Project Risk Log Template Wilmont's Pharmacy Drone Project Rev: 00, Date: 15th Apr 2020 Risk ID
Priority
WBS
Responsible Person
Dates
Risk Description
1
2
2
1
1.2.1.
1.2.2.
William Holt
Luis Villegas
The actual cost of the project exceeds the agreed cost The customer is not satisfied with the prototype
3
2
1.3.4.
William Holt
4
3
1.2.1.
William Holt, Luis Villegas
Impact Rating Scale 5 6 7
5 4 3 2 1
2 Very High High 2 Moderate Low 2 Very Low
8 2 Likelihood Rating Scale 5 Nearly Certain 4 Likely 3 Possible 2 Unlikely 1 Rare
Cost 1.3.1.
William Holt >$10,000 <$8,000 William Holt, Luis 1.3.3. <$5,000Villegas <$3,000 1.2.1; 1.4.1 <$500 Geral Hasper 1.5.1.
Design is not completed in a timely manner Schedule Delay in materials arriving, or materials unavailable > 4 weeks delay > 2 weeks delay Develop system takes longer than expected > 1 weeks delay 1 weeks delay Tests find<serious flight errors ondrones 1 day delay
Impact Rating
Severity
04.06.20
5
3
15
> 4 weeks delay < 1 weeks delay
04.06.20
5
3
15
> 4 weeks delay
04.06.20 Description
5
2
10
> 4 weeks delay < 1 weeks delay
Health, Safety 3 and the Environment
1
3
> 1 weeks delay
1 day delay
3
15
> 2 weeks delay
1 day delay
3
15
> 4 weeks delay
>20% time increase 04.06.20 10-20% time increase 5-10% time increase <5% time04.06.20 increase insignificant increase
Closed
Quality System will not operate System will not meet specs Performance is reduced Some compensation is required May require correction
1 2 3 4 5
5
1
5
04.06.20
2
4
8
1
2
3
4
1
2
3
4
5
6 9 12 15
8 12 16 20
10 15 20 25
2 4 3 6 4 8 5 10 Severity = Likelihood Rating x Impact Rating low moderate high
Severe injury or fatality 5 major impact minor injury or impact insignificant impact 5 no impact
04.06.20
Likelihood Rating
Severity
Impact Rating
04.06.20 Scope
Luis Villegas Project is delayed due to weather Description >80% probability of occurring 50-80% chance of occurring 21-49% chance of occurring 1-20% chance of occurring <1% chance of occurring
Impact
Likelihood Rating
Open The design of the system is not approved by the customer
Analysis
5
Prior to Mitigation
After Mitigation
< 1 week delay
Mitigation Strategy
Contingency
Double check design. Have independent design review.
$5,000.00
Make an Earned Value Estimate. Request a budget forward. Reduce unnecessary expenses.
$6,000.00
Double check design. Have independent design review. Add schedule contingency in plan to allow design to be complete. Add additional staff. Use expedited shipping. Confirm availability with suppliers during design. Modify design if required.
Add schedule contingency in plan to allow develop system. Double check design. Have independent > 4 weeks delay < 1 weeks delay design review. Add 2-3 extra days for weather. Add < 1 weeks delay 1 day delay cost for days off. < 1 week delay
$5,000.00
Status