Rencana Anggaran Biaya Pekerjaan Pembuatan Talud Batu Kali Belawan International Container Terminal No I 1 2 3 4

II 1 2 3 4 5 6 7 8 9 10

III

Uraian pekerjaan PEKERJAAN PERSIPAN & PENGUJIAN Mobilisasi dan demobilisasi alat Pembersihan lokasi Test kuat tekan beton Rambu-rambu keselamatan

PEKERJAAN TALUD Galian tanah pondasi di daerah pasang surut Cerucuk kayu laut dia 4" L = 4 m Lantai kerja 1 : 3 : 5 Balok grid, beton bertulang 25 x 40 cm Balok penutup atas, beton bertulang 15 x 55 cm Balok pondasi beton cor Pasangan batu kali 1 : 3 Plesteran/siar batu kali 1 : 3 Saluran pipa air PVC dia 2" Dewatering

PEKERJAAN LAIN-LAIN 1 Pembersihan akhir 2 Photo dokumentasi dan administrasi

Sat

ls ls ls ls

3

m m1 m3 3 m 3 m 3 m m3 m2 unit ls

ls ls

Vol

Harga Sat

Jumlah harga

1.00 1.00 1.00 1.00

9,104,000.00 3,500,000.00 1,500,000.00 3,000,000.00 Jumlah I

9,104,000.00 3,500,000.00 1,500,000.00 3,000,000.00 17,104,000.00

175.35 1,670.00 8.35 33.40 13.36 86.84 115.23 384.10 167.00 1.00

57,145.00 37,965.00 534,530.00 2,956,797.18 2,753,005.17 2,226,685.00 757,556.00 47,575.00 14,325.00 11,304,000.00 Jumlah II

10,020,375.75 63,401,550.00 4,463,325.50 98,757,025.93 36,780,149.07 193,365,325.44 87,293,177.88 18,273,557.50 2,392,275.00 11,304,000.00 526,050,762.07

1.00 1.00

1,300,000.00 1,000,000.00 Jumlah III

1,300,000.00 1,000,000.00 2,300,000.00

Rekapitulasi Harga Pekerjaan Pembuatan Talud Batu Kali Belawan International Container Terminal No

Uraian pekerjaan

I

PEKERJAAN PERSIAPAN

III

PEKERJAAN TALUD

V

PEKERJAAN LAIN-LAIN

Jumlah

Ket

17,104,000.00

526,050,762.07

2,300,000.00

Jumlah PPN 10 % Total Dibulatkan

: : : :

545,454,762.07 54,545,476.21 600,000,238.28 600,000,000.00

Terbilang : enam ratus juta rupiah

Belawan,

Dibuat oleh, CV / PT …………………………… DINAS PENYIAPAN FASILITAS ASISTEN MANAJER

Disetujui oleh, MANAJER TEKNIK

RUDI MARLA

2009

(………………………………………) SYAHMENAN TARMIZI

Ditetapkan oleh, GENERAL MANAGER

TRIPICCANTO

Analisa Harga Satuan Pekerjaan Perkerasan Lapangan Penumpukan Eks Kantin dan Kantor Operator Perusahaan Pelayaran Belawan International Container Terminal 1.

3

1 m galian tanah biasa NO Uraian I Bahan II Alat 1 excavator 2 dump truck III Upah 1 pekerja 2 mandor

sat

koef

Harga sat (Rp)

jam jam

0.025 0.025

475,000.00 125,000.00 Jumlah

11,875.00 3,125.00 11,875.00

hr hr

0.050 0.010

55,000.00 65,000.00 Jumlah

2,750.00 650.00 3,400.00

Total 2.

2

1m NO I 1 2

pasangan bata 1/2 batu 1 : 4 Uraian Bahan batu bata semen

koef

bh zak m3

55.000 0.300

850.00 48,000.00

46,750.00 14,400.00

0.030

80,000.00 Jumlah

2,400.00 63,550.00

II Alat 1 alat bantu

ls

1.000

500.00 Jumlah

500.00 500.00

III 1 2 3 4

hr hr hr hr

0.200 0.025 0.167 0.017

55,000.00 65,000.00 75,000.00 80,000.00 Jumlah

11,000.00 1,625.00 12,500.00 1,333.33 26,458.33

Upah pekerja mandor tukang kepala tukang

Harga sat (Rp)

Total 1 kg pembesian No Uraian I Bahan : 1 besi beton 2 kawat beton II Alat : 1 bar bender 2 bar cutter III 1 2 3

Upah pekerja tukang kepala tukang

Sat

Koef

Harga sat. (Rp)

Jlh. Harga (Rp)

90,508.33

Jlh harga (Rp)

kg kg

1.100 0.010

9,375.00 14,500.00 Jumlah

10,312.50 145.00 10,457.50

jam jam

0.009 0.009

15,000.00 15,000.00 Jumlah

141.97 141.97 283.93

hr hr hr

0.020 0.015 0.004

55,000.00 75,000.00 80,000.00 Jumlah

1,100.00 1,125.00 320.00 2,545.00

Total 4.

15,275.00

sat

3 pasir

3.

Jlh. Harga (Rp)

1 m3 beton 0,3 x 0,4 balok penutup coneblock No Uraian sat koef harga sat (Rp) 1 beton ready mix K 225 m3 1.000 716,000.00 2 besi beton kg 0.000 13,286.43 2 3 bekisting, 3 kali pakai m 1.440 102,547.23 4 pengecoran m3 1.000 75,000.00 5 vibrator hr 0.125 150,000.00

13,286.43

Jlh harga (Rp) 716,000.00 0.00 147,668.02 75,000.00 18,750.00 957,418.02

5.

6.

7.

8.

9.

3

1m No 1 2 3 4 5

beton kanstein 0,3 x 1,2 Uraian beton ready mix K 225 besi beton bekisting, 3 x pakai pengecoran vibrator

sat m3 kg 2 m m3 hr

koef harga sat (Rp) 1.000 716,000.00 48.630 13,286.43 6.648 102,547.23 1.000 75,000.00 0.125 150,000.00

Jlh harga (Rp) 716,000.00 646,119.19 681,734.01 75,000.00 18,750.00 2,137,603.20

1 m3 beton kanstein 0,2 x 0,9 No Uraian 1 beton ready mix K 225 2 besi beton 3 bekisting, 3 kali pakai 4 pengecoran 5 vibrator

sat m3 kg m2 m3 hr

koef harga sat (Rp) 1.000 716,000.00 71.148 13,286.43 9.900 102,547.23 1.000 75,000.00 0.125 150,000.00

Jlh harga (Rp) 716,000.00 945,303.07 1,015,217.61 75,000.00 18,750.00 2,770,270.68

1 m3 parit beton No Uraian 1 beton ready mix K 225 2 besi beton 3 bekisting, 3 kali pakai 4 pengecoran 5 vibrator

sat 3 m kg m2 m3 hr

koef harga sat (Rp) 1.000 716,000.00 60.318 13,286.43 12.800 102,547.23 1.000 75,000.00 0.125 150,000.00

Jlh harga (Rp) 716,000.00 801,411.01 1,312,604.59 75,000.00 18,750.00 2,923,765.59

Sat

Koef

Jlh harga (Rp)

bh m3

44.000 0.050

4,500.00 80,000.00 Jumlah

198,000.00 4,000.00 198,000.00

II Alat : 1 alat bantu

ls

1.000

1,500.00 Jumlah

1,500.00 1,500.00

III Upah 1 pekerja 2 mandor

hr hr

0.160 0.060

55,000.00 65,000.00 Jumlah

8,800.00 3,900.00 12,700.00

Total

212,200.00

1 m2 memasang coneblock baru No Uraian I Bahan : 1 coneblock 2 pasir timbun

Harga sat. (Rp)

3

1 m base coarse class A No Uraian I Bahan :

Sat

1 base coarse

m

II Alat : 1 motor grader 2 vibro roller III Upah 1 pekerja

3

Koef

Harga sat. (Rp)

Jlh harga (Rp)

1.150

370,000.00 Jumlah

425,500.00 425,500.00

jam jam

0.085 0.075

225,000.00 250,000.00 Jumlah

19,125.00 18,750.00 37,875.00

hr

0.300

55,000.00 Jumlah

16,500.00 16,500.00

Total

479,875.00

3 10. 1 m base coarse class B No Uraian I Bahan :

1 base coarse class B II Alat : 1 motor grader 2 vibro roller III Upah 1 pekerja

Sat m

3

Koef

Harga sat. (Rp)

1.150

330,000.00 Jumlah

379,500.00 379,500.00

jam jam

0.085 0.075

225,000.00 250,000.00 Jumlah

19,125.00 18,750.00 37,875.00

hr

0.300

55,000.00 Jumlah

16,500.00 16,500.00

Total 11. 1 unit manhole drainase RCP No Uraian I Bahan : 1 beton ready mix K 225 2 besi beton 3 bekisting 4 field gully

Jlh harga (Rp)

Sat m3 kg m2 unit

Koef

433,875.00

Harga sat. (Rp)

Jlh harga (Rp)

3.208 195.162 24.480 1.000

716,000.00 13,286.43 125,000.00 650,000.00 Jumlah

2,296,641.60 2,593,006.65 3,060,000.00 650,000.00 8,599,648.25

II Alat : 1 alat bantu

ls

1.000

15,000.00 Jumlah

15,000.00 15,000.00

III 1 2 2 4

hr hr hr hr

6.000 0.600 1.500 0.150

55,000.00 65,000.00 75,000.00 80,000.00 Jumlah

330,000.00 39,000.00 112,500.00 12,000.00 493,500.00

Upah pekerja mandor tukang kepala tukang

Total

9,108,148.25

2

12. 1 m bongkar coneblock No Uraian I Bahan : 1 -

Sat

Koef

Harga sat. (Rp)

Jlh harga (Rp)

-

-

Jumlah

0.00

II Alat : 1 alat bantu

ls

1.000

750.00 Jumlah

750.00 750.00

III Upah 1 pekerja 2 mandor

hr hr

0.100 0.010

55,000.00 65,000.00 Jumlah

5,500.00 650.00 6,150.00

Total

6,900.00

2

13. 1 m memasang kembali coneblock lama No Uraian Sat I Bahan : 1 pasir timbun m3

Koef

Harga sat. (Rp)

Jlh harga (Rp)

0.050

0.00 Jumlah

0.00 0.00

II Alat : 1 alat bantu

ls

1.000

750.00 Jumlah

750.00 750.00

III Upah 1 pekerja 2 tukang

hr hr

0.120 0.060

55,000.00 75,000.00 Jumlah

6,600.00 4,500.00 11,100.00

Total

11,850.00

14. 1 m3 galian tanah No Uraian I Bahan : 1 -

Sat

Koef

-

-

Harga sat. (Rp) Jumlah harga (Rp) -

0.00

II Alat : 1

-

III Upah : 1 pekerja 2 mandor

-

hr hr

15. 1 m3 galian tanah keras No Uraian I Bahan : 1 -

-

0.500 0.050

Sat

Koef

-

-

Jumlah 55,000.00 65,000.00

0.00 27,500.00 3,250.00 30,750.00

Harga sat. (Rp) Jumlah harga (Rp) -

0.00

II Alat : 1

-

III Upah : 1 pekerja 2 mandor

-

hr hr

16. 1 m3 beton 1 : 3 : 5 untuk lantai kerja No Uraian Sat I Bahan : 1 semen zak 2 pasir beton m3 3 batu kerikil m3

-

1.000 0.033

Koef

Jumlah

0.00

55,000.00 65,000.00

55,000.00 2,145.00 57,145.00

Total

57,145.00

Harga sat. (Rp) Jumlah harga (Rp)

4.945 0.550 0.930

48,000.00 80,000.00 116,000.00 Jumlah

237,360.00 44,000.00 107,880.00 389,240.00

II Alat : 1 concrete mixer

hr

0.250

125,000.00 Jumlah

31,250.00 31,250.00

III 1 2 3 4

hr hr hr hr

1.500 0.007 0.375 0.037

55,000.00 65,000.00 75,000.00 80,000.00

82,500.00 455.00 28,125.00 2,960.00 114,040.00

Total

534,530.00

Upah pekerja mandor tukang kepala tukang

17. 1 m2 cetakan beton (bekisting) untuk balok grid 25 x 40 No Uraian Sat Koef Harga sat. (Rp) Jumlah harga (Rp) I Bahan : 3 1 Kayu m 0.014 5,075,000.00 73,333.75 2 Plywood lbr 0.295 155,000.00 45,717.25 3 Paku kg 0.400 11,600.00 4,640.00

II Alat : 1 III 1 2 3 4 5

Jumlah

123,691.00

Jumlah

0.00

-

Upah pekerja mandor tukang kepala tukang tukang (bongkar cetakan)

hr hr hr hr hr

0.120 0.050 0.150 0.150 0.120

55,000.00 65,000.00 75,000.00 80,000.00 55,000.00 Jumlah Total

6,600.00 3,250.00 11,250.00 12,000.00 6,600.00 39,700.00 163,391.00

18. 1 m2 cetakan beton (bekisting) untuk pondasi beton No Uraian Sat Koef Harga sat. (Rp) Jumlah harga (Rp) I Bahan : 3

1 Kayu 2 Plywood 3 Paku

II Alat : 1 III 1 2 3 4

m lbr kg

0.043 0.295 0.400

5,075,000.00 116,000.00 11,475.00

215,687.50 34,214.20 4,590.00

Jumlah

254,491.70

Jumlah

0.00

-

Upah pekerja mandor tukang kepala tukang

hr hr hr hr

0.200 0.010 0.500 0.050

55,000.00 65,000.00 75,000.00 80,000.00 Jumlah Total

11,000.00 650.00 37,500.00 4,000.00 53,150.00 307,641.70

19. 1 m2 cetakan beton (bekisting) untuk balok penutup atas No Uraian Sat Koef Harga sat. (Rp) Jumlah harga (Rp) I Bahan : 1 Kayu m3 0.021 5,075,000.00 107,843.75 2 Plywood lbr 0.295 116,000.00 34,214.20 3 Paku kg 0.400 11,475.00 4,590.00

II Alat : 1 III 1 2 3 4

Jumlah

146,647.95

Jumlah

0.00

-

Upah pekerja mandor tukang kepala tukang

hr hr hr hr

0.200 0.010 0.500 0.050

55,000.00 65,000.00 75,000.00 80,000.00 Jumlah Total

11,000.00 650.00 37,500.00 4,000.00 53,150.00 199,797.95

20. 1 m3 beton bertulang 15 x 55 cm, balok penutup atas No Uraian Sat Koef Harga sat. (Rp) Jumlah harga (Rp) 1 2 3 4 5

beton ready mix K225 bekisting, 2 kali pakai besi pengecoran vibrator

m3 m2 kg m3 hr

1.000 3.636 118.920 1.000 0.125

21. 1 m3 beton bertulang 25 x 40 cm, balok grid No Uraian Sat Koef 1 2 3 4 5

beton ready mix K225 bekisting, 2 kali pakai besi pengecoran vibrator

3

m m2 kg m3 hr

1.000 8.000 101.446 1.000 0.125

716,000.00 99,898.98 13,286.43 75,000.00 150,000.00 Jumlah

716,000.00 363,232.67 1,580,022.50 75,000.00 18,750.00 2,753,005.17

Harga sat. (Rp) Jumlah harga (Rp) 716,000.00 99,898.98 13,286.43 75,000.00 150,000.00 Jumlah

716,000.00 799,191.80 1,347,855.38 75,000.00 18,750.00 2,956,797.18

22. 1 m3 pondasi beton No Uraian 1 2 3 4 5

beton ready mix K225 bekisting, 3 kali pakai besi pengecoran vibrator

23. 1 m3 pasangan batu kali/belah 1 : 3 No Uraian I Bahan : 1 semen 2 batu kali 3 pasir pasang

Sat 3

Koef

m 2 m kg m3 hr

1.000 4.126 74.800 1.000 0.125

Sat

Koef

Harga sat. (Rp) Jumlah harga (Rp) 716,000.00 102,547.23 13,286.43 75,000.00 150,000.00 Jumlah

716,000.00 423,109.88 993,825.12 75,000.00 18,750.00 2,226,685.00

Harga sat. (Rp) Jumlah harga (Rp)

zak m3 m3

3.100 1.200 0.430

48,000.00 250,000.00 80,000.00 Jumlah

148,800.00 300,000.00 34,400.00 483,200.00

II Alat : 1 alat bantu

ls

1.000

750.00 Jumlah

750.00 750.00

III 1 2 3 4

hr hr hr hr

2.700 1.350 0.134 0.202

55,000.00 75,000.00 80,000.00 65,000.00

148,500.00 101,250.00 10,752.00 13,104.00 273,606.00

Total

757,556.00

Upah : pekerja tukang kepala tukang mandor

24. 1 m2 plesteran/siar 1 : 3 tebal 15 mm No Uraian Sat I Bahan : 1 pasir pasang m3 2 semen zak

Koef

Harga sat. (Rp) Jumlah harga (Rp)

0.030 0.200

80,000.00 48,000.00 Jumlah

2,400.00 9,600.00 12,000.00

II Alat : 1 alat bantu

ls

1.000

750.00 Jumlah

750.00 750.00

III 1 2 3 4

hr hr hr hr

0.286 0.214 0.021 0.021

55,000.00 75,000.00 80,000.00 65,000.00 Jumlah

15,730.00 16,050.00 1,680.00 1,365.00 34,825.00

Upah : pekerja tukang kepala tukang mandor

Total 25. 1 m' kayu laut dipancang ke dalam tanah No Uraian Sat I Bahan : 1 kayu laut m

Koef

47,575.00

Harga sat. (Rp) Jumlah harga (Rp)

1.000

16,500.00 Jumlah

16,500.00 16,500.00

II Alat : 1 alat pancang

ls

0.009

400,000.00 Jumlah

3,500.00 3,500.00

III 1 2 3 4

hr hr hr hr

0.250 0.050 0.005 0.001

55,000.00 75,000.00 80,000.00 65,000.00 Jumlah

13,750.00 3,750.00 400.00 65.00 17,965.00

Upah : pekerja tukang kepala tukang mandor

Total

37,965.00

26. 1 unit saluran pipa air dari PVC dia 2" No Uraian Sat I Bahan : 1 pipa PVC m1 2 ijuk ls II Alat : 1

-

III Upah : 1 pekerja 2 mandor

-

hr hr

Koef

Harga sat. (Rp) Jumlah harga (Rp)

0.500 1.000

16,500.00 3,000.00 Jumlah

8,250.00 3,000.00 11,250.00

-

Jumlah

-

55,000.00 65,000.00 Jumlah

2,750.00 325.00 3,075.00

0.050 0.005

0.00

Total 27. Dewatering No I Bahan : 1

Uraian

Sat

Koef

-

-

-

Jumlah

unit

4.000

200,000.00 Jumlah

800,000.00 800,000.00

hr hr hr

1.500 0.750 0.05

55,000.00 75,000.00 65,000.00 Jumlah

82,500.00 56,250.00 3,250.00 142,000.00

Jumlah

942,000.00

II Alat : 1 pompa submersible 2" III 1 2 4

14,325.00

Upah : pekerja tukang mandor

Untuk 1 hari kerja (1 x frekwensi)

Harga sat. (Rp) Jumlah harga (Rp) 0.00 0.00

Frekwensi kerja yang berhubungan dengan pengeringan air diperkirakan sebanyak 12 kali. Total dewatering 28. Tanggul sementara 1 m' No Uraian I Bahan : 1 karung plastik pasir kayu laut dia 3"

11,304,000.00

Sat

Koef

bh m3 m1

24 0.4 6

Harga sat. (Rp) Jumlah harga (Rp) 5,000.00 80,000.00 16,500.00 Jumlah

120,000.00 32,000.00 99,000.00 251,000.00

II Alat : 1 alat bantu langsir pasir

ls

1.000

3,500.00 Jumlah

3,500.00 3,500.00

III 1 2 4

hr hr hr

0.663 0.100 0.0181

55,000.00 75,000.00 65,000.00 Jumlah

36,465.00 7,500.00 1,176.50 45,141.50

Upah : pekerja tukang mandor

Total

299,641.50

Daftar harga bahan upah dan alat Pekerjaan Perkerasan Lapangan Penumpukan Eks Kantin dan Kantor Operator Perusahaan Pelayaran Belawan International Container Terminal No I

Uraian

Sat

Harga (Rp.)

Bahan 1 Beton Ready mix K 300

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Beton Ready mix K 225 Semen 40 kg Pasir pasang Cat thermoplastic Tinner Glass bead drop on Kerikil Base coarse klass B Base coarse klass A Coneblock K 450 t = 10 cm Batu bata Besi beton Kawat beton RCP dia. 60 cm Paku Plywood 9 mm Kayu bekisting Kayu laut dia. 4" Batu Kali

II 1 2 3 4

Upah Pekerja Tukang Kepala tukang Mandor

III 1 2 3 4 5 6 7 8 9

Alat Vibrator Motor grader Vibro roller Excavator Molen Bar bender Bar cutter Dump truck Pompa Submersible

3

781,250.00

3

716,000.00 48,000.00 80,000.00 25,500.00 20,915.00 30,000.00 116,000.00 330,000.00 370,000.00 4,500.00 850.00 9,375.00 14,500.00 760,500.00 11,600.00 155,000.00 5,075,000.00 16,500.00 250,000.00

hr hr hr hr

55,000.00 75,000.00 80,000.00 65,000.00

hr jam jam jam hr jam jam jam hr

150,000.00 225,000.00 250,000.00 475,000.00 125,000.00 15,000.00 15,000.00 125,000.00 200,000.00

m

m zak 3 m kg ltr kg m3 m3 m3 bh bh kg kg m' kg lbr m3 m' m3

Ket

339,476.11 1 Jenis lapangan/spesifikasi

Jalur TT beton bertulang, lapangan penumpukan coneblock, perletakan container dicat

2 2 Luas (m )

7,763.80

3 Biaya investasi (Rp)

2,635,625,000.00 757,125,000.00

4 Estimasi biaya perawatan: Tahun 1 Tahun 2 Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8 Tahun 9 Tahun 10

0.00 0.00 22,000,000.00 0.00 100,000,000.00 22,000,000.00 0.00 0.00 22,000,000.00 100,000,000.00 266,000,000.00 Jumlah

1,023,125,000.00 934,125,000.00

3360813537 Jalur TT beton bertulang, lapangan penumpukan gravel, perletakan container beton bertulang 7,763.80 1,878,500,000.00 0.00 0.00 0.00 5,000,000.00 0.00 37,000,000.00 5,000,000.00 0.00 0.00 5,000,000.00 37,000,000.00 89,000,000.00 89,000,000.00

No

Jenis lapangan/spesifikasi

Luas m2

Biaya investasi (Rp)

1

2

3

Estimasi biaya perawatan 5 6

4

1 Jalur TT beton bertulang, lapangan penumpukan coneblock, perletakan container dicat

7763.801

2,058,500,000.00

0.00

0.00

22,000,000.00

0.00

2 Jalur TT beton bertulang, lapangan penumpukan gravel, perletakan container beton bertulang

7763.801

1,634,000,000.00

0.00

0.00

5,000,000.00

0.00

100,000,000.00 22,000,000.00

37,000,000.00

5,000,000.00

7

8

9

0.00

0.00 22,000,000.00

0.00

0.00

5,000,000.00

10 100,000,000.00

37,000,000.00

Related Documents

Rab Talud Batu Kali
February 2021 1
Rab Talud & Jalan
February 2021 1
Informe-talud
March 2021 0
Babad Batu
February 2021 0
Rab Pkrs
January 2021 2
Rab Jalan.docx
March 2021 0

More Documents from "Pramana Hadi Bajuz"

Rab Talud Batu Kali
February 2021 1
Market Maker Traps (4)
January 2021 1
Jurnal Proyek Akhir
February 2021 0
Buku Quantum Ikhlas-libre
January 2021 1
Bab I Pendahuluan
February 2021 2