Lifting Side

  • Uploaded by: sivareddy143
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Lifting Side as PDF for free.

More details

  • Words: 1,085
  • Pages: 9
Loading documents preview...
RAW MILL - 2 CONDITION MONITORING REPORT 14

13

Pressing Side

Date:19/09/2007 16

11

15

20(Base Frame)

12

Time:11AM Feed:

17

18

19(Base Frame)

4

3

6

5 10(Base Frame)

8 1

9(Base Frame)

Lifting Side Sl. Descrip No tion 1

1

2 3

H

7

2

Vibration V

A

H

Displacement V A

Code

Bearing Condition Colour Lub.No. Cond.No.

LR

HR

Remarks

0.1

0.5

0.8

-19

-19

2

1

1.1

1.2

-13

-19

3

1.7

1.9

1.2

4

4

2.3

2

1.6

5

5

6

6

1.3

1.5

1.4

7

7

1.2

2

1.6

8

8

1

1.2

2.1

9

9

1.3

1.4

0.1

10

10

0.8

1.2

0.1

11

11

2.9

1.5

0.8

A

Green

12

12

2.3

2.1

1.3

D

Red

13

13

1.5

1.7

1.7

14

14

1.8

1.9

1.8

15

15

1.8

1.9

1.3

16

16

1.3

1.6

1

17

17

1.4

1.9

1.4

18

18

1.7

1.9

1.5

19

19

1.1

1.3

0.1

20

20

0.1

0.3

0.3

Checked by

Section Incharge

Page 1 of 9

1 … …

47

5

-1

2

-18

Dept.Head

RAWMILL AREA CONDITION MONITORING REPORT Date: 02/07/07 Sl. No Description 1 Rawmill-1 Vent Bagfilter Fan D.E 2 Rawmill-1 Vent Bagfilter Fan N.D.E 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Rawmill-2 Vent Bagfilter Fan D.E Rawmill-2 Vent Bagfilter Fan N.D.E Rawmill-1 O-Sepa Fan D.E Rawmill-1 O-Sepa Fan N.D.E Rawmill-2 O-Sepa Fan D.E Rawmill-2 O-Sepa Fan N.D.E RABH fan D.E RABH fan N.D.E Rawmill-1 Circulating Elevator D.E Rawmill-1 Circulating Elevator N.D.E Rawmill-2 Circulating Elevator D.E Rawmill-2 Circulating Elevator N.D.E Blending Silo feeding Elevator D.E Blending Silo feeding Elevator N.D.E Pinion Bearings Rawmill-1 Lifting side D.E Rawmill-1 Lifting side N.D.E Rawmill-1 Pressing side D.E Rawmill-1 Pressing side N.D.E Rawmill-2 Lifting side D.E Rawmill-2 Lifting side N.D.E Rawmill-2 Pressing side D.E Rawmill-2 Pressing side N.D.E

Checked by

Time: 08:00AM H 4.1 1.8 6.6 3 1.6 2.3 1 1 2.8 0.6 0.9 0.9 8.9 10.5 8.3 7 1.3 2.2

Vibration V 1.7 0.8 2.5 1.1 1 1.6 0.8 0.5 1.9 0.4 0.8 1 5.1 6.5 6.2 9.5 1.5 1.3

A 2.1 0.9 2.1 1.1 1.3 1.2 1.6 1.5 2.5 1 1.6 1.2 7.3 6.4 4.8 4.7 1.1 1.2

1.5 1.3 1.9 2.1 1.6 1.6 1.9 3.6

1.4 0.7 1.5 1.2 3.2 0.8 2.3 2.1

0.9 0.6 0.7 0.7 1.2 0.9 1.6 1.5

Bearing Condition Code Colour Lub.No. Cond.No. A

Green

3

A

Green

3

A A A A A A

Green Green Green Green Green Green

4 4 2 4 2 2

D A

Red Green

Section Incharge

41 4

LR 35 44 38 31 25 41 25 26 30 24 24 19 20 17 17 13 -18 -19

HR 31 40 33 27 19 37 20 21 26 20 19 15 -5 -11 0 -7 -19 -19

11 8

-7 -1

Remarks 16/07/2007 5:30PM 16/07/2007 5:30PM

Dept.Head

7

19

16

M16 x 2

34

22

20

Bolt

22

25

RAWMILL MAIN DRIVE GEAR BOX AND MOTOR VIBRATION REPORT Output shaft

Date: 03/07/07

6

4

2

5

3

1

Time: 10:30AM

Input Shaft

Sl. No 1 2 3 4 5 6 7 8

Description Gear box Rawmill-1 Lifting side Rawmill-1 Pressing side Rawmill-2 Lifting side Rawmill-2 Pressing side Motor Rawmill-1 Lifting side Rawmill-1 Pressing side Rawmill-2 Lifting side Rawmill-2 Pressing side

H 2 1.4 1.9 2.2

1 V

1.6 1.6 2.9 2.2 Bearing 2.2 1.2 2 1.5 1.7 2.1 1 0.6

Checked by

A 1.6 2 2.2 2.1 1.2 1.4 1.4 1

H

2 V

A

H

3 V

A

H

2.2 1.7 1.5 1.9 2 1.3 1.9 1.8 1.9 1.3 2.6 1.5 1.6 3.5 2.9 3.1 1.8 2.2 3.6 2.2 2.7 2.2 1.5 2 1.5 2.2 Motor Base frame Gearbox Base frame 1 0.7 0.9 1.7 1.4 1.2 0.6 1.1 1.1 1.5 1.5 1.6 1.3 1.4 0.5 1.9 2.2 1 0.7 0.5 0.4 1.5 1.9 1.4

Section Incharge

4 V

A

2.2

1.8

2.4

1.8

H

5 V

A

H

6 V

A

2.1 1.5 2.8 1.6

1.5 1.3 2.7 2.6

2 1.3 2.8 1.7

2.1 1.4 1.6 2.1

2.4 2 2.5 2.4

1.7 1.2 2.7 2

Dept.Head

RAW MILL - 1 CONDITION MONITORING REPORT 14

13

Pressing Side

Date:19/09/2007 15

11

16

20(Base Frame)

12

Time:9AM Feed:

17

18

19(Base Frame)

4

3 6

5

10(Base Frame)

8 1

9(Base Frame)

Lifting Side Sl. Descrip No tion

H

7

2

Vibration V

1

1

0.8

0.4

2

2

0.4

3

3

0.9

4

4

5

5

6

A

H

Displacement V A

Code

Bearing Condition Colour Lub.No. Cond.No.

LR

HR

Remarks

0.6

-18

-19 E3

0.9

1

-17

-19 E3

1

1.2

2.2

0.9

1.2

6

1

1.5

1.3

7

7

1.4

1.3

1.2

8

8

1.3

1.4

1.4

9

9

1.5

1.9

1.2

10

10

0.9

0.5

0.3

11

11

1.2

0.9

0.6

D

Red



44

1

-18

12

12

0.2

1.4

0.7

C

Yellow



32

-1

-16

13

13

1.3

1.3

1.5

14

14

0.1

0.2

0.3

15

15

2

1.4

0.2

16

16

1.3

1.4

0.2

17

17

1.4

1.1

1.1

18

18

1.6

1.1

1.3

19

19

1.3

0.9

1.4

20

20

1.1

0.7

0.3

Checked by

Section Incharge

Page 6 of 9

Dept.Head

RAWMILL AREA FANS CONDITION MONITORING REPORT Date: Time: Mill Feed: 1

Sl. No

2

Temperat ure

Description

H

Vibration V

A

H

Displacement V A

Code

Bearing Condition Colour Lub.No. Cond.No.

LR

1 Rawmill-1 Vent Bag filter Fan 1

2.1

0.8

0.9

2

2.8

1.3

1.1

2.8

1

2.6

1.5

2 Rawmill-2 Vent Bag filter Fan 1 2 3 Rawmill-1 O-Sepa Fan 1 2 4 Rawmill-2 O-Sepa Fan 1 2 5 RABH Fan 1 2

Checked by

Section Incharge

Dept.Head

HR

Remarks

RAWMILL AREA BUCKET ELEVATORS CONDITION MONITORING REPORT Date: Time:

1

2 Mill Feed:

Sl. No

Description

H

Vibration V

A

H

Displacement V A

Code

Bearing Condition Colour Lub.No. Cond.No.

LR

HR

1 Rawmill-1 Circulating Elevator 1 2 2 Rawmill-2 Circulating Elevator 1 2 3 BlendingSilo Feeding Elevator 1 2 4 Dust Silo Elevator 1 2

Checked by

Section Incharge

Dept.Head

Remarks

RAWMILL O-SEPA SEPARATOR CONDITION MONITORING REPORT 4(Base Frame)

Date: Time: 3 2

5(Base Frame)

Mill Feed:

1

Sl. No

Description

H

Vibration V

A

H

Displacement V A

Code

Bearing Condition Colour Lub.No. Cond.No.

LR

HR

1 Rawmill-1 O-Sepa 1 2 3 4 5 2 Rawmill-2 O-Sepa 1 2 3 4 5

Checked by

Section Incharge

Dept.Head

Remarks

Related Documents

Lifting Side
January 2021 1
Lifting Lug
February 2021 1
Lifting Lug.xlsx
February 2021 1
Lifting Operation
March 2021 0
Lifting-lug.xls
February 2021 1

More Documents from "Sajal Kulshrestha"