Project : Khurais Crude Facilities Location : Khurais Saudi Arabia Zone A Igloo 1
Activities
DIG1FND043 DIG1FND021 DIG1FND022 DIG1FND031 DIG1FND032 DIG1FND033 DIG1FND034 DIG1FND035 DIG1FND036 DIG1FND037 DIG1FND038 DIG1GFD031 DIG1GFD032 DIG1GFD033 DIG1GFD034 DIG1GFD041 DIG1GFD081 DIG1GFD082 DIG1GFD083 DIG1GFD101 DIG1GFD091 DIG1GFD092 DIG1GFD093 DIG1GFD094 DIG1GFD151 DIG1GFD152 DIG1GFD153 DIG1GFD154 DIG1GFD155 DIG1GFD161 DIG1GFD162 DIG1GFD164 DIG1GFD163 DIG1GFD165 DIG1GFD166 DIG1GFD167 DIG1GFD168 DIG1GFD169 DIG1GD1610 DIG1GD1612 DIG1GD1613 DIG1GD1614 DIG1GD1615 DIG1RFD071 DIG1RFD072 DIG1RFD073 DIG1GND021 DIG1GND022 DIG1GND031 DIG1GND032 DIG1GND036 DIG1GND034 DIG1GND035 DIG1GND091 DIG1GND092 DIG1GND162 DIG1GND161 DIG1MD0201 DIG1MD0211 DIG1MD0221 DIG1MD0241 DIG1MD0301
Demolition works of existing 8 Igloss Excavation Of Foundation Structrural Backfilling upto the Slab On Grade Form Work For Blinding Concrete For Footing Pouring For Blinding Concrete For Footing Form Work For Strip Footing Pouring Concrete For Strip Footing Form Work & Rebars For Column and Wall Neck Pouring Concrete For Wall Neck Damp Proofing to Walls and Foundation Rebars & Pouring Concrete For Slab on Grade with Form Work & Rebars for Columns &Walls at G.FL. Pouring Concrete For Columns & Walls at G.FL. Form Work & Rebar at G. Floor Sus. Beam & Slab Pouring Conc. G.Floor Sus. Beam& Slab Masonry Block Work - Supply & Install Install & Fix steel Door Frame- Anti Blast Doors Install& Fix steel Door & Acc.- Sand Blast doors Install & Fix Anti Blast Doors, Sliding Plastering Works for Block Walls Prepare the Walls Surface to Receive Paint First Stage of Painting Include-One underCoat Epoxy paint Final Stage of Painting Include Three Coats Install Portable Fire Extinguishers Install HVAC Duct Works, including Dampers Install Package Air Condition Units Install sound attenuators ,vav boxes, . . etc Install Air Outlets & Inlets, Air Grill Install Electrical Conduit at Ground Floor Install and Fix Cable Tray Lay & Pull Feeding Wires Lay & Pull Feeding Cables Install Electrical Panel Boards Install Switches & Outlets Install & Fix Sockets Install Lights & Fixtures at Ground Floor Install Conduits for Telephone and Data Network Install & Lay Feeder Cables & Wires Install Tele. & Data Accessories Outlets Install Fire Alarm Conduit - First Fix Lay & Pull Wires and Cables Install Fire Alarm EQ. and Accessories Install & Lay Foam Concrete for Roof Install Water Proofing Membrane for Roof Install protection board on top of roof W.P. Excavate Top Soil under Traverses & Compaction. Sand Filling and compaction -Sides of Traverses LCC Concrete under Traverses R.W. / Blinding RCC Traverses R.W. - FM/WK & Rebars /Conc. Pour RCC Parapet - FM/WK / Rebar & Pouring Concrete Aggregate Fill For Embankment Dry Mix - Traverse Surfacing 50mm External Plastering Works for Walls External Paint Install & Fix Cupper Tape with air Terminal Install Earthing pits, Bonding to structure Excavation of Foundation Backfilling up to the Bottom of Duct Slab Backfilling up to Slab on Grade Bacfill &Form Earth Traverse to Duct &Mech Plant Fmwk - Blinding Conc. to Mech Plant R.W. Footing
Concretor
Carpenter
Carpenter Helper
Steel Fixer
Steel Fixer Welder
Steel Fixer Helper
Waterproofer
Labor
Mason
Mason Helper
Tiler
Tile Helper
Fin. Carpenter
Struc. Steel Worker
Painter
Kerbstone/EX MEP T Tile Layer TECH/HELP
1 1 1 21.66 21.66 21.66
81.36 81.36 81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94 32.94 32.94
170.00
1
1
1
1
1
1
1
1
1
1
1 1
1 1
1
1
51.52 1
21.66 21.66 21.66
81.36 81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94 32.94
170.00 170.00
51.52 51.52
170.00
51.52
81.36 81.36 81.36
32.94 32.94 32.94
170.00 170.00 170.00
1
1
51.52 51.52 51.52 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
21.66 21.66 21.66
81.36 81.36 81.36
32.94 32.94 32.94
170.00 170.00
51.52 51.52
1 1
1 1
1
1
1 1 1 1 1 1 1 1 1 81.36
32.94
1
1
Earth Wks/Road Wks. Labor Crew
Asphalt Worker
DIG1MD0311 DIG1MD0321 DIG1MD0341 DIG1MD0342 DIG1MD0343 DIG1MD0381 DIG1MD0392 DIG1MD0344 DIG1MD0394 DIG1MD0345 DIG1MD0396 DIG1MD0398 DIG1MD0346 DIG1MD0351 DIG1MD0371 DIG1MD0372 DIG1MD0373 DIG1MD0397 DIG1MD0374 DIG1MD0701 DIG1MD0711 DIG1MD0731 DIG1MD0801 DIG1MD1502 DIG1MD1511 DIG1MD1581 DIG1MD1591 DIG1MD1512 DIG1MD1522 DIG1MD1513 DIG1MD1531 DIG1MD1541 DIG1MD1521 DIG1MD1601 DIG1MD1602 DIG1MD1603 DIG1MD1604 DIG1MD1613 DIG1MD1561 DIG1MD1571 DIG1MD1551 DIG1MD1621 DIG1TCD151 DIG1TCD152 DIG1TCD161 DIG1TCD162 DIG1TCD163 DIG2FND021 DIG2FND022 DIG2FND031 DIG2FND032 DIG2FND033 DIG2FND034 DIG2FND035 DIG2FND036 DIG2FND037 DIG2FND038 DIG2GFD031 DIG2GFD032 DIG2GFD033 DIG2GFD034 DIG2GFD041 DIG2GFD083 DIG2GFD081 DIG2GFD082 DIG2GFD090 DIG2GFD091 DIG2GFD092 DIG2GFD093 DIG2GFD094 DIG2GFD151 DIG2GFD152
Pour Blinding Conc. to Mech Plant R.W. Footing Rebars & Formworks to Footing for Retaining Wall Pouring Concrete to Footing for Retaining Wall Formwork & Rebars for R. Wall Neck Concrete for R. Wall Neck Fmwk &Rebars to Retain. Wall of Mechanical Plant Concrete to Retaining Wall of Mechanical Plant Fmwk of blinding for Base slab - Concrete Duct Fmwk & Rebars to Mech. Plant Slab on Grade Pour blinding Conc for Base slab - Concrete Duct Concrete to Mech. Plant Slab on Grade RCC Works for Concrete Plinth - Mech Equipment Pour Conc. Protec'n to Conc Duct &M.P. Base Slab Rebars & Fmwk to Base Slab & Wall of Conc. Duct Pour Concrete to Base Slab & Walls of Conc Duct Rebars & Fmwks to Conc. Duct going up to Igloo Pour Concrete Of Concrete Duct going up to Igloo Provide new Concrete Hardstanding near EWS Install Precast Slab covering to Concrete Duct Install Waterproofing Membrane to Blinding Install Waterproofing Membrane to Conc.Duct& R.W Install Protect'n Board to Conc.Duct & Mech.Wall Install Internal Security Grill Provide Gulley/Condensate Drainage System Supply and Install Portable Fire Extinguishers Install Humidifier Water Tank Install Packaged Water Booster Pump set Install &Insulate Duct insde Conc. Duct &Testing Install Fire Damper for the Concrete Duct Install External Insulated Ductwork to AHU Install Spark Arrestor for external Ductworks Install Humidity & Temp're Control for Ext Duct Install External Package Air Handling Unit Install Elect Feeding Conduit and Wirings Install Main Switchboard Conduits and Wirings Install Emergency Isolation Panel Conduits & Wir Install Main Distibution Board & other D.B's Install Emergency Isolation Panel Provide Power & Control System to Water Booster Provide Power & Control Sys. to Humidifier H2O T Provide Power and Control System to all AHU Install Emerg. Lighting &Central Battery System Testing & Commissioning for Fire Fighting System Testing & Commissioning of HVAC Testing & Commissioning of Electrical System Testing & Commissioning of Telephone System Testing & Commissioning for Fire Alarm System Excavation Of Foundation Structrural Backfilling upto the Slab On Grade Form Work For Blinding Concrete For Footing Pouring For Blinding Concrete For Footing Form Work For Strip Footing Pouring Concrete For Strip Footing Form Work & Rebars For Column and Wall Neck Pouring Concrete For Wall Neck Damp Proofing to Walls and Foundation Rebars & Pouring Concrete For Slab on Grade with Form Work & Rebars for Columns &Walls at G.FL. Pouring Concrete For Columns & Walls at G.FL. Form Work & Rebar at G. Floor Sus. Beam & Slab Pouring Conc. G.Floor Sus. Beam& Slab Masonry Block Work - Supply & Install Install & Fix Anti Blast Doors, Sliding Install & Fix steel Door Frame- Anti Blast Doors Install& Fix steel Door & Acc.- Sand Blast doors Plastering Works for Block Walls Prepare the Walls Surface to Receive Paint First Stage of Painting Include-One underCoat Epoxy paint Final Stage of Painting Include Three Coats Install Portable Fire Extinguishers Install HVAC Duct Works, including Dampers
21.66 21.66 21.66 21.66
21.66 21.66 21.66 21.66 21.66 21.66 21.66 21.66
81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94
170.00
51.52
170.00
51.52
170.00
51.52
170.00
1
1
1
1
1
1
1
1
1 1 1 1
1 1 1 1
1 1
1 1
1 1
1 1
1
170.00
1
170.00
1
170.00
1
1 1 1 81.36
32.94
170.00
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
21.66 21.66 21.66
81.36 81.36 81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94 32.94 32.94
170.00
1
1
1
1
1
1
1
1
1
1
1 1
1 1
1 1
1 1
1 1
21.66 21.66 21.66
81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94
170.00 170.00
1 1
170.00
1
170.00 170.00
1
1
1 1
1 1 1 1 1
DIG2GFD153 DIG2GFD154 DIG2GFD155 DIG2GFD161 DIG2GFD162 DIG2GFD164 DIG2GFD163 DIG2GFD165 DIG2GFD166 DIG2GFD167 DIG2GFD168 DIG2GFD169 DIG2GD1610 DIG2GD1612 DIG2GD1613 DIG2GD1614 DIG2GD1615 DIG2RFD071 DIG2RFD072 DIG2RFD073 DIG2GND021 DIG2GND022 DIG2GND031 DIG2GND032 DIG2GND036 DIG2GND034 DIG2GND035 DIG2GND091 DIG2GND092 DIG2GND161 DIG2GND162 DIG2MPD252 DIG2MPD262 DIG2MPD272 DIG2MD0201 DIG2MD0202 DIG2MD0203 DIG2MD0206 DIG2MD0301 DIG2MD0311 DIG2MD0321 DIG2MD0341 DIG2MD0342 DIG2MD0343 DIG2MD0381 DIG2MD0392 DIG2MD0344 DIG2MD0345 DIG2MD0346 DIG2MD0351 DIG2MD0371 DIG2MD0372 DIG2MD0373 DIG2MD0374 DIG2MD0394 DIG2MD0396 DIG2MD0398 DIG2MD0701 DIG2MD0711 DIG2MD0731 DIG2MD0801 DIG2MD15P1 DIG2MD15F1 DIG2MD15H1 DIG2MD15H2 DIG2MD15H3 DIG2MD15H4 DIG2MD15H5 IG2MD15H6 DIG2MD15H7 DIG2MD15H8 DIG2MD16E1
Install Package Air Condition Units Install sound attenuators ,vav boxes, . . etc Install Air Outlets & Inlets, Air Grill Install Electrical Conduit at Ground Floor Install and Fix Cable Tray Lay & Pull Feeding Wires Lay & Pull Feeding Cables Install Electrical Panel Boards Install Switches & Outlets Install & Fix Sockets Install Lights & Fixtures at Ground Floor Install Conduits for Telephone and Data Network Install & Lay Feeder Cables & Wires Install Tele. & Data Accessories Outlets Install Fire Alarm Conduit - First Fix Lay & Pull Wires and Cables Install Fire Alarm EQ. and Accessories Install & Lay Foam Concrete for Roof Install Water Proofing Membrane for Roof Install protection board on top of roof W.P. Excavate Top Soil under Traverses & Compaction. Sand Filling and compaction -Sides of Traverses LCC Concrete / Blinding under Traverses R.W. RCC - FM/WK & Rebars /Conc rour- Traverses R.W. RCC Parapet - FM/WK / Rebar & Pouring Concrete Aggregate Fill on Embankment Dry Mix - Traverse Surfacing 50mm External Plastering Works for Walls External Paint Install Earthing pits, Bonding to structure Install & Fix Cupper Tape with air Terminal Structural Condition Survey Reports Utilize Electromagnetic Cable Detector Relocate Existing Cables affected if necessary Excavation of Foundation Backfilling up to the Bottom of Duct Slab Backfilling up to Slab on Grade Bacfill &Form Earth Traverse to Duct &Mech Plant Fmwk - Blinding Conc. to Mech Plant R.W. Footing Pour Blinding Conc. to Mech Plant R.W. Footing Rebars & Formworks to Footing for Retaining Wall Pouring Concrete to Footing for Retaining Wall Formwork & Rebars for R. Wall Neck Concrete for R. Wall Neck Fmwk &Rebars to Retain. Wall of Mechanical Plant Concrete to Retaining Wall of Mechanical Plant Fmwk of blinding for Base slab - Concrete Duct Pour blinding Conc for Base slab - Concrete Duct Pour Conc. Protec'n to Conc Duct &M.P. Base Slab Rebars & Fmwk to Base Slab & Wall of Conc. Duct Pour Concrete to Base Slab & Walls of Conc Duct Rebars & Fmwks to Conc. Duct going up to Igloo Pour Concrete Of Concrete Duct going up to Igloo Install Precast Slab covering to Concrete Duct Fmwk & Rebars to Mech. Plant Slab on Grade Concrete to Mech. Plant Slab on Grade RCC Works for Concrete Plinth - Mech Equipment Install Waterproofing Membrane to Blinding Install Waterproofing Membrane to Conc.Duct& R.W Install Protect'n Board to Conc.Duct & Mech.Wall Install Internal Security Grill Provide Gulley/Condensate Drainage System Supply and Install Portable Fire Extinguishers Install &Insulate Duct insde Conc. Duct &Testing Install Fire Damper for the Concrete Duct Install External Insulated Ductwork to AHU Install External Package Air Handling Unit Install Humidifier Water Tank Install Packaged Water Booster Pump set Install Spark Arrestor for external Ductworks Install Humidity & Temp're Control for Ext Duct Install Elect Feeding Conduit and Wirings
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21.66 21.66 21.66
81.36 81.36 81.36
32.94 32.94 32.94
170.00 170.00
1 1 1
1 1
1 1 1
1 1 1 1 1 1
1 1 1 1 21.66 21.66 21.66 21.66 21.66
81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94
170.00
1
170.00
1
170.00
1
1
1
1
1
1
1
1
1
1
1
1 1 1 1
1 1 1 1
1 1
1 1
1 21.66 21.66 21.66 21.66 21.66
81.36 81.36 81.36 81.36 81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94 32.94 32.94 32.94 32.94
170.00
1
170.00
1
170.00
1
170.00
1 1 1 1
81.36
170.00
1 1 1 1 1 1 1 1 1 1 1 1
DIG2MD16E2 DIG2MD16E3 DIG2MD16E4 DG2MPD16E7 DG2MPD15E6 DIG2MD15E5 DG2MPD16E8 DG2MPD16E9 DIG2TCD151 DIG2TCD152 DIG2TCD161 DIG2TCD162 DIG2TCD163 DIG2GND061 DIG2GND063 DIG2GND073 DEUMSTMH01 DEUMSTMH03 DEUMSTMH02 DEUMSTMH04 DEUMSTMH05 DEUMSTMH06 DEUMSTSP01 DEUMSTSP02 DEUERS01 DEUERS02 DEUERS03 DEUERS04 DEUERS05 DEUERS06 DEUENC004 DEUENC005 DEUENC006 DEUENC007 DEUENC008 DEUENC0010 DEUENC009 DEUENC023 DEUENC013 DIG1GND043 DIG1GND033 DIG2GND033 DIG2GND043 DIG2GND053 DIGLWKCOM9
Install Main Switchboard Conduits and Wirings Install Main Distibution Board & other D.B's Install Emergency Isolation Panel Conduits & Wir Install Emerg. Lighting Central Battery System Provide Power & Control Sys. to Humidifier Water Provide Power & Control System to Water Booster Install Emergency Isolation Panel Provide Power and Control System to all AHU Testing & Commissioning for Fire Fighting System Testing & Commissioning of HVAC Testing & Commissioning of Electrical System Testing & Commissioning of Telephone System Testing & Commissioning for Fire Alarm System Exsiting W.T.'s Evacuate & Clean Refurbished Emergency Water Tank - 1 Refurbished Emergency Water Tank - 2 Excavation & Concrete Works for Manholes/Gully Excavation for surface water lines Water Proofing works for Manhole/Gully Pipe laying for surface water lines Backfilling above pipes Testing & Commissioning Civil works & Side RipRap for Soakaway ponds Mechanical works for Soakaway ponds Refurbish Electrical Substation S/S 02 E/M works for Package substation S/S 02 & Genset Supply and Install Ring Main Unit / Transformer Supply and Install Package substation 1000KVA Install Main Distribution Board / Main Breakers Install Stand by Generator/Fuel Tank & Accs. Excavation for L.V Cable Supply & Installation L.V Cable-300sq mm 4C XLPE Cable Protection / Warning Tape & Backfilling Excavation for Duct Bank Installation Duct Bank w/ Conc Protec. as spec. F.O. Cable Protection /Warning Tape &Backfilling Backfilling for Ductbank Testing & Commissioning -Mechanical Works Testing & Commissioning -Electrical Works Lay Basecourse for Parking Areas & Service Roads RCC concrete Hardstands & Asphalt works -IG1 RCC concrete Hardstands & Asphalt works- IG2 Install Road markings & Signage Utilities/Roads Completion - IG1 & IG2 Building Works Completion - IG1 & IG2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21.66
81.36
32.94
170.00
1
1 1
1
1
1 1 1 1 81.36
32.94
170.00
1
1 1 1 1 1 1 1 1 1 1 1
21.66
81.36
32.94
1
1 1 1 1
1 1 1
21.66 21.66
81.36 81.36 81.36 81.36
32.94 32.94 32.94 32.94
170.00 170.00
1
953.05
6671.40
2668.50
6290.10
1 1
0.00
643.19
1 1
14.00
30.00
49.00
48.00
2.00
2.00
0.00
9.00
0.00
0.00
111.00
0.00
2.00
GOSP 2 Activities General excavation General Backfilling of Areas/Roads Subbase preparation under paving Limited excavation up to 1.5 m Limited Excavation (Over 1.5m depth) Reinf concrete pit for sewer Installation of PVC drainage system Installation of Cast Iron Drainage Laying of Sand for Pipe Prot. Lay of slabs/bricks Cables
Road (Base course+ subbase) Asphalting of Roads Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support Foundation Protection Execution of expansion joints PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
GOSP 3 Activities General excavation General Backfilling of Areas/Roads Subbase preparation under paving Limited excavation up to 1.5 m Limited Excavation (Over 1.5m depth) Reinf concrete pit for sewer Installation of PVC drainage system Installation of Cast Iron Drainage Laying of Sand for Pipe Prot. Lay of slabs/bricks Cables Road (Base course+ subbase) Asphalting of Roads Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support Foundation Protection Execution of expansion joints PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
GOSP 4 Activities General excavation General Backfilling of Areas/Roads Subbase preparation under paving Limited excavation up to 1.5 m Limited Excavation (Over 1.5m depth) Reinf concrete pit for sewer Installation of PVC drainage system Installation of Cast Iron Drainage Laying of Sand for Pipe Prot.
Lay of slabs/bricks Cables Road (Base course+ subbase) Asphalting of Roads Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support Foundation Protection Execution of expansion joints PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
INLET / OUTLET Activities General excavation General Backfilling of Areas/Roads Subbase preparation under paving Limited excavation up to 1.5 m Limited Excavation (Over 1.5m depth) Reinf concrete pit for sewer Installation of Cast Iron Drainage Laying of Sand for Pipe Prot. Lay of slabs/bricks Cables Road (Base course+ subbase) Asphalting of Roads Lean Concrete Reinforced Concrete UP TO +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support Foundation Protection Execution of expansion joints PR / Lay light items (Real V) Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) Hydrotest Resin Pip on Site
COMMON Activities General excavation (Common) General excavation (Pond) General Backfilling of Areas/Roads (Ponds) Embank bund walls by machine (Pond 2) Embank bund walls by machine (Ponds) Limited section excavation up to 1.5 m (Common) Limited section excavation up to 1.5 m (Ponds) Limited section excavation over 1.5 m (Common) Limited section excavation over 1.5 m (Ponds) Reinf concrete pit for sewer (Common) Reinf concrete pit for sewer (Ponds) Installation of PVC drainage system (Common)
Installation of PVC drainage system (Ponds) Laying of Sand for Pipe Prot. (Common) Laying of Sand for Pipe Prot. (Ponds) Lay of slabs/bricks Cables (Common) Lay of slabs/bricks Cables (Ponds) Roadbed (Base course+ subbase) (Common) Asphalting of Roads (Common) Ballasting of areas (Pond 2) Ballasting of areas (Ponds) Guard Rail Erection Fencing of Metal Post Lean Concrete (Common) Lean Concrete (Ponds) Reinforced Concrete UP TO +1.0 M (Common) Reinforced Concrete UP TO +1.0 M (Ponds) Reinforced Concrete for Paving (Common) Concrete for Piping support (Common) Foundation Protection (Common) Foundation Protection (Ponds) Reinf. Concrete Road Channel (Common) PR / Lay light items (Real V) (Common) PR / Lay light items (Real V) (Ponds) Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) Hydrotest Resin Pip on Site
Date Started: February 17, 2007 Target Date of Comp : Feb 2009
MONTHLY PROGRESS PLAN 14
Qty
DMHS
Unit
Relative %
Date start
Date finish
Duration
1
2 ###
1,269.00 8,340.00 43,659.00 44.52 225.10 2,400.00 107.00 163.00 238.00 10,202.00 20,634.00 508.00 6,259.00 185.00 24,211.00 294.00 40,516.00 12,105.00 111.00 120.00 46.00 44,023.00 31.00 4,790.00
102.00 1,218.00 4,066.00 4,570.00 2,680.00 1,757.00 480.00 535.00 108.00 38.00 1,226.00 774.00 750.00 38,046.00 626.00 8,335.00 1,456.00 9,088.00 2,421.00 261.00 4,730.00 8,879.00 31,156.00 19.00 1,603.00 124,924.00
cu.m 0.082% cu.m 0.975% sq.m. 3.255% sq.m. 3.658% cu.m 2.145% sq.m. 1.406% m 0.384% m 0.428% cu.m 0.086% sq.m. 0.030% cu.m. 0.981% sq.m. 0.620% cu.m 0.600% cu.m 30.455% cu.m 0.501% sq.m. 6.672% cu.m. 1.166% sq.m. 7.275% m 1.938% cu.m. 0.209% cu.m 3.786% cu.m. 7.108% Kg 24.940% Kg 0.015% m 1.283% 13.02% 100.000%
23-Jan-10 10-Feb-10 5-May-10 15-Feb-10 22-Feb-10 23-Feb-10 3-Mar-10 4-Mar-10 16-Mar-10 26-Apr-10 17-May-10 17-Mar-10 1-Apr-10 26-May-10 13-Jun-10 30-Jun-10 25-Apr-10 26-Aug-10 2-Sep-10 6-Jul-10 14-Jul-10 15-Aug-10 29-Aug-10 6-Sep-10 26-Aug-10 27-Jul-10 26-Aug-10 12-Sep-10 14-Sep-10 13-Mar-10 22-Jul-10 27-Jul-10 3-Aug-10 26-Aug-10 29-Aug-10 29-Aug-10 14-Sep-10 13-Mar-10 26-Aug-10 14-Sep-10 13-Mar-10 28-Jul-10 3-Aug-10 6-Jul-10 31-Jul-10 16-Aug-10 13-Jun-10 26-Jun-10 3-Feb-10 17-Mar-10 14-Jun-10 8-Jul-10 22-Jul-10 28-Aug-10 13-Sep-10 13MAR10A 28-Aug-10 5-Mar-10 1-May-10 1-May-10 3-Jul-10 12-Mar-10
15-Feb-10 13-Feb-10 16-May-10 19-Feb-10 22-Feb-10 2-Mar-10 3-Mar-10 14-Mar-10 16-Mar-10 4-May-10 25-May-10 30-Apr-10 29-Apr-10 12-Jun-10 13-Jun-10 5-Jul-10 28-Apr-10 4-Sep-10 18-Sep-10 13-Jul-10 21-Jul-10 25-Aug-10 1-Sep-10 16-Sep-10 4-Sep-10 11-Aug-10 11-Sep-10 26-Sep-10 26-Sep-10 26-Jul-10 2-Aug-10 7-Aug-10 14-Aug-10 6-Sep-10 6-Sep-10 5-Sep-10 16-Sep-10 27-Jul-10 31-Aug-10 19-Sep-10 27-Jul-10 2-Aug-10 8-Aug-10 21-Jul-10 15-Aug-10 26-Aug-10 15-Jun-10 12-Aug-10 11-Apr-10 24-Jun-10 21-Jun-10 17-Aug-10 31-Aug-10 12-Sep-10 27-Sep-10 14-Sep-10 7-Sep-10 10-Mar-10 2-May-10 4-May-10 19-Jul-10 14-Mar-10
31
30 3
###
31 4
###
30 5
###
31 6
###
31 7
30 8
31 9
###
###
###
21.00 6.7% 18.9% 18.3% 18.9% 12.00 10.00 5.00 280.0% 620.0% 600.0% 620.0% 600.0% 620.0% 1.00 13.00 230.8% 238.5% 1.00 ### 10.00 1.00 6.00 8.00 20.00 1.00 800.0% 3100.0% 3000.0% 3100.0% 3000.0% ### 15.00 193.3% 200.0% 206.7% 200.0% 206.7% 1.00 800.0% 3000.0% ### 5.00 6.00 8.00 375.0% 387.5% 14.00 7.00 7.00 10.00 4.00 10.00 8.00 14.00 14.00 #REF! #REF! #REF! #REF! #REF! #REF! 10.00 #REF! #REF! #REF! #REF! #REF! #REF! 8.00 5.00 10.00 10.00 10.00 10.00 8.00 7.00 3.00 5.00 5.00 5.00 5.00 5.00 5.00 14.00 14.00 10.00 3.00 42.00 10.00 20.00 7.00 35.00 35.00 14.00 10.00 7.00 10.00 7.00 2.00 4.00 15.00 2.00
18.9%
18.3%
30 10
###
620.0% 600.0% 620.0%
###
600.0%
31 11 ###
31 12 ###
29 13 ###
9.5% 8.9% 8.3% 620.0% 620.0% 580.0%
31 14 ###
30 15
31 16
###
###
10.2% 9.9% 8.9% 8.6% 620.0% 600.0%
10.2% 8.9% 620.0%
30 17 ###
31 18 ###
9.9% 10.2% 8.6% 8.9% 600.0% 620.0%
238.5% 230.8% 238.5% 230.8% 238.5% 238.5% 215.4% 3100.0% 3000.0% 3100.0% 3000.0% 3100.0% 3100.0% 2900.0% 3100.0% 3000.0% 3100.0% 300.0% 310.0% 3100.0% 3000.0% 3100.0% 3000.0% 3100.0% 3100.0% 2900.0% 3100.0% 3000.0% 3100.0% 3000.0% 483.3% 516.7% 500.0% 516.7% 500.0%
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
19 ###
30 20 ###
31 21
30 22
###
###
10.2% 9.9% 10.2% 8.9% 8.6% 8.8% 620.0% 600.0% 620.0%
10% 8.6%
31 23 ###
31 24 ###
28 25 ###
4.3%
### 3100.0% 3000.0% 3100.0% 3000.0% 387.5%
3100.0% 3000.0% 3100.0% 3000.0% 3100.0% 3100.0% 206.7% 200.0% 206.7% 200.0% 206.7% 206.7% 186.7% 3100.0% 3000.0% 3100.0% 3000.0% 3100.0% 580.0% 516.7% 516.7% 483.3% 387.5% 375.0% 387.5% 375.0% 387.5% 387.5% 362.5% 207.1% 414.3% 414.3% 310.0% 300.0% 310.0% 310.0% 290.0% 400.0% 775.0% 775.0% 725.0% 280.0% 310.0% 290.0% 362.5%
31
387.5% 375.0% 387.5% 155.0% 150.0% 155.0%
375.0% 150.0%
620.0% 516.7% 387.5% 221.4% 442.9% 442.9% 310.0% 775.0% 310.0% 387.5%
600.0% 500.0% 375.0% 214.3% 428.6% 428.6% 300.0% 750.0% 300.0% 375.0%
620.0% 516.7% 387.5% 221.4%
600.0% 500.0% 375.0% 214.3%
620.0% 516.7% 387.5% 221.4%
620.0% 600.0% 620.0%
442.9% 310.0% 775.0% 310.0% 387.5%
428.6% 300.0% 750.0% 300.0% 375.0%
442.9% 310.0% 775.0%
442.9% 428.6% 442.9% 310.0% 300.0% 310.0% 775.0% 750.0% 775.0%
300.0% 750.0%
387.5%
387.5% 375.0% 387.5%
375.0%
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
387.5% 375.0% 387.5% 221.4% 214.3% 221.4%
#REF! #REF!
#REF! #REF!
#REF! #REF!
155.0%
310.0% 200.0%
#REF! #REF!
#REF! #REF!
100.0% 100.0% 100.0% 12500.0%
2100.0% -64000.0%
2100.0% -64000.0% 610.0% 48800.0% 2516.7% 1912.5% 765.0% 34500.0% 2420.0% 22200.0% 5480.0% 4066.7% 6862.5% 1957.1% 1285.7% 3914.3% 4780.0% 9550.0% 2100.0% 3800.0% 0.0%
48800.0% 2516.7% 1912.5% 765.0% 34500.0% 2420.0% 22200.0% 5480.0% 4066.7% 6862.5% 1957.1% 1285.7% 3914.3% 4780.0%
375.0%
#REF! #REF!
100.0% 100.0% 100.0% 12500.0%
#REF! #REF!
0.0% #REF! #REF!
15-Mar-10 18-Mar-10 20-Mar-10 21-Mar-10 23-Mar-10 24-Mar-10 5-Apr-10 3-May-10 5-May-10 6-May-10 11-May-10 12-May-10 16-May-10 18-May-10 26-May-10 26-May-10 3-Jun-10 16-Jun-10 30-Jun-10 8-May-10 5-Jun-10 13-Jun-10 12-Jul-10 12-Jul-10 15-Jul-10 2-Jun-10 2-Jun-10 6-Jun-10 28-Jun-10 30-Jun-10 6-Jul-10 6-Jul-10 12-Jul-10 15-Mar-10 13-May-10 25-May-10 25-May-10 2-Jun-10 20-Jun-10 1-Jul-10 10-Aug-10 25-Aug-10 5-Sep-10 8-Sep-10 8-Sep-10 16-Sep-10 8-Sep-10 15-Feb-10 9-Mar-10 23-Feb-10 24-Feb-10 25-Feb-10 28-Feb-10 1-Mar-10 4-Mar-10 6-Mar-10 8-May-10 16-Feb-10 18-Apr-10 30-May-10 16-Jun-10 4-Jul-10 22-Aug-10 5-Sep-10 12-Sep-10 10-Jul-10 21-Jul-10 3-Aug-10 17-Aug-10 19-Aug-10 17-Aug-10 29-Jul-10
15-Mar-10 19-Mar-10 20-Mar-10 23-Mar-10 23-Mar-10 5-Apr-10 5-Apr-10 5-May-10 10-May-10 6-May-10 11-May-10 16-May-10 17-May-10 25-May-10 27-May-10 2-Jun-10 3-Jun-10 27-Jun-10 1-Jul-10 15-May-10 12-Jun-10 20-Jun-10 13-Jul-10 14-Jul-10 17-Jul-10 19-Jun-10 19-Jun-10 29-Jun-10 29-Jun-10 11-Jul-10 8-Jul-10 8-Jul-10 15-Aug-10 24-May-10 24-May-10 1-Jun-10 30-May-10 12-Jun-10 30-Jun-10 12-Jul-10 21-Aug-10 5-Sep-10 25-Sep-10 28-Sep-10 28-Sep-10 30-Sep-10 28-Sep-10 22-Feb-10 6-May-10 23-Feb-10 24-Feb-10 27-Feb-10 28-Feb-10 3-Mar-10 4-Mar-10 5-May-10 16-May-10 25-May-10 25-May-10 15-Jun-10 16-Jun-10 8-Jul-10 6-Sep-10 11-Sep-10 23-Sep-10 17-Jul-10 28-Jul-10 14-Aug-10 21-Aug-10 1-Sep-10 25-Aug-10 14-Aug-10
1.00 7.00 1.00 6.00 1.00 12.00 2.00 3.00 5.00 1.00 1.00 4.00 2.00 7.00 2.00 7.00 1.00 10.00 2.00 7.00 7.00 7.00 2.00 3.00 2.00 15.00 15.00 21.00 2.00 10.00 3.00 3.00 30.00 14.00 10.00 7.00 5.00 9.00 10.00 10.00 10.00 10.00 15.00 15.00 15.00 10.00 15.00 12.00 10.00 5.00 1.00 13.00 1.00 10.00 1.00 6.00 8.00 20.00 1.00 15.00 1.00 5.00 14.00 6.00 8.00 7.00 7.00 10.00 4.00 12.00 8.00 14.00
15-Aug-10 21-Aug-10 30-Aug-10 13-Mar-10 29-Jul-10 3-Aug-10 10-Aug-10 15-Aug-10 17-Aug-10 17-Aug-10 4-Sep-10 13-Mar-10 17-Aug-10 28-Aug-10 13-Mar-10 4-Aug-10 10-Aug-10 10-Jul-10 3-Aug-10 19-Aug-10 30-May-10 26-Jun-10 23-Feb-10 29-Mar-10 17-Jun-10 28-Jul-10 9-Aug-10 15-Aug-10 31-Aug-10 13-Mar-10 31-Aug-10 1-May-10 1-May-10 6-May-10 8-Mar-10 24-May-10 24-May-10 4-Aug-10 15-Mar-10 19-Mar-10 20-Mar-10 25-Mar-10 26-Mar-10 26-Mar-10 27-Mar-10 30-Mar-10 26-May-10 30-May-10 8-Jun-10 10-Jun-10 19-Jun-10 19-Jun-10 27-Jun-10 22-Jul-10 25-Jul-10 31-Jul-10 1-Aug-10 31-May-10 25-Jul-10 2-Aug-10 6-Sep-10 26-Aug-10 21-Aug-10 28-Jun-10 20-Jul-10 1-Aug-10 5-Aug-10 5-Aug-10 5-Aug-10 7-Aug-10 7-Aug-10 13-Mar-10
30-Aug-10 31-Aug-10 7-Sep-10 2-Aug-10 9-Aug-10 14-Aug-10 21-Aug-10 25-Aug-10 25-Aug-10 24-Aug-10 6-Sep-10 3-Aug-10 22-Aug-10 1-Sep-10 3-Aug-10 9-Aug-10 15-Aug-10 25-Jul-10 18-Aug-10 30-Aug-10 1-Jun-10 24-Jul-10 22-Apr-10 10-Jun-10 24-Jun-10 25-Aug-10 6-Sep-10 30-Aug-10 11-Sep-10 9-Sep-10 7-Sep-10 5-May-10 5-May-10 23-May-10 14-Mar-10 25-May-10 27-May-10 19-Aug-10 18-Mar-10 19-Mar-10 24-Mar-10 25-Mar-10 26-Mar-10 26-Mar-10 29-Mar-10 30-Mar-10 29-May-10 30-May-10 9-Jun-10 17-Jun-10 20-Jun-10 26-Jun-10 27-Jun-10 24-Jul-10 29-Jul-10 31-Jul-10 4-Aug-10 7-Jun-10 1-Aug-10 9-Aug-10 7-Sep-10 29-Aug-10 22-Aug-10 21-Jul-10 21-Jul-10 11-Aug-10 29-Aug-10 22-Aug-10 22-Aug-10 9-Aug-10 9-Aug-10 12-Aug-10
14.00 10.00 8.00 5.00 10.00 10.00 10.00 10.00 8.00 7.00 3.00 5.00 5.00 5.00 5.00 5.00 5.00 14.00 14.00 10.00 3.00 25.00 10.00 20.00 7.00 25.00 25.00 14.00 10.00 10.00 7.00 5.00 5.00 15.00 7.00 2.00 4.00 14.00 2.00 1.00 7.00 1.00 6.00 1.00 12.00 2.00 3.00 1.00 2.00 7.00 2.00 7.00 1.00 2.00 5.00 1.00 4.00 7.00 7.00 7.00 2.00 3.00 2.00 21.00 2.00 10.00 21.00 15.00 15.00 3.00 3.00 14.00
2-Aug-10 14-Aug-10 14-Aug-10 22-Aug-10 23-Aug-10 23-Aug-10 28-Aug-10 30-Aug-10 6-Sep-10 4-Sep-10 28-Aug-10 28-Aug-10 28-Aug-10 10-Mar-10 15-May-10 26-May-10 17-May-10 23-May-10 15-Jun-10 3-Jul-10 14-Jul-10 26-Jul-10 26-May-10 13-Jun-10 7-Jun-10 14-Jun-10 19-Jul-10 13-Jul-10 4-Aug-10 31-Jul-10 15-Apr-10 17-Apr-10 1-Jul-10 26-Jun-10 3-Jul-10 14-Jul-10 14-Jul-10 7-Aug-10 17-Aug-10 16-Jun-10 3-Jul-10 28-Jul-10 21-Aug-10
12-Aug-10 18-Aug-10 21-Aug-10 26-Aug-10 2-Sep-10 2-Sep-10 1-Sep-10 9-Sep-10 26-Sep-10 23-Sep-10 13-Sep-10 13-Sep-10 13-Sep-10 17-Mar-10 17-Jun-10 29-Jun-10 14-Jun-10 29-May-10 1-Jul-10 13-Jul-10 25-Jul-10 5-Aug-10 29-Jun-10 5-Jul-10 13-Jun-10 24-Jun-10 24-Jul-10 29-Jul-10 10-Aug-10 16-Aug-10 30-Jun-10 29-Apr-10 12-Jul-10 1-Jul-10 13-Jul-10 25-Jul-10 25-Jul-10 17-Aug-10 28-Aug-10 8-Jul-10 25-Jul-10 19-Aug-10 28-Aug-10 28-Aug-10 30-Sep-10
10.00 5.00 7.00 5.00 10.00 10.00 5.00 10.00 15.00 15.00 15.00 15.00 15.00 7.00 30.00 30.00 25.00 6.00 15.00 10.00 10.00 10.00 30.00 20.00 6.00 10.00 5.00 15.00 6.00 15.00 6.00 10.00 10.00 6.00 10.00 10.00 10.00 10.00 10.00 20.00 20.00 20.00 7.00 0.00 0.00
14 Qty 1,269.00 8,429.00 43,659.00 11,131.00 2,486.00 185.00 80.00 107.00 75.00 150.00
DMHS 102.00 1,123.00 4,066.00 4,452.00 2,619.00 1,353.00 16.00 535.00 50.00 24.00
Unit
Relative %
cu.m cu.m sq.m. cu.m cu.m cu.m m m cu.m sq.m.
0.088% 0.964% 3.492% 3.823% 2.249% 1.162% 0.014% 0.459% 0.043% 0.021%
Date start
Date finish
Duration
1 ###
4/20/2007 2/1/2008 1/1/2008 2/15/2007 4/20/2007 6/1/2007 7/15/2007 4/1/2008 8/1/2007 2/1/2008
9/30/2007 11/30/2008 12/15/2008 10/31/2008 10/30/2008 2/28/2008 5/31/2008 5/31/2008 11/30/2008 6/30/2008
31 2
164.00 304.00 350.00 625.00 280.0% 560.00 273.00 322.00 61.00 488.00 151.00
30 3
###
620.0%
31 4
30 5
31 6
31 7
30 8
31 9
###
###
###
###
###
###
6.7%
18.9%
18.3%
18.9%
18.9%
18.3%
600.0% 620.0% 600.0% 620.0% 620.0% 600.0% 1100.0% 3100.0% 3000.0% ### 3100.0% 3000.0% 230.8% 238.5% 238.5% 230.8% 5.3% 3100.0% 3000.0%
30 10
###
31 11
###
31 12
###
620.0% 600.0% 620.0% 3100.0% 3000.0% 3100.0% 238.5% 230.8% 238.5% 3100.0% 3000.0% 3100.0%
29 13
###
8.9% 620.0% 3100.0% 238.5% 3100.0%
3100.0% 3000.0% 3100.0% 3000.0% 3100.0% 3100.0%
31 14
###
30 15
###
31 16
###
30 17
###
31 18
###
31 19
###
30 20
###
31 21
###
30 22
###
31 23
###
9.5% 10.2% 9.9% 10.2% 9.9% 10.2% 10.2% 9.9% 10.2% 9.9% 8.3% 8.9% 8.6% 8.9% 8.6% 8.9% 8.9% 8.6% 8.9% 8.6% 580.0% 620.0% 600.0% 620.0% 600.0% 620.0% 620.0% 600.0% 620.0% 2900.0% 3100.0% 3000.0% 3100.0% 3000.0% ### 3100.0% 3000.0% 3000.0% 215.4% 2900.0% 3100.0% 3000.0% 3100.0% 300.0% 310.0% 2900.0% 3100.0% 3000.0% 3100.0% 3000.0% ### 3100.0% 3000.0% 3100.0% 3000.0% 483.3% 516.7% 500.0% 516.7% 500.0%
31 24
###
4.3%
28 25
###
### 100.0% 100.0% 100.0% 12500.0% 56000.0% 2100.0% 30505.3% 48800.0% 2516.7%
100.0% 100.0% 100.0% 12500.0% 56000.0% 2100.0% 30505.3% 610.0% 48800.0% 2516.7%
10,716.00 21,676.00 383.00 6,284.00 185.00 24,211.00 294.00 40,152.00 12,105.00 70.00 120.00 46.00 45,482.00 10.00 4,431.00
1,288.00 813.00 416.00 35,345.00 581.00 8,335.00 1,456.00 5,074.00 2,421.00 142.00 4,730.00 9,709.00 30,261.00 12.00 1,522.00 116,445.00
cu.m. 1.106% 7/1/2008 11/30/2008 sq.m. 0.698% 8/1/2008 12/31/2008 cu.m 0.357% 2/21/2007 1/31/2008 cu.m 30.353% 3/3/2007 2/28/2008 cu.m 0.499% 5/24/2007 12/31/2007 sq.m. 7.158% 2/1/2008 10/31/2008 cu.m. 1.250% 12/1/2007 7/31/2008 sq.m. 4.357% 6/1/2007 11/30/2008 m 2.079% 2/1/2008 10/31/2008 cu.m. 0.122% 2/1/2008 4/30/2008 cu.m 4.062% 2/1/2008 10/31/2008 cu.m. 8.338% 10/1/2007 1/20/2009 Kg 25.987% 11/15/2007 11/30/2008 Kg 0.010% 12/4/2007 6/30/2008 m 1.307% 2/1/2008 11/30/2008 12.13% 100.000%
153.00 153.00 345.00 363.00 222.00 274.00 244.00 549.00 274.00 90.00 274.00 478.00 382.00 210.00 304.00
387.5% 2.3% 3100.0% 3000.0% 3100.0% 3000.0% ### 3100.0% 3000.0% 3100.0% 3000.0% 3100.0% 3100.0% 193.3% 200.0% 206.7% 200.0% 206.7% 206.7% 200.0% 206.7% 200.0% 206.7% 206.7% 186.7% 3.6% 3000.0% ### 3100.0% 3000.0% 3100.0% 3000.0% 3100.0% 580.0% 516.7% 516.7% 483.3% 375.0% 387.5% 387.5% 375.0% 387.5% 375.0% 387.5% 387.5% 362.5% 207.1% 414.3% 414.3% 310.0% 300.0% 310.0% 310.0% 290.0% 400.0% 775.0% 775.0% 725.0% 280.0% 310.0% 290.0% 362.5% 10.71% 93.46% 119.11% 167.27% 195.84% 10.71% 104.18% 223.29% 390.55% 586.40%
14 Qty 1,269.00 8,337.00 43,659.00 11,313.00 2,535.00 228.00 960.00 107.00 163.00 205.00 10,176.00 20,584.00 441.00 6,304.00 185.00 24,211.00 294.00 40,468.00 12,105.00 91.00 120.00 47.00 45,564.00 15.00 4,439.00
DMHS 102.00 1,111.00 4,066.00 4,525.00 2,626.00 1,476.00 192.00 535.00 108.00 33.00 1,222.00 772.00 576.00 35,635.00 581.00 8,335.00 1,456.00 5,135.00 2,421.00 200.00 4,730.00 9,920.00 30,336.00 18.00 1,525.00 117,636.00
Unit
Relative %
Date start
Date finish
Duration
1
31 2
###
cu.m 0.087% 5/20/2007 10/30/2007 cu.m 0.944% 3/2/2008 12/31/2008 sq.m. 3.456% 2/1/2008 1/31/2009 cu.m 3.847% 3/17/2007 11/30/2008 cu.m 2.232% 5/20/2007 11/30/2008 cu.m 1.255% 7/1/2007 3/30/2008 m 0.163% 8/15/2007 6/30/2008 m 0.455% 5/1/2008 6/30/2008 cu.m 0.092% 9/1/2007 12/30/2008 sq.m. 0.028% 3/1/2008 7/31/2008 cu.m. 1.039% 8/1/2008 12/31/2008 sq.m. 0.656% 9/1/2008 1/31/2009 cu.m 0.490% 3/23/2007 2/28/2008 cu.m 30.293% 4/2/2007 3/30/2008 cu.m 0.494% 6/23/2007 1/30/2008 sq.m. 7.085% 3/1/2008 11/30/2008 cu.m. 1.238% 1/1/2008 8/31/2008 sq.m. 4.365% 7/1/2007 12/30/2008 m 2.058% 3/1/2008 11/30/2008 cu.m. 0.170% 3/1/2008 5/31/2008 cu.m 4.021% 3/2/2008 11/30/2008 cu.m. 8.433% 11/1/2007 2/28/2009 Kg 25.788% 12/15/2007 12/30/2008 Kg 0.015% 1/3/2008 7/30/2008 m 1.296% 3/2/2008 12/30/2008 12.26% 100.000%
###
164.00 305.00 366.00 625.00 561.00 274.00 321.00 61.00 487.00 153.00 153.00 153.00 343.00 364.00 222.00 275.00 244.00 549.00 275.00 92.00 274.00 486.00 382.00 210.00 304.00
1,269.00 8,645.00 43,659.00 11,189.00 2,512.00 173.00 480.00 107.00 75.00
102.00 1,148.00 4,066.00 4,475.00 2,645.00 1,305.00 96.00 535.00 50.00
Unit
Relative %
cu.m cu.m sq.m. cu.m cu.m cu.m m m cu.m
0.086% 0.971% 3.441% 3.787% 2.238% 1.104% 0.081% 0.453% 0.042%
Date start
Date finish
Duration
10/30/2007 12/31/2008 1/31/2009 11/30/2008 11/30/2008 3/30/2008 6/30/2008 6/30/2008 12/30/2008
164.00 305.00 366.00 625.00 561.00 274.00 321.00 61.00 487.00
30 5
8.7% 8.0%
31 6
31 7
0.11% 0.11%
1
31 2
###
###
###
7.3%
18.3%
18.9%
18.9%
18.3%
18.3%
4.8% 5.3%
5.0% 5.5% 11.3%
8.7% 8.2% 3.6%
5.0% 5.5% 11.3% 5.3%
9.0% 8.5% 14.0%
9.0% 8.5% 14.0%
###
2.4%
31 4
###
4.8%
2.88% 3.41% 8.49% 11.90%
30 5
620.0% 516.7% 387.5% 221.4%
600.0% 500.0% 375.0% 214.3%
620.0% 516.7% 387.5% 221.4%
620.0% 600.0% 620.0%
442.9% 310.0% 775.0% 310.0% 387.5%
428.6% 300.0% 750.0% 300.0% 375.0%
442.9% 310.0% 775.0%
442.9% 428.6% 442.9% 310.0% 300.0% 310.0% 775.0% 750.0% 775.0%
300.0% 750.0%
387.5%
387.5% 375.0% 387.5%
375.0%
31
###
###
###
###
7.3%
18.3%
18.9%
18.9%
18.3%
18.3%
5.0% 5.5% 11.3%
5.0% 5.5% 11.3% 5.3%
###
9.8% 8.5% 5.0% 5.5% 10.9% 9.7%
9.8% 8.2% 4.8% 5.3%
10.2% 8.5% 5.0% 5.5%
9.8% 8.2% 4.8% 5.3%
10.2% 8.5% 5.0% 5.5%
10.2% 8.5% 5.0% 5.5%
9.8% 8.2% 4.8% 5.3%
10.2% 8.5% 5.0% 5.5%
9.8% 8.2% 4.8% 5.3%
10.2% 8.5%
9.3%
6.4% 20.3%
6.2% 19.6%
9.7% 50.8% 6.4% 20.3%
9.3% 49.2% 6.2% 19.6%
6.4% 20.3%
6.4%
6.2%
6.4%
6.2%
6.2%
20.3%
19.6% 19.6%
20.3% 20.3%
19.6% 19.6%
20.3% 20.3%
8.2% 8.0%
5.5%
5.6%
12.7% 5.6%
11.9% 5.3%
6.2%
6.4% 4.2%
6.4% 8.1% 13.3%
6.0% 7.6% 13.8%
5.04% 6.20% 6.01% 30.94% 37.15% 43.16%
31 11
###
31 12
###
###
11.3% 12.7% 5.6% 11.3% 33.7% 10.9% 6.4% 8.1% 14.8% 9.9%
10.9% 12.3% 5.5% 10.9% 32.6% 10.9% 6.2% 7.9% 14.3% 9.9%
11.3% 12.7% 5.6% 11.3% 33.7% 11.3% 6.4% 8.1% 14.8% 10.2%
8.05% 5.27% 51.22% 56.48%
5.67% 62.16%
28
###
### 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
8.5%
5.8%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3.73% 0.96% 0.49% 98.55% 99.51% 100.00%
0.0% 73.33% 173.33%
31 14
30 15
31 16
10.9% 12.3% 5.5% 10.9%
11.3% 12.7% 5.6% 11.3%
11.3% 12.7% 5.6% 11.3%
10.9%
11.3%
10.9%
5.5% 10.9%
5.6% 11.3%
5.5% 10.9%
10.9% 6.2% 7.9% 14.3% 9.9%
11.3% 6.4% 8.1% 14.8% 10.2%
11.3% 6.4% 8.1%
10.9% 6.2% 7.9%
11.3% 6.4% 8.1%
10.9% 6.2% 7.9%
6.4% 8.1%
10.2%
9.9%
10.2%
9.9%
9.9%
5.57% 5.37% 5.55% 78.53% 83.90% 89.45%
5.37% 94.82%
5.43% 5.37% 67.59% 72.96%
30 17
31 18
31 19
30 20
31 21
20.3%
5.5%
30 22
###
###
###
###
###
###
###
###
###
9.8% 8.2% 4.8% 5.3%
10.2% 8.5% 5.0% 5.5%
9.8% 8.2% 4.8% 5.3%
10.2% 8.5% 5.0% 5.5%
10.2% 8.5% 5.0% 5.5%
9.8% 8.2% 4.8% 5.3%
10.2% 8.5% 5.0% 5.5%
9.8% 8.2% 4.8% 5.3%
10.2% 8.5%
9.3% 6.2%
9.7% 50.8% 6.4%
9.3% 49.2% 6.2%
6.4%
6.4%
6.2%
6.4%
6.2%
6.2%
5.0% 5.5% 11.3% 9.7%
4.8% 5.3% 10.9% 9.3%
5.0% 5.5% 11.3% 9.7%
5.0% 5.5% 11.3% 9.7%
7.9% 4.6% 5.2% 10.6% 9.0%
6.2%
6.4%
6.2%
6.4%
6.4%
6.0%
6.4%
31 24
###
4.8% 5.3% 10.9% 9.3%
6.4%
31 23
###
9.8% 8.5% 5.0% 5.5% 10.9% 9.7%
0.0% 4122.21% 10778.89%
1912.5% 765.0% 33702.3% 2420.0% 21403.6% 5480.0% 4066.7% 6862.5% 1957.1% 1285.7% 3914.3% 4780.0% 9550.0% 2100.0% 3800.0% 0.0%
25
8.2%
29 13
0.00% ###
31 24
###
9.0% 8.5% 13.5%
30
31 23
###
9.0% 8.5% 14.0%
10
30 22
###
6.0%
9
31 21
###
6.4%
30
30 20
###
6.4%
8
31 19
27.08% 16.68% ### ###
###
6.2%
3.83% 25.91%
31 18
310.0% 200.0%
###
6.4%
5.6%
### 416.71% 403.26% 414.46% 248.04% ### ### ### ### ###
30 17
375.0%
###
6.2%
8.7% 8.2% 13.5%
31 16
387.5% 375.0% 387.5% 221.4% 214.3% 221.4%
1912.5% 765.0% 33702.3% 2420.0% 21403.6% 5480.0% 4066.7% 6862.5% 1957.1% 1285.7% 3914.3% 4780.0%
155.0%
###
7.9% 4.6% 5.2% 10.6% 9.0%
9.0% 8.5% 14.0%
30 15
375.0% 150.0%
###
5.0% 5.5% 11.3% 9.7%
###
4.8% 5.3%
###
31 14
5.0% 5.5% 11.3% 9.7%
###
5.0% 2.1%
###
29 13
4.8% 5.3% 10.9% 9.3%
5.5%
31 7
###
31 12
5.0% 5.5% 11.3% 9.7%
3.42% 3.32% 3.43% 15.32% 18.65% 22.08%
31 6
31 11
4.8% 5.3% 10.9% 9.3%
8.7% 8.2% 13.5%
5.6%
30 10
###
2.87% 5.62%
30 3
31 9
###
9.0% 8.5%
2.64% 2.75%
30 8
###
5.0% 2.1%
600.0% 500.0% 375.0% 214.3% 428.6% 428.6% 300.0% 750.0% 300.0% 375.0%
### 204.13% 197.54% 229.96% 326.49% 437.85% 422.70% 451.04% 418.90% 406.77% 419.79% 404.45% ### 992.90% ### ### ### ### ### ### ### ### ### ###
5.6%
### 5/20/2007 3/2/2008 2/1/2008 3/17/2007 5/20/2007 7/1/2007 8/15/2007 5/1/2008 9/1/2007
4.8%
2.6%
14 DMHS
31 4
###
2.4%
0.00% 0.00%
Qty
30 3
620.0% 516.7% 387.5% 221.4% 442.9% 442.9% 310.0% 775.0% 310.0% 387.5%
387.5% 375.0% 387.5% 155.0% 150.0% 155.0%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 0.0%
28 25
###
8.5%
### 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
150.00 12,593.00 25,471.00 405.00 6,340.00 185.00 24,211.00 294.00 40,203.00 12,105.00 70.00 120.00 46.00 50,207.00 10.00 4,450.00
24.00 1,512.00 956.00 456.00 35,648.00 581.00 8,335.00 1,456.00 5,077.00 2,421.00 140.00 4,730.00 9,709.00 31,165.00 12.00 1,533.00 118,177.00
sq.m. 0.020% 3/1/2008 7/31/2008 cu.m. 1.279% 8/1/2008 12/31/2008 sq.m. 0.809% 9/1/2008 1/31/2009 cu.m 0.386% 3/23/2007 2/28/2008 cu.m 30.165% 4/2/2007 3/30/2008 cu.m 0.492% 6/23/2007 1/30/2008 sq.m. 7.053% 3/1/2008 11/30/2008 cu.m. 1.232% 1/1/2008 8/31/2008 sq.m. 4.296% 7/1/2007 12/30/2008 m 2.049% 3/1/2008 11/30/2008 cu.m. 0.118% 3/1/2008 5/31/2008 cu.m 4.002% 3/2/2008 11/30/2008 cu.m. 8.216% 11/1/2007 2/28/2009 Kg 26.371% 12/15/2007 12/30/2008 Kg 0.010% 1/3/2008 7/30/2008 m 1.297% 3/2/2008 12/30/2008 12.31% 100.000%
153.00 153.00 153.00 343.00 364.00 222.00 275.00 244.00 549.00 275.00 92.00 274.00 486.00 382.00 210.00 304.00
20.3%
2.6%
Qty
DMHS
80.00 7,480.00 38,047.00 9,613.00 2,301.00 169.00 88.00 311.00 740.00 12,858.00 26,009.00 293.00 3,063.00 11.00 21,139.00 142.00 35,769.00 10,570.00 52.00 17.00 643,352.00 19,614.00
6.00 1,075.00 3,544.00 3,846.00 2,879.00 1,335.00 440.00 207.00 118.00 1,543.00 975.00 379.00 18,898.00 44.00 7,166.00 703.00 4,278.00 2,114.00 110.00 2,795.00 155,062.00 7,960.00 215,477.00
Unit
Relative %
cu.m 0.003% cu.m 0.499% sq.m. 1.645% cu.m 1.785% cu.m 1.336% cu.m 0.620% m 0.204% cu.m 0.096% sq.m. 0.055% cu.m 0.716% sq.m. 0.452% cu.m 0.176% cu.m 8.770% cu.m 0.020% sq.m. 3.326% cu.m 0.326% sq.m. 1.985% m 0.981% cu.m 0.051% cu.m 1.297% Kg 71.962% m 3.694% 22.45% 100.000%
Duration
0.10% 0.10%
1
6/6/2007 9/30/2008 6/30/2008 6/30/2008 11/28/2007 1/31/2008 6/30/2008 7/30/2008 6/2/2008 11/17/2008 1/14/2009 1/31/2008 2/28/2008 8/31/2008 8/4/2008 10/31/2008 10/31/2008 8/16/2008 9/27/2008 7/15/2008 12/30/2008 7/30/2008
9.0% 8.5%
2.62% 2.72%
31 2
### 4/22/2007 1/15/2008 1/31/2008 5/1/2007 6/7/2007 8/1/2007 3/1/2008 11/15/2007 10/14/2007 8/5/2008 10/26/2008 5/15/2007 5/15/2007 7/1/2007 3/18/2008 6/1/2008 7/15/2007 5/4/2008 7/31/2008 11/15/2007 10/1/2007 1/15/2008
8.7% 8.0%
8.7% 8.2% 3.6%
9.0% 8.5% 14.0%
9.0% 8.5% 14.0%
5.6%
14 Date finish
20.3%
19.6%
20.3% 20.3%
0.00% 0.00%
Date start
19.6%
2.85% 5.57%
30 3
###
46.00 260.00 152.00 427.00 175.00 184.00 122.00 259.00 233.00 105.00 81.00 262.00 290.00 428.00 140.00 153.00 475.00 105.00 59.00 244.00 457.00 198.00
5.6%
2.85% 3.37% 8.42% 11.79%
31 4
30 5
###
###
###
19.6%
67.4%
13.0%
7.3%
5.5%
31 7
###
7.0% 13.7%
9.0% 8.5% 14.0%
30 8
###
7.3% 17.7%
9.0% 8.5% 13.5%
8.2% 8.0%
5.5%
5.6%
12.7% 5.6%
11.9% 5.3%
6.2%
6.4% 4.2%
6.4% 8.1% 13.3%
6.0% 7.6% 13.8%
4.99% 6.18% 5.99% 30.56% 36.74% 42.73%
30 10
###
7.0% 17.1% 16.3%
9.0% 8.5% 14.0%
3.76% 25.57%
31 9
###
7.3% 17.7% 16.8%
8.7% 8.2% 13.5%
5.6%
3.37% 3.27% 3.38% 15.16% 18.43% 21.81%
31 6
8.7% 8.2% 13.5%
31 11
###
31 12
11.3% 12.7% 5.6% 11.3% 33.7% 10.9% 6.4% 8.1% 14.8% 9.9%
10.9% 12.3% 5.5% 10.9% 32.6% 10.9% 6.2% 7.9% 14.3% 9.9%
11.3% 12.7% 5.6% 11.3% 33.7% 11.3% 6.4% 8.1% 14.8% 10.2%
11.5% 10.3%
8.02% 5.26% 50.75% 56.01%
5.66% 61.67%
31 14
30 15
10.9%
5.5% 10.9%
5.6% 11.3%
5.5% 10.9%
10.9% 6.2% 7.9% 14.3% 9.9%
11.3% 6.4% 8.1% 14.8% 10.2%
11.3% 6.4% 8.1%
10.9% 6.2% 7.9%
11.3% 6.4% 8.1%
10.9% 6.2% 7.9%
6.4% 8.1%
10.2%
9.9%
10.2%
9.9%
9.9%
5.64% 5.46% 5.65% 78.13% 83.60% 89.24%
5.46% 94.70%
5.44% 5.38% 67.11% 72.49%
31 16
11.3%
30 17
31 18
14 Qty 1,272.00 197,296.00 1,098.00 37,667.00 37,667.00 20,996.00 18,871.00 58,872.00 6,425.00 785.00 329.00 672.00
DMHS 102.00 15,784.00 5,218.00 12,555.00 12,555.00 8,398.00 7,548.00 95,736.00 10,448.00 5,360.00 2,246.00 134.00
Unit cu.m cu.m cu.m cu.m cu.m cu.m cu.m cu.m cu.m cu.m cu.m m
Relative %
Date finish
0.038% 10/1/2007 11/30/2007 5.910% 4/30/2007 5/30/2008 1.954% 12/2/2007 4/7/2008 4.701% 2/1/2008 7/1/2008 4.701% 1/1/2008 5/31/2008 3.144% 11/1/2007 9/30/2008 2.826% 11/1/2007 5/31/2008 35.844% 12/15/2007 9/30/2008 3.912% 11/1/2007 5/31/2008 2.007% 10/1/2007 5/31/2008 0.841% 12/1/2007 4/30/2008 0.050% 1/1/2008 6/30/2008
Duration
1
31 2
### 61.00 397.00 128.00 152.00 152.00 335.00 213.00 291.00 213.00 244.00 152.00 182.00
31 19
30 20
###
###
###
###
###
###
###
11.2% 19.1% 6.8%
11.9% 20.4% 7.3%
11.5% 19.7% 7.0%
11.9% 20.4% 7.3%
11.5% 19.7% 7.0%
11.9%
11.9%
11.5%
11.2% 12.4%
25.4% 12.0% 13.3%
24.6% 11.6% 12.9%
25.4% 12.0% 13.3%
24.6% 11.6% 0.9%
7.3% 16.8%
16.8%
7.7%
6.2% 12.9%
12.0% 13.3%
12.0% 13.3%
11.8% 10.7% 7.2%
11.8% 10.7% 7.2%
11.5% 10.3% 7.0%
11.8% 10.7% 7.2%
11.5% 10.3% 7.0%
11.8% 10.7% 7.2%
11.8% 10.7% 7.2%
9.7% 6.8%
3.6%
6.5%
6.3%
6.5%
6.3%
6.5%
6.5%
6.8%
6.6% 6.6%
12.7% 6.8%
12.7% 6.8% 8.6%
7.2% 10.0%
7.0% 21.4%
7.2% 22.1%
6.1%
6.5%
6.3%
6.5% 26.7%
7.0% 21.4% 19.6% 6.3% 28.6%
11.9% 6.3% 14.6%
12.7% 6.8% 15.7%
12.3% 6.6% 15.2%
12.7% 6.8% 15.7%
12.3% 6.6% 15.2%
30 3
###
31 4
30 5
31 6
31 7
30 8
31 9
30 10
###
###
###
###
###
###
###
###
0.3%
7.8%
7.6%
7.8%
7.8%
7.6%
50.8% 7.8%
49.2% 7.6%
9.0% 14.1% 12.7%
31 11
14.1% 12.3%
31 12
29 13
31 14
30 15
31 16
20.3%
###
###
###
###
###
###
7.2% 22.1% 20.3% 6.5% 29.5% 1.7% 6.1% 6.8% 15.2%
7.8% 23.4%
7.8% 24.2%
9.3% 14.6% 5.8% 14.6% 12.7% 20.4%
7.8% 24.2% 20.4% 20.4% 9.3% 14.6% 10.7% 14.6% 12.7% 20.4% 17.0%
7.6% 5.5% 19.7% 19.7% 9.0% 14.1% 10.3% 14.1% 12.3% 19.7% 16.5%
7.6%
20.4% 9.3% 14.6% 10.7% 14.6% 12.7% 20.4% 17.0%
7.3% 22.7% 19.1% 19.1% 8.7% 13.6% 10.0% 13.6% 11.9% 19.1% 15.9%
30 22
###
6.4%
31 23
###
31 24
###
28
###
### 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
28.6%
7.2% 2.9% 20.3% 6.5% 15.2% 52.5%
19.6% 6.3%
6.8%
6.6%
29.5% 7.4%
16.2% 37.0%
38.3%
6.6%
6.6%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
17.3%
20.3% 6.5%
45.8% 6.8%
31
31 19
###
30 20
###
31 21
###
20.4% 20.4% 9.3% 14.6% 10.7% 14.6% 12.7%
19.7%
0.7%
9.0%
9.3%
9.3%
9.0%
10.3%
10.7%
10.7%
10.3%
17.0%
16.5%
30 22
###
31 23
###
31 24
###
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 0.0%
25
### 5.5936% 5.1989% 5.3221% 5.0075% 4.8972% 0.0782% 0.0000% ### 79.496% 84.695% 90.017% 95.025% 99.922% ### ###
18 ###
5.5%
11.6%
30 17
31 21
###
7.0% 16.0% 16.3%
0.0% 73.33% 173.33%
10.9%
###
7.3% 17.7% 16.8%
3.84% 0.98% 0.47% 98.55% 99.53% 100.00%
11.3% 12.7% 5.6% 11.3%
###
6.5% 0.7% 7.3%
5.8%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
20.3% 20.3%
11.3% 12.7% 5.6% 11.3%
0.0000% 0.0000% 0.0005% 0.6570% 1.2364% ### 1.5600% 1.5097% 6.4457% 6.3165% 6.3884% 6.7490% 6.7394% 6.6834% 6.8586% 7.3489% 7.1963% 0.0000% 0.000% 0.001% 0.658% 1.894% 3.291% 4.851% 6.361% 12.807% 19.123% 25.511% 32.260% 39.000% 45.683% 52.542% 59.891% 67.087%
Date start
19.6% 19.6%
10.9% 12.3% 5.5% 10.9%
25.7% 6.5% 5.9%
20.3% 20.3%
8.2%
29 13
19.6% 19.6%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.0% 24.1395%
28 25
###
### 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,629.00 999.00 8,281.00 1,253.00 1,494.00 15,610.00 29,311.00 89,923.00 89,923.00 2,095.00 4,000.00 118.00 960.00 448.00 415.00 5,958.00 57.00 6,897.00 1,936.00 5,992.00 133.00 28.00 3.00 90,528.00 2,760.00
326.00 666.00 5,521.00 200.00 239.00 1,957.00 1,184.00 9,588.00 9,588.00 262.00 4,002.00 234.00 1,907.00 4,043.00 3,744.00 1,986.00 284.00 11,821.00 3,318.00 6,337.00 391.00 82.00 388.00 21,819.00 1,120.00 267,091.00
Total DMHS = 959,750.00
m 0.122% 1/1/2008 5/30/2008 cu.m 0.249% 11/15/2007 9/30/2008 cu.m 2.067% 11/1/2007 5/31/2008 sq.m. 0.075% 2/14/2008 4/30/2008 sq.m. 0.089% 2/1/2008 3/25/2008 cu.m 0.733% 3/1/2008 6/24/2008 sq.m. 0.443% 4/1/2008 7/31/2008 sq.m. 3.590% 7/1/2008 9/30/2008 sq.m. 3.590% 4/18/2008 6/20/2008 m 0.098% 7/1/2008 8/31/2008 m 1.498% 6/19/2008 10/30/2008 cu.m 0.088% 12/1/2007 3/31/2008 cu.m 0.714% 12/1/2007 2/28/2008 cu.m 1.514% 10/1/2007 1/30/2008 cu.m 1.402% 10/30/2007 4/1/2008 sq.m. 0.744% 3/1/2008 6/30/2008 cu.m 0.106% 1/1/2008 4/30/2008 sq.m. 4.426% 1/1/2008 6/5/2008 sq.m. 1.242% 1/1/2008 3/5/2008 sq.m. 2.373% 12/25/2007 3/3/2008 cu.m 0.146% 1/8/2008 3/31/2008 cu.m 0.031% 1/1/2008 3/13/2008 cu.m 0.145% 2/1/2008 4/30/2008 Kg 8.169% 9/15/2007 4/30/2008 m 0.419% 1/2/2008 4/22/2008 27.83% 100.000%
151.00 321.00 213.00 77.00 54.00 116.00 122.00 92.00 64.00 62.00 134.00 122.00 90.00 122.00 155.00 122.00 121.00 157.00 65.00 70.00 84.00 73.00 90.00 229.00 112.00
100%
5.0% 14.1%
19.2% 9.0% 13.6% 20.8% 53.7%
20.5% 9.7% 14.6% 40.3% 46.3% 26.7%
19.9% 9.3% 14.1% 39.0%
19.9% 9.7% 14.6%
9.3%
25.9% 24.6%
26.7% 25.4%
20.7% 24.6%
20.3%
48.4%
31.3% 9.0%
25.4% 1.3%
25.4% 34.4% 25.4% 20.0%
24.6% 19.4%
10.0%
7.0%
13.5%
13.1%
13.5%
25.4% 34.4% 24.6% 20.0%
23.8% 31.1%
25.4%
18.7%
25.6% 19.7% 47.7% 44.3% 28.6% 42.5%
24.0% 18.5% 44.6% 41.4% 34.5% 39.7% 32.2% 12.7% 25.9%
20.0% 25.4% 25.6% 19.7% 7.7% 4.3% 36.9% 17.8% 34.4% 13.5% 27.7%
13.5% 26.8%
0.6% 24.6% 24.8% 19.1%
25.4%
24.6%
19.7%
3.2%
9.7%
9.7%
9.3%
25.4% 33.7%
33.7%
32.6%
50.0% 23.1%
50.0% 23.1%
22.4%
2 ### #REF! #REF!
3 ### #REF! #REF!
4 ### #REF! #REF!
5 ### #REF! #REF!
6 ### #REF! #REF!
7 ### #REF! #REF!
8 ### #REF! #REF!
9 ### #REF! #REF!
10 ### #REF! #REF!
11 ### #REF! #REF!
12 ### #REF! #REF!
13 ### #REF! #REF!
14 ### #REF! #REF!
15 ### #REF! #REF!
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
22.4%
33.3% 13.1% 19.6%
0.0000% 0.0000% 0.0149% 0.4615% 0.4466% ### 0.4615% 1.0173% 2.2444% 3.9599% 7.3126% ### ### ### ### ### 6.7765% 0.0000% 0.000% 0.015% 0.476% 0.923% 1.384% 1.846% 2.863% 5.108% 9.068% 16.380% 28.887% 41.252% 53.168% 64.584% 75.761% 82.537%
1 Monthly Percentage accomplishment = Monthly Cumulative % Accomplishment =
20.5% 9.7% 14.6%
9.7% 14.6%
16 ### #REF! #REF!
17 ### #REF! #REF!
### 5.7388% 5.5062% 0.3355% 0.0000% 0.0000% 0.0000% 0.0000% ### 94.158% 99.665% ### ### ### ### ###
18 ### #REF! #REF!
### #REF! #REF!
19
20 ### #REF! #REF!
21 ### #REF! #REF!
22 ### #REF! #REF!
23 ### #REF! #REF!
24 ### #REF! #REF!
25 ### #REF! #REF!
### #REF! #REF!
91.4115%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00001751 Ramon:
Project : Khurais Crude Facilities Location : Khurais Saudi Arabia 11.55
GOSP 1
inserted column
0.22 Activities
Qty
General excavation
DMHS
1,269.00
MONTHLY PROGRESS PLAN Ramon:
102.00
to derive DMHS this becomes Productivity Rate
Unit
0.08 cu.m
Relative %
0.082%
Date start
Date finish
Duration
inserted column to derive total
Ramon:
sum of DMHS 4/20/2007
9/30/2007
164.00
102.00
31
14 1
Validation
2
28-Feb-07
30 3
31-Mar-07
30-Apr-07
-
397063 General Backfilling of Areas/Roads
8,340.00
1,218.00
0.15 cu.m
0.975%
2/1/2008
11/30/2008
304.00
1,218.00
-
Subbase preparation under paving
43,659.00
4,066.00
0.09 sq.m.
3.255%
1/1/2008
12/15/2008
350.00
4,066.00
-
Limited excavation up to 1.5 m
11,424.00
4,570.00
0.40 cu.m
3.658%
2/15/2007
10/31/2008
625.00
4,570.00
-
2,620.00
2,680.00
1.02 cu.m
2.145%
4/20/2007
10/30/2008
560.00
2,680.00
-
293.00
1,757.00
6.00 cu.m
1.406%
6/1/2007
2/28/2008
273.00
1,757.00
-
Limited Excavation (Over 1.5m depth) Reinf concrete pit for sewer Installation of PVC drainage system
2,400.00
480.00
0.20 m
0.384%
7/15/2007
5/31/2008
322.00
480.00
-
Installation of Cast Iron Drainage
107.00
535.00
5.00 m
0.428%
4/1/2008
5/31/2008
61.00
535.00
-
Laying of Sand for Pipe Prot.
163.00
108.00
0.66 cu.m
0.086%
8/1/2007
11/30/2008
488.00
108.00
-
Lay of slabs/bricks Cables
238.00
38.00
0.16 sq.m.
0.030%
2/1/2008
6/30/2008
151.00
38.00
-
Road (Base course+ subbase)
10,202.00
1,226.00
0.12 cu.m.
0.981%
7/1/2008
11/30/2008
153.00
1,226.00
-
Asphalting of Roads
20,634.00
774.00
0.04 sq.m.
0.620%
8/1/2008
12/31/2008
153.00
774.00
-
508.00
750.00
1.48 cu.m
0.600%
2/21/2007
1/31/2008
345.00
750.00
-
38,046.00
6,259.00
38,046.00
6.08 cu.m
30.455%
3/3/2007
2/28/2008
363.00
38,046.00
-
6.00
2.00
Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M
185.00
626.00
3.38 cu.m
0.501%
5/24/2007
12/31/2007
222.00
626.00
-
8,335.00
0.34 sq.m.
6.672%
2/1/2008
10/31/2008
274.00
8,335.00
-
294.00
1,456.00
4.95 cu.m.
1.166%
12/1/2007
7/31/2008
244.00
1,456.00
-
Foundation Protection
40,516.00
9,088.00
0.22 sq.m.
7.275%
6/1/2007
11/30/2008
549.00
9,088.00
-
Execution of expansion joints
12,105.00
2,421.00
0.20 m
1.938%
2/1/2008
10/31/2008
274.00
2,421.00
-
PR / Lay light items (Real V)
111.00
261.00
2.35 cu.m.
0.209%
2/1/2008
4/30/2008
90.00
261.00
-
Fire Proofing
120.00
4,730.00
39.42 cu.m
3.786%
2/1/2008
10/31/2008
274.00
4,730.00
-
46.00
8,879.00
193.02 cu.m.
7.108%
10/1/2007
1/20/2009
478.00
8,879.00
-
44,023.00
31,156.00
0.71 Kg
24.940%
11/15/2007
11/30/2008
382.00
31,156.00
-
31.00
19.00
0.61 Kg
0.015%
12/4/2007
6/30/2008
210.00
19.00
-
4,790.00
1,603.00
0.33 m
1.283%
2/1/2008
11/30/2008
304.00
1,603.00
-
Concrete for Piping support
626.00
Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
227
31-May-07
31
30 6
5 30-Jun-07
31 7
31-Jul-07
30 8
31-Aug-07
31 9
30-Sep-07
7
19
19
19
19
19
85
240
232
240
240
232
6.7%
18.9%
18.3%
18.9%
18.9%
18.3%
30 10
31-Oct-07
31 11
30-Nov-07
31-Dec-07
29
31 13
12 31-Jan-08
31 14
30 15
31 16
30 17
31 18
31 19
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
31-Aug-08
116
124
120
124
120
124
124
360
337
360
349
360
349
360
360
219
227
219
227
227
219
227
219
227
227
212
227
219
227
219
227
227
53
148
144
148
148
144
148
144
148
148
139
148
144
148
144
148
148
193
200
200
193
200
193
200
200
180
25
46
45
46
45
46
46
43
7
7
248
248
7
7
7
7
7
7
46
45
46
263
272
6
7
7
7
7
7
8
8
8
8 157
17
67
65
67
65
67
67
65
67
65
67
67
3,039
3,144
3,249
3,144
3,249
3,249
3,144
3,249
3,144
3,249
3,249
23
85
87
87
85
87
85
87
2,935
3.00
24,211.00
Reinforced Concrete for Paving
102
31 4
124,924.00
13.02%
497
513
513
497
513
497
576
882
943
913
943
913
943
185
185
173
185
179
185
179
185
943
513
513
480
513
497
513
497
513
513
256
274
265
274
265
274
274
84
90
87 535
501
535
518
535
518
535
557
576
576
539
576
557
576
557
576
576
1,305
2,528
2,528
2,365
2,528
2,447
2,528
2,447
2,528
2,528
3
3
163
163
3
3
3
3
3
153
163
158
163
158
100.000% 120
3,334
3,574
3,973
4,598
4,776
4,804
4,649
5,121
6,260
7,836
8,109
9,411
6,731
6,777
6,913
6,382
6,833
6,804
120
3,453
7,027
11,000
15,598
20,374
25,178
29,827
34,948
41,208
49,045
57,154
66,565
73,296
80,073
86,986
93,368
100,200
107,005
GOSP 2 31
14 Activities
Qty
DMHS
Unit
Relative %
Date start
Date finish
1
Duration
28-Feb-07
General excavation
1,269.00
102.00
0.08 cu.m
0.088%
4/20/2007
9/30/2007
164.00
102.00
-
General Backfilling of Areas/Roads
8,429.00
1,123.00
0.13 cu.m
0.964%
2/1/2008
11/30/2008
304.00
1,123.00
-
Subbase preparation under paving
43,659.00
4,066.00
0.09 sq.m.
3.492%
1/1/2008
12/15/2008
350.00
4,066.00
-
Limited excavation up to 1.5 m
11,131.00
4,452.00
0.40 cu.m
3.823%
2/15/2007
10/31/2008
625.00
4,452.00
-
2,486.00
2,619.00
1.05 cu.m
2.249%
4/20/2007
10/30/2008
560.00
2,619.00
-
185.00
1,353.00
7.31 cu.m
1.162%
6/1/2007
2/28/2008
273.00
1,353.00
-
Limited Excavation (Over 1.5m depth) Reinf concrete pit for sewer Installation of PVC drainage system Installation of Cast Iron Drainage Laying of Sand for Pipe Prot.
80.00
16.00
0.20 m
0.014%
7/15/2007
5/31/2008
322.00
16.00
-
107.00
535.00
5.00 m
0.459%
4/1/2008
5/31/2008
61.00
535.00
-
75.00
50.00
0.67 cu.m
0.043%
8/1/2007
11/30/2008
488.00
50.00
-
150.00
24.00
0.16 sq.m.
0.021%
2/1/2008
6/30/2008
151.00
24.00
-
Road (Base course+ subbase)
10,716.00
1,288.00
0.12 cu.m.
1.106%
7/1/2008
11/30/2008
153.00
1,288.00
-
Asphalting of Roads
21,676.00
813.00
0.04 sq.m.
0.698%
8/1/2008
12/31/2008
153.00
813.00
-
383.00
416.00
1.09 cu.m
0.357%
2/21/2007
1/31/2008
345.00
416.00
-
6,284.00
35,345.00
5.62 cu.m
30.353%
3/3/2007
2/28/2008
363.00
35,345.00
-
185.00
581.00
3.14 cu.m
0.499%
5/24/2007
12/31/2007
222.00
581.00
-
24,211.00
8,335.00
0.34 sq.m.
7.158%
2/1/2008
10/31/2008
274.00
8,335.00
-
294.00
1,456.00
4.95 cu.m.
1.250%
12/1/2007
7/31/2008
244.00
1,456.00
-
Foundation Protection
40,152.00
5,074.00
0.13 sq.m.
4.357%
6/1/2007
11/30/2008
549.00
5,074.00
-
Execution of expansion joints
12,105.00
2,421.00
0.20 m
2.079%
2/1/2008
10/31/2008
274.00
2,421.00
-
70.00
142.00
2.03 cu.m.
0.122%
2/1/2008
4/30/2008
90.00
142.00
-
120.00
4,730.00
39.42 cu.m
4.062%
2/1/2008
10/31/2008
274.00
4,730.00
-
46.00
9,709.00
211.07 cu.m.
8.338%
10/1/2007
1/20/2009
478.00
9,709.00
-
45,482.00
30,261.00
0.67 Kg
25.987%
11/15/2007
11/30/2008
382.00
30,261.00
-
10.00
12.00
1.20 Kg
0.010%
12/4/2007
6/30/2008
210.00
12.00
-
4,431.00
1,522.00
0.34 m
1.307%
2/1/2008
11/30/2008
304.00
1,522.00
-
Lay of slabs/bricks Cables
Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support
PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
116,445.00
12.13%
2
100
30 3
31-Mar-07
221
31 4
31
30 6
5
31 7
30 8
31 9
30-Apr-07
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
7
19
19
19
19
19
30 10
31-Oct-07
31 11
30-Nov-07
31-Dec-07
29
31 13
12 31-Jan-08
31 14
30 15
31 16
30 17
31 18
31 19
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
31-Aug-08
107
115
111
115
111
115
115
360
337
360
349
360
349
360
360
214
221
214
221
221
214
221
214
221
221
207
221
214
221
214
221
221
51
145
140
145
145
140
145
140
145
145
136
145
140
145
140
145
145
149
154
154
149
154
149
154
154
139
1
2
1
2
1
2
2
1
3
3
261
261
3
3
3
3
3
3
2
1
2
263
272
3
3
3
3
3
5
5
5
5
5 165
10
37
36
37
36
37
37
36
37
36
37
37
2,824
2,921
3,018
2,921
3,018
3,018
2,921
3,018
2,921
3,018
3,018
21
79
81
81
79
81
79
81
277
287
287
277
287
630
277
2,726 882
943
913
943
913
943
185
185
173
185
179
185
179
185
943
287
287
268
287
277
287
277
287
287
256
274
265
274
265
274
274
46
49
47 535
501
535
518
535
518
535
609
630
630
589
630
609
630
609
630
630
1,267
2,456
2,456
2,297
2,456
2,377
2,456
2,377
2,456
2,456
2
2
155
155
2
2
2
2
2
145
155
150
155
150
100.000% 109
3,082
3,229
3,462
3,834
3,963
3,967
3,839
4,577
5,697
7,220
7,499
8,819
6,365
6,423
6,588
6,111
6,569
6,548
109
3,191
6,421
9,882
13,717
17,680
21,647
25,486
30,063
35,760
42,980
50,478
59,298
65,663
72,085
78,673
84,784
91,353
97,901
GOSP 3 Activities
Qty
DMHS
Unit
Relative %
Date start
Date finish
1
Duration
General excavation
1,269.00
102.00
0.08 cu.m
0.087%
5/20/2007
10/30/2007
164.00
102.00
-
General Backfilling of Areas/Roads
8,337.00
1,111.00
0.13 cu.m
0.944%
3/2/2008
12/31/2008
305.00
1,111.00
-
Subbase preparation under paving
43,659.00
4,066.00
0.09 sq.m.
3.456%
2/1/2008
1/31/2009
366.00
4,066.00
-
Limited excavation up to 1.5 m
11,313.00
4,525.00
0.40 cu.m
3.847%
3/17/2007
11/30/2008
625.00
4,525.00
-
2,535.00
2,626.00
1.04 cu.m
2.232%
5/20/2007
11/30/2008
561.00
2,626.00
-
Reinf concrete pit for sewer
228.00
1,476.00
6.47 cu.m
1.255%
7/1/2007
3/30/2008
274.00
1,476.00
-
Installation of PVC drainage system
960.00
192.00
0.20 m
0.163%
8/15/2007
6/30/2008
321.00
192.00
-
Installation of Cast Iron Drainage
107.00
535.00
5.00 m
0.455%
5/1/2008
6/30/2008
61.00
535.00
-
Laying of Sand for Pipe Prot.
163.00
108.00
0.66 cu.m
0.092%
9/1/2007
12/30/2008
487.00
108.00
-
Lay of slabs/bricks Cables
205.00
33.00
0.16 sq.m.
0.028%
3/1/2008
7/31/2008
153.00
33.00
-
Road (Base course+ subbase)
10,176.00
1,222.00
0.12 cu.m.
1.039%
8/1/2008
12/31/2008
153.00
1,222.00
-
Asphalting of Roads
20,584.00
772.00
0.04 sq.m.
0.656%
9/1/2008
1/31/2009
153.00
772.00
-
Limited Excavation (Over 1.5m depth)
Lean Concrete
441.00
576.00
1.31 cu.m
0.490%
3/23/2007
2/28/2008
343.00
576.00
-
6,304.00
35,635.00
5.65 cu.m
30.293%
4/2/2007
3/30/2008
364.00
35,635.00
-
185.00
581.00
3.14 cu.m
0.494%
6/23/2007
1/30/2008
222.00
581.00
-
24,211.00
8,335.00
0.34 sq.m.
7.085%
3/1/2008
11/30/2008
275.00
8,335.00
-
294.00
1,456.00
4.95 cu.m.
1.238%
1/1/2008
8/31/2008
244.00
1,456.00
-
Foundation Protection
40,468.00
5,135.00
0.13 sq.m.
4.365%
7/1/2007
12/30/2008
549.00
5,135.00
-
Execution of expansion joints
12,105.00
2,421.00
0.20 m
2.058%
3/1/2008
11/30/2008
275.00
2,421.00
91.00
200.00
2.20 cu.m.
0.170%
3/1/2008
5/31/2008
92.00
120.00
4,730.00
39.42 cu.m
4.021%
3/2/2008
11/30/2008
47.00
9,920.00
211.06 cu.m.
8.433%
11/1/2007
2/28/2009
45,564.00
30,336.00
0.67 Kg
25.788%
12/15/2007
15.00
18.00
1.20 Kg
0.015%
4,439.00
1,525.00 117,636.00
0.34 m
1.296% 100.000%
Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support
PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
12.26%
2
28-Feb-07
3
31-Mar-07
4
30-Apr-07
109
217
6
5
7
8
9
10
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
7
19
19
19
19
19
11
30-Nov-07
13
12
31-Dec-07
31-Jan-08
14
29-Feb-08
15
16
17
18
19
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
31-Aug-08
109
109
113
109
113
113
322
344
333
344
333
344
344
224
217
224
224
217
224
217
224
224
210
224
217
224
217
224
224
56
140
145
145
140
145
140
145
145
136
145
140
145
140
145
145
167
167
162
167
162
167
167
156
162
10
18
19
18
19
19
17
19
7
7
7
7
7
7
6
18
19
18
272
263
7
7
7
7
7
7
6
7
6
7 248
15
50
52
50
52
52
50
52
50
52
52
47
2,839
3,035
2,937
3,035
3,035
2,937
3,035
2,937
3,035
3,035
2,839
21
81
81
79
81
79
81
79
2,937 940
909
940
909
940
940
185
173
185
179
185
179
185
185
290
271
290
281
290
281
290
290
-
273
264
273
264
273
273
200.00
-
67
65
67
274.00
4,730.00
-
535
486.00
9,920.00
-
12/30/2008
382.00
30,336.00
-
1/3/2008
7/30/2008
210.00
18.00
-
3/2/2008
12/30/2008
304.00
1,525.00
-
290
290
281
290
281
290
612
518
518
535
518
535
633
633
592
633
612
633
612
633
633
1,350
2,462
2,303
2,462
2,382
2,462
2,382
2,462
2,462
2
2
3
3
3
3
3
150
150
156
150
156
156
-
124
3,107
3,375
3,385
4,014
4,024
3,909
4,039
4,503
6,003
7,299
7,076
9,474
6,195
6,674
6,393
6,316
6,554
-
124
3,230
6,605
9,990
14,004
18,028
21,937
25,975
30,478
36,481
43,780
50,856
60,330
66,525
73,199
79,592
85,907
92,461
GOSP 4 Activities
Qty
DMHS
Unit
Relative %
Date start
Date finish
1
Duration
General excavation
1,269.00
102.00
0.08 cu.m
0.086%
5/20/2007
10/30/2007
164.00
102.00
-
General Backfilling of Areas/Roads
8,645.00
1,148.00
0.13 cu.m
0.971%
3/2/2008
12/31/2008
305.00
1,148.00
-
Subbase preparation under paving
43,659.00
4,066.00
0.09 sq.m.
3.441%
2/1/2008
1/31/2009
366.00
4,066.00
-
Limited excavation up to 1.5 m
11,189.00
4,475.00
0.40 cu.m
3.787%
3/17/2007
11/30/2008
625.00
4,475.00
-
2,512.00
2,645.00
1.05 cu.m
2.238%
5/20/2007
11/30/2008
561.00
2,645.00
-
Reinf concrete pit for sewer
173.00
1,305.00
7.54 cu.m
1.104%
7/1/2007
3/30/2008
274.00
1,305.00
-
Installation of PVC drainage system
480.00
96.00
0.20 m
0.081%
8/15/2007
6/30/2008
321.00
96.00
-
Installation of Cast Iron Drainage
107.00
535.00
5.00 m
0.453%
5/1/2008
6/30/2008
61.00
535.00
-
Limited Excavation (Over 1.5m depth)
Laying of Sand for Pipe Prot.
75.00
50.00
0.67 cu.m
0.042%
9/1/2007
12/30/2008
487.00
50.00
-
150.00
24.00
0.16 sq.m.
0.020%
3/1/2008
7/31/2008
153.00
24.00
-
Road (Base course+ subbase)
12,593.00
1,512.00
0.12 cu.m.
1.279%
8/1/2008
12/31/2008
153.00
1,512.00
-
Asphalting of Roads
25,471.00
956.00
0.04 sq.m.
0.809%
9/1/2008
1/31/2009
153.00
956.00
-
Lay of slabs/bricks Cables
Lean Concrete
405.00
456.00
1.13 cu.m
0.386%
3/23/2007
2/28/2008
343.00
456.00
-
6,340.00
35,648.00
5.62 cu.m
30.165%
4/2/2007
3/30/2008
364.00
35,648.00
-
185.00
581.00
3.14 cu.m
0.492%
6/23/2007
1/30/2008
222.00
581.00
-
24,211.00
8,335.00
0.34 sq.m.
7.053%
3/1/2008
11/30/2008
275.00
8,335.00
-
294.00
1,456.00
4.95 cu.m.
1.232%
1/1/2008
8/31/2008
244.00
1,456.00
-
Foundation Protection
40,203.00
5,077.00
0.13 sq.m.
4.296%
7/1/2007
12/30/2008
549.00
5,077.00
-
Execution of expansion joints
12,105.00
2,421.00
0.20 m
2.049%
3/1/2008
11/30/2008
275.00
2,421.00
70.00
140.00
2.00 cu.m.
0.118%
3/1/2008
5/31/2008
92.00
120.00
4,730.00
39.42 cu.m
4.002%
3/2/2008
11/30/2008
46.00
9,709.00
211.07 cu.m.
8.216%
11/1/2007
2/28/2009
50,207.00
31,165.00
0.62 Kg
26.371%
12/15/2007
10.00
12.00
1.20 Kg
0.010%
4,450.00
1,533.00
0.34 m
1.297%
Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support
PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
118,177.00
12.31%
2
28-Feb-07
3
31-Mar-07
107
4
30-Apr-07
215
6
5
7
8
9
10
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
7
19
19
19
19
19
11
30-Nov-07
13
12
31-Dec-07
31-Jan-08
14
29-Feb-08
15
16
17
18
19
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
31-Aug-08
113
113
117
113
117
117
322
344
333
344
333
344
344
222
215
222
222
215
222
215
222
222
208
222
215
222
215
222
222
57
141
146
146
141
146
141
146
146
137
146
141
146
141
146
146
148
148
143
148
143
148
148
138
143
5
9
9
9
9
9
9
9
3
3
3
3
3
3
3
9
9
9
272
263
3
3
3
3
3
5
5
5
5
5 306
12
40
41
40
41
41
40
41
40
41
41
37
2,840
3,036
2,938
3,036
3,036
2,938
3,036
2,938
3,036
3,036
2,840
21
81
81
79
81
79
81
79
2,938 940
909
940
909
940
940
185
173
185
179
185
179
185
185
287
268
287
277
287
277
287
287
-
273
264
273
264
273
273
140.00
-
47
46
47
274.00
4,730.00
-
535
486.00
9,709.00
-
12/30/2008
382.00
31,165.00
-
1/3/2008
7/30/2008
210.00
12.00
-
3/2/2008
12/30/2008
304.00
1,533.00
-
287
287
277
287
277
599
287
518
518
535
518
535
619
619
579
619
599
619
599
619
619
1,387
2,529
2,366
2,529
2,448
2,529
2,448
2,529
2,529
2
2
2
2
2
2
2
151
151
156
151
156
156
100.000% -
119
3,095
3,363
3,374
3,980
3,985
3,864
3,992
4,444
5,979
7,306
7,082
9,474
6,212
6,691
6,430
6,363
6,663
-
119
3,214
6,577
9,951
13,931
17,916
21,780
25,772
30,216
36,195
43,501
50,583
60,057
66,270
72,961
79,391
85,754
92,417
INLET / OUTLET Activities
Qty
General excavation
DMHS
Unit
Relative %
Date start
Date finish
1
Duration
2
28-Feb-07
3
31-Mar-07
4
6
5
30-Apr-07
31-May-07
30-Jun-07
1
4
1
7
31-Jul-07
8
31-Aug-07
9
30-Sep-07
10
31-Oct-07
11
30-Nov-07
13
12
31-Dec-07
14
15
16
17
18
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
31-Aug-08
128
128
80.00
6.00
0.08 cu.m
0.003%
4/22/2007
6/6/2007
46.00
6.00
-
General Backfilling of Areas/Roads
7,480.00
1,075.00
0.14 cu.m
0.499%
1/15/2008
9/30/2008
260.00
1,075.00
-
70
120
128
124
128
124
Subbase preparation under paving
38,047.00
3,544.00
0.09 sq.m.
1.645%
1/31/2008
6/30/2008
152.00
3,544.00
-
23
676
723
699
723
699
Limited excavation up to 1.5 m
9,613.00
3,846.00
0.40 cu.m
1.785%
5/1/2007
6/30/2008
427.00
3,846.00
-
279
279
261
279
270
279
270
Limited Excavation (Over 1.5m depth)
2,301.00
2,879.00
1.25 cu.m
1.336%
6/7/2007
11/28/2007
175.00
2,879.00
-
169.00
1,335.00
7.90 cu.m
0.620%
8/1/2007
1/31/2008
184.00
1,335.00
-
88.00
440.00
5.00 m
0.204%
3/1/2008
6/30/2008
122.00
440.00
-
Laying of Sand for Pipe Prot.
311.00
207.00
0.67 cu.m
0.096%
11/15/2007
7/30/2008
259.00
207.00
-
Lay of slabs/bricks Cables
740.00
118.00
0.16 sq.m.
0.055%
10/14/2007
6/2/2008
233.00
118.00
-
Road (Base course+ subbase)
12,858.00
1,543.00
0.12 cu.m
0.716%
8/5/2008
11/17/2008
105.00
1,543.00
-
Asphalting of Roads
26,009.00
975.00
0.04 sq.m.
0.452%
10/26/2008
1/14/2009
81.00
975.00
-
Reinf concrete pit for sewer Installation of Cast Iron Drainage
Lean Concrete Reinforced Concrete UP TO +1.0 M
Concrete for Piping support
279
270
279
270
510
510
494
510
461
225
218
225
218
225
225 112
108
112
108
13
25
25
23
25
24
25
24
15
16
16
15
16
15
16
1
9
379.00
1.29 cu.m
0.176%
5/15/2007
1/31/2008
262.00
379.00
-
25
43
45
45
43
45
43
45
45
6.17 cu.m
8.770%
5/15/2007
2/28/2008
290.00
18,898.00
-
1,108
1,955
2,020
2,020
1,955
2,020
1,955
2,020
2,020
1,825
11.00
44.00
4.00 cu.m
0.020%
7/1/2007
8/31/2008
428.00
44.00
-
3
3
3
3
3
3
3
3
21,139.00
7,166.00
0.34 sq.m.
3.326%
3/18/2008
8/4/2008
140.00
7,166.00
-
142.00
703.00
4.95 cu.m
0.326%
6/1/2008
10/31/2008
153.00
703.00
-
4,278.00
0.12 sq.m.
1.985%
7/15/2007
10/31/2008
475.00
4,278.00
-
Execution of expansion joints
10,570.00
2,114.00
0.20 m
0.981%
5/4/2008
8/16/2008
105.00
2,114.00
-
PR / Lay light items (Real V)
52.00
110.00
2.12 cu.m
0.051%
7/31/2008
9/27/2008
59.00
110.00
-
Grouting Operation
17.00
2,795.00
164.41 cu.m
1.297%
11/15/2007
7/15/2008
244.00
2,795.00
-
643,352.00
155,062.00
0.24 Kg
71.962%
10/1/2007
12/30/2008
457.00
155,062.00
-
19,614.00
7,960.00
0.41 m
3.694%
1/15/2008
7/30/2008
198.00
7,960.00
-
215,477.00
22.45%
24 397
18,898.00
35,769.00
Hydrotest Resin Pip on Site
279
395
293.00
Foundation Protection
Und. Fibreg. Pip. On S.PN14 (6In)
270
3,063.00
Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving
279
19
31-Jan-08
153
279
270
279
10,518
270
279
279
261
3
3
3
3
3
3
717
1,536
1,587
1,536
1,587
205
138
142
142
279
270
279
270
279
279
564
604
624
322
2
58
183
355
355
332
355
344
355
344
172
10,179
10,518
10,518
9,840
10,518
10,179
10,518
10,179
10,518
683
1,166
1,246
1,206
1,246
1,206
1,206
10,518
100.000% -
-
1
1,416
2,664
3,010
3,361
3,253
13,889
13,611
13,766
14,543
14,522
14,401
14,779
15,835
15,506
14,686
12,053
-
-
1
1,417
4,081
7,092
10,453
13,706
27,595
41,206
54,971
69,514
84,035
98,437
113,215
129,051
144,557
159,243
171,296
COMMON Activities
General excavation (Common)
Qty
DMHS
Unit
Relative %
Date start
Date finish
1
Duration
28-Feb-07
2 31-Mar-07
3
4
6
5
7
8
9
10
11
30-Apr-07
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
30-Nov-07
52
50
40
1,233
1,193
1,233
1,233
1,193
1,233
1,193
13
12
14
15
16
17
31-Dec-07
31-Jan-08
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
1,233
1,233
1,153
1,233
1,193
1,193
1,223
1,264
1,182
1,264
285
2,395
2,561
2,478
2,561
2,395
2,561
2,478
2,561
1,272.00
102.00
0.08 cu.m
0.038%
10/1/2007
11/30/2007
61.00
102.00
-
197,296.00
15,784.00
0.08 cu.m
5.910%
4/30/2007
5/30/2008
397.00
15,784.00
-
1,098.00
5,218.00
4.75 cu.m
1.954%
12/2/2007
4/7/2008
128.00
5,218.00
-
Embank bund walls by machine (Pond 2)
37,667.00
12,555.00
0.33 cu.m
4.701%
2/1/2008
7/1/2008
152.00
12,555.00
-
Embank bund walls by machine (Ponds)
37,667.00
12,555.00
0.33 cu.m
4.701%
1/1/2008
5/31/2008
152.00
12,555.00
-
Limited section excavation up to 1.5 m (Common)
20,996.00
8,398.00
0.40 cu.m
3.144%
11/1/2007
9/30/2008
335.00
8,398.00
-
752
777
777
727
777
752
777
Limited section excavation up to 1.5 m (Ponds)
18,871.00
7,548.00
0.40 cu.m
2.826%
11/1/2007
5/31/2008
213.00
7,548.00
-
1,063
1,099
1,099
1,028
1,099
1,063
1,099
Limited section excavation over 1.5 m (Common)
58,872.00
95,736.00
1.63 cu.m
35.844%
12/15/2007
9/30/2008
291.00
95,736.00
-
6,425.00
10,448.00
1.63 cu.m
3.912%
11/1/2007
5/31/2008
213.00
10,448.00
-
Reinf concrete pit for sewer (Common)
785.00
5,360.00
6.83 cu.m
2.007%
10/1/2007
5/31/2008
244.00
5,360.00
-
Reinf concrete pit for sewer (Ponds)
329.00
2,246.00
6.83 cu.m
0.841%
12/1/2007
4/30/2008
152.00
2,246.00
-
General excavation (Pond) General Backfilling of Areas/Roads (Ponds)
Limited section excavation over 1.5 m (Ponds)
Installation of PVC drainage system (Common)
2,561
681
5,593
10,199
9,541
10,199
9,870
10,199
1,472
1,521
1,521
1,422
1,521
1,472
1,521
659
681
681
637
681
659
681
458
458
429
458
443
18 31-Jul-08
2,478
83
752
777
777
9,870
10,199
10,199
64
64
672.00
134.00
0.20 m
0.050%
1/1/2008
6/30/2008
182.00
134.00
-
23
21
23
22
23
Installation of PVC drainage system (Ponds)
1,629.00
326.00
0.20 m
0.122%
1/1/2008
5/30/2008
151.00
326.00
-
67
63
67
65
65
Laying of Sand for Pipe Prot. (Common) Laying of Sand for Pipe Prot. (Ponds) Lay of slabs/bricks Cables (Common)
999.00 8,281.00 1,253.00
666.00 5,521.00 200.00
0.67 cu.m 0.67 cu.m 0.16 sq.m.
0.249% 2.067% 0.075%
11/15/2007 11/1/2007 2/14/2008
9/30/2008 5/31/2008 4/30/2008
321.00 213.00 77.00
666.00 5,521.00 200.00
-
64 804
60 752 42
64 804 81
62 778 78
64 804
62
128
111 506 291
523 301
405 291
Lay of slabs/bricks Cables (Ponds)
1,494.00
239.00
0.16 sq.m.
0.089%
2/1/2008
3/25/2008
54.00
239.00
-
Roadbed (Base course+ subbase) (Common) Asphalting of Roads (Common)
15,610.00 29,311.00
1,957.00 1,184.00
0.13 cu.m 0.04 sq.m.
0.733% 0.443%
3/1/2008 4/1/2008
6/24/2008 7/31/2008
116.00 122.00
1,957.00 1,184.00
-
Ballasting of areas (Pond 2)
89,923.00
9,588.00
0.11 sq.m.
3.590%
7/1/2008
9/30/2008
92.00
9,588.00
-
Ballasting of areas (Ponds) Guard Rail Erection
89,923.00 2,095.00
9,588.00 262.00
0.11 sq.m. 0.13 m
3.590% 0.098%
4/18/2008 7/1/2008
6/20/2008 8/31/2008
64.00 62.00
9,588.00 262.00
-
4,000.00
4,002.00
1.00 m
1.498%
6/19/2008
10/30/2008
134.00
4,002.00
-
Lean Concrete (Common) Lean Concrete (Ponds)
118.00 960.00
234.00 1,907.00
1.98 cu.m 1.99 cu.m
0.088% 0.714%
12/1/2007 12/1/2007
3/31/2008 2/28/2008
122.00 90.00
234.00 1,907.00
-
Reinforced Concrete UP TO +1.0 M (Common)
Fencing of Metal Post
33 778
64 804
523
1,948
59 657
59 657
59
24 488 70
505
488
2,259
2,334
376
4,043.00
9.02 cu.m
1.514%
10/1/2007
1/30/2008
122.00
4,043.00
-
1,027
994
1,027
994
415.00 5,958.00 57.00
3,744.00 1,986.00 284.00
9.02 cu.m 0.33 sq.m. 4.98 cu.m
1.402% 0.744% 0.106%
10/30/2007 3/1/2008 1/1/2008
4/1/2008 6/30/2008 4/30/2008
155.00 122.00 121.00
3,744.00 1,986.00 284.00
-
48
725
749
749
700
73
68
749 505 73
Foundation Protection (Common)
6,897.00
11,821.00
1.71 sq.m.
4.426%
1/1/2008
6/5/2008
157.00
11,821.00
-
2,334
2,183
2,334
Foundation Protection (Ponds)
1,936.00
3,318.00
1.71 sq.m.
1.242%
1/1/2008
3/5/2008
65.00
3,318.00
-
1,582
1,480
255
Reinf. Concrete Road Channel (Common)
5,992.00
6,337.00
1.06 sq.m.
2.373%
12/25/2007
3/3/2008
70.00
6,337.00
-
2,806
2,625
272
133.00
391.00
2.94 cu.m
0.146%
1/8/2008
3/31/2008
84.00
391.00
-
112
135
144
28.00
82.00
2.93 cu.m
0.031%
1/1/2008
3/13/2008
73.00
82.00
-
35
33
15
PR / Lay light items (Real V) (Ponds)
634
301 3,231
3,231
131
131
926
926
2,996
56 593
448.00
31-Aug-08
22
358
Reinforced Concrete UP TO +1.0 M (Ponds) Reinforced Concrete for Paving (Common) Concrete for Piping support (Common)
PR / Lay light items (Real V) (Common)
4,644
19
30-Jun-08
Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) Hydrotest Resin Pip on Site
3.00
388.00
129.33 cu.m
0.145%
2/1/2008
4/30/2008
90.00
388.00
-
90,528.00
21,819.00
0.24 Kg
8.169%
9/15/2007
4/30/2008
229.00
21,819.00
-
1,120.00
0.41 m
0.419%
1/2/2008
4/22/2008
112.00
1,120.00
-
2,760.00
Total DMHS =
267,091.00
27.83%
959,750.00
100%
1,524
2,954
2,858
2,954
125
134
129
2,954
2,763
2,954
2,858
300
290
310
220
100.000% -
-
40
1,233
1,193
1,233
1,233
2,717
5,995
10,577
19,531
33,404
33,027
31,826
30,492
29,852
18,100
15,711
15,328
-
-
40
1,272
2,465
3,698
4,930
7,647
13,642
24,218
43,750
77,153
110,181
142,007
172,498
202,350
220,450
236,161
251,489
1
2
3
4
6
5
7
8
9
10
11
13
12
14
15
16
17
18
19
28-Feb-07
31-Mar-07
30-Apr-07
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
30-Nov-07
31-Dec-07
31-Jan-08
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
Man Hour
229
6,659
13,045
16,822
19,047
20,976
21,374
22,231
37,612
45,092
60,335
78,159
79,937
78,271
70,878
72,553
58,922
56,477
53,950
Cum Man Hour
229
6,888
19,933
36,754
55,802
76,778
98,152
120,383
157,995
203,086
263,421
341,580
421,518
499,789
570,667
643,220
702,141
758,618
812,569
1 Months Manpower Requirement =
2
28-Feb-07
3
31-Mar-07
1
4
30-Apr-07
26
6
5 31-May-07
50
30-Jun-07
65
7
31-Jul-07
73
8
31-Aug-07
81
9
30-Sep-07
82
10
31-Oct-07
86
11
30-Nov-07
145
173
13
12
31-Dec-07
31-Jan-08
232
14
29-Feb-08
301
15
31-Mar-08
307
16
30-Apr-08
301
17
31-May-08
273
18
30-Jun-08
279
19
31-Jul-08
227
31-Aug-08
31-Aug-08
217
208
As Per COPr DERIVATION OF MANPOWER RESOURCES: qty blinding concrete formwork
prod 5 m3 9 m2
mhrs 2 5
duration 10 45
mhrs 1 1
350
trade
Manpower Requirement =
10 1 mason 45
307
301
300
301 273
279
4.5 carpenter 250
footing concrete formwork
50 m3 85 m2
3 5
150 425
5
30
5
3 mason 85
232
200 173
8.5 carpenter
145
150
footing backfilling
112 m3
3
336
5
227
67.2 6.72 labours
100 65
86
82
81
73
50
50 26 1
-
Feb-07
1 Months Manpower Requirement = As Per BOQ
2
Mar-07
3
Apr-07
4
May-07 Jun-07
6
5
Jul-07
7
Aug-07 Sep-07
8
9
Oct-07
10
Nov-07 Dec-07
11
Jan-08
13
12
Feb-08
14
15
Mar-08
Apr-08
May-08 Jun-08
16
17
18
19
28-Feb-07
31-Mar-07
30-Apr-07
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
30-Nov-07
31-Dec-07
31-Jan-08
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
2
52
103
132
150
165
168
175
296
354
474
614
628
615
557
570
463
444
31-Aug-08
424
468
13609
26663
34382
38931
42873
43687
45438
76876
92163
123320
159751
163385
159980
144868
148292
120431
115434
110270
468
14078
40741
75123
114054
156927
200614
246052
322928
415091
538411
698162
861547
1021527
1166395
1314687
1435118
1550552
1660822
700 614 600
628
615 557
570
Manpower Requirement =
474
500 400
354 296
300 200
165
168
175
463
700 614
628
615
600
557
570
Manpower Requirement =
474
500 400
354 296
300 200 103
100
Mar-07
Apr-07
RAMON: 16 Oct. 2008
PRODUCTIVITY RATE, Summary as per data above
0.08
GOSP 2 0.08
GOSP 3
GOSP 4
0.08
0.08
INLET-OUTLET General excavation
COMMON 0.08
General excavation (Common)
0.08
General excavation (Pond)
0.08
General Backfilling of Areas/Roads
0.15
0.13
0.13
0.13
General Backfilling of Areas/Roads
0.14
General Backfilling of Areas/Roads (Ponds)
4.75
Subbase preparation under paving
0.09
0.09
0.09
0.09
Subbase preparation under paving
0.09
Embank bund walls by machine (Pond 2)
0.33
Embank bund walls by machine (Ponds)
0.33
Limited excavation up to 1.5 m
0.40
0.40
0.40
0.40
Limited excavation up to 1.5 m
0.40
Limited section excavation up to 1.5 m (Common)
0.40
Limited Excavation (Over 1.5m depth)
1.02
1.05
1.04
1.05
Limited Excavation (Over 1.5m depth)
1.25
Limited section excavation up to 1.5 m (Ponds)
0.40
Limited section excavation over 1.5 m (Common)
1.63
Limited section excavation over 1.5 m (Ponds)
1.63
Reinf concrete pit for sewer (Common)
6.83
Reinf concrete pit for sewer (Ponds)
6.83
Installation of PVC drainage system (Common)
0.20
Installation of PVC drainage system (Ponds)
0.20
Reinf concrete pit for sewer
6.00
7.31
6.47
7.54
Reinf concrete pit for sewer
7.90
Installation of PVC drainage system
0.20
0.20
0.20
0.20
Installation of Cast Iron Drainage
5.00
5.00
5.00
5.00
Laying of Sand for Pipe Prot.
0.66
0.67
0.66
0.67
Laying of Sand for Pipe Prot.
0.67
Laying of Sand for Pipe Prot. (Common)
0.67
Lay of slabs/bricks Cables
0.16
0.16
0.16
0.16
Lay of slabs/bricks Cables
0.16
Laying of Sand for Pipe Prot. (Ponds)
0.67
Lay of slabs/bricks Cables (Common)
0.16
Lay of slabs/bricks Cables (Ponds)
0.16
Installation of Cast Iron Drainage
5.00
150
165
168
175
2 Feb-07
GOSP 1
132
52
0
General excavation
463
Road (Base course+ subbase)
0.12
0.12
0.12
0.12
Road (Base course+ subbase)
0.12
Roadbed (Base course+ subbase) (Common)
0.13
Asphalting of Roads
0.04
0.04
0.04
0.04
Asphalting of Roads
0.04
Asphalting of Roads (Common)
0.04
Lean Concrete
1.48
1.09
1.31
1.13
Lean Concrete
1.29
Lean Concrete (Common)
1.98
Lean Concrete (Ponds)
1.99
Reinforced Concrete up to +1.0 M
6.08
5.62
5.65
5.62
Reinforced Concrete UP TO +1.0 M
6.17
Reinforced Concrete UP TO +1.0 M (Common)
9.02
Reinforced Concrete +1.0M/+ 7.0 M
3.38
3.14
3.14
3.14
Reinforced Concrete +1.0M/+ 7.0 M
4.00
Reinforced Concrete UP TO +1.0 M (Ponds)
9.02
Reinforced Concrete for Paving
0.34
0.34
0.34
0.34
Reinforced Concrete for Paving
0.34
Reinforced Concrete for Paving (Common)
0.33
Concrete for Piping support
4.95
4.95
4.95
4.95
Concrete for Piping support
4.95
Concrete for Piping support (Common)
4.98
May-07 Jun-07
Jul-07
Aug-07 Sep-07
Oct-07
Nov-07 Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08 Jun-08
Foundation Protection
0.22
0.13
0.13
0.13
Foundation Protection
0.12
Execution of expansion joints
0.20
0.20
0.20
0.20
Execution of expansion joints
0.20
PR / Lay light items (Real V)
2.35
2.03
2.20
2.00
PR / Lay light items (Real V)
2.12
Fire Proofing
39.42
39.42
39.42
39.42
Grouting Operation
1.06
Foundation Protection (Common)
1.71
Foundation Protection (Ponds)
1.71
PR / Lay light items (Real V) (Common)
2.94
PR / Lay light items (Real V) (Ponds)
2.93
193.02
211.07
211.06
211.07
Und. Fibreg. Pip. On S.PN14 (6In)
0.71
0.67
0.67
0.62
Und. Fibreg. Pip. On S.PN14 (6In)
0.24
Und. Fibreg. Pip. On S.PN14 (6In)
0.24
P/E FiberGl. Pip. On S.PN6 (6In)
0.61
1.20
1.20
1.20
Hydrotest Resin Pip on Site
0.41
Hydrotest Resin Pip on Site
0.41
Hydrotest Resin Pip on Site
0.33
0.34
0.34
0.34 Ballasting of areas (Pond 2)
0.11
Ballasting of areas (Ponds)
0.11
Guard Rail Erection
0.13
Fencing of Metal Post
1.00
Grouting Operation
164.41
Reinf. Concrete Road Channel (Common)
Grouting Operation
129.33
Date Started: February 17, 2007 Target Date of Comp : Feb 2009 30 20
31 21
30-Sep-08
30 22
31-Oct-08
31 23
30-Nov-08
120
124
120
349
360
349
219
227
144
144
7
7
7
240
248
240
152
157
152
913
943
497
513
265
274
518
535
31 24
31-Dec-08
31-Jan-09
576
557
2,447
2,528
2,447
158
163
158
174
157
576
372
6,585
6,800
4,526
907
372
113,590
120,389
124,916
125,822
126,194
30
31 21
28-Feb-09
497
557
20
28 25
30 22
31 23
30-Sep-08
31-Oct-08
30-Nov-08
111
115
111
349
360
349
214
221
140
140
3
3
3
253
261
253
159
165
159
913
943
277
287
265
274
518
535
31-Dec-08
630
609
2,377
2,456
2,377
150
155
150
1 1 1 1 1 1 1 1 1 1 1
102 1,123 4,066 4,452 2,619 1,353 16 535 50 24 1,288 813 416 35,345 581 8,335 1,456 5,074 2,421 142 4,730 9,709 30,261 12 1,522 -
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
28 25
31-Jan-09
28-Feb-09
174
165
630
626 8,335 1,456 9,088 2,421 261 4,730 8,879 31,156 19 1,603 -
1 1 1 1 1 1 1 1 1 1 1 1 1
-
277
609
1
126,194
31 24
102 1,269 100% 1,218 4,066 4,570 2,680 1,757 480 535 108 38 1,226 774 750 38,046
406
6,337
6,544
4,288
969
406
104,239
110,782
115,070
116,039
116,445
116,445
20
21
22
23
24
30-Sep-08
31-Oct-08
30-Nov-08
31-Dec-08
109
113
109
113
333
344
333
344
217
224
217
140
145
140
7
7
7
7
240
248
240
248
151
156
151
156
909
940
909
281
290
281
264
273
264
518
535
518
612
633
612
633
2,382
2,462
2,382
2,382
150
156
150
150
25
31-Jan-09
28-Feb-09
344
156
281
633
572
6,315
6,525
6,315
4,314
1,134
572
98,776
105,302
111,617
115,931
117,064
117,636
20
21
22
23
24
30-Sep-08
31-Oct-08
30-Nov-08
31-Dec-08
113
117
113
117
333
344
333
344
215
222
215
141
146
141
3
3
3
3
296
306
296
306
187
194
187
194
909
940
909
277
287
277
264
273
264
518
535
518
599
619
599
619
2,448
2,529
2,448
2,448
151
156
151
151
102 1,111 4,066 4,525 2,626 1,476 192 535 108 33 1,222
1 1 1 1 1 1 1 1 1 1 1
772 576 35,635 581 8,335 1,456 5,135 2,421 200 4,730 9,920 30,336 18 1,525 -
1 1 1 1 1 1 1 1 1 1 1 1 1 1
102 1,148 4,066 4,475 2,645 1,305 96 535 50 24 1,512
1 1 1 1 1 1 1 1 1 1 1
956 456 35,648 581 8,335 1,456 5,077 2,421 140 4,730 9,709 31,165 12 1,533 -
1 1 1 1 1 1 1 1 1 1 1 1 1 1
25
31-Jan-09
28-Feb-09
344
194
277
619
559
6,456
6,671
6,456
4,460
1,157
559
98,873
105,544
112,001
116,460
117,618
118,177
20
21
30-Sep-08
22
31-Oct-08
23
30-Nov-08
24
31-Dec-08
25
31-Jan-09
28-Feb-09
124
441
456
250
72
361
373
10,179
10,179
138
142
270
279
169
50 10,179
10,518
11,202
11,468
10,790
10,552
169
182,498
193,966
204,756
215,308
215,477
20
21
30-Sep-08
22
31-Oct-08
752 9,870
62
3,127
896
896
30-Nov-08
23 31-Dec-08
24 31-Jan-09
6 1,075 3,544 3,846
1 1 1 1
2,879 1,335 440 207 118 1,543 975 379 18,898 44 7,166 703 4,278 2,114 110 2,795 155,062 7,960
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
102 15,784 5,218 12,555 12,555 8,398 7,548 95,736 10,448 5,360 2,246 134 326 666 5,521 200 239 1,957 1,184 9,588 9,588 262 4,002 234 1,907 4,043 3,744 1,986 284 11,821 3,318 6,337 391 82
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
215,477
25 28-Feb-09
388 21,819 1,120 14,706
896
266,195
267,091
20
21
-
-
267,091
22
-
267,091
23
-
267,091
24
1 1 1
267,091
25
30-Sep-08
31-Oct-08
30-Nov-08
31-Dec-08
31-Jan-09
51,602
38,904
32,375
21,202
3,237
28-Feb-09 1,131
864,171
903,075
935,450
956,652
959,889
961,020
2.04
20
21
30-Sep-08
22
31-Oct-08
198
150
217
23
30-Nov-08
125
208
24
31-Dec-08
25
31-Jan-09
82
28-Feb-09
12
4
198
150 125
82
12 Jul-08
20
Aug-08 Sep-08
21
22
Oct-08
23
Nov-08 Dec-08
24
25
30-Sep-08
31-Oct-08
30-Nov-08
31-Dec-08
31-Jan-09
406
306
255
167
25
9
105471
79517
66172
43335
6617
2311
1766292
1845809
1911981
1955316
1961933
1964244
444
424
28-Feb-09
406 306 255 167
Jan-09
4 Feb-09
444
424
406 306 255 167
25 Jul-08
Aug-08 Sep-08
Oct-08
Nov-08 Dec-08
Jan-09
9 Feb-09
Project : Khurais Crude Facilities Location : Khurais Saudi Arabia
Date Started: February 17, 2007 Target Date of Comp : Feb 2009
MONTHLY PROGRESS PLAN (QUANTITY)
GOSP 1 Activities
Qty
DMHS
Unit
Relative %
Date start
Date finish
Duration
1,269
102 cu.m
0.082%
4/20/2007
9/30/2007
164.00
General Backfilling of Areas/Roads
8,340
1,218 cu.m
0.975%
2/1/2008
11/30/2008
304.00
Subbase preparation under paving
43,659
4,066 sq.m.
3.255%
1/1/2008
12/15/2008
350.00
Limited excavation up to 1.5 m
11,424
4,570 cu.m
3.658%
2/15/2007
10/31/2008
625.00
2,620
2,680 cu.m
2.145%
4/20/2007
10/30/2008
560.00
293
1,757 cu.m
1.406%
6/1/2007
2/28/2008
273.00
Reinf concrete pit for sewer Installation of PVC drainage system
2,400
480 m
0.384%
7/15/2007
5/31/2008
322.00
Installation of Cast Iron Drainage
107
535 m
0.428%
4/1/2008
5/31/2008
61.00
Laying of Sand for Pipe Prot.
163
108 cu.m
0.086%
8/1/2007
11/30/2008
488.00
Lay of slabs/bricks Cables
238
38 sq.m.
0.030%
2/1/2008
6/30/2008
151.00
Road (Base course+ subbase)
10,202
1,226 cu.m.
0.981%
7/1/2008
11/30/2008
153.00
Asphalting of Roads
20,634
774 sq.m.
0.620%
8/1/2008
12/31/2008
153.00
508
750 cu.m
0.600%
2/21/2007
1/31/2008
345.00
6,259
38,046 cu.m
30.455%
3/3/2007
2/28/2008
363.00
185
626 cu.m
0.501%
5/24/2007
12/31/2007
222.00
24,211
8,335 sq.m.
6.672%
2/1/2008
10/31/2008
274.00
294
1,456 cu.m.
1.166%
12/1/2007
7/31/2008
244.00
Foundation Protection
40,516
9,088 sq.m.
7.275%
6/1/2007
11/30/2008
549.00
Execution of expansion joints
12,105
2,421 m
1.938%
2/1/2008
10/31/2008
274.00
Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support
2
28-Feb-07
General excavation
Limited Excavation (Over 1.5m depth)
1
3
31-Mar-07
256
4
6
5
7
8
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
85
240
232
240
240
232
567
10
31-Oct-07
11
30-Nov-07
13
12
31-Dec-07
31-Jan-08
14
15
16
29-Feb-08
31-Mar-08
796
850
823
823
850
850
823
850
823 3,742
3,867
3,617
3,867
3,742
3,867
3,742
3,867
3,867
3,742
3,867
567
567
530
567
548
567
548
567
567
548
567
51
145
140
145
145
140
145
140
145
145
136
145
140
145
140
145
145
140
140
32
33
33
32
33
32
33
33
30
127
231
224
231
224
231
231
216
231
224
231
53
54 10
10
10
10
10
2,067
2,067
2,000
2,067
2,000
4,181
4,046
4,181
4,046
2,739
2,651
2,739
10
10
10
10
10
46
44
46
44
46
46
44
46
44
46
46
500
517
535
517
535
535
517
535
517
535
535
7
25
26
26
25
26
25
26
2,214
2,288
2,288
2,214
2,288
2,214
10
10
10
10
10
46
49
47
49
47
2,562
2,739
2,651
2,739
2,651
2,739
37
37
35
37
36
37
36
37
2,288
2,288
2,140
2,288
2,214
2,288
2,214
2,288
2,288
2,214
2,288
1,281
1,370
1,325
1,370
1,325
1,370
1,370
1,325
1,370 14
2/1/2008
4/30/2008
90.00
36
38
37
2/1/2008
10/31/2008
274.00
13
14
46
8,879 cu.m.
7.108%
10/1/2007
1/20/2009
478.00
31,156 Kg
24.940%
11/15/2007
11/30/2008
382.00
31
19 Kg
0.015%
12/4/2007
6/30/2008
210.00
4,790
1,603 m
1.283%
2/1/2008
11/30/2008
304.00
3
24
31-Dec-08
25
31-Jan-09
28-Feb-09
1,269 8,340 43,659 11,424 2,620 293 2,400 107 163 238 10,202 20,634 508 6,259 185 24,211 294 40,516 12,105 111 120 46 44,023 31 4,790
1,871
4,181
483
3.786%
13.02%
850
548
0.209%
124,924
23
30-Nov-08
567
261 cu.m.
234,548
22
31-Oct-08
548
4,730 cu.m
Hydrotest Resin Pip on Site
21
30-Sep-08
567
120
P/E FiberGl. Pip. On S.PN6 (6In)
20
31-Aug-08
567
111
44,023
19
31-Jul-08
548
Fire Proofing Und. Fibreg. Pip. On S.PN14 (6In)
18
30-Jun-08
567
PR / Lay light items (Real V) Grouting Operation
17
30-Apr-08 31-May-08
548
10
12
9
30-Apr-07
2,214
13
14
13
14
14
13
3
3
3
3
3
3
3
3
3
3
3
3
3
1,844
3,573
3,573
3,342
3,573
3,457
3,573
3,457
3,573
3,573
3,457
3,573
3,457
4
5
488
488
473
488
473
4
5
4
5
4
457
488
473
488
473
3
2
100.000%
GOSP 2 Activities
Qty
DMHS
Unit
Relative %
Date start
Date finish
Duration
1,269
102 cu.m
0.088%
4/20/2007
9/30/2007
164.00
General Backfilling of Areas/Roads
8,429
1,123 cu.m
0.964%
2/1/2008
11/30/2008
304.00
Subbase preparation under paving
43,659
4,066 sq.m.
3.492%
1/1/2008
12/15/2008
350.00
Limited excavation up to 1.5 m
11,131
4,452 cu.m
3.823%
2/15/2007
10/31/2008
625.00
2,486
2,619 cu.m
2.249%
4/20/2007
10/30/2008
560.00
185
1,353 cu.m
1.162%
6/1/2007
2/28/2008
273.00
80
16 m
0.014%
7/15/2007
5/31/2008
322.00
107
535 m
0.459%
4/1/2008
5/31/2008
61.00
Reinf concrete pit for sewer Installation of PVC drainage system Installation of Cast Iron Drainage Laying of Sand for Pipe Prot.
75
50 cu.m
0.043%
8/1/2007
11/30/2008
488.00
150
24 sq.m.
0.021%
2/1/2008
6/30/2008
151.00
Road (Base course+ subbase)
10,716
1,288 cu.m.
1.106%
7/1/2008
11/30/2008
153.00
Asphalting of Roads
21,676
813 sq.m.
0.698%
8/1/2008
12/31/2008
153.00
383
416 cu.m
0.357%
2/21/2007
1/31/2008
345.00
6,284
35,345 cu.m
30.353%
3/3/2007
2/28/2008
363.00
185
581 cu.m
0.499%
5/24/2007
12/31/2007
222.00
24,211
8,335 sq.m.
7.158%
2/1/2008
10/31/2008
274.00
294
1,456 cu.m.
1.250%
12/1/2007
7/31/2008
244.00
Foundation Protection
40,152
5,074 sq.m.
4.357%
6/1/2007
11/30/2008
549.00
Execution of expansion joints
12,105
2,421 m
2.079%
2/1/2008
10/31/2008
274.00
Lay of slabs/bricks Cables
Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support
PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
2
28-Feb-07
General excavation
Limited Excavation (Over 1.5m depth)
1
249
3
31-Mar-07
552
4
6
5
7
8
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
85
240
232
240
240
232
10
31-Oct-07
11
30-Nov-07
13
12
31-Dec-07
31-Jan-08
14
15
16
29-Feb-08
31-Mar-08
804
860
832
22
23
31-Oct-08
30-Nov-08
860
832
860
860
832
860
832 3,742
3,867
3,617
3,867
3,742
3,867
3,742
3,867
3,867
3,742
3,867
534
552
534
552
552
516
552
534
552
534
552
552
534
552
49
138
133
138
138
133
138
133
138
138
129
138
133
138
133
138
138
133
133
20
21
21
20
21
20
21
21
19
4
8
7
8
7
8
8
7
5
5
5
5
5
2,171
2,171
2,101
2,171
2,101
4,392
4,250
4,392
4,250
2,739
2,651
2,739
5
5
5
5
5
34
33
34
33
34
34
33
34
33
34
34
502
519
537
519
537
537
519
537
519
537
537
7
25
26
26
25
26
25
26
2,194
2,267
2,267
2,194
2,267
2,194
8
7
8
53
54
4
5
5
5
5
29
31
30
31
30
2,562
2,739
2,651
2,739
2,651
2,739
37
37
35
37
36
37
36
37
2,267
2,267
2,121
2,267
2,194
2,267
2,194
2,267
2,267
2,194
2,267
1,281
1,370
1,325
1,370
1,325
1,370
1,370
1,325
1,370 14
2/1/2008
4/30/2008
90.00
23
24
23
4.062%
2/1/2008
10/31/2008
274.00
13
14
46
9,709 cu.m.
8.338%
10/1/2007
1/20/2009
478.00
30,261 Kg
25.987%
11/15/2007
11/30/2008
382.00
10
12 Kg
0.010%
12/4/2007
6/30/2008
210.00
4,431
1,522 m
1.307%
2/1/2008
11/30/2008
304.00
3
24
31-Dec-08
25
31-Jan-09
1,871
4,392
2,194
13
14
13
14
14
13
3
3
3
3
3
3
3
3
3
3
3
3
3
1,905
3,691
3,691
3,453
3,691
3,572
3,691
3,572
3,691
3,691
3,572
3,691
3,572
1
1
452
452
437
452
437
1
1
1
1
1
423
452
437
452
437
3
28-Feb-09
1,269 8,429 43,659 11,131 2,486 185 80 107 75 150 10,716
485
0.122%
100.000%
21
30-Sep-08
552
142 cu.m.
12.13%
20
31-Aug-08
552
4,730 cu.m
116,445
19
31-Jul-08
534
70
233,736
18
30-Jun-08
552
120 45,482
17
30-Apr-08 31-May-08
534
5
9
9
30-Apr-07
2
21,676 383 6,284 185 24,211 294 40,152 12,105 70 120 46 45,482 10 4,431 -
GOSP 3 Activities
Qty
DMHS
Unit
Relative %
Date start
Date finish
Duration
28-Feb-07
General excavation
1,269
102 cu.m
0.087%
5/20/2007
10/30/2007
164.00
General Backfilling of Areas/Roads
8,337
1,111 cu.m
0.944%
3/2/2008
12/31/2008
305.00
Subbase preparation under paving
43,659
4,066 sq.m.
3.456%
2/1/2008
1/31/2009
366.00
Limited excavation up to 1.5 m
11,313
4,525 cu.m
3.847%
3/17/2007
11/30/2008
625.00
Limited Excavation (Over 1.5m depth)
2,535
2,626 cu.m
2.232%
5/20/2007
11/30/2008
561.00
Reinf concrete pit for sewer
228
1,476 cu.m
1.255%
7/1/2007
3/30/2008
274.00
Installation of PVC drainage system
960
192 m
0.163%
8/15/2007
6/30/2008
321.00
Installation of Cast Iron Drainage
107
535 m
0.455%
5/1/2008
6/30/2008
61.00
Laying of Sand for Pipe Prot.
163
108 cu.m
0.092%
9/1/2007
12/30/2008
487.00
Lay of slabs/bricks Cables
205
33 sq.m.
0.028%
3/1/2008
7/31/2008
153.00
Road (Base course+ subbase)
10,176
1,222 cu.m.
1.039%
8/1/2008
12/31/2008
153.00
Asphalting of Roads
20,584
772 sq.m.
0.656%
9/1/2008
1/31/2009
153.00
441
576 cu.m
0.490%
3/23/2007
2/28/2008
343.00
6,304
35,635 cu.m
30.293%
4/2/2007
3/30/2008
364.00
185
581 cu.m
0.494%
6/23/2007
1/30/2008
222.00
24,211
8,335 sq.m.
7.085%
3/1/2008
11/30/2008
275.00
294
1,456 cu.m.
1.238%
1/1/2008
8/31/2008
244.00
Foundation Protection
40,468
5,135 sq.m.
4.365%
7/1/2007
12/30/2008
549.00
Execution of expansion joints
12,105
2,421 m
2.058%
3/1/2008
11/30/2008
275.00
Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support
PR / Lay light items (Real V)
3
31-Mar-07
4
30-Apr-07
272
6
5
7
8
9
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
93
232
240
240
232
232
543
11
30-Nov-07
13
12
31-Dec-07
31-Jan-08
14
29-Feb-08
15
31-Mar-08
16
17
30-Apr-08 31-May-08
23
24
30-Nov-08
31-Dec-08
847
847
820
847
820
847 3,698
3,459
3,698
3,579
3,698
3,579
3,698
3,698
3,579
3,698
3,579
543
561
561
543
561
543
561
561
525
561
543
561
543
561
561
543
561
543
54
136
140
140
136
140
136
140
140
131
140
136
140
136
140
140
136
140
136
26
26
25
26
25
26
26
24
25
51
90
93
90
93
93
87
93
90
93
90
54
53 10
10
10
10
10
2,062
1,995
2,062
1,995
2,062
4,036
4,171
4,036
4,171
2,641
2,729
2,641
10
10
10
10
10
39
40
39
40
40
39
40
39
40
40
36
502
537
520
537
537
520
537
520
537
537
502
7
26
26
25
26
25
26
25
2,285
2,285
2,211
2,285
2,211
2,285
10
10
10
10
10
42
40
42
40
42
2,729
2,641
2,729
2,641
2,729
2,729
37
35
37
36
37
36
37
37
2,285
2,138
2,285
2,211
2,285
2,211
2,285
2,285
2,211
2,285
2,211
1,365
1,321
1,365
1,321
1,365
1,365
1,321
1,365
1,321 13
5/31/2008
92.00
31
30
31
3/2/2008
11/30/2008
274.00
13
13
47
9,920 cu.m.
8.433%
11/1/2007
2/28/2009
486.00
30,336 Kg
25.788%
12/15/2007
12/30/2008
382.00
15
18 Kg
0.015%
1/3/2008
7/30/2008
210.00
4,439
1,525 m
1.296%
3/2/2008
12/30/2008
304.00
3
25
31-Jan-09
28-Feb-09
3,698
4,171
520
3/1/2008
12.26%
22
31-Oct-08
820
4.021%
117,636
21
30-Sep-08
847
0.170%
233,820
20
31-Aug-08
820
200 cu.m.
P/E FiberGl. Pip. On S.PN6 (6In)
19
31-Jul-08
820
4,730 cu.m
45,564
18
30-Jun-08
561
10
12
10
31-May-07
91
Grouting Operation
Hydrotest Resin Pip on Site
2
120
Fire Proofing Und. Fibreg. Pip. On S.PN14 (6In)
1
2,211
14
13
14
14
13
14
3
3
3
3
3
3
3
3
3
3
3
3
3
2,028
3,698
3,459
3,698
3,578
3,698
3,578
3,698
3,698
3,578
3,698
3,578
3,578
2
2
453
438
453
438
438
2
2
2
2
2
438
438
453
438
453
3
3
100.000%
1,269 8,337 43,659 11,313 2,535 228 960 107 163 205 10,176 20,584 441 6,304 185 24,211 294 40,468 12,105 91 120 47 45,564 15 4,439 -
GOSP 4 Activities
Qty
DMHS
Unit
Relative %
Date start
Date finish
Duration
28-Feb-07
General excavation
1,269
102 cu.m
0.086%
5/20/2007
10/30/2007
164.00
General Backfilling of Areas/Roads
8,645
1,148 cu.m
0.971%
3/2/2008
12/31/2008
305.00
Subbase preparation under paving
43,659
4,066 sq.m.
3.441%
2/1/2008
1/31/2009
366.00
Limited excavation up to 1.5 m
11,189
4,475 cu.m
3.787%
3/17/2007
11/30/2008
625.00
Limited Excavation (Over 1.5m depth)
2,512
2,645 cu.m
2.238%
5/20/2007
11/30/2008
561.00
Reinf concrete pit for sewer
173
1,305 cu.m
1.104%
7/1/2007
3/30/2008
274.00
Installation of PVC drainage system
480
96 m
0.081%
8/15/2007
6/30/2008
321.00
Installation of Cast Iron Drainage
107
535 m
0.453%
5/1/2008
6/30/2008
61.00
Laying of Sand for Pipe Prot.
75
50 cu.m
0.042%
9/1/2007
12/30/2008
487.00
150
24 sq.m.
0.020%
3/1/2008
7/31/2008
153.00
Road (Base course+ subbase)
12,593
1,512 cu.m.
1.279%
8/1/2008
12/31/2008
153.00
Asphalting of Roads
25,471
956 sq.m.
0.809%
9/1/2008
1/31/2009
153.00
405
456 cu.m
0.386%
3/23/2007
2/28/2008
343.00
6,340
35,648 cu.m
30.165%
4/2/2007
3/30/2008
364.00
185
581 cu.m
0.492%
6/23/2007
1/30/2008
222.00
24,211
8,335 sq.m.
7.053%
3/1/2008
11/30/2008
275.00
294
1,456 cu.m.
1.232%
1/1/2008
8/31/2008
244.00
Foundation Protection
40,203
5,077 sq.m.
4.296%
7/1/2007
12/30/2008
549.00
Execution of expansion joints
12,105
2,421 m
2.049%
3/1/2008
11/30/2008
275.00
Lay of slabs/bricks Cables
Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Reinforced Concrete for Paving Concrete for Piping support
PR / Lay light items (Real V) Fire Proofing Grouting Operation Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
1
2
3
31-Mar-07
269
4
30-Apr-07
537
6
5
7
8
9
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
93
232
240
240
232
232
11
30-Nov-07
13
12
31-Dec-07
31-Jan-08
14
29-Feb-08
15
31-Mar-08
16
17
30-Apr-08 31-May-08
23
24
30-Nov-08
31-Dec-08
879
879
850
879
850
879 3,698
3,459
3,698
3,579
3,698
3,579
3,698
3,698
3,579
3,698
3,579
537
555
555
537
555
537
555
555
519
555
537
555
537
555
555
537
555
537
54
134
139
139
134
139
134
139
139
130
139
134
139
134
139
139
134
139
134
20
20
19
20
19
20
20
18
19
25
45
46
45
46
46
43
46
45
46
45
54
53 5
5
5
5
5
2,552
2,469
2,552
2,469
2,552
4,994
5,161
4,994
5,161
2,641
2,729
2,641
5
5
5
5
4
35
37
35
37
37
35
37
35
37
37
33
505
540
523
540
540
523
540
523
540
540
505
7
26
26
25
26
25
26
25
2,270
2,270
2,197
2,270
2,197
2,270
5
5
5
5
5
30
29
30
29
30
2,729
2,641
2,729
2,641
2,729
2,729
37
35
37
36
37
36
37
37
2,270
2,124
2,270
2,197
2,270
2,197
2,270
2,270
2,197
2,270
2,197
1,365
1,321
1,365
1,321
1,365
1,365
1,321
1,365
1,321 13
3/1/2008
5/31/2008
92.00
24
23
24
4.002%
3/2/2008
11/30/2008
274.00
13
13
46
9,709 cu.m.
8.216%
11/1/2007
2/28/2009
486.00
31,165 Kg
26.371%
12/15/2007
12/30/2008
382.00
10
12 Kg
0.010%
1/3/2008
7/30/2008
210.00
4,450
1,533 m
1.297%
3/2/2008
12/30/2008
304.00
3
25
31-Jan-09
28-Feb-09
1,269 8,645 43,659 11,189 2,512 173 480 107 75 150 12,593
3,698
5,161
523
0.118%
100.000%
22
31-Oct-08
850
140 cu.m.
12.31%
21
30-Sep-08
879
4,730 cu.m
118,177
20
31-Aug-08
850
70
244,969
19
31-Jul-08
850
120 50,207
18
30-Jun-08
555
5
11
10
31-May-07
2,197
14
13
14
14
13
14
3
3
3
3
3
3
3
3
3
3
3
3
3
2,234
4,074
3,812
4,074
3,943
4,074
3,943
4,074
4,074
3,943
4,074
3,943
3,943
1
1
454
439
454
439
439
1
1
1
1
1
439
439
454
439
454
3
3
25,471 405 6,340 185 24,211 294 40,203 12,105 70 120 46 50,207 10 4,450 -
INLET / OUTLET Activities
Qty
General excavation
DMHS
Unit
Relative %
Date start
Date finish
Duration
28-Feb-07
80
6 cu.m
0.003%
4/22/2007
6/6/2007
46.00
General Backfilling of Areas/Roads
7,480
1,075 cu.m
0.499%
1/15/2008
9/30/2008
260.00
Subbase preparation under paving
38,047
3,544 sq.m.
1.645%
1/31/2008
6/30/2008
152.00
Limited excavation up to 1.5 m
9,613
3,846 cu.m
1.785%
5/1/2007
6/30/2008
427.00
Limited Excavation (Over 1.5m depth)
2,301
2,879 cu.m
1.336%
6/7/2007
11/28/2007
175.00
169
1,335 cu.m
0.620%
8/1/2007
1/31/2008
184.00
88
440 m
0.204%
3/1/2008
6/30/2008
122.00
Reinf concrete pit for sewer Installation of Cast Iron Drainage
1
2 31-Mar-07
3
4
6
5
30-Apr-07
31-May-07
30-Jun-07
16
54
10
698
7 31-Jul-07
8
31-Aug-07
9 30-Sep-07
10
31-Oct-07
11
30-Nov-07
13
12
31-Dec-07
14 31-Mar-08
489
834
892
863
28
28
28 22
22
22
22
19
37
37
35
37
36
37
36
95
98
98
92
98
95
98
6
408
394
408
368
28
28
28
118 sq.m.
0.055%
10/14/2007
6/2/2008
233.00
Road (Base course+ subbase)
12,858
1,543 cu.m
0.716%
8/5/2008
11/17/2008
105.00
Asphalting of Roads
26,009
975 sq.m.
0.452%
10/26/2008
1/14/2009
81.00
293
379 cu.m
0.176%
5/15/2007
1/31/2008
262.00
19
34
35
35
34
35
34
35
35
3,063
18,898 cu.m
8.770%
5/15/2007
2/28/2008
290.00
180
317
327
327
317
327
317
327
327
296
11
44 cu.m
0.020%
7/1/2007
8/31/2008
428.00
1
1
1
1
1
1
1
1
21,139
7,166 sq.m.
3.326%
3/18/2008
8/4/2008
140.00
703 cu.m
0.326%
6/1/2008
10/31/2008
153.00
1.985%
7/15/2007
10/31/2008
475.00
Execution of expansion joints
10,570
2,114 m
0.981%
5/4/2008
8/16/2008
105.00
PR / Lay light items (Real V)
52
110 cu.m
0.051%
7/31/2008
9/27/2008
59.00
Grouting Operation
17
2,795 cu.m
1.297%
11/15/2007
7/15/2008
244.00
Und. Fibreg. Pip. On S.PN14 (6In) Hydrotest Resin Pip on Site
643,352
155,062 Kg
71.962%
10/1/2007
12/30/2008
457.00
19,614
7,960 m
3.694%
1/15/2008
7/30/2008
198.00
831,718
215,477
22.45%
1,280
2,334
2,259
2,334
2,259
43,641
3,674
675
408
740
4,278 sq.m.
3,306
7,509
Lay of slabs/bricks Cables
142
863
698
259.00
35,769
892
7,760
7/30/2008
Foundation Protection
892
675
11/15/2007
Concrete for Piping support
863
7,509
0.096%
Reinforced Concrete for Paving
892
698
316
2,334
2,334
2,184
21
30-Sep-08
7,760
675
20
31-Aug-08
653
698
19
31-Jul-08
7,259
675
207 cu.m
Reinforced Concrete +1.0M/+ 7.0 M
18
30-Jun-08
698
698
311
Reinforced Concrete UP TO +1.0 M
17
30-Apr-08 31-May-08
250 698
Laying of Sand for Pipe Prot.
Lean Concrete
16
29-Feb-08
698
675
57
15
31-Jan-08
22
31-Oct-08
23
30-Nov-08
24
31-Dec-08
25
31-Jan-09
28-Feb-09
80 7,480 38,047 9,613 2,301 169 88 311 740 12,858 26,009 293 3,063 11 21,139 142 35,769 10,570 52 17 643,352 19,614
36 3,796
2,082
1,927
9,633
9,954
42,233
42,233
1
1
1
1
1
1
2,114
4,530
4,681
4,530
4,681
604
28
29
29
28
29
2,334
2,259
2,334
2,259
2,334
2,334
2,259
2,334
2,819
3,020
3,121
1,611
1
27
24
43,641
42,233
1
2
2
2
2
2
2
2
1
42,233
43,641
43,641
40,825
43,641
42,233
43,641
42,233
43,641
1,684
2,873
3,071
2,972
3,071
2,972
2,972
43,641
4,495
100.000%
COMMON Activities
General excavation (Common) General excavation (Pond) General Backfilling of Areas/Roads (Ponds)
Qty
DMHS
Unit
Relative %
Date start
Date finish
Duration
1 28-Feb-07
1,272
102 cu.m
0.038%
10/1/2007
11/30/2007
61.00
197,296
15,784 cu.m
5.910%
4/30/2007
5/30/2008
397.00
2 31-Mar-07
3
4
6
5
7
8
9
10
11
30-Apr-07
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
30-Nov-07
646
626
497
15,406
14,909
15,406
15,406
14,909
15,406
14,909
13
12
14
15
31-Dec-07
31-Jan-08
29-Feb-08
31-Mar-08
15,406
15,406
14,412
15,406
257
266
16
17
30-Apr-08 31-May-08
14,909
1,098
5,218 cu.m
1.954%
12/2/2007
4/7/2008
128.00
37,667
12,555 cu.m
4.701%
2/1/2008
7/1/2008
152.00
Embank bund walls by machine (Ponds)
37,667
12,555 cu.m
4.701%
1/1/2008
5/31/2008
152.00
Limited section excavation up to 1.5 m (Common)
20,996
8,398 cu.m
3.144%
11/1/2007
9/30/2008
335.00
1,880
Limited section excavation up to 1.5 m (Ponds)
18,871
7,548 cu.m
2.826%
11/1/2007
5/31/2008
213.00
2,658
Limited section excavation over 1.5 m (Common)
58,872
95,736 cu.m
35.844%
12/15/2007
9/30/2008
291.00
6,425
10,448 cu.m
3.912%
11/1/2007
5/31/2008
213.00
785
5,360 cu.m
2.007%
10/1/2007
5/31/2008
244.00
329 672 1,629
2,246 cu.m 134 m 326 m
0.841% 0.050% 0.122%
12/1/2007 1/1/2008 1/1/2008
4/30/2008 6/30/2008 5/30/2008
152.00 182.00 151.00
999
666 cu.m
0.249%
11/15/2007
9/30/2008
321.00
50
96
96
90
96
8,281 1,253
5,521 cu.m 200 sq.m.
2.067% 0.075%
11/1/2007 2/14/2008
5/31/2008 4/30/2008
213.00 77.00
1,166
1,205
1,205
1,127 260
1,205 504
4,037 7,208
4,172 7,448
Reinf concrete pit for sewer (Common) Reinf concrete pit for sewer (Ponds) Installation of PVC drainage system (Common) Installation of PVC drainage system (Ponds) Laying of Sand for Pipe Prot. (Common) Laying of Sand for Pipe Prot. (Ponds) Lay of slabs/bricks Cables (Common) Lay of slabs/bricks Cables (Ponds)
1,494
239 sq.m.
0.089%
2/1/2008
3/25/2008
54.00
Roadbed (Base course+ subbase) (Common) Asphalting of Roads (Common)
15,610 29,311
1,957 cu.m 1,184 sq.m.
0.733% 0.443%
3/1/2008 4/1/2008
6/24/2008 7/31/2008
116.00 122.00
Ballasting of areas (Pond 2)
89,923
9,588 sq.m.
3.590%
7/1/2008
9/30/2008
92.00
Ballasting of areas (Ponds) Guard Rail Erection
89,923 2,095
9,588 sq.m. 262 m
3.590% 0.098%
4/18/2008 7/1/2008
6/20/2008 8/31/2008
64.00 62.00
4,002 m
1.498%
6/19/2008
10/30/2008
134.00
Fencing of Metal Post
4,000
100
249
266
60
7,186
7,682
7,434
7,682
7,682
7,186
7,682
7,434
7,682
1,943
1,943
1,818
1,943
1,880
1,943
2,746
2,746
2,569
2,746
2,658
2,746
1,048
1,048
925
925
100
65 111 324
114 324
111
93
96
93
1,166 488
1,205
18,266
43,556
3,230 7,208
28 299
110
30 331 110
Reinforced Concrete for Paving (Common)
5,958
1,986 sq.m.
0.744%
3/1/2008
6/30/2008
122.00
80
83
83
78
57
284 cu.m
0.106%
1/1/2008
4/30/2008
121.00
15
Foundation Protection (Common)
6,897
11,821 sq.m.
4.426%
1/1/2008
6/5/2008
157.00
Foundation Protection (Ponds)
1,936
3,318 sq.m.
1.242%
1/1/2008
3/5/2008
65.00
Reinf. Concrete Road Channel (Common)
5,992
6,337 sq.m.
2.373%
12/25/2007
3/3/2008
70.00
133
391 cu.m
0.146%
1/8/2008
3/31/2008
84.00
28
82 cu.m
0.031%
1/1/2008
3/13/2008
73.00
3
388 cu.m
0.145%
2/1/2008
4/30/2008
90.00
8.169%
9/15/2007
4/30/2008
229.00
0.419%
1/2/2008
4/22/2008
112.00
599
6,325
12,255
11,860
12,255
30
83
3
1,514
1,465
14
15
14
1,362
1,274
1,362
1,318
923
864
149
2,654
2,482
257
38
46
49
12
11
5
1
1
1
12,255
11,464
12,255
11,860
739
715
764
542
7,448
28,101 358
30 331 114
22
31-Oct-08
692 4,172
5
100.000%
29,323
97
67 114 334
114
27.83%
30,300
100
63 107 313
155.00
1,120 m
30,300
93
67 114 334
4/1/2008
267,091
93
100
67
10/30/2007
2,760
96
100
1.402%
742,701
96
97
3,744 cu.m
Hydrotest Resin Pip on Site
6,069
935
415
21,819 Kg
6,272
6,272
905
Reinforced Concrete UP TO +1.0 M (Ponds)
90,528
6,272
6,069
935
122.00 90.00 122.00
Und. Fibreg. Pip. On S.PN14 (6In)
6,069
6,272
875
3/31/2008 2/28/2008 1/30/2008
Grouting Operation
1,880
5,867
12/1/2007 12/1/2007 10/1/2007
PR / Lay light items (Real V) (Ponds)
1,943
935
0.088% 0.714% 1.514%
PR / Lay light items (Real V) (Common)
1,943
6,272
234 cu.m 1,907 cu.m 4,043 cu.m
Concrete for Piping support (Common)
1,880
935
118 960 448
21
30-Sep-08
248
3,439
Lean Concrete (Common) Lean Concrete (Ponds) Reinforced Concrete UP TO +1.0 M (Common)
20
31-Aug-08
7,434
905
802
19
31-Jul-08
14,909
Embank bund walls by machine (Pond 2)
Limited section excavation over 1.5 m (Ponds)
18
30-Jun-08
1,514
1,465
1,362
220
896
896
30-Nov-08
23 31-Dec-08
24 31-Jan-09
25 28-Feb-09
1,272 197,296 1,098 37,667 37,667 20,996 18,871 58,872 6,425 785 329 672 1,629 999 8,281 1,253 1,494 15,610 29,311 89,923 89,923 2,095 4,000 118 960 448 415 5,958 57 6,897 1,936 5,992 133 28 3 90,528 2,760
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Project : Khurais Crude Facilities
Date Started: February 17, 2007
MONTHLY PROGRESS PLAN (QUANTITY)
Location : Khurais Saudi Arabia
Target Date of Comp : Feb 2009
GOSP 1 31
14 Date start Activities
Qty
DMHS
Unit
Date finish
Duration
Relative %
1
2
30 3
31 4
31
30 6
5
31 7
30 8
31 9
30 10
31 11
29
31 13
12
31 14
30 15
31 16
28-Feb-07
31-Mar-07
30-Apr-07
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
30-Nov-07
31-Dec-07
31-Jan-08
29-Feb-08
31-Mar-08
256
567
548
567
548
567
567
548
567
548
567
567
530
567
548
560.00
51
145
140
145
145
140
145
140
145
145
136
145
140
164.00
85
240
232
240
240
232
30 17
30-Apr-08 31-May-08
31 18
31 19
30 20
31 21
30 22
31 23
30-Nov-08
31 24
31-Dec-08
28 25
30-Jun-08
31-Jul-08
31-Aug-08
30-Sep-08
31-Oct-08
31-Jan-09
28-Feb-09
567
548
567
567
548
567
###
145
140
145
145
140
140
###
EXCAVATION, FILL, CONCRETE WORKS Limited excavation up to 1.5 m
11,424
4,570 cu.m
3.658%
2/15/2007
10/31/2008
Limited Excavation (Over 1.5m depth)
2,620
2,680 cu.m
2.145%
4/20/2007
10/30/2008
General excavation
1,269
102 cu.m
0.082%
4/20/2007
9/30/2007
General Backfilling of Areas/Roads
8,340
1,218 cu.m
0.975%
2/1/2008
11/30/2008
62.00
124.00
625.00
###
304.00
796
850
823
850
823
850
850
823
850
###
823
FOUNDATION Lean Concrete Reinforced Concrete up to +1.0 M Reinforced Concrete +1.0M/+ 7.0 M Foundation Protection Grouting Operation Fire Proofing
508
750 cu.m
0.600%
2/21/2007
1/31/2008
6.00
345.00
6,259
38,046 cu.m
30.455%
3/3/2007
2/28/2008
10.00
363.00
185
626 cu.m
0.501%
5/24/2007
12/31/2007
82.00
222.00
40,516
9,088 sq.m.
7.275%
6/1/2007
11/30/2008
8.00
549.00
46
8,879 cu.m.
7.108%
10/1/2007
1/20/2009
122.00
478.00
120
4,730 cu.m
3.786%
2/1/2008
10/31/2008
123.00
274.00
293
1,757 cu.m
1.406%
6/1/2007
2/28/2008
480 m
0.384%
7/15/2007
5/31/2008
12
###
46
44
46
44
46
46
44
46
44
46
46
500
517
535
517
535
535
517
535
517
535
535
7
25
26
26
25
26
25
26
2,214
2,288
2,288
2,214
2,288
2,214
2,288
2,288
2,140
2,288
2,214
2,288
2,214
2,288
2,288
2,214
2,288
2,214
3
3
3
3
3
3
3
3
3
3
3
3
3
3
13
14
13
14
13
14
14
13
14
###
483
### ### 3
2
### ###
UNDER GROUND FACILITIES Reinf concrete pit for sewer Installation of PVC drainage system
2,400
273.00 44.00
322.00
Laying of Sand for Pipe Prot.
163
108 cu.m
0.086%
8/1/2007
11/30/2008
17.00
488.00
Concrete for Piping support
294
1,456 cu.m.
1.166%
12/1/2007
7/31/2008
122.00
244.00
Installation of Cast Iron Drainage
107
535 m
0.428%
4/1/2008
5/31/2008
122.00
61.00
44,023
31,156 Kg
24.940%
11/15/2007
11/30/2008
106.00
382.00
31
19 Kg
0.015%
12/4/2007
6/30/2008
19.00
210.00
4,790
1,603 m
1.283%
2/1/2008
11/30/2008
59.00
304.00
32
###
33
33
32
33
32
33
33
30
127
231
224
231
224
231
231
216
231
224
231
10
10
10
10
10
10
10
10
10
10
10
10
37
37
35
37
36
37
36
37
53
54
### 10
10
10
###
10
### ###
RTRP Und. Fibreg. Pip. On S.PN14 (6In) P/E FiberGl. Pip. On S.PN6 (6In) Hydrotest Resin Pip on Site
1,844
3,573
3,573
3,342
3,573
3,457
3,573
3,457
3,573
3,573
3,457
3,573
4
5
4
5
4
5
4
457
488
473
488
473
488
488
473
488
473
3,617
3,867
3,742
3,867
3,742
3,867
3,867
3,742
3,867
3,742
###
3,457
### ###
PAVING 3,867
1,871
###
Subbase preparation under paving
43,659
4,066 sq.m.
3.255%
1/1/2008
12/15/2008
28.00
350.00
Reinforced Concrete for Paving
24,211
8,335 sq.m.
6.672%
2/1/2008
10/31/2008
31.00
274.00
2,562
2,739
2,651
2,739
2,651
2,739
2,739
2,651
2,739
###
Execution of expansion joints
12,105
2,421 m
1.938%
2/1/2008
10/31/2008
0.00
274.00
1,281
1,370
1,325
1,370
1,325
1,370
1,370
1,325
1,370
###
261 cu.m.
0.209%
2/1/2008
4/30/2008
90.00
36
38
37
151.00
46
49
47
ROAD WORKS PR / Lay light items (Real V) Lay of slabs/bricks Cables
111 238
38 sq.m.
0.030%
2/1/2008
6/30/2008
Road (Base course+ subbase)
10,202
1,226 cu.m.
0.981%
7/1/2008
11/30/2008
151.00
153.00
Asphalting of Roads
20,634
774 sq.m.
0.620%
8/1/2008
12/31/2008
31.00
153.00
234,548
124,924
13.56%
100.000%
### 49
###
47 2,067
2,067
2,000
2,067
2,000
4,181
4,046
4,181
4,046
### 4,181
###
Note:
This specific sheet was done by Ramon Aytona on 17 Oct. 2008 based from source workshe
PRODUCTIVITY RATE, Summary as per data above GOSP 1
GOSP 2
GOSP 3
GOSP 4
INLET-OUTLET
General excavation
0.08
0.08
0.08
0.08
General excavation
General Backfilling of Areas/Roads
0.15
0.13
0.13
0.13
General Backfilling of Areas/Roads
Subbase preparation under paving
0.09
0.09
0.09
0.09
Subbase preparation under paving
Limited excavation up to 1.5 m
0.40
0.40
0.40
0.40
Limited excavation up to 1.5 m
Limited Excavation (Over 1.5m depth)
1.02
1.05
1.04
1.05
Limited Excavation (Over 1.5m depth)
Reinf concrete pit for sewer
6.00
7.31
6.47
7.54
Reinf concrete pit for sewer
Installation of PVC drainage system
0.20
0.20
0.20
0.20
Installation of Cast Iron Drainage
Installation of Cast Iron Drainage
5.00
5.00
5.00
5.00
Laying of Sand for Pipe Prot.
0.66
0.67
0.66
0.67
Laying of Sand for Pipe Prot.
Lay of slabs/bricks Cables
0.16
0.16
0.16
0.16
Lay of slabs/bricks Cables
Road (Base course+ subbase)
0.12
0.12
0.12
0.12
Road (Base course+ subbase)
Asphalting of Roads
0.04
0.04
0.04
0.04
Asphalting of Roads
Lean Concrete
1.48
1.09
1.31
1.13
Lean Concrete
Reinforced Concrete up to +1.0 M
6.08
5.62
5.65
5.62
Reinforced Concrete UP TO +1.0 M
Reinforced Concrete +1.0M/+ 7.0 M
3.38
3.14
3.14
3.14
Reinforced Concrete +1.0M/+ 7.0 M
Reinforced Concrete for Paving
0.34
0.34
0.34
0.34
Reinforced Concrete for Paving
Concrete for Piping support
4.95
4.95
4.95
4.95
Concrete for Piping support
Foundation Protection
0.22
0.13
0.13
0.13
Foundation Protection
Execution of expansion joints
0.20
0.20
0.20
0.20
Execution of expansion joints
PR / Lay light items (Real V)
2.35
2.03
2.20
2.00
PR / Lay light items (Real V)
Fire Proofing
39.42
39.42
39.42
39.42
Grouting Operation
193.02
211.07
211.06
211.07
Und. Fibreg. Pip. On S.PN14 (6In)
0.71
0.67
0.67
0.62
Und. Fibreg. Pip. On S.PN14 (6In)
P/E FiberGl. Pip. On S.PN6 (6In)
0.61
1.20
1.20
1.20
Hydrotest Resin Pip on Site
Hydrotest Resin Pip on Site
0.33
0.34
0.34
0.34
Grouting Operation
sed from source worksheets as herein done by Diego
COMMON 0.08
General excavation (Common)
0.08
General excavation (Pond)
0.08
lling of Areas/Roads
0.14
General Backfilling of Areas/Roads (Ponds)
4.75
ration under paving
0.09
Embank bund walls by machine (Pond 2)
0.33
Embank bund walls by machine (Ponds)
0.33
0.40
Limited section excavation up to 1.5 m (Common)
0.40
1.25
Limited section excavation up to 1.5 m (Ponds)
0.40
Limited section excavation over 1.5 m (Common)
1.63
Limited section excavation over 1.5 m (Ponds)
1.63
Reinf concrete pit for sewer (Common)
6.83
Reinf concrete pit for sewer (Ponds)
6.83
Installation of PVC drainage system (Common)
0.20
Installation of PVC drainage system (Ponds)
0.20
0.67
Laying of Sand for Pipe Prot. (Common)
0.67
0.16
Laying of Sand for Pipe Prot. (Ponds)
0.67
Lay of slabs/bricks Cables (Common)
0.16
Lay of slabs/bricks Cables (Ponds)
0.16
0.12
Roadbed (Base course+ subbase) (Common)
0.13
0.04
Asphalting of Roads (Common)
0.04
1.29
Lean Concrete (Common)
1.98
Lean Concrete (Ponds)
1.99
ation up to 1.5 m
tion (Over 1.5m depth)
Cast Iron Drainage
7.90
5.00
ncrete UP TO +1.0 M
6.17
Reinforced Concrete UP TO +1.0 M (Common)
9.02
ncrete +1.0M/+ 7.0 M
4.00
Reinforced Concrete UP TO +1.0 M (Ponds)
9.02
ncrete for Paving
0.34
Reinforced Concrete for Paving (Common)
0.33
4.95
Concrete for Piping support (Common)
4.98
Reinf. Concrete Road Channel (Common)
1.06
Foundation Protection (Common)
1.71
Foundation Protection (Ponds)
1.71
0.12
p. On S.PN14 (6In)
0.20
2.12
164.41
PR / Lay light items (Real V) (Common)
2.94
PR / Lay light items (Real V) (Ponds)
2.93
Grouting Operation
129.33
0.24
Und. Fibreg. Pip. On S.PN14 (6In)
0.24
0.41
Hydrotest Resin Pip on Site
0.41
Ballasting of areas (Pond 2)
0.11
Ballasting of areas (Ponds)
0.11
Guard Rail Erection
0.13
Fencing of Metal Post
1.00
PLANNED BASELINE Contractor's Mobilization Zone A Zone B Zone D Zone C External Utilities
Quantity 2713 11972 8579 10879 8061 17280 59484
% Weight 4.56% 20.13% 14.42% 18.29% 13.55% 29.05% 100.00%
PLANNED TARGET Zone A Zone B Zone D Zone C External Utilities
Quantity 4868 4320 6426 3942 9063 28619
% Weight
ACTUAL
17.01% Zone A 15.09% Zone B 22.45% Zone D 13.77% Zone C 31.67%External Utilities 100.00%
Quantity 5166 4320 6427 4005 9064 28982
% Weight 17.82% 14.91% 22.18% 13.82% 31.27% 100.00%