Resume

  • Uploaded by: Dhruv Tamrakar
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Resume as PDF for free.

More details

  • Words: 1,718
  • Pages: 6
Loading documents preview...
SAP Functional Consultant

DHRUVA TAMRAKAR SAP MM Consultant Mobile: 09871309493, 09406622052 Email : [email protected],[email protected]

OBJECTIVE Seeking assignments in SAP Functional Consultancy in MM Module as well as other Modules with a technology driven organization of repute. Key Points of Profile  Certified SAP MM Consultant (ECC 6.0, EHP 4) secured 80% from Siemens (Atos Origin), New Delhi.  CERTICATE ID: 0008069815.  Well versed with SAP PS (project system).  Domain Functional Experience in Electric Utilization Company (M/S Eltel Engineers Pvt. Ltd.)  Good Professional Qualification: Full time B.E. (Electrical and Electronics Engg.) and full time M.B.A. (Operation and Marketing Mgmt.)

Year

Course

2009-2011

Full TimeMBA

2004-2008 2003

Full TimeB.E. 12th

2001

10th

EDUCATIONAL PROFILE Extreme/Branch University/Board Operation & Marketing Management

DAVV Indore

College/school

VaishnavSM Institute of Management, Indore Electrical & R.G.P.V. Bhopal IES IPS Electronics Engg. Academy, Indore PCM MP Board Bhopal G.H.S Unchehra, Satna Common Subject MP Board Bhopal S.H.S Unchehra, Satna SAP Experience Summary

Percentag e 60%

66% 72% 69%

 Working at Vital Wires Consulting Pvt. Ltd., Gurgaon, as a SAP MM Consultant 2/3. (From Feb 2011 to presently working) 1.2 year in SAP MM alone with SAP PS.  SAP MM Trainee Experience in Siemens Information System Ltd. (from NOV’10-Dec’10) for 1 months including SAP MM Certification completion.  SAP MM Trainee Experience in Birla Corporation Ltd. Cement Division, SATNA (M.P.) (Jun’ 2010 – July’ 2010) for one month.  M/S Eltel Engineers Pvt. Ltd. - 2 yrs exp. as Dy. Project Manager Electric Utilization Company.  Total exp. is 3.4 years (1.4 years exp. in SAP MM alone with SAP PS till now and 2 years domain exp.)

Page 1 of 6

SAP Functional Consultant

SAP Professional Projects

1. MultiColor Steel India Pvt. Ltd.,Delhi Roll: SAP MM Consultant Duration: Jan’2012- Presently Working Project: Up gradation for ECC 6.00 EHP 4 and End to End CIN Implementation Client: Multicolor Steels, since 1994, has been a pioneer leader in India in the field of Metal roofing and wall systems. Having installed over 7 million square meters of metal roofing systems in over 500 projects all over India, now offers complete range of products & services for Steel construction including Pre-Engineered Steel Buildings. Project Preparation Phase: Business Information Gathering- Set-up Project Infrastructure, Identification of Project Manager, Steering Committee, Process Owners and Project Sponsor, functional business process, business process improvement requirement, Unit Test of CIN Process in existing system, Identification of Core Team Members, General Requirement, Explanation of function and events, Gap Analysis, As is-process etc. Blue Print Phase: Mapping User’s requirements in the blue print, define the TO BE process in Blue print according to AS IS process, preparation of flow chart of business project for sap system, defining integration between the modules and Gap analysis, test of blueprint from user end, sign off from user end. Realization Phase:Maintaining Excise Registrations, Maintaining Company Code Settings for Taxes, Maintaining Plant Settings for Excise Information, Maintaining Excise Groups, Maintaining Series Groups, Maintaining Excise Duty Indicators, Selecting Tax Calculation Procedure, Defining Tax Codes for Purchasing Documents, Assignment of Tax Code to Company Codes, Classifying Condition Types. Account Determination-Defining GL Accounts for Taxes, Specifying Excise Accounts per Excise Transactions, Specifying G/L Accounts to Excise Transaction Types. Utilization Determination- Excise Registers- SAP Script Forms, Number Range, Master Data for Excise – J1ID. Testing of end to end process in system, testing of integration with other modules, giving training to use standard report related to SAP MM module and SAP CIN module. Project preparation: Training to end users about CIN process, capturing the incoming excise, updating the Register (RG23A, RG23C, RG23D and RG1), Extraction the data into register, printing the register data.

2. Multicolor Steel India Pvt. Ltd., Delhi Roll: SAP PS Consultant. Duration: Jan’2012- presently working Project: PS End to End Implementation Client: Multicolor Steels Pvt. Ltd.

Page 2 of 6

SAP Functional Consultant Project Preparation Phase: Business Information Gathering- Set-up Project Infrastructure, Identification of objectives for implementation for each process area, functional business process, business process improvement requirement, Process linkage and Integration, AS IS-process etc. Blue Print Phase: Mapping User’s requirements in the blue print, define the TO BE process in Blue print, preparation of flow chart of business project for sap system, defining integration between the modules and Gap analysis, test of blueprint from user end.

3. PICL India Pvt. Ltd. Roll: SAP MM Consultant Project: Support Tax code and new tax rates maintenance (Tax Procedure Maintenance)

4. Pioneer/Urban Pvt. Ltd. for SAP PS as well as SAP MM: Key Roll: SAP Project System with SAP MM Functional Consultant Duration: July 2011- Dec 2011 Project: Implementation Final Preparation Phase and Go-live Phase. Client: Pioneer/Urban Eco Infra Pvt. Ltd.: Pioneer Urban Land and Infrastructure Ltd., a leading Indian conglomerate, has been engaged in the development of real estate for the last two decades in Gurgaon. The company has made a distinct place for itself in the development of mini-townships and mega group housing projects.

Final Preparation:  Unit testing of all SAP PS business process as well as SAP MM business process.  Testing of Standard Report for Project Structure, Costing, Budgeting, Confirmation, Milestone, Scheduling etc.  SAP PS user manuals.  SAP Project Procurement User Manuals.  Testing of SAP PS Integration with MM, SD, and PP.  Z Development-reports SAP User Manuals.  Master Data Upload by LSMW and testing of master data  Service, Purchase Order, and Upload testing.

Go-Live Phase: SAP user training to End Users. SAP PS and SAP MM Support to End Users. Good Relation with Client during Go Live phase. Template of Input data related to Master Data- Material Master, Vendor Master, Service Master, Asset Master and Transaction Data- PR, PO, GR, GI, TP.  Daily Report Delivery for Purchasing, budgeting, and Inventory.    

Client: Pioneer Urban Pvt. Ltd. Project: Support L2: (Nov’2011-Dec’2012)  SAP PS- Configure WBS, Network and Activities,

Page 3 of 6

SAP Functional Consultant     

Maintain Relationship between activities (Service) of Urban Eco project. Project Version Setting. Posting Period Change from PS side Project Progress report in daily bases. Material Master Creation, Vendor Master Creation, Service Master Creation.

5. Munjal Showa Ltd:

    

Key Roll: SAP MM Functional Consultant. Duration: March 2011- Oct 2011 Project: Support Client : Munjal Showa Limited in its joint venture with Showa Corporation, designs and manufacturers shock absorbers and struts for leading two-wheelers and four-wheelers. The Munjal Showa manufacturing plant is spread over an area of 24075 sq mt in the industrial area of Gurgaon, Haryana, on the outskirts of the National Capital Territory of Delhi, India. FS and Controlling for ZYPO2 Import procurement report, FS for Report ZMB5B Opening Stock and enhancement in this report later on, Report testing ZRETRO and ZJ1I7 (Excise Report), Vendor Data upload by BDC, Resolving MIRO posting error.

6. Radikal Overseas Pvt. Ltd. for MM module: Key Roll: SAP MM Functional Consultant Duration: Feb’2011- Jun’2011 (i)Project: Implementation Realization Phase Client: Radikal Overseas Pvt. Ltd (hence-forth referred to as “RADIKAL”) manufactures of premium Basmati rice. RADIKAL’s products include traditional Basmati rice and others such as Sugandha, PR1, 1121, PUSA etc. RADIKAL has one technically advanced plant at Garh Mukteshwar,UP.

Go Live Phase:  Training: PR, PO, Goods Receipt, Goods Issue, Transfer Posting to End users according to their area of activity,  Maintain of system smoothness, daily report delivery etc.  SAP User manual of Customize Mandi Module for procurement of gutki rice.

SAP Skills  Procurement Process: Purchase Requisitions / Orders, Request for Quotation, Stock / Consumable Purchases, Subcontracting, External Services and Reporting.  SAP MM Configuration.  MM Pricing, Inventory Management, Account Determination & Split Valuation.  MRP, Consumption Based Planning.  Master Data: Material Master, Vendor Master, Info Records, Source List, Quota Arrangement and Messages.

Page 4 of 6

SAP Functional Consultant  Purchasing Optimization: Contracts, Scheduling Agreements, Invoicing Plans, Release Procedures, Purchasing Document Configuration.  Inventory Management: Goods Receipt / Issue, Stock Transfers, Reservations, Consignment, Physical Inventory.  SAP MM – CIN (Country India Version).  Knowledge of ASAP Methodology of each phase for SAP Implementation.  SAP MM/SAP PS Tables and Fields Knowledge.  Well versed in Reporting for SAP MM and SAP PS.  Understanding business process, study and analyze workflow to design solutions.  SAP MM Integration with SAP FI, SAP PP, and SAP SD.

Other Domain Experience            

Last associated with Eltel Engineer, Satna (M.P.) as Dy. Project Manager – Procurement. Feb’08–Jan’10 Eltel Engineers Pvt. Ltd., Satna Dy. Project Manager Managing production and procurement operations with a view to ensure timely accomplishment of production targets within the time and cost parameters. Directing the development and implementation of key procurement strategies / contingency plans for direct & indirect materials and ensuring that plans are aligned with production / project requirements. 3.15 MVA & 5 MVA Power Transformer substation along with their 33kv/11kv lines. Job of survey, Erection, Installation, and Commissioning of 33kv/11kv. Cost estimation of all materials and make availability to construction site. Procurement of material likewise conductor, poles, insulators, transformers etc. Before storing the material it has to be sent to test. Consistently evaluating vendor performance to ensure adherence to predefined specifications and supply of quality material / execution of job works. Identifying capacity limitations & bottlenecks and process problems, plant upsets reasons for production shortfall for taking corrective action. Practical knowledge of Business Process Analysis and Design, Process Rationalization, costing planning, budgeting planning, Capacity Planning, Performance Measurement and Quality. Functional exposure in handling the procurement & purchase operations with key focus on bottom line profitability by ensuring optimal utilization of resources.

Computer Proficient Operating System Languages Database Miscellaneous

: : : :

Windows 7 and XP, 2000 C & C++. MS access. Internet Applications, CorelDraw and MS office 2003-2007.

Personal Profile Name Father’s Name

: :

Dhruva Tamrakar Shri Panna Lal Tamrakar

Page 5 of 6

SAP Functional Consultant Mother’s Name Postal Address Gender Date of Birth Marital Status Known Languages Achievement Hobby

: : : : : : : :

Smt. Kamla Devi Tamrakar 121 ward no. 6, Unchehra distt. Satna (M.P.)-485661 Male 22.06.1986 Single English, Hindi Best Award in Carom, National Conference Management award. Playing Cricket, Playing Chess, Reading spiritual books.

Page 6 of 6

Related Documents

Resume
January 2021 4
Resume
January 2021 3
Resume
January 2021 4
Resume
January 2021 4
Grh Resume
January 2021 1
Resume Rbd
January 2021 1

More Documents from "Elok Oktaviana Lalypora Bobo"

Resume
January 2021 3
Blackbook Project
February 2021 0
Contact Details
February 2021 2