INSPECTION & TEST PLAN Contractor:SEPCOIII ELECTRIC POWER CONSTRUCTION CORPORATION., LTD.

EPC Contractor : Sub-Contractor Name :

SEPCOIII Electric Power Construction Co., Ltd. /

Owner: Lucky Electric Power Company Limited

Item

Sl. No.

Activity / Process

ITP No. :

LEPCL-10-ZZZ-MQA200001-S01-D

Project Name :

LEPCL 660MW CFPP, Karachi

Rev. No. :

B

Owner Name :

Lucky Electric Power Company Ltd.

Consultant Name:

FICHTNER

Date :

Responsibility

Characteristics to be checked

Method of Check / Instrument

Quantum / Frequency of Check

Ref. Doc. / Acceptance Standard

Format of Record

Material/ Quantity / Diemension

V/M

As Tech. Spec.

Paking list/ Receiving Report

Remark Sub-contractor

Contractor

Consultant

Material receiving inspection record(where applicable)

H

W

S

1. INSPECTION AND PREPARATION

1.1

Receiving inspection of structure steel maerials

1.2

Ensure the tools and equipment used for erection are calibrated

As Tech. Spec.

Tech. Spec.

Calibration Report

H

R

R

1.3

Review qualification license for special type of worker

As Tech. Spec.

Tech. Spec.

Qualification license

H

R

R

2. SUBSEQUENT WORKS HANDOVER Foundation and anchor bolt verification

2.1

Diemension/ Elevation

V/M

Once

Approved Drg.

Survey Report

H

W

S

3. STEEL STRUCTURE ERECTION 3.1

Aligned and plumbness inspection

Plumbness/ Diemension

V/M

Each floor

Approved Drg.

Check List / Survey Report

H

W

H

3.2

Connection bolt final tightening inspection and testing

Torque

M

10% of each joints

Approved Drg.

Check List / Survey Report

H

W

H

3.3

Anchor bolt tightening prior to grouting

Tightness

As Tech. Spec.

Tech. Spec. /Approved Drg.

Report

H

W

W

3.4

Installation & fixing of grating and checkered plate

Flatness

V

Each floor

Approved Drg.

Check List

H

W

W

3.5

Handrail, ladder and staircase alignment and installation

Alignment

V

Each floor

Approved Drg.

Check List

H

W

W

4. WELDING AND VERIFICATION

Consultant: FICHTNER GMBH & CO KG

INSPECTION & TEST PLAN Contractor:SEPCOIII ELECTRIC POWER CONSTRUCTION CORPORATION., LTD.

EPC Contractor : Sub-Contractor Name :

SEPCOIII Electric Power Construction Co., Ltd. /

Owner: Lucky Electric Power Company Limited

Item

Sl. No.

Activity / Process

ITP No. :

LEPCL-10-ZZZ-MQA200001-S01-D

Project Name :

LEPCL 660MW CFPP, Karachi

Rev. No. :

B

Owner Name :

Lucky Electric Power Company Ltd.

Consultant Name:

FICHTNER

Date :

Consultant: FICHTNER GMBH & CO KG

Responsibility

Characteristics to be checked

Method of Check / Instrument

Quantum / Frequency of Check

Ref. Doc. / Acceptance Standard

Format of Record

Dimesion/ Qaulity

V

As Tech. Spec.

Tech. Spec. /Approved Drg.

Remark Sub-contractor

Contractor

Consultant

Check List

H

W

H

4.1

Weld visual inspection including repair

4.2

Magnetic particle testing/Dye penetrant testing on lifting lugs

As Tech. Spec.

Tech. Spec.

MT/PT Report

H

R

H

4.3

Ultrasonic testing for butt weld joints (T>10mm)

As Tech. Spec.

Tech. Spec.

UT Report

H

R

H

5. painting work (Indoor)

5.1

Inspection of surface preparation

surface preparation

V

Each floor

Approved Drg.

Check List

H

W

H

5.2

Verify Dry film thickness(DFT) after primer

DFT

M

Each floor

Approved Drg.

Check List / Survey Report

H

W

S

5.3

Verify Dry film thickness(DFT) after Intermediate

DFT

M

Each floor

Approved Drg.

Check List / Survey Report

H

W

W

6.1

Inspection of surface preparation

surface preparation

V

Each floor

Approved Drg.

Check List

H

W

H

6.2

Verify Dry film thickness(DFT) after primer

DFT

M

Each floor

Approved Drg.

Check List / Survey Report

H

W

S

6.3

Verify Dry film thickness(DFT) after Intermediate

DFT

M

Each floor

Approved Drg.

Check List / Survey Report

H

W

S

6.4

Verify Dry film thickness(DFT) after preiner after final paint

DFT

M

Each floor

Approved Drg.

Check List / Survey Report

H

W

W

6. painting work (Outdoor)

INSPECTION & TEST PLAN Contractor:SEPCOIII ELECTRIC POWER CONSTRUCTION CORPORATION., LTD.

EPC Contractor : Sub-Contractor Name :

SEPCOIII Electric Power Construction Co., Ltd. /

Owner: Lucky Electric Power Company Limited

Item

Sl. No.

Activity / Process

ITP No. :

LEPCL-10-ZZZ-MQA200001-S01-D

Project Name :

LEPCL 660MW CFPP, Karachi

Rev. No. :

B

Owner Name :

Lucky Electric Power Company Ltd.

Consultant Name:

FICHTNER

Date : Characteristics to be checked

Method of Check / Instrument

Quantum / Frequency of Check

Ref. Doc. / Acceptance Standard

Consultant: FICHTNER GMBH & CO KG

Responsibility Format of Record

Remark Sub-contractor

Contractor

Consultant

Legend: H: Hold Point

H: QA/QC organization shall be noticed of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance. (RFI is required to submit.)

W:Witness Point W:QA/QC organization shall be notified of the timing of inspection or test in advance. However, the inspection of test shall be performed as scheduled if the QA/QC organization representative is not present. (RFI is rquired to submit.)

R: Report Review

R: Document/Reprot review. (RFI is not rquired to submit.)

S: Surveillance

S: QA/QC organization to monitor work in progress without notice from construction organization. (RFI is not required to submit.)

Related Documents

Itp For Aph
March 2021 0
Itp For Hdpe
February 2021 1
Itp
February 2021 3

More Documents from "Syed Mahmud Habibur Rahman"

Itp For Aph
March 2021 0
Itp For Duct Work
March 2021 0
005 Transmittal001
March 2021 0