MITSUBISHI GENERATOR SET TECHNICAL PRESENTATION
COURSE OUTLINE 1. 2. 3.
Rating Definition Mitsubishi Alternators & Ratings Basic Installation Requirement a. b. c. d.
4. 6.
Foundation Pad or Slab Ventilation Fuel System Exhaust System
Engine and AC Alternator Specification MGS Control & Devices
7. MGS Local Panel 8. System Flow Diagram 1. 2. 3. 4.
9.
Cooling system Air intake & exhaust system Fuel System Lubrication system
Synchronization & Parallel Operation 10. Maintenance 11. Basic Troubleshooting
RATING DEFINITION
MITSUBISHI MGS ALTERNATORS
Leroy-Somer Alternator
Stamford Alternator
Kato Alternator
MGS Standard Rating Available
MGS Standard Rating Available
MGS Basic Installation Requirement
Foundation Pad
1. Foundation Pad should be levelled smoothly 2. Dynamic/operational weight (Wet Weight + 30%) should be considered and approved by your structural engineer including future equipment) 3. Rubber pads is not recommended due to deterioration later on.
Foundation Pad
Ventilation
Fuel System
1. Fuel pipes should be B.I pipe and must have separate and individual line for supply and return pipe line especially when having multiple generator set. 2. Fuel Day Tank maximum height should not be exceed 1.5M from center line of generator set as shown in the drawing section detail. 3. Prior to fuel filling, it should be flash out and clean from welding flux or foreign material. 4. Fuel supply line should be with wye strainer and ball valve for maintenance purpose. 5. Fuel-water should be installed inside fuel day tank containment area.
Exhaust System 1. Exhaust pipe system restriction including muffler must not exceed 600mmH2O. 2. Flexible joint should be free and not carrying the weight of exhaust muffler and exhaust pipe. 3. Internal temperature of exhaust pipe may reach up to 500-600 degree Celsius. Nearby material should be fire retardant. 4. Exhaust muffler and exhaust pipe should have minimum of two (2) inch thick Rockwool insulation with wire mesh prior to aluminum cladding. 5. Provide drain pipe at lowest portion of exhaust piping system. 6. Exhaust tail end should have flapper for vertical end and tapered cut for horizontal end. 7. MHIESP will conduct final inspection on exhaust flexible flange for foreign debris prior to genset start up.
Electrical System 1. Make sure that power cables with the same phase must not be laid out together and per phase power cable ampacity must not be less than rated current of generator set. 2. Generator output should have CB prior to Automatic Transfer Switch or Manual Transfer Switch to load side. CB over current relay should be set as per rated current of generator set. 3. Provide power cable at generator set neutral bus bar going to generator set ground, if required. 4. Provide grounding connection from generator body frame to building grounding system. 5. Provide 220V AC power supply for every generator set battery charger with dedicated CB on the distribution panel. 6. Other device may need separate power supply depend on option accessories included.
Engine and AC Alternator Specification
Engine Specification
SAE 40
Alternator Specification
Alternator Specification
MGS SYSTEM CONTROL & DEVICES Outgoing Terminal AVR
Diesel Engine
PMG
Exciter System
Stator Coil
MP
MP
L.O press C/W Sensor Sensor Stop
63Q
Starting Motor
AC Generator
Char. Alt.
Battery Governor Controller
I/F MGS 7310 Controller
Frequency Adj. Voltage Adj.
Engine Protection Measurement Circuit Generator Measurement Circuit Other Circuit
Communication Port (USB port for programming, RS485, RS232
7310 Panel
49W
Radiator
Gov. Act.
Generator Control Panel (Local)
Generator Local Panel
560 Panel (Old & Obsolete)
7310 Panel New
Note: Once 560 module is damage, replacement should be 7310 panel assembly
Operation Comparison 560 Panel
7310 Panel
MGS 7310 Features
MGS 7310 Features
Manual Operation Key switch
Stop/Reset button
Emergency Stop
Manual Button
Start button
1.
Set the key switch to “ACTIVE”
2.
Set the controller to manual mode.
3.
To start the generator set, press the start button.
4.
To stop the generator set, press the STOP BUTTON or EMERGENCY STOP or set the key switch to OFF/RESET position. Note: Read the Operation Manual for the detailed internal operation of controller.
Automatic Operation Key switch
Stop/Reset button
Emergency Stop
Auto Button 1.
Set the key switch to “ACTIVE”
2.
Set the controller to auto mode.
3.
To start the generator set, remote start signal from the ATS must be activated / shorted.
4.
To stop the generator set, remote start signal from ATS must be de-activated / opened.
5.
After remote start signal has been de-activated, engine shall automatically switch to cool-down mode (3min) then stop.
System Flow
Cooling System Flow
Fuel System Flow
Lubrication System Flow
Air Intake & Exhaust System Flow
Air Intake & Exhaust System Flow
Synchronization & Parallel Operation of Generator Set
Essential requirements for parallel operation 1. All Generators must have the same voltage. 2. All Generators must have the same frequency. 3. All Generators must have the same number of phase rotation. 4. All Generators must have the same phase rotation. 5. All Generators and Prime Movers (Engines), must have similar no load, to full load, voltage and frequency characteristics. 6. Generator installation must be provided with Synchronizing equipment. 7. Should have protection relay such as Reverse power, Over-current and etc.
Ways to check synchronization point
G1 U
V
N W
G2 U
CB “ON”
V
N W
CB “OFF”
1. Lamp : Synchronization point is when the Lamp is Off. 2. Tester : Synchronization point is when the tester reading is at Zero (0) Volts. For a system with 380V:
Reading of meter 380/1.732 = 220V Maximum reading will be at 440V
Synchronizing Equipment Synchronization Equipment is required to monitor the bus frequency and the incoming generator frequency, to ensure that the generator are in synchronism. DG1
DG2
Synch Panel Full Manual Operation
Synch Panel Full Manual Operation
DIESEL GENERATOR MAINTENANCE
Safety it’s up to you
Safety it’s up to you
PERFORM PERIODIC MAINTENANCE PER RUNNING HOUR INTERVALS OR WHICH EVER COME FIRST
ADJUST
WALK AROUND INSPECTION BEFORE OPERATION
WALK AROUND INSPECTION DURING OPERATION
WEEKLY INSPECTION
CONDUCT GENSET MAINTENANCE OPERATION. Test run generator set with out load for 5-10 minutes.
MONTHLY INSPECTION
CONDUCT GENSET MAINTENANCE OPERATION. Test run generator set with load. At least 50% load for 15-30 minutes.
YEARLY INSPECTION ANALYZE ENGINE OIL PROPERTIES ANALYZE COOLANT PROPERTIES
Every 2 years or 250 running hours
MAINTENANCE FOR AC GENERATOR AND SWITCHGEAR Every 3 Months:
GENERATOR AND SWITCHGEAR Every Year:
GENERATOR AND SWITCHGEAR Every Year:
Scope of Rank Maintenance Rank A Rank B, C & D Rank E ( For SU Genset) Rank F1
BASIC TROUBLESHOOTING
Basic Troubleshooting
Basic Troubleshooting
Basic Troubleshooting
Basic Troubleshooting
Basic Troubleshooting
Basic Troubleshooting
Basic Troubleshooting
Thank You!