1

Página

S10

Presupuesto Presupuesto

1201016

Subpresupuesto Lugar

005 MONTEVERDE PIURA - PIURA - PIURA

Item

Descripción

05

POZO TUBULAR

Cliente

05.01

"HABILITACION URBANA MONTEVERDE II" MONTEVERDE - DISTRITO DE CASTILLA - PROVINCIA DE PIURA DEPARTAMENTO DE PIURA" POZO TUBULAR Y CASETA DE BOMBEO Costo al

Und.

Metrado

Precio S/.

12/06/2017

Parcial S/. 1,341,821.48

TRABAJOS PRELIMINARES

48,977.30

05.01.01

TRAZO Y REPLANTEO

m2

36.00

2.47

05.01.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

GLB

1.00

98.18

98.18

60.00

813.17

48,790.20

05.01.03 05.02 05.02.01

INSTALACION, USO Y RETIRO DE HERRAMIENTAS DE ACERO NEGRO D=24" Y 0.21" PROXIMO A SU EXTRACCION

m

PERFORACION DE POZO TUBULAR

88.92

579,644.39

PERFORACION DE POZO TUBULAR - REGISTRO DE CONTROL

223,495.44

05.02.01.01

PERFORACION DEL POZO CON BARRENO DE 21" METODO DE PERCUSION

m

180.00

1,171.80

210,924.00

05.02.01.02

REGISTRO DE DIAGRAFIA DEL POZO: RESISTIVIDAD Y RAYOS GAMMA 1CU

GLB

1.00

10,000.00

10,000.00

05.02.01.03

SONDAJE DE NIVELES DE POZO

GLB

1.00

911.44

911.44

05.02.01.04

ANALISIS GRANULOMETRICO DEL POZO

und

1.00

410.00

410.00

05.02.01.05

ANALISISFISICO-QUIMICO Y BACTERIOLOGICO

und

1.00

1,250.00

1,250.00

05.02.02

TUBERIAS Y FILTROS

291,428.60

05.02.02.01

SUMINISTRO E INSTALACION DE TUBERIA PARA COLUMNA D=15" EN FIERRO NEGRO 6MM ASTM 120/BCC

m

134.40

1,328.44

178,542.34

05.02.02.02

SUMINISTRO E INSTALACION DE TUBERIA FILTRO EN ACERO INOXIDABLE D=15" X4MM DE ESPESOR, ABERTURA 1.5MM TRAPEZOIDAL

m

45.60

2,271.44

103,577.66 1,227.00

05.02.02.03

SUMINISTRO E INST. DE TUB. FoGo 4" P/COL. DE GRAVA

m

10.00

122.70

05.02.02.04

SUMINISTRO Y COLOCACION DE GRAVA SELECCIONADA CALIBRE =2 A 4mm

m3

20.00

404.08

05.02.03

DESARROLLO DEL POZO

8,081.60 23,865.60

05.02.03.01

DESAROLLO DE POZO POR AIRE COMPRIMIDO

h

72.00

202.60

14,587.20

05.02.03.02

SUMINISTRO Y COLOCACION DE TRIPOLIFOSFATO DE SODIO

kg

80.00

115.98

9,278.40

und

1.00

2,450.02

2,450.02

72.00

316.53

22,790.16

05.02.04 05.02.04.01 05.02.05

REGISTRO Y PRUEBAS DE CONTROL PRUEBA DE VERTICALIDAD Y ALINEAMIENTO DEL POZO

2,450.02

BOMBEO DEL POZO

27,146.89

05.02.05.01

PRUEBA DE BOMBEO DEL POZO A CAUDAL VARIABLE

h

05.02.05.02

EVACUACION DEL AGUA POR PRUEBA DE BOMBEO DEL POZO

GLB

1.00

814.42

814.42

05.02.05.03

MONTAJE Y DESMONTAJE DE EQUIPO DE BOMBEO

GLB

1.00

3,542.31

3,542.31

05.02.06

SELLADO DEL POZO

8,586.02

05.02.06.01

ANILLO DE CONCRETO SIMPLE

GLB

1.00

3,894.65

3,894.65

05.02.06.02

SELLO SANITARIO DE CONCRETO F´c=175 Kg/cm2 EN ESPACIO ANULAR 1.00M

GLB

1.00

656.78

656.78

05.02.06.03

SELLO DE CONCRETO F´c=175 Kg/cm2 EN FONDO DEL POZO TUBULAR

GLB

1.00

674.42

674.42

05.02.06.04

DESINFECCION DEL POZO TUBULAR

und

1.00

2,939.76

2,939.76

SELLO METALICO DE LA BOCA DEL POZO TUBULAR

und

1.00

420.41

05.02.06.05 05.02.07

OTROS

05.02.07.01

LIMPIEZA, NIVELACION DEL TERRENO Y ELIMNACION DEL DESMONTE

GLB

1.00

1,706.20

05.02.07.02

SUMINISTRO E INSTALACION DE EQUIPO AMPERIMETRO

GLB

1.00

965.62

05.03 05.03.01

CERCO PERIMÉTRICO

1,706.20 965.62 46,717.39

TRABAJOS PRELIMINARES

1,423.08

05.03.01.01

LIMPIEZA MANUAL DE TERRENO

m2

336.00

2.03

05.03.01.02

TRAZO Y REPLANTEO

m2

300.00

2.47

05.03.02

420.41 2,671.82

MOVIMIENTO DE TIERRAS

682.08 741.00 2,691.24

05.03.02.01

EXCAVACION DE ZANJAS PARA CIMIENTOS

m3

35.85

41.53

1,488.85

05.03.02.02

BASE CON AFIRMADO E=0.10M, INC. COMPACTACION CON EQUIPO LIVIANO

m2

30.74

16.52

507.82

05.03.02.03

REFINE Y NIVELACION DE ZANJAS

m

49.90

3.50

174.65

05.03.02.04

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

4.62

6.09

28.14

05.03.02.05

ELIMINACION DE MATERIAL EXCEDENTE D=4.0 KM

m3

39.03

12.60

491.78

CONCRETO SIMPLE P/SOLADO F'c=100 Kg/cm2, E=0.10M

m2

30.74

37.52

1,153.36

CIMIENTOS CORRIDOS 1:10 CEMENTO: HORMIGÓN + 30%P.G

m3

22.99

230.17

05.03.03 05.03.03.01 05.03.03.02 05.03.04 05.03.04.01

CONCRETO SIMPLE

CONCRETO ARMADO ZAPATAS

6,444.97

5,291.61 12,196.50 606.97

2

Página

S10

Presupuesto Presupuesto

1201016

Subpresupuesto Lugar

005 MONTEVERDE PIURA - PIURA - PIURA

Item

Descripción

Cliente

"HABILITACION URBANA MONTEVERDE II" MONTEVERDE - DISTRITO DE CASTILLA - PROVINCIA DE PIURA DEPARTAMENTO DE PIURA" POZO TUBULAR Y CASETA DE BOMBEO Costo al

Und.

Metrado

Precio S/.

Parcial S/.

05.03.04.01.01

CONCRETO F'C=210 KG/CM2 EN ZAPATAS

m3

1.20

420.04

05.03.04.01.02

ACERO DE REFUERZO FY=4200 KG/CM2

kg

20.26

5.08

05.03.04.02

12/06/2017

SOBRECIMIENTOS ARMADOS

504.05 102.92 3,100.12

05.03.04.02.01

CONCRETO F'C= 175KG/CM2 PARA SOBRECIMIENTOS

m3

2.03

384.92

781.39

05.03.04.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

m2

28.94

52.75

1,526.59

05.03.04.02.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

141.73

5.08

719.99

05.03.04.02.04

CURADO DE CONCRETO

m2

35.72

2.02

05.03.04.03

COLUMNAS

72.15 6,059.28

05.03.04.03.01

CONCRETO F'C 210 KG/CM2 PARA COLUMNAS

m3

4.27

420.86

1,797.07

05.03.04.03.02

ENCOFRADO Y DESCENCOFRADO DE COLUMNAS

m2

49.32

50.75

2,502.99

05.03.04.03.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

326.69

5.08

1,659.59

05.03.04.03.04

CURADO DE CONCRETO

m2

49.32

2.02

05.03.04.04

VIGAS

99.63 2,430.13

05.03.04.04.01

CONCRETO F'C=210 KG/CM2. PARA VIGAS

m3

1.85

437.60

809.56

05.03.04.04.02

ENCOFRADO Y DESCENCOFRADO DE PARA VIGAS Y DINTELES

m2

12.37

50.75

627.78

05.03.04.04.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

189.05

5.08

960.37

05.03.04.04.04

CURADO DE CONCRETO

m2

16.05

2.02

05.03.05

MUROS Y TABIQUES DE ALBAÑILERIA

05.03.05.01

MURO DE LADRILLO K.K. ARCILLA DE SOGA CON MORTERO 1:4 x 1.5CM

m2

140.15

61.56

05.03.05.02

JUNTA DE E=2.5 CM C/SELLO ELASTOMETRICO

m

15.40

12.21

05.03.06

32.42 8,815.66

REVOQUES ENLUCIDOS Y MOLDURAS

8,627.63 188.03 3,347.32

05.03.06.01

TARRAJEO DE SOBRECIMIENTOS C/C:A 1:5, JUNTA E=1.5 CM

m2

28.94

33.08

957.34

05.03.06.02

TARRAJEO COLUMNAS C/C:A 1:5, JUNTA E=1.5 CM

m2

49.32

37.33

1,841.12

TARRAJEO VIGAS C/C:A 1:5, JUNTA E=1.5 CM

m2

12.37

44.37

05.03.06.03 05.03.07

CARPINTERIA METALICA

548.86 5,845.41

05.03.07.01

PUERTA PEATONAL DE FIERRO

und

1.00

787.48

787.48

05.03.07.02

PORTON DE FIERRO P-4

und

1.00

5,057.93

5,057.93

112.69

112.69 146.24

05.03.08

CERRAJERIA

465.21

05.03.08.01

CHAPA DE SOBREPONER 3 GOLPES

und

1.00

05.03.08.02

BISAGRA DE 5/8" X 6"79 (2 ALAS)

und

8.00

18.28

05.03.08.03

PICAPORTE DE 1/22 (SEGUN DISEÑO) PARA P-4

und

2.00

103.14

05.03.09

PINTURA

206.28 5,488.00

05.03.09.01

PINTURA LATEX DOS MANOS EN VIGAS, COLUMNAS Y SOBRECIMIENTOS

m2

90.63

23.48

2,127.99

05.03.09.02

PINTURA LATEX DOS MANOS EN MUROS EXTERIORES

m2

140.15

20.91

2,930.54

m2

17.71

24.25

429.47

05.03.09.03 05.04 05.04.01 05.04.01.01 05.04.02

PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS EN CARPINTERIA METALICA CASETA DE BOMBEO

109,713.44

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO

185.25 m2

75.00

2.47

185.25

MOVIMIENTO DE TIERRAS

4,790.84

05.04.02.01

CORTE DE TERRENO A NIVEL DE SUBRASANTE

m3

28.02

41.53

1,163.67

05.04.02.02

EXCAVACION DE ZANJAS PARA CIMIENTOS

m3

66.13

41.53

2,746.38

05.04.02.03

BASE CON AFIRMADO E=0.10M, INC. COMPACTACION CON EQUIPO LIVIANO

m2

9.39

16.52

155.12

05.04.02.04

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

66.13

6.09

402.73

05.04.02.05

ELIMINACION DE MATERIAL EXCEDENTE D=4.0 KM

m3

25.63

12.60

05.04.03

CONCRETO SIMPLE

322.94 23,115.14

05.04.03.01

CONCRETO SIMPLE P/SOLADO F'c=100 Kg/cm2, E=0.10M

m2

1.92

37.52

72.04

05.04.03.02

CIMIENTOS CORRIDOS 1:10 CEMENTO: HORMIGÓN + 30%P.G

m3

17.67

230.17

4,067.10

FALSO PISO F'C= 140 KG/CM2

m2

66.13

286.95

18,976.00

05.04.03.03 05.04.04 05.04.04.01 05.04.04.01.01

CONCRETO ARMADO

29,518.19

ZAPATAS CONCRETO F'C=210 KG/CM2 EN ZAPATAS

501.08 m3

0.96

420.04

403.24

3

Página

S10

Presupuesto Presupuesto

1201016

Subpresupuesto Lugar

005 MONTEVERDE PIURA - PIURA - PIURA

Item

Descripción

Cliente

05.04.04.01.02 05.04.04.02

"HABILITACION URBANA MONTEVERDE II" MONTEVERDE - DISTRITO DE CASTILLA - PROVINCIA DE PIURA DEPARTAMENTO DE PIURA" POZO TUBULAR Y CASETA DE BOMBEO

ACERO DE REFUERZO FY=4200 KG/CM2

Costo al

Und. kg

Metrado

Precio S/. 19.26

12/06/2017

Parcial S/. 5.08

SOBRECIMIENTOS ARMADOS

97.84 6,181.45

05.04.04.02.01

CONCRETO F'C= 175KG/CM2 PARA SOBRECIMIENTOS

m3

6.37

384.92

2,451.94

05.04.04.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

m2

49.15

52.75

2,592.66

05.04.04.02.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

223.79

5.08

1,136.85

2.93

420.86

1,233.12

05.04.04.03

COLUMNAS

4,452.54

05.04.04.03.01

CONCRETO F'C 210 KG/CM2 PARA COLUMNAS

m3

05.04.04.03.02

ENCOFRADO Y DESCENCOFRADO DE COLUMNAS

m2

21.96

50.75

1,114.47

05.04.04.03.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

414.36

5.08

2,104.95

3.86

437.60

1,689.14

05.04.04.04

VIGAS

4,221.90

05.04.04.04.01

CONCRETO F'C=210 KG/CM2. PARA VIGAS

m3

05.04.04.04.02

ENCOFRADO Y DESCENCOFRADO DE PARA VIGAS Y DINTELES

m2

10.63

50.75

539.47

05.04.04.04.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

392.38

5.08

1,993.29

05.04.04.05

LOSA ALIGERADA

11,528.40

05.04.04.05.01

CONCRETO F'C=210 KG/CM2. P/LOSA ALIGERADA

m3

4.46

445.60

1,987.38

05.04.04.05.02

ENCOFRADO Y DESCENCOFRADO PARA LOSAS ALIGERADAS

m2

92.08

55.48

5,108.60

05.04.04.05.03

LADRILLO ARCILLA LOSA ALIGERADA 15X30X30

und

406.60

2.12

861.99

05.04.04.05.04

ACERO DE REFUERZO FY=4200 KG/CM2

kg

702.84

5.08

3,570.43

05.04.04.06

BASE DE GRUPO ELECTROGENO

1,460.66

05.04.04.06.01

CONCRETO F'C=210 KG/CM2 - BASE DE GRUPO ELECTROGENO

m3

1.58

414.06

654.21

05.04.04.06.02

ENCOFRADO Y DESENCOFRADO - BASE GRUPO ELECTROGENO

m2

4.08

44.55

181.76

05.04.04.06.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

122.97

5.08

05.04.04.07

CAJA DE REBOSE

624.69 1,172.16

05.04.04.07.01

CONCRETO F'C=210 KG/CM2 CAJA DE REBOSE

m3

0.96

427.86

410.75

05.04.04.07.02

ENCOFRADO Y DESENCOFRADO CAJA DE REBOSE

m2

10.55

49.41

521.28

05.04.04.07.03

ACERO DE REFUERZO FY=4200 KG/CM2

kg

47.27

5.08

05.04.05

MUROS Y TABIQUES DE ALBAÑILERIA

05.04.05.01

MURO DE LADRILLO K.K. ARCILLA DE SOGA CON MORTERO 1:4 x 1.5CM

m2

84.09

61.56

05.04.05.02

MURO DE LADRILLO K.K. DE ARCILLA D/CABEZA C/MORTERO 1:4 X 1.5 CM.

m2

96.80

88.15

05.04.06

240.13 13,709.50

REVOQUES ENLUCIDOS Y MOLDURAS

5,176.58 8,532.92 12,638.90

05.04.06.01

TARRAJEO INTERIOR/EXTERIOR C/C:A 1:5, JUNTA E=1.5 CM

m2

211.20

29.75

6,283.20

05.04.06.02

TARRAJEO DE COLUMNAS Y VIGAS C/MORTERO 1:5, JUNTA E=1.5 CM

m2

32.59

44.37

1,446.02

05.04.06.03

VESTIDURA DE DERRAMES EN PUERTAS. VENTANAS Y VANOS

m

47.25

31.78

1,501.61

05.04.06.04

CIELO RASO CON MEZCLA DE CEMENTO - ARENA

m2

75.50

45.14

3,408.07

05.04.07

PISOS Y PAVIMENTOS

9,191.52

05.04.07.01

PISO CEMENTO PULIDO

m2

63.56

30.05

1,909.98

05.04.07.02

PISO CERAMICO 30X30

m2

64.57

65.46

4,226.75

m2

31.48

54.84

1,726.36

05.04.07.03

VEREDA DE CONCRETO F'C=175KG/CM2 E=10CM INC. ACABADO Y BRUÑADO CON MEZCLA

05.04.07.04

ENCOFRADO (INCL. HABILITACION DE MADERA) P/VEREDAS Y/O RAMPAS

m2

30.53

37.51

1,145.18

05.04.07.05

JUNTAS DE DILATACION CON ASFALTO 1"

m

24.08

7.61

183.25

m

34.00

13.74

467.16

m2

8.82

94.37

832.34

m2

3.26

420.01

1,369.23

PUERTA METALICA

m2

4.48

288.04

1,290.42

VENTANAS METALICAS

m2

2.88

129.97

374.31

05.04.08 05.04.08.01 05.04.09 05.04.09.01 05.04.10 05.04.10.01 05.04.11 05.04.11.01 05.04.11.02 05.04.12

CONTRAZOCALOS CONTRAZOCALO CEMENTO S/COLOREAR H=30 CM INCL. IMPERMEABILIZANTE

467.16

ZOCALOS ZOCALO DE MAYOLICA

832.34

CARPINTERIA DE MADERA PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM. + MARCO CEDRO 2X3"

1,369.23

CARPINTERIA METALICA

CERRAJERIA

1,664.73

349.28

4

Página

S10

Presupuesto Presupuesto

1201016

Subpresupuesto Lugar

005 MONTEVERDE PIURA - PIURA - PIURA

Item

Descripción

Cliente

"HABILITACION URBANA MONTEVERDE II" MONTEVERDE - DISTRITO DE CASTILLA - PROVINCIA DE PIURA DEPARTAMENTO DE PIURA" POZO TUBULAR Y CASETA DE BOMBEO Costo al

Und.

Metrado

Precio S/.

12/06/2017

Parcial S/.

05.04.12.01

CHAPA DE SOBREPONER 3 GOLPES

und

2.00

112.69

225.38

05.04.12.02

CHAPA ALUMINIZADA TIPO TAMBOR DE EMBUTIR

und

1.00

84.78

84.78

05.04.12.03

BISAGRAS CAPUCHINAS ALUMINIZADA DE 4" X 2"

und

6.00

6.52

05.04.13

PINTURA

39.12 7,305.74

05.04.13.01

PINTURA LATEX DOS MANOS EN MUROS INTERIORES Y EXTERIORES

m2

243.78

20.91

5,097.44

05.04.13.02

PINTURA LATEX DOS MANOS EN CIELO RASO

m2

75.50

22.52

1,700.26

m2

20.95

24.25

508.04

05.04.13.03

PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS EN CARPINTERIA METALICA

05.04.14

INSTALACIONES SANITARIAS

1,355.41

05.04.14.01

PUNTOS DE AGUA

pto

3.00

85.62

256.86

05.04.14.02

TUBERIA PVC C-10 D=1/2"

m

7.50

4.90

36.75

05.04.14.03

VALVULA COMPUERTA + 2UU + NICHO

pza

1.00

93.57

93.57

05.04.14.04

PUNTOS DE DESAGUE

pto

3.00

102.37

307.11

05.04.14.05

PUNTOS DE VENTILACION

pto

1.00

49.86

49.86

05.04.14.06

TUBERIA PVC SAL 4"

m

5.00

10.43

52.15

05.04.14.07

TUBERIA PVC SAL 2"

m

5.62

6.19

34.79

05.04.14.08

CAJA DE REGISTRO DE DESAGÜE 12" X 24"

und

1.00

185.55

185.55

05.04.14.09

SUMIDEROS PLUVIAL DE BRONCE D=2"

und

2.00

26.99

53.98

05.04.14.10

SUMIDEROS PLUVIAL DE BRONCE D=4"

und

4.00

40.77

163.08

05.04.14.11

REGISTRO ROSCADO DE BRONCE 4"

und

1.00

46.77

46.77

05.04.14.12

MONTANTE PLUVIAL C/TUBERIA D=2"

m

6.00

12.49

05.04.15

APARATOS Y ACCESORIOS SANITARIOS

74.94 827.55

05.04.15.01

INODORO TANQUE BAJO DE PORCELANA BLANCO INC. ACCESORIOS

und

1.00

357.43

357.43

05.04.15.02

LAVATORIO 12"X24" PORCELANA BLANCO

und

1.00

270.96

270.96

05.04.15.03

DUCHA CROMADA

und

1.00

132.60

132.60

05.04.15.04

KIT DE ACCESORIOS PARA SS.HH.

und

1.00

66.56

05.04.16

VARIOS

66.56 2,392.66

05.04.16.01

TRIPLAY DE 19MM EN BASE DE GRUPO ELECTROGENO

m2

2.64

42.70

05.04.16.02

NEOPRENE 1"X1" EN BASE GRUPO ELECTROGENO

m

7.00

8.91

62.37

05.04.16.03

PERNOS ANCLAJE 5/8" X 0.60M CADMIADOS

und

6.00

80.00

480.00

05.04.16.04

GARGOLAS DE EVACUACION PLUVIAL

und

3.00

75.00

225.00

05.04.16.05

COBERTURA LIV. ESTRUCTURA METALICA C/PLANCHA ETERNIT

und

1.00

1,512.56

1,512.56

05.05

EQUIPAMIENTO E INSTALACIONES HIDRAULICAS

05.05.01

112.73

556,768.96

SUMINISTRO Y MONTAJES DE EQUIPOS

35,475.40

05.05.01.01

SUMINISTRO E INSTALACION DE REDUCCION DE H.D BRIDADO DE 200 a 150mm

und

1.00

464.76

464.76

05.05.01.02

SUMINISTRO E INSTALACION DEVALVULA DE AIRE AUTOMATICA TRIPLE FUNCION DE HIERRO DUCTIL Ø1" INC.ACCESORIOS

und

1.00

4,445.43

4,445.43

und

2.00

214.76

429.52

und

2.00

389.76

779.52

05.05.01.03 05.05.01.04

SUMINISTRO E INSTALACION DE COLLARIN DE TOMA DE H.D DE 150 x 25mm. SUMINISTRO E INSTALACION DE NIPLES DE H.D BRIDA-ESPIGA DE 150mm x 0.50m.

05.05.01.05

SUMINISTRO E INSTALACION DE UNION DESSER DE H.D. DE 150mm

und

1.00

444.76

444.76

05.05.01.06

SUMINISTRO E INSTALACION DE MANOMETROS CON RANGO 0 A 200 PSI

und

2.00

587.93

1,175.86

05.05.01.07

SUMINISTRO E INSTALACION DE TEE DE HD BRIDADA DE 150x110mm

und

2.00

954.76

1,909.52

05.05.01.08

SUMINISTRO E INSTALACION DE VALVULA CHECK BRIDADADE 150mmHD

und

1.00

1,434.76

1,434.76

05.05.01.09

SUMINISTRO E INSTALACION DE NIPLE DE HD BRIDADO DE 150mm x 0.30m

und

1.00

314.76

314.76

05.05.01.10

SUMINISTRO E INSTALACION DE MACROMEDIDOR ELECTROMAGNETICO Ø150mm

und

1.00

12,584.76

12,584.76

05.05.01.11

SUMINISTRO E INSTALACION DE NIPLE BRIDADO DE 150mm x 2.25m

und

1.00

1,502.26

1,502.26

SUMINISTRO E INSTALACION DE VALVULA COMPUERTA BRIDADA DE 100mm

und

1.00

770.76

770.76

05.05.01.12 HD 05.05.01.13

SUMINISTRO E INSTALACION DE COLLARIN DE TOMA DE HD DE 200x25mm ROSCADO

und

1.00

229.76

229.76

05.05.01.14

SUMINISTRO E INSTALACION DE NIPLE DE HD BRIDADO DE 100mm x 0.45m

und

2.00

364.76

729.52

5

Página

S10

Presupuesto Presupuesto

1201016

Subpresupuesto Lugar

005 MONTEVERDE PIURA - PIURA - PIURA

Item

Descripción

Cliente

"HABILITACION URBANA MONTEVERDE II" MONTEVERDE - DISTRITO DE CASTILLA - PROVINCIA DE PIURA DEPARTAMENTO DE PIURA" POZO TUBULAR Y CASETA DE BOMBEO Costo al

Und.

Metrado

Precio S/.

12/06/2017

Parcial S/.

05.05.01.15

SUMINISTRO E INSTALACION DE TEE DE H.D. BRIDADA DE 200 x 100mm.

und

1.00

84.76

84.76

05.05.01.16

SUMINISTRO E INSTALACION DE NIPLE DE H.D BRIDADO DE 100mm. x 0.25m.

und

1.00

264.76

264.76

und

2.00

304.76

609.52 534.76

05.05.01.17

SUMINISTRO E INSTALACION DE NIPLE DE H.D BRIDA-ESPIGA DE 100mm. (L=0.30m)

05.05.01.18

SUMINISTRO E INSTALACION DE UNION DRESSER DE H.D. DE 100mm.

und

1.00

534.76

05.05.01.19

SUMINISTRO E INSTALACION DE CODO DE H.D BRIDADO DE 100mm x 45°

und

1.00

264.76

264.76

05.05.01.20

SUMINISTRO E INSTALACION DE NIPLE DE H.D BRIDADO DE 100mm. x 2.20m.

und

1.00

1,316.76

1,316.76

05.05.01.21

SUMINISTRO E INSTALACION DE CODOS DE H.D BRIDADO DE 100mm x 90°

und

2.00

314.76

629.52

05.05.01.22

SUMINISTRO E INSTALACION DE VALVULA CHEK BRIDADO DE 100mm

und

1.00

1,152.76

1,152.76

05.05.01.23

SUMINISTRO E INSTALACION DE TUBERIA DE FoGdo DE 25mm.

und

3.00

100.51

301.53

05.05.01.24

SUMINISTRO E INSTALACION DE CODO DE FoGdo ROSCADO DE 25mmx90°

und

2.00

86.76

173.52

und

1.00

1,223.76

1,223.76

05.05.01.25

SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE HD BRIDADA 150mm

05.05.01.26

SUMINISTRO E INSTALACION DE NIPLE DE HD BRIDADO DE 150mm x 1.40m

und

1.00

938.76

938.76

05.05.01.27

SUMINISTRO E INSTALACION DE CODO DE H.D BRIDA 150mm x 45°

und

1.00

394.76

394.76

SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE 25mm. BRONCE ROSCADA.

und

1.00

134.76

134.76

SUMINISTRO E INSTALACION DE NIPLE DE HD BRIDADO DE 100mm X 0.15m

und

1.00

234.76

05.05.01.28 05.05.01.29 05.05.02

SUMINISTRO E INSTALACIÓN DE SISTEMA DE CLORINACION

234.76 32,841.14

05.05.02.01

TEE DE F°G° DE 20mmx20mm ROSCADO

und

2.00

40.08

80.16

05.05.02.02

UNION UNIVERSAL DE FIERRO GALVANIZADO ROSCADO DE 20mm

und

3.00

33.61

100.83

05.05.02.03

PROBADOR DE FUGAS DE CLORO

und

1.00

182.76

182.76

05.05.02.04

DIFUSOR DE PVC DE 12mm

und

1.00

77.37

77.37

05.05.02.05

FILTRO "Y" DE 20mm, CON MALLA DE ACERO INOXIDABLE

und

1.00

106.19

106.19

05.05.02.06

VALVULA CORPORATION DE BRONCE DE D=20mm

und

1.00

125.26

125.26

05.05.02.07

CODO DE FIERRO GALVANIZADO UNION ROSCADA DE 20mmX90º

und

8.00

179.78

1,438.24

05.05.02.08

VALVULA DE BRONCE DE 20mm TIPO CHECK

und

1.00

275.08

275.08

05.05.02.09

VALVULA DE INTERRUPCION DE BRONCE DE 20mm TIPO GLOBO

und

4.00

350.63

1,402.52

05.05.02.10

TUBERIA DE FIERRO GALVANIZADO DE D=20mm

m

6.00

42.82

256.92

05.05.02.11

SUMINISTRO E INSTALACION DE TUBERIA DE POLIETILENO DE 10mm

m

10.00

104.94

1,049.40

05.05.02.12

BALANZA DE 500 KG TIPO PLATAFORMA CON JUEGO DE PESAS

und

2.00

2,400.00

4,800.00

05.05.02.13

BALONES PARA CLORO DE 150Lb (68Kg) C/CARGA COMPLETA, VALVULAS Y ABRAZADERAS PARA SUJECION DE BALONES

und

2.00

250.00

500.00

05.05.02.14

MANOMETRO DE 0-200PSI CON UNA VALVULA COMPUERTA DE 20mm PARA PURGA

und

1.00

902.90

902.90

05.05.02.15

SUMINISTRO Y MONTAJE DE BOMBA BOOSTER 1HP DE POTENCIA Q=25L/s, HDT=40m

und

1.00

2,775.95

2,775.95

05.05.02.16

REGULADOR DE CLORO AL VACIO C/CAPACIDAD 0-25Lb/dia AUTOMATICO G/CONECTOR TUB. 10mm, INYECTOR (PRES. MINIMA 55PSI ),C/C

und

2.00

9,383.78

18,767.56

und

1.00

150,536.61

150,536.61

05.05.03 05.05.03.01 05.05.04

EQUIPO DE BOMBEO SUMINISTRO E INSTALACION DE ELECTROBOMBA SUMEGIBLE Q=26.07 LPS, ADT=128.66M, POT.APROX =65HP

150,536.61

ELECTRIFICACION - SISTEMA DE DISTRIBUCION EN BAJA TENSION

337,915.81

05.05.04.01

SUMINISTRO E INST. DE TABLERO DE TRANSFERENCIA MANUAL

und

1.00

15,125.00

15,125.00

05.05.04.02

SUMINISTRO E INST. DE TABLERO DE BOMBAS AUTOSOPORTADO TIPO E-024

und

1.00

64,375.00

64,375.00

und

1.00

11,462.50

11,462.50

05.05.04.03

SUMINISTRO E INST. DE TABLERO GENERAL 220V, AUTOSOPORTADO TIPO E-024

05.05.04.04

SUMINISTRO E INST. DE TABLERO CON PLC

und

1.00

23,688.82

23,688.82

05.05.04.05

SUM. E INST. TABLERO ELECTRICO TRIFASICO FºGº EMPOTRADO 24 POLOS

und

1.00

1,017.15

1,017.15

05.05.04.06

SUMINISTRO E INST. DE INTERRUPTOR TERMOMAGNETICO 3x40A

und

1.00

107.88

107.88

05.05.04.07

SUMINISTRO E INST. DE INTERRUPTOR TERMOMAGNETICO 3x20 A

und

1.00

79.88

79.88

05.05.04.08

SUMINISTRO E INST. DE INTERRUPTOR TERMOMAGNETICO 2x20 A

und

1.00

47.88

47.88

05.05.04.09

SUMINISTRO E INST. DE INTERRUPTOR TERMOMAGNETICO 2x16 A

und

2.00

47.88

95.76

05.05.04.10

SUMINISTRO E INST. DE INTERRUPTOR DIFERENCIAL DE 2x25 A/30mm A

und

1.00

133.55

133.55

05.05.04.11

SUMINISTRO E INST. DE CONDUCTOR DE Cu 2.5 mm2 TW

m

326.10

2.59

844.60

6

Página

S10

Presupuesto Presupuesto

1201016

Subpresupuesto Lugar

005 MONTEVERDE PIURA - PIURA - PIURA

Item

Descripción

Cliente

"HABILITACION URBANA MONTEVERDE II" MONTEVERDE - DISTRITO DE CASTILLA - PROVINCIA DE PIURA DEPARTAMENTO DE PIURA" POZO TUBULAR Y CASETA DE BOMBEO Costo al

Und.

Metrado

Precio S/.

12/06/2017

Parcial S/.

05.05.04.12

SUMINISTRO E INST. DE CONDUCTOR DE Cu 4 mm2 THW

m

62.92

2.99

188.13

05.05.04.13

SUMINISTRO E INST. CONDUCTOR DE Cu DE 10 mm2 NYY UNIPOLAR

m

25.08

6.95

174.31

05.05.04.14

SUMINISTRO E INST. CONDUCTOR DE Cu DE 95 mm2 NYY UNIPOLAR

m

10.89

43.91

478.18

05.05.04.15

SUMINISTRO E INST. CONDUCTOR DE Cu DE 240 mm2 NYY UNIPOLAR

m

46.20

102.76

4,747.51

05.05.04.16

SUMINISTRO E INST. DE CABLE APANTALLADO

m

90.00

9.56

860.40

05.05.04.17

SUMINISTRO E INSTALACION DE CABLE XPT

m

90.00

2.87

258.30

05.05.04.18

SUMINISTRO E INST. DE SENSOR DE INUNDACION

und

1.00

540.00

540.00

05.05.04.19

SUMINISTRO E INSTALACION DE LUMINARIA 2x36W

und

11.00

119.69

1,316.59

05.05.04.20

SUMINISTRO E INSTALACION DE LUMINARIA 20W

und

17.00

173.96

2,957.32

05.05.04.21

SUMINISTRO E INST. DE INTERRUPTOR SIMPLE UNIPOLAR

und

5.00

38.74

193.70

05.05.04.22

SUMINISTRO E INST. DE INTERRUPTOR DOBLE UNIPOLAR

und

2.00

40.91

81.82

05.05.04.23

SUMINISTRO E INST. DE TOMACORRIENTE DOBLE C/PUESTA A TIERRA

und

3.00

36.97

110.91

SUMINISTRO E INSTALACION DE TOMACORRIENTE EMPOTRABLE 16A, 3P+T

und

1.00

38.76

38.76

05.05.04.25

SUMINISTRO E INST. DE DUCTO PVC SEL DE 15 mm Ø

m

131.23

8.07

1,059.03

05.05.04.26

SUMINISTRO E INST. DE DUCTO PVC SEL DE 20mm Ø

m

21.98

10.40

228.59

05.05.04.27

SUMINISTRO E INST. DE DUCTO PVC SAP DE 35mm Ø

und

6.27

11.62

72.86

und

1.00

196,694.06

196,694.06

05.05.04.24 IP67

05.05.04.28

SUMINISTRO DE GRUPO ELECTROGENO 315KW STAND BY, 284KW POT. CONTINUA, 440V TRIFASICO

05.05.04.29

EXCAVACION MANUAL

und

4.00

61.10

244.40

05.05.04.30

INSTALACION DEL POZO DE CONEXION A TIERRA

und

4.00

717.13

2,868.52

05.05.04.31

RELLENO Y COMPACTACION DE LA PUESTA A TIERRA

und

4.00

63.40

253.60

05.05.04.32

TECLE MECANICO 3 TN.

und

1.00

5,050.40

5,050.40

TECLE MECANICO 1 TN.

und

1.00

2,520.40

05.05.04.33

COSTO DIRECTO GASTOS GENERALES 10.0000% UTILIDAD (10%)

2,520.40 1,341,821.48 134,182.15 134,182.15 --------------------------

SUB TOTAL IGV (18%)

1,610,185.78 289,833.44 ==================

TOTAL DE PRESUPUESTO SON :

UN MILLON NOVECIENTOS MIL DIECINUEVE Y 22/100 NUEVOS SOLES

1,900,019.22

Related Documents

Pozo
February 2021 3
Pozo Somero
February 2021 0
Hurtado Pozo
February 2021 14
Pozo Somero (autoguardado)
February 2021 0
El Pozo Los Adioses Onetti
February 2021 2
El Pozo Delta De Dirac
March 2021 0

More Documents from "Torres Pineda Osvaldo"

January 2021 0
Pozo
February 2021 3
March 2021 0
Matematicas 1
February 2021 1
Control 4 Logica
February 2021 1
Sistema De Control Final
January 2021 2