PLANT LEVEL OEE No of Woring MACHINE NAME day's
Per day hour's
Plant Level Planned Hour
Oerating Level Planned Hr
Total Down time
Plant Level Available hr
Oerating Level Available hr
Plant Level Availability Factor
operating Level Availability Factor
Plant Level Performance Factor
Operating Performance Factor
Quality factor
Plant Level Oee
Operating Level OEE
450- IT
24
22.5
540
500
114
426
386
0.79
0.77
0.92
0.97
0.98
0.71
0.73
450- IIT
22
22.5
495
450
85
410
365
0.83
0.81
0.92
1.00
0.97
0.74
0.79
650-T
11
22.5
248
216
90
157
126
0.64
0.62
0.92
0.99
0.96
0.56
0.59
750-T
24
22.5
540
504
106
434
398
0.80
0.79
0.92
0.99
0.98
0.73
0.77
840-IT
24
22.5
540
503
111
429
392
0.79
0.78
0.92
0.99
0.98
0.72
0.76
840-IIT
23
22.5
518
471
162
355
309
0.69
0.69
0.92
0.96
0.95
0.60
0.63
840-IIIT
24
22.5
540
501
177
363
324
0.67
0.69
0.92
0.99
0.95
0.59
0.65
840-IIIT
22
22.5
495
455
231
264
224
0.53
0.57
0.92
0.95
0.95
0.47
0.52
1320-T
22
22.5
495
440
175
320
265
0.65
0.66
0.92
0.96
0.97
0.58
0.61
1750-T
23
22.5
518
492
172
346
320
0.63
0.67
0.92
0.90
0.95
0.55
0.57
2200- T
23
22.5
AVERAGE
518
453
102
416
351
0.77
0.78
0.92
0.94
0.96
0.68
0.70
5445
4984
1524
3921
3460
0.72
0.69
0.92
0.96
0.98
0.69
0.65