Isdp Mobile Ciag Operation Training

  • Uploaded by: JL Mitchell
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Isdp Mobile Ciag Operation Training as PDF for free.

More details

  • Words: 1,228
  • Pages: 22
Loading documents preview...
Security Level:

ISDP Mobile (CIAG) August, 2016 www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

目录 

Mobile Tool Main Line



Operation for CIAG



How to do Site Sign



How to do Site verify



F&Q



Why can not find the site sign task?



Why subcon already on site, but ISDP Mobile still inform that not on site, can not process?



Why Subon already finish site sign, but not site verify task?



What can I do if subcon feedback some issue that I can not handle?

Page2

Mobile Tool Main Line 1 Receiving, shipment, and storage in country central warehouse

Production at supply center

In-transit and goods handover

2

2 Receiving, shipment, and storage in subcontractor warehouse

RN

2 Site sign

RN

Installation selfcheck at Site A

2

2

Site verify upon completion at site

4 3

4 Third-party spot check at site

3

PAC

2

STR Installation selfcheck at Site B

Shipment Return & STR

Information collection

Toolkit 1

Online RF

 Collect SN of materials transferred out.

 Repackage loose parts.

ISD Mobile

2

 Collect bills and item bar codes.  Query status and push information.

WDT

3

Network Management

 Collect ESN remotely.  Power-on, transmission, and

 Collect ESN at sites.  Power-on and active materials

active materials

Information interaction between tools and systems

Data processing

Application

SCM system Web-based SCM platform: Satisfy the requirements for application approval, bill creation, status query, and information pushing.

Preferred

Second choice Page3

4

目录 

Mobile Tool Main Line



Operation for CIAG



How to do Site Sign



How to do Site verify



F&Q



Why can not find the site sign task?



Why subcon already on site, but ISDP Mobile still inform that not on site, can not process?



Why Subon already finish site sign, but not site verify task?



What can I do if subcon feedback some issue that I can not handle?

Page4

How to do Site sign

3 1

4

Step 1: Find DN (Option 1)

2

Page5

How to do Site sign

3 1 4 Step 1: Find DN (Option 2)

2

Page6

How to do Site sign

Step 2: Finish site sign

1

2 1

Show this Verification code to Deliver after click submit.

3

2

3 There is another way to check the verification code: CIAG view>Completed Tasks

Page7

How monitor the Deliver’s location?

How to monitor the Deliver’s Location:

5

6

Page8

目录 

Mobile Tool Main Line



Preparation (CEG) 

Register Uniportal Account for Subcontractors;



Binding the account with subcontractor and project;



Operation for CIAG



How to do Site Sign



How to do Site verify



F&Q



Why can not find the site sign task?



Why subcon already on site, but ISDP Mobile still inform that not on site, can not process?



Why Subon already finish site sign, but not site verify task?



What can I do if subcon feedback some issue that I can not handle? Page9

How to do Site verify? 3 1 Step 1: Find Verify task

4

2

Page10

How to do Site verify? 【Remark】: Subcon have to take a photo for the site after do verify submimt.

2 1

Step 2: Finish site verify

3

Page11

How to do Site verify?

4

Page12

目录 

Mobile Tool Main Line



Preparation (CEG) 

Register Uniportal Account for Subcontractors;



Binding the account with subcontractor and project;



Operation for CIAG



How to do Site Sign



How to do Site verify



F&Q



Why can not find the site sign task?



Why subcon already on site, but ISDP Mobile still inform that not on site, can not process?



Why Subon already finish site sign, but not site verify task?



What can I do if subcon feedback some issue that I can not handle? Page13

NO1: Why can not find the site sign task? 1. The ISDP Mobile account did not binding subcontractor The site sign task is pushed by the project code, site code and the subcontractor. If the account not binding the correct subcontractor, can not find out the site sign task. Who and how to check whether the account binding subcontractor or not ? Normally, CEG set up subcontractor’s account. Below is the screen to check the ISDP Mobile.

Page14

2. The binding Subcontractor is not the same as the one in DN The binding subcontractor is not the same as the one in DN in SCM system. Also can manual input the DN to find out the site sign task. How to check the correct subcontractor in SCM? Link 1: Site INV > Site Sign > Sign Link 2: Site INV > Inventory Mgmt > Onhand Query

Page15

3.DN is not shipped in SCM system If can not find out the site sign DN, maybe central warehouse forget to do DN ship. Need to contact SCM colleague to do the DN ship. How to know if the DN is shipped or not in SCM: Link: Site INV > Inventory Mgmt > Onhand Query

Page16

4. DN already been signed If the DN already been signed, the DN will not show in ISDP mobile.

Can check the DN sign or not in SCM system, if the location type is onsite, mean the DN already been signed. Site INV > Inventory Mgmt > Onhand Query

Page17

5.In PH, the DN send from customer warehouse no need to do site sign and site verify.

Page18

NO2: Why subcon already on site, but ISDP Mobile still inform that not on site, can not do site sign and site verify?

Subcon can click the map logo to enter the map, can check if his location is correct or not: if correct, should be the location for the Site is wrong. Ask subcon to provide the correct for the site to jianghuaming 00308129 to update. And subcon can do the site sign and site verify 5 min after update. If subcon’s location is not the same as map, should be the Map issue Upload log and feedback to huawei.

Page19

NO3: Why Subon already finish site sign, but not site verify task?

【Two reason】: 1, No all materials need to do site verify, just type and type two materials need to. Materials subcon signed not need to do site verify. 2, Project team have apply no need to site verify in system.

Page20

NO4: What can I do if subcon feedback some issue that I can not handle? 1, Inform subcon to upload log according to below screen. 2, Clear the issue and inform Subcon to provide the ISDP Mobile screen. 3, operation ISDP Mobile account, project code, site code. 4, Create a edts in system or contact me (00282647).

Page21

Thank you www.huawei.com Copyright© 2011 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

Related Documents


More Documents from "Sri Nivas"

Curso De Piano
February 2021 1
Acordes
February 2021 1
February 2021 0