Bharat Petroleum Corporation Limited Integrated Refinery Expansion Project (Stage- II)

Contract No. xxxxxxxxxx

Kochi, Kerala

JOB NO.:

MONTHLY PROGRESS REPORT PROGRESS REPORT NO.

STATUS AS OF: DD/MM/YYYY

Prepared By:

0

Month & Year

DD-MM-YYYY

Information / Action

Initials

MPR No. xxx Sheet 1 of 24

Initials

Initials

Rev.

DATE

Purpose for Prepare Issue d By Document Number :

Reviewed By

Approved By

TABLE OF CONTENTS SECTION PAGE NO. 1.

INTRODUCTION

4

2.

EXECUTIVE SUMMARY

5

2.1 2.2 2.3 2.4 2.5 2.6 2.7

GENERAL OVERVIEW MAJOR HIGHLIGHTS AREAS OF ATTENTION OVERALL PROGRESS STATISTICS OVERALL PROGRESS CURVE LEVEL-1 SCHEDULE OVERALL MANPOWER HISTOGRAM

5 5 5 5 5 5 5

3. DETAIL STATUS

6

3.1 HSE 3.2 QA/ QC 3.3 ENGINEERING 3.4 PROCUREMENT AND CONTRACTING 3.5 CONSTRUCTION

6 6 6 6 6

4.

AREAS OF ATTENTION WITH ACTION PLANS

7

5.

PROGRESS STATISTICS

7

6. TIME AND COST ANALYSIS

8

A1 - MILESTONES STATUS

10

A2 - PROGRESS CURVES

11

A3 - MANPOWER HISTOGRAM

12

A4 - DOCUMENT / DELIVERABLE SUMMARY STATUS

13

A5 - ORDERING SUMMARY STATUS

14

A6 - EQUIPMENT SUMMARY STATUS – MANUFACTURING & DELIVER

15

A7 - BULK MATERIAL SUMMARY STATUS - MANUFACTURING & DELIVERY

16

A8 - COMMODITY RELEASE STATUS - CONSTRUCTION QUANTITY

17

A9 – SUB CONTRACTING STATUS

18

A10- CONSTRUCTION STATUS

19

A11- HYDRO TESTING STATUS – PIPING

20

A12 – SYSTEM COMPLETION STATUS

21

A13 – INVOICING STATUS

22

A14 – VARIATION ORDER STATUS

23

Month & Year

MPR No. xxx Sheet 2 of 24

A15 – CONSTRUCTION PHOTOGRAPHS

24

INTRODUCTION CLIENT

:

CONSULTANT

:

PROJECT NAME & LOCATION

:

DESIGN CAPACITY

: UNIT

LICENSOR

SCOPE OF WORK

:

(As Applicable)

PROJECT KEY DATES

:

Effective start Date

:

Mech. Completion Date Schedule Contractual Actual/Anticipated

: : : :

Commissioning Date (As Applicable) Schedule Contractual Actual/Anticipated

: : :

PROJECT DURATION Schedule Contractual Actual/Anticipated

Month & Year

: : :

Months Months Months

MPR No. xxx Sheet 3 of 24

CAPACITY

1. EXECUTIVE SUMMARY 2.1 General Overview 2.2 Major Highlights 2.3 Areas of Attention 2.4 Overall Progress Statistics

Description

Weighte d Value

During the Month % Schedul Actual e

Unit- 01 Unit- 02 Unit-03

………. Overall ProjectPhysical

2.5 Overall Progress Curve 2.6 Level-1 Schedule 2.7 Overall Manpower Histogram

Month & Year

MPR No. xxx Sheet 4 of 24

Cumulative % Schedul e

Actual

3. Detail Status 3.1

3.2

HSE

QA/ QC

3.3

Engineering

3.3.1 Process 3.3.2 Design Safety 3.3.3 Mechanical - Static 3.3.4 Mechanical – Rotary 3.3.5 Civil / Structural 3.3.6 Plant layout & piping 3.3.7 Electrical 3.3.8 Telecom 3.3.9 Instrumentation 3.3.10

3.4

Sub-contractor / Package Vendor Engineering

Procurement and Contracting

3.4.1 Pre-Ordering

Month & Year

MPR No. xxx Sheet 5 of 24

-Pre Ordering report 3.4.2 Expedition & Inspection Post Ordering report 3.4.3 Shipping , Transportation & Delivery 3.4.4 Assigned Items 3.4.5 Contracting status

3.5

Construction

3.5.1 Infrastructure & Site Development 3.5.2 Civil / structural works 3.5.3 Mechanical Erection & Piping Works 3.5.4 Electrical Works 3.5.5.Instrumentation Works

Month & Year

MPR No. xxx Sheet 6 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

4. AREAS OF ATTENTION WITH ACTION PLANS SL. NO.

Month & Year

AREAS OF ATTENTION

CONSTRAINTS

MPR No. xxx

IMPACT ON SCHEDULE (IN MONTHS)

N

ACTIO PLAN

Sheet 7 of 24

ACTION BY

TARG DA

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

5. PROGRESS STATISTICS 1.

UNIT WISE PROGRESS

DESCRIPTION

WEIGHTE D VALUE

Process

DURING PERIOD CUMULATIVE % % SCHEDUL ACTUAL SCHEDUL ACTUAL E E

Detailed Engineering Ordering Manufacturing & Delivery Construction Unit Overall

MAJOR REASONS FOR SHORTFALL

Month & Year

MPR No. xxx Sheet 7 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

6. TIME AND COST ANALYSIS

- Write up on time & Cost Impact - Updated Network may be provided

Month & Year

MPR No. xxx Sheet 8 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

Annexures

Month & Year

MPR No. xxx Sheet 9 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project A1 - MILESTONES STATUS UP TO : dd/mm/yyyy S. N O

MILE STONE DESCRIPTION

Month & Year

(UNIT WISE)

COMPLETION DATE SCHEDUL E

ANTICIPATED

MPR No. xxx Sheet 10 of 24

ACTUA L

STATUS / REMARKS

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A2 - PROGRESS CURVES

Month & Year

MPR No. xxx Sheet 11 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A3 - MANPOWER HISTOGRAM

Month & Year

MPR No. xxx Sheet 12 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A4 - DOCUMENT / DELIVERABLE SUMMARY STATUS ----------------------------------AFC / IFA------------IFD------------FINAL---------Tota Pla Pla Pla Total Actual Total Actual Total Actual l n n n

Drawings/Documents Discipline Process HSE Civil Mechanical Piping Electrical Telecom Instrumentation Materials and Corrosion Total

Month & Year

MPR No. xxx

Sheet 13 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project A5 - ORDERING SUMMARY STATUS

DEPARTMENT

TOTA L MR’s

ISSUE INQUIRY SCH.

ACT.

RECEIVE BIDS

EVALUATION COMPLETE

ISSUE FOI/LOI

SCH.

SCH.

SCH.

ACT.

ACT.

ACT.

MECHANICAL - STATIC MECHANICAL - ROTARY PIPING - I MTO - II MTO - FINAL MTO CIVIL / STRUCTURAL ELECTRICAL TELECOM INSTRUMENTATION HSE TOTAL

Month & Year

MPR No. xxx

Sheet 14 of 24

ISSUE PO SCH.

ACT.

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A6 - EQUIPMENT SUMMARY STATUS – MANUFACTURING & DELIVER EQUIPMENT DESCRIPTION

TOTAL NOS

ORDERED

DESPATCHED

RECEIVED AT SITE

UNDER TRANSIT

SITE DELIVERY FORECAST FOR BALANCE EQUIPMENT CALENDAR MONTHS -->>---> 1 2 3 4 5 6

COLUMNS VESSELS REACTORS COMPRESSORS AIR COOLERS PUMPS EXCHANGERS BLOWERS / FANS MISC. (Major Critical Items) ----TOTAL

(UNIT WISE)

Month & Year

MPR No. xxx

Sheet 15 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A7 - BULK MATERIAL SUMMARY STATUS - MANUFACTURING & DELIVERY (UNIT WISE) S NO.

ITEM DESCRIPTION

1

STRUCTURAL STEEL

2

VALVES

3

PIPES

4

FITTINGS

5

FLANGES

6

FIELD INSTRUMENTS

7

CABLES

8

-HT

9

-LT

10

Month & Year

UNIT

TOTAL REQUIREMEN T

ORDERED

DESPATCHED

RECEIVE D AT SITE

CABLE TRAYS

MPR No. xxx

Sheet 16 of 24

STATUS / PROBLEMS

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project A8 - COMMODITY RELEASE STATUS - CONSTRUCTION QUANTITY

S.N O

NAME OF CONTRACT

Month & Year

MAJOR WORKS ITEMS

TENDER QUANTITY

EXPECTED QUANTITY

MPR No. xxx

CUMULATIVE RELEASED QUANTITY

BALANCE QTY. YET TO BE RELEASED QUANTITY

QTY. UNDER HOLD VENDO ENGINEERIN TOTA R G L (A + (A) (B) B)

Sheet 17 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A9 – SUB CONTRACTING STATUS S. NO

TENDER ON SALE

DESCRIPTION

PILING WORKS

RECEIVE BIDS

COMPLETE EVALUATIO N

CONTRACT AWARD CONTRACT

SIGNING DATE

NAME OF CONTRACTOR/ DURATION OF CONTRACT

SCH FORECAS T ACT.

CIVIL WORKS

SCH FORECAS T ACT.

STRUCTURAL WORKS

SCH FORECAS T ACT.

MECHANICAL WORKS

SCH FORECAS T ACT.

……..

SCH FORECAS T ACT.

TOTAL NO. OF CONTRACTS

SCH ACT.

Month & Year

MPR No. xxx

Sheet 18 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project A10- CONSTRUCTION STATUS

S. NO

DESCRIPTION OF WORK

Month & Year

AGEN CY

CONTRAC T VALUE ( M US $)

CUM. INVOICED BY AGENCY

MPR No. xxx

CONTRACTUAL STAR T DATE

COMPL N DATE

ACT/AN T COMPL N DATE

REMAR K

CUM % AGE CONST N SCH

CONTRACTU AL SCH.

Sheet 19 of 24

ACTU AL

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project A11- HYDRO TESTING STATUS – PIPING S. NO 1

DESCRIPTION

TOTA L

FRON T AVL

CHECK LISTE D

MECH. CLEARED

NDT CLEARE D

THIS MONTH ACTUA PROGRAMME L

CUMULATIVE SCH.

UNIT- I

1.1 1.2 1.3 1.4 2

UNIT-II

3

UTILLITIES & OFFSITES

TOTAL

Month & Year

MPR No. xxx

Sheet 20 of 24

ACT.

REMARKS

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project A12 – SYSTEM COMPLETION STATUS S. NO

MECH. COMPLETION SCHEDU ACT./ANT LE .

SYSTEM

1

COOLING WATER SYSTEM

2

DM WATER SYSTEM

3

RAW WATER SYSTEM INCL. W.T. PLANT

4

EFFLUENT TREATMENT & DISPOSAL SYSTEM

5

FIRE WATER SYSTEM

6

PLANT & INSTRUMENTATION SYSTEM

7

INERT GAS SYSTEM

8

FUEL OIL SYSTEM

9

POWER SUPPLY & DISTRBUTION SYSTEM

10

DCS SYSTEM

11

COMPRESSOR SYSTEM

Month & Year

MPR No. xxx

ACT./ ANT DATE PRE-COMMG

COMMG

Sheet 21 of 24

REMARKS

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project A13 – INVOICING STATUS

Month & Year

MPR No. xxx

Sheet 22 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A14 – VARIATION ORDER STATUS (AS APPLICABLE)

Month & Year

MPR No. xxx

Sheet 23 of 24

Job No. xxxxx Monthly Progress Report Integrated Refinery Expansion Project

A15 – CONSTRUCTION PHOTOGRAPHS

Month & Year

MPR No. xxx

Sheet 24 of 24