1

PROGRESS BAR CHART

KCC

GOSP1

MAC-KETTANEH JV

Milestone

mhr

Qty

0 1.5

3

10/05/2020 493612697.xlsx

2

3

4

5

6

7

8

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Jul-07 Aug-07 Sep-07

13185 8600

m3 m3

7491 800 1600 4000 1091

m3 m3 m3 m3 m3

EXCAVATION, FILL, CONCRETE WORKS Excavation - General Excavation - Lim. Section Foundations Concrete - Foundations Main Pipe Rack Foundations 31-Jul-07 Secondary Pipe Rack Foundations 31-Aug-07 Main Equipment Foundations 15-Nov-07 Other Equipments 15-Feb-08 Forms Steel Reinforcement Bolts & Inserts Bitumen Emulsion Epoxy Coating Grout: non-shrink, epoxy

5 11139 m2 70 652078 kg 0.125 72299 kg 0.6 12309 m2 0.6 2364 m2 0.16 56954 dm3

Paving Concrete - Paving Steel Wire Mesh Formation of Paving Polyethelene Sheet Sealent

1.27 0.04 0 0.08 0.6

3995 94421 4842 24211 9684

m3 kg m3 m2 m

0

6864

m3

Fill - Open

1000 460

Page 1 of 67

5000 1033

5000 1150

2185 1150

1150

1150

1150

1033

360 160

810 160 200 450

960 160 350 450

960 160 350 450

960 160 350 450

800

800

350 450

800

1204 70509 7818 592 114

1428 83566 9265 1331 256 2100

1428 83566 9265 1577 303 4381

1428 83566 9265 1577 303 4381

1190 69639 7721 1577 303 4381

1190 69639 7721 1315 252 4381

200

535 31337 3475

KCC

GOSP1

MAC-KETTANEH JV Fill - Between Foundations

0

11014

m3

Excavation - Trench Limited Section

1.1

495

m3

U/G Sewer & Drains (under Paved area 31-Dec-07 U/G Sewer & Drains (outside Paved are 31-Dec-08

1.5 1.5

assumed 1200 1200

m m

Cast Iron Gratings & Covers

0.15

1380

kg

0 0 0 0

5128 5074 1651 825

m3 m3 m3 m3

10/05/2020 493612697.xlsx

176

573

1044

1338

1411

1333

83

83

83

83

200

200

200

SEWERS & DRAINS

ROAD WORKS Formation - Subase Formation - Base Course Bituminous Base Course, 80mm Bituminous Wearing Course, 40mm

31-Dec-08

Page 2 of 67

1

STAFF LOADING SCHEDULE

KCC

GOSP1

MAC-KETTANEH JV

Milestone

mhr

Qty

Construction Manager Site Engineer General Foreman Foreman - excavation & Backfill Foreman - Forms Foreman - Steel Fixing Foreman - Pouring Foreman - Finishing Foreman - U/G services Foreman - Roads Gangleader

0.5 1 1

Labor - Excavation & polyethelene sheet Carpenter - Forms Carpenter - Bolts & Inserts Steel Fixer

mhr

Qty

2

3

4

5

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

1

MANPOWER DISTRIBUTION

10/05/2020 493612697.xlsx

0.5 1 1 1 1 1 0.5

Page 3 of 67

7

8

Jul-07 Aug-07 Sep-07

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

1

2

0.5 0.5 3

0.5 0.5 3

0.5 0.5 3

0.5 0.5 3

0.5 0.5 3

2

3

4

5

6

7

8

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

3 0 0 0

6

6 10 2 8

7 23 4 19

7 27 4 22

7 27 4 22

Jul-07 Aug-07 Sep-07

7 27 4 22

7 23 4 19

6 23 4 19

Mason: Pouring & sealent Pipe Fitter Paint applicator: epoxy & emulsion paint

0 0 0

10/05/2020 493612697.xlsx

4 0 0

9 0 2

12 0 4

14 0 4

14 1 4

12 1 4

12 1 4

1386320 2203451

3 690 13.3% 293434 Monthly Manhour 1097

31 7934 12610

64 16513 26247

77 20038 31849

80 20670 32854

81 20970 33331

70 18133 28821

68 17769 28243

1097

13707

39954

71803

104657

137988

166808

195051

1964244

Cumulative manhour No. of Labor 14.9% -239207

4 978

48 11241

99 23397

120 28392

124 29287

126 29712

109 25692

107 25177

Cumulative manhour, BOQ rev.2 No. of Labor, BOQ rev.2

978

12219

35616

64008

93295

123008

148700

173876

4

42

88

107

111

112

97

95

1

2

3

4

5

6

7

8

TOTAL

EQUIPMENT LOADING SCHEDULE

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Excavator Dump Truck Forms Mobile Crane Water Tanker

KCC

GOSP1

MAC-KETTANEH JV

U U cycle, days

6

1.49

0.5 1

m2

Shovel Bobcat

Page 4 of 67

Jul-07 Aug-07 Sep-07

0.5 1.5

0.5 1.5

0.5 1.5

0.5 1

0.5 1

0.5 1

0.2 0.5

124 0.5

278 0.5 0.5

329 0.5 0.5

329 0.5 0.5

329 0.5 0.5

275 0.5 0.5

275 0.5 0.5

0.25 0.5

0.25 0.5

0.25 1

0.5 1

0.5 1

0.5 1

0.5 1

MAC-KETTANEH JV

KCC

GOSP1

Roller Compactor

10/05/2020 493612697.xlsx

0.25

Paver Grader

Page 5 of 67

0.25

0.25

0.5

0.5

0.5

0.5

9

10

11

KCC

GOSP1

MAC-KETTANEH JV 12

13

14

15

16

10/05/2020 493612697.xlsx

17

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

18

19

20

21

22

23

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

324

725

425

400

175

116

625 100

125 300

400

175

116

1078 63110 6997 1315 252 4381

632 36995 4102 1191 229 4381

595 34819 3861 698 134 4381

260 15233 1689 657 126 4381

172 10098 1120 288 55 4381

200

440

600

24

191 37 4381

4381

4381

2281

200 4727 440 1212

400 9454 440 2424 485

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 440 2424 1050

900

1000

1200

1100

1100

964

Page 6 of 67

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 242 2424 1050

195 4609 1182 799

1255

1139

83

83

200

200 200

KCC

GOSP1

MAC-KETTANEH JV 956

760

490

339

143

200 200

200

200

200

200

200

300

300

10/05/2020 493612697.xlsx

57

300

280

400

1400 400

Page 7 of 67

1400 1400

1400 1400

528 1400 451

528 600 225

600 300

300

9

10

11

12

13

14

15

16

0.5 1 1 1 2 1 1

0.5 0.5 3

9

18

19

20

21

22

23

0.5 1 1 1 2 1 1 1 0.5 0.5 3

0.5 1 1 1 2

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 0.5 3

0.5 1 1 1 2 1 1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 2

1 1 0.5 0.5 2

10

11

12

13

14

15

16

17

18

19

20

21

22

23

0 12 2 10

0 11 2 9

0 5 1 4

0 3 1 3

1 0 0 1

1 0 0 1

1 0 0 1

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

0.5 1 1 1 2 1 1 1 0.5 0.5 3

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

2 21 3 17

10/05/2020 493612697.xlsx

17

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

0.5 1 1 1 2 1 1

KCC

GOSP1

MAC-KETTANEH JV

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1 0 0 1

Page 8 of 67

1 0 0 1

1 0 0 1

1 0 0 1

1 0 0 1

1 0 0 1

0 0 0 1

KCC

GOSP1

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

11 1 4

8 2 3

7 2 2

5 1 2

5 1 1

6 1 1

7 1 0

7 0 0

6 0 0

4 0 0

4 0 0

4 0 0

4 0 0

4 0 0

3 0 0

59 15376 24438

38 9781 15546

34 8894 14137

18 4575 7271

15 3834 6094

10 2553 4058

11 2756 4381

9 2456 3904

8 2117 3365

7 1710 2718

7 1710 2718

7 1710 2718

7 1710 2718

7 1710 2718

4 1006 1599

0 0 0

219489

235036

249173

256444

262537

266596

270976

274880

278245

280963

283681

286399

289117

291835

293434

293434

92 21785

59 13859

53 12602

27 6482

23 5432

15 3618

17 3905

15 3480

13 3000

10 2423

10 2423

10 2423

10 2423

10 2423

6 1425

0 0

195662

209520

222122

228604

234036

237654

241559

245039

248038

250461

252884

255307

257730

260153

261579

261579

82

52

48

24

20

14

15

13

11

9

9

9

9

9

5

0

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

0.2 0.5

0.2 0.5

249 0.5 0.5

146 0.4 0.4

137 0.4 0.4

60 0.25 0.25

40 0.25 0.25

0.5 1

0.5 1

0.5 1

0.5 1

0.5 1

0.5 1

0.5 1

0.5 1

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

0.5 1

Page 9 of 67

0.5 1

0.25 0.5

0.25 0.5

0.25 0.5

0.25 0.5

0.25 0.5

0.5

0.5

0.5

KCC

GOSP1

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.25

0.25

0.25

0.25

0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25

Page 10 of 67

GOSP 3

MAC-KETTANEH JV

1

PROGRESS BAR CHART

Milestone

mhr

Qty

0 1.5

3

KCC 2

3

4

5

6

7

8

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Jul-07 Aug-07 Sep-07

13185 8600

m3 m3

7491 800 1600 4000 1091

m3 m3 m3 m3 m3

EXCAVATION, FILL, CONCRETE WORKS Excavation - General Excavation - Lim. Section Foundations Concrete - Foundations Main Pipe Rack Foundations 31-Aug-07 Secondary Pipe Rack Foundations 31-Sep-07 Main Equipment Foundations 15-Dec-07 Other Equipments 15-Mar-08 Forms Steel Reinforcement Bolts & Inserts Bitumen Emulsion Epoxy Coating Grout: non-shrink, epoxy

5 11139 m2 70 652078 kg 0.125 72299 kg 0.6 12309 m2 0.6 2364 m2 0.16 56954 dm3

Paving Concrete - Paving Steel Wire Mesh Formation of Paving Polyethelene Sheet Sealent

1.27 0.04 0 0.08 0.6

3995 94421 4842 24211 9684

m3 kg m3 m2 m

0

6864

m3

Fill - Open

Page 11 of 67

1000 460

5000 1033

5000 1150

2185 1150

1150

1150

1150

360 160

810 160 200 450

960 160 350 450

960 160 350 450

960 160 350 450

800

1204 70509 7818 592 114

1428 83566 9265 1331 256 2100

1428 83566 9265 1577 303 4381

1428 83566 9265 1577 303 4381

1190 69639 7721 1577 303 4381

200

535 31337 3475

350 450

GOSP 3

MAC-KETTANEH JV Fill - Between Foundations

0

11014

m3

Excavation - Trench Limited Section

1.1

495

m3

U/G Sewer & Drains (under Paved area 31-Dec-07 U/G Sewer & Drains (outside Paved are 31-Dec-08

1.5 1.5

assumed 1200 1200

m m

Cast Iron Gratings & Covers

0.15

1380

kg

0 0 0 0

5128 5074 1651 825

m3 m3 m3 m3

KCC 176

573

1044

1338

1411

83

83

83

200

200

SEWERS & DRAINS

ROAD WORKS Formation - Subase Formation - Base Course Bituminous Base Course, 80mm Bituminous Wearing Course, 40mm

31-Dec-08

Page 12 of 67

GOSP 3

MAC-KETTANEH JV

1

STAFF LOADING SCHEDULE

Milestone

mhr

Qty

2

0.5 1 1

1 mhr

Qty

3

4

5

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Construction Manager Site Engineer General Foreman Foreman - excavation & Backfill Foreman - Forms Foreman - Steel Fixing Foreman - Pouring Foreman - Finishing Foreman - U/G services Foreman - Roads Gangleader

MANPOWER DISTRIBUTION

KCC

0.5 1 1 1 1 1 0.5

Page 13 of 67

Jul-07 Aug-07 Sep-07

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 0.5 3

0.5 0.5 3

0.5 0.5 3

6

7

8

1

2

3

2

3

4

5

6 10 2 8

8

0.5 1 1 1 2 1 1 0.5 0.5 3

3 0 0 0

7

0.5 1 1 1 2 1 1

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Labor - Excavation & polyethelene sheet Carpenter - Forms Carpenter - Bolts & Inserts Steel Fixer

6

7 23 4 19

7 27 4 22

Jul-07 Aug-07 Sep-07

7 27 4 22

7 27 4 22

7 23 4 19

GOSP 3

MAC-KETTANEH JV

KCC

Mason: Pouring & sealent Pipe Fitter Paint applicator: epoxy & emulsion paint

0 0 0

4 0 0

9 0 2

12 0 4

14 0 4

14 1 4

12 1 4

TOTAL

3

31

64

77

80

81

70

2

3

4

5

6

7

8

1

EQUIPMENT LOADING SCHEDULE

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Excavator Dump Truck Forms Mobile Crane Water Tanker

U U cycle, days

6

1.49

m2

Shovel Bobcat Roller Compactor Paver Grader

Page 14 of 67

0.5 1

Jul-07 Aug-07 Sep-07

0.5 1.5

0.5 1.5

0.5 1.5

0.5 1

0.5 1

0.5 1

124 0.5

278 0.5 0.5

329 0.5 0.5

329 0.5 0.5

329 0.5 0.5

275 0.5 0.5

0.25 0.5 0.25

0.25 1 0.25

0.25 1 0.25

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

GOSP 3

MAC-KETTANEH JV 9

10

11

12

13

14

15

16

17

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

1033

324

800

725

425

400

175

116

800

625 100

125 300

400

175

116

1078 63110 6997 1315 252 4381

632 36995 4102 1191 229 4381

595 34819 3861 698 134 4381

260 15233 1689 657 126 4381

172 10098 1120 288 55 4381

1190 69639 7721 1315 252 4381

200

440

600

KCC 18

19

20

21

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

191 37 4381

4381

4381

2281

200 4727 440 1212

400 9454 440 2424 485

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 440 2424 1050

900

1000

1200

1100

1100

964

Page 15 of 67

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 440 2424 1050

400 9454 242 2424 1050

195 4609 1182 799

GOSP 3

MAC-KETTANEH JV 1333

1255

1139

83

83

83

200

200

200 200

956

760

490

339

143

200 200

200

200

200

200

200

300

300

KCC

57

300

280

400

1400 400

Page 16 of 67

1400 1400

1400 1400

528 1400 451

528 600 225

600 300

300

GOSP 3

MAC-KETTANEH JV

9

10

11

12

13

14

15

16

17

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 1 1 1 2 1 1

0.5 0.5 3

0.5 0.5 3

9

10

2 21 3 17

18

19

20

21

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

0.5 1 1 1 2 1 1 1 0.5 0.5 3

0.5 1 1 1 2 1 1 1 0.5 0.5 3

0.5 1 1 1 2

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 1 1 1 1

0.5 0.5 3

0.5 1 1 1 2 1 1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 3

1 1 0.5 0.5 2

1 1 0.5 0.5 2

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

6 23 4 19

KCC

0 12 2 10

0 11 2 9

0 5 1 4

0 3 1 3

1 0 0 1

1 0 0 1

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1 0 0 1

Page 17 of 67

1 0 0 1

1 0 0 1

1 0 0 1

1 0 0 1

1 0 0 1

1 0 0 1

0 0 0 1

GOSP 3

MAC-KETTANEH JV

KCC

12 1 4

11 1 4

8 2 3

7 2 2

5 1 2

5 1 1

6 1 1

7 1 0

7 0 0

6 0 0

4 0 0

4 0 0

4 0 0

4 0 0

4 0 0

3 0 0

68

59

38

34

18

15

10

11

9

8

7

7

7

7

7

4

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

0.2 0.5

0.2 0.5

0.2 0.5

275 0.5 0.5

249 0.5 0.5

146 0.4 0.4

137 0.4 0.4

60 0.25 0.25

40 0.25 0.25

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.5 1 0.5

0.25 0.5 0.25

0.25 0.5 0.25

0.25 0.5 0.25

0.25 0.5 0.25

0.25 0.5 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25

Page 18 of 67

1

PROGRESS BAR CHART

KCC

INLET / OUTLET

MAC-KETTANEH JV Milestone

mhr

Qty

0 1.5

3

2

10/05/2020 493612697.xlsx

3

4

5

6

7

8

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Jul-07 Aug-07 Sep-07

14202 6880

m3 m3

2202 460

3964 2000 1964

m3 m3 m3

30-Sep-08 EXCAVATION, FILL, CONCRETE WORKS Excavation - General Excavation - Lim. Section Foundations Concrete - Foundations Pipe Rack Foundations Other Foundations

Forms Steel Reinforcement Bolts & Inserts Bitumen Emulsion Epoxy Coating Grout: non-shrink, epoxy

5 8545 m2 70 344159 kg 0.125 32379 kg 0.6 8708 m2 0.6 2398 m2 0.16 9314 dm3

Paving Concrete - Paving Steel Wire Mesh Formation of Paving Polyethelene Sheet Sealent

1.27 0.04 0 0.08 0.6

3488 82440 4227 21139 8456

m3 kg m3 m2 m

0

6470

m3

Fill - Open

Page 19 of 67

2000

5000

5000

1000

1000

550 300 250

550 300 250

1186 47752 4493

1186 47752 4493 1208 333

INLET / OUTLET

MAC-KETTANEH JV Fill - Between Foundations

0

0

m3

Excavation - Trench Limited Section

1.1

622

m3

U/G Sewer & Drains (under Paved area) U/G Sewer & Drains (outside Paved area)

1.5 1.5

0 0

m m

Cast Iron Gratings & Covers

0.15

360

kg

0 0 0 0

6463 6395 2081 1040

m3 m3 m3 m3

SEWERS & DRAINS

ROAD WORKS Formation - Subase Formation - Base Course Bituminous Base Course, 80mm Bituminous Wearing Course, 40mm

30-Sep-08

Page 20 of 67

KCC 10/05/2020 493612697.xlsx

1

STAFF LOADING SCHEDULE

KCC

INLET / OUTLET

MAC-KETTANEH JV

Milestone

mhr

Qty

1

1

Labor - Excavation & polyethelene sheet

mhr

Qty

3

4

5

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Construction Manager Section Manager Sen. Project Engineer Site Engineer General Foreman Foreman - excavation & Backfill Foreman - Forms Foreman - Steel Fixing Foreman - Pouring Foreman - Finishing Foreman - U/G services Foreman - Roads Gangleader

MANPOWER DISTRIBUTION

2

10/05/2020 493612697.xlsx

2

1

1 1

1

Page 21 of 67

0

7

8

Jul-07 Aug-07 Sep-07

1

1 1 1 1

1 1 1 1 1 1 0.5

1 1 1 1 2 1 1

1 1 1 1 2 1 1

1

0.5 0.5 2

0.5 0.5 2

0.5 0.5 2

0.5 0.5 2

0.5 0.5 2

3

4

5

6

7

8

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

0

6

0

0

0

Jul-07 Aug-07 Sep-07

3

6

6

KCC

INLET / OUTLET

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

Carpenter - Forms Carpenter - Bolts & Inserts Steel Fixer Mason: Pouring & sealent Pipe Fitter Paint applicator: epoxy & emulsion paint

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

23 2 13 6 0 0

23 2 13 6 0 4

TOTAL

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

3 690 1097

50 12982 20634

53 13907 22104

0

0

0

0

0

1097

21731

43835

0 0

0 0

0 0

0 0

0 0

4 978

78 18394

83 19704

0

0

0

0

0

978

19372

39076

0

0

0

0

0

4

69

74

1

2

3

4

5

6

7

8

1386320 2203451

1964244

192145 Monthly Manhour

8.7%

Cumulative manhour No. of Labor 8.7% -239207

Cumulative manhour, BOQ rev.2 No. of Labor, BOQ rev.2

EQUIPMENT LOADING SCHEDULE

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Excavator Dump Truck Forms Mobile Crane Water Tanker

U U cycle in days

6

2.16

0.5 1

0.5 1.5

0.5 1.5

Jul-07 Aug-07 Sep-07

0.5 1.5

m2

Shovel Bobcat Roller Compactor

0.25 0.25

Page 22 of 67

0.25 0.25

0.25 0.25

0.25 0.5 0.25

0.25 0.5 0.5

0.5 1

0.5 1

274 0.5 0.5

274 0.5 0.5

0.25 0.5 0.5

0.25 0.5 0.5

INLET / OUTLET

MAC-KETTANEH JV Paver Grader

? ?

Page 23 of 67

KCC 10/05/2020 493612697.xlsx

9

10

11

12

13

14

15

16

17

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

1000

1000

1000

1000

420

550 300 250

550 300 250

550 300 250

550 300 250

450 200 250

214

1186 47752 4493 1208 333

1186 47752 4493 1208 333

1186 47752 4493 1208 333 1300

1186 47752 4493 1208 333 1400

970 39070 3676 1208 333 1500

461 18580 1748 989 272 1500

470 129 1500

1500

614

525 12409 636 3182

525 12409 636 3182

525 12409 636 3182 2000

525 12409 636 3182 2000

525 12409 610 3182 2000

525 12409 436 3182 2000

338 7989

1100

1200

1200

1100

970

636

900

KCC

INLET / OUTLET

MAC-KETTANEH JV

18

10/05/2020 493612697.xlsx

19

20

21

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

214

2048 456

Page 24 of 67

104

104

KCC

INLET / OUTLET

MAC-KETTANEH JV

104

104

104

104

75

75

75

75

60

900

1700 900

1700 1700

1500 1700

663 1700 481

Page 25 of 67

395 800 240

10/05/2020 493612697.xlsx

800 400

400

9

10

11

12

13

14

15

16

17

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

1 1 1 1 2 1 1

1 1 1 1 2 1 1

0.5 0.5 2

0.5 0.5 2

1 1 1 1 2 1 1 1 0.5 0.5 2

9

10

11

1 1 1 1 2 1 1 1 0.5 0.5 2

1 1 1 1 2 1 1 1 0.5 0.5 2

1 1 1 1 1 1 1 1 0.5 0.5 2

12

13

14

1 1 1 1 1

6

7

7

4

1

18

10/05/2020 493612697.xlsx

19

20

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 0.5 0.5 2

1 0.5 0.5 2

1 0.5 0.5 2

1 0.5 0.5 2

1 0.5 0.5 2

1 0.5 0.5 2

15

16

17

18

19

20

1

1

21

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1 1 1 1

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

6

KCC

INLET / OUTLET

MAC-KETTANEH JV

21

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1

Page 26 of 67

0

0

0

KCC

INLET / OUTLET

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

23 2 13 6 0 4

23 2 13 6 0 4

25 2 15 10 0 4

25 2 15 10 0 4

21 2 12 13 0 4

11 1 7 11 0 3

3 0 2 8 0 1

3 0 2 8 0 0

2 0 1 3 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

53 13907 22104

54 14021 22285

63 16313 25929

63 16329 25954

56 14599 23204

34 8874 14104

15 4009 6373

14 3536 5620

7 1723 2738

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

65939

88224

114152

140106

163310

177414

183787

189406

192145

192145

192145

192145

192145

192145

192145

192145

83 19704

84 19866

98 23114

98 23136

88 20685

53 12573

24 5681

21 5010

10 2441

0 0

0 0

0 0

0 0

0 0

0 0

0 0

58780

78646

101760

124896

145581

158154

163835

168844

171285

171285

171285

171285

171285

171285

171285

171285

74

75

87

87

78

47

21

19

9

0

0

0

0

0

0

0

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

0.5 1

0.5 1

0.5 1

0.5 1

0.2 1

1

1

1

1

1

274 0.5 0.5

274 0.5 0.5

274 0.5 0.5

274 0.5 0.5

224 0.5 0.5

106 0.3 0.5

0.5

0.5

0.5

0.5

0.3

0.25 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.5 0.5 0.5

0.25 0.25 0.25

Page 27 of 67

0.25

KCC

INLET / OUTLET

MAC-KETTANEH JV 0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

0.25 0.25

Page 28 of 67

10/05/2020 493612697.xlsx

0.1 0.1

1

PROGRESS BAR CHART

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV Milestone

mhr

Qty

0 1.5

3

2

10/05/2020 493612697.xlsx

3

4

5

6

7

8

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Jul-07 Aug-07 Sep-07

307032 80983

m3 m3

25000 6066

3693 2569 899 225

m3 m3 m3 m3

31-Oct-08 EXCAVATION, FILL, CONCRETE WORKS Excavation - General Excavation - Lim. Section Foundations Concrete - Foundations Foundations Ditches Slabs for pit covering

Forms Steel Reinforcement Bolts & Inserts Bitumen Emulsion Epoxy Coating Grout: non-shrink, epoxy Paving Concrete - Paving Steel Wire Mesh Formation of Paving Polyethelene Sheet Sealent Fill - Open

5 18348 m2 70 322179 kg 0.125 582 kg 0.6 5750 m2 0.6 2787 m2 0.16 2754 dm3

1.27 0.04 0

0 0 0

0.6

0

m3 kg m3 m2 m

0

0

m3

8000

15000 2110

23000 3956

23000 6066

25000 6594

25000 6594

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV Fill - Between Foundations

0

Fill - tank bunds & evaporation ponds Surfacing Material - Marl Cap Geotextile Sheet - S&P Polyethelene Sheet HDPE liner Crushed Stone

0

10/05/2020 493612697.xlsx

m3

0 30436 m3 0 173181.9 m3 0.2 23397 m2 0.08 2958 m2 0.02 152000 m2 2 2558 m3

6000

8000

12000

12000

1000 12000

1364 511

2273 851

3637 1361

3637 1361

2500 12000 1742 220 11320

3637 1361

SEWERS & DRAINS Excavation - Trench Limited Section Sand Fill - Trench

1.1 1

44371 m3 16611 m3 assumed 1.5 336 m 1.5 336 m 1.5 1330 m 2 299 m 0.15 12268 kg

U/G Sewer & Drains (under Paved area) U/G Sewer & Drains (outside Paved area) PVC pipe 6" PVC pipe 8" Cast Iron Gratings & Covers ROAD WORKS Formation - Subase Formation - Base Course Bituminous Base Course, 80mm Bituminous Wearing Course, 40mm Guar Rail … Fencing

31-Oct-08

0 0 0 0 3

8392 7218 2345 1172 2095

m3 m3 m3 m3 m

4.5

4000

m

COMMON FACILITIES RTR pipe

assumed

50 215

225

U/G Sewer & Drains (under Paved area) U/G Sewer & Drains (outside Paved area)

31-Dec-07 3.148 31-Dec-08 3.148

9761 9761

Milestone

mhr

Qty

1

Labor - Excavation & polyethelene sheet

mhr

Qty

2

3

600

1000

1600

1600

1600

4

5

6

7

8

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Construction Manager Section Manager Sen. Project Engineer Site Engineer General Foreman Foreman - excavation & Backfill Foreman - Forms Foreman - Steel Fixing Foreman - Pouring Foreman - Finishing Foreman - U/G services Foreman - Roads Gangleader

MANPOWER DISTRIBUTION

10/05/2020 493612697.xlsx

m m

1

STAFF LOADING SCHEDULE

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV

1

1

1

1

1

1

1

1 1 1

2 1 2

2 2 2

2 2 2

2 2 2

2 2 2

2 2 2

1

2

3

3

3

3

1

2

3

3

3

3

3

4

5

6

7

8

2

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

0

Jul-07 Aug-07 Sep-07

0

12

31

48

Jul-07 Aug-07 Sep-07

56

59

61

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

Carpenter - Forms Carpenter - Bolts & Inserts, guard rail, fence Steel Fixer Mason: Pouring & sealent Pipe Fitter Paint applicator: epoxy & emulsion paint

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 7 0

0 0 0 0 12 0

0 0 0 0 19 0

0 0 0 0 21 0

0 0 0 0 21 0

TOTAL

0 0 0

0 0 0

12 3165 5031

38 9834 15630

60 15599 24793

75 19498 30991

79 20612 32761

82 21294 33846

0

0

5031

20661

45454

76445

109206

143052

0 0

0 0

19 4485

59 13934

94 22101

117 27626

124 29205

128 30172

0

0

4485

18418

40520

68146

97351

127522

0

0

17

53

83

104

110

114

1

2

3

4

5

6

7

8

1386320 2203451

1964244

30.5% 670992

Monthly Manhour Cumulative manhour No. of Labor 30.5% -239207

Cumulative manhour, BOQ rev.2 No. of Labor, BOQ rev.2

EQUIPMENT LOADING SCHEDULE

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Excavator Dump Truck Forms Mobile Crane Water Tanker Shovel Bobcat Roller Compactor

U U cycle, days

6

4.97

m2

0.5 1

Jul-07 Aug-07 Sep-07

0.5 2.5

3 6

4 7.5

5 7.5

5 7.5

5 7.5

5 7.5

0

0

1

1

0 1 2

0 1 2

0 1 2

0 1 2

0 1 2

1 0.25 0.5

2 0.5 1

3 1 2

3 1 2

3 1 2

3 1 2

3 1 2

MAC-KETTANEH JV Paver Grader

KCC

COMMON AREA and OFF SITE

10/05/2020 493612697.xlsx

0.5

1

1

1

1

1

9

10

11

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV 12

13

14

15

16

17

18

19

10/05/2020 493612697.xlsx

20

21

22

23

24

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

25000 6594

1319

25000 6594

25000 6594

23000 6594

23000 6066

18000 6066

13000 4748

6032 3429

5000 1591

250 250

269 269

400 400

400 400

400 400

549 400 149

600 350 200 50

365 100 200 65

260

200

200 60

150 50

2728 47898 87 623 302

2981 52347 95 855 414 551

1814 31844 58 934 453 551

1292 22684 41 568 275 551

994 17449 32 405 196 551

1242 21811 39

1337 23469 42 389 189

1987 34898 63 419 203

1987 34898 63 623 302

1987 34898 63 623 302

311 151 551

3300 12000 2332 295 15149

3300 12000 3000 379 19490

3300 12000 3000 379 19490

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV

3300 12000 3000 379 19490

3409 1276

3409 1276

3321 1243

3637 1361

100 50 225

100 100 225 100

86 100 225 100

86 215 99

3300 12000 3000 379 19490 225

3300 12000 3086 390 20048 500

3300 12000 2409 305 15648 500

2800 12000 1829 231 11879 500

1036 9182

6000

500

333

3637 1361

3637 1361

3409 1276

3182 1191

1275 477

909 340

1000

2600

2600

2200 1892

2200 1892

792 1892 645

1000

500

500

500

2200 860

500

500

500

500

10/05/2020 493612697.xlsx

2600

2600

868

681 850 323 576

850 425 759

425 759

500

1500

9

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV 1300 200

561 900

1600

1600

1600

1500

1400

561

400

10

11

12

13

14

15

16

17

18

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

19

10/05/2020 493612697.xlsx

20

21

1

1

1

1

1

1

1

1

1

1

1

1

2 2 2

2 2 2 1 1 1

2 2 2 1 1 1

2 2 2 1 1 1

2 2 2 1 1 1

2 2 2 1 1 1 1 3 1 3

2 2 2 1 1 1 1 3 1 3

2 2 2 1 1 1 1 3 1 3

2 2 1 1 1 1 1 2 1 3

2 1

2 1

1 1

1 1 1 1 1 1 3

1

1

1 2

1 2

15

16

17

18

19

20

21

3

3

3

3

3

3

3

3

3

3

9

10

11

12

13

14

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

60

61

61

63

61

64

54

44

20

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1

2 2 2 1 1 1 1 3 1 3

22

1

1

1

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

15

0

0

0

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

0 0 0 0 20 0

24 0 6 3 21 0

26 0 6 3 21 1

38 9 9 5 22 1

38 9 9 5 19 2

38 9 9 5 19 2

52 9 13 6 18 2

57 9 14 7 17 3

35 10 9 5 7 3

25 10 6 3 5 2

19 17 5 3 0 1

0 10 0 0 0 1

0 9 0 0 0 0

81 20995 33370

115 29990 47666

118 30707 48807

147 38170 60669

144 37361 59383

146 37940 60303

154 40143 63805

152 39495 62775

88 22992 36544

67 17310 27514

45 11612 18456

12 3034 4822

9 2408 3828

0 0 0

0 0 0

0 0 0

176422

224088

272895

333564

392946

453250

517054

579829

616373

643886

662342

667164

670992

670992

670992

670992

126 29747

180 42492

184 43509

229 54082

224 52936

228 53757

241 56878

237 55960

138 32577

104 24527

70 16452

18 4299

14 3412

0 0

0 0

0 0

157270

199761

243270

297352

350288

404045

460923

516883

549459

573986

590438

594736

598149

598149

598149

598149

112

160

164

204

200

203

215

211

123

93

62

16

13

0

0

0

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

5 7.5

5 7.5

5 7.5

5 7.5

5 7.5

5 7

3 5.5

3 5

2 5

2 4

0 1 2

287 2 2

308 2 2

459 2 2

459 2 2

459 2 2

629 2 1

688 2 1

419 2 0.5

298 2 0.5

229 1 0.5

0.5

0.5

3 1 2

3 1 2

3 1 2

3 1 2

3 1 2

3 1 2

3 1 2

3 1 2

3 1 1

2 1 1

0.25 0.25 0.25

0.25 0.25 0.25

0.25 0.25 0.25

0

1

1

1

KCC

COMMON AREA and OFF SITE

MAC-KETTANEH JV 1

1

1

1

1

1

0.5

0.5

10/05/2020 493612697.xlsx

0.25

0.25

MAC-KETTANEH JV

KCC

COMMON RESOURCES

10/05/2020 493612697.xlsx

1

PROGRESS BAR CHART

Milestone

mhr

Qty

Page 39 of 67

2

3

4

Unit Feb-07 Mar-07 Apr-07 May-07

MAC-KETTANEH JV

KCC

COMMON RESOURCES

10/05/2020 493612697.xlsx

1

STAFF LOADING SCHEDULE

Milestone

mhr

Qty

Construction Manager Site Engineer General Foreman Foreman - excavation & Backfill Foreman - Forms Foreman - Steel Yard Foreman - Pouring Foreman - Finishing Foreman - U/G services Foreman - Roads Gangleader

3

4

Unit Feb-07 Mar-07 Apr-07 May-07

1

Page 40 of 67

2

1

1

1

MAC-KETTANEH JV

KCC

COMMON RESOURCES

TOTAL

Budget

EQUIPMENT LOADING SCHEDULE

10/05/2020 493612697.xlsx

0 0

0 0

0 0

0 0

1

2

3

4

Unit Feb-07 Mar-07 Apr-07 May-07

Excavator Dump Truck

U U

Forms Mobile Crane Water Tanker

m2

Shovel Bobcat Roller Compactor

1

1 1

1 1

1 1

1

1

1

2

1

1 1 1 1 1

1 2 2 2 1

1 2 2 2 1

Paver Grader Tower Crane Boom Truck Trailer Truck Pick up Forklift

Page 41 of 67

5 Jun-07

6

7

KCC

COMMON RESOURCES

MAC-KETTANEH JV 8

9

10

11

12

10/05/2020 493612697.xlsx

13

14

15

16

Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08

Page 42 of 67

5 Jun-07

1

6

7

KCC

COMMON RESOURCES

MAC-KETTANEH JV

8

9

10

11

12

10/05/2020 493612697.xlsx

13

14

15

16

Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08

1

1

1

1

1

1

Page 43 of 67

1

1

1

1

1

KCC

COMMON RESOURCES

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

5

6

7

8

9

10

11

12

13

14

15

16

Jun-07

Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

2

2

2

2

2

2

2

2

2

2

2

2

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

Page 44 of 67

COMMON RESOURCES

MAC-KETTANEH JV 17 Jun-08

18

19

20

21

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

Page 45 of 67

KCC 10/05/2020 493612697.xlsx

COMMON RESOURCES

MAC-KETTANEH JV

17 Jun-08

1

18

19

20

21

22

23

24

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1

1

1

1

1

1

Page 46 of 67

1

KCC 10/05/2020 493612697.xlsx

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

17

18

19

20

21

22

23

24

Jun-08

KCC

COMMON RESOURCES

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1 1

1 1

1 1

1 1

1 1

1 1

1 1

23 22

2

2

2

2

2

1

1

41

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 2 2 2 1

1 1 1 2 1

1 1 1 1

21 42 41 43 24

Page 47 of 67

1 1 1

Rev2

PROGRESS BAR CHART

KCC

SUMMARY

MAC-KETTANEH JV

1

Changes

mhr

Qty

Excavation - General Excavation - Lim. Section

-46852 -11469

0 1.5

Foundations Concrete - Foundations

-15913

3

2

10/05/2020 493612697.xlsx

3

4

5

6

7

8

9

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

Jul-07 Aug-07 Sep-07 Oct-07

373974 122263

m3 m3

37621

m3

EXCAVATION, FILL, CONCRETE WORKS

Forms Steel Reinforcement Bolts & Inserts Bitumen Emulsion Epoxy Coating Grout: non-shrink, epoxy Paving Concrete - Paving Steel Wire Mesh Formation of Paving Polyethelene Sheet Sealent Fill - Open Fill - Between Foundations

-13638 5 71449 m2 -1449448 70 3274650 kg -38189 0.125 322157 kg 0.6 63694 m2 0.6 14641 m2 -81425 0.16 239884 dm3

0

-53110

1.27 0.04 0 0.6

19468 460124 23595 117983 47192

m3 kg m3 m2 m

0 0

33926 44056

m3 m3

2000 920

20000 2986

37000 6476

42370 8556

32370 10666

27202 11126

25000 12194

25000 11960

25000 10308

720

2340

3540

3840

3840

4070

3750

3600

1071 3480 5264 5710 5710 6420 5944 5721 62675 203693 308151 334265 334265 354161 326306 313249 6949 22584 34166 37062 37062 38466 35377 33929 1183 3845 5817 6310 6310 6992 6466 227 738 1117 1212 1212 1444 1343 4200 12962 17524 17524 17524 17524

Page 48 of 67

353

1500

3235

4764

5499

5489

5175

MAC-KETTANEH JV

SUMMARY

Page 49 of 67

KCC 10/05/2020 493612697.xlsx

KCC

SUMMARY

MAC-KETTANEH JV Fill - tank bunds & evaporation ponds Surfacing Material - Marl Cap Geotextile Sheet - S&P Polyethelene Sheet HDPE liner Crushed Stone

0 0 0.2 0.08 0.02 2

30436 173182 23397 2958 152000 2558

m3 m3 m2 m2 m2 m3

10/05/2020 493612697.xlsx

6000

8000

12000

12000

1000 12000

2500 12000 1742 220 11320

3300 12000 2332 295 15149

1364 511

2438 851

3967 1361

3967 1361

3967 1361

3739 1276

400

800

850

215

225

900 50 225

1600

1600

1500

SEWERS & DRAINS Excavation - Trench Limited Section Sand Fill - Trench

762

U/G Sewer & Drains (under Paved area) U/G Sewer & Drains (outside Paved are PVC pipe 6" PVC pipe 8" Cast Iron Gratings & Covers

2840 2840

1.1 1

46973 m3 16611 m3 assumed 1.5 5136 m 1.5 5136 m 1.5 1330 m 2 299 m 0.15 18148 kg

ROAD WORKS Formation - Subase Formation - Base Course Bituminous Base Course, 80mm Bituminous Wearing Course, 40mm Guar Rail … Fencing

-1447 -1432 -466 -233 -313

0 0 0 0 3

35367 33909 11028 5514 2095

m3 m3 m3 m3 m

4.5

4000

m

COMMON FACILITIES RTR pipe U/G Sewer & Drains (under Paved area) U/G Sewer & Drains (outside Paved area)

assumed 3.148 9761 3.148 9761

m m

600

Page 50 of 67

1000

1600

MAC-KETTANEH JV

SUMMARY

Page 51 of 67

KCC 10/05/2020 493612697.xlsx

1

STAFF LOADING SCHEDULE

KCC

SUMMARY

MAC-KETTANEH JV

2

10/05/2020 493612697.xlsx

3

4

5

7

8

9

mhr

U-mth

238

24 46 23 19 143

U U U U U

1 1 0 0 0

1 2 1 1 3

1 2 1 1 6

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

QA/QC Manager QA/QC Inspector

24 140

U U

1 1

1 1

1 3

1 5

1 7

1 7

1 7

1 7

1 7

Safety Manager Safety Inspector Male Nurse

24 182 24

U U U

1 1 1

1 2 1

1 5 1

1 7 1

1 8 1

1 8 1

1 9 1

1 9 1

1 9 1

Project Control Engineer Scheduler Cost Control Officer Material Engineer Reporting Engineer Quantity Surveyor Cad-Operator

22 21 24 19 24 63 23

U U U U U U U

1 1 1 1 1 1

1 1 1 1 1 2 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

Secretary Clerk

24 41

U U

1 1

1 1

1 2

1 2

1 2

1 2

1 2

1 2

1 2

Surveyor Assistant Surveyor

65 130

U U

1 2

2 4

3 6

3 6

3 6

3 6

3 6

3 6

3 6

Project Manager Construction Manager Section Manager Sen. Project Engineer Const. Field Engineer

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

6

Page 52 of 67

Jul-07 Aug-07 Sep-07 Oct-07

Sr. Project Accountant Deputy Project Accountant Store Keeper Cahier

23 23 24 20

U U U U

Administrator Personnel Officer Camp Boss Time Keeper Purchaser

23 23 23 120 15

U U U U U

Logistics Officer PMV Officer Foreman - Electrical Foreman - Plumbing

19 23 18 17

U U U U

143 142 163 91 106 70 102 65 739

U U U U U U U U

General Foreman Foreman - excavation & Backfill Foreman - Forms Foreman - Steel Fixing Foreman - Pouring Foreman - Finishing Foreman - U/G services Foreman - Roads

108

687

MANPOWER DISTRIBUTION

Gangleader

KCC

SUMMARY

MAC-KETTANEH JV

Milestone

mhr

Qty

337

10/05/2020 493612697.xlsx

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 2 1

1 1 1 4 1

1 1 1 5 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

2 2 0 1 0 0 0 0

5 5 2 3 1 0 0 0

5 7 6 5 3 0 1 0

6 7 8 5 4 0 4 2

7 7 8 5 4 0 6 3

7 7 9 6 5 0 6 3

7 7 10 6 5 0 6 3

7 7 10 6 5 0 6 3

7 7 10 6 5 0 6 3

1

2

3

4

5

6

7

8

9

1

1

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

U

0

Page 53 of 67

4

10

16

17

Jul-07 Aug-07 Sep-07 Oct-07

17

17

17

17

Labor - Excavation & polyethelene sheet Carpenter - Forms Carpenter - Bolts & Inserts, guard rail, fence Steel Fixer Mason: Pouring & sealent Pipe Fitter Paint applicator: epoxy & emulsion paint TOTAL

KCC

SUMMARY

MAC-KETTANEH JV 1067 1401 269 960 798 312 191

U U U U U U U

6 0 0 0 0 0 0

6 1387100 1560 2203451 Monthly Manhour 2478 Cumulative manhour 2478 No. of Labor 9 1964244 -239207 2209 Cumulative manhour, BOQ rev.2 2209 No. of Labor, BOQ rev.2 8

Budget

EQUIPMENT LOADING SCHEDULE

18 21 4 17 9 0 0

38 67 11 55 27 0 4

58 102 17 83 44 8 11

76 110 18 90 53 13 17

87 110 18 90 56 22 18

93 124 19 96 58 26 18

94 115 18 88 55 26 20

84 111 17 85 53 25 19

73 18980 30150

212 339 394 418 451 433 411 55120 88140 102440 108680 117260 112580 106860 87560 140013 162729 172642 186271 178837 169750

32628

120188

114 26877

330 528 614 651 703 675 641 78054 124813 145063 153899 166049 159422 151322

29086

107141

231954

377017

530916

696966

856388

1007710

101

295

471

547

581

627

602

571

2

3

4

5

6

7

8

9

1

U-mth U-mth

10/05/2020 493612697.xlsx

260201

422930

Unit Feb-07 Mar-07 Apr-07 May-07 Jun-07

595572

781843

960680

1130430

Jul-07 Aug-07 Sep-07 Oct-07

Note: BOQ items requiring written instruction from employer are not considered Excavator Dump Truck (Not including -Additional m3xkm)

129 277

96 173

U U

2 3

3 8

6 13

7 15

8 14

8 13

8 13

7 12

7 11

Forms Mobile Crane Water Tanker

16497 77 82

m2

225 116

0 1 0

248 2 2

803 3 3

1215 4 5

1318 4 5

1318 4 5

1482 5 6

1372 5 6

1321 5 6

Shovel Bobcat

237 92

143 110

1 0

3 2

5 3

7 6

7 6

8 6

8 6

8 6

8 6

Page 54 of 67

Roller Compactor

124

Paver Grader Tower Crane Boom Truck Trailer Truck Dyna Pick up Forklift

KCC

SUMMARY

MAC-KETTANEH JV

46 20 20 54 42

10/05/2020 493612697.xlsx

82

0

1

2

3

4

5

5

5

5

20 36

0 0

0 0

0 1

0 1

0 1

0 1

0 1

0 1

0 1

21 42 41 60 39

0 0 0 0 1

1 1 1 1 1

1 2 2 2 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

800 700 600 500 400 300 200 100 0 1

Page 55 of 67 2500000

2

3

4

5

6

7

MAC-KETTANEH JV

KCC

SUMMARY

10/05/2020 493612697.xlsx

2500000 2000000 1500000 1000000 500000 0 1

2

3

4

5

6

6

7

8

2500000 2000000 1500000 1000000 500000 0 1

Page 56 of 67

2

3

4

5

MAC-KETTANEH JV

KCC

SUMMARY

10/05/2020 493612697.xlsx

700 600 500 400 300 200 100 0 1

Page 57 of 67

2

3

4

5

6

7

8

9

10

11

12

KCC

SUMMARY

MAC-KETTANEH JV 13

14

15

16

17

18

19

10/05/2020 493612697.xlsx

20

Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

Jul-08

25000 8242

25000 7594

23000 7594

23000 6486

18000 6066

13000 4748

6032 3429

5000 1591

1319

3100

2469

2100

1432

846

549

600

365

260

200

2728 47898 87 1474 505 19024

2981 52347 95 855 414 19575

1814 31844 58 934 453 14489

1292 22684 41 568 275 5113

994 17449 32 405 196 551

311 151 551

1600 37816 1761 9697 4200

5848 4976 4883 3823 2794 269774 214850 182755 124630 73673 26730 20460 15655 9356 4050 6220 5377 4338 3721 2568 1295 1247 1056 998 758 17524 18824 18924 19024 19024

636

900 4788

21

22

23

24

Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

525 12409 1036 3182

525 12409 1917 3182

925 21863 2397 5606 2000

1725 40770 2397 10454 2970

2125 50224 2371 12878 5070

2125 50224 2197 12878 6200

1938 45805 1761 11745 4656

1600 37816 1761 9697 4200

1600 37816 1761 9697 4200

1100 4190

2400 3431

4200 2500

4900 1658

5370 963

4600 399

4400 114

4128

1928

Page 58 of 67

1600 37816 1761 9697 4200

1600 37816 1364 9697 4200

1190 28125 484 7212 3698

390 9218 2364 1598

MAC-KETTANEH JV

SUMMARY

Page 59 of 67

KCC 10/05/2020 493612697.xlsx

3300 12000 3000 379 19490

3300 12000 3000 379 19490

3300 12000 3000 379 19490

3843 1276

3590 1243

3740 1361

900 500 225 100

886 900 225 100

400 886 215 99

1300 200

561 900

KCC

SUMMARY

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

3300 12000 3000 379 19490 225

3300 12000 3086 390 20048 500

3300 12000 2409 305 15648 500

2800 12000 1829 231 11879 500

1036 9182

6000

500

333

3740 1361

3740 1361

3513 1276

3182 1191

1275 477

909 340

800

800

800

400

475

1075

1275

2275

3820

3160

2600

2600

868

900

2700 900

3900 2560

4500 3592

6463 4392 481

6392 5887 1445

5600 6281 1650 723 576

3856 5600 1752 825 759

1056 3856 2102 875 759

500

500

500

500

500

500

500

1600

1600

1600

1500

1400

561

400

500

Page 60 of 67

1056 2400 1050

1200 1200

600

MAC-KETTANEH JV

SUMMARY

Page 61 of 67

KCC 10/05/2020 493612697.xlsx

10

11

12

KCC

SUMMARY

MAC-KETTANEH JV

13

14

15

16

17

Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

18 Jul-08

19

10/05/2020 493612697.xlsx

20

21

22

23

24

Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 1 7

1 2 1 0 5

1 2 1 0 4

1 2 1 0 4

1 1 1 0 2

1 7

1 7

1 7

1 7

1 7

1 7

1 7

1 7

1 7

1 7

1 7

1 6

1 5

1 4

1 3

1 9 1

1 9 1

1 9 1

1 9 1

1 9 1

1 9 1

1 9 1

1 9 1

1 9 1

1 9 1

1 9 1

1 8 1

1 7 1

1 6 1

1 4 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1 1 1 3 1

1 1 1

1 1 1

1 1

1

1

1 3 1

1 2 1

1 2 1

1 1 1

1 1 1

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 1

1 1

1 1

1 1

1 1

3 6

3 6

3 6

3 6

3 6

3 6

3 6

3 6

3 6

3 6

3 6

3 6

2 4

2 4

1 2

Page 62 of 67

KCC

SUMMARY

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1

1 1 1

1 1 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6 1

1 1 1 6

1 1 1 6

1 1 1 6

1 1 1 5

1 1 1 4

1 1 1 4

1 1 1 3

1 1 1 2

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1

1 1

1 1

1

1

1

7 7 11 7 6 0 6 3

7 7 11 7 6 3 6 3

7 7 11 7 6 5 6 3

7 7 11 7 6 5 6 3

7 7 10 5 6 6 6 4

7 7 8 2 6 6 6 4

7 7 5 2 5 6 6 4

7 7 5 2 5 6 6 4

7 6 5 2 5 6 5 4

6 5 5 2 5 6 4 4

6 5 4 1 4 6 3 4

5 4 4 1 4 5 2 3

4 4 4 1 4 4 2 2

4 4 4 1 4 4 2 2

2 2 2 1 2 2 1 1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

17

17

17

17

17

17

17

17

Jul-08

17

Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

17

Page 63 of 67

16

14

10

8

4

73 113 13 73 47 29 18

69 99 10 60 43 31 16

70 97 17 52 39 29 13

KCC

SUMMARY

MAC-KETTANEH JV 66 77 14 37 38 24 11

68 57 12 27 37 24 8

59 56 10 21 41 23 5

383 345 334 284 250 232 99580 89700 86840 73840 65000 60320 158186 142491 137948 117297 103254 95820

10/05/2020 493612697.xlsx

49 60 11 22 44 20 3

24 37 11 16 34 7 4

19 25 11 12 24 5 2

3 20 17 11 21 0 2

3 0 11 6 18 0 2

3 0 10 6 18 0 0

3 0 0 6 18 0 0

3 0 0 5 15 0 0

1 0 0 2 6 0 0

226 58760 93342

150 39000 61953

115 29900 47497

91 23660 37585

56 14560 23129

51 13260 21064

37 9620 15282

31 8060 12804

13 3380 5369

1288616 1431107 1569055 1686352 1789607 1885427 1978769 2040722 2088219 2125804 2148933 2169997 2185278 2198082 2203451

597 538 521 443 390 141013 127022 122972 104563 92045

362 85418

352 83209

234 55227

179 42341

142 33504

87 20618

79 18777

58 13623

48 11414

20 4786

1148724 1275746 1398718 1503281 1595327 1680744 1763953 1819180 1861521 1895026 1915644 1934421 1948044 1959457 1964244

532

479

464

395

347

322

314

208

160

126

78

71

51

43

18

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08

Jul-08

Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09

7 11

6 10

6 9

6 9

5 8

3 7

3 6

2 6

2 5

0 0

0 0

0 0

0 0

0 0

0 0

1350 6 6

1149 6 6

1127 5 5

883 5 5

645 4 4

630 3 3

688 3 3

419 3 2

299 3 2

230 2 2

0 1 2

0 1 2

0 1 1

0 1 1

0 0 0

8 6

8 6

8 6

8 6

8 6

8 6

8 6

8 6

7 6

4 4

4 3

4 3

2 2

2 2

1 1

Page 64 of 67

KCC

SUMMARY

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

5

5

5

5

5

5

5

4

4

2

2

2

1

1

1

0 1

0 1

1 2

2 3

2 3

2 3

2 3

2 3

2 2

2 2

1 2

1 2

1 1

1 1

1 0

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 2

1 2 2 3 1

1 2 2 3 1

1 2 2 3 1

1 2 2 2 1

1 1 1 2 1

0 1 1 1 1

0 1 0 1 1

No. of Labor

No. of Labor

2

3

4

5

6

7

8

9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Cumulative manhour

Page 65 of 67

KCC

SUMMARY

MAC-KETTANEH JV

10/05/2020 493612697.xlsx

Cumulative manhour

Cumulative manhour

1

2

3

4

5

6

7

8

9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Cumulative manhour, BOQ rev.2

Cumulative manhour, BOQ rev.2

2

3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Page 66 of 67

MAC-KETTANEH JV

SUMMARY

No. of Labor, BOQ rev.2

No. of Labor, BOQ rev.2

3

4

5

6

7

8

9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Page 67 of 67

KCC 10/05/2020 493612697.xlsx