INSPECTION & TEST PLAN Contractor:SEPCOIII ELECTRIC POWER CONSTRUCTION CORPORATION., LTD.

Sl. No.

EPC Contractor :

SEPCOIII Electric Power Construction Co., Ltd.

ITP No. :

LEPCL-10-HZZ-MQA200003-G01-C

Sub-Contractor Name :

Project Name :

LEPCL 660MW CFPP, Karachi

/

Rev. No. :

C

Owner Name :

Lucky Electric Power Company Ltd.

Item

Flue gas and air duct

Date :

03-07-2019

Consultant Name:

FICHTNER

Activity / Process

Characteristics to be checked

Method of Check / Instrument

Quantum / Frequency of Check

Ref. Doc. / Acceptance Standard

Format of Record

V

All fabraction welds

Approved Drg.

V/M

All ducts

Owner: Lucky Electric Power Company Limited

Consultant: FICHTNER GMBH & CO KG

Responsibility Remark Sub-contractor

Contractor

Consultant

Inspection Report

H

W

W

Approved Drg.

Inspection Report

H

W

W

All ducts

Tech. Spec. /Approved Drg.

Check list

H

W

W

All ducts

Tech. Spec. /Approved Drg.

Check list

H

W

W

All erection welds

Approved Drg.

Inspection Report

H

W

H

All ducts

Approved Drg.

Check list

H

W

W

All ducts

Tech. Spec.

Inspection Report

H

H

H

1. PRE-ASSEMBLING OF DUCT 1.1

Visual inspection on welds

1.2

Dimensional check

Dimension

2. ERECTION OF DUCT 2.1

Erection of supports

2.2

Erection of sections of duct

2.3

Visual inspection on welds

2.4

Damper & expansion joint

V

3. LEAK CONTROL 3.1

Leak test of all jonits

Leakage

V/M

Legend: H: Hold Point

W:Witness Point

R: Report Review

W:QA/QC organization shall be notified of the timing of inspection H: QA/QC organization shall be noticed of the timing of or test in advance. However, the inspection of test shall be performed inspection or test in advance. Inspection or test shall not be as scheduled if the QA/QC organization representative is not present. R: Document/Reprot review. (RFI is not rquired to submit.) carried out without the QA/QC organization representative (RFI is rquired to submit.) in attendance. (RFI is required to submit.)

S: Surveillance

S: QA/QC organization to monitor work in progress without notice from construction organization. (RFI is not required to submit.)

Related Documents

Itp For Duct Work
March 2021 0
Itp For Aph
March 2021 0
Itp For Hdpe
February 2021 1
Itp
February 2021 3

More Documents from "Syed Mahmud Habibur Rahman"

Itp For Aph
March 2021 0
Itp For Duct Work
March 2021 0
005 Transmittal001
March 2021 0