Loading documents preview...
PDC DEEP DIVE – PRODUCTIVITY IMPROVEMENT
Shots per hour
Part Name : GEAR BOX HOUSING 40 35 30 25 20 15 10 5 0
1
30
Baseline
Optimize Machine Parameter
1
3
36
1
Robot sprayer Internal and Shots to be As per NADCA Optimization External spray increased to optimization meet NADCA
33
Achieved Output
Ideas 1. To increase the effectiveness of heat transfer at bottom/side core by modifying the internal cooling design in CFT.
2.Reduce heat check mark in high temp. spots by introducing loose pieces wherever required. NADCA STANDARD. NADCA Cycle time =26.90 + (0.0365 * Machine Locking Force in Tons) =26.90+(0.0365*2000) =100 sec 36 shots/Hour Considering 90 % Of NADCA Cycle time we should achieve 33 shots/Hour We Planning to achieve Cycle time by New Innovation and ideas In Future
Inference : We have improved 10 %from the baseline.
Kaizen No. & Date : 19.02.2019
KAIZEN IDEA - SHEET Category
P
Q
C
D
Kaizen Theme:
Kaizen Start : 23.01.2019
To Improve Productivty in Gear Box housing
Kaizen Finish : 19.02.2019
Problem / Present Status 1) Cycle time of auto sprayer is around 55sec.
Department
S
M
: HPDC
Team Members M.Gopi, Sivanesan, Raymond furdato, Srinath, Praveen, Aravind, Dharani Babu
Countermeasure/ After improvements 1. Machine Parameter Optimised.
Benefits 1) Productivity improved 30 nos to 33 nos.
2. Auto spray lubrication on both the dies at same time and program optimised according to the requirements.
2) Cycle time reduced 120 sec to 109 sec.
3. External Spray position modified for effectivness.
4) Auto spray and Die life increased
3) Auto spray is given in required area.
4. Die temp. attained to 180±30°c rapidly, by this activity at after spray condition.
Sep'18 40
Before
After
* This Kaizen is
30
30
Reversible If reversible updated in Process sheet
20 10
Ir-reversible
JH Check sheet
0
shots/Hour
Timer cooling given at 7 different spots of the die at less volume and pressure
Analysis Auto Sprayer Cycle time high
3) Ouptut per hour increased from 30 to 33 No's.
shots/Hour 32
Scope & Plan for Horizontal Deployment: S.No.
Item
Target Date
Responsibility
Status
1
Ladder Frame
March '19
M.Gopi
on Going
33
34
30
IF IT IS POKA YOKE WHAT TYPE & FUNCTION
30
Use forced extermal cooling at specific spots
QM check sheet
1) Less No.of interpolations in Auto sprayer.
Before spray temperature of the die is high Differnence of Die temp. at specific spots
Eqpt/ fixture Drawing
Results 2.Cycle time reduction from 55sec to 48sec.
More spray required to cool and lubricate the die
PM Check sheet
Timer cooling given at 5 locations of Die at High pressure and volume.
28 Sep'18
Feb'19
1. To increase the effectiveness of heat transfer at bottom/side core by modifying the New Ideas to reach 100 internal cooling design in CFT. % Nadca Cycle time 2.Reduce heat check mark in high temp. spots by introducing loose pieces wherever required.
Prevention
Shutdown
Detection
Warning Control
1