Loading documents preview...
RAW MILL - 2 CONDITION MONITORING REPORT 14
13
Pressing Side
Date:19/09/2007 16
11
15
20(Base Frame)
12
Time:11AM Feed:
17
18
19(Base Frame)
4
3
6
5 10(Base Frame)
8 1
9(Base Frame)
Lifting Side Sl. Descrip No tion 1
1
2 3
H
7
2
Vibration V
A
H
Displacement V A
Code
Bearing Condition Colour Lub.No. Cond.No.
LR
HR
Remarks
0.1
0.5
0.8
-19
-19
2
1
1.1
1.2
-13
-19
3
1.7
1.9
1.2
4
4
2.3
2
1.6
5
5
6
6
1.3
1.5
1.4
7
7
1.2
2
1.6
8
8
1
1.2
2.1
9
9
1.3
1.4
0.1
10
10
0.8
1.2
0.1
11
11
2.9
1.5
0.8
A
Green
12
12
2.3
2.1
1.3
D
Red
13
13
1.5
1.7
1.7
14
14
1.8
1.9
1.8
15
15
1.8
1.9
1.3
16
16
1.3
1.6
1
17
17
1.4
1.9
1.4
18
18
1.7
1.9
1.5
19
19
1.1
1.3
0.1
20
20
0.1
0.3
0.3
Checked by
Section Incharge
Page 1 of 9
1 … …
47
5
-1
2
-18
Dept.Head
RAWMILL AREA CONDITION MONITORING REPORT Date: 02/07/07 Sl. No Description 1 Rawmill-1 Vent Bagfilter Fan D.E 2 Rawmill-1 Vent Bagfilter Fan N.D.E 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Rawmill-2 Vent Bagfilter Fan D.E Rawmill-2 Vent Bagfilter Fan N.D.E Rawmill-1 O-Sepa Fan D.E Rawmill-1 O-Sepa Fan N.D.E Rawmill-2 O-Sepa Fan D.E Rawmill-2 O-Sepa Fan N.D.E RABH fan D.E RABH fan N.D.E Rawmill-1 Circulating Elevator D.E Rawmill-1 Circulating Elevator N.D.E Rawmill-2 Circulating Elevator D.E Rawmill-2 Circulating Elevator N.D.E Blending Silo feeding Elevator D.E Blending Silo feeding Elevator N.D.E Pinion Bearings Rawmill-1 Lifting side D.E Rawmill-1 Lifting side N.D.E Rawmill-1 Pressing side D.E Rawmill-1 Pressing side N.D.E Rawmill-2 Lifting side D.E Rawmill-2 Lifting side N.D.E Rawmill-2 Pressing side D.E Rawmill-2 Pressing side N.D.E
Checked by
Time: 08:00AM H 4.1 1.8 6.6 3 1.6 2.3 1 1 2.8 0.6 0.9 0.9 8.9 10.5 8.3 7 1.3 2.2
Vibration V 1.7 0.8 2.5 1.1 1 1.6 0.8 0.5 1.9 0.4 0.8 1 5.1 6.5 6.2 9.5 1.5 1.3
A 2.1 0.9 2.1 1.1 1.3 1.2 1.6 1.5 2.5 1 1.6 1.2 7.3 6.4 4.8 4.7 1.1 1.2
1.5 1.3 1.9 2.1 1.6 1.6 1.9 3.6
1.4 0.7 1.5 1.2 3.2 0.8 2.3 2.1
0.9 0.6 0.7 0.7 1.2 0.9 1.6 1.5
Bearing Condition Code Colour Lub.No. Cond.No. A
Green
3
A
Green
3
A A A A A A
Green Green Green Green Green Green
4 4 2 4 2 2
D A
Red Green
Section Incharge
41 4
LR 35 44 38 31 25 41 25 26 30 24 24 19 20 17 17 13 -18 -19
HR 31 40 33 27 19 37 20 21 26 20 19 15 -5 -11 0 -7 -19 -19
11 8
-7 -1
Remarks 16/07/2007 5:30PM 16/07/2007 5:30PM
Dept.Head
7
19
16
M16 x 2
34
22
20
Bolt
22
25
RAWMILL MAIN DRIVE GEAR BOX AND MOTOR VIBRATION REPORT Output shaft
Date: 03/07/07
6
4
2
5
3
1
Time: 10:30AM
Input Shaft
Sl. No 1 2 3 4 5 6 7 8
Description Gear box Rawmill-1 Lifting side Rawmill-1 Pressing side Rawmill-2 Lifting side Rawmill-2 Pressing side Motor Rawmill-1 Lifting side Rawmill-1 Pressing side Rawmill-2 Lifting side Rawmill-2 Pressing side
H 2 1.4 1.9 2.2
1 V
1.6 1.6 2.9 2.2 Bearing 2.2 1.2 2 1.5 1.7 2.1 1 0.6
Checked by
A 1.6 2 2.2 2.1 1.2 1.4 1.4 1
H
2 V
A
H
3 V
A
H
2.2 1.7 1.5 1.9 2 1.3 1.9 1.8 1.9 1.3 2.6 1.5 1.6 3.5 2.9 3.1 1.8 2.2 3.6 2.2 2.7 2.2 1.5 2 1.5 2.2 Motor Base frame Gearbox Base frame 1 0.7 0.9 1.7 1.4 1.2 0.6 1.1 1.1 1.5 1.5 1.6 1.3 1.4 0.5 1.9 2.2 1 0.7 0.5 0.4 1.5 1.9 1.4
Section Incharge
4 V
A
2.2
1.8
2.4
1.8
H
5 V
A
H
6 V
A
2.1 1.5 2.8 1.6
1.5 1.3 2.7 2.6
2 1.3 2.8 1.7
2.1 1.4 1.6 2.1
2.4 2 2.5 2.4
1.7 1.2 2.7 2
Dept.Head
RAW MILL - 1 CONDITION MONITORING REPORT 14
13
Pressing Side
Date:19/09/2007 15
11
16
20(Base Frame)
12
Time:9AM Feed:
17
18
19(Base Frame)
4
3 6
5
10(Base Frame)
8 1
9(Base Frame)
Lifting Side Sl. Descrip No tion
H
7
2
Vibration V
1
1
0.8
0.4
2
2
0.4
3
3
0.9
4
4
5
5
6
A
H
Displacement V A
Code
Bearing Condition Colour Lub.No. Cond.No.
LR
HR
Remarks
0.6
-18
-19 E3
0.9
1
-17
-19 E3
1
1.2
2.2
0.9
1.2
6
1
1.5
1.3
7
7
1.4
1.3
1.2
8
8
1.3
1.4
1.4
9
9
1.5
1.9
1.2
10
10
0.9
0.5
0.3
11
11
1.2
0.9
0.6
D
Red
…
44
1
-18
12
12
0.2
1.4
0.7
C
Yellow
…
32
-1
-16
13
13
1.3
1.3
1.5
14
14
0.1
0.2
0.3
15
15
2
1.4
0.2
16
16
1.3
1.4
0.2
17
17
1.4
1.1
1.1
18
18
1.6
1.1
1.3
19
19
1.3
0.9
1.4
20
20
1.1
0.7
0.3
Checked by
Section Incharge
Page 6 of 9
Dept.Head
RAWMILL AREA FANS CONDITION MONITORING REPORT Date: Time: Mill Feed: 1
Sl. No
2
Temperat ure
Description
H
Vibration V
A
H
Displacement V A
Code
Bearing Condition Colour Lub.No. Cond.No.
LR
1 Rawmill-1 Vent Bag filter Fan 1
2.1
0.8
0.9
2
2.8
1.3
1.1
2.8
1
2.6
1.5
2 Rawmill-2 Vent Bag filter Fan 1 2 3 Rawmill-1 O-Sepa Fan 1 2 4 Rawmill-2 O-Sepa Fan 1 2 5 RABH Fan 1 2
Checked by
Section Incharge
Dept.Head
HR
Remarks
RAWMILL AREA BUCKET ELEVATORS CONDITION MONITORING REPORT Date: Time:
1
2 Mill Feed:
Sl. No
Description
H
Vibration V
A
H
Displacement V A
Code
Bearing Condition Colour Lub.No. Cond.No.
LR
HR
1 Rawmill-1 Circulating Elevator 1 2 2 Rawmill-2 Circulating Elevator 1 2 3 BlendingSilo Feeding Elevator 1 2 4 Dust Silo Elevator 1 2
Checked by
Section Incharge
Dept.Head
Remarks
RAWMILL O-SEPA SEPARATOR CONDITION MONITORING REPORT 4(Base Frame)
Date: Time: 3 2
5(Base Frame)
Mill Feed:
1
Sl. No
Description
H
Vibration V
A
H
Displacement V A
Code
Bearing Condition Colour Lub.No. Cond.No.
LR
HR
1 Rawmill-1 O-Sepa 1 2 3 4 5 2 Rawmill-2 O-Sepa 1 2 3 4 5
Checked by
Section Incharge
Dept.Head
Remarks