RAPID PROJECT PACKAGE 3
EQUIPMENT (ALL ITEMS)
TR PROJECT NO. 02260
SUB SUPPLIER IDENTIFICATION
PURCHASE ORDER NUMBER : 0226004220 REVIEW RESPONSE BY PURCHASER:
Purchaser review and comments do not indicate either responsibility or liability for accuracy and completeness of this document or alter any contractual terms and conditions: Rejected
Comment As Noted
Reviewed With Comments
Reviewed Without Comments
Reviewed As built
VOID
For Information
DATE: 07-Apr-16
DOCUMENT DATA VENDOR IDENTIFICATION: KOREA HEAT EXCHANGER IND. CO., LTD
DOCUMENT TITLE: ERECTION PROCEDURE
VENDOR DOCUMENT NO.: K1513-PRC-0012
REV: B
CODE: PRC-0002
PURCHASER DOCUMENT NO.: V-02260-1120-E-008-0041
REV: B
CLASS: O
OWNER DOCUMENT NO.: RAPID-P0003-1032-PMG-PRC-0001-0015
REV: 1
DOCUMENT NUMBER Project RAPID
Package P0003
Originator 1032
V-02260-1120-E-008-0041 -B Discipline PMG
Doc. Type PRC
Unit nº 0001
Serial nº 0015
Rev
Page
1
01 / 25
PETRONAS RAPID PROJECT (PACKAGE 3)
ERECTION PROCEDURE
OWNER approval: Name: Date (DD-MMM-YY): Signature:
Document Class: O Pages modified under this revision:
B
21-Mar-16
IFR – Issued for Review
J.R.LEE
Y.O.LEE
A
21-Dec-15
IFR – Issued for Review
J.R.LEE
Y.O.LEE
M.G.HA
REV.
DATE DD-MMM-YY
WRITTEN BY
CHECKED BY
(name & signature)
(name & signature)
APPROVED BY (name & signature)
STATUS-REVISION MEMO
Sections changed in last revision are identified by a vertical line in the right margin. Electronic Filename: RAPID-P0003-1032-PMG-PRC-0001-0015_1.pdf
M.G.HA
INDEX 1. INSTALLATION MANUAL FOR AIR COOLED HEAT EXCHANGER (POLY 5 PROJECT – FORCED DRAFT TYPE) STEP-1 : Install the top beam STEP-2 : Install the horizontal brace STEP-3 : Install the column STEP-4 : Install the post bar STEP-5 : Install the middle beam STEP-6 : Install the chamber & fan-ring to top beam STEP-7 : Install the machinery mount STEP-8 : Install the horizontal brace STEP-9 : Install the motor base & bearing mount STEP-10 : Install the fan guard STEP-11 : Install the vertical brace STEP-12 : Turn over the bay STEP-13 : Assembly the fan & motor STEP-14 : Install the top beam STEP-15 : Install the platform support & brace STEP-16 : Install the platform frame to platform support STEP-17 : Install the grating to platform frame STEP-18 : Install the handrail & ladder STEP-19 : Install the tube bundle on this steel structure
1) Install the top beam.
Top beam
Top beam
2) Install the horizontal brace.
Horizontal brace
3) Install the column.
Column
4) Install the post bar.
Post bar
5) Install the middle beam.
Middle beam
6) Install the chamber & fan-ring to top beam.
Fan ring
Chamber
7) Install the machinery mount.
Machinery mount
8) Install the horizontal brace.
Horizontal brace
9) Install the motor base & bearing mount.
Motor base & bearing mount
10) Install the fan guard.
Fan guard
11) Install the vertical brace.
Vertical brace
Vertical brace
12) Turn over the bay.
PAGE 24 OF 38
PAGE 15 OF 33
13) Assembly the fan & motor.
(Refer to IOM manual)
14) Install the top beam.
Top beam
15) Install the platform support & brace.
Platform support
Platform brace
16) Install the platform frame to platform support.
Platform frame
17) Install the grating to platform frame.
Grating
18) Install the handrail & ladder.
Handrail
Ladder
19) Install the tube bundle on this steel structure.
Tube Bundle