Ex18195003_001-1003-01 Rev.0

  • Uploaded by: Richard
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Ex18195003_001-1003-01 Rev.0 as PDF for free.

More details

  • Words: 3,165
  • Pages: 8
Loading documents preview...
Doc Title: PUMP DATA SHEET (PDS)

PUMP DIVISION COIMBATORE

Document Rev:

Flowserve Document No.:

EX18195003_001-1003-01

Customer Name:

FLOWSERVE PERU S.A.C

FS Reference Number:

EX18195003

End User Name:

PLUSPETROL PERU CORPOTATION S.A.

Customer PO Number:

3133 & 20-JUN-18

Pump Tag No(s):

PBB-3315

Equipment Service:

NON PRESSURIZED DRAIN PUMP

Pump Size:

ECPJ 32-160-R

Quantity:

1 NOS

0

Rev

Revision Description

Created By

Checked By

Released By

Release Date

0

Issued For Approval

KS

SRR

RVS

30-Jul-18

A

30/07/2018

For Approval

REV.

DESCRIPTION

DATE

KS BY

SRR

RVS

CHK

APPD

PROJECT: PISCO DIESEL BLENDING

TITLE:

Perú Corp. S.A.

DATA SHEET FOR NON PRESSURIZED DRAIN PUMP PBB-3315 P&P FACILITIES DEPARTMENT All the information contained in this

ESC

DOCUMENT Nº:

document is confidential and property of Pluspetrol, and the totally or partial copy or reproduction of it is prohibited without previous authorization.

REVISION:

PPIS-548-HD-M-013 N/A

REPLACE TO:

0 Pag: 1 de 7

CLIENT: PROJECT:

PLUSPETROL PERU CORPORATION S.A PISCO DIESEL BLENDING Title: Page:

DATA SHEET FOR NON PRESSURIZED DRAIN PUMP PBB-3315 Code:

Perú Corp. S.A.

02 of 07

Revision:

PPIS-548-HD-M-013

0

API-610 CENTRIFUGAL PUMP PROCESS / SITE / PERFORMANCE / DRIVER DATA SHEET 1 Note APPLICABLE TO: 2

FOR

3

SITE

4

NO. REQ

5

MANUFACTURER

APPLICABLE NTL/INTNTL STANDARD:

PROPOSAL

PBB-3315 (NOTE 19)

NON PRESSURIZED DRAIN PUMP

TYPE

No. STAGES

VERTICAL

MODEL

6 7

Rev

PPIS-548-RI-M-003 TAG

SERVICE

PISCO PLANT PUMP SIZE

1

MR

API-610 11TH ED

UNIT

PLUSPETROL PERÚ CORP. S.A.

SERIAL NO.

LIQUID CHARACTERISTICS (FOR NORMAL CASE)

8

Units

9

LIQUID TYPE OR NAME :

10

VAPOR PRESSURE (NOTE 2):

11

RELATIVE DENSITY :

12

SPECIFIC HEAT : VISCOSITY (NOTE 3):

13

Maximum

Normal

Minimum

NOTE

INTERMITTENT

• IF INTERMITTENT NO. OF STARTS (NOTE 5):

0.5

values refer

PUMPS OPERATE IN:

0.89

only to the

CORROSION DUE TO : (6.12.1.9)

property

EROSION DUE TO : (6.12.1.9) H2S CONCENTRATION (ppm) : (6.12.1.12)

psia Btu/(lbm-°F) cP

SERVICE :

Max & min

HYDROCARBON

Listed

5.34

14 15

CHLORIDE CONCENTRATION (ppm) :

OPERATING CONDITIONS (6.1.2) Units

Maximum Flow

16 17

NPSHa Datum:

18

PUMPING TEMPERATURE :

Rated Flow (certified point)

°F

86

19

FLOW :

gpm

50

20

DISCHARGE PRESSURE (NOTE 8): (6.3.2)

psia

54

21

SUCTION PRESSURE :

psia

14

22

DIFFERENTIAL PRESSURE :

psi

40

23

DIFFERENTIAL HEAD :

ft

102

24

NPSHA (NOTE 12):

25

HYDRAULIC POWER :

Normal Flow

Minimum Flow

PARTICULATE SIZE (DIA IN MICRONS) PARTICULATE CONCENTRATION (PPM)

C.L. Impeller

ft

36

HP

1.1

NOTE: ALL OPERATING CONDITIONS ARE REFERED TO THE MINIMUM LIQUID CHARACTERISTICS. MAXIMUM LIQUID CHARACTERISTICS OR OTHER OPERATIONAL CASES ARE LOCATED IN THE NOTES PAGE

26 SITE AND UTILITY DATA (NOTE 6)

27 28

LOCATION:

COOLING WATER :

29

OUTDOOR

30

MOUNTED AT (NOTE 9):

31

ELECTRIC AREA CLASSIFICATION:

32

GROUP

INLET

UNHEATED

l

GRADE

TROPICALISATION REQD 6.1.22

Class I / Group D

DIVISION TEMP CLASS

Class I / Group D

33

SITE DATA :

34

ELEVATION (MSL) :

35

RANGE OF AMBIENT TEMPS:MIN / MAX

54

/

86

36

RELATIVE HUMIDITY: MIN / MAX

84

/

100

37

UNUSUAL CONDITIONS: •

TEMP

°F

2

PRESS.

psig

T3B

SOURCE

RETURN

DESIGN

MAX MIN

COOLING WATER CHLORIDE CONCENTRATION: ft

52

BAROMETER :

SPECIFY OTHER :

UTILITY CONDITIONS :

40

ELECTRICITY :

Psia

INSTRUMENT AIR :

°F

STEAM

HEATING

480

120

41

VOLTAGE

42

PHASE

3

1

43

HERTZ

60

60

CONTROL

ppm psig

DRIVERS TEMP °F

MIN

psig

HEATING

Max

Min PRESS. psig

DRIVERS

MAX

%

OTHER DUST/ MARINE COAST ENVIRONMENT (SALT MIST, SANDSTORM)

38 39

14.67

Max Min

SHUTDOWN

44 PERFORMANCE

45 46 47 48

DRIVER (7.1.5) (NOTE 16 & 17)

ECPJ 32-160-R

PROPOSAL CURVE NO.

3520

RPM

DRIVER TYPE

As Tested Curve No. IMPELLER DIA.:

49

RATED

RATED POWER

5.35

6.89 MIN.

MAX.

3.11 HP

5.31 36.80

EFFICIENCY

in.

VARIABLE SPEED REQUIRED

(%)

SOURCE OF VARIABLE SPEED

gpm

OTHER

gpm

MANUFACTURER

50

RATED CURVE BEP FLOW (at rated impeller dia)

51

MIN FLOW :

52

PREFERRED OPERATING REGION (6.1.11)

35.7

to

61.2

gpm

NAMEPLATE POWER (TO BE FILLED BY VENDOR)

53

ALLOWABLE OPERATING REGION

10.7

to

74.9

gpm

Nominal RPM

54

MAX HEAD @ RATED IMPELLER

123.72

ft

RATED LOAD RPM

55

MAX POWER @ RATED IMPELLER

3.87

HP

FRAME OR MODEL

56

NPSH3 AT RATED FLOW :

6.6

ft

ORIENTATION

57

CL PUMP TO U/S BASEPLATE

ft

LUBE

58

NPSH MARGIN AT RATED FLOW :

ft

BEARING TYPE:

59

SPECIFIC SPEED (6.1.9)

60

SUCTION SPECIFIC SPEED LIMIT

61

SUCTION SPECIFIC SPEED

62

MAX. ALLOW. SOUND PRESS. LEVEL REQD (6.1.14)

63

EST MAX SOUND PRESS. LEVEL

64

MAX. SOUND POWER LEVEL REQ'D (6.1.14)

65

EST MAX SOUND POWER LEVEL

66 67 68 69 70

MOTOR

GEAR

THERMAL

gpm

10.7

STABLE

(6.8.9)

gpm,rpm,ft

RADIAL THRUST

<12000 gpm,rpm,ft

STARTING METHOD <85 @ 1 mt (dBA) (dBA)

5

VERTICAL

/ / Open Valve (Fully-Loaded)

MOTOR TYPE ENCLOSURE TYPE SEE DRIVER DATA SHEET

TEFC

HP

CLIENT:

PLUSPETROL PERU CORPORATION S.A

PROJECT:

PISCO DIESEL BLENDING Title: Page:

DATA SHEET FOR NON PRESSURIZED DRAIN PUMP PBB-3315 Code:

Perú Corp. S.A.

03 of 07

Revision:

PPIS-548-HD-M-013

0

API 610 CENTRIFUGAL PUMP MECHANICAL DATA SHEET 2

API PUMP TYPE:

VS4

3 4

Rev

CONSTRUCTION

1 Note

NOZZLE CONNECTIONS (NOTE 3):

5

[Based on API 610 definitions]

CASING MOUNTING:

SEE ALSO PAGE 6

CASING TYPE:

(6.5.5)

OH3 BACKPULLOUT LIFTING DEVICE REQD. (9.1.2.6)

Size

Facing

Rating

Position

1.5"

RF

150

TOP

6

SUCTION

7

DISCHARGE

8

PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)

VERTICAL (6.3.10)

CASE PRESSURE RATING: MAWP :

No.

9

Size

Type

Facing

Rating

SINGLE VOLUTE

(6.3.6)

HYDROTEST :

Posn.

BALANCE/LEAK OFF

SUCT'N PRESS. REGIONS DESIGNED FOR MAWP

11

DRAIN

ROTATION:

12

VENT



IMPELLERS INDIVIDUALLY SECURED :

13

PRESSURE GAGE



BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION :

14

TEMP GAGE



PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS

15

WARM-UP LINE

SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3) Drain Valve Supplied By

First Critical Speed Wet (Multi stage pumps only)

18

DRAINS MANIFOLDED

COMPONENT BALANCE TO ISO 1940 G1.0

19

VENT Valve Supplied By

SHRINK FIT -LIMITED MOVEMENT IMPELLERS (9.2.2.3)

20

VENTS MANIFOLDED THREADED CONS FOR PIPELINE SERVICE & < 50°C (6.4.3.2)

21

COUPLING:(7.2.3)

22

SPECIAL FITTINGS FOR TRANSITIONING (6.4.3.3)

MANUFACTURER

23

CYLINDRICAL THREADS REQUIRED (6.4.3.8)

MODEL

24

GUSSET SUPPORT REQUIRED

RATING (POWER/100 RPM)

25 VS 6 DRAIN

27

DRAIN TO SKID EDGE

N/A

(7.2.13.f)

in.

SERVICE FACTOR

> 1.5

RIGID

28

YES

COUPLING WITH HYDRAULIC FIT (7.2.10) MATERIAL (6.12.1.1) (NOTE 4)

29 30

APPENDIX H CLASS

31

MIN DESIGN METAL TEMP (6.12.4.1)

32

REDUCED-HARDNESS MATERIALS REQ'D (6.12.1.12.1)

33

Applicable Hardness Standard (6.12.1.12.3)

34

BARREL :

35

BOWL :

36

DIFFUSERS

37

IMPELLER :

38

IMPELLER WEAR RING :

39

S-1

COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11) COUPLING IN COMPLIANCE WITH (7.2.4)

NO NA

API 610 compliant

COUPLING GUARD STANDARD PER (7.2.13.a) Window on Coupling Guard

CARBON STEEL BASEPLATE CAST IRON

CASE WEAR RING :

40

SHAFT:

A322 GR 4140

MOUNTING :

41

Bowl (if VS-type)

CARBON STEEL

42

Inspection Class

Level 1

BASEPLATE CONSTRUCTION (7.3.14) BASEPLATE DRAINAGE (7.3.1) NON-GROUT CONSTRUCTION : (7.3.13) VERTICAL LEVELING SCREWS : LONGITUDINAL DRIVER POSITIONING SCREWS :

BEARINGS AND LUBRICATION (6.10.1.1) BEARING (TYPE / NUMBER):

l

GROUT AND VENT HOLES

45

RADIAL

SLEEVE

/

l

DRAIN CONNECTION

46

THRUST

ROLLER

/

MOUNTING PADS SIZED FOR BASEPLATE LEVELING (7.3.5)

(6.11.4)

SUPPLIED WITH :

REVIEW AND APPROVE THRUST BEARING SIZE : (9.2.5.2.4)

MOUNTING PADS TO BE MACHINED (7.3.6)

48

PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET LUBRICATION :

(6.10.2.2) (6.11.3) (9.6.1)

OTHER

GREASE

PRESSURE LUBE SYSTEM TO ISO 10438-

50

(9.2.6.5)

N/A

ISO 10438 DATA SHEETS ATTACHED

51

Pressurized Lube Oil System mtd on pump baseplate

52

Location of Pressurized Lube Oil System mounted on baseplate :

N/A

53 INTERCONNECTING PIPING PROVIDED BY

Supplier

55 56

OIL VISC. ISO GRADE

57

CONSTANT LEVEL OILER :

58 59 60 61 62 63 64 65 66 67

YES

°F

API BASEPLATE NUMBER :

43

NO

COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3)

S5

Carbon steel CAST IRON A426Gr.CPCA15 CAST IRON A426Gr.CPCA15

54

NO

SPACER LENGTH

26

50

°F

(VIEWED FROM COUPLING END)

17

49

°F

@

ROTOR:

16

47

@

psig

HYDROTEST OH PUMP AS ASSEMBLY

10

44

psig

VG

N/A

REMARKS :

ANSI B15.1

CLIENT:

PLUSPETROL PERU CORPORATION S.A

PROJECT:

PISCO DIESEL BLENDING Title: Page:

DATA SHEET FOR NON PRESSURIZED DRAIN PUMP PBB-3315 Code:

Perú Corp. S.A.

Revision:

PPIS-548-HD-M-013

04 of 07

0

API 610 CENTRIFUGAL PUMP DATA SHEET MECHANICAL SEAL / INSTRUMENTATION INSTRUMENTATION

1 Note 2

SEE ATTACHED API-670 DATA SHEET

3

ACCELEROMETER (7.4.2.1)

4

Number of Accelerometers

5

Mounting Location of Accelerometers

SEAL SUPPORT SYSTEM MOUNTING NO

(7.5.1.4) IDENTIFY LOCATION ON BASEPLATE

6

INTERCONNECTING PIPING BY

7

PROVISION FOR MTG ONLY

8

Number of Accelerometers

9

Mounting Location of Accelerometers FLAT SURFACE REQUIRED

12

Number of Accelerometers

13

Mounting Location of Accelerometers

MECHANICAL SEAL (6.8.1) SEE ATTACHED ISO 21049/API 682 DATA SHEET (6.10.2.11)

14 15

Supplier

(6.10.2.10)

10 11

Rev

SEAL SUPPORT SYSTEM MOUNTED ON PUMP BASEPLATE

YES

NO

ADDITIONAL CENTRAL FLUSH PORT

(6.8.9)

HEATING JACKET REQ'D.

(6.8.11)

API SEAL CODE SEAL MANUFACTURER

VIBRATION PROBES (7.4.2.2)

SIZE AND TYPE

16

PROVISIONS FOR VIB. PROBES

17

NUMBER PER RADIAL BEARING

MANUFACTURER CODE

18

NUMBER PER AXIAL BEARING

ARRANGEMENT

MONITORS AND CABLES SUPPLIED BY (7.4.2.4)

SEAL CHAMBER DATA

19 20 21 22

TEMPERATURE (7.4.2.3)

23

PROVISIONS FOR TEMP PROBES

24

RADIAL BEARING TEMP.

25 26 27 28

NUMBER PER RADIAL BEARING THRUST BEARING TEMP.

TEMPERATURE

gpm

PRESSURE

psig

FLOW

gpm

SEAL FLUSH PLAN MATERIAL SEAL FLUSH PLAN PIPING TYPE

NUMBER PER THRUST BEARING ACTIVE SIDE NUMBER PER THRUST BEARING INACTIVE SIDE

29

TEMP. GAUGES (WITH THERMOWELLS) (9.1.3.6)

30

PRESSURE GAUGE TYPE

AUXILIARY FLUSH PLAN MATERIAL AUXILIARY FLUSH PLAN PIPING TYPE

31 32

REMARKS

PIPING ASSEMBLY

33

THREADED

NO

34

FLANGED

YES

35

UNIONS

YES

36

TUBE TYPE FITTINGS

37

SOCKET WELDED

38

NECK WELDED

NO

39 40 41 42 43 HEATING AND COOLING (6.1.17)

44 45

COOLING REQ'D

46

COOLING WATER PIPING PLAN

47

COOLING WATER PIPING

48

FITTINGS

49

COOLING WATER PIPING MATERIALS

50

COOLING WATER REQUIREMENTS:

51

BEARING HOUSING

gpm

52

HEAT EXCHANGER

gpm

53

TOTAL COOLING WATER

54

HEATING MEDIUM

55 56

gpm

OTHER HEATING PIPING

57 PIPING & APPURTENANCES

58 59

MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)

60

VENT

61

DRAIN

62

COOLING WATER

63

TAG ALL ORIFICES (7.5.2.4)

64

SOCKET WELD CONN ON SEAL GLAND (7.5.2.8)

65 66 67 68

N/A YES NO

CLIENT: PROJECT:

PLUSPETROL PERU CORPORATION S.A PISCO DIESEL BLENDING Title: Page:

NON PRESSURIZED DRAIN PUMP PBB-3315 Code:

Perú Corp. S.A.

Revision:

PPIS-548-HD-M-013

05 of 07

0

API 610 CENTRIFUGAL PUMP DATA SHEET PAINT / TESTS / OTHER REQUIREMENTS SURFACE PREPARATION AND PAINT

1 Note 2

MANUFACTURER'S STANDARD

3

OTHER (SEE BELOW)

4

SPECIFICATION NO.

TEST (NOTE 14) NO

SHOP INSPECTION (8.1.1)

YES

PERFORMANCE CURVE

Rev

& DATA APPROVAL PRIOR TO SHIPMENT.

AS PER "PPIS-548-RI-M-003" PARAGRAPH 6.6

5

TEST WITH SUBSTITUTE SEAL (8.3.3.2.b)

6

PUMP:

7

PUMP SURFACE PREPARATION

MATERIAL CERTIFICATION REQUIRED

8

PRIMER

9

FINISH COAT

CASING (6.12.1.8)

AS PER "PPIS-548-RI-M-003" PARAGRAPH 6.6

IMPELLER SHAFT OTHER

10

CASTING REPAIR WELD PROCEDURE APPR REQD (6.12.2.5)

BASEPLATE:

(6.12.3.1)

11

BASEPLATE SURFACE PREPARATION

INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)

12

PRIMER:

13

FINISH COAT

RADIOGRAPHY

14

DETAILS OF LIFTING DEVICES

LIQUID PENETRANT

(6.12.3.4.e)

MAG PARTICLE

15

ULTRASONIC

16

SHIPMENT: (8.4.1)

17

EXPORT BOXING REQUIRED

YES

MAG PARTICLE

18

OUTDOOR STORAGE MORE THAN 6 MONTHS

YES

RADIOGRAPHY

19

SPARE ROTOR ASSEMBLY PACKAGED FOR:

20

ROTOR STORAGE ORIENTATION (9.2.8.2)

HARDNESS TEST REQUIRED (8.2.2.7)

21

SHIPPING & STORAGE CONTAINER FOR VERT STORAGE (9.2.8.3)

ADDNL SUBSURFACE EXAMINATION (6.12.1.5) (8.2.1.3)

(NOTE 13)

INSPECTION REQUIRED FOR CASTINGS

EXPORT

LIQUID PENETRANT ULTRASONIC

22

FOR

23

N2 PURGE (9.2.8.4)

24

SPARE PARTS

METHOD

25

START-UP

YES

26

NORMAL MAINTENANCE

YES

PMI TESTING REQUIRED (8.2.2.8)

27 28

lb

WEIGHTS ITEM No

PUMP

DRIVER

COMPONENTS TO BE TESTED RESIDUAL UNBALANCE TEST (J.4.1.2)

GEAR

BASE

TOTAL

29

NOTIFICATION OF SUCCESSFUL SHOP PERFORMANCE TEST (8.1.1.c) (8.3.3.5)

30

BASEPLATE TEST (7.3.21)

31

HYDROSTATIC

32

HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2) OTHER PURCHASER REQUIREMENTS

33 34

COORDINATION MEETING REQUIRED (10.1.3)

35

MAXIMUM DISCHARGE PRESSURE TO INCLUDE

PERFORMANCE TEST YES

TEST IN COMPLIANCE WITH (8.3.3.2) TEST DATA POINTS TO (8.3.3.3)

36

MAX RELATIVE DENSITY

37

OPERATION TO TRIP SPEED

38

MAX DIA. IMPELLERS AND/OR NO OF STAGES

YES

TEST TOLERANCES TO (8.3.3.4) NPSH (8.3.4.3.1) (8.3.4.3.4) NPSH-1ST STG ONLY (8.3.4.3.2)

39

CONNECTION DESIGN APPROVAL (9.2.1.4)

NO

NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3)

40

TORSIONAL ANALYSIS / REPORT (6.9.2.10)

NO

TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)

41

PROGRESS REPORTS

YES

RETEST ON SEAL LEAKAGE (8.3.3.2.d)

42

OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5)

RETEST REQUIRED AFTER FINAL HEAD ADJ (8.3.3.7.b)

43

ADDITIONNAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1)

COMPLETE UNIT TEST (8.3.4.4.1)

44

SOUND LEVEL TEST (8.3.4.5)

45

LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3)

NO

CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)

46

MODAL ANALYSIS REQUIRED (9.3.9.2)

NO

LOCATION OF CLEANLINESS INSPECTION

47

DYNAMIC BALANCE ROTOR (6.9.4.4)

NO

NOZZLE LOAD TEST

48

INSTALLATION LIST IN PROPOSAL (10.2.3.l)

YES

CHECK FOR CO-PLANAR MOUNTING PAD SURFACES

49

VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3)

MECHANICAL RUN TEST UNTIL OIL TEMP STABLE

50

4 HR. MECH RUN AFTER OIL TEMP STABLE (8.3.4.2.1)

51

TRANSIENT TORSIONAL RESPONSE

(6.9.2.4)

52

BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)

NO

IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e)

NO

NO

53

CASING RETIREMENT THICKNESS DRAWING (10.3.2.3)

54

FLANGES RQD IN PLACE OF SKT WELD UNIONS (7.5.2.8)

55

INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3)

56

CONNECTION BOLTING (7.5.1.7)

57

CADMIUM PLATED BOLTS PROHIBITED

YES

58

VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.c)

YES

59

VENDOR SUBMIT TEST PROCEDURES (8.3.1.1)

YES

60

SUBMIT INSPECTION CHECK LIST (8.1.5)

YES

61

4 HR. MECH RUN TEST (8.3.4.2.2) BRG HSG RESONANCE TEST (8.3.4.7) STRUCTURAL RESONANCE TEST (9.3.9.2) REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST

YES

(9.2.7.5) AUXILIARY EQUIPMENT TEST (8.3.4.6) EQUIPMENT TO BE INCLUDED IN AUXILLIARY TESTS LOCATION OF AUXILIARY EQUIPENT TEST IMPACT TEST

(6.12.4.3)

PER EN 13445 PER ASME SECTION VIII

62 REMOVE CASING AFTER TEST

CLIENT: PROJECT:

PLUSPETROL PERU CORPORATION S.A PISCO DIESEL BLENDING Title: Page:

DATA SHEET FOR NON PRESSURIZED DRAIN PUMP PBB-3315 Code:

Perú Corp. S.A.

06 of 07

Revision:

PPIS-548-HD-M-013

0

API 610 CENTRIFUGAL PUMP DATA SHEET VERTICAL SUMP / CAN SPECIFICATIONS 1 Note VERTICAL TYPE (FIG 1.1) 2

Rev

VS4

REMARKS

3 4 5 VERTICAL PUMPS

6 7

VERTICAL PUMPS (CONT'D)

(+) UP

PUMP THRUST:

(-) DOWN

LINE SHAFT:

8

STATIC THRUST

lbf

lbf

LINE SHAFT DIAMETER

in.

9

AT MIN FLOW

lbf

lbf

TUBE DIAMETER

in.

10

AT RATED FLOW

lbf

lbf

11

AT MAX FLOW

lbf

lbf

12

MAX THRUST

lbf

lbf

13

SOLEPLATE REQUIRED

14

SOLEPLATE Length x Width

15

SOLEPLATE THICKNESS

16 17

ft

LINESHAFT CONNECTION

ft

X

in.



SUCTION STRAINER TYPE



LEVEL CONTROL

IMPELLER COLLETS ACCEPTABLE

MOUNTING FLANGE REQUIRED

HARDENED SLEEVES UNDER BEARINGS (9.3.10.5) RESONANCE TEST

COLUMN PIPE:

18

DIAMETER

in.

19

LENGTH

ft

20

NUMBER

21

SPACING

22

LINE SHAFT COUPLING:

STRUCTURAL ANALYSIS (9.3.5) DRIVER ALIGNMENT SCREWS

ft

SUCTION CAN SUCTION CAN

GUIDE BUSHINGS:

23

NUMBER

24

LINE SHAFT BEARING SPACING

THICKNESS

in. SEPARTATE MOUNTING PLATE (9.3.8.3.1)

26

PROVIDE SEPARATE SOLEPLATE (9.3.8.3.3)

27 BOWL HEAD CALCULATION REQUIRED

29

MATERIALS (additional)

30

SUCTION CAN / BARREL:

31

DISCHARGE HEAD :

32

BOWL SHAFT :

SHAFT ENCLOSING TUBE :

33

LINESHAFT :

DISCHARGE PIPE :

34

LINESHAFT HARDFACING :

PRESSURE RATING:

35

BELLMOUTH :

HEAD

36

BOWL BEARING :

CAST IRON

COLUMN PIPE

37

LINESHAFT BEARING :

CAST IRON

LINESHAFT SLEEVES :

BOWL



CARBON STEEL

38

BEARING RETAINER :

MAWP

SUMP / VESSEL ARRANGEMENT

39 SUMP DIMENSIONS :

40 41

SUMP DEPTH

L1

ft

42

SUMP STRUCTURAL COVER THICKNESS

L2

ft

43

FOUNDATION HEIGHT

L3

ft

44

GROUTING HEIGHT

L4

45

SUBMERGENCE REQUIRED

L5

46

SUMP TOP TO LOW LIQUID LEVEL

L6

47

GRADE TO 1ST STAGE IMPELLER

L7

By vendor

ft

48

PUMP LENGHT

L8

By vendor

ft

49

SUMP DIMENSIONS

ft By vendor

ft ft

ft

L9 X L10

50 51 52 53 VESSEL DIMENSIONS

54 55

VESSEL DIAMETER

M1

6

ft

56

BOOT DIMENSION (UNTIL TANGENT LINE)

M2

(NOTE 11)

ft

57

NOZZLE PROJECTION

M3

58

BOOT DIAMETER

M4

(NOTE 11)

ft

59

TOP OF DRUM TO LOW LIQUID LEVEL

M5

4.42

ft

60

NOZZLE TO 1ST STAGE IMPELLER

M6

By vendor

ft

61

SOLEPLATE NOZZLE DIMENSIONS

M7

2 (NOTE 4)

ft

62

PUMP SUBMERGENCE

M8

By vendor

ft

63

PUMP LENGTH

M9

By vendor

ft

66

in.

DRAIN PIPED TO SURFACE (9.3.13.5)

28

65

ft

DIAMETER

25

64

in.

LENGTH

2,5 (NOTE 4, 18) ft

HYDRO

CLIENT: PROJECT:

PLUSPETROL PERU CORPORATION S.A PISCO DIESEL BLENDING Title: Page:

DATA SHEET FOR NON PRESSURIZED DRAIN PUMP PBB-3315 Code:

Perú Corp. S.A.

PPIS-548-HD-M-013

07 of 07

Revision:

0

API-610 CENTRIFUGAL PUMP WELDING REQUIREMENTS AND NOTES PRESSURE VESSEL DESIGN CODE REFERENCES

1 Note 2

Rev

THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER

3

CASTING FACTORS USED IN DESIGN ( TABLE 4)

4

SOURCE OF MATERIAL PROPERTIES

YES

5 WELDING AND REPAIRS

6 7

THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 11 IF NO PURCHASER PREFERENCE IS STATED)

8

ALTERNATE WELDING CODES AND STANDARDS

9

WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD)

10

WELDER/OPERATOR QUALIFICATION

YES

11

WELDING PROCEDURE QUALIFICATION

YES

12

NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS

13

MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES

YES (IF REQUIRED)

14

POSTWELD HEAT TREATMENT

YES (IF REQUIRED)

15

POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS

NO DEFAULT PER TABLE 11

16 MATERIAL INSPECTION

17 18

THESE REFERENCES MUST BE LISTED BY THE PURCHASER

19

ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 14) (8.2.2.5) TYPE OF INSPECTION METHOD

20

RADIOGRAPHY

21

ULTRASONIC INSPECTION

22

MAGNETIC PARTICLE INSPECTION

23

LIQUID PENETRANT INSPECTION

24 25 26 27

REMARKS : 1

28 29

CHARACTERISTICS OF THE HYDRAULIC CIRCUIT: Size Facing Rating DISCHARGE

1.5"

RF

150

30

2

FLUID VAPOR PRESSURE TO BE CONFIRMED BY PLUSPETROL.

31

3

VISCOSITY: 1.69 - 5.34 cP.

32

4

TO BE CONFIRMED BY VENDOR.

33

5

PUMP VENDOR SHALL INDICATE THE NUMBER OF MAXIMUM ALLOWABLE STARS PER UNIT OF TIME.

34

6

COOLING WATER IS NOT AVAILABLE.

35

7

HYDRAULIC CIRCUIT DESIGN CONDITIONS: DESIGN PRESSURE: 100 PSIG, DESIGN TEMPERATURE: 136 °F.

36

8

DISCHARGE PRESSURE AT GROUND LEVEL

37

9

PUMP WILL BE MOUNTED ON OPEN DRAIN VESSEL VBA-3315

38

10

DELETED

39

11

OPEN DRAIN VESSEL VBA-3315 IS UNDERGROUND AND DOES NOT HAVE A BOOT

40

12

NPSHA IS CALCULATED CONSIDERING PUMP SUCTION IS LOCATED 1 ft ABOVE VESSEL BOTTOM

41

13

PACKING ACCORDING DOCUMENT "PPIS-548-RI-M-003" PARAGRAPH 4.8.

42

14

INSPECTION AND TEST PLAN ACTIVITIES ACCORDING DOCUMENT "PPIS-548-RI-M-003" PARAGRAPH 7. PARTICULAR TECHNICAL REQUIREMENT, SEE DOCUMENT "PPIS-548-RI-M-003" PARAGRAPH 6.

43

15

44

16

MOTOR SHALL BE ACCORDING TO DOCUMENT PCSE-100-ET-E-001 "L.V ELECTRIC MOTORS".

45

17

MOTOR SHALL BE SUITABLE FOR END OF CURVE OPERATION.

46

18

DISTANCE FROM GRADE TO VESSEL TOP WALL: 2 ft.

47

19

FOR MORE DETAIL SEE P&ID DOC. PPIS-548-PL-Y-014-1.

48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65

DEFAULT TO TABLE 15 FOR FABRICATIONS

YES FOR CASTINGS

Related Documents


More Documents from "Cruz Nel"

January 2021 1
Control De Existencia 1 1
January 2021 1
Novales
March 2021 0