INDUSTRIAL SERVICES, DEI. MAGNETIC PARTICLE INSPECTION REPORT SGS Thailand Limited

SGS (Thailand ) Limited

100 Nanglinchee Road. Chongnonsee Yannawa Bangkok 206/6 Moo.1 Tambol Sathing Mo. Amphur Singha Korn Songkhla 90280

Client:

Contact No.: +66(0)2 678 1813

Contact No : +66(0)74 332 711

www.th.sgs.com

www.sgs.co.th

SOMAS

Address:

SOMAS, SIDI LARBI

Project Name :

Report No:

WORKOVER

Item Description:

PO No: EL HANCHEN, ESSAOUIRA , MOROCCO

White Background Batch No:

Serial No:

Mast Axis Section of Land Rig

Areas Inspected: Magnetic Ink Batch No:

ASTM EN 709-1

Babb v Co 09714/2

Light Intensity : >1000 LUX @Test Surface

System



Serial No. 17219



White background

Wire Brush Blast Cleaning

Fluorescent Magnetic Ink

Lifting capacity AC Yoke : 10 lbs./4.5 Kgs.



Power tools

Pole spacing 5"

Sketch / Photo:

Note : Mask Axite Two is on the right hand Side. Wire and Power brush cleaning and paint remover

Coatings & Preparation:

Visual Inspection Restrictions : None Results of Examination:

No visable indications found, Item was found to be fit for use.

Comments:

Date of Inspection: Next of Inspection Date:

BHEN-12079-1

14-Nov-14 14/11/2015

TECHNICIAN:

Reviewed By:

Date :

Date :

John Dolan

PF-TH-IND-IN-076/Ver.01/13.09.13/ Page 1 of 1

AWS D1.1



Testing medium

Surface Preparation

Black Magnetic Ink



Permanent Magnet

ASME SEC V ART 7

ASME SEC B31.3 ✘

Babb v Co 11614

Black Light Unit

SOMAS MA-002

Procedure/Acceptance Criteria

All stress baring welds

Equipment:

✘ AC Yoke

4

SGS Ref No:

Contact Telephone : Location :

14-Nov-14

Date of Inspection :



Wet Dry

Related Documents