Problem Statement

  • Uploaded by: Souradeep Paul
  • 0
  • 0
  • May 2022
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Problem Statement as PDF for free.

More details

  • Words: 454
  • Pages: 2
Loading documents preview...
Ecovision *Problem statement*My interpretation* .Sustainable infrastructue >Environmentally responsible processes >Resource efficient(long term) >*Design*Construction*Operation*Maintenance*Renovation*Demolition*all phases hav e the above characteristics* >Classic requirements-Safety,Stability,Economy,Utility,Durability,Comfort *also imp* .Requirement-Product or Design solution >For sustainable building(commercial building as given) >Water,energy,resource,material management >Reduce impact on health,environment >Alternative sources of water and energy >Better resource utilisation/waste management >Optimum building life cycle >Be innovative but need time tested,economical solutions .We have to provide DESIGN or PRODUCT *solutions* for the following >Fire protection: Fireproof external cladding,building materials, use of water s prinklers, >Structural integrity >Electrical Systems >Plumbing and mechanical Systems(Airflow and temperature management) >Water treatment,storage and distribution >Wastewater collection and treatment >Lighting .Mass and spaces in and around the existing commercial building:Commercial Offic e >12 floors-G+12 >Total site area-15697m^2 >Built area(base of building)-4320 m^2(roughly 27.5%) >Daily flow:3500 office employees+ 500 (guests/clients) + 500 (maintenance) *DIVISION OF SPACES IN EACH FLOOR* >Ground floor:Parking for 1000 4 wheelers,1000 two wheelers, lifts, stairways, f ire escapes >From 1st to 10th1.Office space for 325 ppl(maybe cubicles) - Base employees 2.One seminar room seating 350 ppl(Only used once in a week)-(RARELY USED) 3.5 Meeting rooms : Flow of 15-20 ppl twice (RARELY USED) 4.7 toilets with a flow of 40 ppl every hour 5.5 store rooms:Caters to procurement requirement- Constant flow of 50/hr 6.Cafeteria: In 1st,4th,7th,10th- Maximum 1000 each...avg 850 during lunch and b reak(2hrs per day) Otherwise avg flow is 75/ hr(after office hrs 3 are open/total 200 ppl) 7.5 lounge/recreational rooms : 5-10/hr,100 each during break 8.One renewable Generator room+One Airflow and temperature management room in e very floor (Constant check every two hrs by 2 officials) Contains Renewable energy generator sets, Transformers, Central Air Handling Sys tems >11th floor1.Office space for 200 ppl 2.One seminar room seating 350 ppl 3.5 Meeting rooms: flow of 15-20ppl

4.7 toilets with a flow of 40 ppl every hour( I doubt) 5.5 store rooms:Caters to procurement requirement- Constant flow of 50/hr 6.5 lounge/recreational rooms : 5-10/hr,100 each during break 7.One renewable Generator room+One Airflow and temperature management room >Top floor-Executive area 1.Office space for 50 ppl 2.One seminar room seating 350 ppl 3.Meeting rooms: flow of 5-10 ppl/twice 4.One toilet in every cabin+ three toilets for guests and other clients 5.5 store rooms:Caters to procurement requirement- Constant flow of 50/hr 6.Special cafeteria for 100 ppl 7.2 lounge/recreational rooms : 2-5/hr,20 during break & beyond 8.One renewable Generator room+One Airflow and temperature management room

Special notes by ktj: * Entire building temperature controlled(Find ways to reduce the load in Airflow and temperature management system) *Using eco-friendly ideas that shall reduce water use *Less requirement of sources of energy/ save resources in infrastructure *Provide statistics regarding effect that they are bringing in the infrastructur e *Economic Details and breakeven point of investment

Related Documents

Statement Of The Problem
February 2021 1
Statement Of The Problem
February 2021 1
Problem 74 Problem 85
January 2021 1
Problem Statements
February 2021 1
Problem Solving.docx
February 2021 2
Sample-problem
March 2021 0

More Documents from "Joshua Oliver"

Deber 3 Fisica
January 2021 1
Kaos
January 2021 5
January 2021 2
9tbsbqaaqbaj
February 2021 0