION
DESIGN
PROCUREMENT
DETAILING
CONSTRUCTION (FABRICATION & ERECTION)
QUALITY CONTROL
Illustrative Peak Man‐ho ours
Office e bound resources
ENGINEERING
Engineering g g committed
Designers g committed
% 100%
As‐builts
Site based resources
FEED
Design
Close‐out C reports r
CALCULATIONS & CALCULATIONS & PLANT DESIGN
Quality Construction Management committed
Detailers committed
Engineers g released
Designers released
Detailers released
QUALITY & CONSTRUCTION MANAGEMENT RELEASED
Documentatio on Close‐out
INITIAL ESTIMATE
99%
otocol close‐out – E&I Pro Detail procurement cllose‐out 97.5% %
Piping erection cllose‐out 90% Sm mall bore
Piping erection cllose‐out Large bore, NPS2 & & above 80%
P Piping field fab brication & mechanical eerection 70% & close‐out
Shop p fabrication cllose‐out 60% Civil erection cllose‐out C
Fabriccation detail cllose‐out 55% In‐house & eex‐stock
Sup per‐checking cllose‐out 50% Design doccumentation cllose‐out
BASIC ENGINEERING Docum mentation Close‐out
Schedule objectivves
DETAIL CHECKING
DETAIL ENGINEERING DETAIL ENGINEERING
DETAILING
FEASIBILITY ANALYSIS
PERIPHERAL DESIGN
DETAILING
COMMISSIO ONING START‐UP
EXTENDED PHASE & KEY DOC’S
Construction QA/QC Detaiil review Final adjud dications Detail design close‐out 40% D Super‐‐checking com mmences Detail proccurement com mmences
Design reeview #2‐Scope freeze Plant design close‐out 20% Detaail design com mmences Fabrication detail com mmences
Kick‐Off M Meeting 5% Conceptu ual design com mmences
CONCEPT CAPACITIES, MATERIALS
DESIGN B BASIS
Discip pline sectio ons
Supporting Structural Electrical HVAC M t i l H dli Materials Handling Piping Instrument & Ctrl Machinery Piping (Plant design) Process
ITB STUD DY
Gen neric milestones
0% ITB Receiveed Decision to o tender Engineeringg activities com mmence 1%
Design review
Design revview #3‐AFC Ap pprovals Engineering activities cllose‐out 30% Bulk proccurement com mmences
Progresss Derivatives