Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

01

PAVIMENTACION

Presupuesto

01.01

0492002

Und.

Metrado

Precio S/.

Parcial S/. 1,784,889.36

OBRAS PROVISIONALES

13,111.53

01.01.01

LOCAL PARA OFICINA Y/O ALMACÉN

mes

6.00

400.00

2,400.00

01.01.02

CARTEL DE IDENTIFICACION DE LA OBRA 4.80 x 3.60

GLB

1.00

800.00

800.00

01.01.03

AGUA PARA LA CONSTRUCCION

GLB

1.00

1.53

1.53

01.01.04

MOVILIZACION Y DESMOVILIZACIÒN DE MAQUINARIA

GLB

1.00

2,710.00

2,710.00

VESTUARIO Y COMEDOR DE OBREROS

mes

6.00

1,200.00

01.01.05 01.02

TRABAJOS PRELIMINARES

7,200.00 29,414.60

01.02.01

LIMPIEZA DE TERRENO MANUAL

m2

15,149.98

0.26

3,938.99

01.02.02

TRAZO NIVEL Y REPLANTEO DE RED VIAL

m2

15,149.98

0.74

11,210.99

01.02.03

TALA Y RETIRO DE ARBUSTOS

und

4.00

58.71

234.84

01.02.04

DEMOLICION DE VEREDAS e=0.10m.

m2

861.78

16.28

14,029.78

01.03

MOVIMIENTO DE TIERRAS

352,643.72

01.03.01

CORTE HASTA NIVEL DE SUB RASANTE C/EQUIPO

m3

5,954.81

4.48

01.03.02

PERFILADO Y COMPACTACION DE SUBRASANTE CON MAQUINARIA

m2

9,964.29

2.54

25,309.30

26,677.55

01.03.03

CONFORMACION, EXTENDIDO, RIEGO Y COMPACTACION DE SUBRASANTE CON OVER E= 0.20M

m2

9,964.29

10.83

107,913.26

01.03.04

CONFORMACION, EXTENDIDO, RIEGO Y COMPACTACION DE SUB BASE CON MATERIAL AFIRMADO E= 0.20M.

m2

9,964.29

10.64

106,020.05

01.03.05

EXCAVACION MANUAL PARA SARDINELES PERALTADOS

m3

206.67

26.09

5,392.02

01.03.06

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

7,701.85

10.56

81,331.54

01.04

OBRAS DE CONCRETO

106,130.28

01.04.01

ENCOFRADO DESENCOFRADO DE SARDINELES PERALTADOS

m2

706.85

29.14

20,597.61

01.04.02

CONCRETO F'C= 175 KG/CM2, EN SARDINEL

m3

193.01

404.20

78,014.64

01.04.03

CURADO QUÍMICO DE SARDINELES LONGITUDINAL DE CONFINAMIENTO

m2

2,297.26

1.28

2,940.49

01.04.04

JUNTAS DE DILATACION EN SARDINEL ASFALTO

m

290.46

7.37

2,140.69

01.04.05

PINTADO DE SARDINELES

m2

618.49

3.94

01.05

PAVIMENTO

2,436.85 1,115,315.13

01.05.01

LOSA DE CONCRETO F´C = 210 KG/CM2, PAVIMENTO E=20 CM

m2

10,164.19

101.42

1,030,852.15

01.05.02

ENCOFRADO Y DESENCOFRADO DE PAVIMENTO

m2

915.22

24.40

22,331.37

01.05.03

CURADO CON ADITIVO EN PAVIMENTO

m2

10,164.19

1.57

15,957.78

01.05.04

JUNTAS DE DILATACION EN PAVIMENTO

m

6,912.25

6.68

01.06

CUNETAS

46,173.83 115,968.60

01.06.01

EXCAVACION DE CUNETA ( A MANO)

m3

72.42

26.09

1,889.44

01.06.02

NIVELACION Y COMPACTACCION DE CUNETAS

m2

1,034.52

3.96

4,096.70

01.06.03

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

85.28

10.56

900.56

01.06.04

ENCOFRADO Y DESENCOFRADO DE CUNETA

m2

25.40

26.08

662.43

01.06.05

CUNETA DE CONCRETO F´C = 210 KG/CM2, E=20 CM

m2

1,034.52

101.42

104,921.02

01.06.06

CURADO CON ADITIVO EN CUNETA

m2

1,034.52

1.57

1,624.20

01.06.07

JUNTAS DE DILATACION EN CUNETA

m

297.50

6.30

01.07 01.07.01 01.07.01.01 01.07.02 01.07.02.01 01.07.02.02 01.08

REPOSICION DE CONEXIONES DE AGUA POTABLE TRABAJOS PRELIMINARES TRAZO, NIVEL Y REPLANTEO PARA ZANJAS

382.91 m

341.88

1.12

382.91 17,586.16

REDES DE AGUA POTABLE

23,933.96

CONEXIONES DOMICILIARIA DE AGUA DE 1/2"

und

68.00

258.62

CONEXIONES DOMICILIARIA DE DESAGUE

und

68.00

93.35

SEÑALIZACIÓN MARCAS EN EL PAVIMENTO

m2

579.55

10.03

01.08.02

SEÑALES VERTICALES

und

36.00

195.16

01.09.01

LIMPIEZA GENERAL DE LA OBRA LIMPIEZA GENERAL DE OBRA

6,347.80 12,838.65

01.08.01 01.09

1,874.25 24,316.87

5,812.89 7,025.76 15,149.98

m2

15,149.98

1.00 Fecha :

15,149.98 16/06/2020 16:56:25

2

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

02

CONSTRUCCION DE VEREDAS

Presupuesto

02.01 02.01.01 02.02

0492002

Und.

Metrado

Precio S/.

Parcial S/. 529,975.07

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO DE VEREDAS, e = 0.10 m

2,381.75 m2

3,307.99

0.72

MOVIMIENTO DE TIERRAS

2,381.75 71,390.33

02.02.01

CORTE HASTA NIVEL DE SUBRASANTE, EN VEREDAS

m3

496.20

6.89

3,418.82

02.02.03

COMPACTACIÓN DE SUBRASANTE, EN TERRENO NORMAL, PARA VEREDAS

m2

3,307.99

2.53

8,369.21

m2

3,307.99

2.53

8,369.21

BASE GRANULAR COMPACTADA C/EQUIPO LIVIANO, PARA VEREDAS, e = 0.15m m2

02.02.02 02.02.05 02.02.04 02.03

REFINE Y NIVELACION DE SUBRASANTE, EN TERRENO NORMAL, PARA VEREDAS

3,307.99

10.87

35,957.85

EXCAVACION DE ZANJAS PARA UÑA DE VERDAS

m3

228.85

26.60

6,087.41

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

870.06

10.56

CONCRETO SIMPLE

9,187.83 310,075.81

02.03.02

ENCOFRADO Y DESENCOFRADO DE VEREDAS Inc. UÑA

m2

598.08

41.37

24,742.57

02.03.03

CONCRETO EN VEREDA E=0.10 CM

m3

640.55

387.44

248,174.69

02.03.04

CURADO QUÍMICO DE VEREDAS

m2

3,307.99

6.41

21,204.22

02.03.05

JUNTAS DE DILATACION CON ASFALTO

m

1,476.00

6.99

10,317.24

02.03.06

CONSTRUCCION DE RAMPAS

m2

103.13

54.66

5,637.09

m2

103.13

3.94

406.33

02.04 02.04.01 02.05

PINTURA PINTADO DE RAMPAS

406.33

ALINEACION DE CAJAS

12,927.80

02.05.01

ALINEACIÓN DE CAJA DE AGUA POTABLE

und

74.00

94.73

02.05.02

ALINEACIÓN DE CAJA DE DESAGUE

und

74.00

79.97

02.06 02.06.01

JARDINERIA

7,010.02 5,917.78 132,793.05

MOVIMIENTO DE TIERRAS

32,029.59

02.06.01.01

CORTE MANUAL EN TERRENO NORMAL

m3

553.06

02.06.01.03

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

642.07

8.12

5,213.61

02.06.01.04

RELLENO CON TIERRA DE CHACRA / JARDINERIA

m3

535.06

23.15

12,386.64

m2

2,675.29

31.19

83,442.30

02.06.02 02.06.02.01 02.06.03

26.09

SEMBRADO SEMBRADO DE GRAS

14,429.34

83,442.30

MEDIDAS DE MITIGACION DE IMPACTO AMBIENTAL

10,800.00

02.06.03.01

BAÑOS PARA PERSONAL DE LA OBRA

mes

6.00

300.00

1,800.00

02.06.03.02

MEDIDAS DE CONSERVACION AMBIENTAL

mes

6.00

1,500.00

9,000.00

NIVELACION DE BUZONES EN GENERAL

und

12.00

317.93

3,815.16

LIMPIEZA GENERAL DE OBRA

m2

2,706.00

1.00

02.06.04 02.06.04.01 02.06.04.02 03 03.01 03.01.01

VARIOS

6,521.16

PLAZOLETAS

2,706.00 858,124.80

PLAZOLETA 1

524,624.51

TRABAJOS PRELIMINARES

1,815.56

03.01.01.01

LIMPIEZA DE TERRENO MANUAL

m2

821.52

0.26

213.60

03.01.01.02

TRAZO Y REPLANTEO

m2

821.52

1.95

1,601.96

03.01.02 03.01.02.01

SARDINEL DE CONCRETO SIMPLE

1,735.73

MOVIMIENTO DE TIERRAS

123.67

03.01.02.01.01

EXCAVACION MANUAL PARA SARDINELES PERALTADOS

m3

3.19

26.09

03.01.02.01.02

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

3.83

10.56

03.01.02.02

CONCRETO SIMPLE

83.23 40.44 1,612.06

03.01.02.02.01

SARDINELES DE CONCRETO DE F'C=175 KG/CM2.

m3

4.79

11.26

53.94

03.01.02.02.02

ENCOFRADO DESENCOFRADO DE SARDINELES PERALTADOS

m2

15.95

29.14

464.78

03.01.02.02.03

CURADO QUÍMICO DE CONCRETO EN SARDINEL

m2

19.94

6.56

130.81

03.01.02.02.04

ACABADO DE SARDINEL SISTEMA MICROCEMENTO

m2

19.94

44.69

891.12

03.01.02.02.05

JUNTAS DE DILATACION EN SARDINELES

m

10.69

6.68

71.41

Fecha :

16/06/2020 16:56:25

3

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

03.01.03 03.01.03.01

0492002

Und.

Metrado

Precio S/.

Parcial S/.

MUROS DE CONTENCION

205,435.50

MOVIMIENTO DE TIERRAS

20,106.02

03.01.03.01.01

EXCAVACION DE ZANJAS Y ZAPATAS H=1.50m

m3

435.24

26.60

11,577.38

03.01.03.01.02

RELLENO CON MATERIAL DE PRESTAMO COMPACTADO

m3

40.31

92.60

3,732.71

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

454.16

10.56

4,795.93

m2

165.11

21.01

3,468.96

03.01.03.01.03 03.01.03.02 03.01.03.02.01 03.01.03.03

CONCRETO SIMPLE SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON

3,468.96

CONCRETO ARMADO

181,860.52

03.01.03.03.01

CONCRETO EN ZAPATAS F'C= 210 KG/CM2

m3

115.58

450.54

52,073.41

03.01.03.03.02

CONCRETO EN MUROS DE CONTENCION F'C= 210 KG/CM2

m3

72.44

583.49

42,268.02

03.01.03.03.03

ENCOFRADO Y DESENCOFRADO MUROS DE CONTENCION

m2

429.54

45.41

19,505.41

03.01.03.03.04

ACERO DE REFUERZO Fy = 4200 KG/CM2

kg

13,682.20

4.94

67,590.07

03.01.03.03.05

JUNTAS ASFALTICAS

m

33.56

11.33

380.23

03.01.03.03.06

TUBERIA PVC SAL 3"

m

4.40

9.86

03.01.04 03.01.04.01 03.01.05 03.01.05.01 03.01.06 03.01.06.01 03.01.06.01.01

REVOQUES ENLUCIDOS TARRAJEO DE MUROS DE CONTENCION

m2

159.05

31.40

4,994.17

m2

159.05

9.82

1,561.87

PINTURA PINTURA EN MURO EXTERIOR CON IMPRIMANTE

1,561.87

VEREDAS DE CONCRETO PERIMETRAL

40,278.32

MOVIMIENTO DE TIERRAS

14,215.59 m3

63.70

6.89

438.89

m2

269.44

2.53

681.68

03.01.06.01.03

COMPACTACIÓN DE SUBRASANTE, EN TERRENO NORMAL, PARA VEREDAS m2

269.44

2.53

681.68

03.01.06.01.04

RELLENO CON MATERIAL DE PRESTAMO COMPACTADO

m3

129.12

92.60

11,956.51

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

43.26

10.56

03.01.06.01.02

03.01.06.01.05 03.01.06.02

CORTE HASTA NIVEL DE SUBRASANTE, EN VEREDAS

43.38 4,994.17

REFINE Y NIVELACION DE SUBRASANTE, EN TERRENO NORMAL, PARA VEREDAS

CONCRETO SIMPLE

456.83 26,043.46

03.01.06.02.01

VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2

m2

271.51

64.78

17,588.42

03.01.06.02.02

ENCOFRADO Y DESENCOFRADO DE VEREDAS Inc. UÑA

m2

145.81

41.37

6,032.16

03.01.06.02.03

JUNTAS DE DILATACION CON ASFALTO

m

97.64

6.99

682.50

03.01.06.02.04

CURADO QUÍMICO DE VEREDAS

m2

271.51

6.41

1,740.38

m2

4.89

3.94

19.27

03.01.06.03 03.01.06.03.01 03.01.07 03.01.07.01 03.01.07.01.01 03.01.07.01.02 03.01.07.02

PINTURA PINTADO DE RAMPAS

19.27

BANCAS DE CONCRETO

6,755.88

MOVIMIENTO DE TIERRAS

179.88

EXCAVACION PARA CIMIENTOS EN BANCAS

m3

4.64

26.09

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

5.57

10.56

CONCRETO ARMADO

121.06 58.82 6,576.00

03.01.07.02.01

CONCRETO F'C=175 KG/CM2.

m3

6.54

491.13

03.01.07.02.02

ENCOFRADO Y DESENCOF. BANCAS

m2

23.18

42.22

978.66

03.01.07.02.03

ACERO DE REFUERZO Fy = 4200 KG/CM2

kg

231.28

4.94

1,142.52

03.01.07.02.04

REVESTIMIENTO DE BANCA CON TERRAZO

m2

32.45

31.89

1,034.83

03.01.07.02.05

CURADO QUÍMICO DE BANCAS

m2

32.45

6.41

03.01.08 03.01.08.01

ESCALINATAS

208.00 5,352.66

MOVIMIENTO DE TIERRAS

1,501.22

03.01.08.01.01

PERFILADO Y COMPACTADO DE ESCALINATA

m2

68.52

8.03

03.01.08.01.02

RELLENO CON MATERIAL DE PRESTAMO COMPACTADO

m3

10.27

92.60

03.01.08.02

3,211.99

CONCRETO SIMPLE

550.22 951.00 2,324.95

03.01.08.02.01

CONCRETO DE ESCALINATAS F'C=175 KG/CM2 E=10CM.,PASTA 1:2

m2

10.22

59.56

608.70

03.01.08.02.02

ENCOFRADO Y DESENCOFRADO PARA ESCALINATA

m2

12.75

41.37

527.47

Fecha :

16/06/2020 16:56:25

4

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

0492002

Und.

Metrado

Precio S/.

Parcial S/.

03.01.08.02.03

CURADO QUÍMICO EN ESCALINATA

m2

82.08

6.41

03.01.08.02.04

JUNTAS DE DILATACION CON ASFALTO

m

94.80

6.99

03.01.08.03 03.01.08.03.01 03.01.09 03.01.09.01

PISOS Y PAVIMENTOS CONCRETO PARA PISO F'C=175 KG/CM2 E=10CM.,PASTA 1:2

526.13 662.65 1,526.49

m2

56.98

26.79

PLATAFORMA PARA ESCULTURA

1,526.49 1,601.19

MOVIMIENTO DE TIERRA

588.66

03.01.09.01.01

EXCAVACION PARA BASE DE ESCULTURA

m3

3.48

26.09

90.79

03.01.09.01.02

RELLENO CON MATERIAL DE PRESTAMO COMPACTADO

m3

5.01

92.60

463.93

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

4.18

8.12

03.01.09.01.03 03.01.09.02 03.01.09.02.01

OBRAS DE CONCRETO SIMPLE CONCRETO PARA PLATAFORMA DE ESCULTURA F'C=175 KG/CM2 E=10CM.,PASTA 1:2

m2

5.91

54.87

324.28 593.19

03.01.09.02.02

ENCOFRADO Y DESENCOF.

m2

14.05

42.22

03.01.09.02.03

CURADO QUÍMICO DE PLATAFORMA PARA ESCULTURA

m2

14.83

6.41

03.01.10 03.01.10.01

33.94 1,012.53

VEREDAS DECORATIVA

95.06 2,686.62

MOVIMIENTO DE TIERRAS

207.49

03.01.10.01.01

EXCAVACION DE ZANJAS PARA VEREDA DECORATIVA

m3

3.54

26.60

94.16

03.01.10.01.02

RELLENO CON MATERIAL DE PRESTAMO

m3

1.18

58.01

68.45

03.01.10.01.03

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

4.25

10.56

03.01.10.02

CONCRETO SIMPLE

44.88 2,479.13

03.01.10.02.01

ENCOFRADO Y DESENCOF.

m2

9.90

42.22

417.98

03.01.10.02.02

VERDA DE CONCRETO F'C= 175 KG/CM2 E=8" = 20 CM

m2

11.81

89.33

1,054.99

03.01.10.02.03

CURADO QUÍMICO DE VEREDAS

m2

19.69

6.41

126.21

03.01.10.02.04

ACABADO DE VEREDA SISTEMA MICROCEMENTO

m2

19.69

44.69

03.01.11 03.01.11.01 03.01.11.01.01 03.01.11.01.02 03.01.11.02

SARDINEL DE CONCRETO SIMPLE

879.95 4,113.07

MOVIMIENTO DE TIERRAS

161.60

EXCAVACION DE ZANJA PARA SARDINEL

m3

4.51

26.09

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

5.41

8.12

CONCRETO SIMPLE

117.67 43.93 3,951.47

03.01.11.02.01

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m

22.56

33.82

762.98

03.01.11.02.02

CONCRETO SIMPLE FC=175 KG/CM2

m3

6.77

456.76

3,092.27

03.01.11.02.03

JUNTAS DE DILATACION EN SARDINELES

m

9.00

6.68

60.12

03.01.11.02.04

CURADO QUÍMICO DE SARDINELES LONGITUDINAL DE CONFINAMIENTO

m2

28.20

1.28

36.10

03.01.12 03.01.12.01

ARBOLIZACION Y AREAS VERDE

18,031.36

MOVIMIENTO DE TIERRAS

4,995.14

03.01.12.01.01

CORTE MANUAL EN TERRENO NORMAL

m3

82.08

03.01.12.01.02

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

102.39

8.12

831.41

03.01.12.01.03

RELLENO CON TIERRA DE CHACRA / JARDINERIA

m3

82.08

23.15

1,900.15

EXCAVACION DE HOYOS PARA PLANTONES h= 1.20

m3

3.90

31.31

03.01.12.01.04 03.01.12.02

26.09

SEMBRADO SEMBRADO DE GRAS

m2

410.38

31.19

03.01.12.02.02

SEMBRADO DE PLANTONES INCLUYE TAPADO DE HOYOS

und

13.00

18.19

03.01.13.01 03.01.13.02 03.01.14 03.01.14.01

VARIOS BASURERO DE FIBRA DE VIDRIO SUMINISTRO E INSTALACION DE BARANDAS TUB. F°G° D=2¨E TUB,FºGº DE H= 0.90 EN ESCALERA

122.11 13,036.22

03.01.12.02.01 03.01.13

2,141.47

12,799.75 236.47 9,198.60

und

10.00

122.46

1,224.60

m

39.87

200.00

7,974.00

INSTALACIONES SANITARIAS Y ELECTRICAS

23,322.63

INSTALACIONES DE RED DE AGUA

2,997.87

03.01.14.01.01

TRAZO Y REPLANTEO RED EN RED DE DISTRIBUCION

m

55.40

2.07

114.68

03.01.14.01.02

EXCAVACIÓN ZANJA (MANUAL) P/TUB.T-NORMAL (0.40 X 0.50)

m3

11.08

26.60

294.73

Fecha :

16/06/2020 16:56:25

5

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

0492002

Und.

Metrado

Precio S/.

Parcial S/.

03.01.14.01.03

RELLENO CON MATERIAL PROPIO ZARANDEADO Y COMPACTADO

m3

4.43

29.77

131.88

03.01.14.01.04

RELLENO CON MATERIAL PROPIO COMPACTADO

m3

4.43

29.77

131.88

03.01.14.01.05

CAMA DE ARENA FINA E=0.10

m3

2.22

85.32

189.41

03.01.14.01.06

CONEXION DE AGUA C/TUB. A RED EXISTENTE

und

1.00

678.61

678.61

03.01.14.01.07

TUBERIA DE AGUA PVC. DE 3/4"

m

55.40

14.87

823.80

03.01.14.01.08

CAJA DE CONCRETO PRE FABRICADA DE 24"X12"

und

3.00

150.32

450.96

03.01.14.01.09

VALVULA DE CONTROL DE PVC 3/4"

und

3.00

60.64

181.92

03.01.14.02

ACCESORIOS

138.52

03.01.14.02.01

CODO DE PVC DE 45° DE 3/4"

pza

6.00

10.22

61.32

03.01.14.02.02

CODO DE PVC DE 90° DE 3/4"

pza

3.00

10.22

30.66

03.01.14.02.03

TEE DE PVC PARA RED AGUA DE 3/4"

pza

2.00

23.27

03.01.14.03

INSTALACIONES PARA DRENAJE PLUVIAL

46.54 1,915.20

03.01.14.03.01

TRAZO Y REPLANTEO RED EN RED DE DISTRIBUCION

m

14.13

2.07

29.25

03.01.14.03.02

EXCAVACIÓN ZANJA (MANUAL) P/TUB.T-NORMAL (0.40 X 0.50)

m3

2.83

26.60

75.28

03.01.14.03.03

RELLENO CON MATERIAL PROPIO ZARANDEADO Y COMPACTADO

m3

1.13

29.77

33.64

03.01.14.03.04

RELLENO CON MATERIAL PROPIO COMPACTADO

m3

1.13

29.77

33.64

03.01.14.03.05

CAMA DE ARENA FINA E=0.10

m3

0.10

85.32

8.53

03.01.14.03.06

TUBERIA PVC SAL 6"

m

9.05

47.97

434.13

03.01.14.03.07

TUBERIA PVC SAL 4"

m

11.97

83.55

1,000.09

03.01.14.03.08

CAJA DE CONCRETO PRE FABRICADA DE 24"X12"

und

2.00

150.32

03.01.14.04

INSTALACIONES ELECTRICAS

03.01.14.04.01

TRAZO Y REPLANTEO RED DE DISTRIBUCION

03.01.14.04.02

MOVIMIENTO DE TIERRAS

300.64 18,271.04

m2

111.29

1.95

217.02 1,033.70

03.01.14.04.02.01

EXCAVACION MANUAL DE ZANJAS PARA TUBERIA

m3

17.81

26.09

03.01.14.04.02.02

EXCAVACION PARA CIMIENTOS DE POSTES

m3

1.50

26.09

39.14

03.01.14.04.02.03

RELLENO CON MATERIAL PROPIO COMPACTADO

m3

8.90

29.77

264.95

RELLENO CON MATERIAL PROPIO ZARANDEADO Y COMPACTADO

m3

8.90

29.77

264.95

CONCRETO F'C=140 KG/CM2 PARA ANCLAJES DE FAROLA

m3

1.50

399.30

598.95

CONCRETO F'C=140 KG/CM2 PARA DADOS DE S DE FAROLA

m3

0.46

399.30

03.01.14.04.02.04 03.01.14.04.03 03.01.14.04.03.01 03.01.14.04.03.02 03.01.14.04.04 03.01.14.04.04.01 03.01.14.04.05

CONCRETO SIMPLE

782.63

POSTES POSTES DE FIERRO DE 4"

m

10.00

212.84

10.00

90.26

902.60

129.28

7.19

929.52 102.40

ACCESORIOS

2,128.40 2,140.62

PASTORAL TIPO ''T' DE F°G° PARA FAROLA TIPO ESFÉRICA

und

03.01.14.04.05.02

TUBERIA PVC SEL DE 11/2"

m

03.01.14.04.05.03

CURVA DE PVC SEL 1 1/2"

und

20.00

5.12

03.01.14.04.05.04

CAJA DE PASE EN FAROLA

und

10.00

20.61

CABLES Y CONDUCTORES

206.10 2,133.12

03.01.14.04.06.01

TENDIDO DE CABLE NYY 3x1x6mm² + THW 1x6mm² (N.L.T)

m

129.28

11.39

03.01.14.04.06.02

TENDIDO DE CABLE ELECTRICO NYY 2X1X16mm EN FAROLA

m

58.00

11.39

03.01.14.04.07

183.68 2,128.40

03.01.14.04.05.01

03.01.14.04.06

464.66

ARTEFACTOS DE ILUMINACION

1,472.50 660.62 9,294.60

03.01.14.04.07.01

LUMINARIA COMPLETA CON EQUIPO PARA LAMP. DE 70W

und

10.00

602.93

6,029.30

03.01.14.04.07.02

FAROLA ESFERICA HPC 80 PARA LAMPARA LED

und

10.00

326.53

3,265.30

und

1.00

540.95

540.95

03.01.14.04.08 03.01.14.04.08.01 03.01.15 03.01.15.01 03.01.15.01.01 03.01.15.01.01.01 03.01.15.01.01.01.01

INSTALACIONES GENERALES EMPALMES Y UNIONES

540.95

MIRADOR 1

89,054.71

ESTRCUTURA

55,404.40

MOVIMIENTO DE TIERRAS

55,404.40

EXCAVACIONES EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD

1,540.08 m3

29.29

26.09 Fecha :

764.18 16/06/2020 16:56:25

6

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

0492002

Und.

Metrado

Precio S/.

Parcial S/.

03.01.15.01.01.01.02

EXCAVACION DE VIGAS DE CONEXION

m3

9.78

26.60

260.15

03.01.15.01.01.01.03

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

48.84

10.56

515.75

03.01.15.01.01.02

OBRAS DE CONCRETO SIMPLE

03.01.15.01.01.02.01 03.01.15.01.01.02.01 03.01.15.01.01.02.01

549.46

SOLADOS SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON SOLADO PARA VIGAS DE CONEXION MEZCLA 1:12 CEMENTO-HORMIGON

03.01.15.01.01.03

549.46 m2

13.88

21.48

298.14

m2

11.70

21.48

251.32

CONCRETO ARMADO

03.01.15.01.01.03.01

53,314.86

ZAPATAS

03.01.15.01.01.03.01 03.01.15.01.01.03.01 03.01.15.01.01.03.02

5,420.10

CONCRETO EN ZAPATAS F'C= 210 KG/CM2

m3

8.33

450.54

3,753.00

ACERO DE REFUERZO Fy = 4200 KG/CM2

kg

337.47

4.94

1,667.10

475.17

2,779.74

VIGAS DE CONEXION

7,664.97

03.01.15.01.01.03.02

CONCRETO EN VIGAS DE CONEXION F'C= 210 KG/CM2

m3

5.85

03.01.15.01.01.03.02

ACERO ESTRUCTURAL EN VIGAS DE CONEXION FY=4200 KG/CM2

kg

700.50

4.95

3,467.48

03.01.15.01.01.03.02

ENCOFRADO Y DESENCOF.

m2

33.58

42.22

1,417.75

618.65

2,084.85

03.01.15.01.01.03.03

PARAPETOS ARMADOS

6,786.96

03.01.15.01.01.03.03

CONCRETO EN PARAPETO F'C=210 KG/CM2

m3

3.37

03.01.15.01.01.03.03

ACERO ESTRUCTURAL EN PARAPETO FY=4200 KG/CM2

kg

278.67

4.95

1,379.42

03.01.15.01.01.03.03

ENCOFRADO Y DESENCOFRADO EN PARAPETOS

m2

42.73

71.35

3,048.79

03.01.15.01.01.03.03

CURADO QUÍMICO DE PARAPETO

m2

42.73

6.41

03.01.15.01.01.03.04

COLUMNAS

273.90 9,298.19

03.01.15.01.01.03.04

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

3.79

603.25

2,286.32

03.01.15.01.01.03.04

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

kg

783.99

4.98

3,904.27

03.01.15.01.01.03.04

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

37.81

75.78

2,865.24

03.01.15.01.01.03.04

CURADO QUÍMICO DE COLUMNA

m2

37.81

6.41

242.36

03.01.15.01.01.03.05

BANCAS

03.01.15.01.01.03.06

CONCRETO F'C=175 KG/CM2.

m3

1.25

491.13

613.91

03.01.15.01.01.03.07

ACERO DE REFUERZO Fy = 4200 KG/CM2

kg

150.53

4.94

743.62

03.01.15.01.01.03.08

ENCOFRADO Y DESENCOF. BANCAS

m2

14.96

42.22

631.61

03.01.15.01.01.03.09

VIGAS

03.01.15.01.01.03.10

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

7.75

493.87

3,827.49

03.01.15.01.01.03.11

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

51.64

71.35

3,684.51

03.01.15.01.01.03.12

ACERO GRADO 60 EN VIGAS

kg

734.95

4.75

3,491.01

03.01.15.01.01.03.13

LOSAS ALIGERADAS

03.01.15.01.01.03.14

CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2

m3

4.08

486.05

1,983.08

03.01.15.01.01.03.15

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

m2

46.66

54.30

2,533.64

03.01.15.01.01.03.16

LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO

und

420.00

2.46

1,033.20

03.01.15.01.01.03.17

ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS

kg

366.48

4.98

1,825.07

03.01.15.01.01.03.18

MUROS DE CONFINAMIENTO

3,777.50

03.01.15.01.01.03.18

CORTE MANUAL EN TERRENO NORMAL

m3

4.29

26.09

03.01.15.01.01.03.18

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

4.93

10.56

52.06

03.01.15.01.01.03.18

CONCRETO EN MUROS DE CONFINAMIENTO F'C= 210 KG/CM2

m3

1.98

576.64

1,141.75

03.01.15.01.01.03.18

ENCOFRADO Y DESENCOFRADO MUROS DE CONFINAMIENTO

m2

21.28

45.41

966.32

03.01.15.01.01.03.18

ACERO ESTRUCTURAL EN MURO DE CONFINAMIENTO FY=4200

kg

304.13

4.95

1,505.44

111.93

KG/CM2 03.01.15.02 03.01.15.02.01

ARQUITECTURA

33,650.31

REVOQUES ENLUCIDOS Y MOLDURAS

03.01.15.02.01.01

REVESTIMIENTO DE PARAPETO CON TERRAZO

03.01.15.02.01.02 03.01.15.02.01.03 03.01.15.02.01.04

6,303.69 m

48.61

31.89

1,550.17

REVESTIMIENTO DE BANCA CON TERRAZO

m2

27.42

31.89

874.42

TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO -ARENA

m2

28.70

31.40

901.18

TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA

m2

56.21

32.89

1,848.75

Fecha :

16/06/2020 16:56:25

7

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

03.01.15.02.01.05 03.01.15.02.02

0492002

TARRAJEO DE LOSA ALIGERADA ARENA+CEMENTO

Und. m2

Metrado

Precio S/.

46.66

Parcial S/.

24.20

PISOS Y PAVIMENTOS

1,129.17 26,181.72

03.01.15.02.02.01

RELLENO Y COMP. MANUAL- MAT. DE PRESTAMO

m3

47.55

53.73

2,554.86

03.01.15.02.02.02

CAMA DE ARENA FINA E=0.05 MT

m3

1.90

7.45

14.16

m2

74.98

314.92

23,612.70

03.01.15.02.02.03 03.01.15.02.03

COLOCACIÓN DE ADOQUINES HEXAGONALES DE , E= 0.08 M SOBRE CAMA DE ARENA PINTURA

1,164.90

03.01.15.02.03.01

PINTURA LATEX EN COLUMNAS CON IMPRIMANTE

m2

28.70

8.33

239.07

03.01.15.02.03.02

PINTURA EN SUPERFICIE EN VIGAS

m2

56.21

9.00

505.89

03.01.15.02.03.03

PINTURA EN CIELORASOS CON IMPRIMANTE

m2

46.66

9.00

03.01.16 03.01.16.01 03.01.16.01.01 03.01.16.01.01.01

MIRADOR 2 ESTRCUTURA

03.01.16.01.01.01.02 03.01.16.01.01.01.03 03.01.16.01.01.01.04 03.01.16.01.01.02.01 03.01.16.01.01.02.01 03.01.16.01.01.02.01 03.01.16.01.01.03 03.01.16.01.01.03.01

76,871.25

EXCAVACIONES EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD

03.01.16.01.01.02

76,871.25

MOVIMIENTO DE TIERRAS

03.01.16.01.01.01.01

3,430.15 m3

57.18

26.09

1,491.83

EXCAVACION DE VIGAS DE CONEXION

m3

20.85

26.60

554.61

EXCAVACION DE PISO INTERIOR

m3

8.89

26.60

236.47

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

108.64

10.56

1,147.24

OBRAS DE CONCRETO SIMPLE

1,049.72

SOLADOS SOLADO PARA VIGAS DE CONEXION MEZCLA 1:12 CEMENTO-HORMIGON SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

1,049.72 m2

22.01

21.48

m2

26.86

21.48

CONCRETO ARMADO

472.77 576.95 72,391.38

ZAPATAS

10,140.65

03.01.16.01.01.03.01

CONCRETO EN ZAPATAS F'C= 210 KG/CM2

m3

16.12

450.54

03.01.16.01.01.03.01

ACERO DE REFUERZO Fy = 4200 KG/CM2

kg

582.58

4.94

03.01.16.01.01.03.02

419.94 108,686.64

VIGAS DE CONEXION

7,262.70 2,877.95 15,001.90

03.01.16.01.01.03.02

CONCRETO EN VIGAS DE CONEXION F'C= 210 KG/CM2

m3

11.01

475.17

5,231.62

03.01.16.01.01.03.02

ACERO ESTRUCTURAL EN VIGAS DE CONEXION FY=4200 KG/CM2

kg

1,270.81

4.95

6,290.51

03.01.16.01.01.03.02

ENCOFRADO Y DESENCOF.

m2

82.42

42.22

03.01.16.01.01.03.03

PARAPETOS ARMADOS

3,479.77 10,140.37

03.01.16.01.01.03.03

CONCRETO EN PARAPETO F'C=210 KG/CM2

m3

5.05

618.65

3,124.18

03.01.16.01.01.03.03

ACERO ESTRUCTURAL EN PARAPETO FY=4200 KG/CM2

kg

418.00

4.95

2,069.10

03.01.16.01.01.03.03

ENCOFRADO Y DESENCOFRADO EN PARAPETOS

m2

63.62

71.35

4,539.29

03.01.16.01.01.03.03

CURADO QUÍMICO DE PARAPETO

m2

63.62

6.41

03.01.16.01.01.03.04

COLUMNAS

407.80 14,516.67

03.01.16.01.01.03.04

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

5.84

603.25

3,522.98

03.01.16.01.01.03.04

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

kg

1,245.88

4.98

6,204.48

03.01.16.01.01.03.04

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

58.27

75.78

4,415.70

03.01.16.01.01.03.04

CURADO QUÍMICO DE COLUMNA

m2

58.27

6.41

03.01.16.01.01.03.05

BANCAS

373.51 3,002.33

03.01.16.01.01.03.05

CONCRETO F'C=175 KG/CM2.

m3

1.87

491.13

918.41

03.01.16.01.01.03.05

ACERO DE REFUERZO Fy = 4200 KG/CM2

kg

229.89

4.94

1,135.66

ENCOFRADO Y DESENCOF. BANCAS

m2

22.46

42.22

03.01.16.01.01.03.05 03.01.16.01.01.03.06

VIGAS

948.26 9,941.16

03.01.16.01.01.03.06

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

7.14

493.87

3,526.23

03.01.16.01.01.03.06

ACERO GRADO 60 EN VIGAS

kg

742.61

4.75

3,527.40

03.01.16.01.01.03.06

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

40.47

71.35

2,887.53

m3

3.85

486.05

1,871.29

03.01.16.01.01.03.07 03.01.16.01.01.03.07

LOSAS ALIGERADAS CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2

8,724.55

Fecha :

16/06/2020 16:56:25

8

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

0492002

Und.

Metrado

Precio S/.

Parcial S/.

03.01.16.01.01.03.07

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

m2

43.98

54.30

2,388.11

03.01.16.01.01.03.07

ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS

kg

701.31

4.98

3,492.52

03.01.16.01.01.03.07

LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und

395.38

2.46

972.63 56.35

03.01.16.01.01.03.08

MUROS DE CONFINAMIENTO

03.01.16.01.01.03.09

CORTE MANUAL EN TERRENO NORMAL

m3

2.16

26.09

03.01.16.01.01.03.10

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

2.49

10.56

26.29

03.01.16.01.01.03.11

CONCRETO EN MUROS DE CONFINAMIENTO F'C= 210 KG/CM2

m3

0.46

576.64

265.25

03.01.16.01.01.03.12

ENCOFRADO Y DESENCOFRADO MUROS DE CONFINAMIENTO

m2

5.90

45.41

267.92

03.01.16.01.01.03.13

ACERO ESTRUCTURAL EN MURO DE CONFINAMIENTO FY=4200 KG/CM2 kg

62.21

4.95

03.01.16.02 03.01.16.02.01

ARQUITECTURA REVOQUES ENLUCIDOS Y MOLDURAS

03.01.16.02.01.01

REVESTIMIENTO DE PARAPETO CON TERRAZO

03.01.16.02.01.02 03.01.16.02.01.03

307.94 31,815.39 8,006.13

m2

72.98

31.89

2,327.33

REVESTIMIENTO DE BANCA CON TERRAZO

m2

41.17

31.89

1,312.91

TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO -ARENA

m2

59.11

31.40

1,856.05

03.01.16.02.01.04

TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA

m2

43.95

32.89

1,445.52

03.01.16.02.01.05

TARRAJEO DE LOSA ALIGERADA ARENA+CEMENTO

m2

43.98

24.20

03.01.16.02.02

PISOS Y PAVIMENTOS

1,064.32 18,684.18

03.01.16.02.02.01

RELLENO Y COMP. MANUAL- MAT. DE PRESTAMO

m3

4.22

53.73

03.01.16.02.02.02

CAMA DE ARENA FINA E=0.05 MT

m3

2.11

7.45

15.72

m2

58.56

314.92

18,441.72

03.01.16.02.02.03 03.01.16.02.03

COLOCACIÓN DE ADOQUINES HEXAGONALES DE , E= 0.08 M SOBRE CAMA DE ARENA PINTURA

226.74

1,283.76

03.01.16.02.03.01

PINTURA LATEX EN COLUMNAS CON IMPRIMANTE

m2

59.11

8.33

492.39

03.01.16.02.03.02

PINTURA EN SUPERFICIE EN VIGAS

m2

43.95

9.00

395.55

03.01.16.02.03.03

PINTURA EN CIELORASOS CON IMPRIMANTE

m2

43.98

9.00

03.01.16.02.04

CARPINTERIA METALICA

03.01.16.02.04.01

SUMINISTRO E INSTALACION DE COBERTURA LIVIANA DE TUB. F°G°

395.82 3,019.80

m2

50.33

60.00

3,019.80

m2

821.52

1.00

821.52

D=2"X4" 03.01.16.02.05 03.01.16.02.05.01 03.02 03.02.01

LIMPIEZA GENERAL DE LA OBRA LIMPIEZA GENERAL DE OBRA

821.52

PLAZOLETA 2

333,500.29

TRABAJOS PRELIMINARES

1,464.86

03.02.01.01

LIMPIEZA DE TERRENO MANUAL

m2

662.83

0.26

172.34

03.02.01.02

TRAZO Y REPLANTEO

m2

662.83

1.95

1,292.52

03.02.02 03.02.02.01 03.02.02.01.01 03.02.02.01.02

SARDINEL DE CONCRETO SIMPLE

9,677.82

MOVIMIENTO DE TIERRAS

1,987.44

EXCAVACION MANUAL PARA SARDINELES PERALTADOS

m3

51.98

26.09

1,356.16

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

59.78

10.56

631.28

03.02.02.02

CONCRETO SIMPLE

03.02.02.03

SARDINELES DE CONCRETO DE F'C=175 KG/CM2.

m3

33.73

11.26

379.80

03.02.02.04

ENCOFRADO DESENCOFRADO DE SARDINELES PERALTADOS

m2

69.42

29.14

2,022.90

03.02.02.05

CURADO QUÍMICO DE CONCRETO EN SARDINEL

m2

104.92

6.56

688.28

03.02.02.06

ACABADO DE SARDINEL SISTEMA MICROCEMENTO

m2

100.90

44.69

4,509.22

JUNTAS DE DILATACION EN SARDINELES

m

13.50

6.68

03.02.02.07 03.02.03 03.02.03.01 03.02.03.01.01

VEREDAS DE CONCRETO PERIMETRAL MOVIMIENTO DE TIERRAS

6,844.75 m3

122.88

6.89

846.64

m2

86.37

2.53

218.52

03.02.03.01.03

COMPACTACIÓN DE SUBRASANTE, EN TERRENO NORMAL, PARA VEREDAS m2

86.37

2.53

218.52

03.02.03.01.04

RELLENO CON MATERIAL DE PRESTAMO COMPACTADO

43.94

92.60

4,068.84

03.02.03.01.02

CORTE HASTA NIVEL DE SUBRASANTE, EN VEREDAS

90.18 281,056.22

REFINE Y NIVELACION DE SUBRASANTE, EN TERRENO NORMAL, PARA VEREDAS

m3

Fecha :

16/06/2020 16:56:25

9

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

03.02.03.01.05 03.02.03.02

0492002

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

Und. m3

Metrado

Precio S/.

141.31

Parcial S/.

10.56

CONCRETO SIMPLE

1,492.23 274,192.20

03.02.03.02.01

VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2

m2

61.90

64.78

4,009.88

03.02.03.02.02

ENCOFRADO Y DESENCOFRADO DE VEREDAS Inc. UÑA

m2

6,285.00

41.37

260,010.45

03.02.03.02.03

JUNTAS DE DILATACION CON ASFALTO

m

220.20

6.99

1,539.20

03.02.03.02.04

CURADO QUÍMICO DE VEREDAS

m2

128.44

6.41

823.30

03.02.03.02.05

CAMA DE ARENA FINA E=0.05 MT

m3

2.45

7.45

18.25

COLOCACIÓN DE ADOQUINES HEXAGONALES DE , E= 0.08 M SOBRE CAMA m2 DE ARENA

24.74

314.92

7,791.12

4.89

3.94

19.27

03.02.03.02.06 03.02.03.03 03.02.03.03.01 03.02.04 03.02.04.01

PINTURA PINTADO DE RAMPAS

19.27 m2

BANCAS DE CONCRETO

6,166.16

MOVIMIENTO DE TIERRAS

55.10

03.02.04.01.01

EXCAVACION PARA CIMIENTOS EN BANCAS

m3

1.44

26.09

37.57

03.02.04.01.02

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

1.66

10.56

17.53

m3

3.97

491.13

1,949.79 900.13

03.02.04.02

CONCRETO ARMADO

6,111.06

03.02.04.02.01

CONCRETO F'C=175 KG/CM2.

03.02.04.02.02

ENCOFRADO Y DESENCOF. BANCAS

m2

21.32

42.22

03.02.04.02.03

ACERO DE REFUERZO Fy = 4200 KG/CM2

kg

155.89

4.94

770.10

03.02.04.02.04

REVESTIMIENTO DE BANCA CON TERRAZO

m2

65.04

31.89

2,074.13

CURADO QUÍMICO DE BANCAS

m2

65.04

6.41

416.91

03.02.04.02.05 03.02.05 03.02.05.01

ESCALINATAS

311.00

MOVIMIENTO DE TIERRAS

311.00

03.02.05.01.01

CORTE SUPERFICIAL MANUAL HASTA 0.20 MT

m3

1.73

9.79

16.94

03.02.05.01.02

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST. =5 KM

m3

1.99

8.12

16.16

03.02.05.01.03

RELLENO CON MATERIAL DE PRESTAMO COMPACTADO

m3

0.93

92.60

86.12

03.02.05.01.04

CONCRETO DE ESCALINATAS F'C=175 KG/CM2 E=10CM.,PASTA 1:2

m2

0.80

59.56

47.65

03.02.05.01.05

ENCOFRADO Y DESENCOFRADO PARA ESCALINATA

m2

3.36

41.37

139.00

CURADO QUÍMICO EN ESCALINATA

m2

0.80

6.41

03.02.05.01.06 03.02.06 03.02.06.01

ARBOLIZACION Y AREAS VERDE

5.13 7,143.28

MOVIMIENTO DE TIERRAS

1,204.75

03.02.06.01.01

CORTE MANUAL EN TERRENO NORMAL

m3

18.34

26.09

478.49

03.02.06.01.02

ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIENTO

m3

25.23

7.49

188.97

03.02.06.01.03

RELLENO CON TIERRA DE CHACRA / JARDINERIA

m3

18.34

23.15

424.57

03.02.06.01.04

EXCAVACION DE HOYOS PARA PLANTONES h= 1.20

m3

3.60

31.31

03.02.06.02

SEMBRADO

112.72 5,938.53

03.02.06.02.01

SEMBRADO DE GRAS

m2

183.40

31.19

5,720.25

03.02.06.02.02

SEMBRADO DE PLANTONES INCLUYE TAPADO DE HOYOS

und

12.00

18.19

218.28

und

8.00

122.46

979.68

03.02.07 03.02.07.01 03.02.08 03.02.08.01

VARIOS BASURERO DE FIBRA DE VIDRIO

979.68

INSTALACIONES SANITARIAS Y ELECTRICAS

26,701.27

INSTALACIONES DE RED DE AGUA

4,205.65

03.02.08.01.01

TRAZO Y REPLANTEO RED EN RED DE DISTRIBUCION

m

96.60

2.07

199.96

03.02.08.01.02

EXCAVACIÓN ZANJA (MANUAL) P/TUB.T-NORMAL (0.40 X 0.50)

m3

19.32

26.60

513.91

03.02.08.01.03

RELLENO CON MATERIAL PROPIO ZARANDEADO Y COMPACTADO

m3

7.73

29.77

230.12

03.02.08.01.04

RELLENO CON MATERIAL PROPIO COMPACTADO

m3

7.73

29.77

230.12

03.02.08.01.05

CAMA DE ARENA FINA E=0.10

m3

3.86

85.32

329.34

03.02.08.01.06

TUBERIA DE AGUA PVC. DE 3/4"

m

96.60

14.87

1,436.44

03.02.08.01.07

CAJA DE CONCRETO PRE FABRICADA DE 24"X12"

und

6.00

150.32

901.92

03.02.08.01.08

VALVULA DE CONTROL DE PVC 3/4"

und

6.00

60.64

363.84

Fecha :

16/06/2020 16:56:25

10

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

03.02.08.02

0492002

Und.

Metrado

Precio S/.

Parcial S/.

ACCESORIOS

170.28

03.02.08.02.01

CODO DE PVC DE 90° DE 3/4"

pza

3.00

10.22

30.66

03.02.08.02.02

TEE DE PVC PARA RED AGUA DE 3/4"

pza

6.00

23.27

139.62

03.02.08.03

INSTALACIONES PARA DRENAJE PLUVIAL

910.89

03.02.08.03.01

TRAZO Y REPLANTEO RED EN RED DE DISTRIBUCION

m

11.23

2.07

23.25

03.02.08.03.02

EXCAVACIÓN ZANJA (MANUAL) P/TUB.T-NORMAL (0.40 X 0.50)

m3

2.25

26.60

59.85

03.02.08.03.03

RELLENO CON MATERIAL PROPIO ZARANDEADO Y COMPACTADO

m3

0.90

29.77

26.79

03.02.08.03.04

RELLENO CON MATERIAL PROPIO COMPACTADO

m3

0.90

29.77

26.79

03.02.08.03.05

CAMA DE ARENA FINA E=0.10

m3

0.45

85.32

38.39

03.02.08.03.06

TUBERIA PVC SAL 6"

m

11.23

47.97

538.70

03.02.08.03.07

CAJA DE CONCRETO PRE FABRICADA DE 24"X12"

und

1.00

150.32

150.32

03.02.08.03.08

REJILLA DE FIERRO PARA CANALETA PLUVIAL

m

1.17

40.00

03.02.08.04

INSTALACIONES ELECTRICAS

03.02.08.04.01

TRAZO Y REPLANTEO RED DE DISTRIBUCION

03.02.08.04.02

MOVIMIENTO DE TIERRAS

46.80 20,751.62

m2

85.14

1.95

166.02 804.24

03.02.08.04.02.01

EXCAVACION PARA CIMIENTOS DE POSTES

m3

1.50

26.09

39.14

03.02.08.04.02.02

EXCAVACION MANUAL DE ZANJAS PARA TUBERIA

m3

13.62

26.09

355.35

03.02.08.04.02.03

EXCAVACION PARA MURO DE TABLERO GENERAL

m3

0.19

22.60

4.29

03.02.08.04.02.04

RELLENO CON MATERIAL PROPIO ZARANDEADO Y COMPACTADO

m3

6.81

29.77

202.73

RELLENO CON MATERIAL PROPIO COMPACTADO

m3

6.81

29.77

202.73

m3

1.50

399.30

598.95 183.68

03.02.08.04.02.05 03.02.08.04.03

CONCRETO SIMPLE

954.33

03.02.08.04.03.01

CONCRETO F'C=140 KG/CM2 PARA ANCLAJES DE FAROLA

03.02.08.04.03.02

CONCRETO F'C=140 KG/CM2 PARA DADOS DE S DE FAROLA

m3

0.46

399.30

03.02.08.04.03.03

CONCRETO F'C=140 KG/CM2 P/ INSTALACION DE TABLERO GENERAL

m3

0.43

399.30

03.02.08.04.04 03.02.08.04.04.01 03.02.08.04.05

POSTES POSTES DE FIERRO DE 4"

m

10.00

212.84

10.00

90.26

902.60

125.14

7.19

899.76 102.40

ACCESORIOS PASTORAL TIPO ''T' DE F°G° PARA FAROLA TIPO ESFÉRICA

und

03.02.08.04.05.02

TUBERIA PVC SEL DE 11/2"

m

03.02.08.04.05.03

CURVA DE PVC SEL 1 1/2"

und

20.00

5.12

03.02.08.04.05.04

CAJA DE PASE EN FAROLA

und

10.00

20.61

CABLES Y CONDUCTORES

206.10 2,085.96

03.02.08.04.06.01

TENDIDO DE CABLE NYY 3x1x6mm² + THW 1x6mm² (N.L.T)

m

125.14

11.39

03.02.08.04.06.02

TENDIDO DE CABLE ELECTRICO NYY 2X1X16mm EN FAROLA

m

58.00

11.39

03.02.08.04.07

2,128.40 2,110.86

03.02.08.04.05.01

03.02.08.04.06

171.70 2,128.40

ARTEFACTOS DE ILUMINACION

1,425.34 660.62 9,294.60

03.02.08.04.07.01

LUMINARIA COMPLETA CON EQUIPO PARA LAMP. DE 70W

und

10.00

602.93

6,029.30

03.02.08.04.07.02

FAROLA ESFERICA HPC 80 PARA LAMPARA LED

und

10.00

326.53

3,265.30

03.02.08.04.08

TABLEROS E INTERRUPTORES DE PROTECCION

1,134.38

03.02.08.04.08.01

TABLERO DE DISTRIBUCION TRIFASICO 380/220V

und

1.00

288.04

288.04

03.02.08.04.08.02

INTERRUPTOR THERMOMAGNETICO DE 2 X 20 A

und

2.00

89.06

178.12

03.02.08.04.08.03

INTERRUPTOR THERMOMAGNETICO DE 3 X50A

und

1.00

92.11

92.11

03.02.08.04.08.04

LLAVE DIFERENCIAL DE 30AM

und

1.00

106.32

106.32

03.02.08.04.08.05

CAJA METALICA PORTAMEDIDOR CMR-E

und

1.00

68.27

68.27

MEDIDOR ELECTRONICO TRIFASICO

und

1.00

401.52

03.02.08.04.08.06 03.02.08.04.09

INSTALACIONES GENERALES

401.52 2,072.83

03.02.08.04.09.01

EMPALMES Y UNIONES

und

1.00

540.95

540.95

03.02.08.04.09.02

POZO DE PUESTA A TIERRA

und

1.00

1,531.88

1,531.88

m2

662.83

1.00

662.83

03.02.08.05 03.02.08.05.01 04

LIMPIEZA GENERAL DE LA OBRA LIMPIEZA GENERAL DE OBRA

662.83

SEGURIDAD Y SALUD

109,910.00 Fecha :

16/06/2020 16:56:25

11

Página

S10

MPJ

Presupuesto

Subpresupuesto Cliente Lugar

"MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL, AV. LA CULTURA CDRA 3 Y 4, AV SAN IGNACIO CUADRA 05 Y AV. JOSE ABELARDO QUIÑONES CDRA 1, 2,3 Y 4, DISTRITO DE SAN IGNACIO PROVINCIA DE SAN IGNACIO - CAJAMARCA". MEJORAMIENTO DE TRANSITABILIDAD VEHICULAR Y PEATONAL 001 Costo al MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO 12/06/2020 CAJAMARCA - SAN IGNACIO - SAN IGNACIO

Item

Descripción

Presupuesto

04.01

0492002

Und.

Metrado

Precio S/.

Parcial S/.

SEGURIDAD Y SALUD EN EL TRABAJO

72,673.00

04.01.01

ELABORACION E IMPLEMENTACION DE PLAN DE SEGURIDAD Y SALUD

GLB

1.00

2,000.00

2,000.00

04.01.02

EQUIPOS DE PROTECION PERSONAL

und

1.00

56,098.00

56,098.00

04.01.03

EQUIPOS DE PROTECION COLECTIVA

GLB

1.00

5,310.00

5,310.00

04.01.04

SEÑALIZACION TEMPORAL DE SEGURIDAD

GLB

1.00

3,175.00

3,175.00

04.01.05

RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD GLB

1.00

840.00

840.00

04.01.06

CAPACITACION EN SEGURIDAD Y SALUD

GLB

1.00

2,000.00

2,000.00

BARANDA METALICAS

und

1.00

3,250.00

04.01.07 04.02 04.02.01 04.02.01.01

PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DEL COVID-19 EN EL TRABAJO ACTIVIDADES DE PREVENCION DEL COVID-19 ELABORACION DEL PLAN PARA VIGILANCIA, PREVENCION Y CONTROL DEL COVID-19

3,250.00 37,237.00 37,237.00

GLB

1.00

2,000.00

2,000.00

04.02.01.02

LIMPIEZA Y DESINFECCION EN OBRA

mes

6.00

2,325.50

13,953.00

04.02.01.03

EQUIPAMIENTO PARA LA VIGILANCIA DE LA SALUD

GLB

1.00

4,595.00

4,595.00

04.02.01.04

EVALUACION DE LA CONDICION DE SALUD DEL TRABAJADOR

und

1.00

7.50

7.50

04.02.01.05

EQUIPOS PARA LAVADOS DE MANOS

GLB

1.00

192.50

192.50

04.02.01.06

SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO COVID-19 EN OBRA

und

1.00

550.00

550.00

04.02.01.07

MEDIDAS PREVENTIVAS COLECTIVAS

GLB

1.00

2,400.00

2,400.00

04.02.01.08

MEDIDAS DE PROTECCION PERSONAL

und

1.00

2,500.00

2,500.00

04.02.01.09

EQUIPAMIENTO PARA LA VIGILANCIA DE LA SALUD

GLB

1.00

4,595.00

4,595.00

04.02.01.10

EQUIPO PARA PROFESIONAL DE SEGURIDAD Y SALUD

mes

6.00

1,074.00

6,444.00 3,282,899.23

COSTO DIRECTO

262,631.94

GASTOS GENERALES (8% CD)

============= 3,545,531.17

SUB TOTAL

============= 3,545,531.17

VALOR REFERENCIAL

88,638.28

GASTOS DE SUPERVISION (2.5% VR)

============= 3,634,169.45

COSTO TOTAL DEL PROYECTO SON :

TRES MILLONES SEISCIENTOS TRENTICUATRO MIL CIENTO SESENTINUEVE Y 45/100 NUEVOS SOLES

Fecha :

16/06/2020 16:56:25

Related Documents

Presupuesto
February 2021 1
Presupuesto
February 2021 1