LAFARGE PAKISTAN CEMENT

Kiln Audit Report-2015 Internal Audit Report Process Team 4/8/2015

It is kiln audit report in which system is analyzed for its critical parameters clinker factor SHC & SPC. To improve and optimize the system reliability and productivity.

Contents

Kiln Operation during trial…………………………………………………………………………..03 Specific Heat Consumption………………………………………………………………………….08 Specific Power Consumption…………………………………………………………………………10 Clinker Factor………………………………………………………………………………………………..10 System Gas Balance……………………………………………………………………………………… 11 Clinker Quality……………………………………………………………………………………………..11 Action Plans…………………………………………………………………………………………………..12

Prepared By Process Team

Page 2

Kiln Audit-2015 Kiln drop test trial was started from 08-April-2015 at 09:00 AM to 09-April-2015 at 09:00 AM, during 24 Hrs clinker weighment was done and net clinker weight was 7195 ton. During this trial all the process measurements of entire pyroline system were taken and calculated the system gas balance, heat balance, SHC, & SPC.

1.1 Kiln Operation during Trial Kiln Operation mimics during the trial are as under

Kiln Operation mimic view

Prepared By Process Team

Page 3

Kiln ID Fans & GCT operational mimic view

Grate Cooler Operational mimic

Prepared By Process Team

Page 4

Kiln Feed Operation mimic

Grate Cooler & Cooler ESP mimic view

Prepared By Process Team

Page 5

Kiln shell scam scanner view during trial

Prepared By Process Team

Page 6

C5 A&B Temperatures and set point During trial cyclone-05 A&B side temperatures trend with set point. It can be clearly seen that temperatures peaks variations from its set points and loss of fuel. It needs to be fine control tune for saving the fuel.

Prepared By Process Team

Page 7

1.2 Specific Heat Consumption The fuel used during the trial was South Africa Coal & Carbon powder, the ratio between the being approximately 85:15 in the duration of trial for both Kiln and Calciner firing. The raw coal feeders are running in proportion. Feeders A01 and B01 were utilized respectively for South Africa Coal and Carbon powder. Total consumption of coal and Cp on both sides is Total Coal towards Kiln:

322.2 ton

Total Coal towards Calciner:

601.8 ton

Prepared By Process Team

Page 8

During trial the Pfisters error by LOW method is as below and these are the fuel tonnage by hourly loss of weight method Main (ton) -0.39 -1.02 -0.67

PC (ton) -0.13 -0.12 0.37

Hourly Average (ton) Day Average

-0.69 -16.64

0.04 0.96

Consumption after Error

305.6

602.8

Description

Specific heat consumption by Heat Balance Tool:

Prepared By Process Team

746 Kcal/Kg clinker

Page 9

1.3 Specific Power Consumption SPC up to Clinker:

62.88 Kwh/ton clinker

SPC up to Kiln area:

32.39 Kwh/ton clinker

1.4 Clinker Factor Kiln Feed consumed during trial:

11524 ton

Clinker weighed:

7195 ton

Clinker Factor:

1.602

Clinker Factor by adding Kiln Feed scale error: 1.67 Raw mill dust was fed directly to the kiln through-out the trail. Kiln feed scale error requires LOW calibration during shutdown.

Prepared By Process Team

Page 10

1.5 System Gas Balance Sheet Gas balance around the whole system is as below and false air across the Preheater is 33395 Nm3/hr or 14.8% which is higher than its target value <7%.

1.6 Clinker Quality The free lime average during the trail was well within the plant operations target. The results from the hourly laboratory results is listed as Average Free Lime:

1.39%

Average Clinker Temperature:

158 C

Clinker Ltr Wight:

1210 g/Ltr

Clinker C3S:

58.53 %

Prepared By Process Team

Page 11

1.7 Action Plans Sr #

Description

Who

When

1

Kiln Inlet analyzer remained out of order throughout the trial, need to be improved its reliability for accurate fuel mix control in kiln and Calciner. Kiln ID fans J1T06 & J1T12 sealing work is required specially shafts sealing, expansion joints and casing joints. Preheater dust losses increased due C4-A bended dip tube and missed dispersion plates of C3B, C4A, C2B which Affecting the cyclone efficiencies, clinker factor and productivity, Need to be maintenance work for improving KPI’s.

Ch Asif/Sohail

29-April-2015

Pervaiz Iqbal

28-April-2015

Fahim-Ul-Ehsan

Scheduled

CO observed at the bottom cyclone exit gas up to 0.5%. This not only a safety hazard but also a waste of fuel due to incomplete combustion. 0.1% CO= 4Kcal/Kg clinker, total waste is 20 Kcal/Kg clinker, so need to be optimized the Calciner combustion by low moisture fuel (AF), small particle size, and good distribution of fuel w.r.t retention time. It also needs the C05 gozze neck cleaning in shutdown. Mechanical flaps were missed and stuck at Cyclone 4 & 5 both A and B side, need to be placed modified flaps with good sealing to stop the gases reversible path and good material flow.

Fahim-Ul-

Preheater Cyclones temperature difference indicating the poor heat transfer b/w material and gases need to be placed all the missing dispersion plates e.g. C3B, C4A, and C4B & C2B.

Muhammad

Scheduled

Ali/M Sajjadullah

Shutdown

Need to be replacing the cyclone-04 A-side bended dip tube because it effecting cyclone dust separating efficiency and pressure drop.

Muhammad

Scheduled

2

3

4

5

6

7

Prepared By Process Team

Shutdown

29-April-2015

Ehsan/Sajjadullah

Muhammad Ali/Fahim-ulEhan

Scheduled

Shutdown

Page 12

Ali/M Sajjadullah

Shutdown

Older generation sluice flaps are source for false air entry in the system at stage 5, 6, 7 and 8. These are to be replaced with new generation flaps for better sealing.

Pervaiz

Scheduled

Iqbal/Sohail

Shutdown

Error in Kiln Feed scale -4.41%, need to be calibrating the LOW kiln feed weigh system in shut down to remove the error.

Ch Asif/Fahim-

Scheduled

ul-Ehsan-Sohail

Shutdown

False air across the Preheater is 67427 Nm3/hr or 14.8% which is higher than its target value <7%. Need to be sealed properly the leakages points of sliding gates, Calciner outlet expansion joint, expansion joints, main doors, pocking holes and eye holes for saving heat & power

Pervaiz

29-April-2015

Pfister online calibration errors are beyond the acceptable limits specially Calciner side, need the Pfisters reliability regarding calibration error Cooler water spray flow meter is out of order, need to be replacing it with reliable meter.

Ch Asif/Sohail

27-April-2015

Ch Asif/Sohail

29-April-2015

13

Required validation of LOW method of fine coal bin to calculate SHC.

Ch Asif/FahimScheduled ulEhsan/Sajjadullah Shutdown

14

Kiln thermal loading is 5.54 MW/m2, standard is < 5.5 MW/m2, its need to be down by optimizing the main side fuel

Fahim-Ul-

8

9

10

11

12

Iqbal/Sohail

29-April-2015

Ehsan/Sajjadullah

15

Needs to be fine control tune of cyclone-05 set point for saving the fuel.

Prepared By Process Team

Imran Haider

29-April-2015

Page 13

Related Documents

Kiln Audit
January 2021 1
Kiln Erection
February 2021 3
Formulas Kiln
January 2021 2
Kiln Technical
March 2021 0
Kiln Questions
March 2021 0
Kiln Systems
February 2021 1

More Documents from "Yuri Botero"

Vade Mecum
March 2021 0
Kiln Audit
January 2021 1
Pcr And Types Of Pcr
March 2021 0
Arch Masonry
January 2021 0