PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP

OWNER ESTIMATE

2018

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM

TOTAL PEKERJAAN (Rp.)

ITEM PEKERJAAN

No.

A

REKAPITULASI

I.

BANGUNAN GEDUNG KLINIK

9.634.447.870,48

1

PEKERJAAN PERSIAPAN

1.465.130.450,00

2

PEKERJAAN STRUKTUR

3.090.653.348,56

3

PEKERJAAN ARSITEKTUR

5.078.664.071,91

4

PEKERJAAN PLUMBING

II.

PARKIR DAN PAGAR GEDUNG

970.824.935,47

1

PEKERJAAN PERSIAPAN

100.000.000,00

2

PEKERJAAN LAHAN PARKIR

291.795.933,25

3

PEKERJAAN PAGAR GEDUNG

579.029.002,22

III.

PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING (MEP)

664.591.235,60

1

PEKERJAAN MEKANIKAL ELEKTRIKAL a. Pekerjaan Panel Panel

40.500.000,00

b. Pekerjaan Kabel Feeder

19.159.800,00

c. Pekerjaan Instalasi Titik Lampu dan Daya

2

122.859.800,00

d. Pekerjaan Kabel Ledder

16.650.000,00

e. Pekerjaan Penangkal Petir

13.300.000,00

f. Pekerjaan Fire Alarm

43.323.768,00

g. Pekerjaan CCTV

70.260.000,00

PEKERJAAN PLUMBING a. Pekerjaan Peralatan Utama Air Bersih

165.989.000,00

b. Pekerjaan Instalasi Plumbing Air Bersih dan Kotor

45.548.867,60

c. Pekerjaan Instalasi Gas Medik

127.000.000,00

IV.

PEKERJAAN PENDINGIN UDARA / AC

924.384.000,00

V.

PEKERJAAN TELEPHONE / FAX/IT

519.442.800,00

VI.

PEKERJAAN BANGUNAN IPAL

334.530.000,00

VII.

PENGADAAN GENERATOR DAN INSTALASINYA

353.310.000,00

VIII.

PENYAMBUNGAN PLN

223.020.000,00

IX.

PENGADAAN KENDARAAN OPERASIONAL

X

PENGADAAN SEPEDA MOTOR

150.000.000,00

XII.

PENGADAAN AMBULAN

854.910.000,00

XIII.

PENGADAAN FURNITURE

1.077.930.000,00

XIV

PENGADAAN ALAT KESEHATAN

3.500.000.000,00

XV

PENGADAAN RUMAH DOKTER 5 Unit

2.494.700.000,00

1.

RUMAH DOKTER TYPE 70

1.919.000.000,00

2

PARKIRAN DAN PAGAR

115.140.000,00

3

MEKANIKAL ELEKTRIKAL

115.140.000,00

4

TELEPHONE / FAX/IT

19.190.000,00

5

PENDINGIN UDARA / AC

76.760.000,00

6

PENYAMBUNGAN AIR BERSIH

19.190.000,00

7

PENYAMBUNGAN PLN

38.380.000,00

8

FURNITURE

191.900.000,00

XVI

KONSULTAN PERENCANAAN

482.507.000,00

XVII

KONSULTAN PENGAWASAN

356.828.000,00

1.375.000.000,00

XVIII PENGEMBANGAN SDM

7.750.000.000,00

SUB TOTAL

31.666.425.841,55

PPN 10 %

3.166.642.584,15

GRAND TOTAL

34.833.068.425,70

DIBULATKAN

34.833.068.000,00

Terbilang : Tiga puluh empat milyar delapan ratus tiga puluh tiga juta enam puluh delapan ribu rupiah

Page 2

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PEMBANGUNAN FISIK GEDUNG KLINIK

ITEM PEKERJAAN

No.

I.

BANGUNAN GEDUNG KLINIK

1.

PEKERJAAN PERSIAPAN BANGUNAN KANTOR

1 2 3 4 5 6 7 8 9 10 11

13 14 15

Pengukuran dan pemasangan bouwplank Membersihkan lapangan dan perataan Urugan Tanah Peninggian Elevasi Rata-rata 1.2 meter Pemadatan Lahan Membuat Papan Nama Proyek Pembuatan kantor sementara Pembuatan pagar sementara Pemasangan Steling Alat Bantu Penyediaan Air Kerja Penyediaan Listrik Kerja Mobilisasi & Demobilisasi - Transportasi Material & Alat Kerja( Container ) Gudang sementara - Gudang sementara - Bedeng pekerja + perlengkapan Safety equipment (helm, sepatu, sabuk pengaman) u/k semua pekerjaan Equipment Proyek ( Scafolding, Mesin genset, Crane u/k erection baja dll) Asuransi jamsostek, P3K, alat pemadaman kebakaran (portable)

2

PEKERJAAN STRUKTUR

A

LANTAI DASAR Pekerjaan Tanah & Pasir

1 2 3 4 5 6

Galian Tanah Untuk Pondasi Pekerjaan Pasir Urug t = 10 cm Bawah Pondasi Batu Kali Lantai kerja bawah pondasi t=5cm Type P1 Lantai kerja bawah pondasi t=5cm Type P2 Urugan kembali bekas galian Urugan Tanah Peninggian Lantai

B

Pekerjaan Pondasi Dan Beton

12

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

m' m² m³ m² bh m² m' Ls Ls Ls

210,00 10.000,00 2.080,00 10.000,00 1,00 15,00 210,00 1,00 1,00 1,00

63.620,00 8.000,00 134.000,00 36.000,00 447.000,00 1.959.750,00 337.600,00 15.660.000,00 37.500.000,00 64.500.000,00

13.360.200,00 80.000.000,00 278.720.000,00 360.000.000,00 447.000,00 29.396.250,00 70.896.000,00 15.660.000,00 37.500.000,00 64.500.000,00

ls

1,00

109.000.000,00

109.000.000,00

m2 m2 ls ls ls

20,00 75,00 1,00 1,00 1,00

1.445.800,00 1.545.800,00 74.750.000,00 122.500.000,00 63.550.000,00

28.916.000,00 115.935.000,00 74.750.000,00 122.500.000,00 63.550.000,00

Total Pekerjaan Persiapan

1.465.130.450,00

m³ m³ m³ m³ m³ m³

313,20 78,30 11,64 0,19 313,20 501,60

80.000 176.000 1.125.429 1.125.429 33.000 134.000

25.056.000,00 13.780.800,00 13.104.208,93 215.238,21 10.335.600,00 67.214.400,00

Pondasi Type P3 (Pasangan Batu Kali) a Pasangan Batu Kali ad. 1 : 5 b Besi beton ᶲ 10 mm (stek penahan sloof p = 25 cm. tiap 2 m.)

m3 kg

109,62 7,71

990.320,00 14.585,00

108.558.878,40 112.426,04

Pondasi Type P4 (Pasangan Batu Kali) a Pasangan Batu Kali ad. 1 : 5 b Besi beton ᶲ 10 mm (stek penahan sloof p = 25 cm. tiap 2 m.)

m3 kg

156,60 15,42

990.320,00 14.585,00

155.084.112,00 224.852,08

Sloof/Tie beam 25/40 Type S1 a Beton K.300 b Besi beton c Bekisting tie beam

m3 kg m2

1.631.258,99 14.585,00 202.103,40

39.549.874,33 49.796.771,40 39.199.975,46

Sloof/Tie beam 15/20Type S2 a Beton K.300 b Besi beton c Bekisting Sloof

m3 kg m2

14,09 1.989,56 187,86

1.631.258,99 14.585,00 202.103,40

22.983.623,61 29.017.771,10 37.967.144,72

Kolom 35/35 Type K1 a Beton K.300 b Besi beton c Bekisting kolom

m3 kg m2

14,54 2.609,32 166,15

1.631.258,99 14.585,00 329.021,20

23.715.732,64 38.056.964,52 54.667.530,42

Kolom 30/30 Type K2 a Beton K.300 b Besi beton c Bekisting kolom

m3 kg m2

40,64 6.853,26 1.400,00

1.631.258,99 14.585,00 329.021,20

66.286.209,25 99.954.772,31 460.629.680,00

Kolom praktis 15/15 Type KP a Beton Site Mix Ad. 1 : 2 : 3 b Besi beton c Bekisting kolom

m3 kg m2

6,58 1.361,67 87,72

1.631.258,99 14.585,00 329.021,20

10.732.052,93 19.859.925,06 28.861.739,66

Beton Tangga a b c

m3 kg m2

2,35 612,17 10,32

1.631.258,99 14.585,00 305.796,20

3.832.806,13 8.928.516,22 3.156.978,81

BETON LANTAI 1 1

2

3

4

5

6

7

8

Beton K.300 Besi beton Bekisting tangga

24,25 3.414,25 193,96

BETON LANTAI 2 / LANTAI ATAP 1

2

3

4

5

Balok 30/55 Type B1 a Beton K.300 b Besi beton c Bekisting Balok

m3 kg m2

90,73 10.849,82 769,86

1.631.258,99 14.585,00 335.321,20

148.009.838,00 158.244.628,78 258.150.379,03

Balok 25/45 Type B2 a Beton K.300 b Besi beton c Bekisting Balok

m3 kg m2

65,76 11.116,92 672,18

1.631.258,99 14.585,00 335.321,20

107.265.474,27 162.140.237,85 225.394.527,61

Balok 20/30 Type B3 a Beton K.300 b Besi beton c Bekisting Balok

m3 kg m2

31,62 6.617,70 421,60

1.631.258,99 14.585,00 335.321,20

51.580.409,41 96.519.112,20 141.371.417,92

Plat Lantai 2/Lantai Atap t = 12 cm a Beton K.300 b Besi beton c Bekisting Plat Lantai

m3 kg m2

41,13 3.804,81 342,78

1.631.258,99 14.585,00 401.021,20

67.098.771,98 55.493.206,36 137.460.442,85

Ring Balk 15/20 Type RB a Beton K.300 b Besi beton c Bekisting Balok

m3 kg m2

3,15 514,10 57,78

1.631.258,99 14.585,00 335.321,20

5.140.912,72 7.498.158,61 19.374.020,63

m3 kg m2 m' m2

1,58 196,88 24,00 7,50 16,50

1.631.258,99 14.585,00 401.021,20 275.275 115.000,00

2.569.232,92 2.871.421,88 9.624.508,80 2.064.562,50 1.897.500,00

C

Pekerjaan Struktur Bangunan Luar

1

Ground water tank a b c e d

Beton K.300 Besi beton Bekisting dinding & Atap Water stop Waterproofing coating ex Poshroc, Sika

Total Pekerjaan Struktur

3

PEKERJAAN ARSITEKTUR

A

Lantai 1 Klinik

1

Pekerjaan Dinding a Pasangan dinding bata (Ringan) ex. Hebel uk. 10 x 20 x 60 cm b Plesteran+Aci c Dinding Homogeneous Tile 30x60cm ex. INDOGRESS area Toilet Kantor

2

3

4

5

Pekerjaan Lantai a Lantai Homogeneous Tile 60x60 cm Unpolish (Motif Kasar) ex. INDOGRESS area Toilet Kantor b Lantai Homogeneous Tile Polish 60x60cm ex. INDOGRESS Area Klinik + teras c Lantai Tangga Homogeneous Tile 60x60cm ex. INDOGRESS

m2 m2 m2

1.826,53 3.653,06 18,14

3.090.653.348,56

153.815,00 68.823,80 456.780,00

280.948.010,35 251.417.737,86 8.283.705,30

m2

31,25

353.140,00

11.035.625,00

m2 m2

2.568,75 12,01

353.140,00 353.140,00

907.128.375,00 4.239.798,84

Pekerjaan Plafond dan Partisi a Gypsum board t=9 mm area Gedung Klinik b Gypsum board (Tahan Kelembaban) t=9 mm area Toilet Kantor c List plafond gypsum d Partisi Gypsumboard 12 mm (doubel 2 sisi) + Rangka Canal C

m2 m2 m' m2

2.568,75 31,25 23,70 680,00

173.192,00 176.104,00 50.080,00 214.260,00

444.886.950,00 5.503.250,00 1.186.896,00 145.696.800,00

Pekerjaan Cat a Cat dinding bagian dalam ex. JOTUN Jotaplas b Cat dinding bagian luar ex. JOTUN (Jotashield) c Cat plafond Gypsum ex. JOTUN Jotaplas + List Plafond

m2 m2 m2

2.557,14 1.095,92 2.600,00

36.641,00 48.081,00 36.250,00

93.696.339,54 52.692.889,32 94.250.000,00

Unit

1,00

15.000.000,00

15.000.000,00

Pekerjaan Pintu & Jendela a Pintu Type P1 (Pintu Utama) [-] Pintu Kaca Temper, t=12mm [-] Floor Hinges BTS 84 ex. DORMA [-] Lockset [-] Push Handle b

Pintu Type P2 ( Pintu Samping & Belakang) Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Pintu Kaca Temper, t=12mm Floor Hinges BTS 84 ex. DORMA Lockset Push Handle

Unit

4,00

14.000.000,00

56.000.000,00

[-] [-] [-] [-] [-]

Pintu Type P3 ( Pintu Kantin) Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Pintu Kaca Temper, t=12mm Floor Hinges BTS 84 ex. DORMA Lockset Push Handle

Unit

1,00

12.500.000,00

12.500.000,00

[-] [-] [-] [-] [-]

Pintu Type P4 Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Pintu Panel Doble Triplek Lapis HPL + (2 Pintu) + Kaca Clear 6 mm + Samblust Floor Hinges BTS 84 ex. DORMA Lockset Push Handle

Unit

1,00

6.800.000,00

6.800.000,00

[-] [-] [-] [-] [-]

Pintu Type P5 Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Pintu Panel Doble Triplek Lapis HPL + Anak Pintu + Kaca Clear 6 mm + Samblust Hinges Lockset Lever Handle

Unit

11,00

5.400.000,00

59.400.000,00

[-] [-] [-] [-] [-]

Pintu Type P6 Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Pintu Panel Doble Triplek Lapis HPL Hinges Lockset Lever Handle

Unit

3,00

3.000.000,00

9.000.000,00

[-] [-] [-] [-] [-]

c

d

e

f

g

Pintu Type P7 Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Pintu Panel Doble Triplek Lapis HPL + Almunium plat (Bagian dalam) Hinges Lockset Lever Handle

Unit

7,00

3.250.000,00

22.750.000,00

[-] [-] [-] [-] [-]

Pintu Type PJ.1 Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Pintu Panel Doble Triplek Lapis HPL + Almunium plat (Bagian dalam) Kaca Temper, t=10mm Hinges Lockset Lever Handle

Unit

10,00

9.000.000,00

90.000.000,00

[-] [-] [-] [-] [-] [-]

Jendela Type J.1 ( 3,5 mtr x 5,5 meter) Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating Kaca Temper, t=10mm Hinges Lockset Lever Handle

Unit

2,00

23.000.000,00

46.000.000,00

[-] [-] [-] [-] [-]

Jendela Type J.2 (Kaca Framles bagian Depan) Acesories Spider Kaca Temper, t=12mm Hinges Lockset Lever Handle

Unit

1,00

68.000.000,00

68.000.000,00

[-] [-] [-] [-] [-]

Unit

1,00

68.000.000,00

68.000.000,00

[-] [-] [-] [-] [-]

Bingkai Jendela Almunium YKK Kaca Temper t=10 mm Hinges Lockset Lever Handle Jendela Type J.4 Bingkai Jendela Almunium YKK Kaca Clear t=6 mm Hinges Lockset Lever Handle

Unit

3,00

4.000.000,00

12.000.000,00

[-] [-] [-] [-] [-]

Jendela Type J.5 Bingkai Jendela Almunium YKK Kaca Clear t=6 mm Hinges Lockset Lever Handle

Unit

16,00

2.600.000,00

41.600.000,00

[-] [-] [-] [-] [-]

Unit

3,00

unit unit unit bh bh m2

7,00 3,00 3,00 10,00 7,00 3,00 .

3.726.700,00 2.307.350,00 2.600.000,00 194.000,00 664.000,00 150.000,00

26.086.900,00 6.922.050,00 7.800.000,00 1.940.000,00 4.648.000,00 450.000,00

m'

7,24

1.599.020,00

11.572.107,74

h

I

J

K

Jendela Type J.3 (Jendela Kaca Mati Bagian Depan)

L

M

N

6

Boven Light Type BV 1 [-] Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating [-] Kaca Stopsol Clear t = 6 mm

Pekerjaan Sanitair a Closet Duduk ex. TOTO + Jet Washer b Wastafel Gantung ex. TOTO c Urinoir d Floor Drain ex. TOTO e Paper holder ex. TOTO f Cermin 60 x 90 cm

7

Pekerjaan Railing a Railling tangga Stailess Steel Ø 3" Lengkap Sesuai Gambar

C

Lantai Atap/ Lantai 3

1

Pekerjaan Dinding a Pasangan dinding bata (Ringan) ex. Hebel uk. 10 x 20 x 60 cm b Plesteran+Aci

2

3

4

1.200.000,00

3.600.000,00

m2 m2

177,27 354,54

153.815,00 68.823,80

27.266.785,05 24.400.790,05

m2

1.300,00

115.000,00

149.500.000,00

m2 m2 m2 m2 m'

1.300,00 1.300,00 1.300,00 1.430,00 354,65

183.800,00 164.420,00 282.900,00 65.700,00 65.200,00

238.940.000,00 213.746.000,00 367.770.000,00 93.951.000,00 23.123.049,60

4.300.000,00

4.300.000,00

Pekerjaan Lantai a Waterproofing Coating Dak Atap ex Poshroc, Sika cm Pekerjaan Atap a Pasang Roof Mesh b Pasang Alumunium Voil c Pasang Rangka Atap Baja Ringan SNI d Pasang Penutup Atap Genteng Metal Pasir e Pasang Nok Genteng Metal Pekerjaan Pintu a [-] [-] [-] [-] [-]

Pintu Type P4 Kusen Hollow 4/8 Pintu Besi Plat Rangka Hollow 4/4 Hinges Lockset Lever Handle

D

Pekerjaan Kulit Luar (FASAD)

1

Clading Alumunium Composit Panel t=4mm + Rangka a Panel ACP Rangka Hollow ex Alucopan,Alucobond, Seven Area Pintu Masuk (Gawangan Depan) b Panel ACP Rangka Hollow ex Alucopan,Alucobond, Seven Area Jendela Depan c Panel ACP Rangka Hollow ex Alucopan,Alucobond, Seven Area Listplank d Panel ACP Dinding Warna Hitam Rangka Hollow ex Alucopan,Alucobond, Seven Area Kantor lt. 2 & 3

Unit

1,00

m2

25,73

1.229.040,00

31.620.741,12

m2

100,00

1.229.040,00

122.904.000,00

m2

319,00

1.229.040,00

392.063.760,00

m2

69,19

1.229.040,00

85.039.735,68

2

Huruf dan LOGO Klinik a Logo & Huruf Timbul [-] Logo dari metal Sheets [-] Tulisan Huruf Timbul (BPR IRIAN SENTOSA) dari Stainless Steel

Unit ls

1,00 1,00

5.421.000,00 8.500.000,00

5.421.000,00 8.500.000,00

Ls

1,00

4.000.000,00

4.000.000,00

24,40 42,67

153.815,00 68.823,80

3.752.624,56 2.936.986,84

3

Pekerjaan Ornamen Depan a Ornamen Lampu Acrilyc

B

Pembuatan Pos Jaga

1

Pekerjaan Dinding a Pasangan dinding bata (Ringan) ex. Hebel b Plesteran+Aci

m2 m2

Pekerjaan Lantai a Lantai Homogeneous Tile 60x60cm ex. INDOGRESS Area Pos Jaga dan Teras

m2

3,65

353.140,00

1.287.548,44

Pekerjaan Plafond a Gypsum board t=9 mm ex. JAYABOARD + Rangka b List Plafond Gypsum

m2 m'

3,65 10,80

173.192,00 50.080,00

631.458,03 540.864,00

Pekerjaan Cat a Cat dinding bagian dalam ex. JOTUN Jotaplas b Cat dinding bagian luar ex. JOTUN (Jotashield)

m2 m2

24,40 16,72

36.641,00 48.081,00

893.930,48 804.010,48

Unit

1,00

5.000.000,00

5.000.000,00

2

3

4

5

Pekerjaan Pintu & Jendela a

Pintu Type PJ2 [-] Kusen Alumunium 4" = 10 cm; Tebal : 1,5 mm ex. YKK, Finish Powder Coating [-] Kaca Tempered 12 mm [-] Daun Pintu Kaca Rangka Alumunium 4" Ex YKK, Finish Powder Coating [-] Hinges [-] Lockset [-] Door Closer

C

Ruang Genset

1

Pekerjaan Pondasi a Galian Tanah Pondasi b Pasir Urug Bawah Pondasi t = 5 cm c Pondasi Batu Kali

m3 m3 m3

3,51 0,27 2,30

80.000 176.000 990.320,00

280.800,00 47.520,00 2.272.784,40

Pekerjaan Beton a Sloof 15/20 Ad. 1 : 2 : 3 b Kolom 20/20 Ad. 1 : 2 : 3 c Balok 15/20 Ad. 1 : 2 : 3 d Cor Dak Atap t = 12 cm Ad. 1 : 2 : 3

m3 m3 m3 m3

0,27 0,48 0,27 1,20

5.310.781,00 8.493.687,00 6.645.244,60 6.011.694,60

1.433.910,87 4.076.969,76 1.794.216,04 7.214.033,52

Pekerjaan Dinding a Pasangan dinding bata (Ringan) ex. Hebel b Plesteran+Aci

m2 m2

19,63 39,26

153.815,00 68.823,80

3.019.388,45 2.702.022,39

Pekerjaan Lantai a Cor Plat Lantai t = 20 cm Lapis Wiremesh M 10 b Floor Hardener 5kg & Trowel

m3 m2

0,90 4,50

3.498.175,00 1.280.000,00

3.148.357,50 5.760.000,00

5

Pekerjaan Plafond a Repair concrete Ceiling exposed

m2

4,50

802.000,00

3.609.000,00

6

Pekerjaan Dak R. Genset a Waterproofing Coating ex Poshroc, Sika Dak Atap R. Genset b Screed Dak Atap R. Genset

m2 m2

10,00 10,00

115.000,00 68.823,80

1.150.000,00 688.238,00

Pekerjaan Cat a Cat dinding bagian dalam ex. JOTUN Jotaplas b Cat dinding bagian luar ex. JOTUN (Jotashield)

m2 m2

24,13 21,43

36.641,00 48.081,00

884.147,33 1.030.375,83

Unit

1,00

18.700.000,00

18.700.000,00

Unit

2,00

1.220.625,00

2.441.250,00

2

3

4

7

8

Pekerjaan Pintu & Jendela a Pintu Type PB1 (2.1 x 1,7) [-] Kusen Pelat Besi t=1,6mm, Finish Cat Duco [-] Pintu Pelat Besi t=1,2mm, Finish Cat Duco [-] ST. STEEL HINGES DB HEAVY DUTY 4"X4" [-] Lockset [-] Flush Bolt [-] Lever Handle b

Jendela Roster Beton [-] Roster Beton (1 x 1 m)

D

Pekerjaan Saluran & Sumur Resapan

1

Pekerjaan Saluran a Pembuatan Saluran Kota Box Culvert 60 x 60 cm

m'

50,00

1.796.500,00

89.825.000,00

2

Sumur Dan Resapan a Sumur Bor Asumsi Kedalaman 50 meter b Sumur resapan Sesuai Gambar c Tutup Manhole 600x600

titik Bh Bh

1,00 2,00 2,00

121.295.000,00 17.516.975,42 400.000,00

121.295.000,00 35.033.950,84 800.000,00

kg kg bh kg kg m2 m' bh bh set

222,72 42,00 36,00 119,65 66,15 21,00 6,70 2,00 36,00 3,00

34.969,00 34.969,00 76.000,00 16.012,50 16.012,50 2.370.000,00 390.800,00 1.260.080,00 552.800,00 750.000,00

7.788.295,68 1.468.698,00 2.736.000,00 1.915.847,14 1.059.226,88 49.770.000,00 2.618.360,00 2.520.160,00 19.900.800,00 2.250.000,00

E

Pekerjaan Canopy

1

Canopy Depan 15,8 a Baja WF 200 X 100 X 5,5 X 8 mm b Baja WF 150 X 75 X 5 X 7 mm c Angku+Mur Ø 16 mm d Hollow 40 x 60 x 5 e Besi Ø 32 Untuk Gantungan Canopy f Penutup Kaca Tempered t = 12 mm + Rangka g Talang Canopy Belakang Zincalum 0.45 mm h Roof Drain Stainless Steel + Pipa PVC AW Ø 2.5" Brikut Accessories i Pin Spider Ø 30 mm FIN Harline j Sambungan Gantungan Canopy

Total Pekerjaan Arsitektur

5.078.664.071,91

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PEMBANGUNAN LAHAN PARKIR DAN PAGAR

ITEM PEKERJAAN

No.

II

PEKERJAAN PARKIRAN DAN PAGAR

A

Pekerjaan Persiapan a

B

Pekerjaan Lapisan Hot Mix t = 5 cm Area Parkir Pekerjaan Lapisan Penetrasi t = 5 cm Area Parkir Lapisan Sirtu t = 10 cm Padat Lapisan Makadam t = 25 cm Padat Cat Marka Pekerjaan Rerumputan & Tanaman [-] Urugan Tanah Area Tanaman [-] Tanaman Rumput [-] Tanaman Peredu [-] Tanaman Palm Pendek [-] Tanaman Bunga

Galian tanah pondasi pagar Urug kembali bekas galian pondasi Urug pasir dibawah pondasi (t= 5cm) Pasangan pondasi batu kosong + pasir urug untuk: Pasangan pondasi Batu Kali campuran 1:4 untuk: Pasangan dinding pagar tebal 1/2 bata, batu bata 1:4

beton bertulang Sloof 20x30, termasuk bekisting camp. 1:2:3 beton bertulang dengan pembesian termasuk bekisting camp. 1:3:5 untuk: Kolom 20x20 Ring Balk 10x10

m3 m2 ls ls ls

183,13 183,13 18,31 45,78 1,00

578.000,00 620.000,00 372.000,00 504.000,00 20.000.000,00

6,13 102.000,00 24,52 36.750,00 1,00 5.400.000,00 1,00 10.000.000,00 1,00 5.600.000,00 Total Pekerjaan Halaman & Area Parkir

105.846.250,00 113.537.500,00 6.812.250,00 23.073.750,00 20.000.000,00 625.183,50 900.999,75 5.400.000,00 10.000.000,00 5.600.000,00 291.795.933,25

m3 m3 m3

126,72 126,72 10,56

80.000,00 33.000,00 176.000,00

10.137.600,00 4.181.760,00 1.858.560,00

m3 m3 m2

42,24 143,88 518,00

624.240,00 990.320,00 153.815,00

26.367.897,60 142.487.241,60 79.676.170,00

m3

15,84

5.310.781,00

84.122.771,04

m3 m3

6,88 2,57

8.493.687,00 6.645.244,60

58.436.566,56 17.078.278,62

m2 m2

1.036,00 1.036,00

68.823,80 40.225,00

71.301.456,80 41.673.100,00

m2 m2

9,00 20,80

850.000,00 580.000,00

7.650.000,00 12.064.000,00

m1

232,00

94.800,00

21.993.600,00

Total Pekerjaan Pagar

579.029.002,22

Pekerjaan Pagar Depan Pintu Besi Rangka Hollow termasuk aksesoris (engsel,kunci dll) Pagar Besi Rangka Besi Hollow

6

m2 m2 m3 m' ls

Pekerjaan Plesteran dan Acian Plesteran dinding bata 1:4 untuk dinding dan kolom Pekerjaan acia dinding dan kolom

5

100.000.000,00 100.000.000,00

Pekerjaan Beton Bertulang a b

4

1,00 100.000.000,00 Total Pekerjaan Persiapan

TOTAL PEKERJAAN (Rp.)

Pekerjaan Tanah dan Galian a b c

3

HARGA SATUAN (Rp.)

Pekerjaan Pagar Keliling Pekerjaan Tanah dan Galian a b c

2

Ls

VOLUME

Pekerjaan Halaman dan Area Parkir a b c d e f

C. 1

Mobilisasi Peralatan dan Tenaga Kerja

SAT.

Pekerjaan Kawat Duri Pekerjaan Kawat Duri Keliling termasuk besi siku

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING

ITEM PEKERJAAN

No.

III.

PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING

A. 1

PEKERJAAN MEKANIKAL ELEKTRIKAL Peralatan Utama (Panel-Panel)

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

Pengadaan dan pemasangan peralatan utama Elektrikal, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. A.1 1 2 3 4

Panel-Panel Main distribusi Panel (MDP) Panel Penerangan - A (LP-A) lantai 1 Panel AC- A (PP-AC, A) Lantai 1 COS 160 A

lot unit unit unit unit

1,00 1,00 1,00 1,00 1,00

7.500.000 10.000.000 7.000.000 4.000.000 12.000.000

Total Pekerjaan Peralatan Utama (Panel-Panel) 2

7.500.000,00 10.000.000,00 7.000.000,00 4.000.000,00 12.000.000,00 40.500.000,00

Pekerjaan Kabel Feeder Pengadaan dan pemasangan Kabel Feeder, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. 1 2 3 4 5

Kabel NYY 4X50mm2 dari meter PLN ke MDP Kabel NYY 4X10mm2 dari MDP ke panel LP-A Kabel NYY 4X10mm2 dari MDP ke panel LP-B Kabel NYY 4X25mm2 dari MDP ke panel PP-AC,A Kabel NYY 4X25mm2 dari MDP ke panel PP-AC,B

m m m m m

50,00 15,00 15,00 8,00 10,00

265.500 107.900 107.900 147.100 147.100

Total Pekerjaan Kabel Feeder 3

19.159.800,00

Peralatan Instalasi Titik Lampu dan Daya Pengadaan dan pemasangan peralatan Instalasi Penerangan & Stop Kontak, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

1 4 5 6 7 8 9 10 11 13 14 15 16

Fixtures unit TL 2x36w TKI + Louver Down light PL 9 watt Down light PL 18 watt Lampu Baret 18 watt Stop kontak 100A Stop kontak AC Saklar tunggal Saklar Seri Saklar Hotel Instalasi titik lampu dalam bangunan NYM 3x2.5mm2 Instalasi titik stop kontak dalam bangunan NYM 3x2.5mm2 dalam PVC conduit Instalasi titik stop kontak AC dalam bangunan NYM 3x2.5mm2 dalam PVC conduit Grounding

bh bh bh bh bh bh bh bh bh titik titik titik titik

62,00 20,00 40,00 10,00 42,00 48,00 16,00 12,00 2,00 152,00 44,00 48,00 1,00

725.750 109.300 151.700 347.400 88.500 146.800 77.900 88.500 142.750 182.000 227.500 273.000 2.000.000

Total Pekerjaan Instalasi Titik Lampu dan Daya 4

13.275.000,00 1.618.500,00 1.618.500,00 1.176.800,00 1.471.000,00

44.996.500,00 2.186.000,00 6.068.000,00 3.474.000,00 3.717.000,00 7.046.400,00 1.246.400,00 1.062.000,00 285.500,00 27.664.000,00 10.010.000,00 13.104.000,00 2.000.000,00 122.859.800,00

Pekerjaan Kabel Ladder Pengadaan dan pemasangan Kabel ladder, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis.

a Kabel Ladder W = 200 mm T = 100 mm b Material Bantu + Fitting

m lot

50,00 1,00

293.000 2.000.000

Total Pekerjaan Kabel Ledder 5

14.650.000,00 2.000.000,00 16.650.000,00

Pekerjaan Penangkal Petir Pengadaan dan pemasangan peralatan utama Penangkal Petir, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

1 Air Terminal Jenis Prinsip Kerja Ketahanan Material IP

: : : : :

Convesional Individual 100 kA ( minimal ) Tembaga Murni Minimum 54

2 Kabel penghantar Type : Material : Tegangan :

BC 50mm2 Tembaga 24 Kv ( minimum )

3 Tiang Type : Material : Ukuran ( Tinggi ) :

Teleskopik Medium A 1000 mm

bh

4,00

500.000

2.000.000,00

m

85,00

40.000

3.400.000,00

bh

6,00

200.000

1.200.000,00

4 Ground rood

unit

2,00

3.000.000

6.000.000,00

5 Bak Kontrol 500 mm x 500mm x 500mm

bh

6 Testing & Commissioning

lot

2,00

600.000

1.200.000,00

1,00

1.500.000

1.500.000,00

Total Pekerjaan Penangkal Petir 6 A.

13.300.000,00

PEKERJAAN FIRE ALARM Peralatan Utama Pekerjaan Fire Alarm

Pengadaan dan pemasangan Peralatan utama Fire Alarm, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis. 1

MCP - FA c/w UPS type : Conventional kapasitas : 15 Zone

B

Pekerjaan Instalasi Fire Alarm

set

1,00

7.132.000

7.132.000,00

bh bh bh bh bh

2,00 4,00 10,00 20,00 34,00

492.000 645.000 598.000 545.000 419.052

984.000,00 2.580.000,00 5.980.000,00 10.900.000,00 14.247.768,00

lot

1,00

1.500.000

Pengadaan dan pemasangan Instalasi Fire Alarm, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai gambar perencanaan & spesifikasi teknis. B.1

Lantai Dasar 1 Manual Fush button 2 Alarm bell 3 Rate of rise detector 4 Smoke detector 5 Instalasi titik alarm dalam bangunan NYA 2x1.5mm2

C

Testing & Commissioning

Total Pekerjaan Fire Alarm VI

PEKERJAAN CCTV Pengadaan dan pemasangan peralatan utama Pekerjaan CCTV, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. Digital vidio recorder 16 chanel (DVR) Computer Desktop + LCD MONITOR 21 inch. Dome Camera LG / Samsung UPS 2200 VA LG TV LED 32" Kabel dan Accessories a. kabel UTP b. Jack adaptor c. Kabel power 2x 1.5mm d. PTT 50x50 d. Pipa Conduit e. Kabel RG6/GA f. Stop kontak 6 lubang g. Connector BNC/RJ 45

unit unit unit unit unit

1,00 1,00 16,00 1,00 2,00

16.000.000 7.500.000 1.800.000 2.500.000 3.500.000

16.000.000,00 7.500.000,00 28.800.000,00 2.500.000,00 7.000.000,00

Lot

1,00

8.460.000

8.460.000,00

Total Pekerjaan CCTV B.

PEKERJAAN PLUMBING

1

Peralatan Utama Plumbing

A.1

1.500.000,00 43.323.768,00

70.260.000,00

Peralatan Utama Air Bersih Pengadaan dan pemasangan Peralatan Utama, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. a Pompa Air Tanah Kapasitas : Total Head : Daya Listrik : Data Listrik : Type : Lokasi :

unit

1,00

7.035.000

7.035.000,00

unit

4,00

4.312.500

17.250.000,00

m' bh lot

80,00 4,00 1,00

184.050 120.000 1.500.000

14.724.000,00 480.000,00 1.500.000,00

m1

50,00

2.500.000

125.000.000,00

50 LPM 50 mtr 1,5 KW 220 V/1 Ph/50 Hz Jet pump (Sanyo, Groundfos, Shimitsu) Parkir Belakang

b Tanki Air Kapasitas : Type : Stainless Steel Lokasi : Lt. Atap Office .- Pipa GIP Ø25 .- Gate Valve dia 25 Fitting dan accessories pipa air bersih

2 m³

c Pengeboran Sumur Dalam (Deep Well) asumsi kedalaman 50 meter

Total Pekerjaan Peralatan Air Bersih

165.989.000,00

2 Pekerjaan Instalasi Plumbing Pengadaan dan pemasangan Air Bersih bahan pipa PVC AW / GIP, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. AIR KOTOR dan air bekas .- SEPTIC TANK Kap. 2000 liter .- Pipa Pvc Ø150 (AW) .- Pipa Pvc Ø100 (AW) .- Pipa Pvc Ø80 (AW) .- Pipa Pvc Ø50 (AW)

unit m' m' m' m'

1,00 20,00 18,00 25,00 18,00

11.425.000 93.655 69.463 54.387 41.876

11.425.000,00 1.873.100,00 1.250.334,00 1.359.675,00 753.771,60

Pipa Riser .- Pipa Pvc Ø100 (AW) .- Pipa Pvc Ø80 (AW)

m' m'

4,00 4,00

50.138 37.312

200.552,00 149.248,00

Fitting dan accessories pipa air kotor

lot

1,00

1.000.000

1.000.000,00

AIR BERSIH .- Pompa distribusi .- Foot valve dia 25 .- Ploat valve dia 25 .- Pipa GIP Ø15 .- Pipa GIP Ø20 .- Pipa GIP Ø25 .- Gate Valve dia 25

unit bh bh m' m' m' bh

1,00 1,00 1,00 30,00 6,00 15,00 2,00

4.385.000 100.000 100.000 143.550 159.750 184.050 120.000

4.385.000,00 100.000,00 100.000,00 4.306.500,00 958.500,00 2.760.750,00 240.000,00

3 Pipa air Hujan .- Pipa Pvc Ø80 (AW) .- Pipa Pvc Ø100 (AW) .- Pipa Pvc Ø150 (AW) ,_ Roof drain dia 80 ._ Fitting dan accessories pipa air bersih

m' m' m' bh lot

46,00 25,00 42,00 8,00 1,00

37.312 69.463 93.655 600.000 1.000.000

1.716.352,00 1.736.575,00 3.933.510,00 4.800.000,00 1.000.000,00

4 Testing & Commissioning

lot

1,00

1.500.000

Total Pekerjaan Peralatan Air Bersih

1.500.000,00 45.548.867,60

2 Pekerjaan Instalasi Gas Medik Pengadaan dan pemasangan Air Bersih bahan pipa GIP, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. a Mesin Gas Medik

Set

b Instalasi Gas Medik .- Pipa Stenlis Ø15 .- Pipa Stenlis Ø20 .- Pipa Stenlis Ø25 .- Gate Valve dia 25

m' m' m' bh

1,00

85.000.000

40,00 260.000 40,00 300.000 40,00 340.000 50,00 120.000 Total Pekerjaan Instalasi Gas Medik

85.000.000,00

10.400.000,00 12.000.000,00 13.600.000,00 6.000.000,00 127.000.000,00

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PEKERJAAN PENGADAAN DAN PEMASANGAN PENDINGIN UDARA (AC)

ITEM PEKERJAAN

No.

IV.

PEKERJAAN VAC

A

Peralatan Utama AC Split

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

Pengadaan dan pemasangan peralatan utama AC Split, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. a AC Wall mounted Kapasitas Sensible Supply Udara Daya Listrik Data Listrik Tipe IU Lokasi

: : : : : : :

b AC Wall mounted : Kapasitas : Sensible : Supply Udara : Daya Listrik : Data Listrik : Tipe IU : Lokasi c AC Ceilling Kapasitas Sensible Supply Udara Daya Listrik Data Listrik Tipe IU Lokasi

: : : : : : :

e AC Floor standing : Kapasitas : Sensible : Supply Udara : Daya Listrik : Data Listrik : Tipe IU : Lokasi AC Wall mounted : Kapasitas : Sensible : Supply Udara : Daya Listrik : Data Listrik : Tipe IU : Lokasi

f

AC Wall mounted : Kapasitas : Sensible : Supply Udara : Daya Listrik : Data Listrik : Tipe IU : Lokasi

g

B

12.000 8.571 1.400 1.5

Btu/h Btu/h Cfm KW

9.000 6.358 262 1

Btu/h Btu/h Cfm KW

18.000 12.587 2.134 2

Btu/h Btu/h Cfm KW

27.000 19.285 1.260 3

Btu/h Btu/h Cfm KW

6.000 4.246 175 0,7

Btu/h Btu/h Cfm KW

18.000 12.587 2.134 2

Btu/h Btu/h Cfm KW

unit

20,00

7.498.000

149.960.000,00

unit

20,00

6.332.000

126.640.000,00

unit

10,00

19.063.000

190.630.000,00

unit

6,00

32.960.000

197.760.000,00

unit

10,00

5.802.000

58.020.000,00

unit

10,00

10.823.000

108.230.000,00

unit

10,00

858.000,00

8.580.000,00

unit

1,00

1.000.000,00

1.000.000,00

380 V/3 Ph/50 Hz Wall mounted Ruang Kerja

380 V/3 Ph/50 Hz Wall mounted Ruang Kerja

380 V/3 Ph/50 Hz Ceilling Ruang Nasabah

380 V/3 Ph/50 Hz Floor Standing Ruang Teller

220 V/1 Ph/50 Hz Wall Mounted R. Meeting

380 V/3 Ph/50 Hz Wall Mounted Ruang Kerja

Peralatan Utama Exhaust Fan Pengadaan dan pemasangan peralatan utama Exhaust Fan, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis.

a Ceilling Fan Kapasitas Daya Motor Data Listrik Type Fan Lokasi b

: : : : :

Fan - EF-1.1 Kapasitas : Daya Motor : Data Listrik : Type Fan : Ruang Yg. Dilayani : Lokasi :

50 Cfm 0.02 KW 220 V/1 Ph/50 Hz Ceilling fan lantai 1

50 Cfm 0.02 KW 220 V/1 Ph/50 Hz Wall fan Khasanah lantai 1

C.

Pekerjaan Instalasi VAC a. Pipa Refrigerant Pengadaan dan pemasangan pipa Refrigerant bahan pipa Tembaga, lengkap terpasang dengan isolasi accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis. - Pipa RefrigerantØ 1/4" - Pipa RefrigerantØ 3/8" Material bantu + fitting

m m lot

360,00 360,00 1,00

96.340 117.460 3.000.000

34.682.400,00 42.285.600,00 3.000.000,00

m lot

100,00 1,00

15.960 500.000

1.596.000,00 500.000,00

lot

1,00

b. Pipa Drain Pengadaan dan pemasangan pipa Drain bahan pipa PVC class AW, lengkap terpasang dengan isolasi dan accessories lain yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis. - Pipa Drain Ø 20mm Material bantu + fitting c. Testing & Commissioning

1.500.000 Total Pekerjaan AC

1.500.000,00 924.384.000,00

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PEKERJAAN PENGADAAN DAN PEMASANGAN TELEPHONE / FAX / IT

Pengadaan dan pemasangan peralatan utama Pekerjaan TELEPHONE, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. a. PABX Key Telephone b. Terminal Box Telephone c. Extension Key Telephone d. Direct Key Telephone e. Outlet Telehone f. Instalasi Outlet Telehone ITC 2(2x0.6mm2) dalam conduit 5/8" g. Nurse Call Digital Commax

unit unit unit unit bh titik Set

1,00 2,00 18,00 5,00 30,00 30,00 3,00

7.500.000 1.500.000 400.000 450.000 125.000 479.440 135.000.000

7.500.000,00 3.000.000,00 7.200.000,00 2.250.000,00 3.750.000,00 14.383.200,00 405.000.000,00

unit unit bh titik

1,00 1,00 30,00 30,00

9.610.000 3.500.000 200.000 424.320

9.610.000,00 3.500.000,00 6.000.000,00 12.729.600,00

unit unit m' unit unit unit

4,00 1,00 50,00 1,00 1,00 30,00

1.500.000 5.000.000 424.400 1.800.000 1.500.000 300.000

6.000.000,00 5.000.000,00 21.220.000,00 1.800.000,00 1.500.000,00 9.000.000,00

PEKERJAAN TELEPHONE / FAX / IT

A.

PEKERJAAN TELEPHONE

VOLUME

PEKERJAAN DATA / LAN Pengadaan dan pemasangan peralatan utama Pekerjaan DATA, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. a. Server b. HUB c. Outlet data d. Instalasi Outlet data UTP CAT 5 (4 Pair) didalam Conduit 5/8"

C.

TOTAL PEKERJAAN (Rp.)

SAT.

V.

B.

HARGA SATUAN (Rp.)

ITEM PEKERJAAN

No.

PEKERJAAN CAR CALLING a. Horn Speaker b. Amplipier 150 watt c. Kabel MYMHY 3 x 1,5 mm d. Kotak Sound System/Car Call e. Paging Microphone f. Ceilling Speaker

Total PekerjaanTelephone

519.442.800,00

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PEKERJAAN PENGADAAN DAN PEMASANGAN GENERATOR

ITEM PEKERJAAN

No.

VII

PEKERJAAN GENSET

A.

Peralatan Utama Genset

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

Pengadaan dan pemasangan Peralatan Utama Genset, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. 1

Genset Type : Silent Kapasitas : 500 kVA Dimensi : 2200 x 1000 x 1620 mm Berat : 1.500 Kg Voltage : 380V/ 3 Ph/ 50Hz Rotasi : 1500 Rpm Sistem Pendingin : Air Radiator Fuel : Solar Kabel NYY 4X35mm2 dari Genset ke MDP

unit

1,00

320.000.000

320.000.000,00

m1

100,00

203.100

20.310.000,00

2

Panel Kontrol Genset ( CPGS )

unit

1,00

3.500.000

3.500.000,00

3

Instalasi Pipa Kenalpot dari Genset ke Area Luar c/w Silencer Residensial

lot

1,00

1.500.000

1.500.000,00

4

Tanki Mingguan c/w Dudukan Tanki Kapasitas : Panjang : Diameter : Tebal Plate :

set

1,00

5.000.000

5.000.000,00

1000 1500 800 4

liter mm mm mm

5

Pompa Tangan ( Solar )

bh

1,00

500.000

500.000,00

6

Instalasi Pipa BBM (Solar) Pipa BS Sch 40 Pipa BBA : - Pipa Ø 32 FOS Material Bantu + Fitting

m lot

20,00 1,00

100.000 500.000

2.000.000,00 500.000,00

Total PekerjaanTelephone

353.310.000,00

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PEKERJAAN PENYAMBUNGAN DAYA PLN

ITEM PEKERJAAN

No.

VIII

PENYAMBUNGAN PLN

A.

Peralatan Utama Genset

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

Pengadaan dan pemasangan Peralatan Utama, lengkap terpasang dengan alat bantu dan accessories lain yang diperlukan sesuai dengan gambar perencanaan & spesifikasi teknis. 1

Gardu Sipil Type 7R2 u/400 x 400 Standart PLN Lengkap - Pentanahan - Main Hole / Pit Kabel dengan Tutup Caker Plat - Pintu Baja

unit

1,00

74.500.000

74.500.000,00

2

Cubickle Type IM Cubickle Type PM Pentanahan Cubikle

unit unit unit

1,00 1,00 1,00

43.100.000 23.200.000 4.000.000

43.100.000,00 23.200.000,00 4.000.000,00

3

Transformator Indoor Kap 400 KVA Pentanahan Transformator

unit unit

1,00 1,00

45.000.000 3.500.000

45.000.000,00 3.500.000,00

4

PGTR 4 Jurusan Pentanahan PTGR

unit unit

1,00 1,00

12.200.000 3.500.000

12.200.000,00 3.500.000,00

5

Kabel TM dari Qubickle ke Transformator N2XSY 3x1x50mm

m1

10,00

300.000

3.000.000,00

6

Kabel TR dari Transformator ke PGTR NYY 4 x 120 mm

m1

10,00

1.102.000

11.020.000,00

Total Pekerjaan Penyambungan PLN

223.020.000,00

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PENGADAAN KENDARAAN OPERASIONAL

ITEM PEKERJAAN

No.

IX

PENGADAAN KENDARAAN OPERASIONAL

A.

Kendaraan Operasional Kepala Klinik

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

Pengadaan Kendaraan Operasional, lengkap Surat On The Road sesuai dengan spesifikasi teknis.

1

Kendaraan Operasional Kijang Inova (On The Road) - Type 2.0 G-MT - Bahan Bakar Bensin - Warna Disesuaikan

unit

1,00

340.000.000

340.000.000,00

B.

Kendaraan Operasional Dokter dan Operasional Klinik Lainnya

1

Kendaraan Operasional Kijang Avansa (On The Road) - Type 1.3 G-MT - Bahan Bakar Bensin - Warna Disesuaikan

unit

4,00

212.000.000

848.000.000,00

2

Kendaraan Operasional Mobil Box - Type 1.3 G-MT - Bahan Bakar Bensin - Warna Disesuaikan

unit

1,00

187.000.000

187.000.000,00

Total Pengadaan Kendaraan Operasional :

1.375.000.000,00

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

No.

XII

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PENGADAAN KENDARAAN AMBULANCE

ITEM PEKERJAAN

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

PENGADAAN KENDARAAN AMBULANCE

Pengadaan Kendaraan Operasional, lengkap Surat On The Road sesuai dengan spesifikasi teknis.

1

Pemesanan Kendaraan Ambulance Mitshubisi Strada Triton - Type Deluxe SC. 4 x 4 - Bahan Bakar Bensin - Warna Disesuaikan & di Brending

unit

1,00

590.910.000

590.910.000,00

2

Pemesanan Kendaraan Ambulance TATA Super AC - Type Jenasah - Bahan Bakar Bensin - Warna Disesuaikan

unit

1,00

264.000.000

264.000.000,00

Total Pengadaan Ambulance

854.910.000,00

REKAPITULASI ANGGARAN BIAYA PROYEK LOKASI PEKERJAAN

: : :

PAKET KERJA

:

PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA PENGADAAN DAN PENGEMBANGAN SDM PENGADAAN KENDARAAN RODA DUA (MOTOR)

ITEM PEKERJAAN

No.

X

SAT.

VOLUME

HARGA SATUAN (Rp.)

TOTAL PEKERJAAN (Rp.)

PENGADAAN KENDARAAN SEPEDA MOTOR

Pengadaan Kendaraan Operasional, lengkap Surat On The Road sesuai dengan spesifikasi teknis.

1

Kendaraan Roda Dua Motor Yamaha - Type N.MAX Non ABS - Bahan Bakar Bensin - Warna Disesuaikan & di Brending

unit

4,00

28.500.000

114.000.000,00

2

Kendaraan Roda Dua Motor Yamaha - Type Fino Premium FI - SE - Bahan Bakar Bensin - Warna Disesuaikan & di Brending

unit

2,00

18.000.000

36.000.000,00

Total Pengadaan Sepeda Motor

150.000.000,00

Related Documents

Rab Klinik Type3
March 2021 0
Rab Pkrs
January 2021 2
Rab Jalan.docx
March 2021 0
Rab Blk.xlsx
January 2021 2
Pembiayaan Klinik
March 2021 0
Klinik Pratama
March 2021 0

More Documents from "luthfia choirunnisa"