Fuel Gas Treating Unit For Hpcl Rajasthan Refinery Limited (hrrl) & Rajasthan Refinery Project (rrp) At Pachpadra Tehsil, Barmer District, Rajasthan, India

  • Uploaded by: umeshchandra yadav
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Fuel Gas Treating Unit For Hpcl Rajasthan Refinery Limited (hrrl) & Rajasthan Refinery Project (rrp) At Pachpadra Tehsil, Barmer District, Rajasthan, India as PDF for free.

More details

  • Words: 9,416
  • Pages: 34
Loading documents preview...
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

EPCC -01 PACKAGE FOR CDU/VDU UNIT_HRRL BARMER, RAJASTHAN

2

3

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

992

Project Milestone

992

Schedule Milestone

992

MS1000

Project Start (Award of Work)

0

Project Start (Award of Work)

MS1025

Start Soil Investigation work

0

Start Soil Investigation work

MS1050

Kick off Meeting

0

Kick off Meeting

MS1100

P&ID -Preliminary

0

P&ID -Preliminary

MS1125

U/G Piping 1st MTO

0

U/G Piping 1st MTO

MS1120

P&ID - AFP

0

P&ID - AFP

MS1010

Award of Heater Package

0

Award of Heater Package

MS1035

0

Site Mobilization and Setting of Site office with posting of RCM

MS1135

Site Mobilization and Setting of Site office with posting of RCM UG Pipe 1st MTO Ordering Complete

0

UG Pipe 1st MTO Ordering Complete

MS1710

Plot Plan - AFP

0

Plot Plan - AFP

MS1150

Start of Piling Works

0

Start of Piling Works

MS1400

Start U/G Piping Work

0

MS1110

Ordering of Column and Desalter

0

Ordering of Column and Desalter

MS1175

30% Model Review Complete

0

30% Model Review Complete

MS1325

Place Order- Switchgears & Transformers

0

Place Order- Switchgears & Transformers

MS1720

AG Piping 1st MTO Ordering Complete

0

AG Piping 1st MTO Ordering Complete

MS1500

Start Heater Foundation Work

0

Start Heater Foundation Work

MS1200

P&ID - Issue for Hazop

0

P&ID - Issue for Hazop

Actual Work Remaining Work

Critical Remaining Work Milestone

Page 1 of 34

Start U/G Piping Work

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration

MS1905

Start Steel Str. Fabricati on Work

0

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Start Steel Str. Fabricati on Work

MS1250

HAZOP Review complete

0

HAZOP Review complete

MS1300

60% Model Review Complete

0

60% Model Review Complete

MS1700

Start Heater Field Erection Work

0

Start Heater Field Erection Work

MS1475

Start Issue A/G Piping Isometrics- AFC

0

MS1225

Plot PLan - AF D

0

MS1525

Start A/G Piping Prefabrication

0

Start A/G Piping Prefabrication

MS1375

P&ID - AFC ( For 90 % MR)

0

P&ID - AFC ( For 90 % MR)

MS1350

Plot Plan - AFC

0

MS1450

90% Model Review Complete

0

MS1915

Start Steel Str. Erection Work

0

MS1425

Completion of Foundation for CDU/VDU Column

0

MS1550

Start A/G Piping Erection

0

MS1885

Substn. Building Ready for Panel Erection

0

MS1635

Start DCS Installation in SRR Bldg. ( By Others )

0

Start DCS Installation in SRR Bldg. ( By Others )

MS1575

Completion Erection of CDU / VDU Column

0

Completion Erection of CDU / VDU Column

MS1020

Start Precommissioning flushing and blowing work

0

MS1895

Equipment Erection Completion

0

MS1625

Energization of Substation

0

MS1835

DCS Power On

0

DCS Power On

MS1775

Start Instrument Loop & Functoin Test

0

Start Instrument Loop & Functoin Test

-1 1

Actual Work Remaining Work

Critical Remaining Work Milestone

Page 2 of 34

2

3

4

5

6

7

8

Start Issue A/G Piping Isometrics- AFC Plot PLan - AF D

Plot Plan - AFC 90% Model Review Complete Start Steel Str. Erection Work Completion of Foundation for CDU/VDU Column Start A/G Piping Erection Substn. Building Ready for Panel Erection

Start Precommissioning flushing and blowing work Equipment Erection Completion Energization of Substation

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

MS1675

Heater Package Erection & Refractory Work Completion

0

MS1650

Completion of Motor Solo Run test

0

MS1725

Complete A/G Piping Er ection

0

MS1750

Completion of Piping Hydro-testing

0

MS1800

Completion of Piping Flushing, Blowing and ReinStatement

0

MS1825

Mechanical Completion

0

MS1810

Heater Dry Out Start

0

MS1875

Commissioning Completion

0

MS1925

Completion of 6 Months Post Commissioning Assistance and PGTR

0

2

3

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Heater Package Erection & Refractory Work Completion Completion of Motor Solo Run test Complete A/G Piping Er ection Completion of Piping Hydro-testing

Completion of Piping Flushing, Blowing and Rein Mechanical Completion Heater Dry Out Start Commissioning Completion

Interface: From Owner

782

Interface: From Owner Engineering

0

Engineering

OOE1000

CDU/VDU Column Loading Information for Civil Design

0

CDU/VDU Column Loading Information for Civil Design

OOE1010

Availability of Native Files ( P&ID, MFD, PFD, Equipment Data Sheet Etc.)

0

Availability of Native Files ( P&ID, MFD, PFD, Equipment Data Sheet Etc.)

Free Issue Material

Free Issue Material

61 0

Crude Distillation Column (CDU) from EIL/Owner (In Two Parts field welding at Site in vertical position by o

0

Vacuum Distillation Column (VDU) from EIL/Owner ( In Three Parts , field welding in vertical position at site

FIM1100

Crude Distillation Column (CDU) from EIL/Owner (In Two Parts field welding at Site in vertical position by others) Vacuum Distillation Column (VDU) from EIL/Owner ( In Three Parts , field welding in vertical position at site by FIM ( Substn ) : Detector, Hooters , Sirens etc.

0

FIM ( Substn ) : Detector, Hooters , Sirens etc.

FIM1275

FIM ( Field) : CCTV Etc.

0

FIM ( Field) : CCTV Etc.

FIM1265

FIM ( SRR) : Detector, Hooters, Sirects Etc.

0

FIM1000 FIM1255

Construction OOCO1000

Actual Work Remaining Work

FIM ( SRR) : Detector, Hooters, Sirects Etc. Construction

465 Handing Over of Site for Construction Work

Critical Remaining Work Milestone

0

Page 3 of 34

Handing Over of Site for Construction Work

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

OOCO1025 OOCO1035

Handing Over of land at site for setting up Project Office, Fabrication and Stoage Yard CDU & VDU COLUMN release for Piping Work

Precommissioning & Commissioning

Original Duration

Month -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Handing Over of land at site for setting up Project Office, Fabrication and Stoage Yard 0 CDU & VDU COLUMN release for Piping Work

0

Precommissioning & Commissioning

294

Availabiity of Raw Water , Plant water , Plant Air

A6670

Availabiity of Raw Water , Plant water , Plant Air

0

A6680

Availability of Cooling Water

0

A6710

Availabiity of Instrument Air

0

FIM1285

0

Availability of Incoming Power Supply for Substn Energization (66 Kv)

0

Availability of DCS, ESD, F&G PLC : FIM (Ready for loop check)

A6690

Availability of Incoming Power Supply for Substn Energization (66 Kv) Availability of DCS, ESD, F&G PLC : FIM (Ready for loop check) Avaiabiity of Nitrogen

A6320

Availability of HP, MP , LP Steam

0

Availability of HP, MP , LP Steam

A6720

Availability of DM Water

0

Availability of DM Water

A6740

Avaiability of Boiler Feed Water

0

Avaiability of Boiler Feed Water

A6730

Availability of Fuel Gas / Fuel Oil / Flushing Oil

0

Availability of Fuel Gas / Fuel Oil / Flushing Oil

A6340

Availability of Feed for Commissioning

0

Availability of Feed for Commissioning

A6330

Availability of Cooling Water Availabiity of Instrument Air

Avaiabiity of Nitrogen

0

Engineering

490

Engineering Process

263

Process

P&ID

263

P&ID

PID1

P&ID - Preliminary

14

PID13

P&ID - AFP

30

PID23

P&ID - AFP - For 60% Model Review ( incorporating S/R/P vendor data) P&ID - Issue for Hazop

21

PID4

Actual Work Remaining Work

Critical Remaining Work Milestone

24

Page 4 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

PID5 PID2

P&ID AF D ( With 60% Model Review Tag Resolution + Hazop Resolution ) P&ID - AFC ( For 90% Model Review)

Equipment Process Data Sheet PDS - LLI/ Critical Items

66

Equipment PDS - Heater

7

A5260

Equipment PDS - Air Cooler

7

A5270

Equipment PDS - Desalter

7

A5290

Equipment PDS - Ejector

10

Equipment PDS

Balance Equipment PDS

10

Equipment PDS - Column, Vessesl, Heat Exch., Rotating Equip, Pkg. Etc. (AFR Isssue) Instrument Process Data Sheet

84

Data Sheet for PSVs

20

EA190

Data Sheet for Analyzer System

65

EA200

Data Sheet for Balance Instruments

70

EA175

Data Sheet for Mass Flowmeters

70

EA185

Data Sheet for Control Valves

60

EA195

Data Sheet for In-line Instruments

70

A5320

Instrument Process Data Sheet (Balance)

70

Actual Work Remaining Work

6

7

Milestone

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Equipment Process Data Sheet PDS - LLI/ Critical Items

PDS - Vessel, Heat Exchangers, Pumps

Balance Equipment PDS

Instrument Process Data Sheet

Process Engineering

251

Critical Remaining Work

8

30

EA145

Process Engineering

5

10 30

A5300

4

20

A5280

A6420

3

14

34

PDS - Vessel, Heat Exchangers, Pu mps

2

Page 5 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

EP1260

Process List and Documents (Balance)

EP1270

Equipment List

11

EP1175

HAZOP

12

2

3

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

251

Civil

407

Civil Soil Investigation

74

A5360

Soil Investigation Plan

2

A5340

Soil Investigation Work

45

A5480

Soil Investigation report - Preliminary

14

A5350

Soil Investigation report - Final

20

Loading Data

132

A5410

Loading Data from Owner for CDU Column

A5420 A5470

Loading Data from Owner for VDU Column + Toyo - Piping Team Loading Data ( Others)

A5450

Loading Data for Substation Building

4

A5460

Loading Data for SRR Building

4

A5490

Loading Data for Tech Str. # 2

5

A5500

Loading Data for Tech Str. # 5

5

A5440

Loading Data from Heater Vendor

5

A5430

Loading Data from Air Cooler Vendor (Main Pipe Rack )

Pile and Foundation Location Plan - AFC Category Critical - Pile and Foundation Location Plan

Actual Work Remaining Work

Critical Remaining Work Milestone

Soil Investigation

Loading Data

2 26 130

14 Pile and Foundation Location Plan - AFC Category

205 149

Page 6 of 34

Critical - Pile and Foundation Location Plan

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

ENGPILE1000 CDU Column - Pile & Fdn. Location Plan

56

ENGPILE1010 Substation Bldg. - Pile & Fdn. Location Plan

50

ENGPILE1030 SRR Bldg. - Pile & Fdn. Location Plan

50

ENGPILE1060 VDU Collumn - Pile & Fdn. Location Plan

78

ENGPILE1040 Technological Structures 2 - Pile & Fdn. Location Plan

77

ENGPILE1050 Technological Structures 5 - Pile & Fdn. Location Plan

77

ENGPILE1020 Pipe Rack - Pile & Fdn. Location Plan

65

ENGPILE1070 Heaters - Pile & Fdn. Location Plan

72

ENGPILE1080 Technological Structures (1,3,4,6,7) - Pile & Fdn. Location Plan Balance - Pile and Foundation Location Plan A5540

Balance - Pile & Fdn. Location Plan

Foundation Drawings

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Balance - Pile and Foundation Location Plan

190 190

Foundation Drawings

365

Fdn Drgs for CDU Column (AFC)

40

A5570

Fdn Drgs for Main Pipe Rack (AFC)

58

A5580

Fdn Drgs for Heaters (AFC)

75

A5600

Fdn. Drawing for Substation Bldg.

45

A5610

Fdn. Drawing for SRR Bldg.

45

A5550

Fdn Drgs for VDU Column (AFC)

55

A5590

Fdn Drgs. for Tech. Structures 2 , 5

60

A5620

Fdn Drgs. for Remaining / Others / Misc. - Equipments

UG Composite

Remaining Work

3

77

A5370

Actual Work

2

200 85

Critical Remaining Work Milestone

Page 7 of 34

UG Composite

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A5380

Conceptual UG Composite Plan-IFR

40

A5390

U/G Composite Plans- IFC

45

Civil (Others) A5400

Other including Paving Works

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Civil (Others)

300 74

A5650

Sub-station Arch Drgs - 1st Issue

19

A5820

SRR Arch Drgs - 1st Issue

15

A5640

Sub-station Arch Drgs & details - AFC

55

A5660

SRR Arch Drgs & Details - AFC

45

A5630

Steel Str. 1st MTO

10

Architecture / Steel Structure

Piping

490

Piping EPIPE1299

Piping Engineering

EPIPE1230

Fire Fighting Drawing - 1st Issue

Plot Plan

490 20 Plot Plan

275

EPIPE1010

Plot Plan-Preliminary

20

EPIPE1000

Plot Plan - AFP

30

EPIPE1050

Plot Plan - AFD

21

EPIPE1150

Plot Plan - AFC

10

3 D Modelling

3 D Modelling

160

EPIPE1075

30 % Model Review

7

EPIPE1125

60 % Model Review

7

Remaining Work

3

300

Architecture / Steel Structure

Actual Work

2

Critical Remaining Work Milestone

Page 8 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

EPIPE1175

90 % Model Review

Piping MTO

EPIPE1035

AG Pipe - MTO (Preliminary)

10

EPIPE1100

AG Pipe - MTO 1

10

EPIPE1240

AG Pipe - MTO 2

6

EPIPE1250

AG Pipe - MTO 3 (Final)

6

Piping Isometric

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Piping MTO

7

Piping Isometric

222 55

EPIPE1270

AG Pipe Isometrics ( Pipe Rack, Priority T Section of Main Pipe Rack + Heater Rack) Isometric for VDU and CDU Column Piping

EPIPE1210

AG Pipe Isometrics - Tech Str. # 2

40

EPIPE1260

AG Pipe Isometrics - Tech Str. # 5

90

EPIPE1220

AG Pipe Isometrics ( Balance) - AFC

40

168 Electrical

297

Electrical A5850

Substation Eqp. Layout (Preliminary)

A5780

Single Line Diagram (AFP)

26

A5830

Electrical Load List (AFR)

45

A5810

Hazardous Area Classifi cation - AFR

40

A5790

Sub-station Eqpt Layout- AFP

60

A5860

Main Cable Route & Layout Plan: Overall & Key Plan - AFR

15

A5890

Main Cable Route & Layout Plan: Overall & Key Plan - AFC

20

Remaining Work

4

290 UG Pipe - MTO 1

Actual Work

3

7

EPIPE1025

EPIPE1200

2

Critical Remaining Work Milestone

5

Page 9 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A5840

Equip Sizing: Load Analysis/ Eqpt Sizing Calculations- AFR

21

A5870

Bulk Material Take Off - 1st

20

A5880

Bulk Material Take Off - final

15

EINST1000

Instrument Index- 1st Issue

EINST1010

SRR Bldg. Equipment Layout : Preliminary

EINST1050

I/O Point Summary/ Point Database

EINST1075 EINST1110

Input to Owner: DCS Hardware Finalization for DCS ( Indicative Only)) Instrument Layout - AFC

40

EINST1100

Bulk Material Take Off

21

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Instrumentation

50 5 30 Input to Owner:

0

DCS Hardware Finalization for DCS ( Indicative Only))

Procurement Engineering

387

Procurement Engineering Static

Static

147

Towers (CS, CS+Clad, Site Joint) Prepare & Issue MR

10

A2710

Receipt of Quotation

12

A2720

Technical Querry / TBE

15

A2730

Key Vendor Data Reci ept

40

A2740

Key Vendor Data Approval

60

Tower Internals_AXDB001

89

A2750

Prepare & Issue MR

10

A2760

Receipt of Quotation

14

Critical Remaining Work Milestone

Towers (CS, CS+Clad, Site Joint)

130

A2700

Remaining Work

3

283

Instrumentation

Actual Work

2

Page 10 of 34

Tower Internals_AXDB001

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A2770

Technical Querry / TBE

14

A2780

Key Vendor Data Reci ept

30

A2790

Key Vendor Data Approval

30

Heat Exchangers

4

5

6

7

Prepare & Issue MR

10

A6490

Receipt of Quotation

20

A6500

Technical Querry / TBE

20

A6510

Key Vendor Data Reci ept

20

A6520

Key Vendor Data Approval

55

SS Clad, Solid SS & Brass Exchanger_AXEA002 Prepare & Issue MR

10

A2860

Receipt of Quotation

20

A2870

Technical Querry / TBE

20

A2880

Key Vendor Data Reci ept

20

A2890

Key Vendor Data Approval

55

Helix heat exchanger_AXEA003 Prepare & Issue MR

10

A6590

Receipt of Quotation

21

A6600

Technical Querry / TBE

26

A6610

Key Vendor Data Reci ept

20

Critical Remaining Work Milestone

SS Clad, Solid SS & Brass Exchanger_AXEA002

Helix heat exchanger_AXEA003

137

A6580

Page 11 of 34

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

CS & LAS Heat Exchanger_AXEA001

135

A2850

8

Heat Exchangers

132

A6480

Remaining Work

3

137

CS & LAS Heat Exchanger_AXEA001

Actual Work

2

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A6620

Key Vendor Data Approval

125

A5680

Prepare & Issue MR

10

A5690

Receipt of Quotation

21

A5700

Technical Querry / TBE

21

A5710

Key Vendor Data Reci ept

45

A5720

Key Vendor Data Approval

45

Vessels Big Vessels (More than 2m Dia)

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Big Vessels (More than 2m Dia)

A2810

Receipt of Quotation

21

A2820

Technical Querry / TBE

26

A2830

Key Vendor Data Reci ept

30

A2840

Key Vendor Data Approval

60

Small Vessels ( Less than 2m Dia)

Air Cooler

142 10

Small Vessels (Less than 2m Dia)

142

A6530

Prepare & Issue MR

10

A6540

Receipt of Quotation

21

A6550

Technical Querry / TBE

26

A6560

Key Vendor Data Reci ept

30

A6570

Key Vendor Data Approval

60

HTAT _Fired Heaters ( Crud e Heater101- F-101A/B an d Vacuum Heater 101-F-102)

Milestone

5

Vessels

Prepare & Issue MR

Remaining Work

4

142

A2800

Critical Remaining Work

3

55

Air Cooler

Actual Work

2

HTAT _Fired Heaters ( Crude Heater101-F-101A/B and Vacuum Heater 101-F-102)

169

Page 12 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A5140

Prepare & Issue MR

5

A5150

Receipt of Quotation

10

A5160

Technical Querry / TBE

15

A5170

Key Vendor Data Reci ept

60

A5180

Key Vendor Data Approval

120

Rotating & Package

2

3

4

5

6

7

Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR 189 PDT + Quench Pump, RCO Prepare & Issue MR

10

A3560

Receipt of Quotation

21

A3570

Technical Querry / TBE

26

A3580

Key Vendor Data Reci ept

30

A3590

Key Vendor Data Approval

100

Centrifugal Pumps Remaining All (API) Prepare & Issue MR

10

A7300

Receipt of Quotation

21

A7310

Technical Querry / TBE

24

A7320

Key Vendor Data Reci ept

20

A7330

Key Vendor Data Approval

100

High speed Centrifugal Pumps (SUNDYNE) Prepare & Issue MR

10

A7350

Receipt of Quotation

21

Actual Work Remaining Work

Critical Remaining Work Milestone

High speed Centrifugal Pumps (SUNDYNE)

178

A7340

Page 13 of 34

Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR PDT + Quench Pump, RCO

Centrifugal Pumps Remaining All (API)

177

A7290

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Rotating & Package

236

A3550

8

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A7360

Technical Querry / TBE

25

A7370

Key Vendor Data Reci ept

21

A7380

Key Vendor Data Approval

100

Positive dispacement Pumps (Diaphragm) Prepare & Issue MR

10

A7600

Receipt of Quotation

21

A7610

Technical Querry / TBE

24

A7620

Key Vendor Data Reci ept

18

A7630

Key Vendor Data Approval

100

Prepare & Issue MR

10

A7550

Receipt of Quotation

21

A7560

Technical Querry / TBE

24

A7570

Key Vendor Data Reci ept

18

A7580

Key Vendor Data Approval

100

Prepare & Issue MR

10

A7500

Receipt of Quotation

20

A7510

Technical Querry / TBE

20

A7520

Key Vendor Data Reci ept

20

A7530

Key Vendor Data Approval

100

Remaining Work

Critical Remaining Work Milestone

5

6

7

Page 14 of 34

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Positive dispacement Pumps (Diaphragm)

Positive dispacement Pumps (Rotary)

Centrifugal Pumps (NON-API)

173

A7490

Actual Work

4

182

A7540

Centrifugal Pumps (NON-API)

3

177

A7590

Positive dispacement Pumps (Rotary)

2

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

Reciprocating Air Compressor Prepare & Issue MR

10

A7450

Receipt of Quotation

20

A7460

Technical Querry / TBE

20

A7470

Key Vendor Data Reci ept

30

A7480

Key Vendor Data Approval

100

Prepare & Issue MR

7

A7400

Receipt of Quotation

20

A7410

Technical Querry / TBE

20

A7420

Key Vendor Data Reci ept

30

A7430

Key Vendor Data Approval

100

Package

99

A5080

Prepare & Issue MR

5

A5090

Receipt of Quotation

10

A5100

Technical Querry / TBE

12

A5110

Key Vendor Data Reci ept

50

A5120

Key Vendor Data Approval

50

Ejector

Remaining Work

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Reciprocating Air Compressor

Purge Oil Mist System

Package

177

Desalter Package

Actual Work

4

169

A7390

A3100

3

173

A7440

Purge Oil Mist System

2

Desalter Package

Ejector

122 Prepare & Issue MR

Critical Remaining Work Milestone

10

Page 15 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A3110

Receipt of Quotation

15

A3120

Technical Querry / TBE

20

A3130

Key Vendor Data Reci ept

55

A3140

Key Vendor Data Approval

55

Others Prepare & Issue MR

10

A7660

Receipt of Quotation

10

A7670

Technical Querry / TBE

25

A7680

Key Vendor Data Reci ept

55

A7640

Key Vendor Data Approval

55

Fire Fighting Equipment / Clean Agent/ Others

4

5

6

7

Prepare & Issue MR

15

A3910

Receipt of Quotation

21

A3920

Technical Querry / TBE

20

A3930

Key Vendor Data Reci ept

30

A3940

Key Vendor Data Approval

60

HVAC Package Prepare & Issue MR

10

A3810

Receipt of Quotation

16

A3820

Technical Querry / TBE

25

A3830

Key Vendor Data Reci ept

40

Critical Remaining Work Milestone

Page 16 of 34

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Fire Fighting Equipment / Clean Agent/ Others

HVAC Package

191

A3800

8

Others

156

A3900

Remaining Work

3

130

A7650

Actual Work

2

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A3840

Key Vendor Data Approval

Piping

20

A3600

Prepare & Issue MR

5

A3610

Receipt of Quotation

10

A3620

TBE/CBE

25

A3650

Prepare & Issue MR

5

A3660

Receipt of Quotation

12

A3670

TBE/CBE

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Piping U/G Piping Material 1st

A/G Piping Material 1st

8

Electrical

Electrical

382

EHV & HV Switchgear (ICOG) Prepare & Issue MR

10

A3960

Receipt of Quotation

15

A3970

Technical Querry / TBE

14

A3980

Key Vendor Data Reci ept

25

A3990

Key Vendor Data Approval

50

Transformers (Power, Lighting, Distribuition) Prepare & Issue MR

10

A4060

Receipt of Quotation

15

A4070

Technical Querry / TBE

30

Milestone

Transformers (Power, Lighting, Distribuition)

188

A4050

Critical Remaining Work

EHV & HV Switchgear (ICOG)

132

A3950

Remaining Work

4

5

A/G Piping Material 1st

Actual Work

3

90 63

U/G Piping Material 1st

2

Page 17 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A4080

Key Vendor Data Reci ept

25

A4090

Key Vendor Data Approval

90

66 KV GIS (Gas Insulated S/gear) Eqpt Prepare & Issue MR

10

A4160

Receipt of Quotation

20

A4170

Technical Querry / TBE

20

A4180

Key Vendor Data Reci ept

25

A4190

Key Vendor Data Approval

90

Prepare & Issue MR

15

A4110

Receipt of Quotation

14

A4120

Technical Querry / TBE

14

A4130

Key Vendor Data Reci ept

25

A4140

Key Vendor Data Approval

90

EHV, HV & MV Cables

5

6

7

Prepare & Issue MR

25

A5740

Receipt of Quotation

21

A5750

Technical Querry / TBE

30

A5760

Key Vendor Data Reci ept

30

A5770

Key Vendor Data Approval

90

AC UPS

Milestone

Page 18 of 34

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

415V MV Switchgear

EHV, HV & MV Cables

AC UPS

222

Critical Remaining Work

8

66 KV GIS (Gas Insulated S/gear) Eqpt

222

A5730

Remaining Work

4

178

A4100

Actual Work

3

183

A4150

415V MV Switchgear

2

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A7040

Prepare & Issue MR

30

A7050

Receipt of Quotation

30

A7060

Technical Querry / TBE

30

A7070

Key Vendor Data Reci ept

30

A7080

Key Vendor Data Approval

90

AC & DC UPS and Battery Charger Prepare & Issue MR

90

A7150

Receipt of Quotation

90

A7160

Technical Querry / TBE

90

A7170

Key Vendor Data Reci ept

60

A7180

Key Vendor Data Approval

90

Prepare & Issue MR

30

A7200

Receipt of Quotation

30

A7210

Technical Querry / TBE

30

A7220

Key Vendor Data Reci ept

145

A7230

Key Vendor Data Approval

150

Instrumentation

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

AC & DC UPS and Battery Charger

Cathodic Protection System

Instrumentation

328

Control Valves

Control Valves

173

A4450

Prepare & Issue MR

25

A4460

Receipt of Quotation

14

Remaining Work

4

252

A7190

Actual Work

3

282

A7140

Cathodic Protection System

2

Critical Remaining Work Milestone

Page 19 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A4470

Technical Querry / TBE

14

A4480

Key Vendor Data Reci ept

25

A4490

Key Vendor Data Approval

75

On-Off/ Self Regulating Valves Prepare & Issue MR

25

A4510

Receipt of Quotation

14

A4520

Technical Querry / TBE

14

A4530

Key Vendor Data Reci ept

25

A4540

Key Vendor Data Approval

75

Prepare & Issue MR

25

A4560

Receipt of Quotation

14

A4570

Technical Querry / TBE

14

A4580

Key Vendor Data Reci ept

25

A4590

Key Vendor Data Approval

75

Analyzer System

5

6

7

Prepare & Issue MR

25

A4610

Receipt of Quotation

14

A4620

Technical Querry / TBE

14

A4630

Key Vendor Data Reci ept

25

A4640

Key Vendor Data Approval

90

Critical Remaining Work Milestone

Page 20 of 34

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

On-Off/ Self Regulating Valves

Pressure Safety Valves

Analyzer System

188

A4600

Remaining Work

4

173

A4550

Actual Work

3

173

A4500

Pressure Safety Valves

2

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

In-line Instruments Prepare & Issue MR

25

A4760

Receipt of Quotation

14

A4770

Technical Querry / TBE

14

A4780

Key Vendor Data Reci ept

25

A4790

Key Vendor Data Approval

75

Field Instruments

4

5

6

7

Prepare & Issue MR

25

A4810

Receipt of Quotation

14

A4820

Technical Querry / TBE

14

A4830

Key Vendor Data Reci ept

25

A4840

Key Vendor Data Approval

75

Instrument Cable Duct/Trays/ Fittings / Others Prepare & Issue MR

25

A4860

Receipt of Quotation

14

A4870

Technical Querry / TBE

14

A4880

Key Vendor Data Reci ept

25

A4890

Key Vendor Data Approval

50

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 In-line Instruments

Instrument Cable Duct/Trays/ Fittings / Others

148

A4850

8

Field Instruments

168

A4800

Procurement

591

Procurement HTAT Fired Heaters ( Crude Heater101-F-101A/B and Vacuum Heater 101-F -102)

Remaining Work

3

168

A4750

Actual Work

2

Critical Remaining Work Milestone

425

HTAT

425

Fired Heaters ( Crude Heater101-F-101A/B and Vacuum Heater 101-F-102)

Page 21 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

PM2801

Ordering / LOI ISsue

PM2803

Heaters Manufacturing & Delivery to Site

2

3

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

5 420 Static

424

Static Towers (CS, CS+Clad, Site Joint) PM2662

Ordering / LOI Issue

PM2672

Manufacturing & Delivery to Site

Tower Internals Ordering / LOI Issue

PM3032

Manufacturing & Delivery to Site

Heat Exchanger CS & LAS Heat Exchanger PM2782

Ordering / LOI ISsue

PM2822

Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 )

PM2792

Part 2 :Manufacturing & Delivery to Site (Remain Heat Exch.) SS Clad, Solid SS & Brass Exchanger PM3212

Ordering / LOI ISsue

PM3232

Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 )

PM3222

Part 2 :Manufacturing & Delivery to Site (Remain Heat Exch.) Helix heat exchanger PM3172

Ordering / LOI ISsue

PM3182

Manufacturing & Delivery to Site (Remain Heat Exch.)

Remaining Work

26 290 Tower Internals

264

PM3022

Actual Work

Towers (CS, CS+Clad, Site Joint)

316

Critical Remaining Work Milestone

14 250 408

Heat Exchanger

408

CS & LAS Heat Exchanger

20 240 305 SS Clad, Solid SS & Brass Exchanger

390 20 240 290

Helix heat exchanger

320 15 290

Page 22 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

Air Cooler

3

4

5

6

7

395

PM2922

Ordering / LOI ISsue

PM2942

Part 1. Manufacturing & Delivery to Site ( AIR COOLER 101-A-101 A~D , 101-A-102 A ~D) Part 2. Manufacturing & Delivery to Site (Remaining)

PM2932

2

Big Vessels (More than 2m Dia)

290 300 Big Vessels (More than 2m Dia)

384

Ordering / LOI Issue

PM2832

Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 )

250

PM2812

Part 2 :Manufacturing & Delivery to Site (Remain Vessel)

290

15

Small Vessels (Less than 2m Dia)

384

PM3132

Ordering / LOI Issue

PM3152

Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 )

250

PM3142

Part 2 :Manufacturing & Delivery to Site (Remain Vessel)

290

15

Rotating Equipments

329

Rotating Equipments

Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR PDT 329+ Quench Pump, RCO PM3272

Ordering / LOI ISsue

PM3282

Manufacturing & Delivery to Site

Centrifugal Pumps Remaining All (API) PM3002

Ordering / LOI ISsue

PM3012

Manufacturing & Delivery to Site

High speed Centrifugal Pumps (SUNDYNE) PM3292

Actual Work Remaining Work

Ordering / LOI ISsue

Critical Remaining Work Milestone

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Air Cooler

14

PM2802

Small Vessels ( Less than 2m Dia)

8

Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR PDT +

25 304 Centrifugal Pumps Remaining All (API)

273 15 258

High speed Centrifugal Pumps (SUNDYNE)

273 15

Page 23 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

PM3302

Manufacturing & Delivery to Site

Positive dispacement Pumps (Diaphragm) PM3252

Ordering / LOI ISsue

PM3262

Manufacturing & Delivery to Site

Positive dispacement Pumps (Rotary) PM3312

Ordering / LOI ISsue

PM3322

Manufacturing & Delivery to Site

Centrifugal Pumps (NON-API) Ordering / LOI ISsue

PM3342

Manufacturing & Delivery to Site

Reciprocating Air Compressor

4

5

6

7

Ordering / LOI ISsue

PM3362

Manufacturing & Delivery to Site

Purge Oil Mist System Ordering / LOI ISsue

PM3532

Manufacturing & Delivery to Site

15 250 Positive dispacement Pumps (Rotary)

265 20 245

Centrifugal Pumps (NON-API)

15 258 Reciprocating Air Compressor

15 255 Purge Oil Mist System

14 255 Package

355

Package Desalter Package

Desalter Package

313

PM3062

Ordering / LOI ISsue

PM3072

Manufacturing & Delivery to Site

Ejector

8 305 Ejector

317

Critical Remaining Work Milestone

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Positive dispacement Pumps (Diaphragm)

265

269

PM3522

8

258

270

PM3352

Remaining Work

3

273

PM3332

Actual Work

2

Page 24 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

PM2702

Ordering / LOI ISsue

PM2712

Manufacturing & Delivery to Site

Others Ordering / LOI ISsue

PM3552

Manufacturing & Delivery to Site

Fire Fighting Equipment / Clean Agent/ Others PM1622

Ordering / LOI ISsue

PM1632

Manufacturing & Delivery to Site

PM1662

Ordering / LOI ISsue

PM1672

Manufacturing Ex. Work

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

12 305 Others

20 255 Fire Fighting Equipment / Clean Agent/ Others

195 10 185

HVAC Package

10 195 Piping

213

Piping U/G Piping Material 1st

U/G Piping Material 1st

129

PM1702

Ordering / LOI ISsue

PM1712

Manufacturing & Delivery to Site (Part Delivery)

60

PM1722

Manufacturing & Delivery to Site (Balance)

50

A/G Piping Material 1st

6

A/G Piping Material 1st

162

PP135

Pipe/ Fittings/ Flanges / Valves A/G 1st- LOI

PP140

Pipe/ Fittings/ Flanges / Valves A/G 1st-Manufacturing & Delivery to Site (Part Delivery) Pipe/ Fittings/ Flanges / Valves A/G 1st-Manufacturing & Delivery to Site (Complete Delivery)

7 75 90 Electrical

381

Electrical

Remaining Work

4

205

HVAC Package

Actual Work

3

275

PM3542

PP150

2

Critical Remaining Work Milestone

Page 25 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

EHV & HV Switchgear (ICOG) Ordering / LOI ISsue

PM1932

Manufacturing & Delivery to Site

Transformers (Power, Lighting, Distribuition) PM1882

Ordering / LOI ISsue

PM1892

Manufacturing & Delivery to Site

66 KV GIS (Gas Insulated S/gear) Eqpt PM1842

Ordering / LOI ISsue

PM1852

Manufacturing & Delivery to Site

415V MV Switchgear

4

5

6

7

Ordering / LOI ISsue

PM1832

Manufacturing & Delivery to Site

EHV, HV & MV Cables Ordering / LOI ISsue

PM3382

Manufacturing & Delivery to Site (Progressivley Delivered)

AC UPS

Transformers (Power, Lighting, Distribuition)

198 18 180

66 KV GIS (Gas Insulated S/gear) Eqpt

218 18 200

415V MV Switchgear

20 200 EHV, HV & MV Cables

60 180 AC UPS

207

PM3412

Ordering / LOI ISsue

PM3422

Manufacturing & Delivery to Site

AC & DC UPS and Battery Charger PM3392

Ordering / LOI ISsue

PM3402

Manufacturing & Delivery to Site

Critical Remaining Work Milestone

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 EHV & HV Switchgear (ICOG)

200

187

PM3372

8

18

207

PM1822

Remaining Work

3

218

PM1922

Actual Work

2

60 200 AC & DC UPS and Battery Charger

207 60 200

Page 26 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

Cathodic Protection System Ordering / LOI ISsue

PM3482

Manufacturing & Delivery to Site

5

6

7

Control Valves

230

PM2162

Ordering / LOI ISsue

PM2172

Manufacturing & Delivery to Site

On-Off/ Self Regulating Valves Ordering / LOI ISsue

PM2152

Manufacturing & Delivery to Site

Pressure Safety Valves

Control Valves

20 210 On-Off/ Self Regulating Valves

20 210 Pressure Safety Valves

230

PM2122

Ordering / LOI ISsue

PM2132

Manufacturing & Delivery to Site

Analyzer System

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Cathodic Protection System

Instrumentation

230

PM2142

8

200 498

20 210 Analyzer System

370

PM2102

Ordering / LOI ISsue

PM2112

Manufacturing & Delivery to Site

In-line Instruments

20 350 In-line Instruments

265

PM2042

Ordering / LOI ISsue

PM2052

Manufacturing & Delivery to Site

Field Instruments

Remaining Work

4

30

Instrumentation

Actual Work

3

237

PM3472

PM2022

2

15 250 Field Instruments

265 Ordering / LOI ISsue

Critical Remaining Work Milestone

15

Page 27 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

PM2032

Manufacturing & Delivery to Site

Instrument Cable Duct/Trays/ Fittings / Other remain PM2062

Ordering / LOI ISsue (Final)

PM2072

Manufacturing and Delivery to Site (Final)

PM2002

Ordering / LOI ISsue

PM2012

Manufacturing and Delivery to Site

Temporary Construction Facility ( Overall)

Piling Work

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

250 Instrument Cable Duct/Trays/ Fittings / Other remain

200 10 120 20 120

Construction Temporary Facility

140

52

PILE1000

Piling Work Subcontract (LOI within 1week from EDC)

14

PILE1010

Piling Contractor Mobilization

45

Civil Works

78

A6010

Civil / Bldg. Work Subcontract(RFQ,TBE,CBE,Ordering)

26

A6020

Civil/Bldg. Contractor Mobilization

52

Mechanical and PIping Work Subcontractor

Subcontracting & Mobilization

Piping / Mech Work Subcontract (RFQ,TBE,CBE,Ordering)

30

CONPIP1025

Piping /Mech Work Subcontract Mobilization

30

E&I

Piling Work

Civil Works

Mechanical and PIping Work Subcontractor

60

CONPIP1000

Remaining Work

5

380

Subcontracting & Mobilization

Actual Work

4

140

Temporary Facility

A6230

3

782

Construction

A5920

2

E&I

105 Electrical Work Subcontract (RFQ,TBE,CBE,Ordering)

Critical Remaining Work Milestone

60

Page 28 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A6240

Electrical Work Subcontract Mobilization

Insulation A6290 A6300

Insulation, Painting & Fireproofing Work Subcontract (RFQ,TBE,CBE,Ordering) Insulation, Painting & Fireproofing Work Subcontract Mobilization

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Insulation

60 Steel Structure Fabrication Work

426

A5200

Shop Drawing

250

A5250

Shop Drawing Approv al

250

A5210

Shop Fabrication and Delivery to Site

330

26

AG Piping Fabrication Work

330

AG Piping Fabrication Work AG Piping : Shop Fabrication

330 Major Ar ea

670

Major Area Area 1. CDU Column

Area 1. CDU Column

555

PILE1030

CDU Column Fdn. Piling

30

A6040

CDU Column-Equip. Fdn.

140

A6050

Erection of CDU Column (in-situ circumferential seam included) AG Piping Erection

Area 2. Building

37 210 Area 2. Building

597

66 Kv SubStation Building (Building Size 110 M x 31 M ) PILE1040

Substation Building Fdn. Piling

CC500

1st Part Sub-station ( Excavation for Fdn , Pile treatment upto 1st Floor Slab Casting )

Remaining Work

5

60

RFQ/TBE/CBE / PO Issue

Actual Work

4

45

A5220

A6060

3

120

Steel Structure Fabrication Work

CONPIP1110

2

Critical Remaining Work Milestone

66 Kv SubStation Building (Building Size 110 M x 31 M )

590 35 170

Page 29 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

CC510 CC840

2nd Part Sub-station ( Excavation for Fdn , Pile treatment upto 1st Floor Slab Casting plus stair case upto top level ) Finishing Item

CC740

Sub-station Bldg Ready for Panel Installation

CC820

Substation Equipment Installation

186

CC760

Substation bldg HVAC installation work , Commissioning and Performance Test Substation Energization

205

CC830

Sattelite Rack Room Building (Building Size 35 M x 36 M )

35

CC580

SRR building Fdn

CC590

SRR building Columns/ Blast-proof Outer Walls

45

CC595

SRR building Roof Slab concreting complete

35

CC610

SRR building Masonry Work/ Plastering

60

CC615

SRR building Flooring/ Tiling complete

75

CC605

SRR bldg Door/ Window Fabrication

CC620

SRR bldg Door/ Window/ Carpentry work

50

CC635

SRR bldg False Flooring/ Ceiling

50

CC675

SRR bldg Final Paint/ Finish work/ Stone Clad ( if Sated in ITB) SRR bldg Ready for Instrument Eqpt /Panel Installation

80

Remaining Work

Critical Remaining Work Milestone

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Sub-station Bldg Ready for Panel Installation

Sattelite Rack Room Building (Building Size 35 M x 36 M )

597

SRR building Excavation for Fdn

Actual Work

6

26

CC570

CC655

5

0

45

SRR Building Equipments / Panels Installation ( Including DCS by Others) SRR bldg HVAC installation work , Commissioning and Performance Test

4

208

SRR Building Fdn. Piling

CC695

3

190

PILE1060

CC645

2

104

100

SRR bldg Ready for Instrument Eqpt /Panel Installation

0 150 180

Page 30 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

CC685

Roof Treatment

60

CC705

DCS Power On

0

Area 3. Piperack Main Pipe Rack Fdn. Piling Works

A6080

Main Piperack Fdn. Work

130

A6070

Main Pipe Rack : RCC Precast Works

155

A6090

Main Piperack RCC Precast Erection

210

A6460

AG Piping Erection

350

A6440

Steel Str. Erection Work

260

A6450

Equipment Erection ( AIR COOLER 101-A- 101 A~D , 101-A-102 A ~D) Area 4. VDU Column PILE1090

VDU Column Fdn. Piling

A6100

VDU Column-Equip. Fdn. + Superstructure (~ 5M Duration Considered) Erection of VDU Column (in-situ circumferential seam included) AG Pipe Erection

CONHTR1065

Area 5. Tech. Structures

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

DCS Power On Area 3. Piperack

85

26 Area 4. VDU Column

571 30 180 52 210

Area 5. Tech. Structures TS # 2

530

PILE1070

Tech. Structures (# 2) Fdn. Piling

45

A6120

Tech Str.-2 FDN. Work

60

A6360

Steel Str. Erection Work TS # 2

A6390

Equipment Erection

Remaining Work

4

611

TS # 2

Actual Work

3

475

PILE1050

CONHTR1055

2

Critical Remaining Work Milestone

170 90

Page 31 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A6400

Stair, Ladder, Platform, Grating, Handrail etc.

A6470

AG Pipe Erection

TS # 5

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

TS # 5

551

A6380

Tech Str.-5 FDN Work and Concrete Works

A6640

Steel Str. Erection Work TS # 5 (Part 1)

80

A6660

Equipment Erection - Part 1

80

A6630

AG Pipe Erection

300

A6410

Stair, Ladder, Platform, Grating, Handrail etc.

220

A6370

Steel Str. Erection Work TS # 5 (Part 2)

148

A6430

Equipment Erection - Part 2

130

TS Others (1,3,4,6,7)

50 170

TS Others (1,3,4,6,7)

562

PILE1120

Tech. Structures (# 1,3,4,6,7) Fdn. Piling

A7690

Tech Str.-(# 1,3,4,6,7) FDN Work.

100

A7700

Steel Str. Erection Work TS # (# 1,3,4,6,7)

150

A7710

Equipment Erection

100

A7720

AG Pipe Erection

200

A7730

Stair, Ladder, Platform, Grating, Handrail etc.

Area 6. Heaters Heater (CDU Heater : 2 Nos; VDU Heater : 1 Nos; Common Stack ~85 Meter)

Remaining Work

4

250

Tech. Structures (# 5) Fdn. Piling

Actual Work

3

90

PILE1080

PILE1100

2

Heater Fdn. Piling

Critical Remaining Work Milestone

70

90 535

Area 6. Heaters

535

Heater (CDU Heater : 2 Nos; VDU Heater : 1 Nos; Common S

80

Page 32 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

A6110

Heater-Equip. Fdn.

A6130

Heater Erection

460

A6180

Heater Piping Erection Work

245

Area 7. LPGTU Area

4

5

6

7

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Area 7. LPGTU Area

532

Piling Work

A7760

Fdn Work

200

A7780

Steel Str. Erection Work

150

A7800

Equipment Erection

A7790

AG Pipe Erection Work

60

Area 8. FGTU Area

90 200 Area 8. FGTU Area

449

A7810

Piling Work

A7820

Fdn Work

A7850

Equipment Erection

A7830

Steel Str. Erection Work

150

A7840

AG Pipe Erection Work

200

60 150

Area 9. Desalter

90

Area 9. Desalter

258

A7870

Civil Works FDN

A7880

Equipment Erection

A7890

AG Piping Work

Common Piping Work (Common)

Remaining Work

3

90

A7750

Actual Work

2

Critical Remaining Work Milestone

104 48 104 707

Common

657

Piping Work (Common)

Page 33 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC

EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT. FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA. (BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001) PROJECT SCHEDULE Activity ID

Activity Name

Original Duration -1 1

CONPIP1050

UG Pipe : Fabrication and Laying

250

CONPIP1100

AG Pipe: Hydrotest & Reinstatement

300

Electrical Work A6150

Electrical Tray & Cabling Work

270

A6220

Inline and Field Instrument Installation Work

230

Insulation , Painting & Fireproofing Execution of Insulation, Painting & Fireproofing Work

8

Month 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Electrical Work

Instrument Work

Insulation , Painting & Fireproofing

402

250

PRECOM1050 PRECOM1025

Loop Check & Function Check

149

PRECOM1150

Mechanical Run Test for Rotating Machines

70

PRECOM1075

Precom Works (Others; Boil out , Steam Blowing , Chemical loading etc. ) Mechanical Completion

75

Commissioning

Precommissioning Overall

45

0

Mechanical Completion

52

Commissioning

PRECOM1085

Heater Refractory Dryout

40

A6350

Commissioning

60

Post Commissioning Service & PGTR

Remaining Work

7

402

Flushing/Blowing and Reinstatement of Process and Utility Piping ( Initially using portable Compressor on HIRE) Motor Solo Run

Actual Work

6

268

Precommissioning Overall

A7900

5

338 Instrument Tray & Cabling Work

PRECOM1095

4

270

A7860

PRECOM1000

3

270

Instrument Work

A6310

2

6 Months Post Commissioning assistance Service and PGTR

Critical Remaining Work Milestone

158 158

Page 34 of 34

Date 01-Jun-19

Revision ISSUE FOR PROPOSAL

Checked UCY

Approved RC