Estructura Del Pie De Presupuesto

  • Uploaded by: Julvercito Alvarez
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Estructura Del Pie De Presupuesto as PDF for free.

More details

  • Words: 67
  • Pages: 8
Loading documents preview...
36,309.67 #REF!

ESTRUCTURA DEL PIE DE PRESUPUESTO PA COSTO DIRECTO GASTOS GENERALES (12%) EXPEDIENTE TECNICO (5%) SUPERVISION (7%) TOTAL

E PRESUPUESTO PARA PERFIL SNIP EN OBRAS POR ADMINISTRACION DIRECTA 300,000.00 36,000.00 15,000.00 21,000.00 372,000.00

ESTRUCTURA DEL PIE DE PRESUPUESTO PARA EXPEDIENTE EN OBRAS POR ADM COSTO DIRECTO GASTOS GENERALES (12%) EXPEDIENTE TECNICO (5%) SUPERVISION (7%) TOTAL

300,000.00 36,000.00 15,000.00 21,000.00 372,000.00

EDIENTE EN OBRAS POR ADMINISTRACION DIRECTA