BPCL Kochi Refinery IREP Project LPG & PROPYLENE MOUNDED BULLET
EIL JOB. NO.- A255 MONTHLY PROGRESS REPORT PROGRESS REPORT NO.-FPRO-0274/A255/MPRI/01 PERIOD FROM: 18 July 2013 TO 14 August 2013
DOCUMENT NO :
PREPARED BY :
FABTECH PROJECTS & ENGINEERS LTD.
17/08/2013
1
INFORMATION
Mr.Pankaj Bhosale
DATE
REPORT NO.
ISSUED FOR
PREPD BY
Mrs. Vaishali B
REVD BY APPRO BY
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Jul13-Aug13 Client BPCL KR PMC EIL Month
TABLE OF CONTENTS SECTION
DESCRIPTION
PAGE NO.
I
Introduction
1
II
Executive Summary
2
III
Detailed Status
3
IV
Drawing / Document Status
4
V
Progress Statistics
5
VI
Miles Stone
6
VII VIII
Area Concern with Action plan Procurement Schedule
7 8
IX
Monthly Construction Progress Status
11
X
Resource Deployment Schedule
12
XI
Summary Status of Engineering drawing
13
XII
Assistance Required from BPCL / EIL
14
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Jul13-Aug 13 Client BPCL KR
Month PMC
EIL
I - INTRODUCTION CLIENT
:
Bharat Petroleum corporation Ltd, Kochi Refinery
PROJECT LOCATION
:
Kochi Refinery, Kochi, Kerala
PMC
:
Engineers India Limited, Chennai
DESIGN CAPACITY
:
2×4270 CuM LPG, 2×4270 CuM PROPYLENE/LPG and 2×4270 CuM PROPYLENE Mounded Bullet
CONTRACT VALUE
:
Rs.1695662685
SCOPE OF WORK :
Residual design, detailed engineering, procurement of material and bought out components, fabrication, construction, erection, inspection & testing, post weld heat treatment, Site Grading & Leveling, coating & painting, cathodic protection, electrical, Instrumentation, piping work, necessary civil & structural works, fire protection, precommissioning & commissioning of LPG & propylene storage & transfer facilities in accordance with datasheets, drawings, specifications, Codes, standard specifications etc. of various discipline as listed in this package, on Lump sum Turnkey Basis (LSTK) including supply of mandatory/recommended spares.
EFFECTIVE START DATE
:
18/07/2013 ( LOI Date)
CONTRACTUAL COMPLETION DATE
:
7/17/2015
PROJECT DURATION
:
24 Months
TIME ELAPSED
:
1 Month
ANTICIPANT COMPLETION DATE
:
7/17/2015
FABTECH PROJECTS & ENGINEERS LTD
Month
Jul13-Aug 13
LPG & PROPYLENE BULLET PROJECT, BPCL KR
Client
BPCL KR
DOCUMENT NO :
PMC
EIL
II - EXECUTIVE SUMMARY -
Site survey is in progress.
-
Soil investigation: Work has been given to M/s GeoFoundations & Structures Pvt. Ltd. Kochi. Soil investigation will start on 19/08/2013
-
Order for BQ Steel plates placed on M/s Essar Steel India Ltd., Hazira, for 6000 MT.
-
CP System enquiry sent to M/s Raychem amd M/s Corretech
-
Mechanical fabrication Bullet drawings are ready and are in internal approval stage.
-
Enquiry sent to Geosoil India for Geogrid(secugrid).
-
DCI uploaded on EIL portal on 16/08/2013.
-
Billing schedule submmited for EIL approval 17/08/2013, through mail and hard copy sent.
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Month Client PMC
Jul13-Aug13 BPCL KR EIL
III - DETAILED STATUS A.
RESIDUAL BASIC ENGINEERING -
B.
DETAILED ENGINEERING -
Bullet fabrication drawings are in internal approval stage.
C.
PROCUREMENT i)
ORDERING
-
Order placed to ESSAR for BQ plates on 22 july 2013, total quantity orderde is 6000 MT
ii) D.
MFG/DELIVERY
SUB-CONTRACTING Order for Labour contractor for Civil Work given to Mr. George Mathew, Kochi, on 31/07/2013
E.
CONSTRUCTION/PRE-COMMISSIONING & COMMISSIONING -
F.
PACKAGE SUB-CONTRACTOR STATUS PACKAGE SUB-CONTRACTORWISE STATUS TO BE GIVEN FUNCTIONWISE (AS APPLICABLE)
I)
ENGINEERING
II)
ORDERING
III)
MANUFACTURING & DELIVERY
IV)
CONSTRUCTION -
FABTECH PROJECTS & ENGINEERS LTD
D LPG & PROPYLENE BULLET PROJECT, BPCL KR r g DOCUMENT NO : . IV DRAWING / DOCUMENT STATUS AS ON 17/08/2013 W e As on Date Total No. of i Balance To Sr. Submitted Code -1 Code -2 Review / Drawing/Document Title Drawings / g be No. to EIL for Approval Approval Record Documents h Submitted Approval t a MECHANICAL g 1 31 0 e PIPING 2 25 0 % 3 CIVIL 63 0 4
PROCESS
18
5
ELECTRICAL
15
0
6
INSTRUMENTATION
22
0
7
PUMPS
4
0
8
FIRE FIGHTING SYSTEM
6
0
9
CATHODIC PROTECTION SYSTEM
15
0
10
BILLING SCHEDULE
3
3
11
SPARES
1
0
Month
Jul13-Aug13
Client
BPCL KR EIL
PMC
Approval / Comments awaited from EIL
Remarks
Waiting for DCI approval
Sent hard copy 17/08/2013
Upload problem 12
HSE POLICY
TOTAL
1
1
204
4
###
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Month Client PMC
Jul13-Aug13 BPCL KR EIL
V - PROGRESS STATISTICS
OVERALL PROJECT PROGRESS
DESCRIPTION
WTD % AGE
DETAILED ENGINEERING
5%
PROCUREMENT
48%
CONSTRUCTION
45%
COMMISSIONING
2%
OVERALL PROGRESS PHYSICAL
% DURING THE MONTH SCHEDULE
ACTUAL
% CUMULATIVE SCHEDULE
ACTUAL
CUMULATIVE SCHEDULE
ACTUAL
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Month Client PMC
VI MILE STONES DUE (CURRENT + 2 MONTHS) Sr. No. Mile Stone Achivement
Complection Date Schedule
Anticipated
Actual
1
BQ Steel Plates ordred
2
Yard finalized for babrication work
3
Soil Investigation
8/17/2013
8/19/2013
4
DCI uploaded
8/13/2013
8/16/2013
5
Soil Investigation Report
6
Drawings approvals Drawings for LPG bullet ( YT626,627) Drawings for PROPYLENE bullet ( YT-632,633) Drawings for PROPYLENE bullet ( YT-634,635)
8/31/2013
Jul13-Aug13 BPCL KR EIL
NTHS) Status / Remarks
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Month Client PMC
Jul13-Aug13 BPCL KR EIL
VII AREA OF CONCERN WITH ACTION PLAN Sr. No.
Areas of Concern
Constraints
Impact on Schedule
Action Plan
Action By
Traget Date
1
Uploading documents on EIL VPortal
Not able to upload documents
Delay in approvals
Discussion with EIL
EIL and Fabtech Projects
8/21/2013
Client:
Bharat Petroleum Corporation Ltd., Kochi Refinery
Consultant:
Engineers India Ltd. Chennai
LOA No. :
10/J22/884/FOA-330E/AJ/13
Document No.:
VIII PROCUREMENT SCHEDULE SN
Item Description
MR / RFQ No.
Vendor Name & (Location)
Enquiry Floatation
Quotation Received
Essar India Ltd. Hazira
7/18/2013
7/19/2013
FOI / PO No.Date
EDD
Order Quantity
Released Quantity
Balance Quantity
Status / Remarks
1 MECHANICAL a BQ Plates
4500021026, 4500021030
b Flanges c Forgings d Low Temp.Pipes e Low Temp.Pipes Fittings f
Fastners (stud nuts)
g Gaskets h Neoperene Pad i
Paint
2 CIVIL a Terram Sheet b Reinforcement Steel c Pump house Structural Steel d Chain link Fencing 3 PIPING a
Seamless pipes
b
ERW pipes
c
Elbows & Fittings/Reducers etc
d Flanges e Gaskets
Page 11 of 20
6000 MT
Ordered
SN f
Item Description
MR / RFQ No.
Vendor Name & (Location)
Enquiry Floatation
Quotation Received
FOI / PO No.Date
Fastners
g Ball Valves h Gate Valves i
Check Valves
j
Globe Valves
k Strainers 4 ELECTRICAL a Light Fittings b Power & Control Cables c Manual Call Points d Lighting Fixture e Junction Box f
MCB's, Push Buttons, Cable Trays
5 INSTRUMENTATION a Junction Box b Cable Tray c Instrumentation Cable d
Pressure Safety Valves + Thermal Relief Valve
e Orifice Plate f
Level Switch
g Pressure Gauges h Gas Detector i
Control Valve
j
Solenoid Valve
k Servo type level instrument Page 12 of 20
EDD
Order Quantity
Released Quantity
Balance Quantity
Status / Remarks
SN
Item Description
l
Radar type instrument
m
Pressure Transmitter & DP Transmitter
MR / RFQ No.
Vendor Name & (Location)
Enquiry Floatation
Virgo Engineers
8/6/2013
Quotation Received
FOI / PO No.Date
n Level Gauge o ROV's 6 PUMPS 7 MERCAPTAN SYSTEM Pumps 8 FIRE FIGHTING a Hydrant b Monitors c Spray System / Sprayers d Isolation Valves e Hose Pipe & Accessories f
Spray Nozzles
9 CATHODIC PROTECTION
M/s Raychem and M/s Corrtech
8/2/2013
Page 13 of 20
EDD
Order Quantity
Released Quantity
Balance Quantity
Status / Remarks
FABTECH PROJECTS & ENGINEERS LTD
Month
Jul13-Aug13
LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Client
BPCL KR EIL
PMC
IX QUANTITATIVE MONTHLY CONSTRUCTION PROGRESS STATUS ( DISCIPLINE WISE )
WORK ITEM DESCRIPTION
UNIT OF MEASUREMENT
EXCAVATION
CM
BACKFILLING / SAND FILLING
CM
RCC WORKS
CM
BRICKWORK
CM
A/G PPG - FAB
ID
A/G PPG - ERN
IM
U/G PPG - FAB
ID
U/G PPG - ERN
IM
INSTRUMENTATION LOOP CHECKING
TOTAL QUANTITY WORKLOAD
CUMULATIVE FRONT
COMPLETED
DURING THE MONTH PROGRAMME COMPLETED
BACKLOG
PROGRAM FOR NEXT MONTH
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO : Manpower Deployment Schedule SN 1 2 3 4 5 6 7 8 9 10 11
Category RCM Resident Engineer Safety Engineer Lead Mechanial Engineer Lead Civil Engineer Electrical Engineer Safety officer Account officer Administration officer Store keeper Quality Engineer
Required no.
Available no.
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1
Month Client PMC
ent Schedule Remarks
Jul13-Aug13 BPCL KR EIL
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR
Month
DOCUMENT NO :
PMC
Client
X SUMMARY STATUS OF ENGINEERING DRAWINGS ( SUMMARY LEVEL & UNIT WISE SEPRATELY)
DISCIPLINE MECHANICAL
TOTAL DRAWINGS NOS. 31
PIPING
25
CIVIL
63
PROCESS
18
ELECTRICAL
15
INSTRUMENTATION
22
PUMPS
4
FIRE FIGHTING SYSTEM
6
CATHODIC PROTECTION SYSTEM
15
TOTAL
199
DRAWINGS RELEASED ( NOS.) DURING THE MONTH CUMULATIVE SCH. ACT. SCH. ACT.
REVIEW STATUS (NOS.) TOTAL DRGS.FOR CODE 1 CODE 2 REVIEW
CODE 3
SUBMISSION PROGM.FOR THE NEXT MONTH FRESH CODE 3
Jul13-Aug13 BPCL KR EIL
REMARKS
FABTECH PROJECTS & ENGINEERS LTD LPG & PROPYLENE BULLET PROJECT, BPCL KR DOCUMENT NO :
Month Client PMC
XI ASSISTANCE REQUIRED FROM BPCL KR / EIL Sr. No.
Description
Action By
1
Uploading documents on EIL portal
EIL
Jul13-Aug13 BPCL KR EIL
R / EIL Remarks Deatails instructions required