RAPID PROJECT PACKAGE 3

EQUIPMENT (ALL ITEMS)

TR PROJECT NO. 02260

SUB SUPPLIER IDENTIFICATION

PURCHASE ORDER NUMBER : 0226004220 REVIEW RESPONSE BY PURCHASER:

Purchaser review and comments do not indicate either responsibility or liability for accuracy and completeness of this document or alter any contractual terms and conditions: Rejected

Comment As Noted

Reviewed With Comments

Reviewed Without Comments

Reviewed As built

VOID

For Information

DATE: 07-Apr-16

DOCUMENT DATA VENDOR IDENTIFICATION: KOREA HEAT EXCHANGER IND. CO., LTD

DOCUMENT TITLE: ERECTION PROCEDURE

VENDOR DOCUMENT NO.: K1513-PRC-0012

REV: B

CODE: PRC-0002

PURCHASER DOCUMENT NO.: V-02260-1120-E-008-0041

REV: B

CLASS: O

OWNER DOCUMENT NO.: RAPID-P0003-1032-PMG-PRC-0001-0015

REV: 1

DOCUMENT NUMBER Project RAPID

Package P0003

Originator 1032

V-02260-1120-E-008-0041 -B Discipline PMG

Doc. Type PRC

Unit nº 0001

Serial nº 0015

Rev

Page

1

01 / 25

PETRONAS RAPID PROJECT (PACKAGE 3)

ERECTION PROCEDURE

OWNER approval: Name: Date (DD-MMM-YY): Signature:

Document Class: O Pages modified under this revision:

B

21-Mar-16

IFR – Issued for Review

J.R.LEE

Y.O.LEE

A

21-Dec-15

IFR – Issued for Review

J.R.LEE

Y.O.LEE

M.G.HA

REV.

DATE DD-MMM-YY

WRITTEN BY

CHECKED BY

(name & signature)

(name & signature)

APPROVED BY (name & signature)

STATUS-REVISION MEMO

Sections changed in last revision are identified by a vertical line in the right margin. Electronic Filename: RAPID-P0003-1032-PMG-PRC-0001-0015_1.pdf

M.G.HA

INDEX 1. INSTALLATION MANUAL FOR AIR COOLED HEAT EXCHANGER (POLY 5 PROJECT – FORCED DRAFT TYPE) STEP-1 : Install the top beam STEP-2 : Install the horizontal brace STEP-3 : Install the column STEP-4 : Install the post bar STEP-5 : Install the middle beam STEP-6 : Install the chamber & fan-ring to top beam STEP-7 : Install the machinery mount STEP-8 : Install the horizontal brace STEP-9 : Install the motor base & bearing mount STEP-10 : Install the fan guard STEP-11 : Install the vertical brace STEP-12 : Turn over the bay STEP-13 : Assembly the fan & motor STEP-14 : Install the top beam STEP-15 : Install the platform support & brace STEP-16 : Install the platform frame to platform support STEP-17 : Install the grating to platform frame STEP-18 : Install the handrail & ladder STEP-19 : Install the tube bundle on this steel structure

1) Install the top beam.

Top beam

Top beam

2) Install the horizontal brace.

Horizontal brace

3) Install the column.

Column

4) Install the post bar.

Post bar

5) Install the middle beam.

Middle beam

6) Install the chamber & fan-ring to top beam.

Fan ring

Chamber

7) Install the machinery mount.

Machinery mount

8) Install the horizontal brace.

Horizontal brace

9) Install the motor base & bearing mount.

Motor base & bearing mount

10) Install the fan guard.

Fan guard

11) Install the vertical brace.

Vertical brace

Vertical brace

12) Turn over the bay.

PAGE 24 OF 38

PAGE 15 OF 33

13) Assembly the fan & motor.

(Refer to IOM manual)

14) Install the top beam.

Top beam

15) Install the platform support & brace.

Platform support

Platform brace

16) Install the platform frame to platform support.

Platform frame

17) Install the grating to platform frame.

Grating

18) Install the handrail & ladder.

Handrail

Ladder

19) Install the tube bundle on this steel structure.

Tube Bundle

Related Documents

Rapid Project Package 3
January 2021 2
Rapid Wealth
January 2021 1
Sop Rapid
January 2021 1
Rapid Escalation
January 2021 1
Torts Project Sem 3
March 2021 0
Project 3 Ee087732
January 2021 1

More Documents from "Mei Qii"