Sr No.

ITEM

Month - 01

Month -02

Month - 04

Month - 03

Month - 05

Month - 06

Month - 07

Month - 08

Month - 09

1 2 3 4 5 6 7 8 9 10

AA) 1 2 3 4 5 6 7 8 9 10

BB) 1 2 3 4 5 6 7 8 9 10

CC) 1 2 3 4

5 6 7 8 9 10

LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C.

file:///conversion/tmp/scratch/482888073.xls

Note : -

Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction

OWNER : ISSUE

DATE

REV DWN CHK APRV

Plant :

MASTER PROJECT CONTROL SCHEDULE LOCATION :

TOYO ENGINEERING INDIA LIMITED DWG NO:

Page :

JOB :-

Sr No.

ITEM

DD)

ELECTRICAL

Month - 01

Month -02

Month - 04

Month - 03

Month - 05

Month - 06

Month - 07

Month - 08

Month - 09

1 2 3 4 5 6 7 8 9

EE)

INSTRUMENTATION

1 2 3 4 5 6 7 8 9

FF)

PIPING

1 2 3 4 5 6 7 8 9

GG)

PROCUREMENT

1 2 3 4 5 6 7 8 9

CONSTRUCTION 1 2 3 4

5 6 7 8 9

LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C. file:///conversion/tmp/scratch/482888073.xls

OWNER : BHARAT PETROLEUM CORPORTIO Plant : 180000 MPTA LUBE BASE STOCK PROJECT

Note : -

Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction

ISSUE

DATE

REV DWN CHK APRV

MASTER PROJECT CONTROL SCHEDULE LOCATION :

MAHUL, MUMBAI, INDIA

TOYO ENGINEERING INDIA LIMITED DWG NO:

Page :

JOB :-

Sr No.

ITEM

MONTH - 01

MONTH - 02

MONTH - 03

MONTH - 04

MONTH - 05

MONTH - 06

MONTH - 07

MONTH - 08

MONTH - 09

MONTH - 10

MONTH - 11

MONTH - 12

EDC 1 2 3 4 5 6 7 8 9 10

AA)

PROCESS

1 2 3 4 5 6 7 8 9 10

BB)

CIVIL

1 2 3 4 5 6 7 8 9 10

CC)

MECHANICAL

1 2 3 4 5

6 7 8

9 10

LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C. -

OWNER :- BHARAT PETORLEUM CORPORTION Ltd. Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction

file:///conversion/tmp/scratch/482888073.xls

ISSUE DESCRIPTION

DATE

REV

DWN CHK APRV

PLANT :

TOYO ENGINEERING INDIA LIMITED

MASTER PROJECT CONTROL SCHEDULE LOCATION :-

DWG NO :

6201-PP-01

Page : 1 OF 2

JOB NO :- 6201

Sr No.

ITEM

DD)

ELECTRICAL

MONTH - 01

MONTH - 02

MONTH - 03

MONTH - 04

MONTH - 05

MONTH - 06

MONTH - 07

MONTH - 08

MONTH - 09

MONTH - 10

MONTH - 11

MONTH - 12

1 2 3 4 5 6 7 8 9

EE)

INSTRUMENTATION

1 2 3 4 5 6 7 8 9

FF)

PIPING

1 2 3 4 5 6 7 8 9

GG)

PROCUREMENT

1 2 3 4 5 6 7 8 9 CONSTRUCTION 1 2 3 4 5

6 7 8 9

LEGENDS : V.D.R. - Vendor Drawing Review A.F.P. - Approved for Planning file:///conversion/tmp/scratch/482888073.xls

OWNER :- BHARAT PETORLEUM CORPORTION Ltd. ISSUE

MASTER PROJECT CONTROL SCHEDULE

PLANT :

TOYO ENGINEERING INDIA LIMITED

A.F.D. - Approved for Design A.F.C. - Approved for Construction

file:///conversion/tmp/scratch/482888073.xls

DESCRIPTION

DATE

REV

DWN CHK APRV

LOCATION :-

DWG NO :

6201-PP-01

Page : 1 OF 2

JOB NO :- 6201

Sr No.

ITEM

MONTH - 01

MONTH - 02

MONTH - 03

MONTH - 04

MONTH - 05

MONTH - 06

MONTH - 07

MONTH - 08

MONTH - 09

MONTH - 10

MONTH - 11

MONTH - 12

MONTH - 13

MONTH - 14

MONTH - 15

MONTH - 16

MONTH - 17

MONTH - 18

EDC 1 2 3 4 5 6 7 8 9

AA)

PROCESS

1 2 3 4 5 6 7 8 9

BB)

CIVIL

1 2 3 4 5 6 7 8 9

CC)

MECHANICAL

1 2 3 4 5 6 7 8 9

LEGENDS : V.D.R. A.F.P. A.F.D. A.F.C. -

Note : Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction

file:///conversion/tmp/scratch/482888073.xls

OWNER :ISSUSE DESCRIPTION

DATE

REV

DWN

CHK

APRV

MASTER PROJECT CONTROL SCHEDULE LOCATION :

PLANT :-

TOYO ENGINEERING INDIA LIMITED DGW NO :-

6201-PP-01

Page :-

1 OF 2

JOB :-

6201

Sr No.

ITEM

DD)

ELECTRICAL

MONTH - 01

MONTH - 02

MONTH - 03

MONTH - 04

MONTH - 05

MONTH - 06

MONTH - 07

MONTH - 08

MONTH - 09

MONTH - 10

MONTH - 11

MONTH - 12

MONTH - 13

MONTH - 14

MONTH - 15

1 2 3 4 5 6 7 8 9

EE)

INSTRUMENTATION

1 2 3 4 5 6 7 8 9

FF)

PIPING

1 2 3 4 5 6 7 8 9

GG)

PROCUREMENT

1 2 3 4 5 6 7 8 9

CONSTRUCTION 1 2 3 4 5

6 7 8 9

LEGENDS : file:///conversion/tmp/scratch/482888073.xls

Note :

OWNER :-

PLANT :-

MONTH - 16

MONTH - 17

MONTH - 18

V.D.R. A.F.P. A.F.D. A.F.C.

-

Vendor Drawing Review Approved for Planning Approved for Design Approved for Construction

file:///conversion/tmp/scratch/482888073.xls

ISSUSE

MASTER PROJECT CONTROL SCHEDULE

2/2/04

DESCRIPTION

DATE

REV

DWN

CHK

APRV

LOCATION :

TOYO ENGINEERING INDIA LIMITED DGW NO :-

6201-PP-01

Page :-

1 OF 2

JOB :-

6201

Sr. No.

ITEM

Feb-05 M-1

Mar-05 M-2

Apr-05 M-3

May-05 M-4

Jun-05 M-5

Jul-05 M-6

Aug-05 M-7

Sep-05 M-8

Oct-05 M-9

Nov-05 M-10

TYPICAL MASTER PROJECT SCHEDULE Jan-06 Feb-06 Mar-06 Apr-06 May-06

Dec-05 M-11

M-12

M-13

M-14

M-15

M-16

Jun-06 M-17

Jul-06 M-18

Aug-06 M-19

REVISED EDC ( 07/06/2005 ) Handing Over of the SITE PLOT ( By OWNER ) Soil Investigation Receipt of GTG ( of M/s. BHEL ) Supplied as AS FREE ISSUE Receipt of STG ( of M/s. BHEL ) Supplied as AS FREE ISSUE Permanent Power IN for Commissioning Gas IN

Completion of Phase 2 ( Closed Cycle with HRSG & STG )

Oct-06 M-21

Nov-06 M-22

Dec-06 M-23

Jan-07 M-24

Feb-07 M-25

< Security Level 2 >

Attachment (1) TMS1-CEP-301 Sheet 1 of 2

EDC ( 10/02/2005 )

Completion of Phase 1 ( Open Cycle with GTG )

Sep-06 M-20

( 28/02/2006 ) ( 30/06/2006 )

Sr No.

ITEM

HH)

CONSTRUCTION

Feb-05 M-1

Mar-05 M-2

Apr-05 M-3

May-05 M-4

Jun-05 M-5

Jul-05 M-6

Aug-05 M-7

Sep-05 M-8

Oct-05 M-9

Nov-05 M-10

TYPICAL MASTER PROJECT SCHEDULE Jan-06 Feb-06 Mar-06 Apr-06 May-06

Dec-05 M-11

M-12

M-13

M-14

M-15

M-16

Jun-06 M-17

Jul-06 M-18

Aug-06 M-19

Sep-06 M-20

Oct-06 M-21

Nov-06 M-22

Dec-06 M-23

Jan-07 M-24

Feb-07 M-25

IMPORTANT MILESTONES / REQUIREMENTS CONSTRUCTION CONTRACTS Civil & Structural Mechanical Piping Electrical Instrumentation Insulation 1 Boundry Wall Construction ( By Separate Contractor ) 2 GTG Foundation 3 Eqpt. FDN. including Excavation 4 Pipe Rack Foundation work 5 Pipe Rack Erection Work 6 Plant Building Works + Admin Building 7 Non Plant Building ( Security, Workshop ) 8 Erection of GTG & Auxiliaries 9 Erection of Gas Compressor System Gas Compressor Piping Works 10 Erection of HRSG & Auxiliaries 11 Erection of STG 12 Erection of Ro + DM Plant Package 13 Erection of Air Compressor Package 14 Erection of Switchyard 15 Erection of DG Set 16 Erection of Auxiliary Cooling Water System 17 Erection of Air Cooled Exchanger 18 A/G Piping Including Testing - Phase 1 - Phase-2 19 Electrical Erection works - Phase 1

- Phase 2 20 Instrumentation Erection works - Phase 1 - Phase 2 21 Painting works 22 Insulation works - Phase 1

- Phase 2 II ) PRECOMMISSIONING / COMMISSIONING 1 Switchyard Commissioning 2 Air Compressor Solo Run & Air Generation 3 DM Plant Commissioning 4 Chemical Cleaning of Gas Compressor Lines 5 Gas Compressor Circuit Oil Flushing 6 Gas Compressor Air Flushing 7 Gas Compressor Solo Run 8 Gas Compressor N2 Purging 9 Gas Compressor Coupled Condition Start-up 10 GTG Startup & Stabilization 11 Power Hook-up to Switchyard : Phase 1 12 HRSG Commissioning 13 STG Commissioning 14 Power Hook-up to Switchyard : Phase 2 End Dates Revised as per Client Comments

2-Aug-05

3

VVG

MAC

TR

V.D.R. - Vendor Drawing Review

End Dates Revised as per Client Comments

7-Jul-05

A.F.P. - Approved for Planning

EDC Revised to 7th June 2005

13-Jun-05

A.F.D. - Approved for Design

FOR EXECUTION

21-Feb-05

2 1 0

DMM DMM SSK

SSK SSK CBD

TR TR DVC

A.F.C. - Approved for Construction

DESCRIPTION

DATE

REV

DWN

CHK

APRV

LEGENDS :

Note :

NOTE : Annexure (1) stating the detailed Schedule for Package Items attached alongwith

OWNER : ISSUE

REGENCY POWER CORP. LTD

PLANT : -

58 MW NG BASED CCPP

MASTER PROJECT CONTROL SCHEDULE LOCATION :

RAMNATAPURAM ( T N)

Page 2 of 2

JOB NO. :-

6215

< Security Level 2 >

Attachment (1) TMS1-CEP-301 Sheet 2 of 2