INSPECTION & TEST PLAN Co ntractor:SEPCOIII ELECT RIC POWER CON ST RUC TION COR PORATION., LTD .
Sl. No.
EPC Contractor : Sub-Contractor Name :
SEPC OIII Electric Power Con struction C o., Ltd. Feich eng Hon gyuan Con struction C o., Ltd.
Item
Air Pre-heater Erection
Activity / Process
Characteristics to be checked
LEPCL-10-HL D-MQA200002-G01-B
Own er: Luck y Electric Power C omp any L imited
ITP No. :
B
Owner Name :
12-11-2019
Consultant Name:
Meth od o f Ch eck / In strum ent
Qu antum / Freq uency o f Check
R ef. Do c. / Accep tan ce Standard
Format of Record Sub-contractor
Contractor
Consultant
Once
Approved Drg. and manual
R
R
R
Once
Tech. Spec. /Approved Drg. Inspection Report
H
W
S
Once
Rev. No. : Date :
Project Name :
LEPCL 660MW CFPP, Karachi Lucky Electric Power Company Ltd.
Co nsultant: FICH TNER GMB H & CO KG
FICHTNER Responsibility Remark
1. DOCUMENTS Verify manual,approved drawings & MS
1.1
2. CENTERING OF FOUNDATION AND RUBBING OF SUPPORT FRAME
2.1
Verify location of APH s teel structure work and release for erection
Location
V/M
Verify loaction and levelness of s upport bearing
3. ROTOR BEARING ASSEMBLY 3.1
Location & levelness
V/M
Tech. Spec. /Approved Drg. Inspection Report
H
W
W
Verify the levelness of guide bearing
Levelness
V/M
Once
Tech. Spec. /Approved Drg. Inspection Report
H
W
W
Verify the torque value of guide bearing locking cap bolt
Torque value
V/M
Once
Tech. Spec. /Approved Drg. Inspection Report
H
W
W
Verify the verticalness of main pedestal
Verticalness
V/M
All main pedes tal
Tech. Spec. /Approved Drg. Inspection Report
H
W
W
Verify the verticalness of s ide pedestal
Verticalness
V/M
All side pedes tal
Tech. Spec. /Approved Drg. Inspection Report
H
W
Verify the levelness and roundness of pocket ring
Levelness & roundness
V/M
Pocket ring
Tech. Spec. /Approved Drg. Inspection Report
H
W
H
5.1
Verify the conc entricity, parallel and pitch of c og pin
Concentricity, parallel & pitc h
V/M
All cog pin
Tech. Spec. /Approved Drg. Inspection Report
H
H
W
5.2
Verify the concentricity of rotor accessories
All T-bar / Tech. Spec. /Approved Drg. Inspection Report sealing angles
3.2
3.3
4. CASING ASSEMBLY 4.1
4.2
4.3
S
5. ROTOR ASSEMBLY
Concentricity
V/M
H
W
W
6.1
Verify the pinion clearanc e data of pinion gear
Clearance
V/M
Tech. Spec. /Approved Drg. Inspection Report
H
H
W
6.2
Verify the motor coupling centering data
Coupling centering
V/M
Motor coupling Tech. Spec. /Approved Drg. Inspection Report
H
H
W
Verify the rotor seal clearanc e
Clearance
V/M
Pos t s eal, radial seal, Tech. Spec. /Approved Drg. Inspection Report axial seal & by-pass seal
H
H
H
H
W
W
W
H
6. ROTOR DRIVE UNIT ERECTION
Pinion gear
7.ROTOR SEAL ERECTION
7.1
8.ACCESSORIES ERECTION
Sootblower and other ass es sories erection
8.1
V
Approved Drg. and manual
Chceklist
9. Welding
Visual ins pection on welds
9.1
V
All welds
Tech. Spec. /Approved Drg. Inspection Report
H
Leg end : H: Hold Point
W: Witness Poin t
R: Report Review
W: QA/QC organizatio n sh all be no tified of the timin g of inspection H: QA/QC org aniza tion shall be n oticed of the timin g of or test in advan ce. However, the in spectio n o f test shall be p erform ed insp ection or test in advan ce. Insp ection or test shall n ot b e as schedu led if the QA/QC org anization rep resentative is no t presen t. R: Document/Reprot review. (RFI is not rquired to submit.) carried ou t witho ut the QA/QC organ ization rep resentative (RF I is rq uired to su bmit.) in attend ance. (RFI is requ ired to subm it.)
S: Surveillance
S: QA/QC organ ization to m onitor work in p ro gress witho ut no tice fro m co nstru ction organ ization . (RFI is n ot req uired to sub mit.)