Loading documents preview...
Planos de Obra Civil: Invernaderos
Cambridge, MA Lexington, MA Hadley, MA Bethesda, MD Washington, DC Chicago, IL Cairo, Egypt Johannesburg, South Africa
Guatemala-CAP Income Generation Activities Project (AGIL)
Implemented by: Abt Associates Inc. #520-C-00-00-00035-00
2003
Abt Associates Inc. Suite 600 4800 Montgomery Lane Bethesda, MD 20814-5341
Prepared for United States Agency for International Development/ Guatemala 1A Calle 7-66, Zona 9 Guatemala City, Guatemala
Prepared by Ulisis Sánchez
AGIL (Apoyo a la Generación de Ingresos Locales)
Planos de Obra Civil
Invernadero Tipo 1
Elaborado por Ing. Ulises Sánchez
CONTENIDO 1. PLANO DE DETALLES DE ESTRUCTURA (1) 2. PLANO DE DETALLES DE ESTRUCTURA (2) 3. PLANO DE MEDIDAS DE ESTRUCTURA (1) 4. PLANO DE MEDIDAS DE ESTRUCTURA (2) 5. PLANO DE NOMENCLATURE DE PIEZAS 6. PLANO DE MEDIDAS DE ESTRUCTURA (3) 7. PLANO DE MEDIDAS DE ESTRUCTURA (4) 8. PRESUPUESTO
*YAf?fL a
EsTRuCTuea Numero de marcos 13
Material: Naders da Rna. FORRO: Plastics y malla antivirus.
Ancho Altura minima:
30.00 metroe 7.00 metros 3.00 msoos
JUNTA DE COLUMNA Y V1GAS HARCOS CENTPALES
PfiRSPECfIVA
JUNTA DECOLUNNA Y VJGAS NAPCOSLATEPALES
DETALLE OE ESTRUCTURA sin eeceIa mayo 2003
eneracion de in resos locales
30
P\ ANT A
LEVEL DE °IS0
INVERNADERO
DETALLE DE UCTU8A Sn ewNa mayo de2OJR’
INVER ER NEDIDAS DE ESTRUCTURA
AND L apoyo a la generaclon de lngresos locales
P I E? A DC 2“ X 3'
1,75
PKZA DE
X3”
175
PIE ZA DE 2”X3‘
VISTA FRONTAL EL INVERHADERO
“
2 ’ X3’
PIEZA DE B’X3”
PUEPT A
PIEZA D
2”X3’
AGILa oyo a la eneracion de in resos locales
INVERNADERO MEDIDAS DE ESTRUCTURA SIN ESCALA
7b
79
1.79
MAYA DE 2003
7b
AL T LIRA DE P TSB
VISTA POSTERIOR DEL INVERNAOERO DETALLE DE COSTANCRkS DE TECHB
DETALL€ DE COSTANERAS LATEPAL€S
INVERNADERO NOMENCLATURE DE PIEZAS
,¿AAGIL apoyo a la generacion de ingresos locales
SIN ESCALA
MAYO DE 2003
DETALLE OE CBSTANEITAS LATERALES
7/ \
PUERTA
VIST4 POSTERIOR DEL INVERNADERO DETALLE DE COSTANERAS DE TECHO PUERTA
PUERTA
0.9i
DETALLE QE PUERTA
DETALLE DE PUERTAS
INVERNADERO
AGIL apoyo a la generacion de ingresos locales
NED
DE ESTRU os aU
PIEZA N° 1 tC4NTIDAD DE PIE ZSS 18)
DETALLE OE BASE DE EONCRETO Y COLDCACTON DEL BLOCK
PIEZA N-° 2 tCANTIDAD DE PIEZAS 13
PIEZAS N' 3 fCANTI DA D DE PIEZ 48 86I
INVERNADERO NEDIDAS DE ESTRUCTURA AGIL apoyo a la generacion de ingresos locales
SIN ESCALA
f4A'¥D DE 2003
NBTA
PARA FIdAR EL PLASTICO A LAS PIEZAS DE NAOERA ENPLEAR UN LISTON OE NADERA OE 1’X172’
PIEZAS N' 7 843 043
0{ 8
PIEZAS N° 8 fCANTIDAD 168)
PIEZAS N° 9 tCANTIDAD 2)
PIEZAS N' IN
IC ANSI PA P 4)
PIEZAS N° 4 CANT I DAD 26J
PIEZA3 N-• 3 tCANTIOA D 83
PIEZAS N-° 6 tCANTIOAD 4)
PIEZAS N-• 10 CANTIDAD 1)
PIEZA3 N-• 11 (CANTIDAD 2J
PIEZA3 N-‘ 18 tCANTIDAD 4J
INVERNADERO DE 210 METROS CUADRADOS LONGITUD 30 METROS ANCHO 7 METROS 3 METROS ALTURA MINIMA LISTADO DE PIEZAS DE MADERA N° de Pieza ldentificacion Largo en pies "Ancho en Pulgadas Espesor en pulgadas Pies Tabla c/u 1 Viga 16 4 1.5 8 2 Viga 14 4 1.5 7 ” 3 Viga ” 20 4 1.5 10 4 Columna 12 3 3 9 5Coumna 14 3“ 3 10.5 6Columna 12 3 2 6 ”7Costanera 6 3 2 3 8Costanera 8 3 2 4 9/Costanera 3 3 2 1.5 10a Columna 8 3 2 4 11 Columna 6 3 2 3 12 Costanera 4 3 2 2 13a Costanera 4 3 2 2 14 Refuerzos 10 4 1.5 5 15 on 10 1.5 1 1.25
Arena
MANO DEOBS 2 Alñbañiles 45 dias OTROS Riego por Goteo Riego por aspercion
2 4 4 8 120
40 150 1667
Total
LISTADO DE VARIOS MATERIALES M2 420 Plastico tratado 150 Mafia Antivirus Clavo de 3“ Block de 15 Cm. Cemento Piedrin
Cantidad Total P.Tabla 13 104 13 91 260 26 26 234 2 21 4 24 14 42 168 672 2 3
Unidades
M3
Quintal
1 200 20 1
P.Umit
Total
AGIL CANTIDAD Y COSTO DE MATERIALES INVERNADERO DE 210 METROS CUADRADOS LONGITUD 30 METROS ANCHO 7 METROS ALTURA MINIMA 3 METROS LISTADO DE PEZAS DE MADERA N° de Pieza ldentificacion Largo en pies Ancho en Pulgadas Espesor en pulgadas Pies Tabla c/u 1Viga 16 4 1.5 8 1.5 7 2Viga 14 4 1.5 10 3Viga 20 4 3 9 4Columna 12 3 3 05 5Columna 14 3 2 6 6 Columna 12 3 2 3 7 Costanera 6 3 2 4 8 Costanera 8 3 2 1.5 9Costanera ” 3 3 2 4 10 Columna 8 3 2 3 11 Columna 6 3 2 2 2 2 1.5 5 14 Refuerzos 10 4 1 1.25 15 Liston 10 1.5 Total LISTADO DE VARIOS MATERIALES M2 420 Plastico tratado 150 Malta Antivirus Clavo de3" Block de 15 Cm.
Cemento Piedrin Arena
. .! MANO DE OBRA 2 Alñbañiles 45 dias
M3
Cantidad Total P.Tabla P.Umit 13 104 Q 2.50 13 91 Q 2.50 26 260 Q 2.50 26 234Q250 2 21 Q 2.50 4 24 Q 2.50 14 42 Q 2.50 168 672 Q 2.50 2 3 Q 2.50 1 4 Q 2.50 2 6 250 4 8 Q 2.50 4 8 Q 2.50 8 40 Q 2.50 120 150 Q 2.50 1867 Q
Z.50
a Q Q Q Q Q Q
P. Unit 3.s0 16.00 250.00 2.50 45.00 130.00 120.00
Quintal
Unidades
1 200 20
Q Q
Total 260.00 227.50 650.00 585.00 52.50” 60.00 105 0 1,680.00 7.50 10.00 15.00 20.00 2 00 100.00 575.00
Q
4,167.50
Q Q Q Q Q Q Q Q Q Q Q
Q Q Q
Total 1,470.00 2,400.00 250 0 5 0 00 900.00 130.00 120.00
Q
5,770.00
Q
4,500.00
Q Q
OTROS Riego por Gotao Riego por aspercion RESUMEN Madera Varios Mano de Obra Otros “
”T OTAL
Q Q Q
Q Q
4,167.50 5,770.00
Q
17,437.50
1,500.00 1,500.00 3,000.00
AGIL (Apoyo a la Generación de Ingresos Locales)
Planos de Obra Civil
Invernadero Tipo 2
Elaborado por Ing. Ulises Sánchez
-
ALGA
g_oyao a ja generacion de ingresos locales
PLANTA DEL TECHO
PERSPECTIVA
INVERNADERO DETALLE DE ESTRUCTURA
sin escala map de 2003
INVERNADERO DE ESTRUCTURA
AGIL apoyo a la generacion de Ingresos locales
I
0, 75
I
'
PI E ZA DC 2”X 3“
1
,
PIE 7_ 4 OE 2‘x 3“
us
'
! HIL/.9^ OE 8LUC K UL I o CF
CN TOOO EL CONT DPNO
t:A.?E DE CGI‹LFET0
0.2 35
VISTA FRONTAL DEL INVERNADEPO
AGIL apoyo a la eneracion de in resos locales
INVERNADERO NEDIDAS DE ESTRUCURA SIN ESCALA
PMSTtcO
NAYO DE 2003
PLASTTCg
VISTA POSTERIOR OEL tNVERNAOEREI DETALLE DE COSTANERAS DE TECHO
DETALLE bE COSTANERAS LATERALES
INVERNADERO
At?ILapoye a la generacion de ingresos locales
NOMENCLATURA DE PIEZAS
SIN ESCALA
MAYO DE 2003
‹4 DETALLE DE CBSTANERAS LATERALES
/7
PUERTA
VISTdt POSTERIOR DEL ENVERHADERO OETALLE DE COSTANERAS DE TECHO PUERTA
gETALLE gE PUERTA
PUERTA
OETALLE DE PUERTAS
1NVERNADERO AT
L apoyo a la generacion de ingresos locales
NE IDAS DE ESTRUCTURA
CARA EXTERIOR DS LAS REZA9 oE NADERA RESPErM EL Nislvlg
PIEZA N°- I tCANTIDAD DE PIEZAS 7)
DETñLLE QE BASE DE CONCRETO Y COLOCACION DEL BLOCK
PIEZA N° 2 tCANTIOA D DE PIEZAS 7)
PIEZAS № 3 tCANTIDAD DE PIEZAS 14)
INVERNADERO
DE ESTRUCTURA
AGI
e ingresos locales NOTA PARA FIJAR EL PLASTICO A LAS PIEZAS DE NADERA ENPLEAR UN LISTON DE NADERA DE 1*X1Z2’ 1. b6
PIEZAS N° 7 fCANTIDAD t4J
PIEZAS N-° 8 tCANTID#D 841
0.08
PIEZAS N’ 9
(CANTIDAD 2)
3.11
0.08
PIEZAS N-° 12 fCANTfDAO 4)
0.06
PIEZAS N°- 4 SCANT I DAD 14J
PIEZAS N^ 5 tCANTIDAD 2)
PIEZAS N-° 6 tCANTIDAD 4)
PIEZAS N’ 10 PIEZAS N° 11 fCANTIDAD IN tCANTIDAD 2)
PIEZAS N-° 13 SCANT I DCD 4)
AGIL CANTIDAD Y COSTO DE MATERIALES DE INVERNADERO TIPO 2 Longitud 15 metros, Ancho 7 metros, Altura Minima 3 metros Area 105 m2 N° dePeza lden icacioLie pies Ancho Pu g. Esp. Pulg. P.T. c/u Cant. ’ T. P.TabIat P.Umit 1 Viga t 16 4 1.5t 8 7 56 Q 2.00 | Q 14 4 1.5 7 7 49 Q 2 Viga 3/Viga 20 4 1.5 10 4 140 4Columna 12 3 3 9 14 126 Q 2.00 Q 2.00 Q 3 10.5 5 Columna 14, 3 2 21 Q i 6 Columna 12 " 3 2 6 4 24 Q 2.00 Q 7 Costanera 6 3 2 3 14 42 Q 2.00 Q 8t Costanera 8 " 3 2 4 84' 336 Q 2.00 | Q 9,Costanera 3 3 2 1.5 2 3 Q 2.00 Q 10;Columna 8 3 2 4 1* 4 Q 2.00 Q 11 Columna 3 2 6 Q 2.00 Q 4 3 2 2 4 8 Q 2.00 Q 2/ Costanera 13 Costanera 4 31 2 2 4 8| Q 2.00 Q 10 4 1.5 14 Refuerzos 5 8 40 Q 2.00 Q 1.25 70 87.5 Q 2.00 Q 10 1.5 1 15 Liston 950.5 | Q 2.00 Q tTotal
Total 112.00 98.00 280.00 252.00 42.00 48.00 84.00 672.00 6.00 8.00 12.00 16.00” 16.00 80.00 175.00 1,901.00
LISTADO DE VARIOS MATERIALES M2 258 Plastico tratado Malla Antivirus 80 Fleje Clavo de 3" Block de 15 Cm. Cemento Piedrin Arena Total
P. Unit i Q 3.50 Q Q 16.00 Q Q Q 250.00 Q Q 2.50 Q Q 45.00 Q Q 130.00 Q Q 120.00 Q Q
Total 903.00 1,280.00 175.00 250.00 300.00 450.00 120.00 100.00 3,578.00
Q
2,300.00
M3
|
Unidades
Quintal
1 Rollo de 2,200 mts.
10
"”
MANO DE OBRA 2 Alñbañiles 23 dias OTROS "” Riego por Goteo o Aspercion
RESUMEN Madera a
Q
1,901.00
Q
8,979.00
CI
Ma de Obra Otros TOTAL