PROF. ISWANDI IMRAN, PHD.

REVIEW PERHITUNGAN STRUKTUR JEMBATAN KALI ANGKE PT. Jaya Konstruksi MP, Tbk

A

REV

FIRST ISSUE

DESCRIPTION

17-01-14

DATE

Elin A.

Iswandi Imran

Iswandi Imran

PREPARED

CHECKED

APPROVED

Akmal S.

CLIENT APPROVED

REVIEW PERHITUNGAN STRUKTUR 2014

DAFTAR ISI

I.

PENDAHULUAN................................................................................................................... 4

II.

ANALISA STRUKTUR RAMP PILE SLAB KALI ANGKE ............................................................ 6 2.1.

PROPERTIES MATERIAL ............................................................................................... 6

2.2.

PERATURAN YANG DIGUNAKAN ................................................................................. 6

2.3.

PEMBEBANAN ............................................................................................................. 6

2.3.1.

Berat Sendiri......................................................................................................... 6

2.3.2.

Beban Lalu Lintas ................................................................................................. 8

2.3.3.

Beban Gempa..................................................................................................... 12

2.3.4.

Faktor Beban ...................................................................................................... 13

2.3.5.

Kombinasi Pembebanan .................................................................................... 13

2.4.

ANALISA STRUKTUR................................................................................................... 15

2.4.1.

Hasil Analisa Struktur dengan Program ETABS .................................................. 15

2.4.2.

Cek Kapasitas Pelat ............................................................................................ 21

2.4.3.

Cek Kapasitas Pier Head ..................................................................................... 24

2.4.4.

Cek Kapasitas Pile............................................................................................... 25

III.

KESIMPULAN ................................................................................................................. 26

3.1.

KAPASITAS PELAT ...................................................................................................... 26

3.2.

KAPASITAS PIER HEAD ............................................................................................... 26

3.3.

KAPASITAS PILE.......................................................................................................... 26

1

REVIEW PERHITUNGAN STRUKTUR 2014 DAFTAR GAMBAR Gambar I-1 Tampak Atas Jembatan Kali Angke ...................................................................................... 4 Gambar I-2 Potongan Melitang Struktur Jembatan................................................................................ 5 Gambar I-3 Potongan Memanjang Struktur Jembatan........................................................................... 5 Gambar II-1 Tabel faktor beban untuk berat sendiri (RSNI T-02-2005) .................................................. 6 Gambar II-2 Beban Aspal ........................................................................................................................ 7 Gambar II-3 Beban railing ....................................................................................................................... 7 Gambar II-4 Beban Terbagi Rata ............................................................................................................. 8 Gambar II-5 Beban Garis 1 ...................................................................................................................... 9 Gambar II-6 Beban Garis 2 ...................................................................................................................... 9 Gambar II-7 Beban Truk ........................................................................................................................ 10 Gambar II-8 Beban Truk 1 ..................................................................................................................... 10 Gambar II-9 beban Truk 2 ..................................................................................................................... 11 Gambar II-10 Spektral desain kota Jakarta ........................................................................................... 12 Gambar II-11 Hasil program respon spektra kota Jakarta .................................................................... 12 Gambar II-12 Moment11 comb1 .......................................................................................................... 15 Gambar II-13 Moment22 comb1 .......................................................................................................... 15 Gambar II-14 Moment11 comb2 .......................................................................................................... 16 Gambar II-15 Moment22 comb2 (M22 max 12,7 t-m) ......................................................................... 16 Gambar II-16 Moment11 comb3 .......................................................................................................... 17 Gambar II-17 Moment22 comb3 .......................................................................................................... 17 Gambar II-18 Moment11 comb4 .......................................................................................................... 18 Gambar II-19 Moment22 comb4 .......................................................................................................... 18 Gambar II-20Moment33 pier head comb.envelope (max M33 = 10,9 t-m) ......................................... 19 Gambar II-21 Moment22 pile comb.envelope (max M22 = 24,6 t-m).................................................. 19

2

REVIEW PERHITUNGAN STRUKTUR 2014 DAFTAR TABEL Tabel II-1 Faktor Beban ......................................................................................................................... 13 Tabel II-2 Kombinasi pembebanan ....................................................................................................... 13 Tabel III-1 Kapasitas Pelat ..................................................................................................................... 26 Tabel III-2 Kapasitas Pier Head .............................................................................................................. 26 Tabel III-3Kapasitas Pile ........................................................................................................................ 26

3

REVIEW PERHITUNGAN STRUKTUR 2014 I. PENDAHULUAN

Project Ramp Pile Slab Kali Angke pada pembangunan Jalan Tol ruas lingkar luar Jakarta (JORR) W2 Utara Seksi II (Joglo – Ulujami) yang dilaksanakan oleh PT. Jaya Konstruksi MP, Tbk selaku Kontraktor, pada perencanaan awalnya diberikan pembebanan material hot mix setebal 5 cm. Sejalan dengan pelaksanaan di lapangan terjadi penyimpanan elevasi yang memerlukan review alinyemen vertical sehingga menyebabkan pembebanan material hot mix bervariasi setebal 5 – 20 cm. Pengecekan struktur terhadap beban gravitasi dan beban secara keseluruhan dalam hal ini perlu dilakukan untuk mengetahui terpenuhi atau tidaknya keamanan struktur.

Gambar I-1 Tampak Atas Jembatan Kali Angke

4

REVIEW PERHITUNGAN STRUKTUR 2014

Gambar I-2 Potongan Melitang Struktur Jembatan

Gambar I-3 Potongan Memanjang Struktur Jembatan

Pengecekan struktur Jembatan dilakukan dalam dua tahan. Tahap pertama yaitu pengecekan kecukupan kapasitas momen pelat terhadap beban gravitasi (termasuk berat sendiri, beban aspal dan beban lalu-lintas) dan tahap kedua yaitu pengecekan kapasitas struktur jembatan secara keseluruhan.

5

REVIEW PERHITUNGAN STRUKTUR 2014 II. ANALISA STRUKTUR RAMP PILE SLAB KALI ANGKE 2.1.

PROPERTIES MATERIAL Jembatan dibangun dengan menggunakan beton precast dan spunpile diameter 60

sebagai pondasi. Mutu beton yang digunakan masing-masing adalah: -

Tiang pancang

K-500

slump 7.5 – 10 cm

-

Dinding

K-350

slump 10 – 12 cm

-

Pelat jembatan

K-350

slump 10 – 12 cm

-

Rigid Pavement

K-350

slump 10 – 12 cm

Tulangan baja yang digunakan sesuai dengan ketentuan PBI 1971 dan SK-SNI 1991 -

Untuk diameter 8 mm dan 10 mm digunakan BJTP 24

-

Untuk diameter 13 mm ke atas digunakan BJTD 40

2.2.

PERATURAN YANG DIGUNAKAN 1) RSNI T-02-2005 Pembebanan untuk Jembatan 2) RSNI2 2833:201x Perencanaan Ketahanan Gempa untuk Jembatan 3) RSNI T-12-2004 Peraturan Struktur Beton untuk Jembatan

2.3.

PEMBEBANAN

2.3.1. Berat Sendiri

Gambar II-1 Tabel faktor beban untuk berat sendiri (RSNI T-02-2005) Aspal

=

22 kN/m³

Beban aspal tebal 20 + 5 cm =

5,5 kN/m²

6

REVIEW PERHITUNGAN STRUKTUR 2014

Gambar II-2 Beban Aspal Beban railing : Area (A) = 0.417 m² Beban railing = 10,425 kN/m

Gambar II-3 Beban railing 7

REVIEW PERHITUNGAN STRUKTUR 2014 2.3.2. Beban Lalu Lintas a)

Beban Lajur “D” beban tersebar merata (BTR) 𝐿 > 30 𝑚 ∶ 𝑞 = 9,0 (0,5 +

15 ) 𝑘𝑃𝑎 𝐿

L = 40,8 m q = 7,8 kPa = 780 kg/m² -----------------> dibulatkan 800 kg/m²

Gambar II-4 Beban Terbagi Rata

8

REVIEW PERHITUNGAN STRUKTUR 2014 beban garis (BGT) p = 49 kN/m

Gambar II-5 Beban Garis 1

Gambar II-6 Beban Garis 2

9

REVIEW PERHITUNGAN STRUKTUR 2014 b)

Beban Truk “T”

Gambar II-7 Beban Truk Terlepas dari panjang jembatan atau susunan bentang, hanya ada satu kendaraan truk "T" yang bisa ditempatkan pada satu lajur lalu lintas rencana.

Gambar II-8 Beban Truk 1 10

REVIEW PERHITUNGAN STRUKTUR 2014

Gambar II-9 beban Truk 2

c)

Gaya Rem Gaya rem ditinjau untuk kedua jurusan lalu lintas dengan nilai sebesar 5% dari beban lajur D yang dianggap ada pada semua jalur lalu lintas. Gaya rem tersebut dianggap bekerja horisontal dalam arah sumbu jembatan dengan titik tangkap setinggi 1,8 m di atas permukaan lantai kendaraan. Beban lajur D tidak direduksi bila panjang bentang melebihi 30 m. q

= 9 kPa

F (m²) = 5/100 x q = 45 kg/m² A

= 4 m x 5 m = 20 m²

F

= 900 kg

11

REVIEW PERHITUNGAN STRUKTUR 2014 2.3.3. Beban Gempa

Gambar II-10 Spektral desain kota Jakarta

Gambar II-11 Hasil program respon spektra kota Jakarta

12

REVIEW PERHITUNGAN STRUKTUR 2014 2.3.4. Faktor Beban

Tabel II-1 Faktor Beban 2.3.5. Kombinasi Pembebanan

Tabel II-2 Kombinasi pembebanan 13

REVIEW PERHITUNGAN STRUKTUR 2014 Kombinasi pada kondisi ultimate 1) 1,2 (BS+railing) + 2 SDL (aspal) + 1 D1 + 1 Rem 2) 1,2 (BS+railing) + 2 SDL (aspal) + 1 D2 + 1 Rem 3) 1,2 (BS+railing) + 2 SDL (aspal) + 1 T1 + 1 REM 4) 1,2 (BS+railing) + 2 SDL (aspal) + 1 T2 + 1 Rem 5) 1,2 (BS+railing) + 2 SDL (aspal) + EQ-X 6) 1,2 (BS+railing) + 2 SDL (aspal) + EQ-Y

14

REVIEW PERHITUNGAN STRUKTUR 2014 2.4.

ANALISA STRUKTUR

2.4.1. Hasil Analisa Struktur dengan Program ETABS a)

Gaya-gaya Dalam pada Pelat

Gambar II-12 Moment11 comb1

Gambar II-13 Moment22 comb1 15

REVIEW PERHITUNGAN STRUKTUR 2014

Gambar II-14 Moment11 comb2

Gambar II-15 Moment22 comb2 (M22 max 12,7 t-m)

16

REVIEW PERHITUNGAN STRUKTUR 2014

Gambar II-16 Moment11 comb3

Gambar II-17 Moment22 comb3

17

REVIEW PERHITUNGAN STRUKTUR 2014

Gambar II-18 Moment11 comb4

Gambar II-19 Moment22 comb4

18

REVIEW PERHITUNGAN STRUKTUR 2014 b)

Gaya-gaya Dalam pada Pier Head dan Pile

Gambar II-20Moment33 pier head comb.envelope (max M33 = 10,9 t-m)

Gambar II-21 Moment22 pile comb.envelope (max M22 = 24,6 t-m)

19

REVIEW PERHITUNGAN STRUKTUR 2014 c)

Resume Gaya-gaya Dalam Maksimum 





Pelat Mtump

= 12,7 ton-m

Mlap

= 12,29 ton-m

Pear Head M22

= 3,54 ton-m

M33

= 10,9 ton-m

Pile Axial

= 85,6 ton

M22

= 24,6 ton-m

M33

= 1,9 ton-m

20

REVIEW PERHITUNGAN STRUKTUR 2014 2.4.2. Cek Kapasitas Pelat 1. Data pelat : Lebar pelat

b := 120cm

Tinggi pelat

h := 35cm

dc := 5cm d := h - dc - 6mm

d = 29.4  cm

Tulangan Tumpuan : d1 := 16mm

s1 := 125mm

2 π

As1 := d1 



b

4 s1

2

As1 = 19.302  cm

ρ1 :=

As1

ρ2 :=

As2

bd

ρ1 = 0.547  %

Tulangan Lapangan : d2 := 16mm

s2 := 100mm

2 π

As2 := d2 



b

4 s2

2

As2 = 24.127  cm

bd

ρ2 = 0.684  %

2. Data material : Kuat tekan beton

fc := 318.1515

kgf 2

cm Modulus elastisitas beton

Ec := 219499.64

kgf 2

cm Kuat leleh tulangan

kgf

fy := 4000

2

cm Modulus elastisitas baja

Es := 2038902

kgf 2

cm 3. Analisa tulangan lentur pelat : Tumpuan : asumsi tulangan tarik leleh As1  fy a1 := a1 = 2.379  cm 0.85  fc  b Momen desain (Mu = r Mn) : a1   Mu1 := ρ  As1  fy   d  2  

ρ := 0.8

check Asumsi tulangan tarik leleh : β1 :=

Mu1 = 1742450.59  kgf  cm fc = 31.2  MPa

0.85 if fc  30  MPa 0.65 if fc  55  MPa

  fc  - 30 if 30  MPa < fc  55  MPa 0.85 - 0.008   MPa    β1 = 0.84

21

REVIEW PERHITUNGAN STRUKTUR 2014 β1  d - a1

εs := 0.003 

εs = 0.028

a1

εs = 0.028

fy

>

Es

fs :=

εs 

fy if

= 0.002 Note = " Tulangan Leleh"

fy Es

( εs  Es) otherwise ρb :=

0.85  fc  β1 fs



0.003  Es ρb = 0.034

0.003  Es + fs

Check tulangan minimum :

ρmin := 0.18%

Check tulangan maksimum :

ρmax := 0.75  ρb

ρmax = 2.576  %

Note = "Tulangan Underreinforced,OK" Lapangan : asumsi tulangan tarik leleh As2  fy a2 := a2 = 2.974  cm 0.85  fc  b Momen desain (Mu = r Mn) : a2   Mu2 := ϕ  As2  fy   d  2  

ϕ := 0.8 Mu2 = 2155101.86  kgf  cm

check Asumsi tulangan tarik leleh : εs := 0.003 

β1  d - a1

εs = 0.028

a1

fy

>

Es

fc = 31.2  MPa

εs = 0.028 = 0.002 Note = " Tulangan Leleh"

fs :=

fy if

εs 

fy Es

( εs  Es) otherwise

ρb :=

0.85  fc  β1 fs



0.003  Es ρb = 0.034

0.003  Es + fs

Check tulangan minimum :

ρmin := 0.18%

Check tulangan maksimum :

ρmax := 0.75  ρb

ρmax = 2.576  %

Note = "Tulangan Underreinforced,OK"

22

REVIEW PERHITUNGAN STRUKTUR 2014 Mutumpuan := 1271600kgf  cm Pengecekan kapasitas lentur Note :=

"OK"

if Mutumpuan  Mu1

"Not OK" otherwise Note = "OK" Mulapangan := 1229500kgf  cm Pengecekan kapasitas lentur Note :=

"OK"

if Mulapangan  Mu2

"Not OK" otherwise Note = "OK"

23

REVIEW PERHITUNGAN STRUKTUR 2014 CEK Kapasitas KAPASITAS PIER HEAD 2.4.3. Cek Pier Head h b d h eff fc' fy

= = = = = =

75 120 6 69 310 4000

cm cm cm cm kg/cm² kg/cm²

coba digunakan tulangan lentur 5D19 tulangan geser (sengkang) D10

D 19 D 10

Cek lentur terhadap M33

terhadap M22

2D19 5D19 Mu33 h gaya As long Atot T

= = = = =

Mn φ φMn

= = =

10,9 49,5 2,836429 14,18214 56728,57 56,72857 28,08064 0,8 22,46451

tm cm cm² kg ton ton.m ton.m

OK

φMn > Mu

Mu22 h gaya As long As tot T

= = = = =

Mn φ φMn

= = =

φMn > Mu

3,54 114 2,836429 5,672857 22691,43 22,69143 25,86823 0,8 20,69458

tm cm cm² kg ton ton.m ton.m

OK

Cek Geser dan torsi Tu Vu

= =

cek geser beton σgeser = = = cek torsi Tu = J = c = τ = =

23,3886 tm 15,497 t

3 Vu/(2bd) 322,8542 t/m² 3,228542 Mpa -23,3886 0,031 0,375 T. c/J 282,9266 2,829266

tm m⁴ m⁴ t/m² Mpa

tegangan akibat geser dan torsi pada beton σ total = 6,057808 Mpa σ tarik beton =

17,60682 kg/cm² 1,760682 Mpa

24

REVIEW PERHITUNGAN STRUKTUR 2014 dibutuhkan tulangan geser dan torsi (sengkang) σ total = 6,057808 Mpa = 6057,808 kN/m² σ total/1m = 6057,808 kN/m digunakan sengkang D10-125 tinggi balok = 750 mm F tul perlu = 4543,356 kN gunakan D10-100 n/ 1m fy As Fn

= 8 buah = 400 Mpa = 78,57143 mm² = 8 As fy = 251428,6 N = 251,4286 kN jumlah kaki yang dibutuhkan tiap m n kaki/m = 18,07017 n kaki

= ≈

OK

2,258771 kaki 4 kaki

CEKKapasitas KAPASITAS PILE KAPASITAS 2.4.4. CEK Cek Pile PILE PuPu Pall Pall

= = = =

Mu Mu

= =

93,5 93,5 ton-mton-m

Mvertical = Mvertical = Mcr =

9,4 ton-m 9,4 ton-m 20 ton-m

Mcr

-85,605 ton ton -85,605 132,2 ton ton 132,2

=

20 ton-m

Mcr > M vert

Mcr > M vert

Mu Mu Mn

Mn

= = =

OK

OK

27 ton-m 30 24,6 ton-mton-m

= Mn > Mu

Mn > Mu

30OK ton-m

OK

Kapasitas pile mencukupi untuk menahan beban

Kapasitas pile mencukupi untuk menahan beban

25

REVIEW PERHITUNGAN STRUKTUR 2014 III. KESIMPULAN Berdasarkan pengecekan struktur yang telah dilakukan dapat disimpulkan bahwa sistem struktur pile slab yang ditinjau masih memiliki tingkat faktor keamanan yang memadai untuk menahan tambahan beban gravitasi yang berasal dari beban aspal setebal 25 cm (yang melebihi ketebalan aspal rencana).

3.1. KAPASITAS PELAT Elemen Pelat

125

Mu (Kgf.cm) 1271600

Mn (Kgf.cm) 1742450.6

100

1229500

2155101.9

Letak Tulangan

B (mm)

H (mm)

D (mm)

Jarak (mm)

Tumpuan

1200

350

16

Lapangan

1200

350

16

Cek OK OK

Tabel III-1 Kapasitas Pelat 3.2. KAPASITAS PIER HEAD Type M33 M22

B (mm) 1200 1200

H (mm) 750 750

Mu (t-m) 10,9 3,54

Mn (t-m) 22,46 20,69

Cek OK OK

Tabel III-2 Kapasitas Pier Head 3.3. KAPASITAS PILE Axial

Moment

Pu Pn Mserv Mcr Mult Mn

ton ton ton-m ton-m ton-m ton-m

85,6 132 9,4 20 27 30

OK OK OK

Tabel III-3Kapasitas Pile

Bandung, 17 January 2014

(Prof. Ir. Iswandi Imran, PhD., IPU-HAKI) 26