Loading documents preview...
Sr No.
ITEM
Month - 01
Month -02
Month - 04
Month - 03
Month - 05
Month - 06
Month - 07
Month - 08
Month - 09
1 2 3 4 5 6 7 8 9 10
AA) 1 2 3 4 5 6 7 8 9 10
BB) 1 2 3 4 5 6 7 8 9 10
CC) 1 2 3 4
5 6 7 8 9 10
LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C.
file:///conversion/tmp/scratch/482888073.xls
Note : -
Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction
OWNER : ISSUE
DATE
REV DWN CHK APRV
Plant :
MASTER PROJECT CONTROL SCHEDULE LOCATION :
TOYO ENGINEERING INDIA LIMITED DWG NO:
Page :
JOB :-
Sr No.
ITEM
DD)
ELECTRICAL
Month - 01
Month -02
Month - 04
Month - 03
Month - 05
Month - 06
Month - 07
Month - 08
Month - 09
1 2 3 4 5 6 7 8 9
EE)
INSTRUMENTATION
1 2 3 4 5 6 7 8 9
FF)
PIPING
1 2 3 4 5 6 7 8 9
GG)
PROCUREMENT
1 2 3 4 5 6 7 8 9
CONSTRUCTION 1 2 3 4
5 6 7 8 9
LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C. file:///conversion/tmp/scratch/482888073.xls
OWNER : BHARAT PETROLEUM CORPORTIO Plant : 180000 MPTA LUBE BASE STOCK PROJECT
Note : -
Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction
ISSUE
DATE
REV DWN CHK APRV
MASTER PROJECT CONTROL SCHEDULE LOCATION :
MAHUL, MUMBAI, INDIA
TOYO ENGINEERING INDIA LIMITED DWG NO:
Page :
JOB :-
Sr No.
ITEM
MONTH - 01
MONTH - 02
MONTH - 03
MONTH - 04
MONTH - 05
MONTH - 06
MONTH - 07
MONTH - 08
MONTH - 09
MONTH - 10
MONTH - 11
MONTH - 12
EDC 1 2 3 4 5 6 7 8 9 10
AA)
PROCESS
1 2 3 4 5 6 7 8 9 10
BB)
CIVIL
1 2 3 4 5 6 7 8 9 10
CC)
MECHANICAL
1 2 3 4 5
6 7 8
9 10
LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C. -
OWNER :- BHARAT PETORLEUM CORPORTION Ltd. Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction
file:///conversion/tmp/scratch/482888073.xls
ISSUE DESCRIPTION
DATE
REV
DWN CHK APRV
PLANT :
TOYO ENGINEERING INDIA LIMITED
MASTER PROJECT CONTROL SCHEDULE LOCATION :-
DWG NO :
6201-PP-01
Page : 1 OF 2
JOB NO :- 6201
Sr No.
ITEM
DD)
ELECTRICAL
MONTH - 01
MONTH - 02
MONTH - 03
MONTH - 04
MONTH - 05
MONTH - 06
MONTH - 07
MONTH - 08
MONTH - 09
MONTH - 10
MONTH - 11
MONTH - 12
1 2 3 4 5 6 7 8 9
EE)
INSTRUMENTATION
1 2 3 4 5 6 7 8 9
FF)
PIPING
1 2 3 4 5 6 7 8 9
GG)
PROCUREMENT
1 2 3 4 5 6 7 8 9 CONSTRUCTION 1 2 3 4 5
6 7 8 9
LEGENDS : V.D.R. - Vendor Drawing Review A.F.P. - Approved for Planning file:///conversion/tmp/scratch/482888073.xls
OWNER :- BHARAT PETORLEUM CORPORTION Ltd. ISSUE
MASTER PROJECT CONTROL SCHEDULE
PLANT :
TOYO ENGINEERING INDIA LIMITED
A.F.D. - Approved for Design A.F.C. - Approved for Construction
file:///conversion/tmp/scratch/482888073.xls
DESCRIPTION
DATE
REV
DWN CHK APRV
LOCATION :-
DWG NO :
6201-PP-01
Page : 1 OF 2
JOB NO :- 6201
Sr No.
ITEM
MONTH - 01
MONTH - 02
MONTH - 03
MONTH - 04
MONTH - 05
MONTH - 06
MONTH - 07
MONTH - 08
MONTH - 09
MONTH - 10
MONTH - 11
MONTH - 12
MONTH - 13
MONTH - 14
MONTH - 15
MONTH - 16
MONTH - 17
MONTH - 18
EDC 1 2 3 4 5 6 7 8 9
AA)
PROCESS
1 2 3 4 5 6 7 8 9
BB)
CIVIL
1 2 3 4 5 6 7 8 9
CC)
MECHANICAL
1 2 3 4 5 6 7 8 9
LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C. -
Note : Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction
file:///conversion/tmp/scratch/482888073.xls
OWNER :ISSUSE DESCRIPTION
DATE
REV
DWN
CHK
APRV
MASTER PROJECT CONTROL SCHEDULE LOCATION :
PLANT :-
TOYO ENGINEERING INDIA LIMITED DGW NO :-
6201-PP-01
Page :-
1 OF 2
JOB :-
6201
Sr No.
ITEM
DD)
ELECTRICAL
MONTH - 01
MONTH - 02
MONTH - 03
MONTH - 04
MONTH - 05
MONTH - 06
MONTH - 07
MONTH - 08
MONTH - 09
MONTH - 10
MONTH - 11
MONTH - 12
MONTH - 13
MONTH - 14
MONTH - 15
1 2 3 4 5 6 7 8 9
EE)
INSTRUMENTATION
1 2 3 4 5 6 7 8 9
FF)
PIPING
1 2 3 4 5 6 7 8 9
GG)
PROCUREMENT
1 2 3 4 5 6 7 8 9
CONSTRUCTION 1 2 3 4 5
6 7 8 9
LEGENDS : file:///conversion/tmp/scratch/482888073.xls
Note :
OWNER :-
PLANT :-
MONTH - 16
MONTH - 17
MONTH - 18
V.D.R. A.F.P. A.F.D. A.F.C.
-
Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction
file:///conversion/tmp/scratch/482888073.xls
ISSUSE
MASTER PROJECT CONTROL SCHEDULE
2/2/04
DESCRIPTION
DATE
REV
DWN
CHK
APRV
LOCATION :
TOYO ENGINEERING INDIA LIMITED DGW NO :-
6201-PP-01
Page :-
1 OF 2
JOB :-
6201
Sr. No.
ITEM
Feb-05 M-1
Mar-05 M-2
Apr-05 M-3
May-05 M-4
Jun-05 M-5
Jul-05 M-6
Aug-05 M-7
Sep-05 M-8
Oct-05 M-9
Nov-05 M-10
TYPICAL MASTER PROJECT SCHEDULE Jan-06 Feb-06 Mar-06 Apr-06 May-06
Dec-05 M-11
M-12
M-13
M-14
M-15
M-16
Jun-06 M-17
Jul-06 M-18
Aug-06 M-19
REVISED EDC ( 07/06/2005 ) Handing Over of the SITE PLOT ( By OWNER ) Soil Investigation Receipt of GTG ( of M/s. BHEL ) Supplied as AS FREE ISSUE Receipt of STG ( of M/s. BHEL ) Supplied as AS FREE ISSUE Permanent Power IN for Commissioning Gas IN
Completion of Phase 2 ( Closed Cycle with HRSG & STG )
Oct-06 M-21
Nov-06 M-22
Dec-06 M-23
Jan-07 M-24
Feb-07 M-25
< Security Level 2 >
Attachment (1) TMS1-CEP-301 Sheet 1 of 2
EDC ( 10/02/2005 )
Completion of Phase 1 ( Open Cycle with GTG )
Sep-06 M-20
( 28/02/2006 ) ( 30/06/2006 )
Sr No.
ITEM
HH)
CONSTRUCTION
Feb-05 M-1
Mar-05 M-2
Apr-05 M-3
May-05 M-4
Jun-05 M-5
Jul-05 M-6
Aug-05 M-7
Sep-05 M-8
Oct-05 M-9
Nov-05 M-10
TYPICAL MASTER PROJECT SCHEDULE Jan-06 Feb-06 Mar-06 Apr-06 May-06
Dec-05 M-11
M-12
M-13
M-14
M-15
M-16
Jun-06 M-17
Jul-06 M-18
Aug-06 M-19
Sep-06 M-20
Oct-06 M-21
Nov-06 M-22
Dec-06 M-23
Jan-07 M-24
Feb-07 M-25
IMPORTANT MILESTONES / REQUIREMENTS CONSTRUCTION CONTRACTS Civil & Structural Mechanical Piping Electrical Instrumentation Insulation 1 Boundry Wall Construction ( By Separate Contractor ) 2 GTG Foundation 3 Eqpt. FDN. including Excavation 4 Pipe Rack Foundation work 5 Pipe Rack Erection Work 6 Plant Building Works + Admin Building 7 Non Plant Building ( Security, Workshop ) 8 Erection of GTG & Auxiliaries 9 Erection of Gas Compressor System Gas Compressor Piping Works 10 Erection of HRSG & Auxiliaries 11 Erection of STG 12 Erection of Ro + DM Plant Package 13 Erection of Air Compressor Package 14 Erection of Switchyard 15 Erection of DG Set 16 Erection of Auxiliary Cooling Water System 17 Erection of Air Cooled Exchanger 18 A/G Piping Including Testing - Phase 1 - Phase-2 19 Electrical Erection works - Phase 1
- Phase 2 20 Instrumentation Erection works - Phase 1 - Phase 2 21 Painting works 22 Insulation works - Phase 1
- Phase 2 II ) PRECOMMISSIONING / COMMISSIONING 1 Switchyard Commissioning 2 Air Compressor Solo Run & Air Generation 3 DM Plant Commissioning 4 Chemical Cleaning of Gas Compressor Lines 5 Gas Compressor Circuit Oil Flushing 6 Gas Compressor Air Flushing 7 Gas Compressor Solo Run 8 Gas Compressor N2 Purging 9 Gas Compressor Coupled Condition Start-up 10 GTG Startup & Stabilization 11 Power Hook-up to Switchyard : Phase 1 12 HRSG Commissioning 13 STG Commissioning 14 Power Hook-up to Switchyard : Phase 2 End Dates Revised as per Client Comments
2-Aug-05
3
VVG
MAC
TR
V.D.R. - Vendor Drawing Review
End Dates Revised as per Client Comments
7-Jul-05
A.F.P. - Approved for Planning
EDC Revised to 7th June 2005
13-Jun-05
A.F.D. - Approved for Design
FOR EXECUTION
21-Feb-05
2 1 0
DMM DMM SSK
SSK SSK CBD
TR TR DVC
A.F.C. - Approved for Construction
DESCRIPTION
DATE
REV
DWN
CHK
APRV
LEGENDS :
Note :
NOTE : Annexure (1) stating the detailed Schedule for Package Items attached alongwith
OWNER : ISSUE
REGENCY POWER CORP. LTD
PLANT : -
58 MW NG BASED CCPP
MASTER PROJECT CONTROL SCHEDULE LOCATION :
RAMNATAPURAM ( T N)
Page 2 of 2
JOB NO. :-
6215
< Security Level 2 >
Attachment (1) TMS1-CEP-301 Sheet 2 of 2